30 July 2021

SIGNIFICANT MINERALISATION FROM MULTIPLE PROSPECTS AT TARRAJI-YAMPI PROJECT

HIGHLIGHTS

  • RC drilling program (18 RC holes for 3,511m) now completed at the Tarraji-Yampi Project in the West Kimberley region of Western Australia with significant results as follows:

  • 13m of massive to semi-massive sulphides intersected at Orion containing ~5-20% chalcopyrite (copper sulphide);

  • 5m of chalcopyrite-rich quartz veining (~10-30% chalcopyrite) at Grant’s Find;

- Intense potassic-sulphide alteration and quartz veining at Fuso and Paul’s Find, possibly indicative of a gold bearing system and additional magnetic surveys underway as the magnetic anomaly remains unexplained; and

- 2m of massive sulphide at Chianti containing dominant chalcopyrite, sphalerite and galena.

  • Texas diamond drilling has been delayed due to rig breakdown at 55m. Drilling is expected to recommence early August 2021 with initial results mid-August 2021.

  • RC rig to return September 2021 for follow-up drilling with a copper-gold focus on Orion and Grant’s Find. Assays for the program are due in late August 2021.

Dreadnought Resources Limited (“ Dreadnought ”) is pleased to announce that the RC drilling program at Tarraji-Yampi (18 RC holes for 3,511m) has now been completed. The drilling sequence was Chianti, Fuso, Paul’s Find, Grant’s Find and Orion. The program successfully intersected significant mineralisation and/or alteration across multiple targets.

In total, 18 RC holes for 3,511m have been completed resulting in several significant intercepts including thick chalcopyrite rich massive and semi-massive sulphides in the first hole ever drilled into Orion. RC drilling has demobilised as planned and will recommence in September 2021 with a particular focus on Orion and Grant’s Find.

Dreadnought’s Managing Director, Dean Tuck, commented: “Intersecting massive copper bearing sulphide in the first hole drilled at Orion is a watershed moment for the Tarraji-Yampi project. Furthermore, significant mineralisation and/or alteration was intersected at Grant’s Find, Fuso, Paul’s Find and Chianti with a number of targets still to be tested and new targets emerging. We have rushed assays and expedited downhole and surface geophysical surveys to assist with prioritising follow up drilling. Our obvious priorities are Orion and Grant’s Find with other priorities to be set as further information is forthcoming. We look forward to returning in September 2021 with follow-up RC drilling and to completing the diamond program at Texas in the meantime.”

==> picture [454 x 144] intentionally omitted <==

Figure 1: KMRC017 chip tray with semi-massive/massive sulphide (44-57m) carrying ~5-20% chalcopyrite.

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

www.dreadnoughtresources.com.au [email protected]

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Drilling at Texas and Orion (E04/2315: 80%)

Texas and Orion are magmatic Ni-Cu-PGE targets hosted within the Ruins Dolerite. In 2015, an airborne VTEM survey was flown resulting in the identification of Texas and Orion as multiple EM anomalies +/- coincident magnetic anomalies hosted within a thick Ruins Dolerite sequence.

Two RC drill holes for 336m were recently drilled at Orion EM Plate C (KMRC018) and into the magnetic anomaly ~850m north of EM Plate C (KMRC017). A ground Fixed Loop EM (“FLEM”) survey was undertaken as planned which highlighted a conductive body associated with the intense magnetic high. While ground truthing the target, a subcropping ironstone with malachite staining was identified and a drill pad was quickly prepared. KMRC017 intersected 13m of massive to semimassive sulphides dominated by pyrite-pyrrhotite and carrying ~5-20% chalcopyrite from 44m

==> picture [211 x 250] intentionally omitted <==

Figure 2: Image showing the location recently drill and planned holes in relation to the FLEM plates at Texas and Orion Ni-Cu-PGE targets over a magnetics image.

downhole. Downhole EM (“DHEM”) and modelling of the FLEM data is ongoing and will assist with designing follow-up drill holes. Samples have been dispatched to the lab for rush analysis with assay results expected in August 2021.

KMRC018 intersected multiple sulphidic shale horizons dominated by pyrrhotite, pyrite and sphalerite with trace chalcopyrite. A DHEM survey is underway to identify any off-hole conductors.

Based on these encouraging results, further RC drilling at Orion is set to commence in September 2021. This drilling will follow-up on the massive sulphide intercept in KMRC017 and finish testing the A and B EM plates (Figure2).

Diamond drilling at Texas has been delayed due to a breakdown of the diamond rig at 55m depth. Drilling is set to recommence in early August 2021 and to be finished in mid-August 2021.

==> picture [388 x 155] intentionally omitted <==

Figure 3: Photo showing the RC rig drilling KMRC018 at Orion

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

www.dreadnoughtresources.com.au [email protected]

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Drilling at Grant’s Find (E04/2315: 80%)

Grant’s Find is a ~700m long outcropping copper-gold lode that was identified and mined in the 1910s and explored by Western Mining Corporation (“WMC”) in the 1950s. In 2019, Dreadnought drilled two diamond holes into Grant’s Find to determine the tenor of copper and gold mineralisation in fresh rock as WMC had not previously assayed for gold in their drilling.

Despite intersecting encouraging copper mineralisation, including 1.7m @ 3.8% Cu and 0.5 g/t Au, the overall tenor of the gold mineralisation was disappointing.

Upon relogging the core, a 1-2mm gold nugget was identified in GRDD002 on the unassayed half of the core, reigniting interest in Grant’s Find.

==> picture [235 x 212] intentionally omitted <==

Figure 4: Photo of diamond core from GRDD002 showing a 1-2mm gold nugget in a copper bearing quartz vein.

After the recent drill program had commenced, approvals were received for RC drilling at Grant’s Find and three holes were drilled (537m). It is considered that the RC drilling would better represent the nuggety nature of the gold mineralisation. All three holes hit chalcopyrite bearing quartz veining with KMRC016 intersecting 5m of chalcopyrite-rich quartz veining (~10-30% chalcopyrite) from 106m within a broader 9m mineralised intercept.

All samples have been dispatched for rush analysis to determine the presence of any significant mineralisation and to assist with the design and prioritisation of follow-up drilling in September 2021.

==> picture [327 x 221] intentionally omitted <==

Figure 5: KMRC016 chip tray showing significant chalcopyrite-quartz veining from 106-111m downhole at Grant’s Find.

www.dreadnoughtresources.com.au [email protected]

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Drilling at Fuso and Paul’s Find (E04/2315: 80%)

Fuso and Paul’s Find are Cu-Au targets defined from airborne magnetics and ground gravity surveys undertaken in 2019. Fuso was defined by an intense magnetic high surrounding the northern extent of a strong density anomaly. The ~500m x 400m ovoid gravity feature is cupped on the northern side by the ~1,700m x 700m magnetic anomaly.

5 RC drill holes for 1,125m were drilled into Fuso. The gravity anomaly was determined to be due to a medium to coarse grained mafic intrusion, following which attention turned to focus on the magnetic anomalies. Four holes were drilled to test the magnetic anomaly and intersected multiple zones of chlorite-sulphide alteration with locally significant quartz-sulphide-carbonate veining. This alteration and mineralisation is suggestive of an orogenic gold system; however, the source of the magnetic anomaly remains unresolved.

One metre samples have been dispatched for rush analysis and additional magnetic surveys are ongoing to assist with defining the magnetic anomalies for follow-up testing.

Paul’s Find is defined by an intense, reversely/remanently magnetised anomaly with a coincident density anomaly. A single RC hole for 249m was drilled into Paul’s Find intersecting a sheared potassic and sulphide altered hornblende-rich lithology with isolated quartz-sulphide veining. The hornblendite is interpreted to be part of a fractionated mafic intrusion with potential to host Ni-CuPGE mineralisation at depth. In addition, the shearing and alteration have the potential to host orogenic gold mineralisation.

All samples have been dispatched for rush analysis to determine the presence of any significant mineralisation and to assist with the design and prioritisation of follow-up drilling in September 2021.

==> picture [454 x 247] intentionally omitted <==

Figure 6: Photo of the RC drill rig drilling KMRC008 at Fuso.

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

www.dreadnoughtresources.com.au [email protected]

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Drilling at Chianti-Rufina Cu-Zn-Ag (E04/2508: 100%)

Chianti was originally defined and drilled by Australian Consolidated Minerals in 1972. An airborne VTEM survey flown in 2015 highlighted a conductor beneath the 1972 drilling. Since acquiring the project, Dreadnought has carried out a FLEM survey covering a portion of the VTEM conductor which contained outcropping gossans and historical drilling. The FLEM survey identified two strong EM plates which were then drilled in late 2019 and successfully intersected highly magnetic massive sulphide mineralisation (refer ASX 2 December 2019).

7 RC holes were drilled for 1,264m into seven FLEM plates with associated outcropping gossans, magnetic anomalies and/or soil anomalies within the interpreted prospective VMS horizon (Figure 7).

KMRC001, drilled into Chianti intersected 2m of massive sulphide dominated by pyrrhotite and pyrite with significant chalcopyrite, sphalerite and minor galena.

Barolo, Amarone and Rufina intersected sulphidic mud horizons with minor base metal sulphides indicative of a prospective mineralised exhalative horizon. DHEM surveys are currently underway across all 7 drill holes with results expected in August 2021.

==> picture [448 x 355] intentionally omitted <==

Figure 7: Plan view of Chianti-Rufina showing the location of recently drilled RC holes in relation to EM plates, soil anomalies and rock chip values from outcropping gossans, over geology and magnetics.

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

www.dreadnoughtresources.com.au [email protected]

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Update on Target Definition at Tarraji-Yampi (E04/2315: 80%)

Detailed mapping at Rough Triangle has identified outcropping masses of cuprite (a high-grade copper oxide) which is encouraging of a preserved oxide and supergene sulphide zone at Rough Triangle. Mapping has confirmed the main lode is 1m to 5m thick with outcropping mineralisation concentrated in the northern ~600m of the ~1.2km long lode, where the lode exploits a zone of structural complexity in the host sediments. Additionally, multiple veins including parallel veins have been identified along strike increasing the potential for additional mineralisation.

==> picture [315 x 201] intentionally omitted <==

Systematic surface sampling has been completed over Rough Triangle and six additional outcropping copper bearing lodes at Tarraji with assays expected in August/September 2021.

Figure 8: Massive cuprite from Rough triangle.

Airborne magnetic surveys at Yampi and Wombarella (E04/2508, E04/2572, E04/2557, E04/2608, E04/2560: 100%)

A detailed airborne magnetic survey has commenced over the Yampi and Wombarella tenements. The survey consists of ~15,000-line kilometres of 100m and 50m spaced flight lines. The results of this

survey will assist with lithostructural interpretations of the Yampi and Wombarella tenements as well as to generate targets for follow-up work. Results are expected in September 2021.

Figure 9: Map showing the location of the Tarraji-Yampi and Wombarella tenements around IGOs and Chalice’s West Kimberley Tenure.

==> picture [324 x 264] intentionally omitted <==

www.dreadnoughtresources.com.au [email protected]

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Ongoing and Upcoming Work Programs at Tarraji-Yampi:

Ongoing: Diamond drilling at Texas.

Ongoing: Target definition work across Tarraji and Yampi.

Completed: RC Drilling at Chianti-Rufina, Fuso, Paul’s Find, Grant’s Find and Orion – drilling to recommence in September 2021.

Completed: Environmental surveys across new targets, including Rough Triangle, for the 2022 field season.

Commenced: Additional FLEM surveys at northern portion of Orion followed by down hole EM surveys.

Commenced: Detailed airborne magnetic survey over Yampi and Wombarella.

==> picture [390 x 462] intentionally omitted <==

Figure 10: Plan view of Tarraji-Yampi showing the location of prospects in relation to solid geology.

www.dreadnoughtresources.com.au [email protected]

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Background on Tarraji-Yampi

Tarraji-Yampi is located entirely within the Yampi Sound Training Area (“YSTA”), a commonwealth owned defence reserve in the West Kimberley, ~80kms from the port of Derby. The YSTA is the second largest defence reserve in Australia after Woomera in South Australia and has been off limits to mineral exploration from 1978 to 2013.

Copper was discovered and mined in the early 1900s with the only significant exploration undertaken by WMC in 1958 and Australian Consolidated Minerals in 1972 with both parties exploring for copper. Since opening for exploration in 2013, Dreadnought has secured the largest ground holding within the YSTA and developed strong working relationships with both the Department of Defence and the Dambimangari People. Dreadnought has completed successful drilling programs at the Chianti-Rufina VMS and Grant’s Find Cu-Au targets. In addition, geophysical and geochemical surveys have resulted in the definition of >12 drill targets.

==> picture [454 x 343] intentionally omitted <==

Figure 11: RC drilling KMRC016 at the Grant’s Find target showing the outcropping copper-gold lode.

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

www.dreadnoughtresources.com.au [email protected]

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Acknowledgements:

Dreadnought would like to acknowledge the continued support of the Dambimangari People, Department of Defence, Frontier Helicopters, Hagstrom Drilling, Ausdrill, Golden Connection, Onshore Environmental and Derby Stock Supplies which have made this program possible.

For further information please refer to previous ASX announcements:

  • 25 October 2019 Emerging VMS Camp around the Chianti VMS Prospect

  • 2 December 2019 Assays and EM survey confirm Massive Sulphide System at Chianti

  • 28 January 2020 Soils and High-Grade Rock Chips Further Validate Chianti-Rufina EM

  • 24 August 2020 High Priority Copper Gold Targets at Fuso and Paul’s Find

  • 11 May 2021 Multiple Conductors Identified at Orion Ni-Cu-PGE

UPCOMING NEWSFLOW

2-4 August: Attending Diggers and Dealers in Kalgoorlie

August: Results from target definition and generation work at Mangaroon

August: Diamond drilling at Texas Ni-Cu-PGE

August: Results of additional FLEM surveys on the northern portion of Orion Ni-Cu-PGE

August: Results of further mapping and systematic sampling of Rough Triangle Cu-Ag-Sb-Bi

August/September: Results of drilling at Tarraji-Yampi (Texas, Orion Ni-Cu-PGE, Grant’s Find, Fuso and Paul’s Find Cu-Au and Chianti-Rufina VMS targets).

August/September: Commencement of ground EM survey along the Money Intrusion at Mangaroon

August/September: Results of REE floatation test work at Yin – Mangaroon

September: Commencement of detailed airborne magnetic and radiometric survey over Mangaroon

September: Results from additional mapping and surface sampling of REE targets at Mangaroon

~Ends~

For further information please contact:

Dean Tuck Jessamyn Lyons Managing Director Company Secretary Dreadnought Resources Limited Dreadnought Resources Limited E:[email protected] E:[email protected]

This announcement is authorised for release to the ASX by the Board of Dreadnought.

Competent Person’s Statement

The information in this announcement that relates to geology and exploration results and planning was compiled by Mr. Dean Tuck, who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the report of the matters based on the information in the form and context in which it appears. The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports, and that the forma and context in which the Competent Person’s findings are presented have not been materially modified from the original reports.

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

www.dreadnoughtresources.com.au [email protected]

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

INVESTMENT HIGHLIGHTS

Kimberley Ni-Cu-Au Projects

Dreadnought controls the second largest land holding in the highly prospective West Kimberley region of WA. The main project area, Tarraji-Yampi, is located only 85kms from Derby and has been locked up as a Defence reserve since 1978.

Tarraji-Yampi presents a rare first mover opportunity with known outcropping mineralisation and historic workings from the early 1900s which have seen no modern exploration.

Three styles of mineralisation occur at Tarraji-Yampi including: volcanogenic massive sulphide (“ VMS ”); Proterozoic Cu-Au; and magmatic sulphide Ni-CuPGE. Numerous high priority nickel, copper and gold drill targets have been identified from recent VTEM surveys, historical drilling and surface sampling of outcropping mineralisation.

==> picture [261 x 358] intentionally omitted <==

Illaara Gold, VMS & Iron Ore Project

Illaara is located 190km northwest of Kalgoorlie in the Yilgarn Craton and covers 75kms of strike along the Illaara Greenstone Belt. Illaara is prospective for typical Archean mesothermal lode gold deposits and base metals VMS mineralisation.

Dreadnought has consolidated the Illaara Greenstone Belt mainly through an acquisition from Newmont. Newmont defined several camp-scale targets which were undrilled due to a change in corporate focus. Prior to Newmont, the Illaara Greenstone Belt was predominantly held by iron ore explorers and has seen minimal gold and base metal exploration since the 1990s.

Mangaroon Ni-Cu-PGE, REE & Au Project

Mangaroon is a first mover opportunity covering ~4,500sq kms of tenure located 250kms south-east of Exmouth in the Gascoyne Region of Western Australia. During most of the regions early history, it did not receive government support for prospecting and or exploration resulting in a vastly underexplored region in Western Australia.

Since acquiring the project in late 2020, Dreadnought has located outcropping high-grade gold bearing quartz veins along the Edmund and Minga Bar Faults, outcropping high tenor Ni-Cu-PGE blebby sulphides in the recently defined Money Intrusion and outcropping high-grade REE ironstones, similar to those under development at the Yangibana REE Project. Mangaroon is still in the early stages with limited modern exploration.

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

www.dreadnoughtresources.com.au [email protected]

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Table 1: Drill Collar Data (GDA94 MGAz51)

Hole ID Easting Northing RL Dip Azimuth EOH **Type ** Prospect
KMRC001 612000 8167152 54 -60 255 147 RC Chianti
KMRC002 611609 8166414 50 -60 52 177 RC Borolo
KMRC003 611044 8167544 50 -60 60 201 RC Rufina South
KMRC004 610726 8167683 50 -60 63 177 RC Rufina North
KMRC005 611408 8167180 50 -60 60 165 RC Amarone North
KMRC006 611542 8166968 50 -60 96 220 RC Amarone South
KMRC007 610448 8167526 50 -60 45 177 RC Lambrusco
KMRC008 625449 8160147 52 -60 319 249 RC Fuso
KMRC009 625275 8159988 49 -60 52 225 RC
KMRC010 624750 8160052 62 -60 319 249 RC
KMRC011 624644 8160154 60 -65 317 237 RC
KMRC012 625473 8160373 49 -90 0 165 RC
KMRC013 627320 8159628 52 -65 360 249 RC Paul’s Find
KMRC014 628810 8168239 71 -49 311 165 RC Grant’s Find
KMRC015 628901 8168282 67 -50 319 189 RC
KMRC016 628971 8168391 73 -46 316 183 RC
KMRC017 627928 8168656 94 -63 290 177 RC Orion
KMRC018 627823 8167849 88 -64 282 159 RC

JORC Code, 2012 Edition – Table 1 report template

Section 1 Sampling Techniques and Data

JORC TABLE 1

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

  • Criteria JORC Code explanation Commentary

  • SamplingNature and quality of sampling (e.g. cut channels, Reverse Circulation (RC) drilling techniques random chips, or specific specialised industry Original 1m Splits (All drilling)

  • standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as limiting the broad meaning of sampling. samples.

Every metre drilled, two 2-3kg sample (split and duplicate) were sub-sampled into calico bags via a Metzke cone splitter. This results in two 1m split samples.

  • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

3m Composites (unmineralized samples)

Outside the target zone, all remaining spoil from the sampling system was collected in buckets and neatly deposited in rows adjacent to the rig. An aluminium scoop was used to then sub-sample each spoil pile to create a 2-3kg 3m composite sample in a calico bag.

  • Aspects of the determination of mineralisation that are Material to the Public Report.

  • In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.

QAQC samples, in addition to the target lode duplicates and blanks, consisting of duplicates and CRM’s (OREAS Standards) were inserted through the program at a rate of 1:50 samples.

Samples will be submitted to the ALS Laboratories in Perth and pulverised to produce a 50g charge for Fire Assay to determine Au and PGEs (PGMICP24) and 0.25g aliquot for four acid digest to

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

www.dreadnoughtresources.com.au [email protected]

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Criteria JORC Code explanation Commentary
determine 48 elements (ME-MS61) with overranges
as required.
Diamond Drilling
Core is orientated for structural and geotechnical
logging where possible. In orientated core, quarter
core will be submitted to the lab for analysis in
intervals ranging from 20cm to 1m depending on the
geological context. If core is orientated, then the half
core will be cut so as to preserve the orientation line
with the same side of the core submitted down the
hole.
QAQC samples consisting of duplicates, blanks
and CRM’s (OREAS Standards) will be inserted
through the program at a rate of 1:50 samples.
Samples will be submitted to the ALS Laboratories
in Perth and pulverised to produce a 50g charge for
Fire Assay to determine Au and PGEs (PGM-
ICP24) and 0.25g aliquot for four acid digest to
determine 48 elements (ME-MS61) with overranges
as required.
Drilling Drill type (e.g. core, reverse circulation, open-hole
RC Drilling
techniques hammer, rotary air blast, auger, Bangka, sonic,
etc.) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented
and if so, by what method, etc.).



Ausdrill undertook the program utilising a Drill Rigs
Australia truck mounted Schramm T685WS drill rig
with additional air from an auxiliary compressor and
booster. Bit size was 5¾”.
Diamond Drilling
Diamond drilling is being undertaken by Hagstrom
Drilling with a frame mounted LF70. Drilling is
initially HQ and dropping to NQ once the hole is
cased off.
Core is orientated using a Reflex EZ trac and Boart
Longyear True Core Orientation Tool.
Drill sample Method of recording and assessing core and chip
RC Drilling
recovery sample recoveries and results assessed. Drilling was undertaken using a ‘best practice’
Measures taken to maximise sample recovery and
approach to achieve maximum sample recover and
ensure representative nature of the samples. quality through the ore zones.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
Best practice sampling procedure included: suitable
have occurred due to preferential loss/gain of
usage of dust suppression, suitable shroud, lifting
fine/coarse material. off bottom between each metre, cleaning of
sampling equipment, ensuring a dry sample and
suitable supervision by the supervising geologist to
ensure good sample quality.
At this stage, no bias occurs between sample
recovery and grade.
Diamond Drilling
HQ and NQ drilling has been undertaken. All core
recoveries are measured and recorded by the drill
crew for each run and remeasured and checked by
Dreadnought personnel.
Core recovery to date has been very high.
At this stage, no known bias occurs between

Dreadnought Resources Limited

www.dreadnoughtresources.com.au

[email protected]

Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Criteria JORC Code explanation Commentary
sample recovery and grade.
Logging Whether core and chip samples have been
RC chips and diamond core were logged by a
geologically and geotechnically logged to a level
qualified geologist with sufficient experience in this
of detail to support appropriate Mineral Resource
geological
terrane
and
relevant
styles
of
estimation, mining studies and metallurgical
mineralisation using an industry standard logging
studies. system which could eventually be utilised within a
Whether logging is qualitative or quantitative in
Mineral Resource Estimation.
nature.
Core
(or
costean,
channel,
etc.)
photography.
The total length and percentage of the relevant


Lithology,
mineralisation,
alteration,
veining,
weathering and structure were all recorded digitally.
intersections logged. Chips were washed each metre and stored in chip
trays for preservation and future reference.
Logging is qualitative, quantitative or semi-
quantitative in nature.
Sub-sampling If core, whether cut or sawn and whether quarter,
RC Drilling
techniques and
sample
preparation
half or all core taken.
If non-core, whether riffled, tube sampled,
split, etc. and whether sampled wet or dry.
rotary
Every metre drilled a 2-3kg sample (split) was sub-
sampled into a calico bag via a Metzke cone splitter.
For all sample types, the nature, quality and
QAQC in the form of duplicates and CRM’s
appropriateness of the sample preparation
(OREAS Standards) were inserted through the ore
technique. zones at a rate of 1:50 samples. Additionally, within
Quality control procedures adopted for all sub- each ore zone, a duplicate sample was taken of the
sampling stages to maximise representivity of
lode and a blank inserted directly after.

samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including
for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.




2-3kg samples will be submitted to ALS laboratories
(Perth), oven dried to 105°C and pulverised to 85%
passing 75um to produce a 50g charge for Fire
Assay with ICP-AES finish to determine Au and
PGEs (PGM-ICP24) and 0.25g aliquot for four acid
digest to determine 48 elements (ME-MS61) with
overranges as required.
Standard laboratory QAQC is undertaken and
monitored.
Diamond Drilling
20cm – 1m quarter core samples will be sawn and
submitted to the lab for analysis. If core is
orientated, then the core will be cut so as to
preserve the orientation line with the same side of
the core submitted down the hole.
QAQC in the form of duplicates, blanks and CRM’s
(OREAS Standards) were inserted through the
mineralised zones at a rate of 1:50 samples.
Additionally, within each mineralised zone, a
duplicate sample was taken and a blank inserted
directly after.
Samples will be submitted to ALS laboratories
(Perth), oven dried to 105°C and pulverised to 85%
passing 75um to produce a 50g charge for Fire
Assay with ICP-AES finish to determine Au and
PGEs (PGM-ICP24) and 0.25g aliquot for four acid
digest to determine 48 elements (ME-MS61) with
overranges as required.
Standard laboratory QAQC is undertaken and
monitored.

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

www.dreadnoughtresources.com.au

[email protected]

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Criteria JORC Code explanation Commentary
Quality of assay The nature, quality and appropriateness of the
Assay technique is Fire Assay which is a ‘Total
data and assaying and laboratory procedures used and
Technique’ for Au and PGEs. Four acid digest is
laboratory tests whether the technique is considered partial or
considered a ‘near total’ technique for the 48
total. elements received under ME-MS61.
For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations




Standard laboratory QAQC is undertaken and
monitored by the laboratory and by the company
upon assay result receival.
factors applied and their derivation, etc. No assay results reported, so no comment on the
Nature of quality control procedures adopted (e.g.
outcomes of the QAQC at this stage.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have
been established.
Verification of The verification of significant intersections by
Logging and sampling were recorded directly into a
sampling and either
independent
or
alternative
company

digital logging system, verified and eventually
assaying personnel. stored in an offsite database.

The use of twinned holes.
Documentation of primary data, data entry
procedures,
data
verification,
data
storage


Significant intersections have been inspected by
senior company personnel.
(physical and electronic) protocols. No twinned holes have been drilled at this time.
Discuss any adjustment to assay data. No adjustments to any assay data have been
undertaken.
Location of data Accuracy and quality of surveys used to locate drill
Collar position was recorded using a Emlid Reach
points holes (collar and down-hole surveys), trenches,
RS2 RTK GPS system (+/- 0.2m x/y, +/-0.5m z).
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.

GDA94 Z51s is the grid format for all xyz data
reported.
Quality and adequacy of topographic control. Azimuth and dip of the drill hole was recorded after
the completion of the hole using a Reflex Sprint IQ
Gyro. A reading was undertaken every 30thmetre
with an accuracy of +/- 1° azimuth and +/-0.3° dip.
Data spacing and
Data spacing for reporting of Exploration Results.
See drill table for hole positions.
distribution Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral



Data spacing at this stage is not suitable for Mineral
Resource Estimation.
Resource
and
Ore
Reserve
estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
Orientation of Whether the orientation of sampling achieves
Drilling was undertaken at a near perpendicular
data in relation to unbiased sampling of possible structures and the
angle to the interpreted strike and dip of the
geological extent to which this is known, considering the
modelled FLEM plates and known outcrop.
structure deposit type.
If the relationship between the drilling orientation

No sample bias is known at this time.
and the orientation of key mineralised structures is
considered to have introduced a sampling bias,
this should be assessed and reported if material.
Sample security The measures taken to ensure sample security. All samples from collection at rig through to
submission at the laboratory have been under the
supervision of Dreadnought personnel or sub-
contractors associated with the company. All
samples are stored is core trays and strapped to
pallets for storage and transport.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.

The program is continuously reviewed by senior
company personnel

Dreadnought Resources Limited Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

www.dreadnoughtresources.com.au [email protected]

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Section 2 Reporting of Exploration Results

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation JORC Code explanation JORC Code explanation JORC Code explanation JORC Code explanation Commentary
Mineral tenement Type,
reference
name/number,
location
and

The Tarraji-Yampi Project consists of 5
and land tenure ownership including agreements or material issues granted
(E04/2315,
E04/2508,
status with third parties such
as
joint
ventures, E04/2572,
E04/2557,
E04/2608)
partnerships, overriding royalties,
native
title
exploration Licenses.
interests, historical sites, wilderness or national park
The Tarraji tenement (E04/2315) is a
and environmental settings. 80/20 JV between IronRinger (Tarraji)
The security of the tenure held at the time of Pty Ltd and Whitewater Resources Pty
reporting along with any known impediments to Ltd.
obtaining a licence to operate in the area. The Yampi Tenements (E04/2508,
E04/2572, E04/2557, E04/2608) are
100%
owned
by
Dreadnought
Exploration Pty Ltd
Dreadnought Exploration Pty Ltd is a
wholly
owned
subsidiary
of
Dreadnought Resources Ltd.
E04/2315,
E04/2508,
E04/2572,
E04/2557 are located within the Yampi
Sound Training Area (YSTA) which is
freehold
land
owned
by
the
Commonwealth
Government
and
administered by the Department of
Defence.
Being
freehold
Commonwealth Land, Native Title has
been extinguished but falls within
Dambinmangari Land.
E04/2608 is partly located within the
YSTA and partly on Vacant Crown Land
which has Native Title claim by the
Warra Combined (NNTT Number 2901)
Exploration done Acknowledgment and appraisal of exploration by
Regional
mapping,
basic
stream
by other parties other parties. sediment, soil sampling and limited
diamond drilling was completed by
WMC in the 1950s.
Shallow
percussion
and
diamond
drilling was undertaken by ACM at
Chianti in the 1970s.
The YSTA was off limits to exploration
from 1978 until 2013.
Geology Deposit type, geological setting and style of
The Tarraji-Yampi Project is located
mineralisation. within the Hooper Complex which is a
Proterozoic Mobile Belt in the West
Kimberley.
The Hooper Complex has known
occurrences of Cu-Zn-Pb-Ag VMS
mineralisation
within
the
Marboo
Formation,
magmatic
Ni-Cu-PGE
mineralisation in the Ruins Dolerite and
later
stage
Proterozoic
Cu-Au
mineralisation
associated
with
significant structures and late-stage
intrusions.
Drill hole A summary of all information material to the
An overview of the drilling program is
information understanding of the exploration results including a given within the text and tables within
tabulation of the following information for all Material this document.

Dreadnought Resources Limited

www.dreadnoughtresources.com.au

[email protected]

Suite 6, 16 Nicholson Road, Subiaco WA 6008 PO Box 1240, West Perth WA 6872

+61 (0) 428 824 343

==> picture [149 x 85] intentionally omitted <==

Criteria JORC Code explanation Commentary Commentary Commentary Commentary Commentary
drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.
Data aggregation In
reporting
Exploration
Results,
weighting

No assays reported.
methods averaging techniques, maximum and/or minimum
grade truncations (e.g. cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship These relationships are particularly important in the
Drilling is undertaken
close
to
between reporting of Exploration Results. perpendicular to the dip of the
mineralisation If the geometry of the mineralisation with respect to mineralisation.
widths and the drill hole angle is known, its nature should be
The true thickness of the mineralisation
intercept lengths reported. intersected
in
drill
holes
cannot
If it is not known and only the down hole lengths are currently be calculated.
reported, there should be a clear statement to this
_effect(e.g. ‘down hole length, true width not known’). _
Diagrams Appropriate maps and sections (with scales) and
Refer to figures within this report.
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Balanced Where comprehensive reporting of all Exploration
The accompanying document is a
reporting Results is not practicable, representative reporting of balanced report with a suitable
both low and high grades and/or widths should be cautionary note.
practiced
to
avoid
misleading
reporting
of
Exploration Results.
Other substantive Other exploration data, if meaningful and material,
Rio Tinto Exploration completed a
exploration data should be reported including (but not limited to): versatile time domain electromagnetic
geological observations; geophysical survey results; (VTEM) and aeromagnetic survey
geochemical survey results; bulk samples – size and covering 206 sq km of the Yampi
method of treatment; metallurgical test results; bulk tenements for 901 line kilometres of
density,
groundwater,
geotechnical
and
rock
data using 125 and 250 m line spacing.
characteristics;
potential
deleterious
or
Targets from the VTEM survey are
contaminating substances. shown in Figure 3 in this report. .
Further work The nature and scale of planned further work (e.g.
Additional drilling is expected to
tests for lateral extensions or depth extensions or commence in September 2021.
large-scale step-out drilling). DHEM surveys are underway.
Diagrams clearly highlighting the areas of possible
extensions,
including
the
main
geological
interpretations and future drilling areas, provided this
information is not commercially sensitive.