17 July 2020
REMAINING METZKE’S FIND ASSAYS
HIGHLIGHTS
-
Assays received for the remaining two holes of the six hole program at Metzke’s Find:
-
MZRC013: 2m @ 1.6 g/t Au from 44m
-
MZRC014: 1m @ 0.3 g/t Au from 72m
-
These results are part of the previously announced high-grade gold results at Metzke’s Find with significant intercepts including:
-
MZRC015: 2m @ 12.8 g/t Au from 51m including 1m @ 24.8 g/t Au from 51m
-
MZRC016: 8m @ 8.1 g/t Au from 84m including 3m @ 21.0 g.t Au from 85m
-
MZRC017: 13m @ 4.2 g/t Au from 48m including 7m @ 7.5 g/t Au from 51m
-
MZRC018: 5m @ 2.4 g/t Au from 71m including 1m @ 11.3 g/t Au from 71m
-
Mineralised lode remains open along strike and at depth with the potential for multiple lodes
-
Follow up RC drilling to commence in August 2020 targeting Metzke’s Find and the Metzke’s corridor to the south with maiden drilling to follow at Longmore’s Find and Black Oak
Dreadnought Resources Limited (“ Dreadnought ”)( ASX:DRE ) is pleased to announce the final results of its recent RC drill program (6 holes, average depth of 95m) at Metzke’s Find, part of the Illaara Gold-VMS Project.
Drilling tested a bend in the mineralised structure where it was interpreted that deeper historical mining may have rendered historical shallow drilling ineffective. A fresh bedrock gold bearing lode was intersected in all holes with high grade intercepts returned from four of the six holes (Figure 1).
Dreadnought Managing Director, Dean Tuck, commented: “The final two holes did not return the same grade as the first four. However, Metzke’s Find remains open along strike and at depth. We plan to commence RC drilling at Metzke’s Find again in August 2020 with a ~2,000m program to test Metzke’s Find at depth and along the 1.5km long mineralised shear. The additional drilling will also provide valuable information on the distribution of gold at Metzke’s Find. ~1,000m of RC Drilling at Longmore’s Find and Black Oak will follow.”
==> picture [396 x 210] intentionally omitted <==
Figure 1: Long section of Metzke’s Find showing the extent of shallow historic workings and the results of more recent drilling by Dreadnought.
Dreadnought Resources Limited Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
www.dreadnoughtresources.com.au [email protected]
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
==> picture [454 x 606] intentionally omitted <==
Figure 2: Plan view of Metzke’s Find showing the extent of historic workings on the surface projection of the lode and the location of historically and recently completed drilling.
www.dreadnoughtresources.com.au
Dreadnought Resources Limited Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
Drill Results at Metzke’s Find
Six RC holes (MZRC013-018) were drilled for an average depth of 95m within the ~200m strike distance between previous significant intercepts. This drilling targeted a bend in the mineralised structure and beneath deeper workings which are considered to have made historical, shallow drilling ineffective. All drill holes intersected the mineralised lode which consists of sugary recrystalised quartz-sulphide veining within a zone of intensely sheared and chlorite, sericite and biotite altered mafic metavolcanics.
The mineralised lode remains open along strike and at depth. There also remains potential for repeat lodes, or brittle offsets of the main lode which have been described from historical accounts of the workings.
Assays received for the last two holes of the six hole program at Metzke’s Find were:
-
MZRC013: 2m @ 1.6 g/t Au from 44m
-
MZRC014: 1m @ 0.3 g/t Au from 72m
These results have highlighted some variability in the distribution of gold within the Metzke’s Find lode(s). Dreadnought is currently relogging and re-interpreting these holes to refine targets for followup drill testing. RC drilling at Metzke’s Find will recommence in August 2020 with a ~2,000m to test the 1.5km long mineralised shear at Metzke’s Find. The additional drilling will also provide valuable information on the distribution of gold at Metzke’s Find.
The previous four holes in the program, returned high-grade results including (see Figures 1 and 2):
-
MZRC015: 2m @ 12.8 g/t Au from 51m including 1m @ 24.8 g/t Au from 51m
-
MZRC016: 8m @ 8.1 g/t Au from 84m including 3m @ 21.0 g.t Au from 85m
-
MZRC017: 13m @ 4.2 g/t Au from 48m including 7m @7.5 g/t Au from 51m
-
MZRC018: 5m @ 2.4 g/t Au from 71m including 1m @ 11.3 g/t Au from 71m
==> picture [429 x 236] intentionally omitted <==
Figure 3: Drone image (north to the right) showing historical workings at Metzke’s Find including additional workings to the south (left side of the image). The rig is on drill hole MZRC013 in this photo.
Dreadnought Resources Limited Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
www.dreadnoughtresources.com.au
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
Background on Metzke’s corridor to the South (E29/1050 and E29/959: 100%)
Infill soil sampling results have highlighted that the mineralised Metzke’s corridor continues to the south of Metzke’s Find for an additional ~1.2km of strike where it terminates against another northwest trending shear. This southern corridor is an attractive drill target and will also be drilled in August 2020, followed by ~1,000m of RC drilling at Longmore’s Find and Black Oak.
==> picture [415 x 519] intentionally omitted <==
- Figure 4: Plan view of Metzke’s corridor highlighting gold-in-soil anomalies over a magnetics image and a zoom in of the historic workings at Metzke’s Find and recent successful drilling.
Dreadnought Resources Limited Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
www.dreadnoughtresources.com.au [email protected]
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
Metzke’s Find (E29/1050: 100%)
Metzke’s Find consists of historic workings which extend over 700m in strike and sit within a 12km long orogenic gold corridor defined by the previous owner, Newmont. Metzke’s Find itself has seen limited exploration in the 1980s and 1990s and, to the extent undertaken, focused on and around the historic workings. No work has taken place along the corridor to the north and south.
In March 2020, results of a 12 hole RC drilling program around the historic workings confirmed bedrock gold mineralisation at Metzke’s Find with significant drill intercepts including:
-
MZRC012: 2m @ 6.8 g/t Au from 79m including 1m @ 12.5 g/t Au from 80m
-
MZRC010: 4m @ 1.9 g/t Au from 64m including 2m @ 3.1 g.t Au from 64m
Drilling intersected the target lode horizon in each of the holes. The lode is characterised as a sugary, recrystalised quartz–sulphide vein with variable pyrite and chalcopyrite hosted within a mafic metavolcanic package. The contact between the lode and the mafic metavolcanics is marked by intense shearing with prolific chlorite, biotite and sericite alteration. There also appears to be a post
mineralisation brittle faulting event which has offset the lode in several locations.
==> picture [348 x 436] intentionally omitted <==
Figure 5: Plan view of Illaara showing the location of gold and VMS targets.
Dreadnought Resources Limited Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
www.dreadnoughtresources.com.au [email protected]
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
Background on Illaara
Illaara is located 190 kms from Kalgoorlie and comprises seven tenements (~900 sq kms) covering over ~75km of strike along the entire Illaara Greenstone Belt. The Illaara Greenstone Belt has now been consolidated through an acquisition from Newmont and subsequently the purchase of Metzke’s Find and an option to acquire 100% of E30/485 and E29/965.
Recent gold exploration within the Illaara Greenstone Belt was spurred on by a ~55km long Au-As-Sb anomaly generated from regional regolith sampling by the Geological Survey of Western Australia.
Prior to Newmont, the Illaara Greenstone Belt was held by iron ore explorers with no focused gold or base metals exploration since the 1990s.
Historically gold was discovered and worked at Metzke’s Find and Lawrence’s Find in the early 1900s. In addition to gold, outcropping VMS base metals mineralisation was identified and briefly tested in the 1980s with no subsequent exploration utilising modern techniques.
==> picture [372 x 427] intentionally omitted <==
Figure 6: Location of Illaara in relation to regional players and gold operations.
www.dreadnoughtresources.com.au [email protected]
Dreadnought Resources Limited Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
For further information please refer to previous ASX announcements:
-
24 June 2019 75 km Long Illaara Greenstone Belt Acquired from Newmont
-
6 December 2019 Consolidation of 75km Long Illaara Greenstone Belt
-
19 March 2020 RC Drilling Hits High Grades at Metzke’s Find
-
29 May 2020 RC Drilling Commences at Illaara Gold-VMS Project
-
15 June 2020 Drilling Complete at Metzke’s Find
-
13 July 2020 RC Drilling hits high grade gold at Metzke’s Find
UPCOMING NEWSFLOW
July: Results of magnetic and gravity 3D inversions at Tarraji
July: Quarterly Activities and Cashflow Report
July: Outcome of the 30 June 2021 JMEI Tax Credits application
July/August: Additional drill targets from geological mapping at Illaara Central and Metzke’s Find corridor work
August: Assay results from RC drilling at Rocky Dam
August: 30 June 2020 JMEI Tax Credit Statements distributed to shareholders
~Ends~
For further information please contact: Dean Tuck Jessamyn Lyons Managing Director Company Secretary Dreadnought Resources Limited Dreadnought Resources Limited E:[email protected] E:[email protected]
This announcement is authorised for release to the ASX by the Board of Dreadnought.
Competent Person’s Statement
The information in this announcement that relates to geology and exploration results and planning was compiled by Mr. Dean Tuck, who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports, and that the forma and context in which the Competent Person’s findings are presented have not been materially modified from the original reports.
Dreadnought Resources Limited Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
www.dreadnoughtresources.com.au [email protected]
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
INVESTMENT HIGHLIGHTS
Kimberley Ni-Cu-Au Projects
Dreadnought controls the second largest land holding in the highly prospective West Kimberley region of WA. The main project area, TarrajiYampi, is located only 85kms from Derby and has been locked up as a Defence reserve since 1978. The area was only recently opened under the Commonwealth Government’s co-existence regime that balances Defence’s needs with the requirements of others including Aboriginal groups, the resources industry, pastoralists and State Governments.
Tarraji-Yampi presents a rare first mover opportunity with known outcropping mineralisation and historic workings from the early 1900s which have seen no modern exploration.
Three styles of mineralisation occur at TarrajiYampi including: volcanogenic massive sulphide (“ VMS ”); Proterozoic Cu-Au (“ IOCG ”); and magmatic sulphide Ni-Cu-PGE. Numerous high priority nickel, copper and gold drill targets have been identified from recent VTEM surveys, historical drilling and surface sampling of outcropping mineralisation.
Illaara Gold & VMS Project
Illaara is located 160km northwest of Kalgoorlie in the Yilgarn Craton and covers 75kms of strike along the Illaara Greenstone Belt. Illaara is prospective for typical Archean mesothermal lode gold deposits and Cu-Zn VMS mineralisation.
Dreadnought has consolidated the Illaara Greenstone Belt mainly through an acquisition from Newmont . Newmont defined several camp-scale targets which were undrilled due to a change in corporate focus. Prior to Newmont, the Illaara greenstone belt was held predominantly by iron ore explorers and has seen minimal gold and base metal exploration since the 1990s. Illaara contains several drill ready gold targets. In addition, the Eastern and Western VMS Horizons are expected to produce exciting drill targets with the application of modern exploration technology.
Rocky Dam Gold & VMS Project
Rocky Dam is located 45kms east of Kalgoorlie in the Eastern Goldfields Superterrane of Western Australia. Rocky Dam is prospective for typical Archean mesothermal lode gold deposits and Cu-Zn VMS mineralisation. Rocky Dam has known gold and VMS occurrences with drill ready gold targets including the recently defined CRA-North Gold Prospect.
Dreadnought Resources Limited Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
www.dreadnoughtresources.com.au
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
Table 1: Drill Collar Data (GDA94 MGAz51)
| Hole ID | Easting | Northing | RL | Dip | Azimuth | EOH |
**Type ** |
Prospect |
|---|---|---|---|---|---|---|---|---|
| MZRC013 | 214612 |
6757778 | 470 | -55 |
90 |
54 | RC | Metzke’s Find |
| MZRC014 | 214589 |
6757776 | 470 | -55 |
90 |
84 | RC | Metzke’s Find |
| MZRC015 | 214604 |
6757815 | 470 | -55 |
90 |
114 | RC |
Metzke’s Find |
| MZRC016 | 214581 |
6757815 | 470 | -55 |
90 |
48 | RC | Metzke’s Find |
| MZRC017 | 214594 |
6757896 | 470 | -55 |
90 |
66 | RC | Metzke’s Find |
| MZRC018 | 214579 |
6757896 | 470 | -55 |
90 |
42 | RC | Metzke’s Find |
Table 2: Significant Results (>0.1 g/t Au and >0.5g/t Au)
| Hole ID | From(m) | To(m) | Interval | **Sample Type ** | Au(g/t) | Prospect |
|---|---|---|---|---|---|---|
| MZRC013 | 44 | 46 | 2 | 1m split | 1.6 | |
| MZRC014 | 72 | 73 | 1 | 1m split | 0.3 | |
| MZRC015 | 51 | 53 | 2 | 1m split | 12.8 | |
| incl. | 51 | 52 | 1 | 1m split | 24.8 | |
| MZRC016 | 78 | 79 | 1 | 1m split | 0.2 | |
| and incl. |
84 85 |
92 88 |
8 3 |
1m split 1m split |
8.0 21.0 |
Metzke’s Find |
| and | 97 | 98 | 1 | 1m split | 0.2 | |
| MZRC017 | 48 | 61(EOH) | 13 | 1m split | 4.2 | |
| incl | 51 | 58 | 7 | 1m split | 7.5 | |
| MZRC018 | 71 | 76 | 5 | 1m split | 2.4 | |
| incl. | 71 | 72 | 1 | 1m split | 11.3 |
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
JORC TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Sampling techniques |
• Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as limiting the broad meaning of sampling. • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used. • Aspects of the determination of mineralisation that are Material to the Public Report. • In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was |
Reverse Circulation (RC) drilling was undertaken to produce samples for assaying. Metzke’s Original 1m Splits Every metre drilled a 2-3kg sample (split) was sub- sampled into a calico bag via a Metzke cone splitter from each metre of drilling. QAQC in the form of duplicates and CRM’s (OREAS Standards) were inserted through the ore zones at a rate of 1:20 samples. Samples were then submitted to the laboratory and pulverised to produce a 50g charge for Fire Assay. Ore grade samples were repeated with 2 further 50g FA’s. |
Dreadnought Resources Limited Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
www.dreadnoughtresources.com.au [email protected]
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information. |
||
| Drilling techniques |
• Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc.). |
Drilling method was Reverse Circulation (RC). Bit size was approximately 141mm. Stark Drilling Pty. Ltd. undertook the program utilising a Schramm truck mounted T450 rig with additional air from an auxiliary compressor and booster. |
| Drill sample recovery |
• Method of recording and assessing core and chip sample recoveries and results assessed. • Measures taken to maximise sample recovery and ensure representative nature of the samples. • Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material. |
Drilling at Metzke’s was undertaken using a ‘best practice’ approach to achieve maximum sample recover and quality though the ore zones. Best practice sampling procedure included: suitable usage of dust suppression, suitable shroud, lifting off bottom between each metre, cleaning of sampling equipment, ensuring a dry sample and suitable supervision by the supervising geologist to ensure good sample quality. At this stage, no bias occurs between sample recovery and grade. |
| Logging | • Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. • Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.) photography. • The total length and percentage of the relevant intersections logged. |
RC chips were logged by a qualified geologist with sufficient experience in this geological terrain and relevant styles of mineralisation using an industry standard logging system which could eventually be utilised within a Mineral Resource Estimation. Lithology, mineralisation, alteration, veining, weathering and structure were all recorded digitally. Chips were washed each metre and stored in chip trays for preservation and future reference. Logging is qualitative, quantitative or semi- quantitative in nature. |
| Sub-sampling techniques and sample preparation |
• If core, whether cut or sawn and whether quarter, half or all core taken. • If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or dry. • For all sample types, the nature, quality and appropriateness of the sample preparation technique. • Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples. • Measures taken to ensure that the sampling is representative of the in-situ material collected, including for instance results for field duplicate/second-half sampling. • Whether sample sizes are appropriate to the grain size of the material being sampled. |
Every metre drilled a 2-3kg sample (split) was sub- sampled into a calico bag via a Metzke cone splitter from each metre of drilling. QAQC in the form of duplicates and CRM’s (OREAS Standards) were inserted through the ore zones at a rate of 1:20 samples. Samples were then submitted to the laboratory and pulverised to produce a 50g charge for Fire Assay. Samples were submitted to ALS laboratories (Perth WA) for a 50g Fire Assay with ICP_AES finish (AU_ICP22). A 2-3kg samples is oven dried to 105 degC and is then pulverised to 85% passing 75um. Standard laboratory QAQC is undertaken and monitored. |
Dreadnought Resources Limited Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
www.dreadnoughtresources.com.au
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Quality of assay data and laboratory tests |
• The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. • For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc. • Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established. |
Assay technique is Fire Assay which is a ‘Total Technique’. At Metzke’s, duplicate samples and CRM’s, in the form of OREAS certified material, was inserted into the sample string approximately every 20th sample. Standard laboratory QAQC is undertaken and monitored by the laboratory and by the company upon assay result receival. All QAQC is deemed to have passed internal DRE standards. |
| Verification of sampling and assaying |
• The verification of significant intersections by either independent or alternative company personnel. • The use of twinned holes. • Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. • Discuss any adjustment to assay data. |
Logging and sampling were recorded directly into a digital logging system, verified and eventually stored in an offsite database. No twinning has been undertaken. No adjustments to any assay data have been undertaken. |
| Location of data points |
• Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. • Specification of the grid system used. • Quality and adequacy of topographic control. |
Collar position was recorded using a handheld Garmin GPS (+/- 3m). GDA94 Z51s is the grid format for all xyz data reported. Azimuth and dip of the drill hole was recorded after the completion of the hole using a down hole Axis Champ. A reading was undertaken every ~30th metre with an accuracy of +/- 0.5deg. |
| Data spacing and distribution |
• Data spacing for reporting of Exploration Results. • Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied. • Whether sample compositing has been applied. |
See drill table for hole positions. Data spacing at this stage is not suitable for Mineral Resource Estimation at this point. |
| Orientation of data in relation to geological structure |
• Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type. • If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material. |
Drilling was undertaken at a sub-perpendicular angle to the interpreted strike and dip of any interpreted mineralised structures or lithologies. Lithologies generally are steeply dipping (~70- 80deg) and thus true widths of mineralisation will have to be extrapolated from any assay results. |
| Sample security | • The measures taken to ensure sample security. |
All samples from collection at rig through to submission at the laboratory have been under the supervision of Dreadnought personnel or sub- contractors associated with the company. All samples are sealed in polyweave bags and stored in bulka bags for storage and transport. |
Dreadnought Resources Limited
www.dreadnoughtresources.com.au
Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Audits or reviews | • The results of any audits or reviews of sampling techniques and data. |
The program will be reviewed by senior company personnel. |
Section 2 Reporting of Exploration Results
(Criteria in this section apply to all succeeding sections.)
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Mineral tenement and land tenure status |
• Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. • The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area. |
• The Illaara Project consists of 7 granted Exploration Licenses (E30/471, E30/476, E29/957, E29/959, E29/1050, E29/965 and E30/485) • Tenements E30/471, E30/476, E29/957 and E29/959 are currently held 100% by Newmont Exploration Pty Ltd but are 100% beneficially owned by Dreadnought Resources, and are currently being transferred to Dreadnoughts name • These 4 tenements are subject to a 2.5% NSR retained by Newmont • E29/1050 is currently held by Gianni, Peter Romeo and is in good standing and will be acquired 100% by Dreadnought with a 1% NSR retained by Gianna, Peter Romeo • E29/965 and E30/485 are currently held by Dalla-Costa, Melville Raymond and is in good standing and will be subject to an option. • There are currently no clear Native Title Claims over the Illaara Project • Part of the Illaara Project is located on Walling Rock Station |
| Exploration done by other parties |
• Acknowledgment and appraisal of exploration by other parties. |
• Newmont Exploration has undertaken exploration activities since 2016 which are mentioned in previous reports. • Historical exploration of a sufficiently high standard was carried out by: Reindler 1984: WAMEX Report 15945 BHP 1985: WAMEX Report 17945 Eastern Group 1988: WAMEX Report A22743 CRA 1987-1991: WAMEX Reports A24270, 28525, 31782, 33959, 35122 Dominion Mining 1993-1994: WAMEX Report A41560 Anglo Australian 1995: WAMEX Report A45251 Mt Burgess Mining 2001-2004: WAMEX Reports A62641, 64908, 668842 John Rutter 2006-2007: WAMEX Reports A72910, 73420, 75754, 76044 |
Dreadnought Resources Limited
www.dreadnoughtresources.com.au
Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Polaris 2006-2007: WAMEX Report A75477 Matsa 2007-2008: WAMEX Report A79756 Western Areas 2015: WAMEX Report A107784 |
||
| Geology | • Deposit type, geological setting and style of mineralisation. |
• The Illaara Project is located within the Illaara Greenstone Belt within the Southern Cross Domain of the Youanmi Terrane approximately 60kms west of the Ida Fault. • The Illaara Project is prospective for orogenic gold, VMS and potentially komatiite hosted nickel mineralisation. • Mineralisation at Metzke’s is quartz vein hosted within sheared undifferentiated mafic rocks. |
| Drill hole information | • A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes: oeasting and northing of the drill hole collar oelevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar odip and azimuth of the hole odown hole length and interception depth ohole length. • If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case. |
• An overview of the drilling program is given within the text and tables within this document |
| Data aggregation methods |
• In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually Material and should be stated. • Where aggregate intercepts incorporate short lengths of high-grade results and longer lengths of low-grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail. • The assumptions used for any reporting of metal equivalent values should be clearly stated. |
• All results have been reported above 0.1g/t Au • No top cutting has been applied. • All reported results have been length weighted (arithmetic length weighting). • No metal equivalent values are reported. |
| Relationship between mineralisation widths and intercept lengths |
• These relationships are particularly important in the reporting of Exploration Results. • If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported. • If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (e.g. ‘down _hole length, true width not known’). _ |
• Drilling is undertaken sub-perpendicular to the dip of the mineralisation. The exact thickness of the mineralisation is currently unknown, however, thicknesses may be smaller than the reported intercepts within this report. |
www.dreadnoughtresources.com.au
Dreadnought Resources Limited Suite 5, 16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014
+61 (0) 428 824 343
==> picture [149 x 85] intentionally omitted <==
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Diagrams | • Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. |
• Refer to figures within this report. |
| Balanced reporting | • Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results. |
• The accompanying document is a balanced report with a suitable cautionary note. |
| Other substantive exploration data |
• Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples – size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances. |
• Suitable commentary of the geology encountered are given within the text of this document. |
| Further work | • The nature and scale of planned further work (e.g. tests for lateral extensions or depth extensions or large-scale step-out drilling). • Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive. |
• Further extensional and infill drilling and diamond drilling at Metzke is planned for the coming months. |