QUARTERLY REPORT

Period ending 31 March 2015

KEY EVENTS

  • z Placement and Share Purchase Plan completed raising a total of $500,000.

  • z Spargoville RC drill sampling (completed December 2014) confirms and extends highly anomalous gold intercepts at Redback prospect.

  • 9m at 4.78g/t Au from 170m including 4m at 9.05g/t Au

  • 20m at 4.05g/t Au from 195m including 2m at 12.1g/t Au

  • 13m at 3.16g/t Au from 188m including 2m at 6.52g/t Au

  • 9m at 4.97g/t Au from 42m including 1m at 15.3g/t Au and 1m at 13.4g/t Au

  • z Follow up RC/diamond drilling at Redback completed, for a total of 15 holes for 3,578.1 metres.

  • z Visible gold logged within nine out of the 13 completed diamond tails.

  • z RC drilling programme completed at Suplejack prospect in the Tanami (NT).

REVIEW OF OPERATIONS

CORPORATE ACTIVITIES

A placement (“Placement”) of 100 million fully paid ordinary shares at $0.002 per share to raise $200,000 was announced on 21 January 2015. The placement was made to sophisticated and professional investors under the Company’s existing 15% placement capacity. The new shares under the placement were allocated on 27 January 2015.

The Company announced a Share Purchase Plan (“SPP”) to raise up to $300,000 on 19 February 2015. The SPP opened on 27 February 2015 and closed on 18 March 2015 with applications received in excess of the capped amount of 150,000,000 new shares. Excess subscription monies were refunded by cheque to the relevant applicants and new shares were allocated on 25 March 2015.

The Company will use the funds raised under the SPP and in the abovementioned placement to:

  • progress exploration and resource definition at the Company’s Redback Gold Project near Spargoville in WA; and

  • provide working capital to the Company.

==> picture [213 x 175] intentionally omitted <==

----- Start of picture text -----

Tanami Mill Ta nami
Granites Mill
NORTHERN
TERRITORY QUEENSLAND
WESTERN
AUSTRALIA
SOUTH
Spargoville AUSTRALIA
Va lley Floor NEW SOUTH WALES
Gold project 500km VICTORIA
TAS
----- End of picture text -----

Tychean Resources Limited ACN 119 031 864 | Level 3, 100 Pirie Street Adelaide South Australia 5000 Phone +61 8 7324 3195 | Fax +61 8 8312 5576 | Email [email protected] | Web www.tycheanresources.com

~~1~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

EXPLORATION ACTIVITIES

Western Australia

Spargoville Gold Project

During the quarter, exploration within the Spargoville Project comprised drilling a total of two RC drillholes (SPRC111– 112) and 14 RC precollars (SPDT001–014) completed for a total of 2,742 metres and 13 NQ2 diamond tails were completed for 836.1 metres (SPDT001–005, SPDT007– 014). All drilling was completed at the Redback prospect, (Figure 1).

Results were received from RC drilling completed during December 2014, (23 holes for 3,526 metres, SPRC088–110).

SPARGOVILLE RC DRILLING RESULTS

High grade results from reverse circulation (RC) drilling completed during December 2014 were received during the period. The RC drilling was completed at the Redback prospect, within the Company’s wholly owned Spargoville Gold Project in the Eastern Goldfields of Western Australia.

The RC drilling, which totalled 23 holes for 3,526 metres, was designed to infill and extend high grade mineralisation to 10/20m x 20m drill spacing.

Significant high grade results were returned from the Eastern, Central and Western Zones, as well as a potential new mineralised zone located within the footwall felsic unit. More significant results include:

Western Zone

  • 9 metres at 4.78g/t Au from 170 metres including 4 metres at 9.05g/t Au from 172 metres

  • 13 metres at 3.16g/t Au from 188 metres including 2 metres at 6.52g/t Au from 193 metres

  • 20 metres at 4.05g/t Au from 195 metres including 2 metres at 12.1g/t Au from 197 metres

  • 7 metres at 3.30g/t Au from 129 metres including 2 metres at 7.22g/t Au from 132 metres

==> picture [236 x 338] intentionally omitted <==

Figure 1 Spargoville Gold Project prospect location plan.

  • 3 metres at 7.42g/t Au from 151 metres including 1 metre at 10.3g/t Au from 153 metres

Footwall Zone

  • 1 metre at 10.2g/t Au from 179 metres to EOH

All significant (≥1.0g/t Au and ≥4 gram metre) results returned from the RC drilling are included as Table 1 and collar details included as Table 2.

The results from the completed extensional drilling at the Redback prospect, has identified further potential for extensions of high grade mineralisation at depth and down plunge to the north associated with the Eastern and Western Zones which remain open.

Central Zone

  • 7 metres at 3.74g/t Au from 65 metres including 2 metres at 9.76g/t Au from 69 metres

  • 9 metres at 4.97g/t Au from 42 metres including 1 metre at 15.3g/t Au from 42 metres

Eastern Zone

  • 5 metres at 8.96g/t Au from 186 metres including 1 metre at 15.7g/t Au from 186 metres

A maximum result of 9 metres at 4.78g/t Au from 170 metres including 4 metres at 9.05g/t Au from 172 metres (SPRC088) has been returned in the north, associated with the Western Zone at depth. Significant (≥1.0g/t Au and ≥4 ram metre) Western Zone mineralisation has been defined in the north over 100 metres of strike and 100 metres of dip extent and is interpreted to plunge to the north at approximately -60 degrees.

~~2~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

Completed RC drilling in the south following up previous Eastern Zone high grade mineralisation, intercepted a maximum result of 3 metres at 7.42g/t Au from 151 metres including 1 metre at 10.3g/t Au from 153 metres .

Also within the drilling in the south, an intercept of 1 metre at 10.2g/t Au from 179 metres to EOH (SPRC094) was intersected within the footwall felsic unit. This is the first significant mineralised intercept returned within the footwall felsic unit.

Table 1 Significant (≥1.0g/t Au and ≥4 gram metre) intercepts – RC drilling, November 2014.

==> picture [237 x 33] intentionally omitted <==

----- Start of picture text -----

Hole ID From To Length Au Zone
(m) (m) (m) (ppm)
----- End of picture text -----

Hole ID From
(m)

To
(m)
Length
(m)

Au
(ppm)
Zone
SPRC088 136 140 4* 1.08 Other
170 179 9 4.78 Western
incl 172 176 4 9.05 Western
190 194 4 2.84 Central
SPRC089 188 198 13 3.16 Western
incl 193 195 2 6.52 Western
206 210 4 4.17 Central
incl 207 208 1 9.34 Central
SPRC090 128 132 4* 2.15 Other
195 215 20 4.05 Western
incl 197 199 2 12.1 Western
SPRC091 162 166 4 2.89 Western
176 179 3 1.72 Eastern
196 200 6 4.15 Eastern
incl 199 200 1 8.20 Eastern
SPRC092 56 60 4* 2.5 Western
65 72 7 3.74 Central
incl 69 71 2 9.76 Central
SPRC093 155 158 3 4.97 Central
incl 156 157 1 9.33 Central
164 169 5 1.79 Eastern
incl 167 168 1 5.33 Eastern
SPRC094 129 136 7 3.3 Western
incl 132 134 2 7.22 Western
146 149 3 1.88 Central
169 172 3 4.21 Eastern
incl 169 170 1 8.03 Eastern
179 180 1 10.2 Footwall - EOH

==> picture [237 x 32] intentionally omitted <==

----- Start of picture text -----

Hole ID From To Length Au Zone
(m) (m) (m) (ppm)
----- End of picture text -----

Hole ID From
(m)

To
(m)
Length
(m)

Au
(ppm)
Zone
SPRC098 112 115 3 1.38 Eastern
SPRC099 96 100 4* 3.48 Other
157 162 5 3.2 Central
166 169 3 2.6 Central
incl 168 169 1 5.74 Central
197 201 4 2.02 Eastern
SPRC101 56 60 4* 1.32 Other
122 126 4 4.97 Western
incl 123 125 2 6.36 Western
186 191 5 8.96 Eastern
incl 186 187 1 15.7 Eastern
and 190 191 1 20.2 Eastern
SPRC102 24 28 4* 9.18 Western
42 51 9 4.97 Central
incl 42 43 1 15.3 Central
and 48 49 1 13.4 Central
SPRC104 89 90 1 4.47 Western
111 120 9 2.11 Central
incl 119 120 1 5.15 Central
SPRC105 145 153 8 2.37 Western
incl 151 152 1 7.26 Western
169 172 3 1.68 Central
205 207 2 4.86 Eastern
incl 205 206 1 6.27 Eastern
SPRC107 40 44 4* 2.33 Supergene
SPRC108 105 108 3 2.88 Western
111 113 2 4.2 Western
123 126 3 3.16 Central
incl 124 125 1 5.04 Central
138 145 7 2.52 Eastern
incl 138 139 1 6.57 Eastern
151 154 3 7.42 Eastern
incl 153 154 1 10.3 Eastern
SPRC109 76 80 4* 2.12 Western
84 92 8 2.39 Central
SPRC110 153 154 1 4.57 Eastern

* Composite interval significant result.

~~3~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

Table 2 Drillhole collar details – Redback RC drilling, December 2014.

==> picture [494 x 32] intentionally omitted <==

----- Start of picture text -----

Hole ID Easting Northing RL Azimuth Dip Total Depth
(GDA) (GDA) (m) (m)
----- End of picture text -----

Hole ID Easting
(GDA)
Northing
(GDA)
RL
(m)
Azimuth Dip Total Depth
(m)
SPRC088 356471.98 6527288.03 336.62 90 -60 228
SPRC089 356460.15 6527309.34 336.48 90 -60 246
SPRC090 356449.42 6527330.35 336.39 90 -60 252
SPRC091 356469.09 6527329.93 336.31 90 -60 216
SPRC092 356581.18 6527168.15 336.83 90 -60 102
SPRC093 356539.26 6527167.51 336.98 90 -60 180
SPRC094 356530.43 6527199.18 336.75 90 -60 180
SPRC095 356550.54 6527328.43 335.50 90 -60 72
SPRC096 356547.37 6527349.54 335.51 90 -60 60
SPRC097 356529.93 6527349.72 335.63 90 -60 108
SPRC098 356509.58 6527349.07 335.90 90 -60 120
SPRC099 356491.22 6527309.95 336.33 90 -60 210
SPRC100 356521.14 6527288.45 336.15 90 -60 126
SPRC101 356501.29 6527288.45 336.48 90 -60 198
SPRC102 356561.12 6527266.76 335.75 90 -60 78
SPRC103 356541.74 6527264.68 336.11 90 -60 114
SPRC104 356517.33 6527264.52 336.40 90 -60 150
SPRC105 356496.31 6527267.56 336.67 90 -60 220
SPRC106 356559.88 6527248.77 335.95 90 -60 96
SPRC107 356539.81 6527248.04 336.15 90 -60 120
SPRC108 356535.30 6527212.22 336.52 90 -60 168
SPRC109 356563.27 6527182.91 336.57 90 -60 120
SPRC110 356544.04 6527184.51 336.71 90 -60 162

SPARGOVILLE COMPLETED RC/DIAMOND DRILLING

During the period a programme of RC and diamond drilling was completed at the Redback prospect within the Company’s wholly owned Spargoville Gold Project in the Eastern Goldfields of Western Australia, (Figure 1).

A total of two RC drillholes (SPRC111–112) and 14 RC precollars (SPDT001–014) completed for a total of 2,742 metres. A total of 13 NQ2 diamond tails were completed for 836.1 metres (SPDT001–005, 007 and 014), (Figure 2, Table 4).

Visible gold mineralisation has been logged within nine of the 13 completed diamond tails, interpreted to be associated with the Western, Central and Eastern Zones of mineralisation. A summary of the visible gold locations relative to the interpreted mineralised zones at the Redback prospect is included below, (Table 3).

Table 3 Visible gold intersection summary – Redback RC/diamond drilling, March 2014.

Hole
Visible Gold Occurrences Logged Visible Gold Occurrences Logged Visible Gold Occurrences Logged
Number Western
Zone
Central
Zone
Eastern
Zone
SPDT001 9
SPDT002 8 2
SPDT004 10 3
SPDT008 9
SPDT010 12
SPDT011 10
SPDT012 19
SPDT013 16
SPDT014 1
Total 67 18 14

~~4~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

==> picture [236 x 336] intentionally omitted <==

Figure 2 Spargoville Gold Project, Redback drilling summary plan.

The intersected visible gold mineralisation indicates that the Central and Eastern Zones remain open at depth and along a potential plunge direction to the north and/or south, and indicate the Western Zone remains open along strike and down plunge to the north.

SPDT001 – A total of nine visible gold occurrences, ranging from 0.1mm to 1.1mm, have been identified within a downhole interval of 1.95 metres from 149.05 metres, within carbonate altered actinolite-chlorite ultramafic, quartz-carbonate veining and minor biotite-chlorite veining, interpreted to be associated with Eastern Zone mineralisation. One of the occurrences is depicted in Figure 3.

==> picture [236 x 166] intentionally omitted <==

Figure 3 Visible gold logged within SPDT001 at 150.92m downhole. Diameter of NQ2 drill core is 50.5mm.

Table 4 Drill hole collar details – Redback RC/diamond drilling, March 2014.

==> picture [495 x 33] intentionally omitted <==

----- Start of picture text -----

Hole Easting Northing RL Azimuth Dip RC Diamond Total Depth
Number (GDA Zone 51) (GDA Zone 51) (m) (m) (m) (m)
----- End of picture text -----

Hole
Number
Easting
(GDA Zone 51)
Northing
(GDA Zone 51)
RL
(m)
Azimuth Dip RC
(m)
Diamond
(m)
Total Depth
(m)
SPDT001 6527198.38 356540.49 336.60 90 -60 90 72.8 162.8
SPDT002 6527200.03 356510.52 336.90 90 -60 150 48.7 198.7
SPDT003 6527216.25 356513.30 336.73 90 -60 132 51.8 183.8
SPDT004 6527227.01 356490.55 337.14 90 -60 150 84.8 234.8
SPDT005 6527287.39 356446.84 336.72 90 -60 198 75.8 273.8
SPDT006 6527310.33 356429.47 336.56 90 -60 228 228
SPDT007 6527331.01 356427.19 336.41 90 -60 228 67.3 295.3
SPDT008 6527348.14 356448.95 336.16 90 -60 180 84.6 264.6
SPDT009 6527350.74 356429.08 336.27 90 -61 228 72.8 300.8
SPDT010 6527319.27 356642.92 334.57 270 -60 162 60.3 222.3
SPDT011 6527289.22 356647.02 332.87 270 -57 138 54.7 192.7
SPDT012 6527318.78 356641.92 334.54 270 -57 156 38.7 194.7
SPDT013 6527346.43 356464.50 336.21 90 -60 162 74.9 236.9
SPDT014 6527370.17 356398.76 336.44 90 -55 240 48.9 288.9
SPRC111 6527166.14 356552.68 336.79 90 -60 168 168
SPRC112 6527197.95 356559.23 336.45 90 -60 132 132

~~5~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

SPDT002 – A total of 10 visible gold occurrences, ranging from 0.1mm to 2mm, have been logged, interpreted to be associated with the Central and Eastern Zones. Eight of the occurrences were logged within a 1.1 metre interval from 167.05 metres, within carbonate altered actinolite-chlorite ultramafic and quartz-carbonate veining, interpreted to be associated with Central Zone mineralisation.

The remaining two occurrences within SPDT002 were logged within a downhole interval of 0.2 metres from 177.00 metres, within a 0.6m interval of moderately biotite altered, sheared sulphidic sediment interpreted to be associated with Eastern Zone mineralisation. The alteration and host to the visible gold is comparable to the one of the hosts of the high grade mineralisation at the Wattle Dam Gold Mine. One of the occurrences is depicted in Figure 4.

SPDT004 – A total of 13 visible gold occurrences, ranging from 0.1mm to 2mm (Figure 5), have been logged, interpreted to be associated with the Central and Eastern Zones. Ten of the occurrences were logged within a 1.3 metre interval from 214.30 metres, within carbonate altered actinolite-chlorite ultramafic and quartz-carbonate (± chlorite) veining, interpreted to be associated with Central Zone mineralisation. One of the occurrences is depicted in Figure 5.

The remaining three occurrences within SPDT004 were logged downhole at 225.08 metres and 229.98 metres within a strongly carbonate altered actinolite-chlorite ultramafic, interpreted to be associated with Eastern Zone mineralisation.

==> picture [236 x 231] intentionally omitted <==

==> picture [293 x 221] intentionally omitted <==

Figure 5 Visible gold logged within SPDT004 at 215.36m downhole.

SPDT008 – A total of nine visible gold occurrences, ranging from 0.1mm to 1mm have been identified within a downhole interval of 2.85 metres from 216.60 metres, within actinolite/tremolite-chlorite ultramafics and quartzcarbonate veining, interpreted to be associated with Western Zone mineralisation. One of the occurrences is depicted in Figure 6.

SPDT010 (previously reported) – A total of 12 visible gold occurrences, ranging from 0.1mm to 2mm, have been identified within a downhole interval of 9.65 metres from 199.55 metres within actinolite-chlorite ultramafic lithologies and quartz-carbonate veining, interpreted to be associated with Western Zone mineralisation. One occurrence identified within the drillhole is depicted in Figure 7.

SPDT011 (previously reported) – A total of 10 visible gold occurrences, ranging from 0.1mm to 1mm, have been identified. Ten of the occurrences have been identified within a downhole interval of 3.05 metres from 206.15 metres, within chlorite-tremolite ultramafic lithologies and quartzcarbonate veining, interpreted to be associated with Western Zone mineralisation.

SPDT012 – A total of 19 visible gold occurrences, ranging from 0.1mm to 0.5mm, have been identified within a downhole interval of 4.05 metres from 176.00 metres, within actinolite-chlorite ultramafics and quartz-carbonate veining, interpreted to be associated with Western Zone mineralisation. One of the occurrences is depicted in Figure 8.

Figure 4 Visible gold logged within SPDT002 at 177.01m downhole. Scale in centimetres.

~~6~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

==> picture [236 x 194] intentionally omitted <==

Figure 6 Visible gold logged within SPDT008 at 219.43m downhole. Scale in centimetres.

==> picture [236 x 210] intentionally omitted <==

Figure 7 Redback Prospect – One of the 12 visible gold occurrences identified within NQ2 drill core (diameter 50.5mm) from drill hole, SPDT010 at 207.28 metres. Three coarse clusters of gold circled in yellow with several smaller specks of gold scattered throughout broken core surface.

SPDT013 – A total of 16 visible gold occurrences, ranging from 0.1mm to 1.0mm, have been identified within a downhole interval of 4.05 metres from 176.00 metres, within actinolite-chlorite ultramafics and quartz-carbonate veining, interpreted to be associated with Western Zone mineralisation. One of the occurrences is depicted in Figure 9.

==> picture [236 x 194] intentionally omitted <==

Figure 8 Visible gold logged within SPDT012 at 177.13m downhole. Diameter of NQ2 drill core is 50.5mm.

==> picture [236 x 210] intentionally omitted <==

Figure 9 Visible gold logged within SPDT013 at 183.42m downhole. Scale in centimetres.

SPDT014 – A single visible gold occurrence, 0.1mm, has been identified at a downhole depth of 260.30 metres, within an actinolite-chlorite ultramafic, interpreted to be associated with Western Zone mineralisation.

Further RC and diamond drilling is currently being planned to further test the extensions of the zones of visible gold mineralisation and will be updated once all assay results are received.

~~7~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

==> picture [463 x 356] intentionally omitted <==

Figure 10 Spargoville Gold Project – Redback Prospect Western Zone longitudinal projection.

==> picture [463 x 356] intentionally omitted <==

Figure 11 Spargoville Gold Project – Redback Prospect Central Zone longitudinal projection.

~~8~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

==> picture [494 x 380] intentionally omitted <==

Figure 12 Spargoville Gold Project – Redback Prospect Eastern Zone longitudinal projection.

Northern Territory

TANAMI FARM-IN AND JOINT VENTURE AGREEMENT

Tanami joint venture partner, Ramelius Resources Limited [RMS], advised that an RC drilling programme was completed at the Suplejack prospect [EL 26625] (Figure 13) between 23 and 27 March 2015, with 15 holes drilled for a total of 1206 metres. Analytical results for gold are expected by mid-April 2015.

Final copies of the Mineral Exploration Agreement for the following groupings of ELAs have been received from the Central Land Council:

  • ELAs 27921, 27997 & 28493. Groundrush; Mt. Solitaire; Groundrush South:

  • ELAs 27995, 29829 and 27511. Officer Hill South; Highland Rocks 2; Highland Rocks:

Tanami joint venture partner, Ramelius Resources Limited, advised Tychean Resources Limited on 23 February 2015, that they had met their minimum expenditure commitment under the terms of the farm-in and joint venture agreement.

~~9~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

==> picture [494 x 731] intentionally omitted <==

----- Start of picture text -----

129° 130° 131°
TANAMI
Northern Territory
� Soldier
� Bluebush Bore
� Tregony
SUPLEJACKSUPLEJACKSUPLEJACKSUPLEJACK
EL27806
Talbot North
� Bald Hill � � ��� The Grange & BrokenwoodStoney Ridge, Jasper Hill, Hyperion & Hyperion Sth
Groundrush Mine
� � �
ELA28493 ELA27921
Groundrush Sth Groundrush
� EL26625
Coyote Pendragon � � Tanami Mine Suplejack
�� Challenger 2&3
Old Pirate � Twin Bonanza
Jims Find � Rabbit Flat Roadhouse ELA27997
Mount Solitaire
Titania �
� Windy Hill
The Granites
Gold Mine
Callie Gold Mine � � ��� � � � � � Cashel
Bunkers Hill
Anomaly 2 � Hordern Hills
� Officer Hill
ELA27995
Officer Hills South
ELA27511
Highland Rocks
ELA29829
Highland Rocks 2
Exploration Licence
Tanami Au Resources (ozs)
Exploration Licence - Application
(1)
� [> 2,000,000] Pastoral Lease
0 20 km � 500,000 to 2,000,000 (5) � Operating Mine
1:1,500,000 � 50,000 to 500,000 (11) � Historic Mine
� < 50,000 (3) � Prospect
TANAMI.WOR
129° 130° 131°
Figure 13 Tanami Project location.
100km radius from processing plant
Lajamanu
Road
Tanami
100km radius from processing plant
Road
-19° -19°
-20° -20°
-21° -21°
T E R R I T O R Y
A U S T R A L I A
W E S T E R N N O R T H E R N
-22° -22°
----- End of picture text -----

~~10~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

Competent Persons Statement

The information contained in this release that relates to exploration results, mineralisation and target generation is based on information compiled by Mr Matthew Svensson, who is a Member of the Australasian Institute of Geologists (MAIG) and a full time employee of the Company. Mr. Svensson has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Svensson consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.

For further information please contact:

Mr Joe Houldsworth

Managing Director, Tychean Resources Limited on 0487 924 326 or

Investor relations:

Mr Duncan Gordon,

Executive Director, Adelaide Equity Partners on 0404 006 444

Further information relating to Tychean Resources Ltd and its various exploration projects can be found on its website: www.tycheanresources.com

This announcement contains previously announced TYK exploration results.

28/03/2014 - High grade gold in new results from Spargoville in WA

02/05/2014 - Spargoville (WA) – aircore gold resample results

22/09/2014 - High grade single metre gold results from Spargoville WA

05/12/2014 – Redback prospect high grade gold results

20/01/2015 - More Redback prospect high grade gold results

05/03/2015 – Visible gold in first diamond drilling at Redback prospect

23/03/2015 – Further visible gold at Redback prospect

The Company is not aware of any new information or data, which hasn’t been previously reported, that materially affects the information included in the current market announcement.

==> picture [146 x 61] intentionally omitted <==

Joe Houldsworth MANAGING DIRECTOR

~~11~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

SCHEDULE OF INTERESTS IN MINING TENEMENTS

As at 31 March 2015

==> picture [494 x 21] intentionally omitted <==

----- Start of picture text -----

Project Tenement Lease name State Status % held by TYK Holders
----- End of picture text -----

Project Tenement Lease name State Status % held by TYK Holders
Spargoville M15/1475 Eagles Nest WA Granted 100% Tychean Resources Ltd
Spargoville E15/967 Kambalda West WA Granted 100% – No nickel rights Tychean Resources Ltd
Spargoville E15/968 Kambalda West WA Granted 100% – No nickel rights Tychean Resources Ltd
Spargoville L15/128 Kambalda West WA Granted 100% – No nickel rights Tychean Resources Ltd
Spargoville L15/255 Kambalda West WA Granted 100% – No nickel rights Tychean Resources Ltd
Spargoville M15/395 Kambalda West WA Granted 100% – No nickel rights Tychean Resources Ltd
Spargoville M15/703 Kambalda West WA Granted 100% – No nickel rights Tychean Resources Ltd
Spargoville P15/5860 Kambalda West WA Granted 100% – No nickel rights Tychean Resources Ltd
Spargoville P15/4884 Kambalda West WA Granted 100% – No nickel rights Tychean Resources Ltd
Spargoville P15/4885 Kambalda West WA Granted 100% – No nickel rights Tychean Resources Ltd
Spargoville P15/4963 Kambalda West WA Granted 100% – No nickel rights Tychean Resources Ltd
Spargoville M15/1448 Hilditch WA Granted 90% Bullabulling Pty Ltd
Tychean Resources Ltd
Spargoville M15/1449 Larkinville WA Granted 75%
80% Ni rights
Tychean Resources Ltd
Pioneer Resources Ltd
Spargoville P15/5912 Villa Deste WA Granted 75%
80% Ni rights
Tychean Resources Ltd
Pioneer Resources Ltd
Spargoville M15/100 North Widgie WA Granted 100% AU rights only Australian Nickel Mines Pty Ltd
Spargoville M15/101 North Widgie WA Granted 100% AU rights only Australian Nickel Mines Pty Ltd
Spargoville M15/102 North Widgie WA Granted 100% AU rights only Australian Nickel Mines Pty Ltd
Spargoville M15/1271 North Widgie WA Granted 100% AU rights only Australian Nickel Mines Pty Ltd
Spargoville M15/653 North Widgie WA Granted 100% AU rights only Australian Nickel Mines Pty Ltd
Spargoville- M15/97 North Widgie WA Granted 100% AU rights only Australian Nickel Mines Pty Ltd
Spargoville M15/99 North Widgie WA Granted 100% AU rights only Australian Nickel Mines Pty Ltd
Spargoville M15/1101 Wattle Dam WA Granted 100%
80% Ni rights
Tychean Resources Ltd
Spargoville M15/1263 Wattle Dam WA Granted 100%
80% Ni rights
Tychean Resources Ltd
Spargoville M15/1264 Wattle Dam WA Granted 100%
80% Ni rights
Tychean Resources Ltd
Spargoville M15/1323 Wattle Dam WA Granted 100%
80% Ni rights
Tychean Resources Ltd

~~12~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

==> picture [495 x 22] intentionally omitted <==

----- Start of picture text -----

Project Tenement Lease name State Status % held by TYK Holders
----- End of picture text -----

Project Tenement Lease name State Status % held by TYK Holders
Spargoville M15/1338 Wattle Dam WA Granted 100%
80% Ni rights
Tychean Resources Ltd
Spargoville M15/1474 Wattle Dam WA Granted 100% Tychean Resources Ltd
Spargoville M15/1769 Wattle Dam WA Granted 100%
80% Ni rights
Tychean Resources Ltd
Spargoville M15/1770 Wattle Dam WA Granted 100%
80% Ni rights
Tychean Resources Ltd
Spargoville M15/1771 Wattle Dam WA Granted 100%
80% Ni rights
Tychean Resources Ltd
Spargoville M15/1772 Wattle Dam WA Granted 100%
80% Ni rights
Tychean Resources Ltd
Spargoville M15/1773 Wattle Dam WA Granted 100%
80% Ni rights
Tychean Resources Ltd
Spargoville M15/1774 Wattle Dam WA Granted 100% Tychean Resources Ltd
Spargoville M15/1775 Wattle Dam WA Granted 100% Tychean Resources Ltd
Spargoville M15/1776 Wattle Dam WA Granted 100% Tychean Resources Ltd
Spargoville P15/5953 Wattle Dam WA Pending 100% Tychean Resources Ltd
Valley Floor E15/1249 Lake Lefroy WA Granted 100% Valley Floor Resources Pty Ltd
Valley Floor E15/1399 Lefroy South WA Granted 100% Valley Floor Resources Pty Ltd
Valley Floor E15/1434 Valley Floor Ext WA Granted 100% Tychean Resources Ltd
Valley Floor E15/1438 Valley Floor Ext WA Granted 100% Tychean Resources Ltd
Tanami EL 26625 Suplejack NT Granted 100% Tychean Resources Limited
Tanami EL 27511 Highland Rocks NT Pending 100% Tychean Tanami Pty Ltd
Tanami EL 27806 Talbot North NT Granted 100% Tychean Tanami Pty Ltd
Tanami EL 27921 Groundrush NT Pending 100% Tychean Resources Limited
Tanami EL 27995 Officer Hills South NT Pending 100% Tychean Resources Limited
Tanami EL 27997 Mount Solitaire NT Pending 100% Tychean Resources Limited
Tanami EL 28493 Groundrush South NT Pending 100% Tychean Resources Limited
Tanami EL 29829 Highland Rocks 2 NT Pending 100% Tychean Tanami Pty Ltd

~~13~~

Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Rule 5.5

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013

Name of entity

TYCHEAN RESOURCES LTD

ABN 40 119 031 864

Quarter ended (“current quarter”) 31 MARCH 2015

Consolidated statement of cash flows

Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
1.3
Dividends received
1.4
Interest and other items of a similar nature
received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Other (provide details if material)
Net Operating Cash Flows
Current quarter
$A’000
Year to date (9
months)
$A’000
(191)
(143)
1
(1,482)
(559)
14
(333) (2,027)
Cash flows related to investing activities
1.8
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
1.9
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.10
Loans to other entities
1.11
Loans repaid by other entities
1.12
Other (provide details if material)
Net investing cash flows
1.13
Total operating and investing cash flows
(carried forward)
- -
(333) (2,027)
  • See chapter 19 for defined terms.

01/05/2010 Appendix 5B Page 1

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

1.13
Total operating and investing cash flows
(brought forward)
(333) (2,027)
Cash flows related to financing activities
1.14
Proceeds from issues of shares, options, etc.
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other (provide details if material)
Net financing cash flows
500
(42)
1,312
(121)
458 1,191
Net increase (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end ofquarter
125
138
(836)
1,099
263 263

Payments to directors of the entity, associates of the directors, related entities of the entity and associates of the related entities

1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
(76)
-
1.25 Explanation necessaryfor an understandingof the transactions

Non-cash financing and investing activities

  • 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows

  • See chapter 19 for defined terms.

Appendix 5B Page 2

01/05/2013

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

  • 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest

Financing facilities available

Add notes as necessary for an understanding of the position.

Amount available Amount used $A’000 $A’000

  • 3.1 Loan facilities 3.2 Credit standby arrangements

Estimated cash outflows for next quarter

  • $A’000

  • 4.1 Exploration and evaluation (391) 4.2 Development 4.3 Production 4.4 Administration (192) Total (583)

Reconciliation of cash

Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
Current quarter
$A’000
Previous quarter
$A’000
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
263 138
Total: cash at end of quarter(item 1.22) 263 138
  • See chapter 19 for defined terms.

01/05/2010 Appendix 5B Page 3

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Changes in interests in mining tenements and petroleum tenements

Changes in interests in mining tenements and petroleum tenements Changes in interests in mining tenements and petroleum tenements Changes in interests in mining tenements and petroleum tenements Changes in interests in mining tenements and petroleum tenements Changes in interests in mining tenements and petroleum tenements
Tenement
reference
and
location
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
6.1
Interests in mining
tenements and
petroleum tenements
relinquished, reduced
or lapsed
P15/4765
Holder
75%
0%
6.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Total number Number quoted Issue price per
security (see
note3) (cents)
Amount paid up
per security (see
note3) (cents)
7.1
Preference
+securities
(description)
7.2
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buy-
backs,
redemptions
7.3
+Ordinary
securities
7.4
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buy-
backs
2,253,631,175 2,253,631,175
250,000,000
85
250,000,000
85
$0.002
$0.006
$0.002
$0.006
7.5
+Convertible
debt
securities
(description)
  • See chapter 19 for defined terms.

Appendix 5B Page 4

01/05/2013

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

7.6
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
7.7
Options
(description and
conversion
factor)
7.8
Issued during
quarter
7.9
Exercised
during quarter
7.10
Expired during
quarter
318,377,195 318,377,195 Exercise price
$0.006
Expiry date
30 June 2015
85 85 $0.006 30 June 2015
7.11
Debentures
(totals only)
7.12
Unsecured
notes(totals
only)

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).

  • 2 This statement does give a true and fair view of the matters disclosed.

29 April 2015 Sign here: ............................................................ Date: ............................ (Company secretary) Justin Nelson Print name: .........................................................

  • See chapter 19 for defined terms.

01/05/2010 Appendix 5B Page 5

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements and petroleum tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement or petroleum tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  • 4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.

  • 5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

  • See chapter 19 for defined terms.