QUARTERLY REPORT
Period ending 31 March 2015
KEY EVENTS
-
z Placement and Share Purchase Plan completed raising a total of $500,000.
-
z Spargoville RC drill sampling (completed December 2014) confirms and extends highly anomalous gold intercepts at Redback prospect.
-
9m at 4.78g/t Au from 170m including 4m at 9.05g/t Au
-
20m at 4.05g/t Au from 195m including 2m at 12.1g/t Au
-
13m at 3.16g/t Au from 188m including 2m at 6.52g/t Au
-
9m at 4.97g/t Au from 42m including 1m at 15.3g/t Au and 1m at 13.4g/t Au
-
z Follow up RC/diamond drilling at Redback completed, for a total of 15 holes for 3,578.1 metres.
-
z Visible gold logged within nine out of the 13 completed diamond tails.
-
z RC drilling programme completed at Suplejack prospect in the Tanami (NT).
REVIEW OF OPERATIONS
CORPORATE ACTIVITIES
A placement (“Placement”) of 100 million fully paid ordinary shares at $0.002 per share to raise $200,000 was announced on 21 January 2015. The placement was made to sophisticated and professional investors under the Company’s existing 15% placement capacity. The new shares under the placement were allocated on 27 January 2015.
The Company announced a Share Purchase Plan (“SPP”) to raise up to $300,000 on 19 February 2015. The SPP opened on 27 February 2015 and closed on 18 March 2015 with applications received in excess of the capped amount of 150,000,000 new shares. Excess subscription monies were refunded by cheque to the relevant applicants and new shares were allocated on 25 March 2015.
The Company will use the funds raised under the SPP and in the abovementioned placement to:
-
progress exploration and resource definition at the Company’s Redback Gold Project near Spargoville in WA; and
-
provide working capital to the Company.
==> picture [213 x 175] intentionally omitted <==
----- Start of picture text -----
Tanami Mill Ta nami
Granites Mill
NORTHERN
TERRITORY QUEENSLAND
WESTERN
AUSTRALIA
SOUTH
Spargoville AUSTRALIA
Va lley Floor NEW SOUTH WALES
Gold project 500km VICTORIA
TAS
----- End of picture text -----
Tychean Resources Limited ACN 119 031 864 | Level 3, 100 Pirie Street Adelaide South Australia 5000 Phone +61 8 7324 3195 | Fax +61 8 8312 5576 | Email [email protected] | Web www.tycheanresources.com
~~1~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
EXPLORATION ACTIVITIES
Western Australia
Spargoville Gold Project
During the quarter, exploration within the Spargoville Project comprised drilling a total of two RC drillholes (SPRC111– 112) and 14 RC precollars (SPDT001–014) completed for a total of 2,742 metres and 13 NQ2 diamond tails were completed for 836.1 metres (SPDT001–005, SPDT007– 014). All drilling was completed at the Redback prospect, (Figure 1).
Results were received from RC drilling completed during December 2014, (23 holes for 3,526 metres, SPRC088–110).
SPARGOVILLE RC DRILLING RESULTS
High grade results from reverse circulation (RC) drilling completed during December 2014 were received during the period. The RC drilling was completed at the Redback prospect, within the Company’s wholly owned Spargoville Gold Project in the Eastern Goldfields of Western Australia.
The RC drilling, which totalled 23 holes for 3,526 metres, was designed to infill and extend high grade mineralisation to 10/20m x 20m drill spacing.
Significant high grade results were returned from the Eastern, Central and Western Zones, as well as a potential new mineralised zone located within the footwall felsic unit. More significant results include:
Western Zone
-
9 metres at 4.78g/t Au from 170 metres including 4 metres at 9.05g/t Au from 172 metres
-
13 metres at 3.16g/t Au from 188 metres including 2 metres at 6.52g/t Au from 193 metres
-
20 metres at 4.05g/t Au from 195 metres including 2 metres at 12.1g/t Au from 197 metres
-
7 metres at 3.30g/t Au from 129 metres including 2 metres at 7.22g/t Au from 132 metres
==> picture [236 x 338] intentionally omitted <==
Figure 1 Spargoville Gold Project prospect location plan.
- 3 metres at 7.42g/t Au from 151 metres including 1 metre at 10.3g/t Au from 153 metres
Footwall Zone
- 1 metre at 10.2g/t Au from 179 metres to EOH
All significant (≥1.0g/t Au and ≥4 gram metre) results returned from the RC drilling are included as Table 1 and collar details included as Table 2.
The results from the completed extensional drilling at the Redback prospect, has identified further potential for extensions of high grade mineralisation at depth and down plunge to the north associated with the Eastern and Western Zones which remain open.
Central Zone
-
7 metres at 3.74g/t Au from 65 metres including 2 metres at 9.76g/t Au from 69 metres
-
9 metres at 4.97g/t Au from 42 metres including 1 metre at 15.3g/t Au from 42 metres
Eastern Zone
- 5 metres at 8.96g/t Au from 186 metres including 1 metre at 15.7g/t Au from 186 metres
A maximum result of 9 metres at 4.78g/t Au from 170 metres including 4 metres at 9.05g/t Au from 172 metres (SPRC088) has been returned in the north, associated with the Western Zone at depth. Significant (≥1.0g/t Au and ≥4 ram metre) Western Zone mineralisation has been defined in the north over 100 metres of strike and 100 metres of dip extent and is interpreted to plunge to the north at approximately -60 degrees.
~~2~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
Completed RC drilling in the south following up previous Eastern Zone high grade mineralisation, intercepted a maximum result of 3 metres at 7.42g/t Au from 151 metres including 1 metre at 10.3g/t Au from 153 metres .
Also within the drilling in the south, an intercept of 1 metre at 10.2g/t Au from 179 metres to EOH (SPRC094) was intersected within the footwall felsic unit. This is the first significant mineralised intercept returned within the footwall felsic unit.
Table 1 Significant (≥1.0g/t Au and ≥4 gram metre) intercepts – RC drilling, November 2014.
==> picture [237 x 33] intentionally omitted <==
----- Start of picture text -----
Hole ID From To Length Au Zone
(m) (m) (m) (ppm)
----- End of picture text -----
| Hole ID | From (m) |
To (m) |
Length (m) |
Au (ppm) |
Zone |
|---|---|---|---|---|---|
| SPRC088 | 136 | 140 | 4* | 1.08 | Other |
| 170 | 179 | 9 | 4.78 | Western | |
| incl | 172 | 176 | 4 | 9.05 | Western |
| 190 | 194 | 4 | 2.84 | Central | |
| SPRC089 | 188 | 198 | 13 | 3.16 | Western |
| incl | 193 | 195 | 2 | 6.52 | Western |
| 206 | 210 | 4 | 4.17 | Central | |
| incl | 207 | 208 | 1 | 9.34 | Central |
| SPRC090 | 128 | 132 | 4* | 2.15 | Other |
| 195 | 215 | 20 | 4.05 | Western | |
| incl | 197 | 199 | 2 | 12.1 | Western |
| SPRC091 | 162 | 166 | 4 | 2.89 | Western |
| 176 | 179 | 3 | 1.72 | Eastern | |
| 196 | 200 | 6 | 4.15 | Eastern | |
| incl | 199 | 200 | 1 | 8.20 | Eastern |
| SPRC092 | 56 | 60 | 4* | 2.5 | Western |
| 65 | 72 | 7 | 3.74 | Central | |
| incl | 69 | 71 | 2 | 9.76 | Central |
| SPRC093 | 155 | 158 | 3 | 4.97 | Central |
| incl | 156 | 157 | 1 | 9.33 | Central |
| 164 | 169 | 5 | 1.79 | Eastern | |
| incl | 167 | 168 | 1 | 5.33 | Eastern |
| SPRC094 | 129 | 136 | 7 | 3.3 | Western |
| incl | 132 | 134 | 2 | 7.22 | Western |
| 146 | 149 | 3 | 1.88 | Central | |
| 169 | 172 | 3 | 4.21 | Eastern | |
| incl | 169 | 170 | 1 | 8.03 | Eastern |
| 179 | 180 | 1 | 10.2 | Footwall - EOH |
==> picture [237 x 32] intentionally omitted <==
----- Start of picture text -----
Hole ID From To Length Au Zone
(m) (m) (m) (ppm)
----- End of picture text -----
| Hole ID | From (m) |
To (m) |
Length (m) |
Au (ppm) |
Zone |
|---|---|---|---|---|---|
| SPRC098 | 112 | 115 | 3 | 1.38 | Eastern |
| SPRC099 | 96 | 100 | 4* | 3.48 | Other |
| 157 | 162 | 5 | 3.2 | Central | |
| 166 | 169 | 3 | 2.6 | Central | |
| incl | 168 | 169 | 1 | 5.74 | Central |
| 197 | 201 | 4 | 2.02 | Eastern | |
| SPRC101 | 56 | 60 | 4* | 1.32 | Other |
| 122 | 126 | 4 | 4.97 | Western | |
| incl | 123 | 125 | 2 | 6.36 | Western |
| 186 | 191 | 5 | 8.96 | Eastern | |
| incl | 186 | 187 | 1 | 15.7 | Eastern |
| and | 190 | 191 | 1 | 20.2 | Eastern |
| SPRC102 | 24 | 28 | 4* | 9.18 | Western |
| 42 | 51 | 9 | 4.97 | Central | |
| incl | 42 | 43 | 1 | 15.3 | Central |
| and | 48 | 49 | 1 | 13.4 | Central |
| SPRC104 | 89 | 90 | 1 | 4.47 | Western |
| 111 | 120 | 9 | 2.11 | Central | |
| incl | 119 | 120 | 1 | 5.15 | Central |
| SPRC105 | 145 | 153 | 8 | 2.37 | Western |
| incl | 151 | 152 | 1 | 7.26 | Western |
| 169 | 172 | 3 | 1.68 | Central | |
| 205 | 207 | 2 | 4.86 | Eastern | |
| incl | 205 | 206 | 1 | 6.27 | Eastern |
| SPRC107 | 40 | 44 | 4* | 2.33 | Supergene |
| SPRC108 | 105 | 108 | 3 | 2.88 | Western |
| 111 | 113 | 2 | 4.2 | Western | |
| 123 | 126 | 3 | 3.16 | Central | |
| incl | 124 | 125 | 1 | 5.04 | Central |
| 138 | 145 | 7 | 2.52 | Eastern | |
| incl | 138 | 139 | 1 | 6.57 | Eastern |
| 151 | 154 | 3 | 7.42 | Eastern | |
| incl | 153 | 154 | 1 | 10.3 | Eastern |
| SPRC109 | 76 | 80 | 4* | 2.12 | Western |
| 84 | 92 | 8 | 2.39 | Central | |
| SPRC110 | 153 | 154 | 1 | 4.57 | Eastern |
* Composite interval significant result.
~~3~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
Table 2 Drillhole collar details – Redback RC drilling, December 2014.
==> picture [494 x 32] intentionally omitted <==
----- Start of picture text -----
Hole ID Easting Northing RL Azimuth Dip Total Depth
(GDA) (GDA) (m) (m)
----- End of picture text -----
| Hole ID | Easting (GDA) |
Northing (GDA) |
RL (m) |
Azimuth | Dip | Total Depth (m) |
|---|---|---|---|---|---|---|
| SPRC088 | 356471.98 | 6527288.03 | 336.62 | 90 | -60 | 228 |
| SPRC089 | 356460.15 | 6527309.34 | 336.48 | 90 | -60 | 246 |
| SPRC090 | 356449.42 | 6527330.35 | 336.39 | 90 | -60 | 252 |
| SPRC091 | 356469.09 | 6527329.93 | 336.31 | 90 | -60 | 216 |
| SPRC092 | 356581.18 | 6527168.15 | 336.83 | 90 | -60 | 102 |
| SPRC093 | 356539.26 | 6527167.51 | 336.98 | 90 | -60 | 180 |
| SPRC094 | 356530.43 | 6527199.18 | 336.75 | 90 | -60 | 180 |
| SPRC095 | 356550.54 | 6527328.43 | 335.50 | 90 | -60 | 72 |
| SPRC096 | 356547.37 | 6527349.54 | 335.51 | 90 | -60 | 60 |
| SPRC097 | 356529.93 | 6527349.72 | 335.63 | 90 | -60 | 108 |
| SPRC098 | 356509.58 | 6527349.07 | 335.90 | 90 | -60 | 120 |
| SPRC099 | 356491.22 | 6527309.95 | 336.33 | 90 | -60 | 210 |
| SPRC100 | 356521.14 | 6527288.45 | 336.15 | 90 | -60 | 126 |
| SPRC101 | 356501.29 | 6527288.45 | 336.48 | 90 | -60 | 198 |
| SPRC102 | 356561.12 | 6527266.76 | 335.75 | 90 | -60 | 78 |
| SPRC103 | 356541.74 | 6527264.68 | 336.11 | 90 | -60 | 114 |
| SPRC104 | 356517.33 | 6527264.52 | 336.40 | 90 | -60 | 150 |
| SPRC105 | 356496.31 | 6527267.56 | 336.67 | 90 | -60 | 220 |
| SPRC106 | 356559.88 | 6527248.77 | 335.95 | 90 | -60 | 96 |
| SPRC107 | 356539.81 | 6527248.04 | 336.15 | 90 | -60 | 120 |
| SPRC108 | 356535.30 | 6527212.22 | 336.52 | 90 | -60 | 168 |
| SPRC109 | 356563.27 | 6527182.91 | 336.57 | 90 | -60 | 120 |
| SPRC110 | 356544.04 | 6527184.51 | 336.71 | 90 | -60 | 162 |
SPARGOVILLE COMPLETED RC/DIAMOND DRILLING
During the period a programme of RC and diamond drilling was completed at the Redback prospect within the Company’s wholly owned Spargoville Gold Project in the Eastern Goldfields of Western Australia, (Figure 1).
A total of two RC drillholes (SPRC111–112) and 14 RC precollars (SPDT001–014) completed for a total of 2,742 metres. A total of 13 NQ2 diamond tails were completed for 836.1 metres (SPDT001–005, 007 and 014), (Figure 2, Table 4).
Visible gold mineralisation has been logged within nine of the 13 completed diamond tails, interpreted to be associated with the Western, Central and Eastern Zones of mineralisation. A summary of the visible gold locations relative to the interpreted mineralised zones at the Redback prospect is included below, (Table 3).
Table 3 Visible gold intersection summary – Redback RC/diamond drilling, March 2014.
| Hole |
Visible Gold Occurrences Logged | Visible Gold Occurrences Logged | Visible Gold Occurrences Logged |
|---|---|---|---|
| Number | Western Zone |
Central Zone |
Eastern Zone |
| SPDT001 | 9 | ||
| SPDT002 | 8 | 2 | |
| SPDT004 | 10 | 3 | |
| SPDT008 | 9 | ||
| SPDT010 | 12 | ||
| SPDT011 | 10 | ||
| SPDT012 | 19 | ||
| SPDT013 | 16 | ||
| SPDT014 | 1 | ||
| Total | 67 | 18 | 14 |
~~4~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
==> picture [236 x 336] intentionally omitted <==
Figure 2 Spargoville Gold Project, Redback drilling summary plan.
The intersected visible gold mineralisation indicates that the Central and Eastern Zones remain open at depth and along a potential plunge direction to the north and/or south, and indicate the Western Zone remains open along strike and down plunge to the north.
SPDT001 – A total of nine visible gold occurrences, ranging from 0.1mm to 1.1mm, have been identified within a downhole interval of 1.95 metres from 149.05 metres, within carbonate altered actinolite-chlorite ultramafic, quartz-carbonate veining and minor biotite-chlorite veining, interpreted to be associated with Eastern Zone mineralisation. One of the occurrences is depicted in Figure 3.
==> picture [236 x 166] intentionally omitted <==
Figure 3 Visible gold logged within SPDT001 at 150.92m downhole. Diameter of NQ2 drill core is 50.5mm.
Table 4 Drill hole collar details – Redback RC/diamond drilling, March 2014.
==> picture [495 x 33] intentionally omitted <==
----- Start of picture text -----
Hole Easting Northing RL Azimuth Dip RC Diamond Total Depth
Number (GDA Zone 51) (GDA Zone 51) (m) (m) (m) (m)
----- End of picture text -----
| Hole Number |
Easting (GDA Zone 51) |
Northing (GDA Zone 51) |
RL (m) |
Azimuth | Dip | RC (m) |
Diamond (m) |
Total Depth (m) |
|---|---|---|---|---|---|---|---|---|
| SPDT001 | 6527198.38 | 356540.49 | 336.60 | 90 | -60 | 90 | 72.8 | 162.8 |
| SPDT002 | 6527200.03 | 356510.52 | 336.90 | 90 | -60 | 150 | 48.7 | 198.7 |
| SPDT003 | 6527216.25 | 356513.30 | 336.73 | 90 | -60 | 132 | 51.8 | 183.8 |
| SPDT004 | 6527227.01 | 356490.55 | 337.14 | 90 | -60 | 150 | 84.8 | 234.8 |
| SPDT005 | 6527287.39 | 356446.84 | 336.72 | 90 | -60 | 198 | 75.8 | 273.8 |
| SPDT006 | 6527310.33 | 356429.47 | 336.56 | 90 | -60 | 228 | 228 | |
| SPDT007 | 6527331.01 | 356427.19 | 336.41 | 90 | -60 | 228 | 67.3 | 295.3 |
| SPDT008 | 6527348.14 | 356448.95 | 336.16 | 90 | -60 | 180 | 84.6 | 264.6 |
| SPDT009 | 6527350.74 | 356429.08 | 336.27 | 90 | -61 | 228 | 72.8 | 300.8 |
| SPDT010 | 6527319.27 | 356642.92 | 334.57 | 270 | -60 | 162 | 60.3 | 222.3 |
| SPDT011 | 6527289.22 | 356647.02 | 332.87 | 270 | -57 | 138 | 54.7 | 192.7 |
| SPDT012 | 6527318.78 | 356641.92 | 334.54 | 270 | -57 | 156 | 38.7 | 194.7 |
| SPDT013 | 6527346.43 | 356464.50 | 336.21 | 90 | -60 | 162 | 74.9 | 236.9 |
| SPDT014 | 6527370.17 | 356398.76 | 336.44 | 90 | -55 | 240 | 48.9 | 288.9 |
| SPRC111 | 6527166.14 | 356552.68 | 336.79 | 90 | -60 | 168 | 168 | |
| SPRC112 | 6527197.95 | 356559.23 | 336.45 | 90 | -60 | 132 | 132 |
~~5~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
SPDT002 – A total of 10 visible gold occurrences, ranging from 0.1mm to 2mm, have been logged, interpreted to be associated with the Central and Eastern Zones. Eight of the occurrences were logged within a 1.1 metre interval from 167.05 metres, within carbonate altered actinolite-chlorite ultramafic and quartz-carbonate veining, interpreted to be associated with Central Zone mineralisation.
The remaining two occurrences within SPDT002 were logged within a downhole interval of 0.2 metres from 177.00 metres, within a 0.6m interval of moderately biotite altered, sheared sulphidic sediment interpreted to be associated with Eastern Zone mineralisation. The alteration and host to the visible gold is comparable to the one of the hosts of the high grade mineralisation at the Wattle Dam Gold Mine. One of the occurrences is depicted in Figure 4.
SPDT004 – A total of 13 visible gold occurrences, ranging from 0.1mm to 2mm (Figure 5), have been logged, interpreted to be associated with the Central and Eastern Zones. Ten of the occurrences were logged within a 1.3 metre interval from 214.30 metres, within carbonate altered actinolite-chlorite ultramafic and quartz-carbonate (± chlorite) veining, interpreted to be associated with Central Zone mineralisation. One of the occurrences is depicted in Figure 5.
The remaining three occurrences within SPDT004 were logged downhole at 225.08 metres and 229.98 metres within a strongly carbonate altered actinolite-chlorite ultramafic, interpreted to be associated with Eastern Zone mineralisation.
==> picture [236 x 231] intentionally omitted <==
==> picture [293 x 221] intentionally omitted <==
Figure 5 Visible gold logged within SPDT004 at 215.36m downhole.
SPDT008 – A total of nine visible gold occurrences, ranging from 0.1mm to 1mm have been identified within a downhole interval of 2.85 metres from 216.60 metres, within actinolite/tremolite-chlorite ultramafics and quartzcarbonate veining, interpreted to be associated with Western Zone mineralisation. One of the occurrences is depicted in Figure 6.
SPDT010 (previously reported) – A total of 12 visible gold occurrences, ranging from 0.1mm to 2mm, have been identified within a downhole interval of 9.65 metres from 199.55 metres within actinolite-chlorite ultramafic lithologies and quartz-carbonate veining, interpreted to be associated with Western Zone mineralisation. One occurrence identified within the drillhole is depicted in Figure 7.
SPDT011 (previously reported) – A total of 10 visible gold occurrences, ranging from 0.1mm to 1mm, have been identified. Ten of the occurrences have been identified within a downhole interval of 3.05 metres from 206.15 metres, within chlorite-tremolite ultramafic lithologies and quartzcarbonate veining, interpreted to be associated with Western Zone mineralisation.
SPDT012 – A total of 19 visible gold occurrences, ranging from 0.1mm to 0.5mm, have been identified within a downhole interval of 4.05 metres from 176.00 metres, within actinolite-chlorite ultramafics and quartz-carbonate veining, interpreted to be associated with Western Zone mineralisation. One of the occurrences is depicted in Figure 8.
Figure 4 Visible gold logged within SPDT002 at 177.01m downhole. Scale in centimetres.
~~6~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
==> picture [236 x 194] intentionally omitted <==
Figure 6 Visible gold logged within SPDT008 at 219.43m downhole. Scale in centimetres.
==> picture [236 x 210] intentionally omitted <==
Figure 7 Redback Prospect – One of the 12 visible gold occurrences identified within NQ2 drill core (diameter 50.5mm) from drill hole, SPDT010 at 207.28 metres. Three coarse clusters of gold circled in yellow with several smaller specks of gold scattered throughout broken core surface.
SPDT013 – A total of 16 visible gold occurrences, ranging from 0.1mm to 1.0mm, have been identified within a downhole interval of 4.05 metres from 176.00 metres, within actinolite-chlorite ultramafics and quartz-carbonate veining, interpreted to be associated with Western Zone mineralisation. One of the occurrences is depicted in Figure 9.
==> picture [236 x 194] intentionally omitted <==
Figure 8 Visible gold logged within SPDT012 at 177.13m downhole. Diameter of NQ2 drill core is 50.5mm.
==> picture [236 x 210] intentionally omitted <==
Figure 9 Visible gold logged within SPDT013 at 183.42m downhole. Scale in centimetres.
SPDT014 – A single visible gold occurrence, 0.1mm, has been identified at a downhole depth of 260.30 metres, within an actinolite-chlorite ultramafic, interpreted to be associated with Western Zone mineralisation.
Further RC and diamond drilling is currently being planned to further test the extensions of the zones of visible gold mineralisation and will be updated once all assay results are received.
~~7~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
==> picture [463 x 356] intentionally omitted <==
Figure 10 Spargoville Gold Project – Redback Prospect Western Zone longitudinal projection.
==> picture [463 x 356] intentionally omitted <==
Figure 11 Spargoville Gold Project – Redback Prospect Central Zone longitudinal projection.
~~8~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
==> picture [494 x 380] intentionally omitted <==
Figure 12 Spargoville Gold Project – Redback Prospect Eastern Zone longitudinal projection.
Northern Territory
TANAMI FARM-IN AND JOINT VENTURE AGREEMENT
Tanami joint venture partner, Ramelius Resources Limited [RMS], advised that an RC drilling programme was completed at the Suplejack prospect [EL 26625] (Figure 13) between 23 and 27 March 2015, with 15 holes drilled for a total of 1206 metres. Analytical results for gold are expected by mid-April 2015.
Final copies of the Mineral Exploration Agreement for the following groupings of ELAs have been received from the Central Land Council:
-
ELAs 27921, 27997 & 28493. Groundrush; Mt. Solitaire; Groundrush South:
-
ELAs 27995, 29829 and 27511. Officer Hill South; Highland Rocks 2; Highland Rocks:
Tanami joint venture partner, Ramelius Resources Limited, advised Tychean Resources Limited on 23 February 2015, that they had met their minimum expenditure commitment under the terms of the farm-in and joint venture agreement.
~~9~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
==> picture [494 x 731] intentionally omitted <==
----- Start of picture text -----
129° 130° 131°
TANAMI
Northern Territory
� Soldier
� Bluebush Bore
� Tregony
SUPLEJACKSUPLEJACKSUPLEJACKSUPLEJACK
EL27806
Talbot North
� Bald Hill � � ��� The Grange & BrokenwoodStoney Ridge, Jasper Hill, Hyperion & Hyperion Sth
Groundrush Mine
� � �
ELA28493 ELA27921
Groundrush Sth Groundrush
� EL26625
Coyote Pendragon � � Tanami Mine Suplejack
�� Challenger 2&3
Old Pirate � Twin Bonanza
Jims Find � Rabbit Flat Roadhouse ELA27997
Mount Solitaire
Titania �
� Windy Hill
The Granites
Gold Mine
Callie Gold Mine � � ��� � � � � � Cashel
Bunkers Hill
Anomaly 2 � Hordern Hills
� Officer Hill
ELA27995
Officer Hills South
ELA27511
Highland Rocks
ELA29829
Highland Rocks 2
Exploration Licence
Tanami Au Resources (ozs)
Exploration Licence - Application
(1)
� [> 2,000,000] Pastoral Lease
0 20 km � 500,000 to 2,000,000 (5) � Operating Mine
1:1,500,000 � 50,000 to 500,000 (11) � Historic Mine
� < 50,000 (3) � Prospect
TANAMI.WOR
129° 130° 131°
Figure 13 Tanami Project location.
100km radius from processing plant
Lajamanu
Road
Tanami
100km radius from processing plant
Road
-19° -19°
-20° -20°
-21° -21°
T E R R I T O R Y
A U S T R A L I A
W E S T E R N N O R T H E R N
-22° -22°
----- End of picture text -----
~~10~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
Competent Persons Statement
The information contained in this release that relates to exploration results, mineralisation and target generation is based on information compiled by Mr Matthew Svensson, who is a Member of the Australasian Institute of Geologists (MAIG) and a full time employee of the Company. Mr. Svensson has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Svensson consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.
For further information please contact:
Mr Joe Houldsworth
Managing Director, Tychean Resources Limited on 0487 924 326 or
Investor relations:
Mr Duncan Gordon,
Executive Director, Adelaide Equity Partners on 0404 006 444
Further information relating to Tychean Resources Ltd and its various exploration projects can be found on its website: www.tycheanresources.com
This announcement contains previously announced TYK exploration results.
28/03/2014 - High grade gold in new results from Spargoville in WA
02/05/2014 - Spargoville (WA) – aircore gold resample results
22/09/2014 - High grade single metre gold results from Spargoville WA
05/12/2014 – Redback prospect high grade gold results
20/01/2015 - More Redback prospect high grade gold results
05/03/2015 – Visible gold in first diamond drilling at Redback prospect
23/03/2015 – Further visible gold at Redback prospect
The Company is not aware of any new information or data, which hasn’t been previously reported, that materially affects the information included in the current market announcement.
==> picture [146 x 61] intentionally omitted <==
Joe Houldsworth MANAGING DIRECTOR
~~11~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
SCHEDULE OF INTERESTS IN MINING TENEMENTS
As at 31 March 2015
==> picture [494 x 21] intentionally omitted <==
----- Start of picture text -----
Project Tenement Lease name State Status % held by TYK Holders
----- End of picture text -----
| Project | Tenement | Lease name | State | Status | % held by TYK | Holders |
|---|---|---|---|---|---|---|
| Spargoville | M15/1475 | Eagles Nest | WA | Granted | 100% | Tychean Resources Ltd |
| Spargoville | E15/967 | Kambalda West | WA | Granted | 100% – No nickel rights | Tychean Resources Ltd |
| Spargoville | E15/968 | Kambalda West | WA | Granted | 100% – No nickel rights | Tychean Resources Ltd |
| Spargoville | L15/128 | Kambalda West | WA | Granted | 100% – No nickel rights | Tychean Resources Ltd |
| Spargoville | L15/255 | Kambalda West | WA | Granted | 100% – No nickel rights | Tychean Resources Ltd |
| Spargoville | M15/395 | Kambalda West | WA | Granted | 100% – No nickel rights | Tychean Resources Ltd |
| Spargoville | M15/703 | Kambalda West | WA | Granted | 100% – No nickel rights | Tychean Resources Ltd |
| Spargoville | P15/5860 | Kambalda West | WA | Granted | 100% – No nickel rights | Tychean Resources Ltd |
| Spargoville | P15/4884 | Kambalda West | WA | Granted | 100% – No nickel rights | Tychean Resources Ltd |
| Spargoville | P15/4885 | Kambalda West | WA | Granted | 100% – No nickel rights | Tychean Resources Ltd |
| Spargoville | P15/4963 | Kambalda West | WA | Granted | 100% – No nickel rights | Tychean Resources Ltd |
| Spargoville | M15/1448 | Hilditch | WA | Granted | 90% | Bullabulling Pty Ltd Tychean Resources Ltd |
| Spargoville | M15/1449 | Larkinville | WA | Granted | 75% 80% Ni rights |
Tychean Resources Ltd Pioneer Resources Ltd |
| Spargoville | P15/5912 | Villa Deste | WA | Granted | 75% 80% Ni rights |
Tychean Resources Ltd Pioneer Resources Ltd |
| Spargoville | M15/100 | North Widgie | WA | Granted | 100% AU rights only | Australian Nickel Mines Pty Ltd |
| Spargoville | M15/101 | North Widgie | WA | Granted | 100% AU rights only | Australian Nickel Mines Pty Ltd |
| Spargoville | M15/102 | North Widgie | WA | Granted | 100% AU rights only | Australian Nickel Mines Pty Ltd |
| Spargoville | M15/1271 | North Widgie | WA | Granted | 100% AU rights only | Australian Nickel Mines Pty Ltd |
| Spargoville | M15/653 | North Widgie | WA | Granted | 100% AU rights only | Australian Nickel Mines Pty Ltd |
| Spargoville- | M15/97 | North Widgie | WA | Granted | 100% AU rights only | Australian Nickel Mines Pty Ltd |
| Spargoville | M15/99 | North Widgie | WA | Granted | 100% AU rights only | Australian Nickel Mines Pty Ltd |
| Spargoville | M15/1101 | Wattle Dam | WA | Granted | 100% 80% Ni rights |
Tychean Resources Ltd |
| Spargoville | M15/1263 | Wattle Dam | WA | Granted | 100% 80% Ni rights |
Tychean Resources Ltd |
| Spargoville | M15/1264 | Wattle Dam | WA | Granted | 100% 80% Ni rights |
Tychean Resources Ltd |
| Spargoville | M15/1323 | Wattle Dam | WA | Granted | 100% 80% Ni rights |
Tychean Resources Ltd |
~~12~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
==> picture [495 x 22] intentionally omitted <==
----- Start of picture text -----
Project Tenement Lease name State Status % held by TYK Holders
----- End of picture text -----
| Project | Tenement | Lease name | State | Status | % held by TYK | Holders |
|---|---|---|---|---|---|---|
| Spargoville | M15/1338 | Wattle Dam | WA | Granted | 100% 80% Ni rights |
Tychean Resources Ltd |
| Spargoville | M15/1474 | Wattle Dam | WA | Granted | 100% | Tychean Resources Ltd |
| Spargoville | M15/1769 | Wattle Dam | WA | Granted | 100% 80% Ni rights |
Tychean Resources Ltd |
| Spargoville | M15/1770 | Wattle Dam | WA | Granted | 100% 80% Ni rights |
Tychean Resources Ltd |
| Spargoville | M15/1771 | Wattle Dam | WA | Granted | 100% 80% Ni rights |
Tychean Resources Ltd |
| Spargoville | M15/1772 | Wattle Dam | WA | Granted | 100% 80% Ni rights |
Tychean Resources Ltd |
| Spargoville | M15/1773 | Wattle Dam | WA | Granted | 100% 80% Ni rights |
Tychean Resources Ltd |
| Spargoville | M15/1774 | Wattle Dam | WA | Granted | 100% | Tychean Resources Ltd |
| Spargoville | M15/1775 | Wattle Dam | WA | Granted | 100% | Tychean Resources Ltd |
| Spargoville | M15/1776 | Wattle Dam | WA | Granted | 100% | Tychean Resources Ltd |
| Spargoville | P15/5953 | Wattle Dam | WA | Pending | 100% | Tychean Resources Ltd |
| Valley Floor | E15/1249 | Lake Lefroy | WA | Granted | 100% | Valley Floor Resources Pty Ltd |
| Valley Floor | E15/1399 | Lefroy South | WA | Granted | 100% | Valley Floor Resources Pty Ltd |
| Valley Floor | E15/1434 | Valley Floor Ext | WA | Granted | 100% | Tychean Resources Ltd |
| Valley Floor | E15/1438 | Valley Floor Ext | WA | Granted | 100% | Tychean Resources Ltd |
| Tanami | EL 26625 | Suplejack | NT | Granted | 100% | Tychean Resources Limited |
| Tanami | EL 27511 | Highland Rocks | NT | Pending | 100% | Tychean Tanami Pty Ltd |
| Tanami | EL 27806 | Talbot North | NT | Granted | 100% | Tychean Tanami Pty Ltd |
| Tanami | EL 27921 | Groundrush | NT | Pending | 100% | Tychean Resources Limited |
| Tanami | EL 27995 | Officer Hills South | NT | Pending | 100% | Tychean Resources Limited |
| Tanami | EL 27997 | Mount Solitaire | NT | Pending | 100% | Tychean Resources Limited |
| Tanami | EL 28493 | Groundrush South | NT | Pending | 100% | Tychean Resources Limited |
| Tanami | EL 29829 | Highland Rocks 2 | NT | Pending | 100% | Tychean Tanami Pty Ltd |
~~13~~
Tychean Resources Ltd • Quarterly Report for the period ending 31 March 2015
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Name of entity
TYCHEAN RESOURCES LTD
ABN 40 119 031 864
Quarter ended (“current quarter”) 31 MARCH 2015
Consolidated statement of cash flows
| Cash flows related to operating activities 1.1 Receipts from product sales and related debtors 1.2 Payments for (a) exploration & evaluation (b) development (c) production (d) administration 1.3 Dividends received 1.4 Interest and other items of a similar nature received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Other (provide details if material) Net Operating Cash Flows |
Current quarter $A’000 |
Year to date (9 months) $A’000 |
|---|---|---|
| (191) (143) 1 |
(1,482) (559) 14 |
|
| (333) | (2,027) | |
| Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a) prospects (b) equity investments (c) other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other (provide details if material) Net investing cash flows 1.13 Total operating and investing cash flows (carried forward) |
||
| - | - | |
| (333) | (2,027) |
- See chapter 19 for defined terms.
01/05/2010 Appendix 5B Page 1
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
| 1.13 Total operating and investing cash flows (brought forward) |
(333) | (2,027) |
|---|---|---|
| Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. 1.15 Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other (provide details if material) Net financing cash flows |
500 (42) |
1,312 (121) |
| 458 | 1,191 | |
| Net increase (decrease) in cash held 1.20 Cash at beginning of quarter/year to date 1.21 Exchange rate adjustments to item 1.20 1.22 Cash at end ofquarter |
125 138 |
(836) 1,099 |
| 263 | 263 |
Payments to directors of the entity, associates of the directors, related entities of the entity and associates of the related entities
| 1.23 1.24 |
Aggregate amount of payments to the parties included in item 1.2 Aggregate amount of loans to the parties included in item 1.10 |
Current quarter $A'000 |
|---|---|---|
| (76) | ||
| - | ||
| 1.25 | Explanation necessaryfor an understandingof the transactions | |
Non-cash financing and investing activities
-
2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows
-
See chapter 19 for defined terms.
Appendix 5B Page 2
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
- 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest
Financing facilities available
Add notes as necessary for an understanding of the position.
Amount available Amount used $A’000 $A’000
- 3.1 Loan facilities 3.2 Credit standby arrangements
Estimated cash outflows for next quarter
-
$A’000
-
4.1 Exploration and evaluation (391) 4.2 Development 4.3 Production 4.4 Administration (192) Total (583)
Reconciliation of cash
| Reconciliation of cash | ||
|---|---|---|
| Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. |
Current quarter $A’000 |
Previous quarter $A’000 |
| 5.1 Cash on hand and at bank 5.2 Deposits at call 5.3 Bank overdraft 5.4 Other (provide details) |
263 | 138 |
| Total: cash at end of quarter(item 1.22) | 263 | 138 |
- See chapter 19 for defined terms.
01/05/2010 Appendix 5B Page 3
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
Changes in interests in mining tenements and petroleum tenements
| Changes in interests in mining tenements and petroleum tenements | Changes in interests in mining tenements and petroleum tenements | Changes in interests in mining tenements and petroleum tenements | Changes in interests in mining tenements and petroleum tenements | Changes in interests in mining tenements and petroleum tenements |
|---|---|---|---|---|
| Tenement reference and location Nature of interest (note (2)) Interest at beginning of quarter Interest at end of quarter 6.1 Interests in mining tenements and petroleum tenements relinquished, reduced or lapsed P15/4765 Holder 75% 0% 6.2 Interests in mining tenements and petroleum tenements acquired or increased Issued and quoted securities at end of current quarter Description includes rate of interest and any redemption or conversion rights together with prices and dates. |
||||
| Total number | Number quoted | Issue price per security (see note3) (cents) |
Amount paid up per security (see note3) (cents) |
|
| 7.1 Preference +securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy- backs, redemptions |
||||
| 7.3 +Ordinary securities 7.4 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy- backs |
2,253,631,175 | 2,253,631,175 | ||
| 250,000,000 85 |
250,000,000 85 |
$0.002 $0.006 |
$0.002 $0.006 |
|
| 7.5 +Convertible debt securities (description) |
- See chapter 19 for defined terms.
Appendix 5B Page 4
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
| 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted |
||||
|---|---|---|---|---|
| 7.7 Options (description and conversion factor) 7.8 Issued during quarter 7.9 Exercised during quarter 7.10 Expired during quarter |
318,377,195 | 318,377,195 | Exercise price $0.006 |
Expiry date 30 June 2015 |
| 85 | 85 | $0.006 | 30 June 2015 | |
| 7.11 Debentures (totals only) |
||||
| 7.12 Unsecured notes(totals only) |
Compliance statement
-
1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).
-
2 This statement does give a true and fair view of the matters disclosed.
29 April 2015 Sign here: ............................................................ Date: ............................ (Company secretary) Justin Nelson Print name: .........................................................
- See chapter 19 for defined terms.
01/05/2010 Appendix 5B Page 5
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
Notes
-
1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.
-
2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements and petroleum tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement or petroleum tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.
-
3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .
-
4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
-
5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.
== == == == ==