DREADNOUGHT RESOURCES LTD Interim / Quarterly Report 2014

Oct 16, 2014

64785_rns_2014-10-16_b4b1487f-f554-4b40-be19-78f3f481a73c.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [127 x 103] intentionally omitted <==

QUARTERLY REPORT

Period ending 30 September 2014

KEY EVENTS

  • z Spargoville air core and RC drill sampling confirms highly anomalous gold intercepts at Redback prospect.

  • z Further RC drilling commenced as a priority at the Redback prospect to focus on extending the high grade gold mineralisation.

  • z Further air core drilling commenced at the Core Farm Prospect to infill and extend zones of high grade paleochannel type gold mineralisation.

==> picture [225 x 185] intentionally omitted <==

----- Start of picture text -----

Tanami Mill Ta nami
Granites Mill
NORTHERN
TERRITORY QUEENSLAND
WESTERN
AUSTRALIA
SOUTH
Spargoville AUSTRALIA
Va lley Floor NEW SOUTH WALES
Gold project 500km VICTORIA
TAS
----- End of picture text -----

  • z Completed a reconnaissance auger drill program at Lake Lefroy South.

  • z Tychean successfully placed a total of 260,333,334 shortfall shares at $0.003 per share to raise $781,000 before costs.

Tychean Resources Limited ACN 119 031 864 | Level 3, 100 Pirie Street Adelaide South Australia 5000 Phone +61 8 7324 3195 | Fax +61 8 8312 5576 | Email [email protected] | Web www.tycheanresources.com

~~1~~

Tychean Resources Ltd • Quarterly Report for the period ending 30 September 2014

REVIEW OF OPERATIONS

CORPORATE ACTIVITIES

Subsequent to the capital raising of up to $1.9 million (announced by Tychean Resources Limited on 21 May 2014) comprising:

A placement (“Placement”) of approximately 136.5 million fully paid ordinary shares at $0.003 per share to raise approximately $0.4 million, with 1 free option being issued for every 2 new shares subscribed for under the Placement; and

A non-renounceable 1 for 3 entitlement issue (“Entitlement Issue” or “Offer”) at $0.003 per share to raise up to approximately $1.5 million, with 1 free option being issued for every 2 new shares subscribed for under the Entitlement Issue,

the Company successfully placed a total of 117,333,334 shortfall shares at $0.003 per share to raise $352,000 before costs (August 2014) and further placed a total of 143 million shortfall shares at $0.003 per share to raise $429,000 before costs (September 2014).

EXPLORATION ACTIVITIES

==> picture [236 x 338] intentionally omitted <==

Figure 1 Spargoville Gold Project prospect location plan.

Western Australia

Spargoville Gold Project

SPARGOVILLE AIR CORE RESAMPLING

A total of 32 one metre scoop samples were collected from significant (≥0.5g/t Au) composite samples returned from the Aircore drilling completed at Redback and Huntsman prospects (Figures 1 & 2) during May 2014.

Highly anomalous results returned from the resampling include:

  • Redback Prospect – 10m @ 2.39g/t Au from 48m including 1m @ 11.3g/t from 55m

  • Redback Prospect – 2m @ 25.8g/t Au from 34m including 1m @ 46.9g/t Au from 35m.

  • Huntsman Prospect - 5m @ 6.78g/t Au from 45m including 1m @ 27.0g/t Au from 47m.

All significant (≥0.5g/t Au) intercepts from the drilling were received within weathered ultramafic lithologies at or adjacent to contacts with felsic lithologies. As well as confirming the significant intercepts returned from the initial composite sampling, the sampling has highlighted a high grade component to the intercepts, a characteristic of the high grade Wattle Dam mineralisation.

SPARGOVILLE RC DRILLING

One metre split results were received from RC drilling completed during May 2014 within the Spargoville Project. Anomalous results were received from the 5B, Trapdoor, and Hilditch Gold prospects (Figure 1) and include:

  • 5B Prospect – 6m @ 9.05g/t Au from 76m including 2m @ 21.0g/t Au from 78m

  • Trapdoor – 18m @ 2.46g/t Au from 84m including 1 m @ 17.4g/t Au from 84m and 1m @ 8.43g/t Au from 95m

  • Hilditch Gold – 4m @ 2.41g/t Au from 140m

Further RC drilling was completed during August 2014 at the Redback, Trapdoor and Huntsman (Figure 2) and Hilditch Gold prospects based on results returned from recent Aircore and RC results. Highlights from the drill results at Redback include:

  • Two mineralised zones confirmed within RC drilling at Redback Prospect (Figure 3)

  • Eastern Zone – 4m at 7.46g/t Au from 113m including

  • 1m at 18.2g/t Au from 114m

  • Eastern Zone – 3m at 17.5g/t Au from 95m including 1m at 33.5g/t Au from 96m

~~2~~

Tychean Resources Ltd • Quarterly Report for the period ending 30 September 2014

  • Western Zone – 3m at 4.18g/t Au from 67m including 1m at 10.1g/t Au from 69m

  • Western Zone – 6m at 4.47g/t Au from 124m including 1m at 14.3g/t Au from 126m

  • Western Zone – 2m at 8.82g/t Au from 136m including 1m at 13.4g/t Au from 136m

Redback Prospect

The completed RC drilling at the Redback prospect was designed to further evaluate highly anomalous results returned from previous Aircore drilling which included 10m @ 2.39g/t Au from 48m including 1m @ 11.3g/t Au from 55m and 2m @ 25.8g/t Au from 34m including 1m @ 46.9g/t Au from 35m.

The high grade mineralisation within the two zones remains open along strike to the north, down dip and along any potential plunge direction to the north, which is the focus of current RC drilling.

The ‘Eastern Zone’ mineralisation, located at the contact between predominantly ultramafic lithologies and overlying felsic lithologies to the east, had previously returned highly anomalous composite results including 4m at 47.7g/t Au from 112m and 8m at 6.47g/t Au from 92m. The corresponding single metre spilt results for these intervals returned 4m at 7.46g/t Au from 113m including 1m at 18.2g/t Au from 114m and 3m at 17.5g/t Au from 95 m including 1m at 33.5g/t Au from 96m .

The ‘Western Zone’ mineralisation, located approximately 20 metres to the west of the Eastern Zone previously returned highly anomalous composite results including 4m at 10.5g/t Au from 68m, 4m at 5.80g/t Au from 124m and 4m at 5.21g/t Au from 136m. The corresponding single metre split results for these intervals returned 3m at 4.18g/t Au from 67m including 1m at 10.1g/t Au from 69 m, 6 m at 4.47g/t Au from 124m including 1m at 14.3g/t Au from 126m and 2m at 8.82g/t Au from 136m including 1m at 13.4g/t Au from 136m .

A comparison between the composite and single metre results at the Redback Prospect has identified variability in gold grades which potentially could be a function of the coarse gold nature of the identified mineralisation (highlighted by the identification of coarse gold when panning intervals within the mineralised intervals) and/or the sampling and confidence levels between the sample types. A program of check sampling will be undertaken on a representative number of the single metre split samples in order to better our understanding of the coarse gold component and determine the optimal assaying technique for the mineralisation. It is planned to undertake screen fire assay analysis and a series of leachwell analyses using different charge weights from samples within the mineralised intervals. The results of this work will impact on the future assaying techniques used at the Redback Prospect.

==> picture [236 x 336] intentionally omitted <==

Figure 2 Spargoville Gold Project, Golden Orb area summary drilling plan.

==> picture [236 x 285] intentionally omitted <==

Figure 3 Spargoville Gold Project, Redback Prospect longitudinal projection.

~~3~~

Tychean Resources Ltd • Quarterly Report for the period ending 30 September 2014

Trapdoor Prospect

The completed RC drilling at the Trapdoor prospect was designed to further evaluate highly anomalous results returned from previous RC drilling including 18 m at 2.46g/t Au from 84 m including 1 m at 17.4g/t Au from 84 m and 1 m at 8.43g/t Au from 95 m.

The one metre split samples collected from the completed RC drilling at Trapdoor returned a maximum anomalous result of 7m at 1.73g/t Au from 109 m and 3m @ 3.26g/t Au from 94m. The significant results are associated with the most eastern mineralised zone and interpreted ultramafic/felsic contact. This eastern mineralisation and geological contact is interpreted to steepen in dip at depth, to sub vertical to steeply easterly dipping, a feature also identified to be associated with the High Grade Eastern Zone at the Redback Prospect.

Hilditch Gold Prospect

The completed RC drilling at the Hilditch Gold Prospect was designed to test for dip and strike extensions to anomalous results returned from previous RC drilling including 4m @ 2.41g/t Au from 140m to end of hole. A single significant result of 3 m at 5.69g/t Au from 125 m including 2 m at 7.26g/t Au from 125 m, was returned from the single metre split sampling.

==> picture [236 x 335] intentionally omitted <==

Follow-up RC drilling programme commenced

A ~3,000 metre, RC drilling programme, (Figure 2), has commenced to follow up highly significant results and mineralised trends identified from recent drilling at the Redback and Trapdoor prospects. The majority of the planned drilling at the Redback prospect will focus on extending the high grade mineralisation immediately to the north of recent drilling.

Follow up drilling is planned at Trapdoor which will infill and extend recent drilling to an initial 20 metre x 40 metre drill spacing.

Follow-up air core drill programme completed

The Company completed a further aircore drilling programme of 148 holes for 2,376m at the Core Farm Paleochannel Gold prospect (Figure 4). Results are pending.

Located immediately to the north west of the Wattle Dam Gold Mine, (Figure 1) the Aircore drilling programme is designed to infill and extend zones of high grade paleochannel style gold mineralisation identified from previous drilling including 3m at 10.7g/t Au from 16m and 2m at 22.4g/t Au from 15m.

==> picture [236 x 334] intentionally omitted <==

Figure 5 Reconnaissance auger drill program at Lake Lefroy South (E15/1399).

Figure 4 Core Farm Gold Prospect drill hole location plan.

~~4~~

Tychean Resources Ltd • Quarterly Report for the period ending 30 September 2014

Reconnaissance auger drilling

A total of 1,371 auger drill holes were completed within E15/1399 (Figure 5) at a drill spacing of 20 metres x 200 metres. The drilling was completed within an area of alluvial sands in order to assist with drill targeting by identifying subtle gold and multi-element anomalism and trends potentially associated with similar geology and structures associated with the Goldfields Ltd, Invincible prospect, located approximately 10 kilometres to the northeast on Lake Lefroy (Figure 6). All results have been received and are currently being evaluated.

==> picture [236 x 338] intentionally omitted <==

Figure 6 Lefroy South location plan.

==> picture [236 x 345] intentionally omitted <==

Figure 7 Tanami Farm-Out project locations.

Northern Territory

Tanami Farm-In and Joint Venture Agreement

Tychean has finalised terms with Ramelius Resources Limited in respect of a Farm-in and Joint Venture Agreement over Tychean’s Tanami Project, a 1,700km² prospective land package within the Tanami Complex, Northern Territory.

Ramelius has commenced its farm-in on a package of two granted Exploration Licences (ELs) and six EL applications in the Northern Territory.

The tenement package, located within 100km of Newmont’s 4.5 million plus ounce Callie gold mine within the Northern Territory Tanami Complex (Figure 7) represents a unique opportunity to explore over 1,700km² of prospective Paleoproterozoic stratigraphy within a significant yet underexplored gold province.

Joe Houldsworth MANAGING DIRECTOR

~~5~~

Tychean Resources Ltd • Quarterly Report for the period ending 30 September 2014

Competent Persons Statement

The information contained in this release that relates to exploration results, mineralisation and target generation is based on information compiled by Mr Matthew Svensson, who is a Member of the Australasian Institute of Geologists (MAIG) and a full time employee of the Company. Mr. Svensson has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Svensson consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.

This release contains previously announced exploration results. The Company is not aware of any new information or data that materially affects the information included in the current market announcement.

TYK ASX Announcement – 19 June 2014

  • High Grade Paleochannel Gold intersected in Air Core Drilling

TYK ASX Announcement – 28 July 2014

  • Spargoville Air Core Resample Results

TYK ASX Announcement – 12 August 2014

  • Exploration Update – Spargoville (WA)

TYK ASX Announcement – 22 September 2014

  • High Grade Single Metre Gold Results from Spargoville (WA)

For further information please contact:

Mr Joe Houldsworth

Managing Director, Tychean Resources Limited on 0487 924 326 or

Investor relations:

Mr Duncan Gordon,

Executive Director, Adelaide Equity Partners on 0404 006 444 Further information relating to Tychean Resources Ltd and its various exploration projects can be found on its website: www.tycheanresources.com

~~6~~

Tychean Resources Ltd • Quarterly Report for the period ending 30 September 2014

SCHEDULE OF INTERESTS IN MINING TENEMENTS

As at 30 September 2014

==> picture [495 x 22] intentionally omitted <==

----- Start of picture text -----

Project Tenement Lease name State Status % held by TYK Holders
----- End of picture text -----

Project Tenement Lease name State Status % held by TYK Holders
Spargoville M15/1475 Eagles Nest WA Granted 100% TYCHEAN RESOURCES LTD
Spargoville E15/967 Kambalda West WA Granted 100% - No nickel rights TYCHEAN RESOURCES LTD
Spargoville E15/968 Kambalda West WA Granted 100% - No nickel rights TYCHEAN RESOURCES LTD
Spargoville L15/128 Kambalda West WA Granted 100% - No nickel rights TYCHEAN RESOURCES LTD
Spargoville L15/255 Kambalda West WA Granted 100% - No nickel rights TYCHEAN RESOURCES LTD
Spargoville M15/395 Kambalda West WA Granted 100% - No nickel rights TYCHEAN RESOURCES LTD
Spargoville M15/703 Kambalda West WA Granted 100% - No nickel rights TYCHEAN RESOURCES LTD
Spargoville P15/5860 Kambalda West WA Granted 100% - No nickel rights TYCHEAN RESOURCES LTD
Spargoville P15/4884 Kambalda West WA Granted 100% - No nickel rights TYCHEAN RESOURCES LTD
Spargoville P15/4885 Kambalda West WA Granted 100% - No nickel rights TYCHEAN RESOURCES LTD
Spargoville P15/4963 Kambalda West WA Granted 100% - No nickel rights TYCHEAN RESOURCES LTD
Spargoville M15/1448 Hilditch WA Granted 90% BULLABULLING PTY LTD
TYCHEAN RESOURCES LTD
Spargoville M15/1449 Larkinville WA Granted 75%
80% nickel rights
TYCHEAN RESOURCES LTD
PIONEER RESOURCES LTD
Spargoville P15/4765 Villa Deste WA Granted 75%
80% nickel rights
TYCHEAN RESOURCES LTD
PIONEER RESOURCES LTD
Spargoville P15/5912 Villa Deste WA Pending 75%
80% nickel rights
TYCHEAN RESOURCES LTD
PIONEER RESOURCES LTD
Spargoville M15/100 North Widgie WA Granted 100% gold rights only AUSTRALIAN NICKEL MINES
PTY LTD
Spargoville M15/101 North Widgie WA Granted 100% gold rights only AUSTRALIAN NICKEL MINES
PTY LTD
Spargoville M15/102 North Widgie WA Granted 100% gold rights only AUSTRALIAN NICKEL MINES
PTY LTD
Spargoville M15/1271 North Widgie WA Granted 100% gold rights only AUSTRALIAN NICKEL MINES
PTY LTD
Spargoville M15/653 North Widgie WA Granted 100% gold rights only AUSTRALIAN NICKEL MINES
PTY LTD
Spargoville- M15/97 North Widgie WA Granted 100% gold rights only AUSTRALIAN NICKEL MINES
PTY LTD
Spargoville M15/99 North Widgie WA Granted 100% gold rights only AUSTRALIAN NICKEL MINES
PTY LTD
Spargoville M15/1101 Wattle Dam WA Granted 100%
80% nickel rights
TYCHEAN RESOURCES LTD
Spargoville M15/1263 Wattle Dam WA Granted 100%
80% nickel rights
TYCHEAN RESOURCES LTD
Spargoville M15/1264 Wattle Dam WA Granted 100%
80% nickel rights
TYCHEAN RESOURCES LTD
Spargoville M15/1323 Wattle Dam WA Granted 100%
80% nickel rights
TYCHEAN RESOURCES LTD

~~7~~

Tychean Resources Ltd • Quarterly Report for the period ending 30 September 2014

==> picture [494 x 21] intentionally omitted <==

----- Start of picture text -----

Project Tenement Lease name State Status % held by TYK Holders
----- End of picture text -----

Project Tenement Lease name State Status % held by TYK Holders
Spargoville M15/1338 Wattle Dam WA Granted 100%
80% nickel rights
TYCHEAN RESOURCES LTD
Spargoville M15/1474 Wattle Dam WA Granted 100% TYCHEAN RESOURCES LTD
Spargoville M15/1769 Wattle Dam WA Granted 100%
80% nickel rights
TYCHEAN RESOURCES LTD
Spargoville M15/1770 Wattle Dam WA Granted 100%
80% nickel rights
TYCHEAN RESOURCES LTD
Spargoville M15/1771 Wattle Dam WA Granted 100%
80% nickel rights
TYCHEAN RESOURCES LTD
Spargoville M15/1772 Wattle Dam WA Granted 100%
80% nickel rights
TYCHEAN RESOURCES LTD
Spargoville M15/1773 Wattle Dam WA Granted 100%
80% nickel rights
TYCHEAN RESOURCES LTD
Spargoville M15/1774 Wattle Dam WA Granted 100% TYCHEAN RESOURCES LTD
Spargoville M15/1775 Wattle Dam WA Granted 100% TYCHEAN RESOURCES LTD
Spargoville M15/1776 Wattle Dam WA Granted 100% TYCHEAN RESOURCES LTD
Valley Floor E15/1249 Lake Lefroy WA Granted 100% VALLEY FLOOR RESOURCES
PTY LTD
Valley Floor E15/1399 Lefroy South WA Granted 100% VALLEY FLOOR RESOURCES
PTY LTD
Valley Floor E15/1434 Valley Floor Ext WA Pending 100% TYCHEAN RESOURCES LTD
Valley Floor E15/1438 Valley Floor Ext WA Pending 100% TYCHEAN RESOURCES LTD
Tanami EL 26625 Suplejack NT Granted 100% Tychean Resources Limited
Tanami EL 27511 Highland Rocks NT Pending 100% Tychean Tanami Pty Ltd
Tanami EL 27806 Talbot North NT Granted 100% Tychean Tanami Pty Ltd
Tanami EL 27921 Groundrush NT Pending 100% Tychean Resources Limited
Tanami EL 27995 Officer Hills South NT Pending 100% Tychean Resources Limited
Tanami EL 27997 Mount Solitaire NT Pending 100% Tychean Resources Limited
Tanami EL 28493 Groundrush South NT Pending 100% Tychean Resources Limited
Tanami EL 29829 Highland Rocks 2 NT Pending 100% Tychean Tanami Pty Ltd

~~8~~

Tychean Resources Ltd • Quarterly Report for the period ending 30 September 2014

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Rule 5.5

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013

Name of entity

TYCHEAN RESOURCES LTD TYCHEAN RESOURCES LTD
ABN
40 119 031 864
Consolidated statement of cash flows
30 SEPTEMBER 2014
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
1.3
Dividends received
1.4
Interest and other items of a similar nature
received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Other (provide details if material)
Net Operating Cash Flows
Current quarter
$A’000
Year to date
(.......months)
$A’000
(585)
(226)
4
(585)
(226)
4
(807) (807)
Cash flows related to investing activities
1.8
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
1.9
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.10
Loans to other entities
1.11
Loans repaid by other entities
1.12
Other (provide details if material)
Net investing cash flows
1.13
Total operating and investing cash flows
(carried forward)
- -
(807) (807)
  • See chapter 19 for defined terms.

01/05/2010 Appendix 5B Page 1

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

1.13
Total operating and investing cash flows
(brought forward)
(807) (807)
Cash flows related to financing activities
1.14
Proceeds from issues of shares, options, etc.
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other (provide details if material)
Net financing cash flows
812
(72)
812
(72)
740 740
Net increase (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end ofquarter
1,099 1,099
1,032 1,032

Payments to directors of the entity, associates of the directors, related entities of the entity and associates of the related entities

1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
108
-
1.25 Explanation necessaryfor an understandingof the transactions

Non-cash financing and investing activities

  • 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows

  • See chapter 19 for defined terms.

Appendix 5B Page 2

01/05/2013

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

  • 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest

Financing facilities available

Add notes as necessary for an understanding of the position.

  • 3.1 Loan facilities 3.2 Credit standby arrangements
Amount available Amount used
$A’000 $A’000

Estimated cash outflows for next quarter

Estimated cash outflows for next quarter
4.1
Exploration and evaluation
4.2
Development
4.3
Production
4.4
Administration
$A’000
631
260
Total 891

Reconciliation of cash

Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
Current quarter
$A’000
Previous quarter
$A’000
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
132 1,099
900 -
Total: cash at end of quarter(item 1.22) 1,032 1,099
  • See chapter 19 for defined terms.

01/05/2010 Appendix 5B Page 3

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Changes in interests in mining tenements and petroleum tenements

Tenement
reference
and location
Nature of interest
(note (2))
Interest at
beginning
ofquarter
Interest at
end of
quarter
6.1
Interests in mining
tenements and
petroleum tenements
relinquished, reduced
or lapsed
M15/1290
ELA15/1419
Holder
Holder
100%
100%
0%
0%
6.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
E15/1434
E15/1438
Holder
Holder
0%
0%
100%
100%
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Tenement
reference
and location
Nature of interest
(note (2))
Interest at
beginning
ofquarter
Interest at
end of
quarter
6.1
Interests in mining
tenements and
petroleum tenements
relinquished, reduced
or lapsed
M15/1290
ELA15/1419
Holder
Holder
100%
100%
0%
0%
6.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
E15/1434
E15/1438
Holder
Holder
0%
0%
100%
100%
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Tenement
reference
and location
Nature of interest
(note (2))
Interest at
beginning
ofquarter
Interest at
end of
quarter
6.1
Interests in mining
tenements and
petroleum tenements
relinquished, reduced
or lapsed
M15/1290
ELA15/1419
Holder
Holder
100%
100%
0%
0%
6.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
E15/1434
E15/1438
Holder
Holder
0%
0%
100%
100%
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Tenement
reference
and location
Nature of interest
(note (2))
Interest at
beginning
ofquarter
Interest at
end of
quarter
6.1
Interests in mining
tenements and
petroleum tenements
relinquished, reduced
or lapsed
M15/1290
ELA15/1419
Holder
Holder
100%
100%
0%
0%
6.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
E15/1434
E15/1438
Holder
Holder
0%
0%
100%
100%
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Tenement
reference
and location
Nature of interest
(note (2))
Interest at
beginning
ofquarter
Interest at
end of
quarter
6.1
Interests in mining
tenements and
petroleum tenements
relinquished, reduced
or lapsed
M15/1290
ELA15/1419
Holder
Holder
100%
100%
0%
0%
6.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
E15/1434
E15/1438
Holder
Holder
0%
0%
100%
100%
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Total number Number quoted Issue price per
security (see
note3) (cents)
Amount paid up
per security (see
note3) (cents)
7.1
Preference
+securities
(description)
7.2
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buy-
backs,
redemptions
7.3
+Ordinary
securities
7.4
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buy-
backs
2,003,242,221 2,003,242,221
1,235,342
291,000,007
1,235,342
291,000,007
0.6
0.3
Fully paid
Fully paid
7.5
+Convertible
debt
securities
(description)
  • See chapter 19 for defined terms.

Appendix 5B Page 4

01/05/2013

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

7.6
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
7.7
Options
(description and
conversion
factor)
7.8
Issued during
quarter
7.9
Exercised
during quarter
7.10
Expired during
quarter
268,970,634
318,377,280
268,970,634
318,377,280
Exercise price
0.6c
0.6c
Expiry date
24/09/14
30/06/15
145,500,006 145,500,006 0.6c 30/06/15
1,123,207
112,135
1,123,207
112,135
0.6c
0.6c
24/09/14
30/06/15
7.11
Debentures
(totals only)
7.12
Unsecured
notes(totals
only)

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).

  • 2 This statement does give a true and fair view of the matters disclosed.

17/10/2014 Sign here: ............................................................ Date: ............................ (Director/Company secretary) Justin Nelson Print name: .........................................................

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect
  • See chapter 19 for defined terms.

01/05/2010 Appendix 5B Page 5

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements and petroleum tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement or petroleum tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  • 4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.

  • 5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

  • See chapter 19 for defined terms.

Appendix 5B Page 6

01/05/2013