ASX ANNOUNCEMENT 18 July 2024
Four Strong Off-Hole Conductors Identified - Tarraji-Yampi (80%, 100%)
HIGHLIGHTS
-
A total of 6 diamond holes (1,524.8m) have been completed at Tarraji-Yampi to test 6 Cu-Au volcanogenic massive sulphide (“VMS”) targets around the Orion deposit. All holes were followed up by down hole EM (“DHEM”) to identify potential off-hole conductors.
-
All holes intersected variably mineralised pyrrhotite, pyrite, chalcopyrite +/- sphalerite and galena horizons along prospective peperite contacts of Ruins Dolerite and Marboo Formation sediments.
-
Assays are expected in August 2024.
-
Preliminary interpretation of DHEM surveys has identified 4 off-hole conductors associated with prospective horizons, including a 50,000S conductor spanning ~150m x 150m, located ~100m down dip of a 3.2m thick gossan intersected in KMDD004 and interpreted to be the structural offset of Orion. This new Orion Offset target and off hole conductors at OR1 and OR2 are priority targets for follow up drilling, following assays and further review.
-
EIS co-funded IP has been partially completed and will recommence later in the year following review of orientation results.
-
Niobium focused drilling at Mangaroon to commence this week.
Dreadnought Resources Limited (“Dreadnought”) is pleased to announce that drilling and geophysical surveys have been completed at Tarraji-Yampi, located in the Kimberley Region of Western Australia.
Dreadnought’s Managing Director, Dean Tuck, commented: “The six hole diamond drill program has intersected mineralisation in every hole. Three of the six targets were effectively tested. In addition, three off-hole conductors have been identified, all associated with prospective peperite margins including the strongest DHEM conductor to date of 50,000S believed to be the structural offset of the main Orion lode. OR2 and OR1 also remain priority targets with off-hole conductors identified down dip of mineralisation. Additionally, the EIS co-funded IP survey commenced with orientation lines completed over Grants and Orion with three of the regional exploration lines completed. This survey will assist in determining if IP is an effective tool to utilise for targeting Cu-Au mineralisation at Tarraji-Yampi.”
==> picture [438 x 233] intentionally omitted <==
Figure 1: Photo of the Topdrill diamond rig at Orion Repeat.
1
ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
SNAPSHOT – Tarraji-Yampi Cu-Au-Ag-Co
Unexplored since the 1970s
-
Outcropping mineralisation was discovered in 1905 and mined for copper at Grant’s Find, Wilson’s Reward,
-
Monarch, Ironclad and Tarraji from 1907-1920.
-
Only historical exploration within the area was by WMC Resources (“WMC”) in the 1950s and Australian Consolidated Minerals (“ACM”) in the 1970s with both parties exploring for copper.
-
Contained entirely within the Yampi Sound Training Area (“YSTA”), Commonwealth land was off limits to mineral exploration from 1978 to 2013.
Genuine Camp Scale Potential
-
Five clusters of historical mining on outcropping mineralisation.
-
Orion discovery (~350m wide x ~150m long x 250m deep and open at depth), under just 1m of cover, made in 2021. Results include KMRC022: 16m @ 2.2% Cu, 38.7g/t Ag, 6.6g/t Au, 0.40% Co from 77m. (ASX 15 Nov 2021)
-
Lithostructural and geochemical similarities to pelitic-mafic or “Besshi-style” VMS systems such as Monty /DeGrussa in Western Australia, Windy Craggy in Canada or the Matchless deposits in Namibia.
- Significant, Step Change, Growth Potential
-
Dreadnought is the first to deploy modern geochemical and geophysical techniques to explore for mineralisation under shallow cover in the region.
-
Multiple priority Orion look-alikes defined through geochemical and geophysical surveys with highly conductive anomalism.
High-Grade, Multi-Metal Potential Including Cu-Ag-Au-Co
- Previous drilling at Orion includes thick high-grade intersections (ASX 15 Nov 2021 and 8 Dec 2021):
KMRC017: 12m @ 1.6% Cu, 31.7g/t Ag, 0.5g/t Au, 0.02% Co from 45m
KMRC022: 16m @ 2.2% Cu, 38.7g/t Ag, 6.6g/t Au, 0.40% Co from 77m, including:
- 2m @ <0.1% Cu, 4.8 g/t Ag, 27.6g/t Au, 1.50% Co from 77m, and:
7m @ 4.7% Cu, 83.3g/t Ag, 4.9g/t Au, 0.20% Co from 82m KMRC039: 20m @ 1.4% Cu, 13.4g/t Ag, 0.5g/t Au, 0.03% Co from 3m, including:
3m @ 7.6% Cu, 116.2g/t Ag, 2.2 g/t Au, 0.14% Co from 18m KMRC047: 12m @ 3.0% Cu, 21.4g/t Ag, 1.7g/t Au, 0.02% Co from 1m, including:
5m @ 5.9% Cu, 44.9 g/t Ag, 3.7g/t Au, 0.01% Co from 1m
Global Energy Decarbonisation Driving Copper Fundamentals
-
Copper is essential for electricity-related technologies with renewable energy systems requiring up to 12x more copper compared to traditional energy systems.
-
S&P Global forecasts that global demand for copper could double from 25mt to 50mt by 2035. Under this scenario, by 2030, supply from both existing and projected copper mines will meet just 80% of demand (S&P Global: The Future of Copper, July 2022) .
2
ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
Technical Discussion of Diamond Drilling
In the Phase 1 drill program (6 holes, 1,640m), 5 of the 6 targets are located along the same interpreted feeder structure as the Orion deposit and are defined by highly conductive, magnetic anomalies associated with elevated pathfinder geochemistry. These targets include the depth extension of Orion. The 6-hole Phase 1 drill program targets are discussed and summarised below with further review and commentary once assays are received.
Orion Extension was defined by a large and strong magnetic anomaly at depth of the main Orion lode. KMDD002 was drilled to test the centre of this magnetic anomaly and a hanging wall lode that was intersected in KMRD056 (1.35m @ 1.0% Cu). Drilling intersected six variably mineralised peperite horizons with late stage stockwork of pyrrhotite, pyrite, chalcopyrite +/- sphalerite and galena ranging from 1-10%. The magnetic anomaly is explained by thick pyrrhotite accumulations between 420m and 440m. DHEM confirms that the target horizon was tested with a ~47,000S plate centred around 420m depth associated with more intense ~5-10% pyrrhotite, pyrite, chalcopyrite, sphalerite, galena and arsenopyrite; a similar assemblage to the Orion lode further up dip.
This target is considered effectively tested and awaiting assays for further review.
==> picture [360 x 494] intentionally omitted <==
Orion Repeat was defined by a 3,500S FLEM conductor and coincident VMS pathfinder geochemistry that sits beneath previous drilling at Orion. KMDD001 was drilled through the main Orion lode and into the centre of the FLEM plate intersecting 2.8m of massive to semimassive sulphides at the Orion lode and three additional mineralised horizons with late stage stockwork of pyrrhotite, pyrite, chalcopyrite +/- sphalerite, galena and arsenopyrite ranging from 1-10%. DHEM confirms that the target was tested with a strong 13,000S on-hole response at ~170m associated with more intense ~5-10% pyrrhotite, pyrite, chalcopyrite, sphalerite and galena.
This target is considered effectively tested and awaiting assays for further review.
Orion Splay was defined by multiple DHEM conductors up to 28,000S that have an orientation sub-parallel to the interpreted feeder structure that might also be offsetting the main Orion deposit. Adjacent drill holes are elevated in VMS pathfinder geochemistry. KMDD003 was drilled to test multiple DHEM plates and intersected four mineralised horizons with late stage stockwork of pyrrhotite, pyrite, chalcopyrite +/- sphalerite ranging from 1- 10%.
DHEM confirms that all plates were effectively tested and awaiting assays for further review.
Figure 2: Plan view image showing the location of previously drilled (black dots) and recently drilled holes (blue dots) at Orion in relation to prospects, geochemical contours, and FLEM/DHEM plates.
3
ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
Orion Offset was defined by a 3,800S FLEM conductor with coincident VMS pathfinder geochemistry. KMDD004 was drilled into the centre of the modelled FLEM plate and intersected a 3.2m wide copper-stained mineralised gossan from 13.6m depth, shallower than the target conductor. A second mineralised horizon with late stage stockwork of pyrrhotite, pyrite, chalcopyrite +/- sphalerite and galena ranging from 1- 5% was intersected around target depth from 93-110m. DHEM confirms that the target is not fully explained with two off-hole conductors identified. The first is the strongest conductor identified to date, at 50,000S consistent with a massive sulphide source, is located ~100m down dip of the gossanous intercept and is interpreted to be the offset of the main Orion lode. The second is a 15,000S conductor that may be associated with black shales which requires further review.
This new Orion Offset target is ~150m x 150m in size and remains a priority target for follow up drilling.
Figure 3: Photo of secondary copper carbonates in the gossanous horizons from ~14m depth in KMDD004 which is located ~100m up dip of the 50,000S offhole conductor.
OR2 is a 7,200S off hole conductor located beneath the strongest Cu auger geochemical anomaly (stronger than Orion) with VMS pathfinder geochemistry. KMRC062, which is the hole from where the DHEM conductor originated, contained elevated Ag-Bi-Mo-Sb-Se at the prospective peperite contact. KMDD005 was drilled into the centre of the modelled DHEM plate intersecting a ~6.2m wide zone of late stage quartz veins with chalcopyrite +/- pyrrhotite and pyrite, possibly representing a footwall stockwork zone of mineralisation or Grant’s style Cu-Au mineralisation. DHEM confirms that the target plate was tested at the target depth and partially explained. There is a strong 14,500S off-hole conductor, consistent with a massive sulphide source, located further down dip and between KMDD005 and KMRC062 on the same prospective mineralised horizon.
This OR2 DHEM target is ~335m x 350m in size and remains a priority target for follow up drilling. Additionally, the Grant’s style Cu-Au mineralisation warrants additional target definition work.
Figure 4: Photo of Grant’s style Cu-Au veining from ~30m down hole in KMDD005 showing chalcopyrite as the primary sulphide.
==> picture [232 x 233] intentionally omitted <==
==> picture [232 x 243] intentionally omitted <==
OR1 is the only target drilled off the interpreted Orion feeder structure, targeting a strong “edge hit” 16,700S DHEM conductor defined from KMRC060 (2m @ 0.4% Pb and 16.6g/t Ag from 106m) along a prospective peperite contact coincident with the DHEM conductor. KMDD006 was drilled into the centre of the modelled DHEM plate intersecting two mineralised horizons with pyrrhotite, pyrite, chalcopyrite +/- sphalerite ranging from 1-5%. DHEM confirms that the target is not fully explained. An off-hole conductor of 24,300S, consistent with a massive sulphide source, was identified which sits further down dip of the mineralised horizons intersected in KMRC060 and KMDD006.
This OR1 target is ~82m x 200m in size and remains a priority target for follow up drilling.
4
ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
| Table 1: Significant Sulphide Intervals (Visual Estimates) with DHEMand Target Status | Table 1: Significant Sulphide Intervals (Visual Estimates) with DHEMand Target Status | Table 1: Significant Sulphide Intervals (Visual Estimates) with DHEMand Target Status | Table 1: Significant Sulphide Intervals (Visual Estimates) with DHEMand Target Status | Table 1: Significant Sulphide Intervals (Visual Estimates) with DHEMand Target Status | Table 1: Significant Sulphide Intervals (Visual Estimates) with DHEMand Target Status | Table 1: Significant Sulphide Intervals (Visual Estimates) with DHEMand Target Status | Table 1: Significant Sulphide Intervals (Visual Estimates) with DHEMand Target Status | ||
|---|---|---|---|---|---|---|---|---|---|
| Hole ID | From (m) |
To | Interval | Mineralisation Style |
Sulphide | Sulphide (%) |
|||
| DHEM | Status | Prospect | |||||||
| (m) | (m) | Type |
|||||||
| KMDD001 | 58.2 | 61 | 2.8 | Semi Massive - Massive |
Po, Ccp, Sp, Py | 80-100 | Plate Hit 10,000S |
Orion Lode | Orion Repeat |
| 113.95 | 118.85 | 4.9 | Veining / Laminated | Po, Py, Ccp, Sp, Gn |
1-5 | No Conductor |
Assays Pending | ||
| 157 | 170.05 | 13.05 | Veining / Laminated / Disseminated |
Po, Py, Ccp, Sp | 1-5 5-10 |
Plate Hit 13,000S |
Target Tested Assays Pending |
||
| 170.05 | 177.55 | 7.5 | Veining / Laminated / Disseminated |
Po, Py, Ccp, Sp, Gn,Apy |
|||||
| KMDD002 | 334.05 | 341 | 6.95 | Veining / Laminated | Po, Py, Ccp | 1-5 | Plate Hit 4,500S |
Target Tested AssaysPending |
Orion Extension |
| 377.9 | 392.6 | 14.7 | Veining / Laminated | Po, Py, Ccp, Gn | 1-5 | Plate Hit 38,400S |
Target Tested AssaysPending |
||
| 420.75 | 433.1 | 12.35 | Veining / Laminated | Po, Py, Ccp, Sp, Gn |
1-5 5-10 |
Plate Hit 47,000S |
Target Tested Assays Pending |
||
| 433.1 | 440.6 | 7.5 | Veining / Laminated | Po, Py, Ccp, Sp, Gn |
|||||
| 471.2 | 493 | 21.8 | Veining / Laminated / Disseminated |
Po, Py, Ccp, Sp | 1-5 | No Conductor |
Assays Pending | ||
| KMDD003 | 80.2 | 88.8 | 8.6 | Veining/Laminated | Po, Py, Ccp, Sp | 1-5 | No Conductor |
Assays Pending | Orion Splay |
| 88.8 | 99.05 | 10.25 | Veining/Laminated | Po, Py, Ccp, Sp | 5-10 | Plate Hit 4,150S |
Target Tested AssaysPending |
||
| 133.2 | 142.41 | 9.21 | Veining/Laminated | Po, Py, Ccp, Sp | 1-5 | Plate Hit 9,000S |
Target Tested AssaysPending |
||
| 184.5 | 207.2 | 22.7 | Veining/Laminated | Po, Py, Ccp | 1-5 | Plate Hit 8,000S |
Target Tested AssaysPending |
||
| KMDD004 | 13.6 | 16.8 | 3.2 | Gossan | Malachite- stainedgossan. |
1-5 | Off hole Conductor |
Priority Target Assays Pending |
Orion Offset |
| Off-hole Conductor of 50,000S, consistent with a massive sulphide source, located ~100m down dip and isinterpretedto be the offset ofthemainOrion lode. |
|||||||||
| 93 | 109.58 | 16.58 | Veining / Laminated / Disseminated |
Po, Py, Ccp | 1-5 | Plate Hit 1,250S |
Target Partially Explained |
||
| Off-hole Conductor of 15,000S, possibly associated with black shales, requires geological review. | Possible New Target |
||||||||
| KMDD005 | 132.25 | 138.42 | 6.17 | Veining / Laminated | Po, Ccp, Sp, Py | 1-5 | Plate Hit 5,800S |
Target Tested AssaysPending |
OR2 |
| Off-hole Conductor of 14,500S, consistent with a massive sulphide source identified down dip of prospectivemineralised horizon intersected in KMDD005 and KMRC062. |
New Target | ||||||||
| KMDD006 | 28 | 32 | 4 | Veining | Ccp, Py, Po | 1-5 | No Conductor |
N/A | OR1 |
| 124.87 | 144.91 | 20.04 | Veining / Laminated / Disseminated |
Po, Ccp, Sp, Py | 1-5 | Plate Hit 4,100S |
Target Partially Explained |
||
| Off-hole Conductor of 24,300S, consistent with a massive sulphide source identified down dip of prospectivemineralised horizon intersected in KMDD006 and KMRC060. |
New Target |
*Sulphide Type: Po-Pyrrhotite, Py-Pyrite, Ccp-Chalcopyrite, Sp-Sphalerite, Gn-Galena, Apy-Arsenopyrite
5
ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
Target Summary
Phase 1 of the 2024 drilling program at Tarraji-Yampi tested and DHEM surveyed 6 priority targets. Targeting was prioritised based on a ranking system summarised in Table 2 below.
Additional field activities were undertaken including EIS co-funded IP survey and mapping of other advanced and early-stage targets
to determine next steps.
A summary of currently defined Cu-Au VMS targets and their status is below. The summary does not include Cu-Au epithermal targets which will be ranked following the EIS co-funded IP survey which was partially completed as part of this program with results expected in August 2024.
| Table 2: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). | Table 2: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). | Table 2: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). | Table 2: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). | Table 2: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). | Table 2: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). | Table 2: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). | Table 2: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). | |
|---|---|---|---|---|---|---|---|---|
Planned |
Plate Dimension (m) |
|||||||
| Planned | Auger |
Conductance | Magnetic |
Down hole |
||||
| Target | Depth |
Target Status |
||||||
| Hole | Geochemistry |
(S) | Anomaly |
Geochemistry |
||||
| (m) | ||||||||
| Orion | ||||||||
| Yes | 620 | - | - | - | Yes | - | Drilled | |
| **Extension ** | ||||||||
| Ag-As-Bi-Mo- | ||||||||
| Orion Repeat | Yes | 260 | 200 x 190 | 3,500 | Yes | - | Drilled | |
Pb-Sb-Se-Zn |
||||||||
| 90 x 45 | 28,000 | Ag-As-Au-Bi- | ||||||
| Ag-As-Bi-Mo- | ||||||||
| Orion Splay | Yes | 245 | 90 x 110 | 14,300 | No | Co-Cu-Mo-Pb- |
Drilled | |
Pb-Sb-Se-Zn |
||||||||
| 600 x390 | 2,500 | Sb-Se-Te-W-Zn | ||||||
| Ag-As-Au-Bi- | Drilled: | |||||||
| Ag-As-Bi-Cd-Mo- | ||||||||
| Orion Offset | Yes | 155 | 200 x 190 | 3,800 | Yes | Co-Cu-Mo-Pb- | Off-hole | |
| Pb-Sb-Se-Zn | ||||||||
| Sb-Se-Te-W-Zn | Conductors |
|||||||
| Drilled: | ||||||||
| Ag-As-Bi-Cd-Cu- | Ag-Bi-Mo- | |||||||
| OR2 | Yes | 160 | 105 x 45 | 7,200 | Yes | Off-hole | ||
| In-Pb-Sb-Se-Zn | Sb-Se |
|||||||
| Conductors | ||||||||
| Ag-Bi-Cd-Cu- | Drilled: | |||||||
| As-Bi-Pb-Sb- | ||||||||
| OR1 | Yes | 200 | 70 x 200 | 16,700 | No | Mo-Pb-Sb-Se- | Off-hole | |
| Se-Te | ||||||||
| Te-Zn | Conductors | |||||||
| Ironclad | TBD | - | Ag-As-Au-Bi-Cu Se-Te-Zn |
Not Surveyed | No | Ag-Bi-Cd-Cu-Mo- Pb-Sb-Se-Te-Zn |
Requires EM/IP |
|
| OR3 | TBD | 255 | Ag-As-Bi-Cd-Mo-Pb- Sb-Se-Te-Zn |
735 x 130 640x 285 |
6,100 8,800 |
Yes | Ag-Bi-Cd-Cu-Mo Pb-Sb-Se-Te-W-Zn |
Under review |
| OR4 | TBD | 250 | Ag-As-Bi-Cd-In-Mo- Pb-Se-Sn-Te-Zn |
65 x 80 55 x 60 55x60 |
5,100 9,500 9,500 |
Yes | Ag-Bi-Cd-Cu-Mo Pb-Sb-Se-Te-Zn |
Under review |
| OR5 | TBD | - | As-Au-Bi-Cu-Se Te-Zn |
Not Surveyed | Yes | Ag-Bi-Cd-Cu-Mo- Pb-Sb-Se-Te-Zn |
Requires magnetic modelling |
|
| OR7 | TBD | 210 | Ag-As-Bi-Cd-Mo-Pb- Se |
310 x 230 305 x 465 430x 270 |
3,200 8,600 5,200 |
Yes | Ag-As-Au-Ba-Cd- Cu-In-Mo-Sb-Zn |
Under review |
| TH1 | TBD | 215 | As-Bi-Mo-Se-Te | 200 x 530 | 2,000 | No | - | Under review |
| TH2 | TBD | 290 | Ag-As-Bi-Cd-Mo-Pb- Sb-Se-Te-Zn |
160 x 260 | 4,800 | Yes | Ag-Bi-Cd-Cu-Mo- Pb-Sb-Se-Te-Zn |
Under review |
| Rufina | TBD | 230 | - | 250 x 210 | 2,400 | No | Ag-As-Bi-Cd-Cu- In-Mo-Pb-Sb-Se- Te-Zn |
Under review |
| Lambrusco | TBD | 330 | - | 220 x 430 | 1,400(EOH) | No | - | Under review |
| Neptune Camp | TBD | - | - | Not Surveyed | - | - | Earlystage | |
| Mangrove Camp | TBD | - | - | Not Surveyed | - | - | Earlystage |
6
ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
Background on Tarraji-Yampi (E04/2508, E04/2557, E04/2608, E04/2860, E04/2861, E04/2862, E04/2863: 100%, E04/2315: 80%)
Tarraji-Yampi is located entirely within the Yampi Sound Training Area (“ YSTA ”), a Commonwealth Defence Reserve in the West Kimberley, ~80kms from the port of Derby. The YSTA is the second largest Defence Reserve in Australia after Woomera in South Australia and was off limits to mineral exploration from 1978 to 2013.
The only significant exploration undertaken in the area was by WMC Resources in 1958 and Australian Consolidated Minerals in 1972, with both parties exploring for copper. Since opening for exploration in 2013, Dreadnought has secured the largest ground holding within the YSTA and developed strong working relationships with both the Department of Defence and the Dambimangari People.
==> picture [462 x 549] intentionally omitted <==
Figure 5: Plan view image showing the location of Cu-Au and VMS prospects over geological interpretation at Tarraji-Yampi.
7
ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
For further information please refer to previous ASX announcements:
-
25 August 2021 RC Results from Orion, Grant’s & Fuso Indicate a large Cu-Au-Ag-Co System
-
• 11 October 2021 Massive Sulphides Intersected in Multiple Holes at Orion Cu-Au-Ag-Co • 2 November 2021 Supergene Confirmed and Massive Sulphides Extended at Orion • 15 November 2021 High-Grade Cu-Ag-Au-Co Discovery at Orion • 8 December 2021 Further High-Grade Cu-Ag-Au-Co from Orion Discovery • 22 June 2022 Orion Auger Program – Tarraji-Yampi Project
-
15 August 2022 Nine Orion Look-alikes from Auger Program, More to Come
-
3 October 2022 Commencement of Regional Auger Program
-
18 May 2023 Additional Orion Look-Alikes from Auger Program
-
24 October 2023 Drilling and Geophysical Surveys Completed at Tarraji-Yampi
-
• 27 March 2024 Drilling and Geophysical Results from Tarraji-Yampi
-
17 June 2024 Cu-Au Drilling Commenced at Tarraji-Yampi
UPCOMING NEWSFLOW
July: Commencement of RC drilling at Gifford Creek Carbonatite Nb-REE (Mangaroon 100%)
July: Moving Loop EM survey at Tiger Cu-Au, Zn-Ag (Mangaroon 100%)
July: June 2024 Quarterly Activities and Cashflow Reports
July/August: Commencement of EIS co-funded RC drilling at Tiger Cu-Au-Zn-Ag (Mangaroon 100%) August: Commencement of RC drilling at Mangaroon Au (100%)
August: Results from drilling at Tarraji-Yampi (80/100%)
August: Results of further target generation and definition work at Mangaroon Au (100%)
August: Results from Nb-REE at the Gifford Creek Carbonatite (Mangaroon 100%) August/September: Results from EIS co-funded IP surveys at Tarraji-Yampi (80%/100%)
August/September: Results from Au and Cu-Au-Zn-Ag drilling at Mangaroon (100%)
~Ends~
For further information please contact: Dean Tuck Jessamyn Lyons Managing Director Company Secretary Dreadnought Resources Limited Dreadnought Resources Limited E: [email protected] E: [email protected]
This announcement is authorised for release to the ASX by the Board of Dreadnought.
8
ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forward-looking information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. There are a number of risks, both specific to Dreadnought, and of a general nature which may affect the future operating and financial performance of Dreadnought, and the value of an investment in Dreadnought including and not limited to title risk, renewal risk, economic conditions, stock market fluctuations, commodity demand and price movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and mining development, construction and commissioning risk.
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations.
Competent Person’s Statement – Exploration Results
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled by Mr. Dean Tuck, who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the announcement of the matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports, and that the forma and context in which the Competent Person’s findings are presented have not been materially modified from the original reports.
==> picture [236 x 313] intentionally omitted <==
==> picture [235 x 313] intentionally omitted <==
Figure 6: Photo of consultant Gerard Tripp inspecting diamond core with Dreadnought’s Claud Tomkins (Left) and inspecting Grant’s Cu-Au lode with Matt Crowe.
9
ASX:DRE
+61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
INVESTMENT HIGHLIGHTS
Kimberley Ni-Cu-Au Project (80/100%)
The project is located only 85kms from Derby in the West Kimberley region of WA and was locked up as a Defence Reserve since 1978.
The project has outcropping mineralisation and historic workings which have seen no modern exploration.
Results to date indicate that there may be a related, large scale, Proterozoic Cu-Au VMS system at Tarraji-Yampi, similar to DeGrussa and Monty in the Bryah Basin.
Mangaroon Ni-Cu-Co-3PGE, Au & REE Project (100%)
Mangaroon covers ~5,000kms[2] and is located 250kms south-east of Exmouth in the Gascoyne Region of WA. At the Money Intrusion, Ni-Cu-Co-3PGE has been identified. Dreadnought also has areas of outcropping high-grade gold including the historic Star of Mangaroon and Diamond gold mines. In addition, Mangaroon has emerged as a globally significant, rapidly growing, potential source of critical minerals. Highlights include:
-
An Exploration Target estimated for the top 150m of ~40km of the Yin REE Ironstone Complex (ASX 13 Feb 2023).
-
An independent Resource for Yin Ironstones Complex of 29.98Mt @ 1.04% TREO over only
==> picture [247 x 329] intentionally omitted <==
-
~4.6kms – including a Measured and Indicated Resource of 26.3Mt @ 1.04% TREO (ASX 30 Nov 2023).
-
Regional source of rare earths at the Gifford Creek Carbonatite totaling ~17kms x ~1km (ASX 7 Aug 2023).
-
A large, independent initial Resource of 10.84Mt @ 1.00% TREO at the Gifford Creek Carbonatites, containing a range of critical minerals including rare earths, niobium, phosphate, titanium and scandium (ASX 28 Aug 2023).
Bresnahan HREE-Au-U Project (100%)
Bresnahan is located ~125km southwest of Newman in the Ashburton Basin. The project comprises ~3,700kms[2] covering over 200kms strike along the Bresnahan Basin / Wyloo Group unconformity. Bresnahan is prospective for unconformity related heavy rare earth (“ HREE ”) deposits similar to Browns Range HREE deposits, unconformity uranium (“ U ”) deposits and mesothermal lode gold similar to Paulsens Au-Ag-Sb deposits along strike.
Prior to consolidation by Dreadnought, the Bresnahan Basin had been successfully explored for unconformity uranium with limited exploration for mesothermal gold. Bresnahan is a first mover opportunity to explore for unconformity HREE.
Central Yilgarn Gold, Base Metals, Critical Minerals & Iron Ore Project (100%)
Central Yilgarn is located ~190km northwest of Kalgoorlie in the Yilgarn Craton. The project comprises ~1,400kms[2] covering ~150km of strike along the majority of the Illaara, Yerilgee, South Elvire and Evanston greenstone belts. Central Yilgarn is prospective for typical Archean mesothermal lode gold deposits, VMS base metals, komatiitehosted nickel sulphides and critical metals including Lithium-Cesium-Tantalum.
Prior to consolidation by Dreadnought, the Central Yilgarn was predominantly held by iron ore explorers and remains highly prospective for iron ore.
10
ASX:DRE
+61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
Table 3: Drill Collar Data (GDA94 MGAz50)
| Hole ID | Easting | Northing | RL | Dip | Azimuth | EOH | **Type ** |
Prospect |
|---|---|---|---|---|---|---|---|---|
| KMDD001 | 627943 | 8168679 | 66 | -60 | 292 | 219.5 | DD |
Repeat |
| KMDD002 | 628248 | 8168621 | 66 | -66 | 292 | 552.2 | DD |
Extension |
| KMDD003 | 627958 | 8168558 | 64 | -60 | 270 | 251.1 | DD |
Splay |
| KMDD004 | 627829 | 8168614 | 65 | -65 | 292 | 150.3 | DD |
Offset |
| KMDD005 | 627698 | 8168790 | 68 | -70 | 280 | 171.8 | DD |
OR2 |
| KMDD006 | 627921 | 8169380 | 70 | -61 | 302 | 179.9 | DD |
OR1 |
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.)
| Criteria | **JORC Code explanation ** | Commentary |
|---|---|---|
| Sampling techniques | • Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as limiting the broad meaning of sampling. • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used. • Aspects of the determination of mineralisation that are Material to the Public Report. • In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information. |
Diamond (DD) drilling was undertaken to produce samples for assaying. Core is orientated for structural and geotechnical logging where possible. In orientated core, half core is submitted to the lab for analysis in intervals ranging from 20cm to 1m depending on the geological context. If core is orientated, then the half core is cut so as to preserve the orientation line with the same side of the core submitted down the hole. QAQC samples consisting of duplicates, blanks and CRM’s (OREAS Standards) will be inserted through the program at a rate of 1:50 samples. Duplicate samples are submitted as quarter core. All samples are submitted to ALS Laboratories in Perth for determination of 48 multi-elements via 4 acid digestion with MS/ICP finish (ALS Code ME-MS61) determination of Au by Fire Assay and ICP-AES finish (ALS Code Au-ICP22). |
| Drilling techniques | • Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc.). |
Diamond Drilling Diamond drilling was undertaken by Top Drill with a truck- mounted low impact Sandvik DE880 diamond drill rig. Drilling is either HQ to end of hole or initially HQ and dropping to NQ once the hole is cased off for deeper drill holes. Core is orientated using a Axis North-seeking Gyro and True Core Orientation Tool. |
| Drill sample recovery | • Method of recording and assessing core and chip sample recoveries and results assessed. • Measures taken to maximise sample recovery and ensure representative nature of the samples. • Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material. |
Diamond Drilling HQ and NQ drilling has been undertaken. All core recoveries are measured and recorded by the drill crew for each run and remeasured and checked by Dreadnought personnel. Core recovery to date has been very high. At this stage, no known bias occurs between sample recovery andgrade. |
| Logging | • Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. • Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.) photography. • The total length and percentage of the relevant intersections logged. |
Diamond Drilling Diamond core is logged under supervision of a Senior Geologist with sufficient experience in this geological terrane and relevant styles of mineralisation using an industry standard logging system which could eventually be utilised within a Mineral Resource Estimation. Lithology, mineralisation, alteration, veining, weathering and structure are recorded digitally. DD Logging is qualitative, quantitative or semi-quantitative in nature. |
| Sub-sampling techniques and sample |
• If core, whether cut or sawn and whether quarter, half or all core taken. |
Diamond Drilling 20cm – 1mquarter core samples are sawn and submitted to |
11
ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
| Criteria | **JORC Code explanation ** | Commentary |
|---|---|---|
| preparation | • If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or dry. • For all sample types, the nature, quality and appropriateness of the sample preparation technique. • Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples. • Measures taken to ensure that the sampling is representative of the in-situ material collected, including for instance results for field duplicate/second-half sampling. • Whether sample sizes are appropriate to the grain size of the material being sampled. |
the lab for analysis. If core is orientated, then the core is cut so as to preserve the orientation line with the same side of the core submitted down the hole. For the purposes of metallurgical testing, half core was submitted where possible to make the required bulk composite mass required for ongoing testwork. In some instances, this required full core to be used. QAQC in the form of duplicates, blanks and CRM’s (OREAS Standards) are inserted through the mineralised zones at a rate of 1:50 samples. Additionally, within each mineralised zone, a duplicate sample is taken and a blank inserted directly after. Samples are submitted to ALS laboratories (Perth), oven dried to 105°C and pulverised to 85% passing 75um to produce a 0.66g charge for determination of 48 multi- elements via 4 acid digestion with MS/ICP finish (ALS Code ME-MS61) and the determination of Au by Fire Assay and ICP-AES finish (ALS Code Au-ICP22). Standard laboratory QAQC is undertaken and monitored. |
| Quality of assay data and laboratory tests |
• The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. • For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc. • Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) andprecision have been established. |
Laboratory Analysis Fire Assay is considered a total digest for Au and Four-acid digest is considered a “near-total” digest for most elements. Standard laboratory QAQC is undertaken and monitored by the laboratory and by the company upon assay result receival. |
| Verification of sampling and assaying |
• The verification of significant intersections by either independent or alternative company personnel. • The use of twinned holes. • Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. • Discuss any adjustment to assay data. |
Logging and Sampling Logging and sampling were recorded directly into a digital logging system, verified and eventually stored in an offsite database. Significant intersections are inspected by senior company personnel. No twinned holes have been drilled at this time. No adjustments to any assay data have been undertaken. |
| Location of data points | • Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. • Specification of the grid system used. • Quality and adequacy of topographic control. |
Collar position was recorded using a Emlid Reach RS2 RTK GPS system (+/- 0.2m x/y, +/-0.5m z). GDA94 Z50s is the grid format for all xyz data reported. Azimuth and dip of the drill hole was recorded after the completion of the hole using a Axis North-seeking Gyro. A reading was undertaken every 10th metre with an accuracy of +/- 1° azimuth and +/-0.3° dip. |
| Data spacing and distribution |
• Data spacing for reporting of Exploration Results. • Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied. • Whether sample compositing has been applied. |
See tables for hole positions and sampling information. |
| Orientation of data in relation to geological structure |
• Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type. • If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material. |
Drilling was undertaken at a near perpendicular angle to the interpreted strike and dip of the ironstone outcrops and modelled magnetic data. No sample bias is known at this time. |
| Sample security | • The measures taken to ensure sample security. |
All core samples were collected and sealed by Dreadnought staff and delivered to Derby Stock Supplies in Derby before transport to Dreadnought’s coreshed in Perth. |
12
ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
| Criteria | **JORC Code explanation ** | Commentary |
|---|---|---|
| Samples were delivered to ALS Laboratories Perth by Dreadnought personnel from the company coreshed. |
||
| Audits or reviews | • The results of any audits or reviews of sampling techniques and data. |
The program is continuously reviewed by senior company personnel. |
| Section 2 Reporting of Exploration Results (Criteria inthis section apply to allsucceeding sections.) |
||
| Criteria | **JORC Code explanation ** | Commentary |
| Mineral tenement and land tenure status |
• Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. • The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area. |
The Tarraji-Yampi Project consists of 9 granted (E04/2315, E04/2508, E04/2557, E04/2608, E04/2860, E04/2861, E04/2862, E04/2863) exploration Licenses. The Tarraji tenement (E04/2315) is a 80/20 JV between IronRinger (Tarraji) Pty Ltd and Whitewater Resources Pty Ltd. The Yampi Tenements (E04/2508, E04/2557, E04/2608) and Tarraji Tenements (E04/2860, E04/2861, E04/2862, E04/2863) are 100% owned by Dreadnought Exploration Pty Ltd. Dreadnought Exploration Pty Ltd is a wholly owned subsidiary of Dreadnought Resources Ltd. E04/2315, E04/2508, E04/2557, E04/2860, E04/2861, E04/2862, E04/2863 are located within the Yampi Sound Training Area (YSTA) which is freehold land owned by the Commonwealth Government and administered by the Department of Defence. Being freehold Commonwealth Land, Native Title has been extinguished but falls within Dambimangari Land. E04/2608 is partly located within the YSTA and partly on Vacant Crown Land which has Native Title claim by the Warra Combined (NNTT Number 2901). |
| Exploration done by other parties |
• Acknowledgment and appraisal of exploration by other parties. |
Regional mapping, basic stream sediment, soil sampling and limited diamond drilling was completed by WMC in the 1950s. Shallow percussion and diamond drilling was undertaken by ACM at Chianti in the 1970s. The YSTA was off limits to exploration from 1978 until 2013. |
| Geology | • Deposit type, geological setting and style of mineralisation. |
The Tarraji-Yampi Project is located within the Hooper Complex which is a Proterozoic Mobile Belt in the West Kimberley. The Hooper Complex has known occurrences of Cu-Zn- Pb-Ag VMS mineralisation within the Marboo Formation, magmatic Ni-Cu-PGE mineralisation in the Ruins Dolerite and later stage Proterozoic Cu-Au mineralisation associated with significant structures and late-stage intrusions. |
| Drill hole information | • A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes: oeasting and northing of the drill hole collar oelevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar odip and azimuth of the hole odown hole length and interception depth ohole length. • If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case. |
An overview of the drilling program is given within the text and tables within this document. |
| Data aggregation methods |
• In reporting Exploration Results, weighting averaging techniques, maximum and/or minimumgrade truncations |
No assay results reported |
13
ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864
| Criteria | **JORC Code explanation ** | Commentary |
|---|---|---|
| (e.g. cutting of high grades) and cut-off grades are usually Material and should be stated. • Where aggregate intercepts incorporate short lengths of high-grade results and longer lengths of low-grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail. • The assumptions used for any reporting of metal equivalent values should be clearly stated. |
||
| Relationship between mineralisation widths and intercept lengths |
• These relationships are particularly important in the reporting of Exploration Results. • If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported. • If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect _(e.g. ‘down hole length, true width not known’). _ |
Drilling is undertaken close to perpendicular to the dip and strike of the mineralisation. The true thickness of the mineralisation intersected in drill holes cannot currently be calculated. |
| Diagrams | • Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. |
Refer to figures within this report. |
| Balanced reporting | • Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results. |
The accompanying document is a balanced report with a suitable cautionary note. |
| Other substantive exploration data |
• Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples – size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances. |
Suitable commentary of the geology encountered are given within the text of this document. |
| Further work | • The nature and scale of planned further work (e.g. tests for lateral extensions or depth extensions or large-scale step-out drilling). • Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive. |
Additional Diamond Drilling DHEM IP |
14