Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

DREADNOUGHT RESOURCES LTD Capital/Financing Update 2024

Oct 6, 2024

64785_rns_2024-10-06_efee4dad-6e73-489f-920b-24421acda6c8.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

ASX ANNOUNCEMENT 7 October 2024

Strong Drilling Results from Tarraji-Yampi (80%, 100%)

HIGHLIGHTS

  • Assays from a diamond drilling program (6 holes, 1,524.8m) at Tarraji-Yampi have been received. These holes were designed to test 6 Cu-Au volcanogenic massive sulphide (“VMS”) targets around the Orion deposit and to identify potential off-hole conductors.

Significant results were returned from the Orion, Orion Repeat, Orion Offset and OR1 targets: Orion and Orion Repeat: KMDD001: 3m @ 4.5% Cu, 2.2g/t Au, 46.0 g/t Ag, 0.15% Co from 58.3m And: 16m @ 0.7% Zn, 0.7% Pb, 12.7g/t Ag, 0.1g/t Au from 162m Including: 2m @ 2.6% Zn, 1.1% Pb, 26.8g/t Ag, 0.1g/t Au from 173m Orion Offset: KMDD004: 5m @ 0.4% Cu, 0.5 g/t Ag from 11m And: 1m @ 1.3% Zn, 0.7% Pb, 32.2g/t Ag, 0.1g/t Au from 23m And a 50,000S conductor spanning ~150m x 150m, located ~100m down dip And: 2m @ 0.9% Zn, 0.2% Pb, 3.8g/t Ag from 106m And a 15,000S conductor spanning ~90m x 140m located ~80m down dip OR1: KMDD006: 6m @ 1.2% Cu, 0.08% Co from 27m Including: 2m @ 2.0% Cu, 0.19% Co from 28m And a 24,300S conductor spanning ~80m x 200m, located ~180m down dip

  • Additionally, a strong 14,500S off hole conductor spanning ~335m x 350m was defined at OR2.

  • Results from the regional IP survey are expected in October 2024.

Dreadnought Resources Limited (“Dreadnought”) is pleased to announce results from a diamond drilling program and down hole EM (“DHEM”) surveys at Tarraji-Yampi, located in the Kimberley Region of Western Australia.

Dreadnought’s Managing Director, Dean Tuck, commented: “This drilling program was designed to identify new zones of mineralisation within and around the same feeder structures as Orion to better understand the Cu-Au VMS system. This program has delivered 6 new zones of mineralisation and four off-hole conductors that warrant follow up drilling. This is a successful outcome for the program and validation of the VMS model of mineralisation. As part of this program, an EIS co-funded IP

==> picture [376 x 200] intentionally omitted <==

survey was undertaken to test the effectiveness of IP at identifying Grant’s Find style Epithermal / Mesothermal Cu-Au mineralisation. The significant intersection of this style of mineralisation at OR1 underscores the importance of this work and we expect the results of that survey in October 2024.”

Figure 1: Photo of the Topdrill diamond rig at Orion Repeat.

1

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Technical Discussion of Diamond Drilling

In the Phase 1 drill program (6 holes, 1,640m), 5 of the 6 targets were located along the same interpreted feeder structure as the Orion deposit and were defined by highly conductive, magnetic anomalies associated with elevated pathfinder geochemistry. These targets include the depth extension of Orion. The 6-hole Phase 1 drill program targets are discussed and summarised below.

Orion Repeat was defined by a 3,500S FLEM conductor and coincident VMS pathfinder geochemistry that sits beneath previous drilling at Orion. KMDD001 was drilled through the main Orion lode and into the centre of the FLEM plate intersecting 3m of massive to semi-massive sulphides at the Orion lode with significant intercept of:

KMDD001: 3m @ 4.5% Cu, 2.2g/t Au, 46.0 g/t Ag, 0.15% Co from 58.3m

and 16m of mineralisation at the target Orion Repeat horizon including:

KMDD001:16m @ 0.7% Zn, 0.7% Pb, 12.7g/t Ag, 0.1g/t Au from 162m

Including: 2m @ 2.6% Zn, 1.1% Pb, 26.8g/t Ag, 0.1g/t Au from 173m

DHEM produced an on-hole response, indicating the FLEM target was tested. The DHEM plate measured ~13,000S with dimensions of ~150m x 140m. The centre of the plate is located below and to the south of the KMDD001. Pb-Zn mineralisation is indicative of the lower temperature edges of a massive sulphide system. This target warrants additional drilling.

==> picture [481 x 445] intentionally omitted <==

Figure 2: Cross Section view showing the results of KMDD001 testing the Orion Repeat target located below the main Orion Lode.

2

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Orion Offset was defined by a 3,800S FLEM conductor with coincident VMS pathfinder geochemistry. KMDD004 was drilled into the centre of the modelled FLEM plate and intersected a ~3.2m wide copper-stained mineralised gossan, shallower than the target conductor with significant results including:

KMDD004: 5m @ 0.4% Cu, 0.5 g/t Ag from 11m

A second mineralised horizon was intersected just below the gossanous horizon with significant results including:

KMDD004: 1m @ 1.3% Zn, 0.7% Pb, 32.2g/t Ag, 0.1g/t Au from 23m

DHEM produced an off-hole response down dip of the mineralised intervals. The DHEM plate measured ~50,000S with dimensions of ~150m x 150m located ~100m down dip of the mineralised intercepts and is interpreted to be the offset of the main Orion lode. This target warrants additional drilling.

A third mineralised horizon was intersected at target depth returning a significant result of:

KMDD004: 2m @ 0.7% Zn, 0.2% Pb, 3.8g/t Ag from 106m

DHEM produced an off-hole response associated with this target interval measuring ~15,000S with dimensions of ~90m x 150m located ~80m down dip and to the north of the drill hole. This off-hole conductor warrants additional drilling.

==> picture [536 x 444] intentionally omitted <==

Figure 3: Cross Section view showing the results of KMDD004 testing the Orion Offset target and intersecting two mineralised zones with strong off hole conductors.

3

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

OR1 was the only target drilled off the interpreted Orion feeder structure, targeting a strong “edge hit” 16,700S DHEM conductor defined from KMRC060 ( 2m @ 0.4% Pb and 16.6g/t Ag from 106m) along a prospective peperite contact coincident with the DHEM conductor. KMDD006 was drilled to test the modelled plate produced no significant assay results, however, the DHEM confirms that the target was not tested. An off-hole conductor of 24,300S, consistent with a massive sulphide source, was identified which sits further down dip of the mineralised horizons intersected in KMRC060 and KMDD006. This OR1 target is ~82m x 200m in size and remains a priority target for follow up drilling.

KMDD006 also intersected a ~6m wide stockwork or Grant’s Find style Cu-Co mineralisation returning:

KMDD006: 6m @ 1.2% Cu, 0.08% Co from 27m

Including: 2m @ 2.0% Cu, 0.19% Co from 28m

Both the off-hole conductor and Grant’s Find style mineralisation warrant follow up drilling.

==> picture [532 x 441] intentionally omitted <==

Figure 4: Cross Section view showing the results of KMDD006 testing the OR1 target and intersecting two mineralised zones with strong off hole conductor at depth.

4

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

OR2 was a 7,200S off hole conductor located beneath the strongest Cu auger geochemical anomaly (stronger than Orion) with VMS pathfinder geochemistry. KMRC062, which is the hole from where the DHEM conductor originated, contained elevated AgBi-Mo-Sb-Se at the prospective peperite contact. KMDD005 was drilled into the centre of the modelled plate which was explained by a sulphidic shale. DHEM confirmed that the target plate was tested at the target depth. DHEM also identified a strong 14,500S off-hole conductor, consistent with a massive sulphide source, located further down dip and between KMDD005 and KMRC062 on the same prospective mineralised horizon. This OR2 DHEM target is ~335m x 350m in size and remains a priority drill target.

Orion Extension was defined by a large and strong magnetic anomaly at depth of the main Orion lode. KMDD002 was drilled to test the centre of this magnetic anomaly and a hanging wall lode that was intersected in KMRD056 (1.35m @ 1.0% Cu). Drilling intersected six variably mineralised peperite horizons with no significant mineralisation. The magnetic anomaly is explained by thick pyrrhotite accumulations between 420m and 440m. DHEM confirms that the target horizon was tested with a ~47,000S plate centred around 420m depth associated with ~510% sulphides dominated by pyrrhotite and pyrite with only trace chalcopyrite, sphalerite, galena and arsenopyrite.

This target is considered effectively tested and explained.

Orion Splay was defined by multiple DHEM conductors up to 28,000S that have an orientation sub-parallel to the interpreted feeder structure that might also be offsetting the main Orion deposit. Adjacent drill holes are elevated in VMS pathfinder geochemistry. KMDD003 was drilled to test multiple DHEM plates. The most significant mineralisation was 1m @ 0.4% Zn, 0.2% Pb and 0.4g/t Au from 81m.

DHEM confirms that all plates were effectively tested and explained.

Figure 5: Plan view image showing the location of previously drilled (black dots) and recently drilled holes (blue dots) at Orion in relation to prospects, geochemical contours, and FLEM/DHEM plates.

==> picture [373 x 513] intentionally omitted <==

5

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Target Summary

Phase 1 of the 2024 drilling program at Tarraji-Yampi tested and DHEM surveyed 6 priority targets. Targeting was prioritised based on a ranking system summarised in Table 2 below.

Additional field activities were undertaken including EIS co-funded IP surveys and mapping of other advanced and early-stage targets

to determine next steps.

A summary of currently defined Cu-Au VMS targets and their status is below. The summary does not include Cu-Au epithermal targets which will be ranked following the EIS co-funded IP surveys which was partially completed as part of this program with results expected in October 2024.

Table 1: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). Table 1: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). Table 1: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). Table 1: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). Table 1: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). Table 1: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). Table 1: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51). Table 1: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51).

Planned
Plate
Dimension
(m)
Planned
Auger
Conductance
Magnetic

Down hole
Target
Depth

Target Status
Hole
Geochemistry
(S)
Anomaly

Geochemistry
(m)
Orion
Yes 620 - - - Yes - Tested
**Extension **
Ag-As-Bi-Mo- Drilled: Requires
Orion Repeat Yes 260 200 x 190 3,500 Yes -

Pb-Sb-Se-Zn

follow up
90 x 45 28,000 Ag-As-Au-Bi-
Ag-As-Bi-Mo-
Orion Splay Yes 245 90 x 110 14,300 No
Co-Cu-Mo-Pb-
Tested

Pb-Sb-Se-Zn
600 x390 2,500 Sb-Se-Te-W-Zn
Ag-As-Au-Bi-
Ag-As-Bi-Cd-Mo- Drilled: Requires
Orion Offset Yes 155 200 x 190 3,800 Yes Co-Cu-Mo-Pb-
Pb-Sb-Se-Zn

follow up
Sb-Se-Te-W-Zn
Ag-As-Bi-Cd-Cu- Ag-Bi-Mo- Drilled: Requires
OR2 Yes 160 105 x 45 7,200 Yes
In-Pb-Sb-Se-Zn
Sb-Se

follow up
Ag-Bi-Cd-Cu-
As-Bi-Pb-Sb- Drilled: Requires
OR1 Yes 200 70 x 200 16,700 No Mo-Pb-Sb-Se-
Se-Te
follow up
Te-Zn
Ironclad TBD - Ag-As-Au-Bi-Cu
Se-Te-Zn
Not Surveyed No Ag-Bi-Cd-Cu-Mo-
Pb-Sb-Se-Te-Zn

Requires EM/IP
OR3 TBD 255 Ag-As-Bi-Cd-Mo-Pb-
Sb-Se-Te-Zn
735 x 130
640x 285
6,100
8,800
Yes Ag-Bi-Cd-Cu-Mo
Pb-Sb-Se-Te-W-Zn

Requires Drilling
OR4 TBD 250 Ag-As-Bi-Cd-In-Mo-
Pb-Se-Sn-Te-Zn
65 x 80
55 x 60
55x60
5,100
9,500
9,500
Yes Ag-Bi-Cd-Cu-Mo
Pb-Sb-Se-Te-Zn
Requires Drilling
OR5 TBD - As-Au-Bi-Cu-Se
Te-Zn
Not Surveyed Yes Ag-Bi-Cd-Cu-Mo-
Pb-Sb-Se-Te-Zn

Requires magnetic
modelling
OR7 TBD 210 Ag-As-Bi-Cd-Mo-Pb-
Se
310 x 230
305 x 465
430x 270
3,200
8,600
5,200
Yes Ag-As-Au-Ba-Cd-
Cu-In-Mo-Sb-Zn
Requires Drilling
TH1 TBD 215 As-Bi-Mo-Se-Te 200 x 530 2,000 No - Requires Drilling
TH2 TBD 290 Ag-As-Bi-Cd-Mo-Pb-
Sb-Se-Te-Zn
160 x 260 4,800 Yes Ag-Bi-Cd-Cu-Mo-
Pb-Sb-Se-Te-Zn
Requires Drilling
Rufina TBD 230 - 250 x 210 2,400 No Ag-As-Bi-Cd-Cu-
In-Mo-Pb-Sb-Se-
Te-Zn
Requires Drilling
Lambrusco TBD 330 - 220 x 430 1,400(EOH) No - Requires Drilling
Neptune Camp TBD - - Not Surveyed - - Earlystage
Mangrove Camp TBD - - Not Surveyed - - Earlystage

6

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

SNAPSHOT – Tarraji-Yampi Cu-Au-Ag-Co

Unexplored since the 1970s

  • Outcropping mineralisation was discovered in 1905 and mined for copper at Grant’s Find, Wilson’s Reward, Monarch, Ironclad and Tarraji from 1907-1920.

  • Only historical exploration within the area was by WMC Resources (“WMC”) in the 1950s and Australian

  • Consolidated Minerals (“ACM”) in the 1970s with both parties exploring for copper.

  • Contained entirely within the Yampi Sound Training Area (“YSTA”), Commonwealth land was off limits to mineral exploration from 1978 to 2013.

Genuine Camp Scale Potential

  • Five clusters of historical mining on outcropping mineralisation.

  • Orion discovery (~350m wide x ~150m long x 250m deep and open at depth), under just 1m of cover, made in 2021. Results include KMRC022: 16m @ 2.2% Cu, 38.7g/t Ag, 6.6g/t Au, 0.40% Co from 77m. (ASX 15 Nov 2021)

  • Lithostructural and geochemical similarities to pelitic-mafic or “Besshi-style” VMS systems such as Monty /DeGrussa in Western Australia, Windy Craggy in Canada or the Matchless deposits in Namibia.

- Significant, Step Change, Growth Potential

  • Dreadnought is the first to deploy modern geochemical and geophysical techniques to explore for mineralisation under shallow cover in the region.

  • Multiple priority Orion look-alikes defined through geochemical and geophysical surveys with highly conductive anomalism.

High-Grade, Multi-Metal Potential Including Cu-Ag-Au-Co

  • Previous drilling at Orion includes thick high-grade intersections (ASX 15 Nov 2021 and 8 Dec 2021):

KMRC017: 12m @ 1.6% Cu, 31.7g/t Ag, 0.5g/t Au, 0.02% Co from 45m

KMRC022: 16m @ 2.2% Cu, 38.7g/t Ag, 6.6g/t Au, 0.40% Co from 77m, including:

  • 2m @ <0.1% Cu, 4.8 g/t Ag, 27.6g/t Au, 1.50% Co from 77m, and:

  • 7m @ 4.7% Cu, 83.3g/t Ag, 4.9g/t Au, 0.20% Co from 82m

  • KMRC039: 20m @ 1.4% Cu, 13.4g/t Ag, 0.5g/t Au, 0.03% Co from 3m, including:

  • 3m @ 7.6% Cu, 116.2g/t Ag, 2.2 g/t Au, 0.14% Co from 18m

  • KMRC047: 12m @ 3.0% Cu, 21.4g/t Ag, 1.7g/t Au, 0.02% Co from 1m, including:

5m @ 5.9% Cu, 44.9 g/t Ag, 3.7g/t Au, 0.01% Co from 1m

Global Energy Decarbonisation Driving Copper Fundamentals

  • Copper is essential for electricity-related technologies with renewable energy systems requiring up to 12x more copper compared to traditional energy systems.

  • S&P Global forecasts that global demand for copper could double from 25mt to 50mt by 2035. Under this scenario, by 2030, supply from both existing and projected copper mines will meet just 80% of demand (S&P Global: The Future of Copper, July 2022) .

7

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Background on Tarraji-Yampi (E04/2508, E04/2557, E04/2608, E04/2860, E04/2861, E04/2862, E04/2863: 100%, E04/2315: 80%)

Tarraji-Yampi is located entirely within the Yampi Sound Training Area (“ YSTA ”), a Commonwealth Defence Reserve in the West Kimberley, ~80kms from the port of Derby. The YSTA is the second largest Defence Reserve in Australia after Woomera in South Australia and was off limits to mineral exploration from 1978 to 2013.

The only significant exploration undertaken in the area was by WMC Resources in 1958 and Australian Consolidated Minerals in 1972, with both parties exploring for copper. Since opening for exploration in 2013, Dreadnought has secured the largest ground holding within the YSTA and developed strong working relationships with both the Department of Defence and the Dambimangari People.

==> picture [462 x 549] intentionally omitted <==

Figure 6: Plan view image showing the location of Cu-Au and VMS prospects over geological interpretation at Tarraji-Yampi.

8

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

For further information please refer to previous ASX announcements:

  • 25 August 2021 RC Results from Orion, Grant’s & Fuso Indicate a large Cu-Au-Ag-Co System

  • 11 October 2021 Massive Sulphides Intersected in Multiple Holes at Orion Cu-Au-Ag-Co2 November 2021 Supergene Confirmed and Massive Sulphides Extended at Orion15 November 2021 High-Grade Cu-Ag-Au-Co Discovery at Orion8 December 2021 Further High-Grade Cu-Ag-Au-Co from Orion Discovery22 June 2022 Orion Auger Program – Tarraji-Yampi Project15 August 2022 Nine Orion Look-alikes from Auger Program, More to Come3 October 2022 Commencement of Regional Auger Program18 May 2023 Additional Orion Look-Alikes from Auger Program24 October 2023 Drilling and Geophysical Surveys Completed at Tarraji-Yampi27 March 2024 Drilling and Geophysical Results from Tarraji-Yampi17 June 2024 Cu-Au Drilling Commenced at Tarraji-Yampi

  • 18 July 2024 Four Strong Off-Hole Conductors Identified

UPCOMING NEWSFLOW

October: Results of further target generation and definition work at Mangaroon Au (100%)

October: Results from EIS co-funded IP surveys at Tarraji-Yampi (80%/100%)

October: Results from Nb-REE drilling at the Gifford Creek Carbonatite (Mangaroon 100%)

October/November: Results from Au and Cu-Au-Zn-Ag drilling at Mangaroon (100%) October/November: Results from airborne geophysical surveys at Mangaroon (100%) October/November: Results from diamond drilling at the Star of Mangaroon (100%) October/November: Results from metallurgical testing at Star of Mangaroon (100%)

November: Initial Resource for Star of Mangaroon (100%)

October: Quarterly Activities and Cashflow Report

28 November: Annual General Meeting

~Ends~

For further information please contact: Dean Tuck Jessamyn Lyons Managing Director Company Secretary Dreadnought Resources Limited Dreadnought Resources Limited E: [email protected] E: [email protected]

This announcement is authorised for release to the ASX by the Board of Dreadnought.

9

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Cautionary Statement

This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forward-looking information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. There are a number of risks, both specific to Dreadnought, and of a general nature which may affect the future operating and financial performance of Dreadnought, and the value of an investment in Dreadnought including and not limited to title risk, renewal risk, economic conditions, stock market fluctuations, commodity demand and price movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and mining development, construction and commissioning risk.

Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations.

Competent Person’s Statement – Exploration Results

The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled by Mr. Dean Tuck, who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the announcement of the matters based on the information in the form and context in which it appears.

The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports, and that the forma and context in which the Competent Person’s findings are presented have not been materially modified from the original reports.

10

ASX:DRE

+61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

INVESTMENT HIGHLIGHTS

Kimberley Ni-Cu-Au Project (80/100%)

The project is located only 85kms from Derby in the West Kimberley region of WA and was locked up as a Defence Reserve since 1978.

The project has outcropping mineralisation and historic workings which have seen no modern exploration.

Results to date indicate that there may be a related, large scale, Proterozoic Cu-Au VMS system at Tarraji-Yampi, similar to DeGrussa and Monty in the Bryah Basin.

Mangaroon Ni-Cu-Co-3PGE, Au & REE Project (100%)

Mangaroon covers ~5,300kms[2] and is located 250kms south-east of Exmouth in the Gascoyne Region of WA. At the Money Intrusion, Ni-Cu-Co-3PGE has been identified. Dreadnought also has areas of outcropping high-grade gold including the historic Star of Mangaroon and Diamond gold mines. In addition, Mangaroon has emerged as a globally significant, rapidly growing, potential source of critical minerals. Highlights include:

  • An Exploration Target estimated for the top 150m of ~40km of the Yin REE Ironstone Complex (ASX 13 Feb 2023).

  • An independent Resource for Yin Ironstones Complex of 29.98Mt @ 1.04% TREO over only

==> picture [247 x 329] intentionally omitted <==

  • ~4.6kms – including a Measured and Indicated Resource of 26.3Mt @ 1.04% TREO (ASX 30 Nov 2023).

  • Regional source of rare earths at the Gifford Creek Carbonatite totaling ~17kms x ~1km (ASX 7 Aug 2023).

  • A large, independent initial Resource of 10.84Mt @ 1.00% TREO at the Gifford Creek Carbonatites, containing a range of critical minerals including rare earths, niobium, phosphate, titanium and scandium (ASX 28 Aug 2023).

Bresnahan HREE-Au-U Project (100%)

Bresnahan is located ~125km southwest of Newman in the Ashburton Basin. The project comprises ~3,700kms[2] covering over 200kms strike along the Bresnahan Basin / Wyloo Group unconformity. Bresnahan is prospective for unconformity related heavy rare earth (“ HREE ”) deposits similar to Browns Range HREE deposits, unconformity uranium (“ U ”) deposits and mesothermal lode gold similar to Paulsens Au-Ag-Sb deposits along strike.

Prior to consolidation by Dreadnought, the Bresnahan Basin had been successfully explored for unconformity uranium with limited exploration for mesothermal gold. Bresnahan is a first mover opportunity to explore for unconformity HREE.

Central Yilgarn Gold, Base Metals, Critical Minerals & Iron Ore Project (100%)

Central Yilgarn is located ~190km northwest of Kalgoorlie in the Yilgarn Craton. The project comprises ~1,400kms[2] covering ~150km of strike along the majority of the Illaara, Yerilgee, South Elvire and Evanston greenstone belts. Central Yilgarn is prospective for typical Archean mesothermal lode gold deposits, VMS base metals, komatiitehosted nickel sulphides and critical metals including Lithium-Cesium-Tantalum.

Prior to consolidation by Dreadnought, the Central Yilgarn was predominantly held by iron ore explorers and remains highly prospective for iron ore.

11

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Table 2: Significant Results (>0.2% Zn, Cu, Pb, >0.2g/t Au)
Hole ID From
(m)
To
(m)
Interval
(m)
Cu
(%)
Au
(g/t)
Ag
(g/t)
Co
(%)
Zn
(%)
Pb
(%)
Prospect
KMDD001
incl
and
incl
and
and
incl
58.3
61.3
3
4.5
2.2
46.0
0.15
**0.4 **
Orion and Orion
Repeat
60
61
1
5.8
3.7
50.9
0.28
1.0
113
118
5
0.4
117
118
1
**1.2 **
120
121
1
0.3
162
178
16
0.1
12.7
0.7
0.7
173
175
2
0.1
26.8
2.6
**1.1 **
KMDD002 335
340
5
0.1
3.3
Orion Extension
and 382
392
10
0.1
0.2
and 431
438
7
0.2
and 472
490
18
0.1
0.2
KMDD003
incl
and
and
80
83
3
0.1
0.3
Orion Splay
81
82
1
0.4
0.4
0.2
96
98
2
0.3
136
139
3
0.1
0.4
KMDD004
incl
and
and
incl.
11
16
5
0.4
0.5
Orion Offset
23
24
1
0.1
32.2
1.3
0.7
25
27
2
0.1
0.2
98
108
10
0.2
106
108
2
3.8
0.7
**0.2 **
KMDD005 No Significant Results OR2
KMDD006 27
33
6
1.2
0.08
OR1
incl 28
30
2
2.0
0.19
Table 3: DrillCollar Data (GDA94 MGAz51)
Hole ID
Easting
Northing
KMDD001
627943
8168679
KMDD002
628248
8168621
KMDD003
627958
8168558
KMDD004
627829
8168614
KMDD005
627698
8168790
KMDD006
627921
8169380
Table 3: DrillCollar Data (GDA94 MGAz51)
Hole ID
Easting
Northing
KMDD001
627943
8168679
KMDD002
628248
8168621
KMDD003
627958
8168558
KMDD004
627829
8168614
KMDD005
627698
8168790
KMDD006
627921
8169380
Table 3: DrillCollar Data (GDA94 MGAz51)
Hole ID
Easting
Northing
KMDD001
627943
8168679
KMDD002
628248
8168621
KMDD003
627958
8168558
KMDD004
627829
8168614
KMDD005
627698
8168790
KMDD006
627921
8169380
Table 3: DrillCollar Data (GDA94 MGAz51)
Hole ID
Easting
Northing
KMDD001
627943
8168679
KMDD002
628248
8168621
KMDD003
627958
8168558
KMDD004
627829
8168614
KMDD005
627698
8168790
KMDD006
627921
8169380
Hole ID Easting Northing RL Dip Azimuth EOH
**Type **
Prospect
KMDD001 627943 8168679 66 -60 292 219.5
DD
Repeat
KMDD002 628248 8168621 66 -66 292 552.2
DD
Extension
KMDD003 627958 8168558 64 -60 270 251.1
DD
Splay
KMDD004 627829 8168614 65 -65 292 150.3
DD
Offset
KMDD005 627698 8168790 68 -70 280 171.8
DD
OR2
KMDD006 627921 8169380 70 -61 302 179.9
DD
OR1

12

ASX:DRE

+61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

JORC Code, 2012 Edition – Table 1 Report Template Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria **JORC Code explanation ** Commentary Commentary
Sampling techniques
Nature and quality of sampling (e.g. cut channels, random
chips,
or
specific
specialised
industry
standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.

Aspects of the determination of mineralisation that are
Material to the Public Report.

In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
Diamond (DD) drilling was undertaken to produce samples
for assaying.
Core is orientated for structural and geotechnical logging
where possible. In orientated core, half core is submitted to
the lab for analysis in intervals ranging from 20cm to 1m
depending on the geological context. If core is orientated,
then the half core is cut so as to preserve the orientation
line with the same side of the core submitted down the hole.
QAQC samples consisting of duplicates, blanks and CRM’s
(OREAS Standards) will be inserted through the program at
a rate of 1:50 samples. Duplicate samples are submitted as
quarter core.
All samples are submitted to ALS Laboratories in Perth for
determination of 48 multi-elements via 4 acid digestion with
MS/ICP finish (ALS Code ME-MS61) determination of Au by
Fire Assay and ICP-AES finish (ALS Code Au-ICP22).
Drilling techniques
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Diamond Drilling
Diamond drilling was undertaken by Top Drill with a truck-
mounted low impact Sandvik DE880 diamond drill rig.
Drilling is either HQ to end of hole or initially HQ and
dropping to NQ once the hole is cased off for deeper drill
holes.
Core is orientated using a Axis Champ North-seeking Gyro
and True Core Orientation Tool.
Drill sample recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.

Measures taken to maximise sample recovery and ensure
representative nature of the samples.

Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Diamond Drilling
HQ and NQ drilling has been undertaken. All core
recoveries are measured and recorded by the drill crew for
each run and remeasured and checked by Dreadnought
personnel.
Core recovery to date has been very high.
At this stage, no known bias occurs between sample recovery
andgrade.
Logging
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.

Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.

The total length and percentage of the relevant
intersections logged.
Diamond Drilling
Diamond core is logged under supervision of a Senior
Geologist with sufficient experience in this geological terrane
and relevant styles of mineralisation using an industry
standard logging system which could eventually be utilised
within a Mineral Resource Estimation.
Lithology, mineralisation, alteration, veining, weathering and
structure are recorded digitally.
DD Logging is qualitative, quantitative or semi-quantitative in
nature.
Sub-sampling
techniques and sample
preparation

If core, whether cut or sawn and whether quarter, half or
all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.

For all sample types, the nature, quality and
appropriateness of the sample preparation technique.

Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.

Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of
the material being sampled.
Diamond Drilling
20cm – 1m half core samples are sawn and submitted to the
lab for analysis. If core is orientated, then the core is cut so
as to preserve the orientation line with the same side of the
core submitted down the hole.
QAQC in the form of duplicates, blanks and CRM’s (OREAS
Standards) are inserted through the mineralised zones at a
rate of 1:50 samples. Additionally, within each mineralised
zone, a duplicate sample is taken and a blank inserted
directly after.
Samples are submitted to ALS laboratories (Perth), oven
dried to 105°C and pulverised to 85% passing 75um to
produce a 0.66g charge for determination of 48 multi-
dreadnoughtresources.com.au 13

13

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017

ABN 40 119 031 864

Criteria **JORC Code explanation ** Commentary
elements via 4 acid digestion with MS/ICP finish (ALS Code
ME-MS61) and the determination of Au by Fire Assay and
ICP-AES finish (ALS Code Au-ICP22).
Standard laboratory QAQC is undertaken and monitored.
Quality of assay data
and laboratory tests

The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
andprecision have been established.
Laboratory Analysis
Fire Assay is considered a total digest for Au and Four-acid
digest is considered a “near-total” digest for most elements.
Standard laboratory QAQC is undertaken and monitored by
the laboratory and by the company upon assay result
receival.
Verification of sampling
and assaying

The verification of significant intersections by either
independent or alternative company personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.

Discuss any adjustment to assay data.
Logging and Sampling
Logging and sampling were recorded directly into a digital
logging system, verified and eventually stored in an offsite
database.
Significant intersections are inspected by senior company
personnel.
No twinned holes have been drilled at this time.
No adjustments to any assay data have been undertaken.
Location of data points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.
Collar position was recorded using a Emlid Reach RS2 RTK
GPS system (+/- 0.2m x/y, +/-0.5m z).
GDA94 Z51 is the grid format for all xyz data reported.
Azimuth and dip of the drill hole was recorded after the
completion of the hole using a Axis Champ North-seeking
Gyro. A reading was undertaken every 10th metre with an
accuracy of +/- 0.5° azimuth and +/-0.15° dip.
Data spacing and
distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

Whether sample compositing has been applied.
See tables for hole positions and sampling information.
Orientation of data in
relation to geological
structure

Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.

If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
Drilling was undertaken at a near perpendicular angle to the
interpreted strike and dip of the stratigraphy and modelled
magnetic data.
No sample bias is known at this time.
Sample security
The measures taken to ensure sample security.
All core samples were collected and sealed by Dreadnought
staff and delivered to Derby Stock Supplies in Derby before
transport to Dreadnought’s coreshed in Perth.
Samples were delivered to ALS Laboratories Perth by
Dreadnought personnel from the company coreshed.
Audits or reviews
The results of any audits or reviews of sampling techniques
and data.
The program is continuously reviewed by senior company
personnel.
Section 2 Reporting of Exploration Results
(Criteria inthis section apply to allsucceeding sections.)
Section 2 Reporting of Exploration Results
(Criteria inthis section apply to allsucceeding sections.)
Section 2 Reporting of Exploration Results
(Criteria inthis section apply to allsucceeding sections.)
Criteria **JORC Code explanation ** Commentary
Mineral tenement and
land tenure status

Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.

The security of the tenure held at the time of reporting

The Tarraji-Yampi Project consists of 5 granted (E04/2315,
E04/2508, E04/2557, E04/2608) and 4 pending (E04/2860,
E04/2861, E04/2862, E04/2863) Exploration Licenses.
The Tarraji tenement (E04/2315) is an 80/20 JV between
Dreadnought Exploration Pty Ltd and Whitewater
Resources Pty Ltd.
dreadnoughtresources.com.au 14

14

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017

ABN 40 119 031 864

Criteria **JORC Code explanation ** Commentary Commentary
along with any known impediments to obtaining a licence
to operate in the area.
The Yampi Tenements (E04/2508, E04/2557, E04/2608) and
Tarraji Tenements (E04/2860, E04/2861, E04/2862,
E04/2863) are 100% owned by Dreadnought Exploration
Pty Ltd.
Dreadnought Exploration Pty Ltd is a wholly owned
subsidiary of Dreadnought Resources Ltd.
E04/2315, E04/2508, E04/2557, E04/2860, E04/2861,
E04/2862, E04/2863 are located within the Yampi Sound
Training Area (YSTA) which is freehold land owned by the
Commonwealth Government and administered by the
Department of Defence. Being freehold Commonwealth
Land, Native Title has been extinguished but falls within
Dambimangari Land.
E04/2608 is partly located within the YSTA and partly on
Vacant Crown Land which has Native Title claim by the
Warra Combined (NNTT Number 2901).
Exploration done by
other parties

Acknowledgment and appraisal of exploration by other
parties.
Regional mapping, basic stream sediment, soil sampling and
limited diamond drilling was completed by WMC in the
1950s.
Shallow percussion and diamond drilling was undertaken by
ACM at Chianti in the 1970s.
The YSTA was off limits to exploration from 1978 until
2013.
Geology
Deposit type, geological setting and style of mineralisation.
The Tarraji-Yampi Project is located within the Hooper
Complex which is a Proterozoic Mobile Belt in the West
Kimberley.
The Hooper Complex has known occurrences of Cu-Zn-
Pb-Ag VMS mineralisation within the Marboo Formation,
magmatic Ni-Cu-PGE mineralisation in the Ruins Dolerite
and later stage Proterozoic Cu-Au mineralisation
associated with significant structures and late-stage
intrusions.
Drill hole information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.

If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion does
not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
An overview of the drilling program is given within the text
and tables within this document.
Data aggregation
methods

In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.

The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Significant intercepts are length weight averaged for all
samples above the below cut offs (including up to 3m of
internal waste)
>0.2% Cu, Zn, Pb
>0.2g/t Au
No top cutting has been applied.
No metal equivalents are reported.
Relationship between
mineralisation widths
and intercept lengths

These relationships are particularly important in the
reporting of Exploration Results.

If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.

If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
Drilling is undertaken close to perpendicular to the dip and
strike of the mineralisation.
The true thickness of the mineralisation intersected in drill
holes cannot currently be accurately calculated.
dreadnoughtresources.com.au 15

15

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Criteria **JORC Code explanation ** Commentary
(e.g. ‘down hole length, true width not known’).
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should include,
but not be limited to a plan view of drill hole collar locations
and appropriate sectional views.
Refer to figures within this report.
Balanced reporting
Where comprehensive reporting of all Exploration Results
is not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
The accompanying document is a balanced report with a
suitable cautionary note.
Other substantive
exploration data

Other exploration data, if meaningful and material, should
be reported including (but not limited to): geological
observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
Suitable commentary of the geology encountered are given
within the text of this document.
Further work
The nature and scale of planned further work (e.g. tests
for lateral extensions or depth extensions or large-scale
step-out drilling).

Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
Additional Diamond Drilling
DHEM
IP

16