Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

DREADNOUGHT RESOURCES LTD Capital/Financing Update 2023

Nov 7, 2023

64785_rns_2023-11-07_6462cbed-cf5b-4850-8e8c-58a9f7f33675.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

ASX ANNOUNCEMENT 8 November 2023

Further Ni-Cu-Co-3PGE Assays & Drilling to Recommence at Mangaroon (Earn-in)

HIGHLIGHTS

  • Assays have been received from the 10-hole (1,074m) RC drill program (REYRC013-022) at the Bookathanna North and High Range prospects. All holes into the keel of the intrusion at Bookathanna North (6 out of 7 holes) successfully intersected mineralisation with results including:

REYRC013: 23m @ 0.50% Ni 0.51% Cu 0.02% Co 0.49g/t 3PGE from 36m including:

2m @ 3.32% Ni 2.88% Cu 0.12% Co 1.46g/t 3PGE from 45m REYRC014: 22m @ 0.18% Ni 0.24% Cu 0.01% Co 0.24g/t 3PGE from 34m including: 7m @ 0.30% Ni 0.44% Cu 0.02% Co 0.38g/t 3PGE from 41m REYRC018: 53m @ 0.15% Ni 0.22% Cu 0.01% Co 0.08g/t 3PGE from 5m including:

1m @ 0.29% Ni 1.50% Cu 0.01% Co 0.11g/t 3PGE from 47m REYRC019: 10m @ 0.36% Ni 0.45% Cu 0.02% Co 0.18g/t 3PGE from 76m including:

2m @ 1.15% Ni 1.30% Cu 0.06% Co 0.36g/t 3PGE from 78m

  • This program follows from the first program (12-holes, REYRC001-012) located ~2.5km to the south which intersected mineralisation in all holes including:

REYRC002: 13m @ 0.19% Ni 0.17% Cu 0.01% Co 0.08g/t 3PGE from 70m including:

1m @ 0.85% Ni 0.77% Cu 0.05% Co 0.17g/t 3PGE from 80m

  • A 7-hole, wide spaced RC drilling program is underway at Bookathanna North. The program will likely be followed by additional RC drilling, initial diamond drilling, down-hole EM (“DHEM”) and moving loop EM (“MLEM”) in March 2024 following the summer months.

  • Induced Polarisation (“IP”) is to commence in November 2023.

Dreadnought Resources Limited (“Dreadnought”) is pleased to announce that assay results have been received from RC drilling at Bookathanna North along the 45km long Money Intrusion part of the Mangaroon Ni-Cu-Co-3PGE Project (Earn-in), located in the Gascoyne Region of Western Australia.

Dreadnought’s Managing Director, Dean Tuck, commented: “We are pleased to have recommenced RC drilling at Bookathanna North with our partners First Quantum Minerals following up on what was a successful drill program in August / September this year. With assays now in hand, we have confirmed that thick near surface sulphide mineralisation with high grade massive and semi massive sulphides exists within the Money Intrusion. Confirming a new Ni-Cu-Co-3PGE sulphide system and opening up an entirely new search space is extremely exciting as we continue to explore and unlock the potential of the Money Intrusion. Every program continues to teach us more about this new system and we look forward to re-assessing the entire Money Intrusion, including follow up geophysics later this month and into 2024.”

Figure 1: Nick Chapman (L) and Chris Manners (R) with semi-massive sulphide RC chips from a step out drill hole at Bookathanna North.

1

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

SNAPSHOT – MANGAROON Ni-Cu-Co-3PGE

Major Miner, First Quantum Minerals, Earning-in

  • The potential of the Money Intrusion is underscored by an Earn-In with First Quantum Minerals Ltd (TSE:FM), a ~$20B TSX listed company (ASX 7 Apr 2021, ASX 30 Aug 2022).

  • First Quantum Minerals can earn an initial 51% interest by funding $12M of expenditure by 1 March 2026. First Quantum Minerals may withdraw at any time during the earn-in phase with 0% interest.

  • Upon satisfying the earn-in requirements, a Joint Venture will be formed where First Quantum Minerals may elect to increase its interest to 70% by sole funding expenditure up until a Decision to Mine.

  • Once a Decision to Mine has been made, Dreadnought can elect to either:

  • Maintain its 30% by co-contributing.

  • Dilute to 20% and be loan carried by First Quantum Minerals, repaid through revenue.

  • Divest its 30% interest to First Quantum Minerals at fair market value.

  • Dreadnought retains gold rights across the earn-in tenements.

Fertile Ni-Cu-Co-3PGE System Confirmed

  • Fertile Ni-Cu-Co-3PGE sulphide systems are rare and the Money Intrusion has already been proven to contain

  • high tenor magmatic Ni-Cu-Co-3PGE mineralisation.

  • The Money Intrusion is confirmed to be ~800Ma, a fertile time for Ni-Cu-Co-3PGE systems globally. Highly prospective keel geometries which are suitable for forming trap sites for magmatic sulphide accumulations have been identified.

  • First pass drilling in 2022 at the Bookathanna and High Range prospects intersected magmatic sulphide

  • mineralisation (ASX 10 Nov 2022). To date, the Ni and Cu have been in ~50:50 proportions.

  • Notwithstanding the early-stage drilling, a significant success rate has already been achieved. Out of the 22 RC holes (2,906m) drilled to date, 15 holes have either assayed or shown visual/pXRF evidence of Ni-Cu-Co-3PGE sulphides.

No Modern Exploration

  • Outcropping Ni sulphides were identified by Alan McDonald, the Pastoralist at Mangaroon in the early 1960s.

  • However, no detailed geophysical, geochemical or mapping programs were ever undertaken.

  • The first-ever detailed airborne magnetics, surface geochemical, ground EM and mapping surveys have now confirmed the potential of the 45km long Money Intrusion.

Genuine Camp Scale Potential

  • Outcropping blebby sulphides have been confirmed over significant portions of the ~45km long Money Intrusion.

  • Multiple plumbing centres have been interpreted, each with the potential for trap sites within the magma pathways.

  • Mineralisation has already been confirmed by drilling at three prospects within the Money Intrusion: Bookathanna, Bookathanna North and High Range.

Nickel and Copper are Critical to the Low Carbon Energy Transition

  • Nickel is essential to clean energy technologies including being a major cathode material in lithium-ion batteries. Furthermore, nickel sulphide deposits have a much lower carbon footprint when being converted to Class 1 nickel for battery grade applications.

  • Copper is essential for electricity-related technologies with renewable energy systems requiring up to 12x more copper compared to traditional energy systems.

2

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

==> picture [486 x 637] intentionally omitted <==

Figure 2: Plan view image showing the location of Bookathanna North drilling (REYRC013-022, red dots) in relation to previous drilling (REYRC001-012, black dots) and planned 7-hole program (REYRC023-029, white dots) over a magnetics (RTP 1VD) and ortho image. The Money Intrusion is outlined in green.

3

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Technical Discussion of Ni-Cu-Co-3PGE RC Drilling (REYRC013-022)

This 10-hole program REYRC003-022) follows from the first program (12-holes, REYRC001-012) located ~2.5km to the south which intersected mineralisation in all holes.

The second program was originally designed as 5 RC holes with DHEM to test 5 EM conductors within the Money Intrusion. Following the intersection of massive sulphides in the first hole (REYRC013), an additional 5 holes were drilled at Bookathanna North infilling and then stepping out north and south along strike. A total of 10 holes were drilled (1,074m) with 7 holes at Bookathanna North and 3 at High Range.

Drilling generally collared into the shallow and weakly weathered gabbroic core of the Money Intrusion before passing into the footwall olivine dolerite and finishing in gneissic to granitic country rock. Significantly, the furthest north hole (REYRC017) intersected a thick gabbroic core and did not reach the mineralised footwall olivine dolerite or country rock. REYRC017 highlights the variable geometry of the Money Intrusion and potential to form trap sites for sulphide accumulation (Figure 3).

Importantly, 6 of the 7 holes at Bookathanna North intersected thick (10-50m) disseminated and net textured Ni-Cu-Co-3PGE sulphides within the footwall olivine dolerite (Figures 3 and 4). Of these, REYRC013 and REYRC019 each intersected 2m of semimassive to massive sulphides. All sulphide mineralisation consists of pentlandite (Fe,Ni)9S8, chalcopyrite (CuFeS2) and pyrrhotite (Fe(1-x)S) with pentlandite and chalcopyrite making up ~40-50% of the sulphide mix with the remainder being pyrrhotite.

Assays have been received from the second program with significant results including:

REYRC013: 23m @ 0.50% Ni 0.51% Cu 0.02% Co 0.49g/t 3PGE from 36m including: 2m @ 3.32% Ni 2.88% Cu 0.12% Co 1.46g/t 3PGE from 45m REYRC014: 22m @ 0.18% Ni 0.24% Cu 0.01% Co 0.24g/t 3PGE from 34m including: 7m @ 0.30% Ni 0.44% Cu 0.02% Co 0.38g/t 3PGE from 41m REYRC018: 53m @ 0.15% Ni 0.22% Cu 0.01% Co 0.08g/t 3PGE from 5m including: 1m @ 0.29% Ni 1.50% Cu 0.01% Co 0.11g/t 3PGE from 47m REYRC019: 10m @ 0.36% Ni 0.45% Cu 0.02% Co 0.18g/t 3PGE from 76m including: 2m @ 1.15% Ni 1.30% Cu 0.06% Co 0.36g/t 3PGE from 78m

The assays have confirmed the high tenor mineralisation which importantly include significant cobalt and palladium, platinum, gold ( “3PGE” ). The 3PGEs are made up of ~70% palladium, ~20% platinum and ~10% gold.

==> picture [338 x 233] intentionally omitted <==

Importantly, a mix of massive and semi-massive sulphides was identified in the program providing potential for a significant massive sulphide deposit in the area. In addition, REYRC019 was a blind step out hole not targeting a conductive anomaly but which also intersected semi-massive sulphides emphasising the need for the entire Money Intrusion to be reassessed.

REYRC015, which targeted a Fixed Loop EM (“ FLEM ”) plate, missed the target but is adjacent to a small off-hole conductor. Further drilling of this target will be considered upon review of planned IP and MLEM surveys in March 2024.

No significant results were returned from 3 holes drilled at High Range.

Figure 3: Long section of Bookathanna North showing the location of the 6 mineralised intercepts and the variable keel position (see REYRC017).

4

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Technical Discussion of Ni-Cu-Co-3PGE Exploration (E08/3274, E09/2384: First Quantum Minerals Earn-in)

The confirmation of a fertile magmatic Ni-Cu-Co-3PGE system within the 45km long Money Intrusion highlights the potential for multiple deposits and/or deposit styles as outlined below.

  • Jinchuan Ni-Cu-PGE: The Money Intrusion has been dated to ~800Ma, similar in age and tectonic setting to the Jinchuan Ni-Cu-PGE deposit in China (>500 Mt @ 1.2% Ni, 0.7% Cu, ~0.4 g/t PGE, Lightfoot 2007). Jinchuan contains three main deposits over ~6.5kms of strike, each situated within a sub-chamber of the overall intrusion. Only one of the deposits outcrops at surface. Mineralisation is dominated by net-textured and disseminated sulphides with minor massive sulphide accumulations. The disseminated sulphides form an envelope around the higher-grade, net-textured and massive sulphides.

  • Eagle and Eagle East: To date, 15 out of 22 RC holes at Bookathana North have intersected mineralisation along significant strike. Results show increasing width and intensity near subtle changes in the walls and base of the intrusion, including the formation of massive and semi-massive mineralisation. This highlights the potential for massive sulphide mineralisation to concentrate and form at trap sites, similar to the Eagle and Eagle East deposits (~5Mt @ 3.5% Ni, 2.9% Cu, 1.6g/t PGE, 0.1% Co, Lundin 2013) in North America.

Drill targeting to date has been dominated by FLEM surveys designed to identify near-surface, massive sulphides along the southwestern edge of the Money Intrusion. Drilling has confirmed high tenor massive, semi-massive sulphides within a halo of nettexture and disseminated sulphides with mineralisation intensifying in trap sites along the edges and base of the intrusion. Drilling has confirmed that thick mineralisation occurs over a significant strike length at Bookathanna North. However, results such as from

==> picture [362 x 429] intentionally omitted <==

REYRC015 demonstrate the FLEM surveys have only been partially effective in identifying the net-textured and semimassive sulphide accumulations.

Given the high tenor of the Ni-Cu-Co3PGE sulphide system, net-textured and semi-massive sulphides are attractive targets in their own right. Additionally, deeper trap sites with the potential to form significant massive sulphide accumulations have not been targeted or assessed.

Targeting going forward will focus on identifying and understanding:

  • large scale, net textured and heavily

  • disseminated sulphide mineralisation using IP surveys; and

  • deep trap sites for massive sulphides

  • using geophysical inversions, DHEM and more powerful EM surveys.

A reassessment of the Money Intrusion and the results to date is underway.

Figure 4: Plan view image showing the location of 7 (6 mineralised) recently completed drill holes at Bookathanna North in relation to FLEM plates over an orthoimage and interpreted Money Intrusion.

5

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Background on Mangaroon (E08/3274, E8/3178, E09/2384, E09/2433, E09/2473: First Quantum Minerals Earn-in) (E08/3275, E08/3439, E09/2290, E09/2359, E09/2370, E09/2405, E09/2448, E09/2449, E09/2450, E09/2467, E09/2478, E09/2531, E09/2535, E09/2616, M09/91, M09/146, M09/147, M09/174, M09/175: 100%)

Mangaroon (Figure 5) covers >5,200kms[2] of the Mangaroon Zone in the Gascoyne Region of Western Australia and is comprised of:

  • the ~45km long Money Intrusion (First Quantum Minerals earn-in) which contains high tenor magmatic NiCu-Co-3PGE mineralisation;

  • the >10km long Mangaroon Au Shear Zone (100%) where fractured, small scale ownership has limited previous gold exploration with only ~200m of the >10km having been drilled notwithstanding the high-grade, camp scale potential;

  • the ~43km long Yin REE Ironstone Complex (100%) which already contains: an independent total Resource of 20.06Mt @ 1.03% TREO (ASX 5 Jul 2023) over only ~4km of the ~43km of ironstones including an initial Indicated Resource of 5.52Mt @ 1.23% TREO over only ~250m of strike (ASX 5 Jul 2023); and an Exploration Target (ASX 13 Feb 2023) over 40 kms of strike; and

  • the ~17km long REE-Nb-Ti-P-Sc Gifford Creek Carbonatite which contain an initial independent Inferred Resource of 10.84Mt @ 1.00% TREO (ASX 28 Aug 2023).

==> picture [439 x 410] intentionally omitted <==

Figure 5: Plan view map of Mangaroon showing the location of the First Quantum Minerals Earn-in and 100% Dreadnought ground (Mangaroon Au Shear Zone, Yin REE Ironstone Complex and REE-Nb-Ti-P-Sc C1-C5 carbonatites) in relation to major structures, geology and roads.

6

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

For further information please refer to previous ASX announcements:

25 November 2020 Mangaroon Ni-Cu-PGE & Au Project7 April 2021 Option/JV Agreement Signed with Global Base Metal Miner14 February 2022 Conductors Defined Along the Money Intrusion10 June 2022 Drilling Successfully Completed at Mangaroon Ni-Cu-PGE30 August 2022 Mangaroon Ni-Cu-PGE Project advances to $15M Earn-In10 November 2022 Exploration Update Mangaroon Ni-Cu-PGE (FQM Earn-In)24 March 2023 Five Strong EM Conductors at Mangaroon Ni-Cu-PGE Project30 August 2023 Drilling Commenced at Money Intrusion Ni-Cu-PGE31 August 2023 Massive and Disseminated Ni-Cu Sulphides Intersected12 September 2023 Thick Ni-Cu Mineralisation over 400m, Open in all Directions21 September 2023 High Grade Ni-Cu-Co-PGE Massive Sulphides Confirmed at Mangaroon

UPCOMING NEWSFLOW

November: Final drilling results from completed drilling at Mangaroon REE (100%)

November: REE Resource upgrade (Mangaroon 100%)

November: Results of geophysical and geochemical surveys at Central Yilgarn (100%)

November: Assays from RC drilling at Tarraji-Yampi (80%, 100%)

23 November: Annual General Meeting

December/January: Assay results from additional Au, Ni-Cu-Co-3PGE and REE drilling at Mangaroon December/January: Results from target generation and definition work at Bresnahan (100%)

January 2024: Quarterly Report

February 2024: Half Year Financial Report

March 2024: Commencement of RC and diamond drilling at Mangaroon Ni-Cu-Co-3PGE (Earn-in)

March/April 2024: Commencement of RC drilling at Mangaroon Rare Earths (100%)

~Ends~

For further information please contact: Dean Tuck Jessamyn Lyons Managing Director Company Secretary Dreadnought Resources Limited Dreadnought Resources Limited E: [email protected] E: [email protected]

This announcement is authorised for release to the ASX by the Board of Dreadnought.

7

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Cautionary Statement

This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forward-looking information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. There are a number of risks, both specific to Dreadnought, and of a general nature which may affect the future operating and financial performance of Dreadnought, and the value of an investment in Dreadnought including and not limited to title risk, renewal risk, economic conditions, stock market fluctuations, commodity demand and price movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and mining development, construction and commissioning risk.

Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations.

Competent Person’s Statement – Exploration Results

The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled by Mr. Dean Tuck, who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the announcement of the matters based on the information in the form and context in which it appears.

The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports, and that the forma and context in which the Competent Person’s findings are presented have not been materially modified from the original reports.

8

ASX:DRE

+61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

INVESTMENT HIGHLIGHTS

Kimberley Ni-Cu-Au Project (80/100%)

The project is located only 85kms from Derby in the West Kimberley region of WA and was locked up as a Defence Reserve since 1978.

The project has outcropping mineralisation and historic workings which have seen no modern exploration.

Results to date indicate that there may be a related, large scale, Proterozoic Cu-Au-Ag-Bi-Sb-Co system at Tarraji-Yampi, similar to Cloncurry/Mt Isa and Tennant Creek.

Mangaroon Ni-Cu-Co-3PGE JV & Au/REE 100% Project

Mangaroon covers ~5,200kms[2] and is located 250kms south-east of Exmouth in the Gascoyne Region of WA. At the Money Ni-Cu-Co-3PGE has been identified and is subject to an earn-in by First Quantum Minerals (up to 70%). Dreadnought also has areas of outcropping high-grade gold including the historic Star of Mangaroon and Diamonds gold mines. In addition, Mangaroon has emerged as a globally significant, rapidly growing, potential source of critical minerals. Highlights include:

  • An Exploration Target estimated for the top 150m of ~40km of the Yin REE Ironstone Complex (ASX 13 Feb 2023).

==> picture [247 x 329] intentionally omitted <==

  • An independent Resource for Yin Ironstones Complex of 20.06Mt @ 1.03% TREO over only ~4kms – including an Indicated Resource of 5.52Mt @ 1.23% TREO over just 250m strike (ASX 5 Jul 2023).

  • Regional source of rare earths at the Gifford Creek Carbonatite totaling ~17kms x ~1km (ASX 7 Aug 2023).

  • A large, independent initial Resource of 10.84Mt @ 1.00% TREO at the Gifford Creek Carbonatites, containing a range of critical minerals including rare earths, niobium, phosphate, titanium and scandium (ASX 28 Aug 2023).

Bresnahan HREE-Au-U Project (100%)

Bresnahan is located ~125km southwest of Newman in the Ashburton Basin. The project comprises ~3,700kms[2] covering over 200kms strike along the Bresnahan Basin / Wyloo Group unconformity. Bresnahan is prospective for unconformity related heavy rare earth (“ HREE ”) deposits similar to Browns Range HREE deposits, unconformity uranium (“ U ”) deposits and mesothermal lode gold similar to Paulsens Au-Ag-Sb deposits along strike.

Prior to consolidation by Dreadnought, the Bresnahan Basin had been successfully explored for unconformity uranium with limited exploration for mesothermal gold. Bresnahan is a first mover opportunity to explore for unconformity HREE.

Central Yilgarn Gold, Base Metals, Critical Minerals & Iron Ore Project (100%)

Central Yilgarn is located ~190km northwest of Kalgoorlie in the Yilgarn Craton. The project comprises ~1,600kms[2] covering ~150km of strike along the majority of the Illaara, Yerilgee and Evanston greenstone belts. Central Yilgarn is prospective for typical Archean mesothermal lode gold deposits, VMS base metals, komatiite hosted nickel sulphides and critical metals including Lithium-Caesium-Tantalum.

Prior to consolidation by Dreadnought, the Central Yilgarn was predominantly held by iron ore explorers and remains highly prospective for iron ore.

9

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Table 1: Significant Intersections >0.1% Ni or Cu with >1% Ni or Cu highlighted.

Hole ID From
(m)
To
(m)
Interval
(m)
Ni
(%)
Cu
(%)
Co
(%)
3PGE
(g/t)
Prospect
REYRC013 36 59 23 0.50 0.51 0.02 0.49 Bookathanna
North
Incl 45 47 2 3.32 2.88 0.12 1.46
REYRC014
incl
34 56 22 0.18 0.24 0.01 0.24
41 48 7 0.30 0.44 0.02 0.38
REYRC015 28 58 30 0.10 0.16 0.01 0.14
REYRC016 41 65 24 0.16 0.19 0.02 0.15
REYRC018 5 58 53 0.15 0.22 0.01 0.08
incl 47 48 1 0.29 1.50 0.01 0.11
REYRC019 76 86 10 0.36 0.45 0.02 0.18
incl 78 80 2 1.15 1.30 0.06 0.36

Table 2: Drill Collar Data (GDA94 MGAz50)

Hole ID Easting Northing RL Dip Azimuth EOH
**Type **
Prospect
REYRC013 364221 7384666 286 -70 045 153
RC
Bookathanna North
REYRC014 364222 7384657 288 -70 40 141
RC
REYRC015 364192 7384670 285 -85 215 81 RC
REYRC016 364245 7384710 288 -75 15 87 RC
REYRC017 364279 7384805 288 -70 20 177
RC
REYRC018 364150 7384574 288 -60 30 69 RC
REYRC019 364136 7384456 286 -80 215 111
RC
REYRC020 360783 7376739 334 -60 290 57 RC High Range
REYRC021 360759 7376696 333 -60 270 81 RC
REYRC022 360725 7376672 333 -60 260 117
RC

JORC Code, 2012 Edition – Table 1 report template Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria **JORC Code explanation ** Commentary Commentary
Sampling techniques
Nature and quality of sampling (e.g. cut channels, random
chips,
or
specific
specialised
industry
standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.

Aspects of the determination of mineralisation that are
Material to the Public Report.

In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed information.
RC Drilling
Reverse Circulation (RC) drilling was undertaken to produce
samples for assaying.
Two sampling techniques were utilised for this program, 1m
metre splits directly from the rig sampling system each
metre and 2m composite sampling from spoil piles. Samples
submitted to the laboratory were determined by the site
geologist.
1m Splits
Every metre drilled a 2-3kg sample (split) was sub-sampled
into a calico bag via a Metzke cone splitter from each metre
of drilling.
2m Composites
All remaining spoil from the sampling system was collected
in buckets from the sampling system and neatly deposited in
rows adjacent to the rig. An aluminium scoop was used to
then sub-sample each spoil pile to create a 2-3kg 2m
composite sample in a calico.
For gold and PGEs, all samples are submitted to the
laboratory and pulverised to produce a 50g charge for Fire
Assay (ALS Code PGM-ICP24).
Base Metal and lithological samples are analysed for 48 multi-
elements via 4 acid digestion with MS/ICP finish (ALS Code
ME-MS61).
Drilling techniques
Drill type (e.g. core, reverse circulation, open-hole hammer,
_rotary air blast, auger, Bangka, sonic, etc.) and details(e.g. _
RC Drilling
Ausdrill undertook theprogram utilisinga Drill Rigs
dreadnoughtresources.com.au 10

10

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017

ABN 40 119 031 864

Criteria **JORC Code explanation ** Commentary
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Australia truck mounted Schramm T685WS drill rig with
additional air from an auxiliary compressor and booster. Bit
size was 5¾”.
Drill sample recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.

Measures taken to maximise sample recovery and ensure
representative nature of the samples.

Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
RC Drilling
Drilling was undertaken using a ‘best practice’ approach to
achieve maximum sample recovery and quality through the
mineralised zones.
Best practice sampling procedure included: suitable usage of
dust suppression, suitable shroud, lifting off bottom between
each metre, cleaning of sampling equipment, ensuring a dry
sample and suitable supervision by the supervising geologist
to ensure good sample quality.
Logging
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.

Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.

The total length and percentage of the relevant
intersections logged.
RC Drilling
RC chips were logged under the supervision of a qualified
geologist with sufficient experience in this geological terrane
and relevant styles of mineralisation using an industry
standard logging system which could eventually be utilised
within a Mineral Resource Estimation.
Lithology, mineralisation, alteration, veining, weathering and
texture were all recorded digitally.
Chips were washed each metre and stored in chip trays for
preservation and future reference.
RC pulp material is also analysed on the rig by pXRF and
magnetic susceptibility meter to assist with logging and the
identification of mineralisation.
Logging is qualitative, quantitative or semi-quantitative in
nature.
Sub-sampling
techniques and sample
preparation

If core, whether cut or sawn and whether quarter, half or
all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.

For all sample types, the nature, quality and
appropriateness of the sample preparation technique.

Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.

Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of
the material being sampled.
Preliminary pXRF analysis
pXRF analysis of pulverised and partially homogenised reject
RC sample piles is fit for purpose as a preliminary
exploration technique.
pXRF is a spot reading on raw (unprocessed) RC sample
piles with variable grain sizes and states of homogenisation.
High grade results were repeated at multiple locations to
confirm repeatability. The competent person considers this
acceptable within the context of reporting preliminary
exploration results.
RC Drilling
From every metre drilled, a 2-3kg sample (split) was sub-
sampled into a calico bag via a Metzke cone splitter or taken
as a grab sample from the bulk reject in more clay-rich
material.
QAQC in the form of duplicates and CRM’s (OREAS
Standards) were inserted through the ore zones at a rate of
1:50 samples. Additionally, within mineralised zones, a
duplicate sample was taken and a blank inserted directly after.
2-3kg samples will be submitted to ALS laboratories (Perth),
oven dried to 105°C and pulverised to 85% passing 75um to
produce a 50g charge for Fire Assay with ICP-AES finish to
determine Au and PGEs (PGM-ICP24) and 0.25g aliquot for
four acid digest to determine 48 elements (ME-MS61) with
overranges as required.
Standard laboratory QAQC is undertaken and monitored.
Quality of assay data
and laboratory tests

The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
Preliminary pXRF analysis
Olympus Vanta M Series pXRF analyser is used to provide
preliminary quantitative measurement of mineralisation. A 3-
beam, 35 second reading time was used with a single reading
on unprepared raw RC chip sample piles. High grade
samples were repeated to confirm repeatability of grade.
Calibration checks of the pXRF are undertaken daily, a silica
blank and certified standard are routinely analysed to
monitor pXRF performance.
Laboratory Analysis

11

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017

ABN 40 119 031 864

Criteria **JORC Code explanation ** Commentary
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Assay technique is Fire Assay which is a ‘Total Technique’
for Au and PGEs. Four acid digest is considered a ‘near total’
technique for the 48 elements received under ME-MS61.
Standard laboratory QAQC is undertaken and monitored by
the laboratory and by the company upon assay result
receival.
Verification of sampling
and assaying

The verification of significant intersections by either
independent or alternative company personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.

Discuss any adjustment to assay data.
Preliminary pXRF analysis
Analytical data was collected directly by the Olympus Vanta
M Series pXRF analyser and downloaded by digital transfer
to an excel spreadsheet with inbuilt QAQC. All data was
checked by the responsible geologist and filed on the
company server.
Logging and Sampling
Logging and sampling were recorded directly into a digital
logging system, verified and eventually stored in an offsite
database.
Significant intersections are inspected by senior company
personnel.
No twinned holes have been completed at this time.
No adjustments to any assay data have been undertaken.
Location of data points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.
Collar position was recorded using a Emlid Reach RS2 RTK
GPS system (+/- 0.2m x/y, +/-0.5m z).
GDA94 Z50s is the grid format for all xyz data reported.
Azimuth and dip of the drill hole was recorded after the
completion of the hole using a Reflex Sprint IQ Gyro. A
reading was undertaken every 30thmetre with an accuracy of
+/- 1° azimuth and +/-0.3° dip.
Data spacing and
distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

Whether sample compositing has been applied.
See drill table for hole positions.
The drill spacing is not suitable for resource estimation.
Orientation of data in
relation to geological
structure

Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.

If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
At this early stage of exploration, mineralisation thickness’s,
orientation and dips are not known.
Drilling was undertaken at a near perpendicular angle to the
interpreted strike and dip of the modelled FLEM plates.
No sample bias is known at this time.
Sample security
The measures taken to ensure sample security.
All geochemical samples were collected, bagged, and sealed
by Dreadnought staff and delivered directly to ALS
Laboratories Perth by Jarrahbar Contracting out of
Carnarvon and Exmouth Haulage out of Exmouth.
Audits or reviews
The results of any audits or reviews of sampling techniques
and data.
The program is continuously reviewed by senior company
personnel.

Section 2 Reporting of Exploration Results

(Criteria in this section apply to all succeeding sections.)

Criteria **JORC Code explanation ** Commentary Commentary
Mineral tenement and
land tenure status

Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.

The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.

The Mangaroon Project consists of 19 granted Exploration
License (E08/3178, E08/3274, E08/3275, E08/3439,
E09/2290, E09/2359, E09/2370, E09/2384, E09/2405,
E09/2433, E09/2448, E09/2449, E09/2450, E09/2467,
E09/2473, E09/2478, E09/2531, E09/2535, E09/2616) and 5
granted Mining Licenses (M09/91, M09/146, M09/147,
M09/174, M09/175).
All tenements are 100% owned by Dreadnought Resources.
E08/3178, E08/3274, E09/2384, E09/2433, E09/2473 are
subject to an option agreement with First Quantum
Minerals over the base metal rights.
dreadnoughtresources.com.au 12

12

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017

ABN 40 119 031 864

Criteria **JORC Code explanation ** Commentary
E08/3178, E09/2370, E09/2384 and E09/2433 are subject to
a 2% Gross Revenue Royalty held by Beau Resources.
E08/3274, E08/3275, E09/2433, E09/2448, E09/2449,
E09/2450 are subject to a 1% Gross Revenue Royalty held
by Beau Resources.
E09/2359 is subject to a 1% Gross Revenue Royalty held by
Prager Pty Ltd.
E09/2290, M09/146 and M09/147 are subject to a 1% Gross
Revenue Royalty held by STEHN, Anthony Paterson and
BROWN, Michael John Barry.
M09/174 is subject to a 0.5% Gross Revenue Royalty held
by STEHN, Anthony Paterson.
M09/175 is subject to a 0.5% Gross Revenue Royalty held
by STEHN, Anthony Paterson and BROWN, Michael John
Barry.
M09/91 is subject to a 1% Gross Royalty held by DOREY,
Robert Lionel.
The Mangaroon Project covers 4 Native Title
Determinations including the Budina (WAD131/2004),
Thudgari (WAD6212/1998), Gnulli (WAD22/2019) and the
Combined Thiin-Mah, Warriyangka, Tharrkari and Jiwarli
(WAD464/2016).
The Mangaroon Project is located over Lyndon,
Mangaroon, Gifford Creek, Maroonah, Minnie Creek,
Edmund, Williambury and Towera Stations.
Exploration done by
other parties

Acknowledgment and appraisal of exploration by other
parties.
Historical exploration of a sufficiently high standard was
carried out by a few parties which have been outlined and
detailed in this ASX announcement including:
Regional Resources 1986-1988s: WAMEX Reports A23715,
23713
Peter Cullen 1986: WAMEX Report A36494
Carpentaria Exploration Company 1980: WAMEX Report
A9332
Newmont 1991: WAMEX Report A32886
Hallmark Gold 1996: WAMEX Report A49576
Rodney Drage 2011: WAMEX Report A94155
Sandfire Resources 2005-2012: WAMEX Report 94826
Geology
Deposit type, geological setting and style of mineralisation.
The Mangaroon Project is located within Mangaroon Zone
of the Gascoyne Province.
The Mangaroon Project is prospective for orogenic gold,
magmatic Ni-Cu-Co-3PGE mineralisation and carbonatite
hosted REEs.
Drill hole information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.

If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion does
not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
An overview of the drilling program is given within the text
and tables within this document.
Data aggregation
methods

In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
Significant intercedpts are length weight averaged for all
samples above the below cut offs (including up to 3m of
internal waste)
>0.1% Ni or Cu

13

ASX:DRE +61 (08) 9473 8345 [email protected] Unit 1, 4 Burgay Court Osborne Park WA 6017 ABN 40 119 031 864

Criteria **JORC Code explanation ** Commentary

Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.

The assumptions used for any reporting of metal
equivalent values should be clearly stated.
>0.1g/t 3PGE (Pt+Pd+Au)
No top cutting has been applied.
No metal equivalents are reported.
Relationship between
mineralisation widths
and intercept lengths

These relationships are particularly important in the
reporting of Exploration Results.

If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.

If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
_(e.g. ‘down hole length, true width not known’). _
Drilling is undertaken close to perpendicular to the dip and
strike of the modelled EM plates. At this early stage, the
relation between mineralisation and drill intercepts is
unknown.
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should include,
but not be limited to a plan view of drill hole collar locations
and appropriate sectional views.
Refer to figures within this report.
Balanced reporting
Where comprehensive reporting of all Exploration Results
is not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
Refer to figures within this report.
Other substantive
exploration data

Other exploration data, if meaningful and material, should
be reported including (but not limited to): geological
observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
Suitable commentary of the geology encountered is given
within the text of this document.
Further work
The nature and scale of planned further work (e.g. tests
for lateral extensions or depth extensions or large-scale
step-out drilling).

Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
EM Surveys
IP surveys
Additional RC drilling
Diamond Drilling

14