동아지질/단일판매ㆍ공급계약체결/(2019.05.07)단일판매ㆍ공급계약체결

단일판매ㆍ공급계약 체결

1. 판매ㆍ공급계약 구분 공사수주
- 체결계약명 Contract N110 Design And Construction of North-South Corridor(Tunnel) Between Ang Mo Kio Ave 3 and Ang Mo Kio Ave 9 Diaphragm Wall Works At Tunnel At Zone 5 And Facility Building
2. 계약내역 계약금액(원) 38,680,442,582
최근매출액(원) 360,734,225,219
매출액대비(%) 10.72
대규모법인여부 미해당
3. 계약상대 LUM CHANG BUILDING CONTRACTORS PTE LTD
- 회사와의 관계 -
4. 판매ㆍ공급지역 Singapore
5. 계약기간 시작일 2019-05-06
종료일 2021-10-15
6. 주요 계약조건 -
7. 계약(수주)일자 2019-05-06
8. 공시유보 관련내용 유보사유 -
유보기한 -
9. 기타 투자판단과 관련한 중요사항
-상기2항의 계약금액은 GST(Goods&Service Tax : 7%) 포함한 금액입니다.



-계약금액은 SGD 45,110,492.13 으로 공시당일 KEB하나은행 고시 최초 매매기준환율 857.46원으로 환산한 금액입니다.



-상기2항의 매출액은 '18년도 연결재무제표 기준 금액입니다.



-계약금액 및 공사기간 등은 공사 진행과정 등에 따라 변경될 수도 있습니다.
※ 관련공시 -