Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

DIATREME RESOURCES LIMITED Capital/Financing Update 2015

Aug 9, 2015

64787_rns_2015-08-09_55203e7b-aa1a-4958-873e-e219526d49ca.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [162 x 124] intentionally omitted <==

Superior Resources Limited

ABN 72 112 844 407

Registered Office: Level 2, 87 Wickham Terrace, Spring Hill, QUEENSLAND, 4000. Postal Address: PO Box 10288, Brisbane Adelaide Street, QUEENSLAND, 4000. Telephone: 07 3839 5099 Facsimile: 07 3832 5300 Email: [email protected]

ASX RELEASE 10 August 2015

Tick Hill Surface Gold Project RESULTS – TAILINGS DRILLING PROGRAM

  • Analytical results from the first stage of the tailings drilling program received.

  • Better than expected gold grades justify a second stage drilling program to further define and delineate a potential gold resource within the tailings storage facility.

  • Average grades of 1.04 g/t Au for the tailings dam (overall), 1.42 g/t Au for the eastern paddock and 0.73 g/t Au for the western paddock.

  • Tailings Dam covers approx. 8 ha and could contain between 600,000-650,000t of tailings material, based on historical records.

  • A second stage follow-up program planned to commence during late August 2015.

Superior Resources Limited ( ASX Code: SPQ ) ( Superior or the Company ) is pleased to confirm that assay results from a 24 hole tailings reconnaissance drilling program have been received. The results of the initial program are encouraging with some intercepts returning better than expected gold grades.

The program also included a series of drill holes in the Tailings Decant Pond and over a soil geochemical anomaly located within an area of alluvium. A summary of the drilling program is detailed in Table 1.

Table 1. Drillprogram summary Table 1. Drillprogram summary
Number of holes
(total metres drilled)
Location Number of samples assayed
Tailings Dam 24 (180m) 173 geochemical
9 environmental
Tailings Decant Pond 8 (18m) 12 geochemical
5 environmental
Alluvium
(400m NW of open cut
pit)
15 (26m) 29 geochemical

ASX Release – 10 August 2015 - Page 1 of 12

Superior Resources Limited

The reconnaissance drilling program was conducted by Superior together with joint venture partner Diatreme Resources Limited ( DRX ) during the period 17 July 2015 to 20 July 2015. The program utilised a DRX-owned air-core drill rig and DRX staff.

Tailings Dam Morphology

The original Tick Hill Gold Mine processing plant comprised crushing and milling circuits feeding into a carbon-in-leach (CIL) gold recovery circuit. Tailings material from the plant was discharged into the tailings dam, which comprises two “paddocks” of a “turkeys nest” construction. A perimeter embankment with a clay core retains the tailings. Wall heights range from 6m to 10.5m. A Tailings Decant pond designed to receive overflow water is located adjacent to the northern wall of the Tailings Dam (Figure 1). Since decommissioning the surface of the Tailings Dam and Tailings decant Pond have been capped and seeded.

==> picture [469 x 278] intentionally omitted <==

Figure 1. Tick Hill Gold Project Tailings Dam and Tailings Decant Pond (looking West). DRX drill rig and support truck located on decant pond circled in red.

Estimated Tonnage

The total reported historical production at Tick Hill was 705,000t for 15,900kg Au at 97% recovery.

Tailings Dam Drill Results

The reconnaissance drilling program on the Tailings Dam was designed as an “orientation” program to provide an initial indication of the nature of the tailings deposit. The drilling was conducted on a 50m x 50m spaced grid over the two Tailings Dam paddocks.

Superior considers the results to be significant and encouraging. A summary of the results is set out in Table 2.

Table 2. Overall grades within Tailings Dam

ASX Release – 10 August 2015 - Page 2 of 12

Superior Resources Limited

Area of Tailings
Facility
Number of
samples
g/t Au
Average Grade
Tailings Dam
Eastern Paddock
78 1.42 1.04 g/t Au
Tailings Dam
Western Paddock
91 0.73

An overall grade of 1.04 g/t Au was achieved from a total of 173 samples. The samples showed minor variability and all tailings material is mineralised.

The eastern tailings paddock returned an average grade of 1.42 g/t Au from 78 samples, whilst the western tailings dam which has been filled to a slightly higher elevation, returned 0.73 g/t Au from 91 samples. Tailings material from the decant pond was also mineralised, with an average grade of 0.46 g/t Au returned from the 7 holes sampled (11 samples).

A summary of the drill hole details and average gold grades are set out in Table 3. Drill hole locations are diagrammatically shown in Figures 2 and 3.

Table 3. Tailings Dam drill hole information and average gold (g/t)

Significant Intersection Significant Intersection Significant Intersection Significant Intersection
Hl
Hole ID Easting Northing RL oe
Depth
Dip Azimuth Au
g/t
From To Interval
THT001 388746 7605591 350 8.7m -90° 0.5m 8.7m 8.2m 1.20
THT002 388748 7605542 350 7.7m -90° 0.6m 7.6m 7.0m 1.34
THT003 388748 7605489 350 7.6m -90° 0.6m 7.6m 7.0m 1.35
THT004 388693 7605592 350 8.1m -90° 0.6m 8.1m 7.5m 1.06
THT005 388694 7605545 350 7.1m -90° 0.6m 7.1m 6.5m 1.54
THT006 388697 7605491 350 6.7m -90° 0.5m 6.7m 6.2m 1.85
THT007 388702 7605442 350 6.6m -90° 0.6m 6.6m 6.0m 1.58
THT008 388650 7605593 350 6.2m -90° 0.6m 6.2m 5.6m 1.15
THT009 388646 7605543 350 6.3m -90° 0.6m 6.3m 5.7m 1.61
THT010 388647 7605493 350 6.1m -90° 0.6m 6.1m 5.5m 1.27
THT011 388649 7605443 350 5.7m -90° 0.6m 5.6m 5.0m 1.82
THT012 388648 7605398 350 4.5m -90° 0.6m 4.5m 3.9m 1.51
THT013 388550 7605590 352 6.6m -90° 0.6m 5.6m 5.0m 0.66
THT014 388545 7605544 352 7.6m -90° 0.6m 6.6m 6.0m 0.48
THT015 388546 7605493 352 8.6m -90° 0.6m 8.6m 8.0m 0.85
THT016 388549 7605444 352 8.3m -90° 0.6m 8.3m 7.7m 0.80
THT017 388549 7605391 352 8.6m -90° 0.6m 8.6m 8.0m 1.08
THT018 388499 7605591 352 7.6m -90° 0.6m 7.6m 7.0m 0.62
THT019 388497 7605543 352 8.8m -90° 0.6m 8.8m 8.2m 0.58
THT020 388495 7605493 352 9.1m -90° 0.6m 9.1m 8.5m 0.82
THT021 388495 7605446 352 9.1m -90° 0.6m 9.1m 8.5m 0.74
THT022 388449 7605593 352 6.8m -90° 0.8m 6.8m 6.0m 0.46
THT023 388446 7605537 352 8.8m -90° 0.8m 8.8m 8.0m 0.64
THT024 388447 7605493 352 8.7m -90° 0.8m 8.7m 7.9m 0.83

Further Work – Tailings Dam

The positive results from the reconnaissance drilling program warrants the planning of a second stage follow-up drilling program. The second stage program will include infill drilling and the collection of samples for metallurgical test work to enable the assessment of potential gold processing and recovery options. Consideration will also be given to determine the most appropriate method for drilling of the tailings in order to ensure consistent and accurate recovery of sample material.

Alluvium Soil Geochemical Anomaly

ASX Release – 10 August 2015 - Page 3 of 12

Superior Resources Limited

Results from the reconnaissance drilling of a historical soil gold geochemical anomaly NW of the open pit to assess the alluvial/eluvial potential were generally disappointing, with only one significant assay returned from the upper section of one hole. Weathered bedrock was encountered at generally shallow depths (between 1m and 2m) and it appears that there is insufficient mineralisation and volume of alluvium to warrant further investigation at this location.

Technical details concerning the deposit, exploration drilling program and the exploration results are presented in Appendix 1 (JORC Table 1).

==> picture [469 x 469] intentionally omitted <==

Figure 2. Drill hole locations on the Tailings Dam and Tailings Decant Pond.

ASX Release – 10 August 2015 - Page 4 of 12

Superior Resources Limited

==> picture [469 x 439] intentionally omitted <==

Figure 3. Overall location plan showing mining lease boundaries and drill hole locations.

ASX Release – 10 August 2015 - Page 5 of 12

Superior Resources Limited

==> picture [478 x 318] intentionally omitted <==

Figure 4. DRX drill rig and support truck located on the Tick Hill Tailings Dam.

==> picture [84 x 68] intentionally omitted <==

Peter Hwang Managing Director

Contact: Mr Carlos Fernicola (07 3831 3922) Mr Peter Hwang (07 3839 5099) Further Information: www.superiorresources.com.au [email protected]

The information in this report, insofar as it relates to Exploration Results is based on information compiled by Mr Ian Reudavey, who is a full time employee of Diatreme Resources Limited and a Member of the Australian Institute of Geoscientists. Mr Reudavey has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the 2012 Edition of ‘The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Reudavey consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.

Certain statements made in this report may contain or comprise certain forward-looking statements. Although Superior Resources Limited believes that any estimates and expectations reflected in such forward-looking statements are reasonable, no assurance can be given that such expectations will prove to have been correct. Accordingly, results and estimations could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in the economic and market conditions, success of business and operating initiatives and changes in the regulatory environment. Superior undertakes no obligation to update publicly or release any revisions of any forward-looking statements to reflect events or circumstances after the date of this report or to reflect the occurrence of

ASX Release – 10 August 2015 - Page 6 of 12

Appendix 1

APPENDIX 1 JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.

Air core drilling was used to obtain 1m samples from which ~3kg was
pulverized to produce a 50g charge for fire assay.

Samples are 1m down hole intervals of air-core drill cuttings collected
from rig-mounted cyclone, the entire sample was collected and
submitted to the laboratory, with riffle splitting of those samples >3.2kg
in weight prior to pulverising.

1m sample intervals are considered appropriate for first pass drilling of
mineralised tailings.
Drilling
techniques
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
Vertical NQ air-core drilling utilizing blade bit, 3m drill runs.
Drilling technique was continually adjusted to suit the prevailing drilling
conditions (e.g. dry, moist, wet with variable clay content).
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due topreferential
Field assessment and logging of sample recovery and sample quality.
Sample weight from laboratory used to assess sample recovery.
Clearance of drill string after every 1m drill interval.
Sample chute cleaned between samples and regular cleaning of
cyclone to prevent sample contamination.

ASX Release – 10 August 2015 - Page 7 of 12

Appendix 1

Criteria JORC Code explanation Commentary
loss/gain of fine/coarse material. No relationship is evident between sample recovery and grade.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Geological logging of the total hole by field geologist, with retention of
sample in chip trays to allow subsequent re-logging / re-interpretation of
data.
Tailings dam is capped by ~0.6m rock and topsoil, with a clay base –
both were readily identifiable from the tailings material.
Qualitative logging includes material lithology and colour.
Logging data stored in both hardcopy and digital format.
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
No sub-sampling on site, entire sample submitted to ALS laboratory in
Townsville for sample preparation.
Sample was dried, weighed, riffle split if >3.2kg, and pulverised.
50g sub-sample for assay is riffle split from homogenized pulverised
sample.
No field duplicates were submitted from this exploration program.
Sample size is considered appropriate for the material sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels

Analysis undertaken by ALS Townsville utilizing AA26 (50g Fire
Assay), with a 0.01 ppm AU detection limit.

Assaying and laboratory procedures are considered appropriate for
gold, technique is considered a total analysis.

The first 50 samples of the batch were assayed in duplicate to
establish accuracy of the assay method (refer diagram attached).

No external quality control procedures have been adopted at this time.

ASX Release – 10 August 2015 - Page 8 of 12

Appendix 1

Criteria JORC Code explanation Commentary
of accuracy (ie lack of bias) and precision have been established.
Verification
of sampling
and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Significant intersections have been verified by company personnel from
both Diatreme Resources Limited and Superior Resources Limited.
No twinned holes have been drilled at this time.
Geological data captured on paper and stored in electronic format,
assay data stored in electronic format.
No adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Handheld GPS survey of drill hole collars, accurate to within 5m.
UTM coordinates, Zone 54, GDA94 datum.
No topographic control at this time, but all drilling confined to relatively
level surface of rehabilitated tailings dam.
Data
spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.
Drill holes spaced at 50m x 50m.
Drill spacing and distribution is sufficient to allow reporting of
exploration results.
Downhole sample compositing has been applied for reporting of
exploration results as a total hole intersection.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
Vertical drill holes are considered appropriate for unbiased sampling of
the target mineralisation.
Exploration drilling has been completed on a regular 50m x 50m within
each paddock of the tailings dam.
The dam was filled from the southern end, with tailings and water
flowing north along the natural slope of the ground surface.
There are no comprehensive records of the utilisation of the tailings
dam.
Sample
security
The measures taken to ensure sample security. Sample collection and transport from the field was undertaken by
company personnel, with samples delivered directly to the laboratory.

ASX Release – 10 August 2015 - Page 9 of 12

Appendix 1

Criteria JORC Code explanation Commentary
Audits or
reviews
The results of any audits or reviews of sampling techniques and data. No audits or reviews of the sampling techniques and data have been
undertaken at this time.

Section 2 Reporting of Exploration Results

Section 2 Reporting of Exploration Results Section 2 Reporting of Exploration Results
(Criterialistedinthe preceding sectionalso apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.

The Tick Hill tailings dam located within ML7094 and ML7096 in
Queensland, adjoining mining leases held by Diatreme Resources
Limited.

The Tick Hill Gold Project (incorporating ML’s 7094, 7096, 7097) is
operated as a Joint Venture between Diatreme Resources Limited and
Superior Resources Limited.

Exploration was conducted under a Plan of Operations for exploration
and rehabilitation activity approved under the_Environmental Protection_
Act 1994 (Qld).
Exploration
done by
other parties
Acknowledgment and appraisal of exploration by other parties. No exploration of the tailings dam has been undertaken by other parties.
Geology Deposit type, geological setting and style of mineralisation. The Tick Hill tailings dam comprises tailings material from the Tick Hill
Gold Mine CIL processing plant, which operated from 1992 to 1995.
Mineralisation occurs within silt and claytailings material.
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for
all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
Drill hole collar table with significant intersections attached.

ASX Release – 10 August 2015 - Page 10 of 12

Appendix 1

Criteria JORC Code explanation Commentary
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high grades)
and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used for
such aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
Exploration results are reported as a length weighted average of the
total hole intercept, as the basal sample was truncated at the
intersection of the clay base and is typically <1m.
No minimum or maximum grade truncations have been applied.
Relationship
between
mineralisatio
n widths and
intercept
lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
As the mineralization is associated with tailings fill a maximum beaching
slope of 2° can be assumed.
All drilling is vertical, hence the drill intersection is essentially equivalent
to the true width of mineralization.
However, the geometry and controls of grade distribution within the
tailings are unknown at this time.
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These
should include, but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.
A map of the drill collar locations and the tailings dam is attached.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades and/or
widths should be practiced to avoid misleading reporting of Exploration
Results.
Not applicable, all results have been reported.
Other
substantive
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
Geological observations suggest an increase in clay content down the
tailings profile and towards the northern end of the tailings dam.

ASX Release – 10 August 2015 - Page 11 of 12

Appendix 1

Criteria JORC Code explanation Commentary
exploration
data
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
No bulk density measurements have been undertaken.
Water was encountered at the base of the tailings on the northern
margin of the tailings dam and some holes could not be completed.
Nometallurgicaltestwork has beenundertakenat this time.
Further work The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including
the main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
Infill drilling to determine mineralisation variability and continuity is
planned.
Samples for metallurgical assessment will be collected from infill drilling .

ASX Release – 10 August 2015 - Page 12 of 12