Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

DGR GLOBAL LIMITED Capital/Financing Update 2004

Jul 27, 2004

64771_rns_2004-07-27_ab890c83-f302-4d03-92b3-d63c5cc8d354.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT - 28 July 2004

ENCOURAGING DRILL RESULTS AT MANUMBAR

The directors of D'Aguilar Gold Ltd wish to advise that they are encouraged by the drilling results from the initial drilling program at its wholly owned Manumbar gold project located near Kilkivan in south east Queensland.

Manumbar is an epithermal carbonate vein system which has previously produced 49,000 oz from three open pits under previous management during the 1990's. The program, consisting of six holes over a total of 1.820 metres, was drilled by reverse circulation pre-collars and diamond core tails. The aim of the initial program was to test for extensions of the vein system along strike and at depth. The results demonstrate that the vein persists at depth into a silica vein zone. D'Aquilar assaved veined zones in CRA drill core from drill holes MB43 and MB44 which intersected the vein system under the east pit at Manumbar in 1991. The results, which included 1.3 metres $@$ 14.5 g/t gold from 104.0 metres (MB43) and 1.2 metre $@$ 6.6 g/t from 84.4 metres (MB44) demonstrate that the Manumbar vein system is comprised of several mineralised zones.

The most positive results were encountered in drill hole DP028 which tested depth extensions of the north pit at Manumbar. A significant vein consisting of quartz and calcite emplaced in a brittle andesite host was encountered over an intersection of 6.0 metres from 94 metres downhole, averaging over 7.6 g/t Au and including 1 metre $@$ 19 g/t from 94 metres and 1 metre $@$ 11 g/t from 99 metres. The true width of the intersection is approximately 4.2 metres. The intersection in DP028 is potentially ore grade and width and provides encouragement for further exploration. Drill hole DP028 was significantly mineralised with carbonate veins and alteration from 20 to 100 metres depth downhole and assay results are awaited for the balance top half of the hole.

The program was preceded by a detailed analysis of past drilling and surface information from CRA Exploration which provided leads for eight new targets at Manumbar. Additional targets which have no surface expression are expected during ongoing exploration.

The Manumbar vein system has a number of geological similarities to epithermal gold vein systems at Cracow (Newcrest / Sedimentary Holdings) and Vera / Nancy (Newmont).

Details of drilling results are shown in Table 1. Figure 1 shows the location of the completed drill holes, planned further holes and areas showing further targets.

ASX Code: DGR

Phone +61 7 3303 0680 Fax +61 7 3903 0683 Email [email protected] Website www.daguilar.com.au

Head Office Level S. annan ar
50 Edward Romans Brisbane QLD 4000 Postal Address GPD Box 6261. Brisbane QLD 4001

Shamrock Mine Site Stack Saake Road PO Box 72, Kilkivari QLD 4600
Phone - +61 7 5484 1366 +617 5484 1434

Table 1

Drillhole D Easting
(metres)
Northing
(metres)
Azimuth
ifoeanna)
Declination
010
degrees)
Hem
(metres)
h7.
(meres)
Length
$(meters)$
Grade
$(0/0)$ Au
Eniozoil
hole
(mirs)
IMB43* 437060 7083195 015 60 104.0 105.3 1.3 14.5 162.0
IMB44* 437112 7083188 000 60 84.4 85.6 1.2 6.61 141.0
DP023 436895 7083326 330 57 87.0 88.0 1.0 1.02 374.1
IDP024 436862 7083264 010 58 231.0 232.0I 1.0 0.1 347.2
IDP025 436988 7083460 225 60 226.0 229.0 3.0 1.46 297.0
IDP026 436838 7083578 205 55 135.2 135.8 0.6 3.23 252.2
IDP028 436724 7083680 317 55 94.0 100.0 6.0 7.65 150.0

*Notes:

$\mathbf{1}$ . Drill holes MB43 and MB44 were assayed by D'Aguilar Gold in zones not previously analysed.

Assay results for DP027 and DP028 (0 to 92 metres) have not been returned at the time of this announcement. $\overline{2}$ .

This announcement has been prepared by Nicholas Mather BSc Hons Geol, a person with over five years experience in the area reported on.

For further information, contact:

Mr Nicholas Mather, Managing Director or Mr Duncan Cornish, Company Secretary Telephone +61 7 3303 0680 or at [email protected]

Electronic copies and more information are available on the Company website at www.daguilar.com.au

Phone +61 7 3303 0680
Fax +61 7 3303 0683
Email [email protected]
Wabsite www.dagailal.com.au

Haad Office Postal Address Eevel 5. GPO Box 5261. 60 Edward Steet. Bristiane QLD 4003 Brisbane OLD 4000

Shamrock Mine Site Black Seaks Read onick besone know
PO Bex 72, Kelebyan QLD 4800
Phone → 61 7 5484 1366 $Fax$ 461 7 5484 1434

Figure 1 Completed and planned drill holes and further drill targets, Manumbar, D'Aquilar Gold Project.