ASX/Media Release

18 June 2019

==> picture [95 x 32] intentionally omitted <==

EXCEPTIONAL INTERCEPT EXPANDS AND STRENGTHENS HIGH-GRADE COPPER MINERALISATION AT SULPHUR SPRINGS

Initial results support potential eastern extension of shallow mineralisation

HIGHLIGHTS

  • Additional Drilling completed at Sulphur Springs

  • Outstanding high-grade copper intercept from first hole:

  • 31m @ 3.24% Cu from 94m, including 11m @ 4.15% Cu from 99m (SSR007)

  • Drill-holes SSR008 and SSR009 currently at the laboratory for analysis

  • Exploration drilling programme currently underway at the Breakers Prospect

Venturex Resources (ASX: VXR) is pleased to advise that the first reverse circulation (RC) drill hole completed as part of a recent drilling programme designed to extend the Indicated Resources at its 100%-owned Sulphur Springs CopperZinc Project, 144km south of Port Hedland in WA, has returned an outstanding thick intercept of high-grade copper mineralisation.

Drill hole SSR007 returned the following assay results:

  • 29m @ 1.47% Cu from 45m

  • 9m @ 0.86% Cu from 82m

  • 31m @ 3.24% Cu from 94m

  • including an outstanding high-grade interval of 11m @ 4.15% Cu from 99m

These outstanding results represent an exceptional start to the programme and have exceeded the Company’s expectations. The results from SSR007 provide further evidence to support the Company’s view that the high-grade copper mineralisation extends further to the east.

==> picture [427 x 297] intentionally omitted <==

Figure 1: Cross-section on 728,905mE showing location of holes SSR007 and SSR008 .

1

Venturex Resources Limited:

==> picture [595 x 37] intentionally omitted <==

==> picture [95 x 32] intentionally omitted <==

SSR007 was drilled through the siliceous hanging wall sequence to a down-hole depth of 45m. Below this, a significant intercept totalling 80m of massive and semi-massive sulphides (from 45 to 125m down-hole) was intersected with visible chalcopyrite evident within the pyrite host. Due to the challenging topography and restricted nature of access, the drillhole was designed on a non-conventional angle and was terminated at the planned end-of-hole depth within semimassive sulphides.

The hole was part of a drill programme designed to test a section of the Inferred Resource located immediately east of the highly successful 2017 drilling programme (see ASX release 18 January 2018). Hole SSR008 (assays pending) was also designed to further test and extend the high-grade copper mineralisation in the upper parts of the orebody.

The results from SSR007 and SSR008 will be used to increase the level of geological confidence in the Sulphur Springs Resource, while also extending the Indicated Mineralisation approximately 60 metres to the east of the Indicated Resource envelope delineated by the 2017 drilling programme (see ASX release 21 March 2018).

The high-grade copper mineralisation is currently interpreted to extend a further 150m to the east, where two historical drill-holes indicate its continuation. Further drilling is planned to identify the full extent of this copper enrichment zone.

==> picture [489 x 282] intentionally omitted <==

Figure 2: Sulphur Springs long-section with Inferred target zone.

Following completion of the Drilling Programme, the drill rig has since moved to the Breakers Prospect, located approximately 15 kilometres to the south of Sulphur Springs. This programme will comprise eight exploration holes targeting mineralisation that was identified in historical drilling beneath a cuprite-malachite gossan that returned exceptional values from surface rock chip sampling of up to 36.7% Cu, 0.42% Zn, 0.19% Pb and 124ppm Ag (see ASX announcement 1 May 2019).

Venturex’s Managing Director, AJ Saverimutto, said: “The assay results from SSR007 are impressive and highlight the quality of the development opportunity at Sulphur Springs, where high-grade copper mineralisation occurs close to surface and will provide early ore feed to the mill from the planned initial open pit”.

“The 70 plus metres of copper mineralisation in SSR007 clearly shows the potential for the shallow portion of the Sulphur Springs deposit to extend along strike to the east.

“We are also very excited about the exploration drilling which is now underway at the Breakers Prospect. The current drilling campaign represents the first major regional exploration push in over a decade at the project and we are looking forward to seeing what this drilling can deliver.”

2

Venturex Resources Limited:

==> picture [595 x 37] intentionally omitted <==

==> picture [143 x 80] intentionally omitted <==

==> picture [95 x 32] intentionally omitted <==

AJ Saverimutto Managing Director

For further information, please contact: AJ Saverimutto/Anthony Reilly/ Trevor Hart Media Venturex Resources Limited Nicholas Read – Read Corporate Ph: +61 8 6389 7400 Ph: +61 8 9388 1474 Email: [email protected] Email: [email protected]

About Venturex Resources Limited

Venturex Resources Limited (ASX: VXR) is an exploration and development company with two advanced Copper Zinc Projects near Port Hedland in the Pilbara region of Western Australia. The two projects are the Sulphur Springs Project which includes the Sulphur Springs Project, Kangaroos Caves Resource plus 27km of prospective tenements on the Panorama trend and the Whim Creek Project which includes the Resources at the Whim Creek, Mons Cupri and Salt Creek mines together with the Evelyn project and 18,100 ha of prospective tenements over the Whim Creek basin.

Competent Person Statement

The Company confirms that:

  • a. The form and context of the material in this release has not been materially modified from any previous announcements; and

  • b. It is not aware of any new information or data that materially affects the information included in the announcements and that all material assumptions and technical parameters underpinning the announcements continue to apply and have not materially changed.

The information in this announcement that relates to Exploration Results is based on information compiled or reviewed by Mr Luke Gibson who is full time employee of Company. Mr Gibson is a member of the Australian Institute of Geoscientists. Mr Gibson has sufficient experience with the style of mineralisation and the type of deposit under consideration. Mr Gibson consents to the inclusion in the report of the results reported here and the form and context in which it appears.

Table 1: Tabulation of drill results

Hole **Easting ** Northing RL Az˚ Dip˚ **EOH ** Interval From To Cu% Pb% Zn% Au g/t Ag g/t Comment
SSR007 728903 7659607 1326 42.5 -60 125 29 45 74 1.47 0.12 0.03 0.07 11.55
9 82 91 0.86 0.01 0.11 0.04 1
31 94 125 3.24 0.01 0.13 0.04 1.69
Inc. 11m 99 110 4.15 0.02 0.08 0.04 2.09
SSR008 728901 7659613 1325 359 -70 108 - - - - - - - - Assays currently at Lab
SSR009 727364 7659844 1257 230 -60 216 - - - - - - - - Assays currently at Lab

Note. Intersections reported as down-hole widths and calculated using a 0.5% copper cut-off.

Table 2: Sulphur Springs Resources Table

Mineral Resources
Location JORC Classification Tonnes (‘000t) Cu % Zn % Pb % Ag g/t
Measured
Sulphur Springs Indicated
Inferred
9,400
4,400
1.5
1.4
3.8
3.7
0.2
0.2
17
18
Sub-total 13,800 1.5 3.8 0.2 17
Measured
Kangaroo Caves Indicated
Inferred
2,300
1,300
0.9
0.5
5.7
6.5
0.3
0.4
13.6
18
Sub-total 3,600 0.8 6 0.3 15
Measured
TOTAL Indicated 11,700 1.4 4.2 0.2 16.3
Inferred 5,700 1.2 4.3 0.2 18.0
Total Resources 17,400 1.3 4.2 0.2 17.0

Note. Totals may not balance due to rounding. The resource is reported at a cut-off grade of 0.4% copper and then less than 0.4% copper and greater than or equal to 2% zinc (see ASX release 21 March 2018 & 22 September 2015).

3

Venturex Resources Limited:

==> picture [842 x 32] intentionally omitted <==

Section 1 Sampling Techniques and Data

==> picture [119 x 45] intentionally omitted <==

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry
standard measurement tools appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as
limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report.

In cases where ‘industry standard’ work has been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types(e.g. submarine nodules) may warrant disclosure of detailed information.
RC drilling is being used to test the Sulphur Springs deposit. The company uses industry
standard practices to measure and sample the chips. A combination of 4-metre composite
and 1-metre split samples will be submitted to the laboratory for analysis

Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic,
etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-
_sampling bit or other type, whether core is oriented and if so, by what method, etc.). _
Reverse Circulation drilling is completed using a standard 5.5inch diameter hammer.
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results assessed.

Measures taken to maximise sample recovery and ensure representative nature of the samples.

Whether a relationship exists between sample recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of fine/coarse material.
Sample condition, including estimated recovery and moisture content are recorded for each
sample by a geologist or technician. When poor sample recovery is encountered during
drilling, the geologist and driller have endeavoured to rectify the problem to ensure maximum
sample recovery. Sample recoveries at Wagga Tank have been variable in places and poorer
sample recoveries encountered. Insufficient data is available at present to determine if a
relationship exists between recovery and grade.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.)
photography.

The total length and percentage of the relevant intersections logged.
RC chips are geologically logged for the total length of the hole using a graphic logging
method. Logging routinely recorded weathering, lithology, mineralogy, mineralization,
structure, alteration and veining. Logs are coded using the company geological coding legend
and entered into the company database.
The following quantitative descriptions are used when logging, amongst others:

Trace less than 1% sulphides.

Disseminated and stockwork 1-50% sulphides.

Semi-massive 50-70% sulphides.

Massive sulphides greater 70%.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples.

Measures taken to ensure that the sampling is representative of the in situ material collected,
including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to thegrain size of the material being sampled.
RC cuttings are split using a rig-mounted cone splitter and the one metre samples from the
mineralised zone are individually submitted for assay. Four-metre composite samples are
taken using a PVC tube through the hanging wall sequence; the one metre composite
samples returning anomalous values will be submitted to elucidate the mineralisation. Field
duplicated are taken every 10 samples within mineralisation.

4

==> picture [842 x 32] intentionally omitted <==

Commentary
Samples from the current drilling programme were assayed by Australian Laboratory Services
Pty. Ltd. Composite and one metre RC samples were prepared and analysed by the following
methods: Samples weighed, crushed and pulverised with the coarse residue retained in
vacuum seal bags. Ag, As, Bi, Cd, Co, Cu, Fe, Mg, Mn, Mo, Ni, Pb, S and Zn analysed by
method ME-OG62 and Au by fire assay method Au-AA25. The company included certified
reference material and blanks with the samples submitted.
The significant intersections reported have been prepared by geologists with relevant VMS
experience. No twinned holes have been drilled. The company uses standard templates
created in Excel to collate sample intervals, drill collar, downhole survey information which
are emailed to the company main office were the information is loaded into a database.
Geological descriptions are recorded in long hand prior to being summarised for digital data
capture.
Drill hole collars were located using a handheld GPS operated by company personnel. Drill
holes are down-hole surveyed by a gyro at the end of hole.
Data/drill hole spacing is variable and appropriate to the geology and historical drilling. 4-
metre sample compositing has been applied to RC drilling within the hanging wall sequence
for gold and multi-element assay.
Drill holes are designed to test the Sulphur Springs orebody which plunges at ~40-50 degrees
to the north. Due to restricted access and topography SSR007 was drilled at an angle -60 to
an azimuth of 045 degrees. The drill holes have been designed to test near surface potential
of sulphide mineralisation amenable to mining by open pit methods and are considered
appropriate for the geometry of the deposit.
The chain of custody is managed by the on-site geologist who places calico sample bags in
poly-weave sacks. Up to 5 calico sample bags are placed in each sack. Each sack is clearly
labelled with:

Venturex Resources

Address of Laboratory
Detailed records are kept of all samples that are dispatched, including details of chain of
custody.
No reviews have been undertaken.
Criteria JORC Code explanation Commentary
Quality of assay
data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures used and
whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc.

Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
Samples from the current drilling programme were assayed by Australian Laboratory Services
Pty. Ltd. Composite and one metre RC samples were prepared and analysed by the following
methods: Samples weighed, crushed and pulverised with the coarse residue retained in
vacuum seal bags. Ag, As, Bi, Cd, Co, Cu, Fe, Mg, Mn, Mo, Ni, Pb, S and Zn analysed by
method ME-OG62 and Au by fire assay method Au-AA25. The company included certified
reference material and blanks with the samples submitted.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative company
personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verification, data storage (physical
and electronic) protocols.

Discuss any adjustment to assay data.
The significant intersections reported have been prepared by geologists with relevant VMS
experience. No twinned holes have been drilled. The company uses standard templates
created in Excel to collate sample intervals, drill collar, downhole survey information which
are emailed to the company main office were the information is loaded into a database.
Geological descriptions are recorded in long hand prior to being summarised for digital data
capture.
Location of data
points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.
Drill hole collars were located using a handheld GPS operated by company personnel. Drill
holes are down-hole surveyed by a gyro at the end of hole.
Data spacing and
distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s)
and classifications applied.

Whether sample compositing has been applied.
Data/drill hole spacing is variable and appropriate to the geology and historical drilling. 4-
metre sample compositing has been applied to RC drilling within the hanging wall sequence
for gold and multi-element assay.
Orientation of
data in relation to
geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures and the
extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and reported
if material.
Drill holes are designed to test the Sulphur Springs orebody which plunges at ~40-50 degrees
to the north. Due to restricted access and topography SSR007 was drilled at an angle -60 to
an azimuth of 045 degrees. The drill holes have been designed to test near surface potential
of sulphide mineralisation amenable to mining by open pit methods and are considered
appropriate for the geometry of the deposit.
Sample security
The measures taken to ensure sample security.
The chain of custody is managed by the on-site geologist who places calico sample bags in
poly-weave sacks. Up to 5 calico sample bags are placed in each sack. Each sack is clearly
labelled with:

Venturex Resources

Address of Laboratory
Detailed records are kept of all samples that are dispatched, including details of chain of
custody.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
No reviews have been undertaken.

5

==> picture [842 x 32] intentionally omitted <==

Section 2 Reporting of Exploration Results

==> picture [119 x 45] intentionally omitted <==

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status

Type, reference name/number, location and ownership including agreements or material
issues with third parties such as joint ventures, partnerships, overriding royalties, native
title interests, historical sites, wilderness or national park and environmental settings.

The security of the tenure held at the time of reporting along with any known impediments
to obtaining a licence to operate in the area.
The Sulphur Springs deposit in located within M49/494. The registered owner of the
tenements are Venturex Sulphur Springs Pty Ltd, a wholly owned subsidiary of Venturex
Resources Ltd. The prospects are held by Venturex Sulphur Springs Pty Ltd
The tenements are within Njamal Native Title Claim (WC99/8) where native title has been
determined. The traditional owners of the land are the Njamal People. The grant of the
tenement predates native title and is not subject to native title claim.
The tenement is subject to two third party royalties on any production from the tenement.
The tenement are in good standing and no known impediments exist.
Exploration done
by other parties

Acknowledgment and appraisal of exploration by other parties.
Previous exploration has been undertaken by a number of parties going back over 30 years.
Modern exploration has been undertaken by Sipa Resources, CBH Resources, Homestake
Mining, andVenturex Resources.
Geology
Deposit type, geological setting and style of mineralisation.
The Sulphur Springs deposit and associated target prospects are related to Volcanogenic
Massive Sulphide systems.
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
collar

dip and azimuth of the hole

down hole length and interception depth

hole length.

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
Details of the drill holes are provided in Table 1 within the body of this report.
Data aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of high-grade results and longer
lengths of low-grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly
stated.
Results reported in this release for SSR007 relate to visual observations of drill core,
specifically the identification of common sulphide minerals. No estimate of grade or
concentration of the minerals is provided. No length weighting or top-cuts have been applied.
Any zones of core loss or cavity are assigned a grade of zero.
Results reported are determined by ALS Laboratories using method ME-OG 62 and fire assay
AuAA25.
Relationship
between
mineralisation
widths and
intercept lengths

These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is known, its nature
should be reported.

If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length, true width not known’).
The Sulphur Springs deposit plunges 40-50 degrees to the north; the drill holes are designed
to intersect the orebody at a nominal 60 degrees, however the local access and topography
required SSR007 to be designed taking these limitations into consideration to intersect the
mineralisation. Only down hole intersections are reported.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
See cross-sections and plans within this announcement

6

==> picture [842 x 32] intentionally omitted <==

Commentary
N/A
The Sulphur Springs deposit has had a significant body of work completed on it, including
geophysical studies, metallurgical test work, geotechnical and ground water studies.
This announcement covers the first drill hole in an eleven-hole programme. The programme
is designed to test the potential for near surface open-pittable material at Sulphur Springs
along with exploration targets ~15km south of Sulphur Springs at the Breaker Prospect.
Once the holes have been drilled, samples will be taken for analysis. Follow up drill testing
are planned for selected anomalies.
Criteria JORC Code explanation Commentary
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
N/A
Other substantive
exploration data

Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
The Sulphur Springs deposit has had a significant body of work completed on it, including
geophysical studies, metallurgical test work, geotechnical and ground water studies.
Further work
The nature and scale of planned further work (e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive
This announcement covers the first drill hole in an eleven-hole programme. The programme
is designed to test the potential for near surface open-pittable material at Sulphur Springs
along with exploration targets ~15km south of Sulphur Springs at the Breaker Prospect.
Once the holes have been drilled, samples will be taken for analysis. Follow up drill testing
are planned for selected anomalies.

7

==> picture [842 x 32] intentionally omitted <==

==> picture [119 x 45] intentionally omitted <==

Section 3 Estimation and Reporting of Mineral Resources

Details on resources for the Sulphur Springs and Kangaroo Caves Deposits have previously been announced to the market, refer ASX announcements dated 21st March 2018 “Venturex Succeeds in upgrading Supergene Copper Zinc-Resource at Sulphur Springs” and “Kangaroo Caves Resource Upgrade” dated 22 September 2015 for most recent update.

(Criteria listed in section 1, and where relevant in section 2 apply to this section.)

Criteria JORC Code explanation Commentary
Database
integrity
Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for Mineral
Resource estimation purposes.
Data validation procedures used.
No new mineral resources are being announced
Site visits Comment on any site visits undertaken by the Competent Person and the outcome of
those visits.
If no site visits have been undertaken indicate why this is the case.
No new mineral resources are being announced
Geological
interpretation
Confidence in (or conversely, the uncertainty of) the geological interpretation of the
mineral deposit.
Nature of the data used and of any assumptions made.
The effect, if any, of alternative interpretations on Mineral Resource estimation.
The use of geology in guiding and controlling Mineral Resource estimation.
The factors affecting continuity both of grade and geology.
No new mineral resources are being announced
Dimensions The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the
Mineral Resource.
No new mineral resources are being announced
Estimation and
modelling
techniques
The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining, interpolation
parameters and maximum distance of extrapolation from data points. If a computer
assisted estimation method was chosen include a description of computer software and
parameters used.
The availability of check estimates, previous estimates and/or mine production records
and whether the Mineral Resource estimate takes appropriate account of such data.
The assumptions made regarding recovery of by-products.
Estimation of deleterious elements or other non-grade variables of economic
significance (e.g. sulphur for acid mine drainage characterisation).
No new mineral resources are being announced

8

==> picture [842 x 32] intentionally omitted <==

Criteria JORC Code explanation Commentary
In the case of block model interpolation, the block size in relation to the average sample
spacing and the search employed.
Any assumptions behind modelling of selective mining units.
Any assumptions about correlation between variables.
Description of how the geological interpretation was used to control the resource
estimates.
Discussion of basis for using or not using grade cutting or capping.
The process of validation, the checking process used, the comparison of model data to
drill hole data, and use of reconciliation data if available.
Moisture Whether the tonnages are estimated on a dry basis or with natural moisture, and the
method of determination of the moisture content.
No new mineral resources are being announced
Cut-off
parameters
The basis of the adopted cut-off grade(s) or quality parameters applied. No new mineral resources are being announced
Mining factors
or assumptions
Assumptions made regarding possible mining methods, minimum mining dimensions
and internal (or, if applicable, external) mining dilution. It is always necessary as part of
the process of determining reasonable prospects for eventual economic extraction to
consider potential mining methods, but the assumptions made regarding mining
methods and parameters when estimating Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation of the basis
of the mining assumptions made.
No new mineral resources are being announced
Metallurgical
factors or
assumptions
The basis for assumptions or predictions regarding metallurgical amenability. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment processes and parameters made when
reporting Mineral Resources may not always be rigorous. Where this is the case, this
should be reported with an explanation of the basis of the metallurgical assumptions
made.
No new mineral resources are being announced
Environmental
factors or
assumptions
Assumptions made regarding possible waste and process residue disposal options. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider the potential environmental impacts of the
mining and processing operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfield project, may not always be well
advanced, the status of early consideration of these potential environmental impacts
should be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.
No new mineral resources are being announced

9

==> picture [842 x 32] intentionally omitted <==

Criteria JORC Code explanation Commentary
Bulk density Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the measurements,
the nature, size and representativeness of the samples.
The bulk density for bulk material must have been measured by methods that
adequately account for void spaces (vugs, porosity, etc.), moisture and differences
between rock and alteration zones within the deposit.
Discuss assumptions for bulk density estimates used in the evaluation process of the
different materials.
No new mineral resources are being announced
Classification The basis for the classification of the Mineral Resources into varying confidence
categories.
Whether appropriate account has been taken of all relevant factors (i.e. relative
confidence in tonnage/grade estimations, reliability of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution of the data).
Whether the result appropriately reflects the Competent Person’s view of the deposit.
No new mineral resources are being announced
Audits or
reviews
The results of any audits or reviews of Mineral Resource estimates. No new mineral resources are being announced
Discussion of
relative
accuracy/
confidence
Where appropriate a statement of the relative accuracy and confidence level in the
Mineral Resource estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the
factors that could affect the relative accuracy and confidence of the estimate.
The statement should specify whether it relates to global or local estimates, and, if local,
state the relevant tonnages, which should be relevant to technical and economic
evaluation. Documentation should include assumptions made and the procedures used.
These statements of relative accuracy and confidence of the estimate should be
compared with production data, where available.
No new mineral resources are being announced

10