Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

DEVELOP GLOBAL LIMITED Regulatory Filings 2017

Sep 5, 2017

64801_rns_2017-09-05_438c7443-5a8b-497a-ae76-fb7bbbb09517.pdf

Regulatory Filings

Open in viewer

Opens in your device viewer

==> picture [256 x 86] intentionally omitted <==

Whim Creek Project - Review for Potential Gold Targets

==> picture [161 x 702] intentionally omitted <==

----- Start of picture text -----

ASX Announcement
ASX Code: VXR
Released: 6 Sept 2017
For further details
Anthony Reilly
Executive Director
T: +61 8 6389 7400
[email protected]
Board
Tony Kiernan
Chairman
Anthony Reilly
Executive Director
Darren Stralow
Non-Executive Director
Trevor Hart
Company Secretary
Contact Details
Registered Office
Level 2
91 Havelock Street
West Perth WA 6005
T: +61 8 6389 7400
F: +61 8 9463 7836
[email protected]
www.venturexresources.com
ABN: 28 122 180 205
----- End of picture text -----

Highlights

New gold and copper soil geochemical targets identified at Evelyn

Venturex Resources Limited (ASX: VXR) advises that, in light of the recent interest in and exploration activities targeting potential Witwatersrand-style gold deposits in the Pilbara region, as highlighted in recent announcements by Novo Resources Corporation, Artemis Resources Limited and De Grey Mining Limited, it has commenced a review of its Whim Creek Project tenements and existing database for potential gold anomalies.

Figure 1 below highlights Venturex’s Whim Creek Pilbara tenements relative to the Novo, Artemis and De Grey tenement holdings.

==> picture [371 x 276] intentionally omitted <==

Venturex’s assessment of the currently available information, and that of the reported exploration activity in the wider district for conglomerate-hosted gold mineralisation, is largely focused on the Fortescue Group sediments (which have an age of between 2,765 – 2,717Ma years). Venturex’s tenure covers the Whim Creek and DeGrey Group sequences, with an age of approximately 3,100Ma; however, based on the results reported by others in the wider area, the Company is undertaking a review of past exploration data compiled on the Company’s project areas for gold mineralisation.

Evelyn Project Exploration (100%)

The Company recently commenced exploration for structurally controlled gold and base metal mineralisation at the Evelyn Project, located 30km south of the Whim

Creek Project and 130km east of Karratha, for targets that had not been previously recognised, and has completed a soil sampling programme.

This initial program of soil sampling comprised 738 samples collected on a 200m x 40m grid spacing, covering approximately 60% of the project area. The samples were analysed for gold as well as a suite of base metal and pathfinder elements.

The soil sampling results returned anomalous gold values of up to 100ppb, and copper results of up to 382ppm. By applying a 10ppb gold and 50ppm copper threshold, the survey successfully identified coincident gold and copper anomalism that appears to be associated with axial plane structures on the regional Croydon Anticline (see Figure 2).

The anomalism is located within structures that are interpreted to cut the Constantine Sandstone, a lower member of the DeGrey Group Formation and the younger Millindinna Intrusive that form the core of the regional anticline. Several of the anomalies remain open and additional sampling to close-off the anomalies and fully test the structures is being planned.

The location of the anomalism on major structures within sedimentary and ultramafic intrusive rock types represents a new style of target for the Company’s Whim Creek – Evelyn Project area.

As part of the review process, Venturex recently acquired the remaining 30% interest from its joint venture partner and now holds a 100% interest in the tenements of the Evelyn Project.

Going forward

Moving forward, the Company’s principal focus remains on rapidly advancing the Sulphur Springs ZincCopper Project to a development decision by completing the current drilling and testing work programme (ASX release dated 1[st] September 2017) in parallel with the permitting pathway.

Without detracting from these activities, the Company will continue to advance the existing VMS targets defined within the Whim Creek Project area while also further evaluating the newly identified gold targets as part of upcoming work programmes.

The Company looks forward to updating investors on results of the current work programmes at Sulphur Springs as they progress.

Anthony Reilly Executive Director

For further information, please contact:

Investors

Anthony Reilly / Trevor Hart Media: Venturex Resources Limited Nicholas Read – Read Corporate Ph: +61 (08) 6389 7400 Ph: (08) 9388 1474 Email: [email protected] Email: [email protected]

About Venturex Resources Limited

Venturex Resources Limited (ASX: VXR) is an exploration and development company with two advanced Copper Zinc Projects near Port Hedland in the Pilbara region of Western Australia. The two projects are the Sulphur Springs Project which includes the Sulphur Springs Project, Kangaroos Caves Resource plus 27km of prospective tenements on the Panorama trend and the Whim Creek Project which includes the Resources at the Whim Creek, Mons Cupri and Salt Creek mines together with the Evelyn project and 18,100 ha of prospective tenements over the Whim Creek basin. Our strategy is to work with our partners Blackrock Metals to expand and extend the existing 4 tonne per day oxide copper heap leach and SXEW operation at Whim Creek, identify other near term production options at Whim Creek, Mons Cupri and Sulphur Springs and fully optimise the Sulphur Springs Project have it shovel ready to take advantage of forecast improvements in base metal prices.

Competency Statements

The information in this announcement that relates to Exploration Results is based on information reviewed by Mr James Guy who is employed as a Consultant to the Company. Mr Guy is a member of Australasian Institute of Mining and Metallurgy and has sufficient experience of relevance to the styles of mineralisation and the types of deposits under consideration, and activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Guy consents to the inclusion in the report of matters based on information in the form and context in which it appears.

2

Figure 2 – Evelyn Project Soil Sample Results

==> picture [366 x 517] intentionally omitted <==

3

==> picture [155 x 52] intentionally omitted <==

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry
standard measurement tools appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken
as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report.

In cases where ‘industry standard’ work has been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.

Samples taken from 30cm depth and sieved to -2mm to collect a 200-300 gram soil
sample.

N/A

N/A

N/A

Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so, by what method, etc.).

N/A
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results assessed.

Measures taken to maximise sample recovery and ensure representative nature of the samples.

Whether a relationship exists between sample recovery and grade and whether sample bias
may have occurred due to preferential loss/gain of fine/coarse material.

N/A
Logging
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.)
photography.

The total length and percentage of the relevant intersections logged.

At each sample site, the, the slope, presence of outcrop , regolith and colour was
recorded along with any comments the sample collector felt relevant.

N/A

N/A
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples.

Measures taken to ensure that the sampling is representative of the in situ material collected,
including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.

N/A

N/A

The sampling method used is considered standard technique for soil sampling. It
ensures that surficial material that could contaminate the sample site is removed
prior to sample collection

Field duplicates were collected at a frequency of every 20thsample.

The sample sizes are considered appropriate given the fine grained nature of the
sample material

The company included certified reference material (CRM) standards, and blank
material within the sample sequence

4

==> picture [156 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
Quality of assay
data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures used and
whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc.

Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
Samples from the program were analysed by Australian Laboratory Services Pty Ltd (ALS).
Analytical method is described below:
Samples were dried and sorted on arrival
The whole sample was pulverised to a nominal 85% passing 75 microns A 25 gram
subsample was collected , digested in an aqua regain solution and gold values determined by
ICPMS to a detection limit of 0.0001ppm (AU-ST43)
Ag,Al,As,B,Ba,Be,Bi,Ca,Cd,Co,Cr,Cu,Fe,Ga,Hg,K,La,Mg,Mn,Mo,Na,Ni,P,Pb,S,Sb,Sr,Th,Ti,Tl,U,V,
W, and Zn were read from the aliquot by ICPAES (ME_ICP41) .
The company inserted certified reference material and blank samples at a rated on 1 every
20 samples in the field.
In addition the laboratory had its own internal QA/QC procedures
No external laboratory checks were undertaken
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative company
personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.
The results of the work have been interpreted by geological consultants employed by the
company who are familiar with the project geology but were not involved in the sample
collection.
The company uses standard templates created in Excel to collect field data which are
emailed to the company main office were the information is loaded into a database.
No adjustments have been made to the assay data.
Location of data
points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.

Sample sites were located using a hand held GPS operated by company personnel to an
accuracy of +/- 5 metres

MGA94 zone 50 datum was used.
Data spacing and
distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s)
and classifications applied.

Whether sample compositing has been applied.
Samples were collected on a 200m X 40m spacing which is considered appropriate for the
level of the survey and size of the likely target.
No compositing of samples was undertaken
Orientation of
data in relation to
geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures and the
extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
Soil sample traverses were oriented approximately perpendicular to the know strike of the
bedrock geological units and structures.
Sample security
The measures taken to ensure sample security.
Samples were stored in the company’s exploration facility at Whim Creek and transported to the
laboratory by a recognised freight contractor. On arrival, the laboratory collated the samples and
checked off the samples received with the sample submission form and recorded and
discrepancies.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.

No reviews have been undertaken

5

==> picture [156 x 52] intentionally omitted <==

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
The soil sampling program was completed on exploration licence 47/1209 and mining lease
47/1455. Both tenements are held 100% by Jutt Resources Pty Ltd a wholly owned subsidiary of
Venturex Resources Limited. Any production from the tenements is subject to a 2.4% royalty
payable to a third party.
The tenements are within land where native title has been determined. The traditional owners of
the land are the Ngarluma People. The company has a regional heritage agreement with the
Ngarluma
The tenements are granted mineral titles, in good standing. Tenement E47/1209 expires on the 27th
September 2017, the company intends to make application for a 12 month extension of term for
the tenement with the Department of Mines,IndustryRegulation and Safety.
Exploration done
by other parties

Acknowledgment and appraisal of exploration by other parties.
Previous exploration has been undertaken by a number of parties going back over 30 years.
Modern exploration has been undertaken by Elf Aquitaine Australia Pty Ltd, Resolute , Ourwest
Corporation PtyLtd,
Geology
Deposit type, geological setting and style of mineralisation.
The company is exploring the Evelyn Project for Volcanogenic Massive Sulphide (VMS) and
structurally controlled gold and base metal deposits.
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
collar

dip and azimuth of the hole

down hole length and interception depth

hole length.

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
N/A
Data aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly
stated.
Exploration results were interpreted by an experienced geologist who based on experience and
statistical review of the results selected threshold level for the various elements to hand contour
the data to generate zones of anomalism.
Relationship
between

These relationships are particularly important in the reporting of Exploration Results.

If thegeometry of the mineralisation with respect to the drill hole angle is known, its
N/A

6

==> picture [156 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
mineralisation
widths and
intercept lengths
nature should be reported.

If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length, true width not known’).
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
A plan showing the anomalism and relationship to known geology and structures is included in
the body of the report.
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
All soil sample results from the survey were used to create the contour plans.
Other substantive
exploration data

Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
N/A
Further work
The nature and scale of planned further work (e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive
Further infill soil sampling and geological mapping and rock chip sampling of anomalous zones will
be undertaken.

7