ASX Announcement

3 April 2024

- Production Restart Study on Woodlawn Copper Zinc Mine, NSW

Woodlawn NPV jumps 37% to A$658m with free cashflow of A$1b over 10-year mine plan

Mine plan shows restart capital cost of just A$42m and first production in H1 CY2025; Outstanding results mean Develop has several funding options, including a potential minority interest sale

Highlights

  • Woodlawn Production Restart Study returns exceptional metrics across the board, showing the mine will create substantial value for shareholders

  • The pre-tax NPV has jumped 37% from the previous estimate in Sep-23 to A$658m; This reflects Develop’s substantial exploration success at the mine, which has seen the Ore Reserve increase by 80% to 6Mt at 2.8% copper-equivalent (CuEq[1] ) and Mineral Resource increase by 55% to 11.3Mt at 3.8% CuEq

  • Pre-tax free cashflow has soared 60% from A$626m to A$1b, based on a 10-year mine plan

  • Study based on consensus price forecasts: Assumed prices in the first 18 months of production are US$8,769/t copper and US$2,688/t zinc

  • Study shows Woodlawn is a low-risk restart: 80% of the mine plan is underpinned by Reserves; Restart capital cost is just A$42m; Fully-permitted; Mine, processing and other infrastructure already in place

  • Production restart has been substantially de-risked with the first two years of production already fully developed and grade control drilling completed; All capital infrastructure installed

  • Mine workforce will peak at 250; Majority of key site management and underground mining/maintenance teams are already employed by Develop; Numerous expressions of interest received from experienced local and regional operational personnel for the remaining positions

  • In light of these exceptionally strong financial and operational metrics, Develop has decided to start exploring funding options which may result in it selling a minority interest in Woodlawn

  • Develop intends to implement a similar strategy at its Sulphur Springs zinc-copper mine in WA; Sulphur Springs NPV is A$523m (as at June 2023)

Develop (ASX: DVP) is pleased to announce the outstanding results of a Production Restart Study on its Woodlawn copper-zinc mine in NSW.

The Study shows Woodlawn is set to generate outstanding financial returns and create substantial value for Develop shareholders, with significant increases in the Net Present Value (NPV), Reserves, free cashflow and mine life compared with previous assessments.

The big gains across all metrics are a direct result of Develop’s highly successful exploration program, which has significantly increased the inventory of copper and zinc, particularly in the Reserve and the Measured and Indicated categories of the Resource.

1

Develop Managing Director Bill Beament said: “The restart plan confirms that Woodlawn is a great mine by any measure.

“The valuation, the inventory, the cashflow and the returns are all extremely strong. At the same time, the start-up costs, the funding requirements and the risks are all very low.

“This exceptional scenario sits against a backdrop of a very bullish outlook for copper and zinc, particularly in tier one locations.

“In light of this enviable position, Develop has commenced exploring several funding options. These include potentially selling a minority interest in Woodlawn to a strategic investor, traditional project finance and offtake financing.

“The sale of a minority interest would enable us to recycle some capital and may provide us with a model which we can apply to our Sulphur Springs mine at the appropriate time.

“We have already received an elevated level of interest in Woodlawn from potential financiers, strategic partners and customers and we will now test this appetite more thoroughly. Completion of this milestone, which will be our major focus this quarter, will put us in the home straight for a production restart.

2

EXECUTIVE SUMMARY

Australian energy transition metals company Develop (ASX: DVP) is pleased to announce that it has completed the production restart study on its flagship 100%-owned Woodlawn Copper-Zinc mine (“Woodlawn” or the “Mine”) located approximately 250 km southwest of Sydney.

The results confirm the mine’s exceptionally strong financial and technical merits based on a 0.85 million tonne per annum (“Mtpa”) underground mine. The mine plan confirms that Woodlawn has the potential to be a very profitable mine with low cash operating costs, robust margins and outstanding economic returns.

The mine plan indicates Woodlawn will produce an average 12,000t of copper and 36,000t of zinc metal in payable streams per annum. Life of mine payable metal of 80,000t copper and 218,000t zinc.

The mine is forecast to generate revenue of A$2.6 billion and pre-tax free cash flow of A$1 billion over an estimated 10-year life.

Financial Summary and Key Outcomes

A summary of financial model outputs and inputs is presented in Table 1, key commodity price assumptions are presented in Tables 2 and 3 with key mine plan outcomes shown in Table 4 below:

Table 1 Financial Model Outputs

Description Unit
Pre-Tax NPV7%1
Payback
Free Cash-flow
Maximum Cash Down
A$M
Mths
A$M
A$M
658
24
1,003
67

1 NPV discount factors are presented on a real basis.

Table 2 Average Commodity Price Realised

Pricing Index(USD) Pricing Index(USD) Pricing Index(USD) Copper Lead Lead Zinc Ag Ag Au Au Forex
Average Realised Mine Plan Price 9,783 2,181 2,890 24 1,963 0.67
Table 3 Commodity Price Deck Forecast
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10
Cu: USD$ / t 8,601 8,938 9,145 9,426 9,681 10,017 10,120 10,373 10,632 10,898
Pb: USD$ / t 2,098 2,100 2,103 2,153 2,228 2,320 2,120 2,173 2,227 2,283
Zn: USD$ / t 2,671 2,705 2,741 2,808 2,899 3,060 2,893 2,965 3,040 3,116
Ag: USD$ / oz 24 25 24 24 23 24 22 23 23 24
Au: USD$ / oz 2,043 2,050 1,900 1,807 1,852 1,898 1,946 1,995 2,044 2,096

Table 4 Key Financial Statistics

Study Outcomes
Production Rate
Mine plan Mine revenue (real)
Mine plan Free Cash flow (pre-tax real)
Infrastructure capital
Pre-tax NPV7%
Max Negative Cash flow
Mine payback
Average Annual Free Cash flow (real)
Mine plan assumed revenue per tonne
Average cash operating costs3
Royalties
Capital Cost
Margin
0.85 Mtpa
A$2,595 million
A$1,003 million
A$42 million
A$658 million
A$67 million
<2 years
A$100 million
A$345/tonne
A$159/tonne
A$16/tonne
A$34/tonne
A$136/tonne

3Cash operating costs include all mining, processing, transport, port, shipping/freight and site based general, TCRC’s and concentrate charges and administration costs.

3

Figure 1 Mine plan Mining Schedule – Tonnes and Grade Mined

==> picture [463 x 251] intentionally omitted <==

Figure 2 Mine plan Processing Schedule – Tonnes and Grades

==> picture [463 x 251] intentionally omitted <==

==> picture [593 x 11] intentionally omitted <==

`

4

Figure 3 Pre-Tax Cash Flow – Annual and Cumulative

==> picture [463 x 281] intentionally omitted <==

Next Steps

Develop has commenced exploring several funding options. These include potentially selling a minority interest in Woodlawn to a strategic investor, traditional project finance and offtake financing.

Mine Plan Summary

Develop’s Woodlawn mine plan work has been completed to a high standard with the assistance of a group of highly experienced independent consultants and contractors, including:

  • Process Plant Infrastructure and Non-Process Infrastructure – Develop and GR Engineering Services

  • Historical and newly conducted Metallurgical Test work – AMML, Heron Resources, Develop, ALS Metallurgy and Auralia Metallurgy

  • Geology and Resources and Geotechnical – Develop and Entech Pty Ltd

The Company would like to extend its thanks to all consultants and staff who assisted the completion of this study.

ORE RESERVES

The Ore Reserves are based on the updated Mineral Resource Estimate announced in March 2024 (see ASX release 22 March 2024). The Ore Reserve estimate, which was prepared by Develop, is presented in Table 5 below. The Ore Reserve represents an 80% increase in tonnes from the previous estimate in 2023 (see ASX release 27 September 2023). The mine plan supporting this estimate is outlined in this document.

Table 5: Woodlawn Ore Reserve

Ore Reserve
Estimate
Ore
(Mt)
Cu
Grade
(%)
Cu
Metal
(kt)
Pb
Grade
(%)
Pb
Metal
(kt)
Zn
Grade
(%)
Zn
Metal
(kt)
Ag
Grade
(g/t)
Ag
Metal
(koz)
Au
Grade
(g/t)
Au
Metal
(koz)
UG Proved
Reserve
1.2 1.7
21.2
1.4
16.9
4.5
55.6
37.1
1,464
0.7
28.8
UG Probable
Reserve
4.8 1.4
67.4
1.3
59.3
3.4
159.3
27.0
4,121
0.4
54.5
UG Total
Reserve
6.0 1.5
88.6
1.3
76.2
3.6
214.8
29.0
5,586
0.4
83.2

*Calculations have been rounded to the nearest 100,000t of ore, 0.1% Zn/Pb/Cu grade, 0.1g/t Ag/Au grade, 1,000 t of Zn/Pb/Cu metal, and 1,000 oz. of Ag/Au metal.

==> picture [593 x 11] intentionally omitted <==

`

5

MINE BACKGROUND

The Woodlawn Mine is located approximately 250 km southwest of Sydney in the state of New South Wales (NSW).

Figure 4: Woodlawn’s Location

==> picture [403 x 327] intentionally omitted <==

MINE TENURE

The Woodlawn Mine is 100% owned by Develop through its subsidiaries Tarago Operations Pty Ltd, Tarago Exploration Pty Ltd and Ochre Resources Pty Ltd. The Mine comprises one mining lease and ten exploration licences.

Table 6 Tenement List

Tenement ID Mine Date
granted
Date expire Registered Holder Area
km2
Ownership
S(C&PL)L0020 Woodlawn 31/10/1973 16/11/2029 Tarago Operations PtyLtd 0.2368 100%
EL7257 Woodlawn 14/11/2008 14/11/2026 Tarago Exploration PtyLtd 174.3 100%
EL7468 Woodlawn 4/03/2010 4/03/2026 Tarago Exploration PtyLtd 19.72 100%
EL7469 Woodlawn 4/03/2010 4/03/2026 Tarago Exploration PtyLtd 61.7 100%
EL8325 Woodlawn 3/12/2014 1/12/2025 Tarago Exploration PtyLtd 179.8 100%
EL8353 Woodlawn 17/03/2015 17/03/2024 Tarago Exploration PtyLtd 44.94 100%
EL8623 Woodlawn 17/07/2017 17/07/2026 Ochre Resources PtyLtd 153.7 100%
EL8712 Woodlawn 5/03/2018 5/03/2024 Ochre Resources PtyLtd 92.8 100%
EL8796 Woodlawn 25/09/2018 25/09/2024 Ochre Resources PtyLtd 66.7 100%
EL8797 Woodlawn 25/09/2018 25/09/2024 Ochre Resources PtyLtd 72.5 100%
EL8945 Woodlawn 19/02/2020 19/02/2026 Tarago Exploration PtyLtd 290 100%

==> picture [593 x 11] intentionally omitted <==

`

6

GEOLOGY & MINERALISATION

The Woodlawn deposit is a stratiform volcanogenic massive sulphide (VMS) deposit that is hosted within the central part of the mid Silurian to early Devonian Goulburn Basin: a deep water, back-arc basin which developed within Ordovician to early Silurian sediments of the Lachlan Fold Belt that hosts numerous metalliferous deposits. Woodlawn lies on the eastern limb of the asymmetric north-northwest plunging Woodlawn Syncline. Mineralisation for base metal (copper, zinc, lead) and precious metal (silver, gold) is hosted in regionally metamorphosed (greenschist facies) fine to coarse-grained felsic to intermediate volcanic rocks, volcanogenic sedimentary rocks and minor carbonaceous shale, known as the Woodlawn Volcanics.

Three mineralised horizons (Lower, Middle and Upper) hosting 11 known massive sulphide lenses occur within a 400 m × 600 m wide and 900 m deep northwest plunging corridor which remains open at depth.

RESOURCES

The underground Mineral Resource Estimate (MRE) of 11.3Mt @ 1.8% Cu, 5.8% Zn, 2.1% Pb, 46gpt Ag & 0.5gpt Au for the Woodlawn copper-zinc mine was prepared by Entech (see ASX announcement dated 22 March 2024) and is reported according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) 2012 edition.

The MRE includes 250,118m of drilling from 1,192 diamond drill holes (DD), including reverse circulation with diamond tails, and 39 reverse circulation (RC) drill holes, completed since 1969. Of the drill metres underpinning the Mineral Resource, 24% were completed by Heron Resources Limited (Heron), 10% were completed by Develop Global Limited (Develop) and the remaining historical drilling was completed by previous owners between 1969 and 2013. The depth from surface to the current vertical limit of the Mineral Resources is approximately 950m.

The Measured, Indicated and Inferred Mineral Resource is reported excluding historical mining voids and exclusion zones, comprise wholly of fresh rock material and use a net smelter return (NSR) cut-off value. The NSR cut-off value chosen to constrain and report Mineral Resource blocks were A$100/t for all lenses (Table 77).

Table 7 Woodlawn underground Mineral Resource, at NSR cut-off of A$100/t

Resource Category Tonnes
(kt)
NSR Zinc (%) Lead (%) Copper
(%)
Gold
(ppm)
Silver
(ppm)
Measured 1,293 417 5.2 1.6 2.1 0.9 47.7
Indicated 6,833 339 4.7 1.7 1.8 0.4 34.6
Inferred 3,135 453 8.5 1.6 1.6 0.5 70.0
Total 11,261 380 5.8 2.1 1.8 0.5 46.0

Notes: Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding

ESG

Our commitment to sustainability is deeply ingrained in our company values. Our sustainability strategy defines how we aim to integrate environmental and social science into our business model and guide us in our efforts to achieve sustainable outcomes for the environments we operate in. We are applying this approach to our planning for Woodlawn, by embedding sustainability-driven designs, decisions, planning and operation into the mine.

Since the acquisition of the site by Develop, focus has been placed on improving the standard of environmental and social management on site, through the lens of the company’s over-arching approach to ESG.

The main focus for the site Environment and Sustainability Team over the previous year has been management of the site water balance as well as the rehabilitation of the site legacy tailings and waste rock storage facilities.

Rehabilitation work on the legacy dams has progressed much more rapidly under Develop leadership and significant progress has been made on an industry-leading approach to disturbed area rehabilitation using composted material in replacement of the difficult to source topsoil. This research project under development and has shown substantial success in accelerating the rate of rehabilitation possible as well as reducing the consumption of natural resources that would otherwise have to be sourced.

==> picture [593 x 11] intentionally omitted <==

`

7

Figure 4 Composted rehab trial area

==> picture [511 x 239] intentionally omitted <==

Most of the rehabilitation on site is conducted using by-product material from other facilities in the region including crushed fines, clays, composts and alkaline materials. The work is completed using local contracting teams and a large amount of local stakeholder engagement is conducted to deliver a cost-effective outcome for the operation with community buy-in.

UNDERGROUND MINING

Develop has completed the mining portion of a study update for Woodlawn, including an Ore Reserve update.

The mine operating costs have been completed by Develop using its own mining services division to price the works required, the cost estimate accuracy is +/- 15%.

Based on the inputs and constraints, the assumed mining method for the deposit is a mixture of overhand and underhand long-hole stoping with cemented paste fill as the main method for backfilling with some requirements for cemented rockfill (CRF) and rockfill in the lower levels of Kate Lens during start-up re-commissioning of the pastefill system.

Net Smelter Return (NSR) Calculation and Stope Optimisation

The NSR values were calculated on a cell-by-cell basis and used in the cut-off calculation and stope optimisation process.

The NSR calculation considers ore being broken into two distinct products:

  • Copper (Cu) and Zinc (Zn)

The suitability of ore for each product is determined by its grade for each metal and its metallurgical weathering category.

Stope optimisations were run on the Mineral Resource models using Deswik’s Stope Optimiser® (SO®) software. All Resource categories (Measured, Indicated and Inferred) were included during the optimisation process.

==> picture [593 x 11] intentionally omitted <==

`

8

Table 5 MSO parameters

Optimisation Parameter Unit Value
Stope Cut-off Grade NSR 120
Min. Mining Width (True Width) m 3.0
Vertical Level Interval m 22.6
Section Length m 20
HW Dilution (True Width) m Calculated in Schedule based on Thickness
FW Dilution (True Width) m Calculated in Schedule based on Thickness
Min. Parallel Waste Pillar Width m 10
Min. FW Dip Angle ° 45

The cut-off value of $120/t was used in the stope optimisation process. A value of $51/t was used as a development cut-off and an incremental stope cut-off which includes the cost of mining and processing but excludes the cost of development.

Table 6 Mine plan NSR cut-off grade

NSR Cut-off for fresh rock underground material NSR Cut-off for fresh rock underground material
Site Operating Costs Units Total Op
Cost
Incremental
Stoping
Incremental
Development
General & Administration AUD / t ore 4.2 - -
Processing – Flotation AUD / t ore 50.8 50.8 50.8
Total AUD / t ore 55.0 50.8 50.8
Mining Operating Costs
Lateral Development AUD / t ore 28.8 - -
Vertical Development AUD / t ore 1.8 - -
Ore Stoping AUD / t ore 46.9 46.9 -
Mine Backfill AUD / t ore 7.8 7.8 -
Mine Services AUD / t ore 7.7 7.7 -
Geology AUD / t ore 2.0 - -
Surface Road Haulage to Plant AUD / t ore 3.0 3.0 3.0
Total AUD / t ore 98.0 65.4 3.0
Calculated NSR Cut-offs Units NSR NSR NSR
Economic Stope cut-off NSR AUD / t ore 153.0
Incremental Stope cut-off NSR AUD / t ore 116.2
Incremental Development cut-off NSR AUD / t ore 53.8

Mining

The mining method in the mine plan is consistent with previous studies: top-down, long hole open stoping utilising paste fill. The majority of the mine development is planned to access stopes as end on and retreat stoping to abutments, the exception to this is the Kate lens where central access drives have been designed where stoping will be mined to a retreating pillar.

Ore is scheduled from a combination of new and remnant areas. The ore will be trucked to surface then transferred 2.1km overland to the processing plant.

==> picture [593 x 11] intentionally omitted <==

`

9

Significant changes in decline strategy from previous studies is incorporated into the current mine plan planning. Scheduling of the mine plan capital development and production areas are now decoupled with decline development ~200 vertical metres ahead of the stoping front. Decline path has been adjusted away from remnant areas and access the historic workings will be from new development.

The new approach with capital development being mined well ahead of production fronts delivers significant benefits, including increased production profile compared to previous mine plans and ability for fast and effective production ramp-up with multiple production fronts available and stope flexibility. It will also give the ability to effectively blend and process both copper and polymetallic ores given flexibility of multiple production fronts.

The current south decline has been developed to exploit the Kate Lens orebody. This development is all but complete and the south decline is planned to continue towards the footwall of D and I lenses.

Figure 5 Developed Stoping Stock - Kate Lens

==> picture [338 x 246] intentionally omitted <==

Table 10 Developed Stoping Stock - Kate Lens

Level Ore (kt) Cu Grade
(%)
Pb Grade
(%)
Zn Grade
(%)
Ag Grade
(g/t)
Au Grade
(g/t)
2530 148 0.8
1.7
4.5
48.3
0.8
2510 148 0.8
1.7
4.5
48.3
0.8
2490 209 1.1
1.5
4.9
45.0
0.8
2460 293 1.6
1.6
5.4
43.0
0.8
2440 329 2.3
1.3
4.5
33.2
0.7
2410 286 2.1
0.8
2.9
19.3
0.5
Total 1,265 1.7
1.3
4.4
36.1
0.7

==> picture [593 x 11] intentionally omitted <==

`

10

Figure 6 Capital development layout

==> picture [350 x 319] intentionally omitted <==

Figure 7 Mine plan

==> picture [350 x 316] intentionally omitted <==

==> picture [593 x 11] intentionally omitted <==

`

11

Stope dilution parameters used in the generation of the current mine plan are outlined in Table 11

Table 11 Stope dilution factors

Area Design HR Indicative ELOS Indicative ELOS
HW FW
A, B, C and J
Lenses
(indicated
resources)
Talc-chlorite altered
zones
3.0 1.0 m 0.5 m
Faulted zones 3.5 1.0 m 0.5 m
Other remnants
(except faulted and
altered zones)
3.5 1.0 m 0.5 m
Extensions (except
faulted and altered
zones)
5.0 0.5 m 0.25 m
D Lens (indicated resources) 6.0 0.5 m 0.25 m
Upper E Lens
(indicated
resources)
<15 m from 790 and
795 faults
3.5 1.0 m 0.5 m
>15 m from 790 and
795 faults
6.0 0.5 m 0.25 m
G Lens (indicated resources) 3.5 1.0 m 0.5 m
H Lens (indicated resources) 3.5 1.0 m 0.5 m
Kate Lens
(indicated
resources)
<15 m from 790 and
795 faults
3.5 1.0 m 0.5 m
>15 m from 790 and
795 faults
6.0 0.5 m 0.25 m
Inferred
resources in D
and I Lenses
<15 m from major
faults
3.5 1.0 m 0.5 m
>15 m from major
faults
5.0 0.5 m 0.25 m

Figure 8 Total underground yearly mined ore tonnes by activity type

==> picture [463 x 252] intentionally omitted <==

==> picture [593 x 11] intentionally omitted <==

`

12

Figure 9 Total underground yearly mined ore tonnes by resource category

==> picture [463 x 280] intentionally omitted <==

METALLURGICAL TESTING AND PROCESSING

The prior operations at Woodlawn were focused on tailings retreatment with underground ore as a supplementary high-grade source. Develop will treat underground ore exclusively, allowing the circuit configuration to optimise this flowsheet.

Historical learnings from the original Denehurst operation as well as Heron processing were used to develop the future flowsheet.

The major problems to be addressed include 1) availability and operability issues in the comminution circuit caused instability of the flotation process; 2) insufficient crushing and/or grinding power to achieve desired consistent throughput rates and product size; 3) water quality issues impacting equipment reliability and flotation performance.

Installation of a tertiary crusher and increasing crushed ore storage capacity will address the comminution capacity issues and support a processing rate more than 850kt per annum.

Water recycled from internal streams and tailing return decant water will be treated via a cation and solids removal circuit. This upscales the Heron strategy by repurposing equipment previously used for tailings retreatment. Antiscalants will be dosed at strategic locations to further control scale formation during operation.

==> picture [593 x 11] intentionally omitted <==

`

13

==> picture [511 x 198] intentionally omitted <==

----- Start of picture text -----

Figure 10 Updated Woodlawn Process Flowsheet
----- End of picture text -----

The 3MW Isa mill used in tailings retreatment circuit will be made redundant. The flotation feed size will be reduced from 75um down to 65um and the 4 x Metso SMD regrind mills will provide liberation in a more energy-efficient manner. These mills will have individual variable speed drives fitted to optimise their performance.

Metallurgical testing is ongoing to optimise best conditions for flotation selectivity in copper, lead and zinc stages for all ore types.

Reagent dosing systems will be redesigned to achieve automated and accurate delivery to the circuit and will respond to changes in feed grades and tonnages. The incorporation of starch into the conditioning stage shows promise for reducing the lead content of the copper concentrate and will be incorporated into the revised flowsheet for when required.

METALLURGICAL RECOVERIES

Expected copper recoveries are uplifted from those used in Heron’s DFS and operating targets. The Heron strategy targeted much higher concentrate grades, limiting recoveries, whereas Develop has normalised concentrate grade targets in line with those achieved from the historical Denehurst operation. The recoveries are supported by actual performance results achieved during historical operation from 1978 to 1998 (20 years).

By segregating and treating copper only ore discretely, rather than blending with polymetallic ore, average copper recoveries of 84% were achieved in historical operation. Recovery of copper from polymetallic ore averaged 64% so there is a large benefit to separate treatment where possible. A key parameter for copper performance, the copper to lead ratio, is also favourably higher than historical for the initial years of operation and aids with limiting the amount of lead reporting to the copper concentrate.

The updated mine plan has assumed the following processing recoveries:

  • (a) Copper – 84% for Cu only ore, 64% for polymetallic ore (Zn)

  • (b) Zinc – 85%

  • (c) Lead – 67%

  • (d) Silver – 90%

  • (e) Gold – 50%

==> picture [593 x 11] intentionally omitted <==

`

14

Figure 11 Cu recoveries via campaigning Cu only and mixed poly ores during historic Denehurst operation

==> picture [431 x 221] intentionally omitted <==

Figure 12 Favourable Cu:Pb ratio of polymetallic ores in mine plan compared to historical Denehurst operations

==> picture [430 x 221] intentionally omitted <==

LOGISTICS AND TRANSPORT

Develop will outsource the transport and logistics management of the Woodlawn concentrate. It is envisaged this will resemble the strategies used by Heron Resources with potential ship loading out of Botany and Port Kembla.

COST ESTIMATION

Capital Cost Estimate

Capital costs are presented in Table 12 and are calculated on pricing received during the study as well as first principles build up. They have been calculated as at the March Quarter 2024 and to an accuracy of +/-15%.

==> picture [593 x 11] intentionally omitted <==

`

15

Table 12 Capital Cost Estimate Summary (+/- 15%)

Infrastructure Capital Capital(A$M)
Processing Plant
Site Infrastructure
Sub Total
33.4
8.1
41.5
Operating Capital Capital (A$M)
Mining (includes UG fleet)
Mine Fixed Plant
Closure
Sub Total
209.7
10.3
16.1
236.1
Total 277.6

Operating Cost Estimate

Mining and processing and all operating costs are summarised below in Table 13.

Table 13 Operating Cost Estimate Summary (+/- 15%)

Operating Cost $/t
Cost Per Unit
Mining
Processing
G and A
Treatment & Refining
Shipping
C1
Capital
AISC
Royalties
Total Cost (including royalties)
67.0
50.5
4.2
29.3
7.9
160.0
33.6
182.6
16.4
209.0

*Variances may appear in table due to rounding

FINANCIAL EVALUATION

The mine plan financial model (the “ Financial Model ”) demonstrates the robust economics of the Mine.

The Woodlawn Mineral Resource and Ore Reserve has been used as the basis to design an underground mine plan and optimised mining schedule to deliver ore grading 1.4% Copper and 4.2% Zinc to a 0.85Mpta processing plant over 10 years to produce an annual average of 12,000t copper and 36,000t of zinc metal in payable streams.

Using industry experts to guide and facilitate the cost estimation and process design a strong understanding of real costs given inflationary market have been built into the Woodlawn mine ensuring successful implementation and execution can be achieved. It has been determined the Mine has an upfront capital requirement of A$42M including:

  • Upgraded crushing circuit;

  • Upgrades to site buildings and infrastructure; and

  • Underground ore development and stoping activities

The mine plan average onsite operating cost including mining, processing, and on-site administration is A$159 per ore tonne processed, on a real basis.

Given the assumed metal prices and AUD:USD exchange rate the mine delivers gross revenue of A$2,595M and a net pre-tax operating cash flow of $A1,003M and averages A$100M per annum.

On this basis, the Mine has a pre-tax NPV7% of A$658M and a payback period of two years.

Annual cash flows are represented in Figure 13. Table 14 represents the mine plan summary.

==> picture [593 x 11] intentionally omitted <==

`

16

Figure 13 Annual Cashflow Graph

==> picture [463 x 281] intentionally omitted <==

==> picture [593 x 11] intentionally omitted <==

`

17

Table 14 Financial Summary

Mining Unit With Exploration
Target
Mined Ore Tonnes Mt 7.5
Nominal Throughput Mtpa 0.85
Mine plan (Mining) Yrs 10
Processed Tonnes Mt 7.5
Avg Zn Grade % 4.2
Avg. Copper Grade % 1.4
Avg. Silver Grade g/t 33.7
Payable Zinc Metal kt 218.3
Payable Copper Metal kt 79.8
Payable Silver Metal Moz 4.8
Economic Assumptions Unit Amount
Avg. Zinc Price USD/t 2,890
Avg. Copper Price USD/t 9,783
Avg. Silver Price USD/oz 24
Avg. Exchange Rate AUD:USD 0.67
Cash Flow Unit Amount
Gross Revenue A$M 2,595
TC/RC, Transport & Royalties A$M 403
On Site Operating Costs A$M 914
Net Operating Cash Flow Pre-Tax A$M
Upfront CAPEX A$M 41.5
-
Processing plant & Infrastructure
A$M 33.4
-
Other Pre-Production Capital
Infrastructure
A$M 8.1
Sustaining CAPEX A$M 211
Net Cash Flow Pre-Tax A$M 1,003
Value Metrics Unit Amount
Pre-Tax NPV8% A$M 658
Pre-Tax Payback Period Yrs 2.0

Sensitivity Analysis

The sensitivity of the pre-tax NPV and IRR was evaluated for changes in key driving variables and parameters such as:

  • exchange rate between USD:AUD;

  • all commodity prices;

  • mining and processing costs; and

  • o discount rate.

==> picture [593 x 11] intentionally omitted <==

`

18

Figure 14 NPV Sensitivity Analysis (+/-15%)

==> picture [463 x 276] intentionally omitted <==

This announcement is authorised for release by the Board of Directors.

Investor Enquiries Media Enquiries Bill Beament Paul Armstrong Develop Read Corporate T: +61 8 6389 7400 P: +61 8 9388 1474 E: [email protected] E: [email protected]

About Develop

Develop (ASX: DVP) has a twin-pronged strategy for creating value. The first of these centres on the exploration and production of futurefacing metals. As part of this, the Company owns the Sulphur Springs copper-zinc-silver mine in WA’s Pilbara region. This mine is currently the focus of ongoing exploration to grow the inventory and various development studies. Develop also owns the Woodlawn zinc-copper mine in NSW. Woodlawn, which is on care and maintenance, comprises an underground mine and a new processing plant. Develop has also recently acquired the Pioneer Dome Lithium Mine in WA’s lithium corridor’ in the Eastern Goldfields. This mine is currently the focus of ongoing exploration to grow the inventory and various development studies. The second plank of Develop’s strategy centres on the provision of underground mining services. As part of this, Develop has an agreement with Bellevue Gold (ASX: BGL) and Mineral Resources (ASX: MIN) to provide underground mining services at their Mines in Western Australia.

Woodlawn Mineral Resources Statement

Woodlawn Mineral Resources Statement Woodlawn Mineral Resources Statement Woodlawn Mineral Resources Statement Woodlawn Mineral Resources Statement Woodlawn Mineral Resources Statement Woodlawn Mineral Resources Statement Woodlawn Mineral Resources Statement
WOODLAWN
(DVP 100%)
WOODLAWN Classification
Tonnes(kt)
Zn %
Pb %
Cu %
Ag g/t
**Aug/t **
Measured 1,293 417 5.2 1.6 2.1 0.9
Indicated 6,833 339 4.7 1.7 1.8 0.4
Inferred 3,135 453 8.5 1.6 1.6 0.5
Total
11,261
380
5.8
2.1
1.8
0.5
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.

==> picture [593 x 11] intentionally omitted <==

`

19

References

  1. The copper equivalent grades for Woodlawn (Cu Eq) are based on copper, lead, zinc, silver and gold prices of US$10,576t Copper, US$2183t Lead, US$2910/t Zinc and US$28.0/oz Silver, and US$2517/oz Gold, with metallurgical metal recoveries of 75% Cu, 84% Pb, 92% Zn, 78% Ag and 43% Au respectively based on historical recoveries at Woodlawn and supported by metallurgical test work undertaken. The zinc equivalent calculation is as follows: Cu Eq = (Cu grade % * Cu recovery % ) + ((Pb grade % * Pb recovery % * (Pb price $/t/Cu price$/t)) + (( Zn grade% * Zn recovery * (Zn price$/t/Cu price$/t)) + (Ag grade gpt /31.103 * Ag recovery % * (Ag price $/oz/Cu price $/t)) + (Au grade gpt /31.103 * Au recovery % * (Au price $/oz/Cu price $/t)).

The information contained in this report references the following ASX announcements:

  • ASX announcement “Woodlawn Updated Mineral Resource Estimate” dated 2 August 2022

  • ASX announcement “Updated DFS – Sulphur Springs” dated 30 June 2023

  • ASX announcement “Updated Woodlawn Mine Plan” dated 27 September 2023

  • ASX announcement “Woodlawn Resource increases by 40%” dated 11 October 2023

  • ASX announcement “Woodlawn Resource Update” dated 22 March 2024 (Original Announcement)

The Company confirms that it is not aware of any information or data that materially affects the information included in the relevant market announcement and all material assumptions and technical parameters underpinning the estimates in the Original Announcement continue to apply and have not materially changed

Competent Person Statements

The information in this announcement that relates to Metallurgical Results at the Woodlawn Mine is based on information complied or reviewed by Mr Kurt Tiedemann who is an employee of the Company. Mr Tiedemann is a member of the Australasian Institute of Mining and Metallurgy and Mr Tiedemann n has sufficient experience with the style of mineralisation and the type of deposit under consideration to qualify as Competent Persons as defined in the JORC Code 2012 Edition. Mr Tiedemann consents to the inclusion in the report of the results reported here and the form and context in which it appears.

The information contained in this announcement relating to the Woodlawn Ore Reserves is based on information compiled or reviewed by Mr Tristan Sommerford who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Sommerford is a full time employee of Develop Global and has sufficient experience relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaking to qualify as Competent Persons as defined in the JORC Code 2012 Edition – Mr Sommerford consents to the inclusion in the announcement of the matters based on their information in the form and context in which it appears.

The information contained in this announcement relating to the Woodlawn Underground Resources is based on information compiled or reviewed by Ms Jillian Irvin of Entech Pty Ltd who is a Member of the Australian Institute of Geoscientists. Ms Irvin consents to the inclusion. Ms Irvin has sufficient experience relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaking to qualify as Competent Persons as defined in the 2012 – Refer Edition of the “Australasian Code for Reporting of Mineral Resources”.

Forward-looking Statements

The information contained in this document (“Announcement”) has been prepared by DEVELOP Global Limited (“Company”). This Announcement is being used with summarised information. See DEVELOP’s other and periodic disclosure announcements lodged with the Australian Securities Exchange, which are available at www.asx.com.au or at www.develop.com.au for more information.

While the information contained in this Announcement has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers give any representations or warranties (express or implied) as to the accuracy, reliability or completeness of the information in this Announcement, or of any other written or oral information made or to be made available to any interested party or its advisers (all such information being referred to as “Information”) and liability therefore is expressly disclaimed. Accordingly, to the full extent permitted by law, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers take any responsibility for, or will accept any liability whether direct or indirect, express or implied, contractual, tortious, statutory or otherwise, in respect of, the accuracy or completeness of the Information or for any of the opinions contained in this Announcement or for any errors, omissions or misstatements or for any loss, howsoever arising, from the use of this Announcement.

This Announcement may include certain statements that may be deemed “forward-looking statements”. All statements in this Announcement, other than statements of historical facts, that address future activities and events or developments that the Company expects, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. The Company, its shareholders, directors, officers, agents, employees or advisers, do not represent, warrant or guarantee, expressly or impliedly, that the information in this Announcement is complete or accurate. To the maximum extent permitted by law, the Company disclaims any responsibility to inform any recipient of this Announcement of any matter that subsequently comes to its notice which may affect any of the information contained in this Announcement. Factors that could cause actual results to differ materially from those in forwardlooking statements include market prices, continued availability of capital and financing, and general economic, market or business conditions. DEVELOP assumes no obligation to update such information.

Investors are cautioned that any forward-looking statements are not guarantees of future performance and that actual results or developments may differ materially from those mineed in forward looking statements. Please undertake your own evaluation of the information in this Announcement and consult your professional advisers if you wish to buy or sell DEVELOP shares.

This Announcement has been prepared in compliance with the JORC Code 2012 Edition. The ‘forward-looking information’ is based on the Company’s expectations, estimates and mineions as of the date on which the statements were made. The Company disclaims any intent or

==> picture [593 x 11] intentionally omitted <==

`

20

obligations to update or revise any forward looking statements whether as a result of new information, estimates or options, future events or results or otherwise, unless required to do so by law.

Cautionary Statement

The mine plan outcomes in this announcement comprise a Production Target and forecast financial information for the Woodlawn Zinc-Copper Mine and are based on an updated mine plan for the Woodlawn Zinc-Copper Mine.

The Ore Reserves and Mineral Resources underpinning the Production Target (and the forecast financial information based on that Production Target) have been prepared by a competent person in accordance with the requirements in the JORC Code 2012 Edition. Refer to the Competent Person Statements at the back of this announcement.

The Production Target is based on Develop’s current expectations of future results or events and should not be relied upon by investors when making investment decisions. All material assumptions upon which the Production Target (and forecast financial information based on the Production Target) are disclosed in this announcement. Develop has concluded that it has a reasonable basis for providing the Production Target and forecast financial information included in this announcement.

The Production Target (and the forecast financial information based on the Production Target) contained in this announcement includes material classified as Ore Reserves and Inferred Mineral Resources. Material classified as Ore Reserves contributes ~79% of the material within the Production Target, Inferred Mineral Resources contribute ~21% of material included within the Production Target. Accordingly, a proportion of the Production Target (and the forecast financial information based on that Production Target) is based on Inferred Mineral and the Company notes there is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the Production Target insofar as it relates to the Inferred Mineral Resources will be realised.

Investors are cautioned not to assume that any part or all of the exploration target will ever be confirmed or converted into mineral resources. The Company may decide not to undertake further exploration work, or may decide to revise or abandon the exploration target as a result of exploration results or other relevant factors.

==> picture [593 x 11] intentionally omitted <==

`

21

SECTION 1 SAMPLING TECHNIQUES AND DATA

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (e.g.
cut channels, random chips, or
specific
specialised
industry
standard
measurement
tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be NSR taken as limiting
the broad meaning of sampling.

Diamond (DD) drilling makes up 98% of Woodlawn underground resource drill holes, including surface parent holes,
wedge holes and drilling from underground drill cuddies, providing intercept points to an average spacing of 20 m × 20 m
and maximum vertical depth of 940 m. Reverse circulation (RC) drilling makes up the remaining 2% of drill holes
underpinning the Mineral Resource Estimate (MRE). The RC holes were drilled from surface locations to a maximum
depth of 145 m. It was noted the RC drilling targeted up-dip extensions of lenses.

DD holes were sampled using HQ3 (61.1 mm) or NQ3 (45 mm) diameter core. Develop’s DD sampling is predominantly
at 1 m downhole intervals, which are broken at major mineralisation or lithological contacts. Historical holes (66% of
database) were a combination of 1 m downhole sampling or were based on geological contacts.

RC samples were collected at 1 m intervals and composited to 2 m (historical) or 4 m (Heron) spear samples. Zones of
mineralisation were re-split at 1 m intervals.

Sludge drilling (119 holes), 12 face samples and 88 channel samples were included in the dataset. The sampling
techniques and quality are unknown, but each sampling method carries high risk of preferential sampling bias outcomes.
For this reason, the sludge, face and channel sample data were excluded from the downhole compositing process and
do not inform the MRE outcome.

Include reference to measures
taken
to
ensure
sample
representivity and the appropriate
calibration of any measurement
tools or systems used.

Prior to 1998, there were no QAQC (quality assurance and quality control) procedures requiring the insertion of
commercially available certified reference materials (CRMs), duplicates and blanks in place.

No blind QAQC procedures were in place for historical diamond drilling from 1969 to 1998. Blanks and CRMs were
inserted alternately at a frequency of 1:30 samples from 1999 to 2012. From 2013, CRMs and blanks were inserted into
the sample stream at frequencies ranging between 1:20 and 1:30 samples.

After 1998, QAQC programmes were implemented for all drilling types. Approximately 25% of the assay database is
supported by QAQC data.

The QAQC data for Develop drilling was independently reviewed by Entech, no bias or errors were identified. The assay
methods reflect current industry practice, it was noted that insertion rates of QAQC samples are sub-optimal in the context
of Scogings and Coombes (2014).

Aspects of the determination of
mineralisation that are Material to
the Public Report. In cases where
‘industry standard’ work has been
done this would be relatively simple
(e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from
which 3 kg was pulverised to
produce a 30 g charge for fire
assay’). In other cases, more
explanation may be required, such
as where there is coarse gold that
has inherent sampling problems.
Unusual
commodities
or
mineralisation
types
(e.g.
submarine nodules) may warrant
disclosure of detailed information.

RC and DD drilling was used to obtain a 1 m sample (on average) from which samples were crushed and then pulverised
in a ring pulveriser (LM5) to a nominal 90% passing 75 μm. For each interval, a 250 g pulp sub-sample was taken; these
were then split to a 50 g charge weight for fire assaying, with checks routinely undertaken.

22

`

Criteria JORC Code explanation Commentary
Drilling techniques
Drill
type
(e.g.
core,
reverse
circulation,
open-hole
hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core
diameter, triple or standard tube,
depth
of
diamond
tails,
face-
sampling bit or other type, whether
core is oriented and if so, by what
method, etc).

A total of 250,118 m of drilling from 1,192 diamond and diamond tails, and 39 RC drill holes, were available for the MRE.
This includes 42 new diamond drill holes completed by Develop since the 2023 MRE (11thOctober 2023).

RC drilling has been confined to shallow near-surface exploration targets and near-surface up-dip testing of lens
mineralisation. RC drilling from 2013 onwards used a 4.5-inch face sampling hammer with a booster and auxiliary
compressor to boost sample recovery.

DD procedures, core sizes and recoveries have varied over the years. Most historical surface drill holes were cored at
NQ size; more recent drilling has predominantly been HQ, reducing to NQ at depth. Underground core sizes were
historically BQ and NQ, with more recent drilling being predominantly NQ.

No core orientation data had been recorded in the Woodlawn drilling metadata. No evidence of core orientation was
observed during Entech’s September 2023 site visit.
Drill
sample
recovery

Method of recording and assessing
core and chip sample recoveries
and results assessed.

During Develop’s DD campaigns, cores were laid out in standard core trays, marked and recoveries calculated. Visual
checks of available historical core photographs confirmed that similar procedures were followed by Heron from 2014 to
2020 and historical owners prior to Heron.

Historical documentation notes that RC recoveries were purely qualitative, with sample recovery visually estimated (most
recoveries were recorded as being close to 100%).

Measures
taken
to
maximise
sample
recovery
and
ensure
representative
nature
of
the
samples.

Core recoveries during Develop’s drilling were fair to good, with an average recovery above 98.5%. Recoveries through
the dolerite, rhyolite, silica sericite alteration zones and through the massive sulphide mineralised zones were generally
excellent; poorer recoveries were experienced through the chlorite and talc chlorite schists and zones of faulting.

No data on the historical core recovery statistics have been recovered, but visual inspection of the core photography
suggests that recoveries were similar to those logged by Develop.

As a result of the high recoveries observed, there is not expected to be any relationship, or bias, associated with the
areas of core loss/poor recovery.

Whether
a
relationship
exists
between
sample
recovery
and
grade and whether sample bias may
have occurred due to preferential
loss/gain of fine/coarse material.

Diamond core recoveries exceed 95%. A sample bias is not likely to have occurred due to core loss of fine/coarse material
as the underground fresh mineralised material which makes up the MRE is competent, with no relationship between grade
and competent/poor ground conditions observed. No relationship between sample recovery and grade tenor was
identified, nor observed.
Logging
Whether core and chip samples
have
been
geologically
and
geotechnically logged to a level of
detail to support appropriate Mineral
Resource
estimation,
mining
studies and metallurgical studies.

The level of detail is considered sufficient to support estimation of Mineral Resources, as well as mining and metallurgical
studies.

Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.

Review of available drill hole data in the database shows the level of detail in geological logging varies from year to year –
from capture of base lithology through to more comprehensive detail that includes lithology, structure, mineralogy,
alteration and weathering (oxidation state) for both RC samples and DD core.

Logging is both qualitative and quantitative. Visual percentage estimates for lithology, mineralogy, mineralisation,
structure (where possible in core only), weathering and features, were routinely recorded, with summary comments
provided.

Since the change of ownership to Develop, 10% of core photography for the W series holes (25% of MRE drill holes), 3%
for U series holes (42% of MRE drill holes) and 80% of Heron’s diamond holes (22% of MRE drill holes) has been located.

Recovered core photographs show drill core was photographed (wet and dry) before sampling, after mark-up.

Since 2022, all diamond core is routinely photographed.

DD core trays and RC chip trays are stored for future reference at Woodlawn; however, the percentage or quality of
retained core is not known.

`

23

Criteria JORC Code explanation Commentary

The total length and percentage of
the relevant intersections logged.

The MRE is informed by 2 RC holes and 869 diamond holes for 16,189 m of drilling intersecting the mineralisation. Less
than 1% (5 DD holes) were not logged.
Sub-sampling
techniques
and
sample preparation

If core, whether cut or sawn and
whether quarter, half or all core
taken.

Observation of assay intervals indicates that selective sampling of mineralised DD core and adjacent footwall, hanging
wall and internal waste was done by Develop and previous owners of the mine.

Database records indicate that half and quarter diamond cores were used for analytical work. Half-core sampling was
observed during the Entech site visit in September 2023.

If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.

RC samples were generally collected as 1 m downhole intervals via a rig-mounted cyclone splitter into plastic bags.
A 2.5–3 kg sample is collected for analysis as either a composite or an individual sample. Samples are collected by a
spear method if the material is dry and as a grab sample if the material is wet (unsuitable for spear sampling).

RC samples were collected at 1 m intervals and composited to 2 m (historical) or 4 m (Heron) spear samples. Zones of
mineralisation were sampled or re-split at 1 m intervals.

For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.

Before 2000: Sample preparation and analyses by Jododex Australia Pty Ltd (Jododex), Australian Mining and Smelting
Pty Ltd (AMS) and Denehurst Limited (Denehurst) were conducted on site at the Woodlawn laboratory (NATA accredited
laboratory):
o
Samples were dried, crushed and ground to ~50 µm, with a quartz flush after every sample.
o
Mills were blown out with compressed air between each sample.
o
A sample for analysis was separated using a riffle splitter.

2000 to 2013: TriAusMin:
o
RC sample preparation and assaying procedures are unknown.
o
Sample preparation of DD core was done at ALS Orange.
o
Analysis of final pulps was done at ALS Brisbane.
o
Samples were crushed and pulverised to 85% passing 75 µm.

2014 to 2020: Heron:
o
Samples were dried, crushed and pulverised to 85% passing 75 µm, with 1:20 sample pulps checked for grind quality
by wet screening at 75 µm with a quartz flush after every sample.
o
1:20 flush samples were assayed.

2022 to current: Develop:
o
Samples were weighed, crushed and pulverised to 85% passing 75 µm, with the coarse residue retained in vacuum
sealed bags.
o
In addition to Develop’s QAQC methods (duplicates, standards and blanks), the laboratory has additional checks.
o
1:60 flush samples were assayed.
Sample preparation techniques are considered appropriate for the style of deposit and commodity under consideration and
reflect standard techniques available at the time.

Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.

No blind QAQC inserts were included for historical diamond drilling from 1969 to 1998.

TriAusMin included blanks and CRMs alternately at a frequency of 1:30 samples from 1999 to 2012. From 2013, blanks
were inserted at a frequency of 1:40 samples and CRMs were inserted at a frequency of 1:20 samples. No blind duplicates
were collected.

From 2014, Heron included blanks at a frequency of 1:30 samples, duplicates were taken from the riffle splitter at a
frequency of 1:30 samples, and CRMs were inserted at a frequency of 1:30 samples.

Develop inserted either a blank, duplicate or CRM at a frequency of 1:20 samples (4.9% assays). Blanks were inserted
at a frequency of 1:60 samples, core duplicates were taken at a frequency of 1:100 samples, and CRMs were inserted at
a frequency of 1:37 samples.

Measures taken to ensure that the
sampling is representative of the in-
situ material collected, including for

No field duplicates were collected from DD core prior to 2022.

For the QAQC sampling undertaken by Develop, all field duplicates are from diamond quarter-core splits.

`

24

Criteria JORC Code explanation Commentary
instance
results
for
field
_duplicate/second-half sampling. _

Whether
sample
sizes
are
appropriate to the grain size of the
material being sampled.

Sample sizes are considered to be industry standard and to appropriately represent mineralisation at the Woodlawn deposit
based on style of mineralisation, thickness and consistency of mineralised intersections, the sampling methodology and
the observed assay ranges.
Quality of assay
data
and
laboratory tests

The
nature,
quality
and
appropriateness of the assaying
and laboratory procedures used and
whether the technique is considered
partial or total.

Before 2000: Sample preparation and analyses by Jododex, AMS (CRA) and Denehurst were conducted on site at the
Woodlawn laboratory (NATA accredited laboratory):
o
For holes W001–W166 and W201–W290:
o
Acid digestion of pulverised aliquot and determination of Cu, Pb and Zn by AAS.
o
XRD analysis for Cu, Pb, Zn, precious metals, Fe, Si, Al, Mg and Ba.
o
Fire assay of samples >2 ppm Au based on aqua regia digest assays.
o
For holes U001–U190, U194–U469 and W167–W199:
o
Aqua regia hydrofluoric and perchloric acid digest with AAS or ICP determination of Cu, Pb, Zn, Ag and Au.
o
Au assays reporting above 2 ppm were re-assayed by fire assay.
o
For some samples, a second aliquot was analysed by pressed powder XRF to determine Fe, Mg, Si, Al and Ba
grades.
o
For holes W160–W165 and W278–W282:
o
Analysed at Classic Comlabs Limited and Geomin Laboratory.
o
Samples were assayed for Cu, Ag, Pb, Zn and Au with some samples analysed for Ba, Al and Fe.

2000 to 2013: TriAusMin:
o
Au was determined at ALS Orange by 30 g fire assay with AAS finish analysis.
o
Multi-element assaying was conducted by ALS Brisbane using a 0.25 g sample with a four-acid digest and ICP-AES
finish for analyses of Ag, Al, As, Au, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, Li, La, Mg, Mn,
Mo, Na, Nb, Ni, P, Pb, S, Sb, Sc, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W, Y, Zn and Zr.

2014 to 2020: Heron:
o
Samples were dried, crushed and pulverised to 85% passing 75 µm, with 1:20 sample pulps checked for grind quality
by wet screening at 75 µm with a quartz flush after every sample.
o
1:20 flush samples were assayed.
o
Au was determined at ALS Orange by 30 g fire assay with an AAS finish and a 1 ppb LLD (lower limit of detection).
o
ALS Orange pulps were sent to ALS Brisbane for multi-element and ore grade analyses, with a 0.25 g sample taken
from each pulp for 33-element four-acid digest with ICP-AES finish.
o
Analyses comprised Ag, Al, As, Ba, Be, Bi, Ca, Cd, Co, Cr, Cu, Fe, Ga, K, La, Mg, Mn, Mo, Na, Ni, P, Pb, S, Sb, Sc,
Sn, Sr, Th, Tl, U, V, W, Y, Zn and Zr.
o
Laboratory quality control standards (blanks, reference standards and duplicates) were inserted at a rate of 5:35
samples during ICP work.

2022 to 2024: Develop:
o
Develop implemented similar analytical procedures for DD core sampled, with analyses completed at ALS Brisbane
for multi-element four-acid digest with ICP-AES finish.
o
Samples were weighed, crushed and pulverised to 85% passing 75 µm, with the coarse residue retained in vacuum
sealed bags.
o
Au was determined at ALS Orange by 30 g fire assay with an AAS finish and a 1 ppb LLD (lower limit of detection).
o
ALS Orange pulps were sent to ALS Brisbane for multi-element and ore grade analyses, with a 0.25 g sample taken
from each pulp for 33-element four-acid digest with ICP-AES finish.
o
Analyses comprised Ag, Al, As, Ba, Be, Bi, Ca, Cd, Co, Cr, Cu, Fe, Ga, K, La, Mg, Mn, Mo, Na, Ni, P, Pb, S, Sb, Sc,

`

25

Criteria JORC Code explanation Commentary
Sn, Sr, Th, Tl, U, V, W, Y, Zn and Zr.
o
Laboratory quality control standards (blanks, reference standards and duplicates) were inserted at a rate of 5:35
samples during ICP work.
The assaying and laboratory procedures are considered appropriate for the style of deposit and commodity under
consideration and reflect standard techniques available at the time.
The described analytical methods are considered to be total assaying techniques:
o
Multi-element analyses by acid digestion and determination by AAS, ICP, ICP-AES with the assumption that
digestion is a total dissolution.
o
Multi-element analyses of a pulverised and pressed aliquot by XRD and XRF.
o
Au determination by fire assay with an AAS finish.

For
geophysical
tools,
spectrometers,
handheld
XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their derivation,
etc.

Geophysical instrumentation was not used for DD core or RC chip sample analyses.

Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates,
external
laboratory
checks) and whether acceptable
levels of accuracy (ie lack of bias)
and
precision
have
been
established.

QAQC procedures:
o
Prior to 1998, there were no Company QAQC samples included in the sample submissions. The laboratory inserted
its own QAQC samples, but no data are available.
o
During 1999 to 2013, blanks and CRMs were included at a rate of about 1: 30 samples. No duplicate samples were
collected during this period.
o
The procedures implemented by Heron since 2014 meet current industry standards.
o
The gold CRMs generally perform very well. Some of the recent CRMs show a small positive or negative bias.
o
The number of gold CRMs submitted represents about 10% of the total samples assayed since 2000.
o
The base metal CRMs generally perform well, except for some of the recent CRMs that show a small positive or
negative bias. However, there are numerous cases of apparent sample swaps.
o
There appear to be more issues with the Pb analyses or laboratory calibrations as there are numerous Pb results
well below the expected values for some CRMs.
o
The number of base metal CRMs submitted represents about 10% of the total number of samples assayed since
2000.
o
The number of blanks submitted represents about 5% of the total number of samples assayed. Most blank assays
are below acceptable limits.
o
The field duplicate samples correlate reasonably well, with some spread in results as expected.
o
The correlation for laboratory checks is very good.

The correlation of umpire samples between the laboratories is generally very good for the major elements, with no obvious
bias evident. The correlation for gold, however, is not as good as the other elements, suggesting gold is more nuggety.

Entech completed a review of the QAQC data available for the Develop 2023 and 2024 drilling and is of the opinion that
the QAQC data are reasonable, and no material bias or errors were identified. The assay methods reflect current industry
practice. Key points and findings are summarised as follows:
o
No gold CRMs were submitted during the 2023 drilling. Base metal CRMs represent about 2.9% of the total number
of assays for the 2023 drilling.
o
Base metal CRMs generally perform well, except for some outlier values that require investigation. There is one case
of an apparent sample mislabel and one data entry error.
o
The number of blanks submitted represents about 1.6% of all samples assayed. Most blank assays are below
acceptable limits; however, there is evidence of contamination between some samples for various elements which

`

26

Criteria JORC Code explanation Commentary
requires follow-up and re-assay.
o
The number of field duplicates submitted represents about 1% of all samples assayed. The field duplicate samples
correlate reasonably well, with some spread in results as expected.
Verification
of
sampling
and
assaying

The
verification
of
significant
intersections by either independent
or alternative company personnel.

In 2022, significant intersections were not identified for independent verification. Original laboratory certificates have not
been located and assay data could not be independently verified. However, in Entech’s opinion, the extensive amount of
drilling metadata collected at the deposit over the mine life from initial discovery in 1969 through to 2024 by multiple
owners during several drilling campaigns and also historical mining of many lenses defined by the metadata, have
mitigated the risk of individual significant intersections or assay errors having a material impact on the MRE outcomes.

During the site visit, the Competent Person inspected drill core mineralised intercepts against received assay results for
23WNUD 047, 049, 058 and 062, and relogged B lens mineralisation within 23WNUD0011 from 286.2 m to 418 m
downhole. This was undertaken on drilling for the B, D, I and J lenses.

Entech checked approximately 5% of original laboratory certificates against assay data in the supplied database, for
Develop drilling completed in 2023 and 2024, and found no data entry errors.

The use of twinned holes.

No twinning of holes was done prior to this MRE, but there is consistent and strong correlation of width and grade of
downhole mineralisation intercepts against close-spaced grade control drilling data (15 m), face sampling and historically
mined widths and strike extents.

Documentation of primary data,
data
entry
procedures,
data
verification, data storage (physical
and electronic) protocols.

For drilling carried out by Develop:
o
Samples were placed in pre-numbered (Sample-ID) calico bags by site personnel.
o
Downhole sample intervals and corresponding (Sample-ID) and density measurements were recorded directly into
the geological database.
o
Individual calico bags were placed in white polyweave bags, which in turn were placed into bulka bags which were
sealed.
o
Manifest and laboratory analysis request form was generated and sent to ALS Orange laboratory.
o
Transportation of bulka bags to the laboratory was via an independent freight contractor.
o
At the laboratory, samples were sorted, checked against supplied manifest then loaded into the laboratory’s data
capture and tracking system, with each sample individually barcoded to facilitate tracking of samples through sample
preparation and analysis workflows.

Discuss any adjustment to assay
data.

Where there are missing assays for Zinc, Copper and Lead within the mineralisation domains, a background grade of
0.0001% has been assigned for each element.

There are limited sulphur assays in the database.
Location of data
points

Accuracy and quality of surveys
used to locate drill holes (collar and

MGA_GDA94, Zone 55 is the grid system covering the region; however, a local mine grid system is established for the
site. The Woodlawn mine grid (WMG) was established in 1970 as an imperial grid.

`

27

Criteria JORC Code explanation Commentary
down-hole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.

The WMG was converted from imperial to metric in 1971.

TriAusMin (formerly Tri Origin Minerals) added 10,000 m to the northings of the WMG, with all historical data converted.
Heron used the WMG grid for drill collar locations.

Drill hole collar locations:
o
Historical drill collar surveys on all surface and underground holes were done using conventional total station
equipment.
o
For Develop’s drilling, holes were initially positioned using a handheld GPS and re-surveyed with a DGPS once the
hole was completed.

Downhole surveying and accuracy:
o
Historical downhole surveying was by single-shot camera at approximately 30 m intervals.
o
The 2014 drill holes by Heron were downhole surveyed by a multi-shot electronic camera and by a gyroscope survey
on completion.
o
From 2015 onwards, a north-seeking gyroscope was used with a gyroscope survey done on completion.

Magnetic minerals are largely absent in the Woodlawn sequence. Consequently, there is very little variance between
magnetic and the gyroscope readings.

Heron retrospectively applied an adjustment to all magnetic survey azimuths to reflect the change in magnetic pole
declination over the life of the mine. In 2019, the WMG bearings were converted, based on the Australian Geoscience
website as follows:
o
TN to Magnetic declination (updated each year on 1 January) – prior to 2020
o
TN to GDA94
o
TN to WMG.

There has been magnetic variation from the time of deposit discovery in 1969 (+11.39°) to 2016 (+12.385°).

The mine comprises substantial historical and recent (Heron) mine workings. The workings, as supplied to Entech, were 3D
digital wireframe volumes representing historical cut and fill workings predominantly in A, B, C and E lenses. Heron used
long hole open stoping (LHOS) and sublevel open stoping (SLOS) methodologies in other lenses and carried out surveys
using a cavity monitoring system (CMS). Development as-builts were picked up by Heron surveyors using total stations
and converted to 3D digital volumes (wireframes).

Develop personnel supplied an underground voids model of 3D digital wireframes representing underground development
since Develop’s mine acquisition in 2022 through to 25thJanuary 2024.

Specification of the grid system
used.

All MRE coordinates are in the Woodlawn mine grid (WMG) system. Grid transform, as used by Develop, is presented
below.

Quality
and
adequacy
of
topographic control.

A digital terrain model (DTM) of the pre-mining surface correlates with historical collar elevations; however, the source
data origins and accuracy of the DTM are unknown.

A LiDAR survey of the post-mining surface was flown in February 2023 by survey contractor SeamSurveys. Decline as-
builts were surveyed by Develop and the correlation with the LiDAR surface position of the box cut provided confidence
that the topographic surface is adequate for use in the MRE.
Data spacing and
distribution

Data spacing for reporting of
Exploration Results.

No Exploration Results are being reported.

`

28

Criteria JORC Code explanation Commentary

Whether the data spacing, and
distribution is sufficient to establish
the degree of geological and grade
continuity
appropriate
for
the
Mineral Resource and Ore Reserve
estimation
procedure(s)
and
classifications applied.

The resource definition drilling is variably spaced, nominally 20 m × 20 m centres in the upper and central area of the
deposit. Drill spacing widens from 40 m to 60 m intercept distances with increasing depth in down-plunge lens extensions.

The data spacing is considered to be sufficient to demonstrate the continuity of both the geology and the
mineralisation. The spacing is sufficient to define a Mineral Resource for the Woodlawn polymetallic deposit.

Most lengths range between 0.2 m and 1 m, with longer sample lengths limited to geometallurgical sampling.

Whether sample compositing has
been applied.

For MRE purposes, a 1 m composite (base and other metals) was generated for resource estimation purposes.
Orientation of data
in
relation
to
geological structure

Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.

Three mineralised Horizons (Lower, Middle and Upper) hosting thirteen known massive sulphide lenses occur within a
400 m × 600 m wide and 900 m deep northwest plunging corridor which remains open at depth. Major northwest trending
faults affect the distribution of the lenses, with several having been disrupted or offset by these faults.

The average orientation of the massive sulphide lenses is dip 60°towards 260°, plunging 110° to the northwest.

RC drilling from surface tested continuity of mineralisation of some lenses to a vertical depth of 145 m and intersected
mineralisation close to orthogonal to mineralisation.

Parent and child DD holes from surface intersect mineralisation close to orthogonal to mineralisation.

Underground DD holes were drilled from locations in the footwall and hanging wall, with some footwall hole orientations
at a low angle to mineralisation due to fan drill angles and spatial constraints associated with location of underground
drive sites.

If the relationship between the
drilling
orientation
and
the
orientation
of
key
mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported if
material.

The orientation of mineralisation was delineated by correlation between downhole lithology and assay data, and between
historical underground as-builts stopes and development drives.

The predominant drilling orientation is c o n s i d e r e d suitable for mineralisation volume delineation at the
Woodlawn deposit, does not introduce bias nor pose a material risk to the MRE outcomes.
Sample security
The measures taken to ensure
sample security.

Sample security of historical data is not documented, with most samples having been prepared and assayed at onsite
laboratories (Woodlawn laboratories).

All Develop’s drill core and approximately half of the historical drill core is stored at the Woodlawn core farm. The core
farm is located on the tenement leases. The core is stored in warehouse racking systems under cover, or on pallets in
the areas next to the storage sheds.

For drilling carried out by Develop:
o
Samples were placed in pre-numbered calico bags that were barcoded.
o
Calico bags were placed in zip-tied polyweave bags.
o
Zip-tied polyweave bags were placed into bulka bags that were sealed and transported to ALS Orange laboratories
for sample preparation and analyses.
o
Barcoded samples were tracked through sample preparation and analyses.
Audits or reviews
The results of any audits or reviews
of sampling techniques and data.

Sampling techniques used over the years are consistent with industry standards in use at the time.

Evidence of umpire checks or independent reviews is broadly documented in the Woodlawn Underground Mineral
Resource (Heron, June 2019) and Updated Independent Technical Due Diligence Review - Heron Resources Ltd -
Woodlawn Mine - New South Wales (BDA, December 2016) as follows:
o
Heron conducted annual audits of laboratory.
o
Prior to Heron and TriAusMin, no independent audit or umpire checks appear to have been completed, but historical
monthly production reconciliation sample data provided anecdotal evidence of robust sampling techniques and data,
i.e., a reliable prediction ofgrade produced from the mine, process recoveries from the mill, and subsequent

`

29

Criteria
JORC Code explanation Commentary
concentrate production and sales.

Verification of historical assays carried out Woodlawn laboratories was done by resampling historical core as part of the
2016 Technical Due Diligence studies by BDA.

SECTION 2 REPORTING OF EXPLORATION RESULTS

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral
tenement
and
land
tenure
status

Type,
reference
name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The following has been summarised from the 2020 Woodlawn Mine Compliance Audit Report prepared by NSW Regulators.

Tarago Operations Pty Ltd (Tarago Operations), a wholly owned subsidiary of Heron Resources Limited (Heron), has
held Special (Crown & Private Lands) Lease No. 20 [S(C&PL)L20] since March 2014. The lease was renewed on 21
January 2015 for a further 15 years and expires on 16 November 2029.

Lease area of [S(C&PL)L20] is 2,368 ha.

A Mining Operations Plan (MOP) is required for the mining operations in accordance with condition 3 of [S(C&PL)L20].

Tarago Operations prepared an MOP for the Woodlawn Mine (Heron Resources Ltd, Woodlawn Mine SML20 mine
operations plan) dated 15 September 2015 (INW15/46417/DOI) – which was approved by the Regulator (then the
Department of Industry - Resources and Energy) on 11 November 2015 (OUT15/31494/DOI).

In November 2000, Collex Pty Ltd obtained development consent to operate a waste bioreactor on the old Woodlawn
mine site using the open cut void. The waste facility was within S(C&PL)L20 and is now operated by Veolia Energy
Services Australia Pty Ltd.

Veolia and Tarago Operations (wholly owned subsidiary of Develop Global) have a current Co-operative agreement in
place across the Woodlawn mining tenement S(C&PL)L20.

The security of the tenure held at
the time of reporting along with any
known impediments to obtaining a
license to operate in the area.

All tenements are in good standing.
Exploration done by
other parties

Acknowledgment and appraisal of
exploration by other parties.

Information relating to activities prior to 2016 has been sourced from Updated Independent Technical Due Diligence
Review Heron Resources Ltd - Woodlawn Mine - New South Wales (BDA, December 2016).

The deposit was discovered by Jododex Australia Pty Ltd in 1969, and 25 drill holes defined an initial open pit mineable
resource totalling 6.3 Mt of polymetallic ore grading 14.4% Zn, 5.5% Pb and 1.7% Cu, and 3.7 Mt of copper mineralisation
grading 1.9% Cu.

Woodlawn operated as an open pit from 1978 to 1987 and from 1986 to 1998 as an underground operation.

CRA, operating as Australian Mining and Smelting (AMS), purchased the mine in 1984 and continued open pit mining
(underground mining commenced in 1986).

The mine was sold to Denehurst Limited in 1987 and underground mining continued until 1998.

From 1978 to 1998 approximately 13.8 Mt of ore was extracted from the open pit, underground and satellite deposits at
average grades of 9.1% Zn, 3.6% Pb, 1.6% Cu, 0.5 g/t Au and 74 g/t Ag.

A tailings retreatment mine commenced in 1992 with tailings processed from three contiguous tailings storage facilities
(TSFs) known as North, South and West dams. Retreated tailings was placed back in North Dam.

Following closure of the mine in 1998, Tri Origin Minerals acquired the mine.

Limited exploration occurred in the late 1990s and early 2000s, but from 2007 to 2013, completion of a 17-hole DD
campaign led to the discoveryof Kate(K)and I lenses.

`

30

Criteria JORC Code explanation Commentary

Heron took 100% ownership of the mine in 2014 following a merger with TriAusMin (formerly Tri Origin Minerals).

Exploration and resource drilling were completed over Woodlawn deposit from September 2014 through to March 2020:
o
2014: 14 diamond holes (5,596 m) and 11 shallower RC holes (1,201 m) testing for up-dip lens extensions as part
of a Preliminary Economic Assessment (PEA) study
o
2015: 92 diamond holes (21,097 m) to firm up the Resource-Reserve base, with focus on K and L lenses ahead of
2016 Feasibility Study
o
2016: 7 diamond holes for 2,298 m
o
2017: 22 diamond holes for 4,246 m
o
2018: 19 diamond holes for 3,195 m
o
2019: 30 diamond holes for 2,593 m
o
2020: 58 diamond holes for 5,225 m
o
Geotechnical and geometallurgical drilling was completed to support underground development and processing
studies.

Heron ceased operation of Woodlawn underground on 25 March 2020.

Develop acquired Woodlawn in February 2022 by purchasing 100% of the shares in Heron Resources Limited.

Exploration and resource drilling was completed at the Woodlawn deposit from November 2022 through to November
2023:
o
2022: 6 diamond drill holes for 4,099 m
o
2023: 119 diamond drill holes for 47,301 m.
Geology
Deposit type, geological setting
and style of mineralisation.

The Woodlawn deposit is described in historical documents as a stratiform syngenetic polymetallic volcanogenic massive
sulphide (VMS) deposit.

The Woodlawn deposit lies on the eastern limb of the asymmetric north-northwest plunging Woodlawn Syncline.

Base metal (zinc, lead, copper) and precious (silver, gold) mineralisation is hosted within regionally metamorphosed
(greenschist facies) fine- to coarse-grained felsic to intermediate volcanic rocks, volcanogenic sedimentary rocks and
minor carbonaceous shale, known as the Woodlawn Volcanics.

Threemineralised horizons (Lower, Middle and Upper) hostingthirteenknown massive sulphide lenses occur within a
400 m × 600 m wide and 950 m deep northwest plunging corridor which remains open at depth.

Major northwest trending faults have an impact on the distribution of the lenses, with several having been disrupted or
offset by these faults.

Two major mineralisation types were historically recognised:
o
Polymetallic mineralisation:fine- to medium grained, banded to massive pyrite–sphalerite–galena–chalcopyrite,
with the gangue mineralogy including talc, quartz, chlorite, phlogopite, muscovite and barite
o
Copper-rich mineralisation:includes pyrite–chalcopyrite, lesser pyrrhotite as well as chlorite, quartz and calcite as
massive sulphide and stockwork veins.

Base metal mineralisation is principally associated with the polymetallic assemblage in the massive sulphide lenses. The
ore is typically massive pyrite and has splays and thickened zones that may be associated with faulting. Grades in the
massive ore may reach >20% Zn with copper and lead grades of several percent.

Copper-rich assemblages are concentrated along the footwall in the massive sulphides or as stockwork veins proximal
to the footwall or hanging wall of the massive sulphides within felsic and metasediments.

Precious metal (Ag, Au) mineralisation occurs mostly in association with the sulphide mineralisation, occurring in both
massive and stockwork systems.
Drill
hole
Information

A summary of all information
material to the understanding of the
exploration results including a
tabulation of the following

No Exploration Results are being reported.

`

31

Criteria JORC Code explanation Commentary
information for all Material drill holes:
o
easting and northing of the drill
hole collar
o
elevation or RL (Reduced Level
– elevation above sea level in
metres) of the drill hole collar
o
dip and azimuth of the hole
o
down
hole
length
and
interception depth
o
hole length.

If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.

Refer to previous statement.
Data
aggregation
methods

In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high
grades) and cut-off grades are
usually Material and should be stated.

No Exploration Results are being reported.

Where
aggregate
intercepts
incorporate short lengths of high
grade results and longer lengths of
low grade results, the procedure
used for such aggregation should
be stated and some typical
examples of such aggregations should
be shown in detail.

No Exploration Results or aggregated intercepts are being reported.

The assumptions used for any
reporting of metal equivalent values
should be clearly stated.

A metal equivalent in the form of net smelter return has been applied to Mineral Resources for reporting purposes and is
further detailed in Section 3 Estimation and Reporting of Mineral Resources.
Relationship between
mineralisation widths
and
intercept lengths

These relationships are particularly
important
in
the
reporting
of
Exploration Results.

If
the
geometry
of
the
mineralisation with respect to the
drill hole angle is known, its nature
should be reported.

If it is not known and only the down
hole lengths are reported, there
should be a clear statement to this
effect (e.g. ‘down hole length, true

The geometry of mineralisation is well known and tested at this deposit via DD drilling and historical mining. Across the
drill hole dataset, angles to mineralisation are considered to represent a drill intercept perpendicular to lens strike
orientation. With increasing depth, the drill hole intercept angle to lens decreases. However, drilling from underground
locations has assisted in mitigating this issue for Measured and Indicated Mineral Resources.

`

32

Criteria JORC Code explanation Commentary
width not known’).
Diagrams
Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported These should include, but
not be limited to a plan view of drill
hole
collar
locations
and
appropriate sectional views.

No significant discovery is being reported. Plan and long section maps, and sections relevant to the Mineral Resources
are included in the body of this Report.
Balanced reporting
Where comprehensive reporting of
all Exploration Results is not
practicable,
representative
reporting of both low and high
grades and/or widths should be
practiced
to
avoid
misleading
reporting of Exploration Results.

No Exploration Results are being reported.
Other
substantive
exploration data

Other
exploration
data,
if
meaningful and material, should be
reported including (but not limited
to):
geological
observations;
geophysical
survey
results;
geochemical survey results; bulk
samples – size and method of
treatment;
metallurgical
test
results; bulk density, groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating
substances.

Given this is a mature stage mine with historical mining and regularised resource and grade control drilling underpinning
Mineral Resources, no substantive exploration data were recently collected at the mine.

Geotechnical, metallurgical, bulk density, rock characteristic testwork was completed to feasibility study level of detail in
2016 by Heron.
Further work
The nature and scale of planned
further work (e.g. tests for lateral
extensions or depth extensions or
large-scale step-out drilling).

Drilling activities are planned to recommence in 2024. Resource infill and grade control drilling will be key priorities for
Develop in 2024. Additional resources growth and exploration drilling activities are also currently being planned.

Diagrams clearly highlighting the
areas
of
possible
extensions,
including
the
main
geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.

Refer to previous statement.

`

33

SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria JORC Code explanation Commentary
Database integrity
Measures taken to ensure that data
has not been corrupted by, for
example, transcription or keying
errors, between its initial collection
and its use for Mineral Resource
estimation purposes.

The database was audited by Entech for validation errors and physical comparison of drill hole core photography against
geological and assay data undertaken for 1,231 holes underpinning the Mineral Resource.

The 2024 MRE update includes 42 new diamond drill holes, intercepting B, D, H, J and K lenses, that were provided to
Entech in .csv format. The .csv files were exported by Develop from drill hole database software, MX Deposit (by
Seequent). These .csv files were imported into the MS Access database created by Entech in 2023, and appended to
the collar, survey, lithology and assay tables. Core photography was provided for 29 holes. Core photography was not
provided for holes that did not intersect mineralisation.

Develop’s database to 25 January 2024 comprised 1,647 Collar records, 32,955 Survey records, 43,394 Assay records
and 36,062 Lithology records. The compiled database used for resource estimation comprised 1,231 Collar records,
33,224 Surveyrecords, 38,771 Assayrecords and 34,985 Lithologyrecords.

Data validation procedures used.

Entech completed various validation checks using built-in validation tools in GEOVIA Surpac™ and data queries in MS
Access such as overlapping samples, duplicate entries, missing data, sample length exceeding hole length, unusual
assay values and a review of below detection limit samples. A visual examination of the data was also completed to
check for erroneous downhole surveys.

The data validation process identified no major drill hole data issues that would materially affect the MRE outcomes.

Entech’s database checks included the following:
o
Checking for duplicate drill hole names and duplicate coordinates in the collar table.
o
Checking for missing drill holes in the collar, survey, assay and geology tables based on drill hole names.
o
Checking for survey inconsistencies including dips and azimuths <0˚, dips >90˚, azimuths >360˚ and negative depth
values.
o
Checking for inconsistencies in the ‘From’ and ‘To’ fields of the assay and geology tables. The inconsistency checks
included the identification of negative values, overlapping intervals, duplicate intervals, gaps and intervals where the
‘From’ value is greater than the ‘To’ value.
Site visits
Comment
on
any
site
visits
undertaken by the Competent
Person and the outcome of those
visits.

The Competent Person undertook a site visit to the Woodlawn deposit between 24 and 27 September 2023. During the
visit, Entech inspected mineralised intersections from the Woodlawn deposit in drill core (B, J, D and I lenses) and in
underground exposures (K and G lenses) and observed drilling, logging, sampling, QAQC and metadata collection
operations.

If
no
site
visits
have
been
undertaken indicate why this is the
case.

Refer to previous statement.
Geological
interpretation

Confidence in (or conversely, the
uncertainty
of)
the
geological
interpretation
of
the
mineral
deposit.

Lithology and structure are considered the predominant controls on both the base metals (zinc, lead, copper), precious
metal (silver, gold) and gangue (iron) mineralisation at the Woodlawn deposit.

All new drilling was in fresh material so the base of complete oxidation (BOCO) and base of partial oxidation (BOPO)
surfaces previously modelled by Entech from downhole logging data remain unchanged.

Mineralisation domains were interpreted primarily on geological logging and downhole geological contacts, based on
lithology, sulphide distribution, grade distribution, major faults and geometry. This combination provided a mineralisation
characterisation which effectively domained mineralisation style and sub-domained higher tenor zinc and copper
mineralisation.

Confidence in the mineralisation continuity was based on geological, mineralogical and assay data that were cross-

`

34

Criteria JORC Code explanation Commentary
referenced with available core photography and historical mine development and stopes wireframes. Two major mineralisation
types previously identified by Heron are recognised:
o
Polymetallic mineralisation: fine- to medium-grained, banded to massive pyrite–sphalerite–galena–chalcopyrite, with
the gangue mineralogy including talc, quartz, chlorite, phlogopite, muscovite and barite
o
Copper-rich mineralisation: includes pyrite–chalcopyrite, lesser pyrrhotite as well as chlorite, quartz and calcite as
massive sulphide and stockwork veins.

A total of 250,118 m of drilling from 1,192 diamond and diamond tails, and 39 RC drill holes were available for the MRE.
This includes 42 new diamond drill holes completed by Develop since the 2023 MRE.
Interpretation of the two mineralisation types was initially undertaken in Seequent Leapfrog GEO™ software using all available
drill holes. Intercepts correlating to massive sulphide and copper-rich mineralisation and underpinned by strike continuity
implied from lithology wireframes were independently identified and manually selected within Seequent Leapfrog GEO ™ prior
to creation of an implicit vein model.
Two sulphide mineralisation domains based on sulphide content were defined: a massive sulphide mineralisation domain for
polymetallic and copper-rich mineralisation, and a stringer mineralisation domain for copper in the footwall associated with
disseminated and stringer sulphide mineralisation.
Massive sulphide mineralisation

Confidence is considered moderate to high in the geological interpretation and continuity of mineralisation domains within
the massive sulphides.

Geological contacts with unmineralised footwall and hanging wall metasediments and felsics were the primary boundaries
used for defining massive sulphide lode domain volumes.

Within the massive sulphide lode domains, correlation and statistical analysis and visual review of the mineralisation
tenor, orientation and continuity underpinned base metal (zinc, lead, copper), precious metal (silver, gold) and gangue
(iron) sub-domain approaches. Statistical distributions highlighted a bimodal distribution for both copper and zinc in the
Middle and Upper massive sulphide lenses. Copper and zinc in these horizons have a distinctive geospatial relationship,
with zinc primarily on the northern flank and copper on the southern flank. This distinction is less evident in the Upper
horizon, which may be due to a combination of sparser drill hole coverage, differing controls on mineralisation and lode
geometry.

Based on these conclusions, Indicator numerical modelling was used (in massive domains) to capture spatially
continuous sub-domains of zinc (including lead) and copper. These sub-domains were exclusive of each other and used
as hard boundaries in the massive sulphide geological envelopes, whereby zinc and lead were composited and estimated
within the zinc sub-domain, and copper was composited and estimated within the copper sub-domain.

Correlation analysis indicated gold, silver and iron were similarly distributed across massive sulphide domains and were
therefore composited and estimated inside this boundary, with no sub-domaining undertaken.

To maintain continuity, some material below 0.6% Zn and 0.6% Cu has been included in the lodes.

Historical underground mining documentation, stope and development void locations, preferential orientations, and
widths were also used to ground-truth interpretations of higher grade/tenor zinc and copper sub-domains and verify the
selected hard boundaries which would control estimated metal outcomes.

Weathering and oxidation horizons have had negligible impact on base and precious metals, with all mineralised domains
lying within fresh material.
Copper stringer mineralisation

In addition to copper in massive sulphide domains, copper occurs as footwall and hanging wall disseminated and stringer
sulphide mineralisation.

Confidence is considered moderate to high in the geological interpretation and continuity of the copper stringer
mineralisation and that any alternate interpretations would be unlikely to result in significant difference to lodes spatially
and/or volumetrically.

Copper-rich domains within the disseminated and stringer sulphides showed poor continuity due to the nature and
geological setting for this style of sulphide mineralisation.

`

35

Criteria JORC Code explanation Commentary

Sampling of core was based primarily on the presence and/or abundance of sulphides, with sampling of massive
sulphides prioritised over sampling of disseminated or stringer sulphide mineralisation. Consequently, sample coverage
of stringer mineralisation is more variable and wider spaced.

Nature of the data used and of any
assumptions made.

Assumptions with respect to mineralisation continuity (plunge, strike and dip) within the underground Mineral Resource
were drawn directly from:
o
Drill hole lithological logging
o
Drill hole core photography for all Develop drilling and (where available) for historical drilling
o
Mapped and interpreted northwest trending major faults
o
Variably spaced resource definition drilling, nominally 20 m × 20 m centres in the upper and central area of the
deposit, with the down-plunge lens extensions nominally 40 m × 40m and 60 m × 60 m intersecting mineralisation
at depth
o
Underground void shapes of development and stopes
o
Underground production drilling (sludge and face sampling) - used to assist with modelling of mineralisation
geometries but not used for MRE purposes
o
Historical resource and mining documentation/records/files.

The effect, if any, of alternative
interpretations
on
Mineral
Resource estimation.

Alternative interpretations and additional drill hole information would be condidered unlikely to result in significant spatial
or volume variations. This conclusion was based on extensive geological data from historical mining (mapping, logging),
observations from site inspections, style of deposit and extensive historical mining of the lenses/plunge orientations which
demonstrated similar lode geometries, widths and dip/plunge continuity across the deposit.

The use of geology in guiding and
controlling
Mineral
Resource
estimation.

The geological sequence, sulphide mineralisation styles and major structural faults defined the geospatial framework for
interpretation of mineralisation domains, which were used to control interpolation of grades.

The factors affecting continuity
both of grade and geology.

Continuity of the base metal lenses is affected, at a mining scale, by localised fault offsets which also may truncate lens
extents (across dip).
Dimensions
The extent and variability of the
Mineral Resource expressed as
length (along strike or otherwise),
plan width, and depth below
surface to the upper and lower
limits of the Mineral Resource.

The mineralisation extent of the Woodlawn deposit comprises three mineralised horizons (Lower, Middle and Upper)
hosting thirteen known massive sulphide lenses occur within a 400 m × 600 m wide and 900 m deep northwest plunging
corridor which remains open at depth. Across-strike widths vary from 1 m to <35 m.

The MRE for zinc, lead, copper, silver and gold on which this Table 1 is based has the following extents:
o
Above 1800 mRL
o
From 8750 mE to 10050 mE
o
From 18950 mN to 19850 mN.
Estimation
and
modelling techniques

The nature and appropriateness of
the estimation technique(s) applied
and key assumptions, including
treatment of extreme grade values,
domaining,
interpolation
parameters and maximum distance
of extrapolation from data points. If
a computer assisted estimation
method was chosen include a
description of computer software
and parameters used.

Domain intercepts were flagged and implicitly modelled in Seequent Leapfrog GEO™ software.

Interpretation was a collaborative process with Develop geologists to ensure Entech’s modelling approach aligned
with mine restart objectives, represented observations and understanding of geological and mineralisation controls.

Domain interpretations used all available drill hole data with sludge and wall chip samples excluded from downhole
compositing. All interpreted intervals were snapped to diamond sample intervals prior to construction of implicitly
modelled 3D lode solids.

All drill hole samples and block model blocks were coded for lens and oxidation domain.

Compositing approaches were selected to honour the mineralisation style, geometry, expected grade variability and
potential mining selectivity.

Drilling samples were composited to 1 m lengths honouring lode domain boundaries. The Seequent Leapfrog length
composite (best fit) was used, whereby any small uncomposited intervals (residuals) were divided evenly between
the composites.

`

36

Criteria JORC Code explanation Commentary

Composites were declustered and reviewed for statistical outliers and top-caps were applied by domain and variable.
Top-caps were applied where outliers were determined to be statistical and spatial in nature.

Exploratory Data Analysis (EDA), variogram modelling and estimation validation was completed in GeoAccess,
Supervisor V8.8 and Isatis™.

Linear estimation techniques were considered suitable due to the style of deposit and density of available data.

Variography analyses for zinc, copper, lead, gold, silver and iron were completed on declustered and capped
downhole composites grouped by mineralisation style (massive, stringer) and horizon (Lower, Middle, Upper).
Robust variogram models with a low to moderate nugget for zinc and lead (6–18%), copper (10%), gold and silver
(6–22%) were delineated and used in Kriging Neighbourhood Analysis (KNA) to determine parent cell estimation
size and optimise search neighbourhoods. Variogram and search parameters for zinc were applied to lead due to
statistical and spatial similarities. It should be noted that although the maximum continuity modelled in the variograms
ranged from 30 m to 150 m, the bulk of spatial variability (~55%) and subsequent kriging weights was applied within
30–50 m in the Lower and Middle horizons and 10–30 m in the Upper horizon.

Maximum ranges of continuity were:
o
Zinc and lead. Lower 150 m, Middle 60 m, Upper 20 m
o
Copper. Lower 60 m, Middle 130 m, Upper 30 m
o
Gold and silver. Lower 165 m, Middle 135–150 m, Upper 120 m.

Search neighbourhoods broadly reflected the direction of maximum continuity within the plane of mineralisation,
ranges, and anisotropy ratios from the variogram models. Neighbourhood parameters were optimised through
Kriging Neighbourhood Analysis (KNA) and validation of interpolation outcomes.

All estimation was completed within respective mineralisation domains:
o
Silver ppm, gold ppm and iron percent. Sulphide domains (massive and stringer).
o
Zinc percent and lead percent. Zinc subdomain inside massive sulphide domain.
o
Copper percent. Copper subdomain inside massive sulphide domain and also in stringer domains.

No other hard boundaries were applied (i.e., weathering profile).

Maximum distance of extrapolation from data points was approximately half the drill hole data spacing. With this
approach, the maximum distance blocks estimated from known data points was ~60 m.

The availability of check estimates,
previous estimates and/or mine
production records and whether the
Mineral Resource estimate takes
appropriate account of such data.

A check estimate was undertaken for zinc, copper and gold on a selection of domains using Inverse Distance
Squared (IDW) with < 3% grade variance for zinc, copper and an average of 8% increase in gold grade for the IDW
outcome.

The most recent Mineral Resource documentation (Entech, 2023) stated a global underground Mineral Resource
prepared under the guidelines of the JORC Code, which includes a high-grade underground Mineral Resource of
10.3 Mt at A$386/t (Net Smelter Return), grading at 6.1% Zn%, 2.2% Pb, 1.8% Cu, 0.5 ppm Au and 47.2 ppm Ag.

By comparison, approaches to domaining, classification, RPEEE (sterilisation and NSR) undertaken by Entech for
this MRE are similar to the approaches for Entech (2022 and 2023), with new drilling, capital development and mine
planning studies considered for this MRE update.

The MRE accounts for historical mined voids, material sterilised by historical mining and operational challenges
experienced by Heron prior to closure in 2020.

The assumptions made regarding
recovery of by-products.

No assumptions were made with respect to by-product recovery.

Estimation of deleterious elements
or other non-grade variables of
economic significance (e.g. sulfur
for
acid
mine
drainage
characterisation).

Both iron and sulphur require monitoring for mine planning and metallurgical amenability purposes and were included in
the MRE block model.

Iron was composited, estimated and validated using the same process as for value elements of gold and silver.

Sulphur was selectively assayed and there were insufficient sulphur data to support estimation. Approximately 23% of
samples (3,172 samples from 13,713 samples) within the mineralised domains have a S% value together with analysis
for Zn%, Pb%, Cu% and Fe%. Multi-element regression analysis was undertaken on raw samples with existing sulphur

`

37

Criteria JORC Code explanation Commentary
determinations to establish a regression relationship that could be applied to the block model to assign an ‘indicative’
S% value on a block-by-block basis. Entech derived a multi-element regression equations for sulphur, resulting in a 94%
correlation for the lower horizon and 97% for both the middle and upper horizons. The formulas use coefficients for zinc,
lead, copper and iron:
Lower Horizon Sulphur % = -3.7066 + Zn % x 0.5680 + Pb % x 0.5121 + Cu % x -0.0740 + Fe % x 1.1026
Middle Horizon Sulphur % = -4.2010 + Zn % x 0.6022 + Pb % x 0.1311 + Cu % x -0.1056 + Fe % x 1.2788
Upper Horizon Sulphur % = -1.6336 + Zn % x 0.3783 + Pb % x 0.3130 + Cu % x -0.3197 + Fe % x 1.2238

The regression formula was applied in the block model on a block-by-block basis, using the estimated zinc, lead, copper
and iron values for the individual blocks.

No assumptions were made within the MRE with respect to other deleterious variables or by-products.

In the case of block model
interpolation, the block size in
relation to the average sample
spacing and the search employed.

Block sizes used were 5 mE × 10 mN and 10 mRL with sub-blocks of 0.625 mE × 0.3125 mN and 0.3125 mRL. The
parent block size was selected to provide suitable volume fill given the available data spacing and mining selectivity. The
drilling data spacing varies from nominal 20 m × 20 m spacing in the central area of the deposit and increases to
exploration spacing of ~100 m to test continuity of mineralisation at depth. Block model origins were selected to correlate
with the Heron 2019 block model.

A two-pass estimation strategy was used, whereby search ranges reflected variogram maximum modelled continuity and
a minimum of 6, maximum of 12 composites for zinc, lead and copper, and a minimum of 6, maximum of 16 for gold and
silver. The second search reduced the minimum composite required in the neighbourhood to 2 or 4 (informed by KNA
outcomes), all other parameters (e.g., range and maximum composites) remained the same. All blocks which did not
meet the criteria to trigger an estimate remained unestimated and were excluded from classification.

Any assumptions behind modelling
of selective mining units.

No selective mining units were assumed for this MRE update.

Any assumptions about correlation
between variables.

Correlation analyses was completed for the Lower, Middle and Upper massive sulphide domains which contributed to
the grouping of elements for compositing and estimation within these domains.

There was insufficient sample population for estimation of sulphur; however, there is a strong positive correlation between
iron and sulphur. A sulphur regression was calculated in the final block model using estimated grades for zinc, lead,
copper and iron grades as inputs based on strong positive correlation.

Grouping of elements for compositing and estimation was based on the following positive correlations:
o
Zinc + lead
o
Gold + silver + iron
o
Copper.

Description of how the geological
interpretation was used to control
the resource estimates.

All estimation was completed within either a geologically defined massive sulphide domain (silver, gold, iron) or within
higher tenor zinc or copper sub-domains inside the massive domains. Hard boundaries for estimation were:
o
Silver ppm, gold ppm and iron percent: Massive sulphide domain
o
Zinc percent and lead percent: Zinc subdomain inside massive sulphide domain
o
Copper percent:
o
Copper subdomain inside massive sulphide domain
o
Stringer domain to footwall of massive domain.

Note that 47 massive and 27 stringer domains were interpreted across the deposit. The updated and new domains were
grouped as per historical nomenclature into lenses A, B, C, D, E, G, H, I, J, K and L.

For the purposes of Exploratory Data Analysis, including variography and kriging neighbourhood analysis for the elements
of zinc, lead, copper, silver, gold and iron, these domains were also grouped by their mineralisation style (massive or
stringer) or by horizon and reflected findings of geospatial, statistical and correlation analysis:

`

38

Criteria JORC Code explanation Commentary
o
Lower: A, B, C, J
o
Middle: D, E, K
o
Upper: G, H, I, L

Geological interpretation of lithology, weathering and structure was not used to control the Mineral Resource estimation
as the domains outlined above represent the key controls on mineralisation at the deposit. Note that interpretations of
lens strike extents included consideration of interpreted structural offsets.

Discussion of basis for using or not
using grade cutting or capping.

Assessment and application of top-capping was undertaken on the zinc, lead, copper, gold and silver variables within
individual (and grouped) domains. Domains were capped to address instances where outliers were defined as both
statistical and spatial outliers, presented below:

Massive domains:
o
Zinc, no caps applied across Lower, Middle, Upper horizons
o
Lead, no caps applied across Lower, Middle, Upper horizons
o
Copper, cap of 15% applied across Lower, Middle, Upper horizons: <2% metal reduction

All stringer domains – zinc 15%, lead 10% and copper 15%:
o
Zinc, caps applied across Lower, Middle, Upper horizons: <1% metal reduction
o
Lead, caps applied across Lower, Middle, Upper horizons: <1% metal reduction
o
Copper, caps applied in Lower Horizon: <1% metal reduction

Individual domains – gold ranging from 4 g/t to 15 g/t:
o
Caps applied in Lower Horizon: 2% metal reduction
o
Caps applied in Middle Horizon: <1% metal reduction
o
Caps applied in Upper Horizon: 4% metal reduction

Individual domains – silver ranging from 100 g/t to 1000 g/t:
o
Caps applied in Lower Horizon: <1% metal reduction
o
Caps applied in Middle Horizon: <1% metal reduction
o
Caps applied in Upper Horizon: 11% metal reduction.

The process of validation, the
checking
process
used,
the
comparison of model data to drill
hole data, and use of reconciliation
data if available.

Global and local validation of the zinc, lead, copper, gold, silver and iron estimated outcomes was undertaken with
statistical analysis, swath plots and visual comparison (cross and long sections) against input data. Global comparison
of declustered and capped composite mean against estimated mean (by domain and variable) highlighted less than 2.5%
variation for zinc, lead, copper. Silver estimated outcome was 4% lower than the global composite mean. Gold estimated
outcome was 8% lower than the global composite mean.

Develop has not commenced production and thus the only reconciliation data are from Heron’s mining of the G lode (in
the months prior to closure) which were not considered suitable for comparison as both mining and milling data during
the months prior to closure were compromised by operational challenges.
Moisture
Whether
the
tonnages
are
estimated on a dry basis or with
natural moisture, and the method of
determination
of
the
moisture
content.

The tonnages were estimated on a dry basis.
Cut-off parameters
The basis of the adopted cut-off
grade(s) or quality parameters
applied.

The MRE is reported exclusive of mineralisation which has been mined and also mineralisation which was considered
sterilised by adjacent mining.

The NSR cut-off of A$100/t is approximately 80% of the break-even stoping cut-off value underpinning the current
Develop Life of Mine Plan (LOMP). The NSR was selected based on discussions with Develop’s engineers and
benchmarked against analogous peer operations (comparable by deposit style, commodities and mine maturity).

The NSR cut-off considers revenue from base metals (zinc, lead, copper - percent) and precious metals (gold, silver -
ppm) and offsets site operating and sustaining capital costs, including underground operating development. Metallurgical
recoveries are factored in the NSR calculation with ‘Cu Ore’ defined as material where zinc < 1%. The base metal and
precious metals used in the NSR calculation all have reasonable potential of being saleable.

For thepurposes of the NSR calculation,assumed metalprices,exchange rates,recoveries and otherpayability

`

39

Criteria JORC Code explanation Commentary assumptions are listed in Table 1. Table 1

==> picture [441 x 91] intentionally omitted <==

  • For the purposes of NSR determination, NSR values were calculated on a block-by-block basis prior to implementing reporting cut-offs.

  • It was noted that the Woodlawn inventory included 8.1 Mt of material adjacent to, or within 10 m, of historical mining voids. The consideration of this material as either sterilised or as a Mineral Resource within the context of Reasonable Prospects for Eventual Economic Extraction (RPEEE) was considered material to MRE outcomes.

  • The process to define material as sterilised or Mineral Resource material included a review of the Mineral Resources within the context of RPEEE. The process included stamping into the block model all estimated blocks within 0–5 m and 5–10 m from open development and stoping voids, running MSO (Mineable Stope Optimiser) on all material in remnant areas and holding discussions with Develop and Entech mining engineers on the likelihood of achieving access, on a lens-by-lens basis.

  • A key assumption underpinning these discussions and caveats to accessing these Mineral Resources included Develop gaining re-entry to sections of historical workings (pre-2014). Entech included or excluded material based on the understanding that a re-entry plan, which includes paste filling of historical voids, is defined and planned for execution as part of the LOMP. The Competent Person reviewed individual lenses against historical and recent (Heron) mining voids, MSO shapes and NSR cut-offs above A$100/t to identify contiguous areas on strike extents, up-dip or down-dip of historical mining which could be considered potentially extractable by Develop within a reasonable timeframe of 15 years.

  • Using this approach approximately ~4.2 Mt of material from lenses A, B, C, E and J were incorporated as remnant Indicated or Inferred Mineral Resources. This comprises 37% of the tonnage in the Woodlawn Mineral Resources. All remaining material (~3.9 Mt) was classified as sterilised, not meeting RPEEE considerations, and is excluded from Mineral Resource tabulations.

  • It is the Competent Person’s opinion that these methods and cut-off grades satisfy the requirements to test, assess and define the Woodlawn Mineral Resources within the context of RPEEE.

  • Mining factors orAssumptions made regarding • Develop plans to implement similar-scale mechanised underground mining methods used previously at Woodlawn. This assumptions possible mining methods, minimum assumption was based on discussions with Develop’s senior geologists and engineers. mining dimensions and internal (or, • The MRE extends nominally 950 m below the topographic surface. Entech considers material at this depth, and at the if applicable, external) mining grades estimated, would fall under the definition of RPEEE (reasonable prospects for eventual economic extraction) in dilution. It is always necessary as an underground mining framework. part of the process of determining • The selected NSR cut-off used for MRE reporting reflect higher costs associated with metal recovery from remnant mining reasonable prospects for eventual areas and would fall within the definition of RPEEE in an underground framework.

  • economic extraction to consider • No mining dilution or cost factors were applied to the estimate.

  • potential mining methods, but the assumptions made regarding mining methods and parameters when estimating Mineral Resources may not always be rigorous. Where this is the case,

  • this should be reported with an

  • The MRE extends nominally 950 m below the topographic surface. Entech considers material at this depth, and at the grades estimated, would fall under the definition of RPEEE (reasonable prospects for eventual economic extraction) in an underground mining framework.

  • • The selected NSR cut-off used for MRE reporting reflect higher costs associated with metal recovery from remnant mining areas and would fall within the definition of RPEEE in an underground framework.

`

40

Criteria JORC Code explanation Commentary
explanation of the basis of the mining
assumptions made.
Metallurgical factors
or
assumptions

The basis for assumptions or
predictions regarding metallurgical
amenability. It is always necessary
as
part
of
the
process
of
determining reasonable prospects
for eventual economic extraction to
consider
potential
metallurgical
methods, but the assumptions
regarding metallurgical treatment
processes and parameters made
when reporting Mineral Resources
may not always be rigorous. Where
this is the case, this should be
reported with an explanation of the
basis
of
the
metallurgical
assumptions made.

Metallurgical recovery factors have been applied within the NSR. Historical metallurgical recovery factors were based on
initial metallurgical testwork during the 2016 feasibility study, a metallurgical review by Mineralis (Ref: Review of
Woodlawn Metallurgical Operations, Mineralis Consultants, April 2020) and later flow process studies conducted by
Heron in 2021 (Ref: Proposed flotation circuit flowsheet and pumping upgrades; high level design and cost estimation,
internal company report, June 2021)

Previous (2022) metallurgical testwork was based on crushing and grinding underground mineralisation from Kate lens
to produce float concentrates for copper, lead and zinc in order to assess recoveries of saleable concentrates for each
metal type. Mineralis observed that zinc performance was the most consistent of the three metals (copper, lead, zinc)
with the lowest outcomes being 50% zinc concentrate at 70% recovery.

Develop has completed additional metallurgical testwork on drill core from the current drilling program; this work is
ongoing and schedule to be completed in mid-2024. Estimated metallurgical recoveries are factored into NSR
calculations.

Both iron and sulphur require monitoring for mine planning and metallurgical amenability purposes. Both variables were
included in the final Mineral Resource block model. There are no known deleterious variables which would materially
affect eventual economic extraction of Mineral Resources.

No factors or assumptions were made within the MRE with respect to other deleterious variables or by-products.
Environmental
factors
or
assumptions

Assumptions
made
regarding
possible
waste
and
process
residue disposal options. It is
always necessary as part of the
process of determining reasonable
prospects for eventual economic
extraction to consider the potential
environmental
impacts
of
the
mining and processing operation.
While
at
this
stage
the
determination
of
potential
environmental impacts, particularly
for a greenfields mine, may not
always be well advanced, the
status of early consideration of
these
potential
environmental
impacts should be reported. Where
these aspects have not been
considered this should be reported
with
an
explanation
of
the
environmental assumptions made.

No environmental factors were applied to the Mineral Resources or resource tabulations.
Bulk density
Whether assumed or determined. If
assumed,
the
basis
for
the
assumptions. If determined, the
method used, whether wet or dry,
the
frequency
of
the
measurements, the nature, size
and representativeness of the
samples.

This MRE contains dry bulk density data which was collected on drill core from 285 holes (between 1981 and 2024).

A total of 3,890 density measurements were available since the 2023 MRE, with approximately 10% of the measurements
falling within massive and stringer mineralisation.

The density samples were located between 18950 mN and 19880 mN, and 8790 mE and 9860 mE, and nominally from
the surface to a depth of 1800 m, providing a representative density profile between mineralised domains, and depth
profile.

The bulk density for bulk material

Density measurements were collected on all samples sent to the laboratory. It was measured using an industry-accepted

`

41

Criteria JORC Code explanation Commentary
must have been measured by methods
that adequately account for void spaces
(vugs, porosity, etc), moisture and
differences between rock and alteration
zones within the deposit.
water immersion density determination method for each sample.

The testing area was inspected by a third-party geology resource geology consultant in December 2018 and reported as
industry standard.

Discuss
assumptions
for
bulk
density estimates used in the
evaluation process of the different
materials.

Multi-element regression analysis using Zn%, Pb%, Cu% and Fe% was undertaken on raw samples with existing density
determinations to establish a regression relationship that could be applied to the block model to assign a density value
on a block-by-block basis.

Each horizon comprised variable mineral relationships and slightly different regression outcomes, therefore a muti-variate
regression was determined and applied by mineralisation Horizon (Lower, Middle, Upper). A 94% correlation between
the original density value and predicted value was noted prior to utilisation of the following formulas within the MRE.
o
Lower Horizon = 2.4824 + Zn % x 0.0198 + Pb % x 0.0561 + Cu % x -0.0057 + Fe % x 0.0425
o
Middle Horizon = 2.4039 + Zn % x 0.0262 + Pb % x 0.0361 + Cu % x 0.0069 + Fe % x 0.0493
o
Upper Horizon = 2.5504 + Zn % x 0.0267 + Pb % x 0.0205 + Cu % x -0.0051 + Fe % x 0.0446
Classification
The basis for the classification of
the Mineral Resources into varying
confidence categories.

The Woodlawn underground zinc-copper deposit contains Measured, Indicated and Inferred Mineral Resources.

Mineral Resources were classified based on geological and grade continuity confidence drawn directly from:
o
Drill hole methodology, data quality, spacing and orientation
o
Geological domaining
o
Estimation quality parameters
o
Historical mining strike lengths, widths, stope orientations and remnant mining areas.

Measured Mineral Resources were defined where a high level of geological confidence in geometry, continuity, and grade
was demonstrated, and were identified as areas where:
o
Blocks were well supported by drill hole data, with drilling averaging a nominal 15 × 15 m or less between drill holes
o
Lenses for G and Kate (K) (Measured) were intercepted on two sublevels and blocks are within 20–40 m from a lens
development drive
o
Estimation quality, slope of regression above 0.8.

Indicated Mineral Resources were defined where a moderate level of geological confidence in geometry, continuity, and
grade was demonstrated, and were identified as areas where:
o
Blocks were well supported by drill hole data, with drilling averaging a nominal 40 × 40 m or less between drill holes
o
Blocks were interpolated with a neighbourhood informed by a minimum of 6 samples.

Inferred Mineral Resources were defined where a lower level of geological confidence in geometry, continuity and grade
was demonstrated, and were identified as areas where:
o
Drill spacing was averaging a nominal 60 m or less, or where drilling was within 80 m of the block estimate
o
Blocks were interpolated with a neighbourhood informed by a minimum of 2 samples.

Mineralisation within the model which did not satisfy the criteria for classification as Mineral Resources remained
unclassified.

Whether appropriate account has
been taken of all relevant factors (ie
relative
confidence
in
tonnage/grade
estimations,
reliability of input data, confidence
in continuity of geology and metal
values, quality, quantity and

Consideration has been given to all factors that are material to Mineral Resource outcomes, including but not limited to
confidence in volume and grade delineation, continuity and preferential orientation mineralisation; quality of data
underpinning Mineral Resources, mineralisation continuity experienced during previous underground operations, nominal
drill hole spacing and estimation quality (conditional bias slope, number of samples, distance to informing samples).

`

42

Criteria JORC Code explanation Commentary
distribution of the data).

Whether the result appropriately
reflects the Competent Person’s
view of the deposit.

The delineation of Measured, Indicated and Inferred Mineral Resources appropriately reflects the Competent Person’s
view on continuity and risk at the deposit.
Audits or reviews
The results of any audits or reviews
of Mineral Resource estimates.

Internal audits and peer review were undertaken by Entech with a focus on independent resource tabulation, block model
validation, verification of technical inputs, and approaches to domaining, interpolation, and classification.
Discussion
of
relative
accuracy/confidence

Where appropriate a statement of
the
relative
accuracy
and
confidence level in the Mineral
Resource
estimate
using
an
approach or procedure deemed
appropriate by the Competent
Person.
For
example,
the
application
of
statistical
or
geostatistical
procedures
to
quantify the relative accuracy of the
resource within stated confidence
limits, or, if such an approach is not
deemed appropriate, a qualitative
discussion of the factors that could
affect the relative accuracy and
confidence of the estimate.

The MRE is globally representative of zinc, lead, copper, gold and silver Mineral Resources; however, there is uncertainty
relating to local representation of volume and grade in Indicated and Inferred Mineral Resources due to the localised fault
structures which terminate and/or offset mineralisation.

Local variances to the tonnage, grade, and metal distribution are expected with further definition drilling. It is the opinion
of the Competent Person that these variances will not significantly affect economic extraction of the deposit.

The MRE is considered fit for the purpose for mine restart objectives that include both strategic and operational mine
planning activities.

The
statement
should
specify
whether it relates to global or local
estimates, and, if local, state the
relevant tonnages, which should be
relevant to technical and economic
evaluation. Documentation should
include assumptions made and the
procedures used.

The Mineral Resource statement relates to global tonnage and grade estimates.

No formal confidence intervals nor recoverable resources were undertaken or derived.

These
statements
of
relative
accuracy and confidence of the
estimate should be compared with
production data, where available.

The mine has transitioned back to care-and-maintenance following a period of intensive drilling and capital development
in 2022-2023. No production stoping was underway at the time of MRE compilation.

==> picture [593 x 54] intentionally omitted <==

43

Section 4 Estimation and Reporting of ore reserves

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral Resource
estimate for conversion
to Ore Reserves

Description
of
the
Mineral
Resource estimate used as a
basis for the conversion to an Ore
Reserve.

The Ore Reserve is based on Mineral Resource estimates by Entech as contained in this announcement.

Clear statement as to whether the
Mineral Resources are reported
additional to, or inclusive of, the
Ore Reserves.

Mineral Resources are inclusive of Reserves.
Site visits
Comment
on
any
site
visits
undertaken by the Competent
Person and the outcome of those
visits.

The Competent Person (Tristan Sommerford, Group Principal Mining Engineer) is a full time employee of Develop Global
and has visited site numerous times being during the Reserve process and is comfortable with the viability of the Ore
Reserve.

If no site visits have been
undertaken indicate why this is the
case.
Study status
The type and level of study
undertaken to enable Mineral
Resources to be converted to Ore
Reserves.

Feasibility level estimation of upfront capital costs, all other costs, modifying factors and parameters are completed to
Feasibility level, resulting in a mine plan that is technically achievable and economic using the determined Ore Reserve.

The Code requires that a study to
at least Pre-Feasibility Study level
has been undertaken to convert
Mineral
Resources
to
Ore
Reserves. Such studies will have
been carried out and will have
determined a mine plan that is
technically
achievable
and
economically viable, and that
material Modifying Factors have
been considered.

Ore Reserves are declared based upon a Study that included mine plans and mine designs that are deemed technically
achievable and have been tested for economic viability using input costs, metallurgical recovery and expected long term
metal prices, after due allowances for royalties.
Cut-off parameters
The basis of the cut-off grade(s) or
quality parameters applied.

Calculated value is based on a Net Smelter Return (NSR) to take account of the revenue from the copper, lead, zinc,
gold and silver metals allowing for metallurgical recoveries and payabilities for each and then offsets for royalties,
shipping and smelter deductions (penalty elements). A stoping cut-off value of $120/t ore and a development ore cut-off
value of $60/t ore has been applied based on the NSR inputs and relevant cost estimates provided by Develop Global
Ltd.

`

==> picture [593 x 12] intentionally omitted <==

44

Criteria JORC Code explanation Commentary
Mining factors or
assumptions

The method and assumptions
used as reported in the Pre-
Feasibility or Feasibility Study to
convert the Mineral Resource to
an Ore Reserve (i.e. either by
application of appropriate factors
by optimisation or by preliminary or
detailed design).

Optimisations have been completed by Develop Global to generate a detailed mine design and schedule. The mining
method selected is longhole stoping with backfill using paste fill. Stope access and extraction is a combination of
longitudinal and transverse orientation. Stoping is primarily top-down but some instances of bottom-up sequencing exist.

The
choice,
nature
and
appropriateness of the selected
mining method(s) and other mining
parameters including associated
design issues such as pre-strip,
access, etc.

Geotechnical analysis by Beck Engineering has been used from previous Feasibility Studies to confirm the mining
method and determine appropriate stope sizes, sequences and ground support requirements for incorporation into the
mine design and schedule.

The assumptions made regarding
geotechnical parameters (eg pit
slopes, stope sizes, etc), grade
control and pre-production drilling.

Geotechnical parameters were taken from 2016 Feasibility study conducted by Beck Engineering. The underground
designs conform to these recommendations.

The major assumptions made and
Mineral Resource model used for
pit and stope optimisation (if
appropriate).

The Mineral Resource model used for optimisation was as detailed previously.

The mining dilution factors used.

Stope designs expand based on factors outlined in geotechnical studies and are controlled by the ground that the material
sits, generally 0.5 m into the hangingwall and 0.5 m into the footwall to account for blasting dilution and a 3% dilution
factor at zero grade has been applied for every stope wall adjacent to paste fill.

The mining recovery factors used.

A mining recovery factor of 95% was applied to all stoping activities and 100% to all ore drives.

Any minimum mining widths used.

A minimum mining with of 3.0 mW was applied.

The manner in which Inferred
Mineral Resources are utilised in
mining studies and the sensitivity
of the outcome to their inclusion.

Mine designs inclusive of Inferred resource material were removed from the plan and the Ore Reserve is technically and
economically viable without them.

The infrastructure requirements of
the selected mining methods.

Mobilisation, establishment and all site and mine infrastructure to support underground mining has been accounted for
in the study. The underground mine design includes suitable infrastructure to support the mining method including an
access decline, ventilation shaft, pump stations and electrical substations.
Metallurgical factors or
assumptions

The
metallurgical
process
proposed and the appropriateness
of that process to the style of
mineralisation.

Whether the metallurgical process
is well-tested technology or novel
in nature.

The
nature,
amount
and
representativeness
of

The process recovery is based on the plant installed by Heron Resources Limited.

Some changes have been designed including:

Installation of a tertiary crusher and increased crushed ore storage

treatment of process water to reduce effect on flotation separation

Simplication of flotation circuit flows in line with proven historical Denehurst operations

Historical metallurgical test work from prior Denehurst operations, Heron Feasbility studies and restart optimisation
work, as well as new testwork on Develop drilling campaigns aligns with flowsheet strategy Metallurgical
assumptions for this Ore Reserve are based on historical achievements as Woodlawn for the relevant copper or
polymetallic ore types.

`

==> picture [593 x 12] intentionally omitted <==

45

Criteria JORC Code explanation Commentary
metallurgical
test
work
undertaken, the nature of the
metallurgical domaining applied
and
the
corresponding
metallurgical
recovery
factors
applied.

Any assumptions or allowances
made for deleterious elements.

The existence of any bulk sample
or pilot scale test work and the
degree to which such samples are
considered representative of the
orebody as a whole.

For minerals that are defined by a
specification, has the ore reserve
estimation been based on the
appropriate mineralogy to meet
the specifications?
Environmental
The status of studies of potential
environmental
impacts
of
the
mining and processing operation.
Details
of
waste
rock
characterisation
and
the
consideration of potential sites,
status
of
design
options
considered and, where applicable,
the status of approvals for process
residue storage and waste dumps
should be reported.

Major Mine approval was received on 4 July 2013 from the NSW Minister for Planning and Infrastructure under Section
75J of the EP & A Act for both the tailings retreatment and underground mine

Tailings storage will be within an already approved and permitted facility. Storage of tailings will be reduced due to the
incorporation of a paste plant, which will place cemented tailings back underground in voids.
Infrastructure
The
existence
of
appropriate
infrastructure: availability of land
for plant development, power,
water, transportation (particularly
for bulk commodities), labour,
accommodation; or the ease with
which the infrastructure can be
provided, or accessed.

The operation uses the existing access road.

New site buildings including processing plant, offices and car park have been constructed and utilized previously by
Heron Resources Limited

Power is supplied from the grid which has sufficient capacity. The current substation on site also has sufficient spare
capacity to service the operation.

Water is be sourced from surface site and underground water plus the Willeroo borefield with potable water being
generated from reverse osmosis plant.
Costs
The derivation of, or assumptions
made, regarding mineed capital
costs in the study.

The methodology used to estimate
operating costs.

Allowances made for the content
of deleterious elements.

The derivation of assumptions
made of metal or commodity
price(s), for the principal minerals
and co- products.

Capital costs for the construction of the processing plant have been provided by GR Engineering Services.

The operating costs used for the economic assessment are based on the site’s 2024 Business Plan.

Capital expenditure requirements are based on the site’s 2024 Business Plan.

Royalties that are applied by the NSW government have been taken into account.

All calculations have been undertaken in Australian dollars.Processing operating costs were determined based on:

`

==> picture [593 x 12] intentionally omitted <==

46

Criteria JORC Code explanation Commentary

The source of exchange rates
used in the study.

Derivation
of
transportation
charges.

The basis for forecasting or source
of treatment and refining charges,
penalties for failure to meet
specification, etc.

The allowances made for royalties
payable, both Government and
private.
Revenue factors
The derivation of, or assumptions
made regarding revenue factors
including head grade, metal or
commodity
price(s)
exchange
rates, transportation and treatment
charges, penalties, net smelter
returns, etc.

The derivation of assumptions
made of metal or commodity
price(s), for the principal metals,
minerals and co-products.

A Net Smelter Return (NSR) was used for revenue. The NSR takes revenue from the copper, zinc, lead, gold and silver
metals allowing for metallurgical recoveries and payabilities for each and then offsets royalties, shipping and smelter
deductions (penalty elements).

The following prices were applied to determine financial viability from MRE inputs:
o
Copper - US$10,576 / t
o
Lead - US$2,183 / t
o
Zinc - US$2,910 / t
o
Silver – US$28 / oz
o
Gold - US$2,517 / oz
o
USD:AUD Exchange rate – 0.69

The Competent Person considers this to be an appropriate commodity price assumption based on the current level of
study and price environment at the time of the completion of the Ore Reserve work.
Market assessment
The demand, supply and stock
situation
for
the
particular
commodity, consumption trends
and factors likely to affect supply
and demand into the future.

A
customer
and
competitor
analysis
along
with
the
identification
of
likely
market
windows for the product.

Price and volume forecasts and
the basis for these forecasts.

For
industrial
minerals
the
customer specification, testing and
acceptance requirements prior to a
supply contract.

A market study has been provided by AFX Commodities for the purpose of this FS.

The quality of the concentrate to be produced from Woodlawn is within the range of peers within the Australian market,
such as Aurelia and 29 Metals.
Economic
The inputs to the
economic
analysis
to
produce
the
net
present value (NPV) in the study,
the source and confidence of
these economic inputs including
estimated inflation, discount rate,
etc.

NPV ranges and sensitivity to
variations
in
the
significant

The Ore Reserve estimate is supported by a financial model that has been prepared from operating cost inputs to a
Feasibility level. The model covers the current 10-year life of the Mine.

All major cost inputs have been sourced from contractors and suppliers.

A discount rate of 7% has been applied.

The resulting NPV and IRR is positive and sensitivity analysis has been completed for commodity price movements.

`

==> picture [593 x 12] intentionally omitted <==

47

Criteria JORC Code explanation Commentary
assumptions and inputs.
Social
The status of agreements with key
stakeholders and matters leading
to social licence to operate.

The Woodlawn deposit is located within the land owned by Veolia Environmental Services Pty Ltd (Veolia). There has
been community consultation including government agencies, local government, the community and non-government
stakeholders.
Other
To the extent relevant, the impact
of the following on the mine and/or
on
the
estimation
and
classification of the Ore Reserves:

Any identified material naturally
occurring risks.

The status of material legal
agreements
and
marketing
arrangements.

The
status
of
governmental
agreements and approvals critical
to the viability of the mine, such as
mineral tenement status, and
government
and
statutory
approvals.
There
must
be
reasonable grounds to expect that
all
necessary
Government
approvals will be received within
the timeframes anticipated in the
Pre-Feasibility or Feasibility study.
Highlight
and
discuss
the
materiality
of
any
unresolved
matter that is dependent on a third
party on which extraction of the
reserve is contingent.

No material naturally occurring risks have been identified for the mine

It is expected that future agreements and Government approvals will be granted in the necessary timeframes for the
successful implementation of the mine.

There are no known matters pertaining to any third parties to affect the development of the mine.
Classification
The basis for the classification of
the Ore Reserves into varying
confidence categories.

Whether the result appropriately
reflects the Competent Person’s
view of the deposit.

The proportion of Probable Ore
Reserves that have been derived
from Measured Mineral Resources
_(if any). _

Classification of the Ore Reserve is based on the Measured and Indicated Mineral Resource classification only.

The Measured Mineral Resource has been converted to a Proved Ore Reserve.

The Indicated Mineral Resource has been converted to a Probable Ore Reserve.

The result appropriately reflects the Competent Person’s view of the deposit.
Audits or reviews
The results of any audits or
reviews of Ore Reserve estimates.

The Ore Reserve estimate has not been independently audited or reviewed.
Discussion of relative
accuracy/ confidence

Where appropriate a statement of
the
relative
accuracy
and
confidence
level
in
the
Ore
Reserve
estimate
using
an
approach or procedure deemed
appropriate by the Competent
Person.
For
example,
the

The mine designs, schedule and financial model for the Ore Reserve have been completed to a Feasibility standard with
a better than +/- 25% level of confidence.

A degree of uncertainty is associated with geological estimates and the Ore Reserve classification reflects the level of
confidence in the Mineral Resource.

There is a degree of uncertainty regarding estimates of modifying mining factors, geotechnical and processing
parameters that are of a confidence level reflected in the level of the study.

There is a degree of uncertainty in the commodity price used however the Competent person(s) are satisfied that the

`

==> picture [593 x 12] intentionally omitted <==

48

  • Criteria JORC Code explanation Commentary application of statistical or assumptions used to determine the economic viability of the Ore Reserve are based on reasonable current data. The geostatistical procedures to Mine is sensitive to adverse movements in commodity prices and/or exchange rates. quantify the relative accuracy of the reserve within stated confidence limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the factors which could affect the relative accuracy and confidence of the estimate.

  • The statement should specify whether it relates to global or local estimates, and, if local, state the relevant tonnages, which should be relevant to technical and economic evaluation. Documentation should include assumptions made and the procedures used.

  • Accuracy and confidence discussions should extend to specific discussions of any applied Modifying Factors that may have a material impact on Ore Reserve viability, or for which there are remaining areas of uncertainty at the current study stage.

  • It is recognised that this may not be possible or appropriate in all circumstances. These statements of relative accuracy and confidence of the estimate should be compared with production data, where available.

==> picture [593 x 12] intentionally omitted <==

`

49