- Sulphur Springs Zinc Copper Project, WA

Significant increase in fresh ore Resource paves way for revised economic study

Project and Reserve update set for end of this month; Drilling hits thick high-grade mineralisation outside current Resource

Highlights

  • Metallurgical test work shows ~1.75Mt of material previously classified as transitional ore can be reclassified as fresh ore; This is a 32% increase in fresh ore Resources

  • The additional fresh ore adds significant upside to the economics of Sulphur Springs because it will result in the production of more marketable/saleable concentrates

  • The increase in fresh ore Resources will form part of the revised economic study and updated Reserve estimate set for release at the end of this month

  • Re-testing of the transitional zinc material, which historically produced a low-quality concentrate achieves >50% zinc-in-concentrate

  • The processing flowsheet has also been optimised from prior studies to reduce complexity, improve stability and concentrate quality

  • Drilling has intersected extremely high-grade zinc mineralisation below the Eastern Lens; Results include:

o 19.0m @ 20.0% Zn, 0.6% Cu, 23.3gpt Ag & 0.5gpt Au

  • The known mineralisation has been further extended below the Eastern and Western lenses

Develop (ASX: DVP) is pleased to announce highly significant metallurgical results with the potential to substantially impact the economics of its Sulphur Springs zinc-copper project in WA’s Pilbara.

The successful test work has resulted in 1.75 million tonnes of Resource material which was classified as transitional ore now being reclassified as fresh ore. This increases the total fresh ore Resource by 32 per cent to 8.65 million tonnes.

This is highly beneficial for the project because the nature of the fresh ore means it can be used to make a concentrate which is simpler to process and more valuable than the concentrate which results from processing transitional ore.

These results will form part of an updated study on the project’s economics, including a new Reserve estimate, which is set for release later this month.

Develop is also pleased to announce a host of strong drilling results from outside the current Resource at Sulphur Springs. The Resource stands at 17.4Mt at 5.8% Zn, 1.0% Cu, 0.3% Pb, 21.0gpt Ag & 0.2gpt Au[1] .

Develop Managing Director Bill Beament said: “Sulphur Springs goes from strength to strength with every piece of technical work we do.

“The drilling, the metallurgical test work, the mine planning and the financial studies all show that this project is tracking well towards a development decision. It has scale, it has the metals needed for the energy transition and it is perfectly located in the Tier-1 jurisdiction of the Pilbara.

“The imminent revised feasibility study and the updated Reserve estimate will reflect the outstanding results of this work, paving the way for us to unlock the value of this excellent asset.

“We took the time to complete a comprehensive review of historical metallurgical test work and undertook an extensive range of new test work. This has identified additional fresh ore which we can include in the underground mine plan.

“In addition, test work on the transitional concentrate has demonstrated that this is expected to be commercially attractive to a range of customers and represents another important value-adding step for the project”.

Metallurgical Update

Following a review of historical and recent metallurgical test work, a refined definition of transitional and fresh geometallurgical domains has been identified at the Sulphur Springs deposit. This work has indicated that approximately 1.75Mt of material previously classified as transitional ore can be reclassified as fresh (hypogene) ore.

Resource
Category
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)¹
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)¹
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)¹
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)¹
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)¹
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)¹
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)¹
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)¹
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Indicated Oxide 209
$381
4.2
0.1
0.3
18.9
0.1
Transitional 4,941
$314
1.2
0.3
6.1
22.5
0.1
Fresh 7,247
$299
1.1
0.3
5.4
21.5
0.1
Sub-total
12,398
$307
1.2
0.3
5.6
21.8
0.1
Inferred Fresh
1,401
$249
0.2
0.5
6.4
38.4
0.2
Sub-total
1,401
$249
0.2
0.5
6.4
38.4
0.2
GRAND TOTAL
13,798
$301 1.1 0.3 5.7 23.5 0.2

Table 1: 2023 Reclassified Sulphur Springs MRE

Resource
Category
Metallurgical
Domain
Tonnes
(kt)
NSR
($A/t)¹
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR
($A/t)¹
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR
($A/t)¹
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR
($A/t)¹
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR
($A/t)¹
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR
($A/t)¹
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR
($A/t)¹
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR
($A/t)¹
Cu %
Pb %
Zn%
Ag g/t
Au g/t
2022 MRE Sub-total
13,760
$298
1.1
0.3
5.7
23.5
0.2
Reclassified
Material
Transitional -1,714
$311
1.2
0.3
5.7
22.6
0.2
Fresh 1,752
$295
1.0
0.3
5.6
21.7
0.1
2023 MRE Sub-total
13,798
$301
1.1
0.3
5.7
23.5
0.2
Nett Change
38
$303 1.1 0.3 5.7 22.2 0.1

Table 2: Key changes 2022 MRE Vs 2023 MRE

Key changes in the Mineral Resource block model due to the reclassification of Transitional to Fresh material in the 2023 block model update:

  • 1,714kt less Transitional material

  • 1,752kt more Fresh material (32% increase)

  • Net increase of 38kt from 2022 to 2023

The reclassification is characterised by cleanly producing separate Cu and Zn concentrates.

Hole ID Feed - %
Feed - %

Cu Conc -
Cu Conc - Cu Conc - Cu Conc - Zn Conc - Zn Conc -
Cu Zn %Cu Cu Rec % %Zn Zn Rec % % Zn Zn Rec %
SSD054 2.9 3.4 31 91 0.6 1.9 54 95
SSD057 1.8 5.1 28 93 1.1 1.6 51 95
SSD064 1.5 8.4 31 78 1.8 1.1 53 91
SSD052 0.2 12.6 18 38 7.3 0.4 54 96
SSD055 1.7 13.6 18 88 8.9 5.7 50 92
SSD060 1.2 4.7 27 81 0.9 1.1 51 93
SSD061 4.3 2.9 31 93 0.4 2.8 55 92
SSD062 4.5 2.2 32 92 0.3 2.0 51 92
SSD065B 2.4 4.1 32 90 0.6 1.0 51 95
SSD068 5.3 1.0 32 92 0.3 5.7 35 62
SSD073 0.2 15.4 12 65 11.9 0.8 50 92
SSD087A 4.6 1.9 31 89 0.6 4.2 50 88
SSD082 2.1 6.8 27 76 4.2 3.9 50 92
SSD076 9.1 5.4 32 95 1.5 7.3 51 88

Table 3: Metallurgical performance of reclassified transitional zone drill holes

Transitional Zn ore is selectively treated based on a Zn to Cu ratio and will produce a single Zn concentrate. Re-testing of the historically poor recovery zones achieves concentrate grades between over 50% Zn at over 88% recovery, with conventional reagents and conditions (see Figure 2). Transitional Cu ore is also treated based on Cu to Zn ratio and produces a single Cu concentrate.

==> picture [495 x 266] intentionally omitted <==

Figure 2: Recleaner flotation tests on transitional Zn ore

The updated metallurgy outcomes are exceptional and produce a marketable product via a simple conventional flowsheet with many potential cost (operating and capital) and environmental benefits.

The Sulphur Springs processing flowsheet has also been optimised from prior studies to reduce complexity and improve stability and quality. Additional metallurgical test work has identified opportunities that include;

  • Process plant design criteria weighted towards the treatment of fresh UG ore, whereby historical design was developed on processing transitional and oxide material.

  • Change from SABC comminution circuit to 3-stage crushing with single Ball mill.

  • Simplified cleaner flotation circuits allowing reduction of internal recirculating loads.

  • Inclusion of a Pb removal stage to improve Cu and Zn concentrate quality. As Pb grades increase deeper in the ore body a saleable Pb concentrate will be produced.

  • Incorporation of paste fill via plant tailings will reduce tailings storage facility volumes.

Project Update

Work has also commenced on validating the design criteria and suitability of the historical mill and plant equipment design for the proposed duty and configuration, GR Engineering and internal resources are rapidly progressing this.

An updated mine plan and project cost (mining, processing and surface infrastructure) based on developing the underground mine first is well advanced. The redesign of the underground mine and open pit will provide inputs for an updated Ore Reserve which is scheduled to be completed late this month.

Exploration Results

As previously announced (see ASX release 19 January 2023), the Company completed a 15-hole (5,584m) reversecirculation exploration drilling programme at the Sulphur Springs deposit.

The programme was designed to test extensions to open mineralisation identified at the Trouser Leg and Eastern Lens targets during the updated 2022 Sulphur Springs Mineral Resource Estimate (MRE).

Assay results have now been received from all drillholes in the programme (see Figure 1). These results will be incorporated into future Resource updates and will also be used to delineating additional drilling targets for further Resource expansion.

Exploration drilling intersected an exceptionally thick zone of high-grade zinc mineralisation at the Sulphur Springs Eastern Lens. Drillhole SSR013, which tested the down-plunge continuation of the Eastern Lens Exploration Target, returned an outstanding high-grade zinc intercept of 19m @ 20% Zn. The results from SSR013, when combined with historical drillhole data highlights an extremely thick, high-grade Zn core which remains open down plunge. Additional zones of low-grade mineralisation are also intersected within the Sulphur Springs Western Lens.

Significant exploration intersections include:

  • 19m @ 20.0% Zn, 0.6% Cu, 0.7% Pb, 23.3gpt Ag & 0.5gpt Au from 387m (SSR013) o And 4m @ 3.3% Zn, 0.3% Cu, 4.7gpt Ag from 412m (SSR013)

  • 4m @ 4.0% Zn from 264m (SSR021)

  • 4m @ 2.9% Zn from 406m (SSR017)

SSR014 was abandoned prior to reaching target depth, no significant intersections (NSI) were recorded in exploration holes SSR015 and SSR019, although both holes intersected very thick zones of pyrite-rich massive sulphide.

==> picture [518 x 350] intentionally omitted <==

Figure 1: Sulphur Springs 2022 drilling programme drillhole intercepts long-section.

This announcement is authorised for release by Bill Beament, Managing Director.

Investor Enquiries

Bill Beament Develop T: +61 8 6389 7400 E: [email protected]

Media Enquiries

Paul Armstrong Read Corporate P: +61 8 9388 1474 E: [email protected]

About Develop

Develop (ASX: DVP) has a twin-pronged strategy for creating value. The first of these centres on the exploration and production of future-facing metals. As part of this, the Company owns the Sulphur Springs zinc-copper-silver project in WA’s Pilbara region. This project is currently the focus of ongoing exploration to grow the inventory and various development studies. Develop also owns the Woodlawn zinc-copper project in NSW. Woodlawn, which is on care and maintenance, comprises an underground mine and a new processing plant. The second plank of Develop’s strategy centres on the provision of underground mining services. As part of this, Develop has an agreement with Bellevue Gold (ASX: BGL) to provide underground mining services at its Bellevue Gold Project in WA.

Sulphur Springs Mineral Resources Statement

ULPHUR SPRINGS PROJECT SULPHUR SPRINGS Resource
Category
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Au g/t
Indicated 12,398 1.2 0.3 5.6 21.8 0.1
Inferred 1,401 0.2 0.5 6.4 38.4 0.2
TOTAL 13,798 1.1 0.3 5.7 23.5 0.2
NGAROO CAVES Resource
Category
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Au g/t
Indicated 2,300 0.9 0.3 5.7 13.6 0.0
Inferred 1,300 0.5 0.4 6.5 18.0 0.0
S KA Total 3,600
0.8
0.3
6.0
15.0
0.0

Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.

1. The information contained in this presentation relating to the Sulphur Springs Resources was previously released in ASX announcement ‘Sulphur Springs Updated Mineral Resource Estimate’ issued 6 September 2022.

2.

  • The information contained in this presentation relating to the Sulphur Springs Reserves was previously released in ASX announcement ‘Sulphur Springs DFS Results and Reserve Upgrade’ issued 10th October 2018.

Competent Person Statement

The information in this announcement that relates to Exploration Results at the Sulphur Springs Project is based on information complied or reviewed by Mr Luke Gibson who is an employee of the Company. Mr Gibson is a member of the Australian Institute of Geoscientists and Mr Gibson has sufficient experience with the style of mineralisation and the type of deposit under consideration. Mr Gibson consents to the inclusion in the report of the results reported here and the form and context in which it appears.

Cautionary Statement

The information contained in this document (“Announcement”) has been prepared by DEVELOP Global Limited (“Company”). This Announcement is being used with summarised information. See DEVELOP’s other and periodic disclosure announcements lodged with the Australian Securities Exchange, which are available at www.asx.com.au or at www.develop.com.au for more information.

While the information contained in this Announcement has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers give any representations or warranties (express or implied) as to the accuracy, reliability or completeness of the information in this Announcement, or of any other written or oral information made or to be made available to any interested party or its advisers (all such information being referred to as “Information”) and liability therefore is expressly disclaimed. Accordingly, to the full extent permitted by law, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers take any responsibility for, or will accept any liability whether direct or indirect, express or implied, contractual, tortious, statutory or otherwise, in respect of, the accuracy or completeness of the Information or for any of the opinions contained in this Announcement or for any errors, omissions or misstatements or for any loss, howsoever arising, from the use of this Announcement.

This Announcement may include certain statements that may be deemed “forward-looking statements”. All statements in this Announcement, other than statements of historical facts, that address future activities and events or developments that the Company expects, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. The Company, its shareholders, directors, officers, agents, employees or advisers, do not represent, warrant or guarantee, expressly or impliedly, that the information in this Announcement is complete or accurate. To the maximum extent permitted by law, the Company disclaims any responsibility to inform any recipient of this Announcement of any matter that subsequently comes to its notice which may affect any of the information contained in this Announcement. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, continued availability of capital and financing, and general economic, market or business conditions. DEVELOP assumes no obligation to update such information.

Investors are cautioned that any forward-looking statements are not guarantees of future performance and that actual results or developments may differ materially from those projected in forward looking statements. Please undertake your own evaluation of the information in this Announcement and consult your professional advisers if you wish to buy or sell DEVELOP shares.

This Announcement has been prepared in compliance with the JORC Code 2012 Edition. The ‘forward-looking information’ is based on the Company’s expectations, estimates and projections as of the date on which the statements were made. The Company disclaims any intent or obligations to update or revise any forward looking statements whether as a result of new information, estimates or options, future events or results or otherwise, unless required to do so by law.

Table 2. Sulphur Springs Significant drilling intersections

Hole ID From Intercept Cu% Pb% Zn% Ag g/t Au g/t Geology
KCR020
-
N/A
-
-
-
-
-
Abandoned prior
_to Target Depth _
KCR021
-
N/A
-
-
-
-
-
Abandoned prior
to Target Depth
SSR011A
436.0
4.0
0.0
0.2
2.0
11.6
0.0
Eastern Lens
SSR012
-
NSI
-
-
-
-
-
Eastern Lens
SSR013
387.0
19.0
0.6
0.7
20.0
23.3
0.3
Eastern Lens
and
412.0
4.0
0.3
0.1
3.3
4.7
0.0
Eastern Lens
and
438.0
4.0
0.0
0.0
1.1
0.6
0.0
Eastern Lens
Foot Wall
SSR014
-
N/A
-
-
-
-
-
Abandoned prior
to Target Depth
SSR015
-
NSI
-
-
-
-
-
Western Lens
SSR016A
296.0
2.0
0.0
0.1
0.5
19.0
0.3
Western Lens
SSR017
406.0
4.0
0.0
0.5
2.9
0.8
0.0
Western Lens
HangingWall
SSR018
416.0
4.0
0.0
0.0
1.4
0.5
0.0
Western Lens
Hanging Wall
SSR019
-
NSI
-
-
-
-
-
Western Lens
SSR020
310.0
1.0
0.0
0.0
1.0
0.7
0.0
Western Lens
HangingWall
SSR021
264.0
4.0
0.0
0.0
4.0
0.7
0.0
Western Lens
Hanging Wall

1. Reported intercepts are determined using averages of length weighted contiguous mineralisation downhole. The lower cut-offs for are 1.0% for copper, lead and/or zinc. Significant intercepts may include samples below the cut-off values if the interval is less than or equal to 2m or two sample intervals down hole. Totals may not balance due to rounding.

2. It is the opinion of Develop Global and the Competent Person that all elements and products have a reasonable potential to be recovered and sold.

Table 2. Sulphur Springs drillhole data

Hole ID East North RL Depth Dip Azi Status
KCR020 733067 7654520 1200 546 -60 225 Abandoned
KCR021 733100 7654450 1200 198 -90 0 Abandoned
SSR011 729306 7660053 1250 42 -76 157 Abandoned
SSR011A 729303 7660052 1250 492 -76 157 Completed
SSR012 729301 7660053 1250 498 -81 190 Completed
SSR013 729303 7660051 1250 450 -65 166.5 Completed
SSR014 728857 7659925 1247 316 -79 288.5 Abandoned
SSR015 728861 7659925 1250 396 -74 312 Completed
SSR016 728862 7659923 1250 42 -85 29.5 Abandoned
SSR016A 728862 7659929 1250 426 -90 0 Completed
SSR017 728890 7659950 1250 462 -71 84 Completed
SSR018 728891 7659949 1250 468 -62 89 Completed
SSR019 728890 7659949 1247 444 -71 98.5 Completed
SSR020 728890 7659948 1247 414 -66 112.5 Completed
SSR021 728887 7659948 1250 396 -74 121 Completed
KCR020 733067 7654520 1200 546 -60 225 Abandoned
KCR021 733100 7654450 1200 198 -90 0 Abandoned

Section 1: Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
**techniques **

Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc.). These
examples should not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report.

In cases where ‘industry standard’ work has been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases, more explanation
may be required such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may
warrant disclosure of detailed information.

Reverse Circulation (RC) drilling were used to obtain samples for geological logging and
assaying.

RC drill holes were sampled at 1m intervals and split using a static Metzke cone splitter
attached to the cyclone to ensure sample representivity.

The company used industry standard practices to measure and sample the drill chips.

A combination of four-metre composite and one-metre split samples, weighing nominally
between 1.0 - 4.0kgs were submitted to the laboratory for multi-element analysis.
Drilling
techniques

Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
_what method, etc.). _

Drilling was completed using industry standard reverse circulation.

Standard and Polycrystalline Dimond (PCD) 5.5inch diameter face sampling hammers
were used for reverse circulation drilling.
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results
assessed.

Measures taken to maximise sample recovery and ensure representative nature of the
samples.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.

Sample condition, including estimated recovery and moisture content were recorded for
each sample by a geologist or technician.

RC samples are not weighed on a regular basis but no significant sample recovery issues
have been encountered in drilling programs to date.

When poor sample recovery was encountered during drilling, the geologist and driller have
endeavoured to rectify the problem to ensure maximum sample recovery.

Insufficient data is available at present to determine if a relationship exists between
recovery and grade.
Logging
Whether core and chip samples have been geologically and geotechnically logged to
a level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.)
photography.

The total length and percentage of the relevant intersections logged.

All RC chips were geologically logged for the total length of the hole using a long hand
logging method. Logging routinely recorded weathering, lithology, mineralogy,
mineralisation, structure, alteration and veining. Logs are coded using the company
geological coding legend and entered into the company database.

The following quantitative descriptions were used when logging, amongst others:
oTrace less than 1% sulphides.
oStringer 1-20% sulphides.
oDisseminated 20-60% sulphides.
oMassive sulphides greater 60%.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or
dry.

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to thegrain size of the material being sampled.

RC cuttings were split using an industry standard rig-mounted Metzke static cone splitter.

Four-metre composite samples were taken from the A-split sample using a PVC tube or
scoop through the hanging-wall and footwall sequences.

One-metre A-split samples were taken through mineralised (sulphide) zones.

One-metre B-split sample field duplicates were selected by geologist from zones of
significant mineralisation.

One-metre B-split samples were retained on site for future reference.

The majority of samples were dry, with good to excellent recoveries.

The sample size of 1.0-4.0kg is considered appropriate and representative for the grain
size and style of mineralisation
Criteria JORC Code explanation Commentary
Quality of assay
data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.

Samples from the current drilling program were assayed by Australian Laboratory
Services Pty. Ltd in Perth.

RC samples were prepared and analysed by the following methods:

Samples weighed, crushed and pulverised with the coarse residue retained in vacuum
seal bags (LOG-22, WEI-21, PREP-31Y).

48 elements are analysed by method ME-MS61 utilising 4 acid digest, ICP-MS and ICP-
AES; Over-limit/Ore-Grade samples are analysed by method (ME-OG62). Au are
analysed by fire assay method Au AA23.

The company included certified reference material and blanks within the at a frequency
on 1:20. Field Duplicated were selected in zones of significant mineralisation at a
frequency on 1:20.

In addition to Develop’s QA/QC methods (duplicates, standards and blanks), the
laboratory has additional checks.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative
company personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.

The significant intersections reported have been prepared by geologists with relevant
VMS experience.

No twinned holes have been drilled.

Geological descriptions are recorded in long hand prior to being summarised for digital
data capture.

The company uses standard templates created in Excel to collate sample intervals, drill
collar, downhole survey information which are loaded into a Geological database.
Location of data
points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.

Surface drill hole collars are initially surveyed using a handheld GPS operated by
company personnel; at programme completion all collars are located by qualified
surveyors using a DGPS.

Down-hole surveys are conducted by the drill contractors using a north-seeking Reflex
gyroscopic tool with readings every 10-30m as the hole is drilled, and a continuous survey
at the end of hole.

Grid systems used are MGA 94 (Zone 51) at Sulphur Springs
Data spacing
and distribution

Data spacing for reporting of Exploration Results.

Whether the data-spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

Whether sample compositing has been applied.

Data/drill hole spacing are variable and appropriate to the geology and historical drilling
spacing.

4-metre sample compositing has been applied to RC drilling within the un-mineralised
hanging-wall and footwall sequences for gold and multi-element assay.
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.

Drill holes at Sulphur Springs are designed to test mineralisation and potential extension
as near to perpendicular as possible (subject to collar access).

Due to restricted access and topography, holes are drilled at an angle between –60⁰ to -
90⁰ to an azimuth of between 084-288⁰.

Drillhole designs are considered appropriate for the geometry of the host sequence.
Sample security
The measures taken to ensure sample security.

The chain of custody is managed by the on-site geological team.

Pre-numbered (calico) sample bags are stored on site within pre-numbered polyweave
sacks prior to being loaded into a Bulka Bag for dispatch to the Laboratory via Toll Ipec.

Detailed records are kept of all samples that are dispatched, including details of chain of
custody.
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.

No reviews have been undertaken.

Section 2: Reporting of Exploration Results

Criteria listed in the preceding section also apply to this section.

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or material
issues with third parties such as joint ventures, partnerships, overriding royalties, native
title interests, historical sites, wilderness or national park and environmental settings.

The security of the tenure held at the time of reporting along with any known impediments
to obtaining a licence to operate in the area.

The Sulphur Springs Deposit in located within M45/454. The registered owner of the
tenements is Venturex Sulphur Springs Pty Ltd, a wholly owned subsidiary of Develop
Global Ltd. The prospects are held by Venturex Sulphur Springs Pty Ltd.

The tenements are within Njamal Native Title Claim (WC99/8) where native title has
been determined. The traditional owners of the land are the Njamal People. The grant
of the tenement predates native title and is not subject to native title claim.

The tenement is subject to two third party royalties on any production from the
tenement. The tenements are in good standing and no known impediments exist.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.

Previous exploration has been undertaken by a number of parties going back over 30
years. Modern exploration has been undertaken by Sipa Resources, CBH Resources,
Homestake Mining, and Venturex Resources.
Geology
Deposit type, geological setting and style of mineralisation.

The Sulphur Springs Deposits and associated targets are related to Volcanogenic
Massive Sulphide systems.
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
collar

dip and azimuth of the hole

down hole length and interception depth

hole length.

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.

Details of the drill holes are provided in Tables 1 & 2 within the body of this report.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly
stated.

Results reported are determined by ALS Laboratories using method ME-OG 62, ME-
MS61 (over limit samples) and fire assay AyAA-23.

All results are reported on a length weighting interval,

No top - cuts have been applied.

Any zones of cavity/no sample are assigned a grade of zero.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is known, its nature
should be reported.

If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length, true width not known’).

The geometry of mineralisation is well known and tested at this deposit via DD drilling.
Across the drillhole dataset angles to mineralisation are considered to represent a drill
intercept perpendicular to lens strike orientation. With increasing depth the drillhole
intercept angle to lens decreases, however drilling from underground locations has
assisted in mitigating this issue for Measured and Indicated Mineral Resources.

Drillholes are designed to intersect the orebodies at a nominal 90 degrees, however
the local access, including mine design and topography required all drillholes to be
designed taking these limitations into consideration to intersect the mineralisation.

Truewidths are estimated to be 65-95% ofthe downholewidthunless otherwise
Criteria JORC Code explanation Commentary
indicated.
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should be Refer to Figures in the body of text within this announcement.
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Balanced Where comprehensive reporting of all Exploration Results is not practicable, Tables 1 & 2 present assays status for the current batch of RC drill holes.
reporting representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
Other Other exploration data, if meaningful and material, should be reported including (but not The Sulphur Springs deposit has had a significant body of work completed on it,
substantive limited to): geological observations; geophysical survey results; geochemical survey including geophysical studies, metallurgical test work, geotechnical and ground water
exploration data results; bulk samples – size and method of treatment; metallurgical test results; bulk studies.
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
Further work The nature and scale of planned further work (e.g. tests for lateral extensions or depth Results from the current programme are planned to be used to produce an update to
extensions or large-scale step-out drilling). the Sulphur Springs Resources and Reserves, along with providing geometallurgical
Diagrams clearly highlighting the areas of possible extensions, including the main data.
geological interpretations and future drilling areas, provided this information is not Future drilling programmes (including DHEM) are also being planned to target the
commercially sensitive depth/plunge extensions tomineralisation intersectinthe current drilling.