DEVELOP GLOBAL LIMITED Capital/Financing Update 2023

Jun 1, 2023

64801_rns_2023-06-01_99528d4b-774e-42c3-9db3-40935415c90b.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

June 2, 2023

- Sulphur Springs Zinc Copper Project, WA

Clarification – Significant increase in fresh Resource paves way for revised economic study

Project and Reserve update set for end of this month; Drilling hits thick high-grade mineralisation outside current Resource

Highlights

  • Metallurgical test work shows ~1.75Mt of material previously classified as transitional material can be reclassified as fresh material; This is a 32% increase in fresh material in the Resource

  • The additional fresh material adds significant upside to the economics of Sulphur Springs because it will result in the production of more marketable/saleable concentrates

  • The increase in fresh material in the Resource will form part of the revised economic study and updated Reserve estimate set for release at the end of this month

  • Re-testing of the transitional zinc material, which historically produced a low-quality concentrate achieves >50% zinc-in-concentrate

  • The processing flowsheet has also been optimised from prior studies to reduce complexity, improve stability and concentrate quality

  • Drilling has intersected extremely high-grade zinc mineralisation below the Eastern Lens; Results include:

  • 19.0m @ 20.0% Zn, 0.6% Cu, 23.3gpt Ag & 0.5gpt Au

  • The known mineralisation has been further extended below the Eastern and Western lenses

Develop (ASX: DVP) is pleased to announce highly significant metallurgical results with the potential to substantially impact the economics of its Sulphur Springs zinc-copper project in WA’s Pilbara.

The successful test work has resulted in 1.75 million tonnes of Resource material which was classified as transitional material now being reclassified as fresh. This increases the total fresh material in the Resource by 32 per cent to 8.65 million tonnes.

This is highly beneficial for the project because the nature of the fresh material means it can be used to make a concentrate which is simpler to process and more valuable than the concentrate which results from processing transitional material.

These results will form part of an updated study on the project’s economics, including a new Reserve estimate, which is set for release later this month.

Develop is also pleased to announce a host of strong drilling results from outside the current Resource at Sulphur Springs. The Resource stands at 17.4Mt at 5.8% Zn, 1.0% Cu, 0.3% Pb, 21.0gpt Ag & 0.2gpt Au[1] .

Develop Managing Director Bill Beament said: “Sulphur Springs goes from strength to strength with every piece of technical work we do.

“The drilling, the metallurgical test work, the mine planning and the financial studies all show that this project is tracking well towards a development decision. It has scale, it has the metals needed for the energy transition and it is perfectly located in the Tier-1 jurisdiction of the Pilbara.

“The imminent revised feasibility study and the updated Reserve estimate will reflect the outstanding results of this work, paving the way for us to unlock the value of this excellent asset.

“We took the time to complete a comprehensive review of historical metallurgical test work and undertook an extensive range of new test work. This has identified additional fresh resources which we can include in the underground mine plan.

“In addition, test work on the transitional concentrate has demonstrated that this is expected to be commercially attractive to a range of customers and represents another important value-adding step for the project”.

Metallurgical Update

Following a review of historical and recent metallurgical test work, a refined definition of transitional and fresh geometallurgical domains has been identified at the Sulphur Springs deposit. This work has indicated that approximately 1.75Mt of material previously classified as transitional resources can be reclassified as fresh (hypogene) resources.

Resource
Category
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag gpt
Au gpt
Indicated Oxide 209
$381
4.2
0.1
0.3
18.9
0.1
Transitional 4,941
$314
1.2
0.3
6.1
22.5
0.1
Fresh 7,247
$299
1.1
0.3
5.4
21.5
0.1
Sub-total
12,398
$307
1.2
0.3
5.6
21.8
0.1
Inferred Fresh
1,401
$249
0.2
0.5
6.4
38.4
0.2
Sub-total
1,401
$249
0.2
0.5
6.4
38.4
0.2
GRAND TOTAL
13,798
$301 1.1 0.3 5.7 23.5 0.2

Table 1: 2023 Reclassified Sulphur Springs MRE

The MRE is reported at a A$80/t Net Smelter Return (NSR) cut-off. Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.

Resource
Category
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag g/t
Au g/t
Metallurgical
Domain
Tonnes
(kt)
NSR ($A/t)2
Cu %
Pb %
Zn%
Ag g/t
Au g/t
2022 MRE Sub-total
13,760
$298
1.1
0.3
5.7
23.5
0.2
Reclassified
Material
Transitional -1,714
$311
1.2
0.3
5.7
22.6
0.2
Fresh 1,752
$295
1.0
0.3
5.6
21.7
0.1
2023 MRE Sub-total
13,798
$301
1.1
0.3
5.7
23.5
0.2
Nett Change
38
$303 1.1 0.3 5.7 22.2 0.1

Table 2: Key changes 2022 MRE Vs 2023 MRE

The MRE is reported at a A$80/t NSR cut-off. Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.

Key changes in the Mineral Resource block model due to the reclassification of Transitional to Fresh material in the 2023 block model update:

  • 1,714kt less Transitional material

  • 1,752kt more Fresh material (32% increase)

  • Net increase of 38kt from 2022 to 2023

The reclassification of transitional material to primary material is characterised by cleanly producing separate Cu and Zn concentrates in a sequential flow sheet. This was based on a review of historic work completed 2002 through to

  1. Drill core intervals for the reclassified tests are bound in a 3-dimensional shape to minimise over-statement of the reclassification area. In total 16 tests, some of which were multiple tests on the same drill core, are indicative of material being primary ore.

==> picture [366 x 260] intentionally omitted <==

Figure 1 - Reclassified transitional to primary zones shown on a Long Section of Sulphur Springs

Hole ID Feed - %
Feed - %

Cu Conc -
Cu Conc - Cu Conc - Cu Conc - Zn Conc - Zn Conc -
Cu Zn %Cu Cu Rec % %Zn Zn Rec % % Zn Zn Rec %
SSD054 2.9 3.4 31 91 0.6 1.9 54 95
SSD057 1.8 5.1 28 93 1.1 1.6 51 95
SSD064 1.5 8.4 31 78 1.8 1.1 53 91
SSD052 0.2 12.6 18 38 7.3 0.4 54 96
SSD055 1.7 13.6 18 88 8.9 5.7 50 92
SSD060 1.2 4.7 27 81 0.9 1.1 51 93
SSD061 4.3 2.9 31 93 0.4 2.8 55 92
SSD062 4.5 2.2 32 92 0.3 2.0 51 92
SSD065B 2.4 4.1 32 90 0.6 1.0 51 95
SSD068 5.3 1.0 32 92 0.3 5.7 35 62
SSD073 0.2 15.4 12 65 11.9 0.8 50 92
SSD087A 4.6 1.9 31 89 0.6 4.2 50 88
SSD082 2.1 6.8 27 76 4.2 3.9 50 92
SSD076 9.1 5.4 32 95 1.5 7.3 51 88

Table 3: Metallurgical performance of reclassified transitional zone drill holes

Previous studies identify inconsistent performance from the transitional material zone, particularly when producing a zinc concentrate. Technical review of the historical results inferred that the reagent conditions were not optimised

sufficiently for many of the underperforming samples. Two composites were created using 2018 reserve material from these same samples that had been kept in cold storage.

==> picture [328 x 243] intentionally omitted <==

Figure 2: Location of samples used for Comp 1 and Comp 2 (Upper Western Lens)

These achieved improved Zn concentrate grade and recovery.

Feed - %
Feed - %

Feed - %

Feed - %
Zn Conc 1
Zn Conc 1

Zn Conc 1-
Zn Conc 1-
Cu Pb Zn Fe - % Zn - Zn Rec %
2 - % Zn
2 - Zn Rec
%
Comp 1 0.4 0.2 6.2 21.1 51.5 85.4 45.4 94.6
Comp 2 0.2 0.2 3.6 31.3 53.7 58.5 49.0 76.9

Table 4: Metallurgical performance of retested Transitional Zinc Ore

In conjunction with historical test work from 2002, 2018 and 2022, this provides a minimum Zn to base metal ratio to define material that will produce a saleable concentrate.

The updated metallurgy outcomes are exceptional and produce a marketable product via a simple conventional flowsheet with many potential cost (operating and capital) and environmental benefits.

The Sulphur Springs processing flowsheet has also been optimised from prior studies to reduce complexity and improve stability and quality. Additional metallurgical test work has identified opportunities that include;

  • Process plant design criteria weighted towards the treatment of fresh UG material, whereby historical design was developed on processing transitional and oxide material.

  • Change from SABC comminution circuit to 3-stage crushing with single Ball mill.

  • Simplified cleaner flotation circuits allowing reduction of internal recirculating loads.

  • Inclusion of a Pb removal stage to improve Cu and Zn concentrate quality. As Pb grades increase deeper in the ore body a saleable Pb concentrate will be produced.

  • Incorporation of paste fill via plant tailings will reduce tailings storage facility volumes.

Project Update

Work has also commenced on validating the design criteria and suitability of the historical mill and plant equipment design for the proposed duty and configuration, GR Engineering and internal resources are rapidly progressing this.

An updated mine plan and project cost (mining, processing and surface infrastructure) based on developing the underground mine first is well advanced. The redesign of the underground mine and open pit will provide inputs for an updated Ore Reserve which is scheduled to be completed late this month.

Exploration Results

As previously announced (see ASX release 19 January 2023), the Company completed a 15-hole (5,584m) reversecirculation exploration drilling programme at the Sulphur Springs deposit.

The programme was designed to test extensions to open mineralisation identified at the Trouser Leg and Eastern Lens targets during the updated 2022 Sulphur Springs Mineral Resource Estimate (MRE).

Assay results have now been received from all drillholes in the programme (see Figure 1). These results will be incorporated into future Resource updates and will also be used to delineating additional drilling targets for further Resource expansion.

Exploration drilling intersected an exceptionally thick zone of high-grade zinc mineralisation at the Sulphur Springs Eastern Lens. Drillhole SSR013, which tested the down-plunge continuation of the Eastern Lens Exploration Target, returned an outstanding high-grade zinc intercept of 19m @ 20% Zn. The results from SSR013, when combined with historical drillhole data highlights an extremely thick, high-grade Zn core which remains open down plunge. Additional zones of low-grade mineralisation are also intersected within the Sulphur Springs Western Lens.

Significant exploration intersections include:

  • 19m @ 20.0% Zn, 0.6% Cu, 0.7% Pb, 23.3gpt Ag & 0.5gpt Au from 387m (SSR013) o And 4m @ 3.3% Zn, 0.3% Cu, 4.7gpt Ag from 412m (SSR013)

  • 4m @ 4.0% Zn from 264m (SSR021)

  • 4m @ 2.9% Zn from 406m (SSR017)

SSR014 was abandoned prior to reaching target depth, no significant intersections (NSI) were recorded in exploration holes SSR015 and SSR019, although both holes intersected very thick zones of pyrite-rich massive sulphide.

==> picture [518 x 350] intentionally omitted <==

Figure 1: Sulphur Springs 2022 drilling programme drillhole intercepts long-section.

This announcement is authorised for release by Bill Beament, Managing Director.

Investor Enquiries Media Enquiries Bill Beament Paul Armstrong Develop Read Corporate T: +61 8 6389 7400 P: +61 8 9388 1474 E: [email protected] E: [email protected]

About Develop

Develop (ASX: DVP) has a twin-pronged strategy for creating value. The first of these centres on the exploration and production of future-facing metals. As part of this, the Company owns the Sulphur Springs zinc-copper-silver project in WA’s Pilbara region. This project is currently the focus of ongoing exploration to grow the inventory and various development studies. Develop also owns the Woodlawn zinc-copper project in NSW. Woodlawn, which is on care and maintenance, comprises an underground mine and a new processing plant. The second plank of Develop’s strategy centres on the provision of underground mining services. As part of this, Develop has an agreement with Bellevue Gold (ASX: BGL) to provide underground mining services at its Bellevue Gold Project in WA.

Sulphur Springs Mineral Resources Statement

ULPHUR SPRINGS PROJECT SULPHUR SPRINGS Resource
Category
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Au g/t
Indicated 12,398 1.2 0.3 5.6 21.8 0.1
Inferred 1,401 0.2 0.5 6.4 38.4 0.2
TOTAL 13,798 1.1 0.3 5.7 23.5 0.2
NGAROO CAVES Resource
Category
Tonnes
(kt)
Cu %
Pb %
Zn %
Ag g/t
Au g/t
Indicated 2,300 0.9 0.3 5.7 13.6 0.0
Inferred 1,300 0.5 0.4 6.5 18.0 0.0
S KA Total 3,600
0.8
0.3
6.0
15.0
0.0

The MRE is reported at a A$80/t NSR cut-off. Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.

1. The information contained in this presentation relating to the Sulphur Springs Resources was previously released in ASX announcement ‘Sulphur Springs Updated Mineral Resource Estimate’ issued 6 September 2022.

2. The Mineral Resource Estimate is reported at a NSR cut-off grade of $A80/t . The NSR cut-off considers revenue from saleable base metals – zinc, copper (per cent) – and silver (ppm) and offsets site operating and sustaining capital costs, including underground operating development. The base metal and precious metals used in the NSR calculation all have reasonable potential of being saleable.

3. The information contained in this presentation relating to the Sulphur Springs Reserves was previously released in ASX announcement ‘Sulphur Springs DFS Results and Reserve Upgrade’ issued 10th October 2018.

Competent Person Statement

The information in this announcement that relates to Exploration Results at the Sulphur Springs Project is based on information complied or reviewed by Mr Luke Gibson who is an employee of the Company. Mr Gibson is a member of the Australian Institute of Geoscientists and Mr Gibson has sufficient experience with the style of mineralisation and the type of deposit under consideration. Mr Gibson consents to the inclusion in the report of the results reported here and the form and context in which it appears.

The information in this announcement that relates to Metallurgical Results at the Sulphur Springs Project is based on information complied or reviewed by Mr Kurt Tiedemann who is an employee of the Company. Mr Tiedemann is a member of the Australasian Institute of Mining and Metallurgy and Mr Tiedemann n has sufficient experience with the style of mineralisation and the type of deposit under consideration. Mr Tiedemann consents to the inclusion in the report of the results reported here and the form and context in which it appears.

The information contained in this announcement relating to the Sulphur Springs Resources is based on information compiled or reviewed by Ms Jillian Irvin of Entech Pty Ltd who is a Member of the Australian Institute of Geoscientists. Ms Irvin consents to the inclusion. Ms Irvin has sufficient experience relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaking to qualify as Competent Persons as defined in the 2012 – Refer Edition of the “Australasian Code for Reporting of Mineral Resources”.

Cautionary Statement

The information contained in this document (“Announcement”) has been prepared by DEVELOP Global Limited (“Company”). This Announcement is being used with summarised information. See DEVELOP’s other and periodic disclosure announcements lodged with the Australian Securities Exchange, which are available at www.asx.com.au or at www.develop.com.au for more information.

While the information contained in this Announcement has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers give any representations or warranties (express or implied) as to the accuracy, reliability or completeness of the information in this Announcement, or of any other written or oral information made or to be made available to any interested party or its advisers (all such information being referred to as “Information”) and liability therefore is expressly disclaimed. Accordingly, to the full extent permitted by law, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers take any responsibility for, or will accept any liability whether direct or indirect, express or implied, contractual, tortious, statutory or otherwise, in respect of, the accuracy or completeness of the Information or for any of the opinions contained in this Announcement or for any errors, omissions or misstatements or for any loss, howsoever arising, from the use of this Announcement.

This Announcement may include certain statements that may be deemed “forward-looking statements”. All statements in this Announcement, other than statements of historical facts, that address future activities and events or developments that the Company expects, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. The Company, its shareholders, directors, officers, agents, employees or advisers, do not represent, warrant or guarantee, expressly or impliedly, that the information in this Announcement is complete or accurate. To the maximum extent permitted by law, the Company disclaims any responsibility to inform any recipient of this Announcement of any matter that subsequently comes to its notice which may affect any of the information contained in this Announcement. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, continued availability of capital and financing, and general economic, market or business conditions. DEVELOP assumes no obligation to update such information.

Investors are cautioned that any forward-looking statements are not guarantees of future performance and that actual results or developments may differ materially from those projected in forward looking statements. Please undertake your own evaluation of the information in this Announcement and consult your professional advisers if you wish to buy or sell DEVELOP shares.

This Announcement has been prepared in compliance with the JORC Code 2012 Edition. The ‘forward-looking information’ is based on the Company’s expectations, estimates and projections as of the date on which the statements were made. The Company disclaims any intent or obligations to update or revise any forward looking statements whether as a result of new information, estimates or options, future events or results or otherwise, unless required to do so by law.

MATERIAL SUMMARY

SULPHUR SPRINGS UNDERGROUND MINERAL RESOURCE ESTIMATE

Material information summary as required under ASX Listing Rule 5.8 and JORC Code (2012) reporting guidelines.

Mineral Resource Statement

The Mineral Resource Statement for the Sulphur Springs zinc-copper underground Mineral Resource estimate (MRE) was prepared in April 2023 and is reported according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) 2012 edition.

The MRE includes 58,868 m of drilling from 149 diamond drill holes (DD), including reverse circulation with diamond tails, and 85 reverse circulation (RC) drill holes, completed since 1988. Of the drill metres underpinning the Mineral Resource, 33% (77 drill holes) were completed by Develop Global Ltd (DVP) during 2021–2022. The remaining historical drilling was completed by previous owners between 1988 and 2017. The depth from surface to the current vertical limit of the Mineral Resources is approximately 400 m.

In the opinion of Entech, the Mineral Resource evaluation reported herein is a reasonable representation of the global underground zinc, copper, silver, lead and gold Mineral Resources within the deposit, based on sampling drill data available as at 18 May 2022.

The Indicated and Inferred Mineral Resources comprise oxide, transitional and fresh rock material and use a net smelter return[1] (NSR) cut-off value. The NSR cut-off value chosen to constrain and report Mineral Resource blocks was A$80/t. Entech considered this cut-off to represent the economic value required to obtain metal recovery[2] using mechanised underground mining methods. The Mineral Resource Statement is presented in Table 4.

Table 4 Sulphur Springs underground zinc-copper Mineral Resource at A$80/t NSR cut-off

Mineral
Resource
Category
Weathering1 Tonnes
(kt)
NSR
(A$/t)2
Zinc
(%)
Copper
(%)
Silver
(ppm)
Lead
(%)
Gold
(ppm)
Iron
(%)
Indicated Oxide 209 381 0.3 4.2 18.9 0.1 0.1 29.8
Transitional 4,941 314 6.1 1.2 22.5 0.3 0.2 23.2
Fresh 7,247 299 5.4 1.1 21.5 0.3 0.1 22.1
Sub-total 12,398 307 5.6 1.2 21.8 0.3 0.1 22.7
Inferred Fresh 1,401 249 6.4 0.2 38.4 0.5 0.2 20.8
Sub-total 1,401 249 6.4 0.2 38.4 0.5 0.2 20.8
Total 13,798 301 5.7 1.1 23.5 0.3 0.2 22.5

1 Weathering profile reflects metallurgical sulphide oxidation state. Supporting information on definition and application within the Mineral Resources is provided under Section 3 of the JORC Code Table 1.

2 The NSR has been calculated using metal pricing, recoveries and other payability assumptions for zinc, copper and silver as detailed in ‘Cut-off parameters’ in

1 Net smelter return inputs and application to Mineral Resources are provided under ‘Cut-off parameters’ in Section 3 of the attached JORC Code Table 1.

2 Based on review of feasibility studies, DVP’s Life of Mine Plan (LOMP) and benchmarked against peer operations with comparable deposit style and commodities.

Section 3 of the attached JORC Code Table 1.

It is Entech’s opinion that all metals used in the NSR calculation have reasonable potential to be extracted, recovered and sold. Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.

Data from a total of 58,868 m of drilling from 149 DD and 85 RC drill holes were available for the MRE. Mineralisation interpretations were informed by 104 DD holes intersecting the resource and 66 RC drill holes intersecting the resource, for a total of 5,954 m of drilling intersecting the resource.

This MRE includes Inferred Mineral Resources which are unable to have economic considerations applied to them, nor is there certainty that further sampling will enable them to be converted to Measured or Indicated Mineral Resources.

Competent Person’s Statement

The information in the report to which this statement is attached that relates to the Estimation and Reporting of Mineral Resources at the Sulphur Springs zinc-copper deposit is based on information compiled by Ms Jill Irvin, BSc, a Competent Person who is a current Member of the Australian Institute of Geoscientists (MAIG 3035). Ms Irvin, Principal Geologist at Entech Pty Ltd, is an independent consultant to Develop Global Limited (DVP) with sufficient experience relevant to the style of mineralisation and deposit type under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves . Ms Irvin consents to the inclusion in the report of matters based on her information in the form and context in which it appears.

Entech undertook a site visit to the Sulphur Springs deposit on 21 October 2021 while the RC and DD drilling campaign, to support the MRE update, was in progress. During the visit, Entech personnel inspected mineralised intersections in drill core (SSD133, hangingwall marker chert, massive and disseminated sulphide mineralisation and footwall dacite) and observed drilling, logging, sampling, QAQC and metadata collection operations.

Drilling Techniques

The first drill program at Sulphur Springs was completed by Miralga Mining in 1986. It consisted of nine RC drill holes that failed to reach target depth and did not intersect significant mineralisation. No assays for these drill holes are included in the database. The first DD hole was completed in 1988.

Drilling between 1990 and 1995 was operated by Sipa Resources Ltd for various joint venture partners. A total of 59 drill holes with RC pre-collars and NQ2-size diamond core tails were completed on approximately 80 m spaced sections. This includes nine drill holes that were re-drilled after the initial drill hole failed to reach the target depth.

Outokumpu managed the drilling for the joint venture partners in 2000 and drilled 19 holes with RC pre-collars and diamond tails to infill the previous drilling and provide material for metallurgical testwork. Most diamond core was HQ size, with some NQ-size core drilled due to drilling difficulties. Some PQ-size core was drilled for metallurgical testwork. A further 22 RC-DD holes were completed by Outokumpu during 2001 to target sulphide mineralisation continuity and for metallurgical and geotechnical testwork. NQ was the preferred size for drill core during this drill program.

CBH Resources Ltd (CBH) drilled 23 RC drill holes in 2005 to test the upper portions of the deposit and potential for open cut mining. During 2007, CBH Sulphur Springs Pty Ltd completed four sterilisation RC drill holes around the mill and stockpile areas and 12 RC drill holes targeting resource infill and extensions to mineralisation.

Venturex Resources Ltd drilled six RC holes in 2012 to target mineralisation in the Inferred Mineral Resource category. Venturex also completed 14 RC-DD holes in 2017, mainly targeting supergene and transitional mineralisation for metallurgical testwork. Most of the drill core is HQ sized; however, PQ size was used where ground conditions were poor.

The drilling conducted by DVP[3] in 2021 was designed to infill drill Mineral Resources to Indicated status and test for resource extensions. The drilling comprised 33 RC-DD holes and 44 RC drill holes. About 80% of the drill core is HQ size with the remainder being NQ size. This phase of drilling accounts for about 45% of the drill hole samples in the database.

In total, approximately 42% of the drill holes in the database are RC, 7% are diamond and 51% have RC pre-collars with diamond core tails.

An independent resurvey of all pre-2007 drill hole positions was completed by a licensed surveyor for CBH in 2007. After 2007, all hole collar coordinates have been picked up by CBH/Venturex employees using a DGPS. Historical downhole surveys were performed on all holes by either single-shot Eastman camera or REFLEX gyroscope readings. The DVP drilling exclusively used gyroscope readings at 10–50 m downhole intervals.

The grid system used for the location of all drill holes is MGA_GDA94, Zone 50.

Topographic control is provided by a combination of external survey control, photogrammetry analysis and DGPS readings.

- Sampling and Sub Sampling Techniques

Sipa Resources sampled chips from RC pre-collars on 1 m intervals with a representative portion retained in chip trays. Where the pre-collars drilled through sedimentary rocks in the hangingwall, grab samples from the 1 m samples were composited to 4 m intervals for assay. Core that was mineralised and its immediate footwall and hangingwall was split using a diamond saw and the half-core was sent for analysis. The core was sampled on approximately 1 m intervals, dependent on mineralisation boundaries. The footwall and poorly mineralised core were selectively sampled every 1–3 m.

Outokumpu sampled mineralised zones in the pre-collars at 1 m intervals using a single-tier riffle splitter and the immediately surrounding material with 2 m composites. Drill core was split into quarters using a diamond saw. Quarter-cores were collected for assay from mineralised zones at approximately 1 m intervals, with sample intervals being based on geological or mineralisation boundaries. Half-cores from selected intervals were sent for metallurgical testwork. A 1–3 m length of less mineralised (or unmineralised) host rock was also sampled with quarter-core for assay.

CBH collected the RC samples from the 2005 drilling at 1 m intervals and used a three-tier riffle splitter to produce samples for assay. A small number of samples were wet, and these were ‘grab’ sampled from the sample bag. The entire samples were weighed, which indicated mostly good sample return. The 2007 RC drilling was sampled in the mineralised zones at 1 m intervals using a spear. The surrounding host rock was sampled as 10 m composites using a spear.

Venturex sampled the 2012 RC drill holes at 1 m intervals in mineralised domains by an unspecified method. The pre-

3 ASX. VXR. 7 October 2021. Report: Change of Company Name.

collars for the 2017 drilling were riffle split into 1 m samples at the cyclone. The 1 m samples were sampled with a scoop to produce 4 m composites, except for the last 10 m of the pre-collars which were scooped to produce a sample for each metre for assay. The drill core was split into quarter-core using a diamond saw. The quarter-core was sampled at nominally 1 m intervals, with breaks at mineralisation or lithology boundaries.

DVP sampled the 2021 RC drill holes with 1 m splits in the mineralised zones. In the unmineralised areas, 4 m composites were produced by spearing the 1 m samples with a scoop. Composites that returned favourable assays were resampled and assayed from the 1 m RC split samples. The RC sample recovery is visually estimated with approximately 23% of the 1 m splits recorded with recoveries of 10% to 50%. Due to the massive nature of the sulphide mineralisation, Entech considers that sample bias due to loss of fine/coarse material may not have a significant impact on the assay results. A grain size analysis to produce a grade profile would help quantify the impact of the low recoveries. The NQ-size diamond core was split in half using a diamond saw. The HQ-size core was split in half using a diamond saw, then one half was split to produce quarter-core. One length of half NQ-size core or one length of quarter HQ-size core were sampled on nominal 1 m intervals, with breaks at mineralisation or rock type boundaries. The core recovery was recorded as good to excellent (92% to 100%).

Sample Analysis Method

Samples from the Sipa Resources drilling up until 1994 were sent to either SGS Australia Pty Ltd (SGS) or Analabs Pty Ltd (Analabs) in Perth. Samples analysed in 1995 were sent to Australian Assay Laboratories (AAL) in Perth. A representative selection of pulps of highly mineralised core was routinely sent to other laboratories for check analysis. Analabs analysed a selection of quarter-core samples that replicated previously sampled half-core and were originally analysed by SGS.

The drill core and RC pre-collar samples from the Outokumpu 2000 drilling were analysed by Genalysis in Perth, with samples assaying greater than 10% zinc and 10% copper also being carried out at ALS Chemex and Analabs. A selection of pulps was sent from Genalysis to Analabs and ALS Chemex, with results comparing well. Duplicates of 43 coarse sample splits from Genalysis were analysed at the three laboratories, and showed good correlation. The drill core and RC pre-collar samples from the 2001 drilling were analysed by Genalysis in Perth. Titration analysis for every sample assaying greater than 10% zinc or 10% copper was carried out by Analabs. A selection of pulps was sent from Genalysis to Analabs, with results comparing well. Duplicates of 67 coarse sample splits were reassayed by Genalysis, with good correlation shown. A selection of pulp samples was re-assayed by Genalysis, with excellent correlation with the original results shown. Due to a lack of available standards, synthetic standards at various grade ranges were created by Gannet Holdings Pty Ltd. A round-robin of 25 samples was sent to four different laboratories to determine the expected values for each standard.

CBH sent the RC samples collected in 2005 to ALS Chemex in Perth for analysis. Field duplicates of mostly mineralised material were generated from the original field rejects. A series of laboratory re-splits from the first sample crush were also analysed. ALS Chemex analysed many laboratory repeats of the original pulverised samples. The standards produced in 2001 were also used during this drill program. ALS inserted many internal standards. The analysis method for the 2007 drilling is not included in the available documents and is assumed to be the same as that used by CBH in 2005.

The sample analysis method used by Venturex for the 2012 drilling is not included in the available documents. Samples from the 2017 drilling were analysed by ALS Laboratories in Perth.

DVP sent the 2021 drill samples to ALS Laboratories in Perth for analysis. Samples with greater than 30% zinc were

sent to ALS Vancouver for validation. Several different standards and blanks were inserted at a rate of approximately 1:20. Duplicate RC samples were collected at a rate of 1:20 during sampling at the rig.

Based on documentation review, Entech is of the opinion the sample preparation techniques and analyses are appropriate for the style of deposit and commodity under consideration, and reflect standard techniques available at the time.

Geology and Geological Interpretation

The Sulphur Springs deposit has been classified as a volcanogenic massive sulphide (VMS) zinc-copper deposit located within the Sulphur Springs Group in the central east of the Archaean Pilbara Craton. The Sulphur Springs Group lies within a north–northeasterly trending litho-tectonic zone known as the Lalla Rookh-Western Shaw Structural Corridor (LWSC) that is bound by regional-scale faults.

At deposit scale, Sulphur Springs deposit lithologies intersected in drill holes comprise polymictic breccia, chert, massive and stringer sulphide mineralisation, and felsic volcanic rocks of dacitic composition. Massive pyrite and base metal mineralisation occurs over a 550 m strike length and 600 m down dip extent, and consists of an upper zone of massive sulphide overlying a disseminated/stringer (disseminated) zone. The upper contact of the massive sulphide unit is generally sharp, while the lower contact with the footwall disseminated zone is diffuse, with gradational metal tenor over several metres. There are indications of structural thickening in some mineralisation areas, which has obscured primary morphology and metal zonation.

Lithology and structure are considered the predominant controls on base and precious metals, and gangue (iron) mineralisation at the Sulphur Springs deposit.

Entech interpreted major lithological units to assist with the definition of deposit-scale geology and sulphide mineralisation sequencing as follows:

  • Footwall dacite contact

  • Rhyodacite hangingwall

  • Footwall and hangingwall marker chert horizons

  • Hangingwall marker breccia (interpreted to represent a thrust).

Mineralisation domains were interpreted primarily on geological and mineralisation characterisation models defined

by downhole geological contacts and were based on lithology, sulphide characterisation (and distribution), grade tenor, structural models and mapped outcrop geology. Four sulphide mineralisation domains (Figure 3 and Figure 4) were defined as follows:

  • Massive sulphide mineralisation (Domain 1) with a sharp hangingwall contact. The footwall contact was defined either by drill hole logging or by iron and sulphur grades greater than 20%.

  • Disseminated mineralisation (Domain 2) underlying the massive sulphide unit.

  • Hangingwall massive sulphide mineralisation (Domain 3) with two discrete shoots 40–60 m in width of hightenor zinc mineralisation.

  • Footwall massive sulphide mineralisation (Domain 4).

Zinc and copper distribution within the sulphide domains have consistent geospatial relationships, further outlined below:

  • Zinc-rich mineralisation is most prominent towards the hangingwall of the massive sulphide (Domain 1).

Discrete zones of zinc occur towards the footwall of the massive sulphide and are interpreted to be structurally emplaced. Lower-tenor zinc-rich mineralisation is also defined within the footwall disseminated horizon (Domain 2).

  • Copper-rich mineralisation occurs as a semi-continuous lobate lens that straddles the footwall contact between the massive sulphide and underlying disseminated zone, with the majority of the copper mineralisation falling within the massive sulphide horizon.

  • Hangingwall zinc mineralisation (Domain 3) that lies 10–40 m above the massive sulphide is interpreted to be structural repetition of the massive sulphides. There is lower marker breccia below the hangingwall mineralisation that is interpreted as localised thrust faulting. Within the hangingwall mineralisation, massive sulphide mineralisation intercepts were flagged by a sharp hangingwall contact with unmineralised country rock, logged massive sulphide intervals and where logging information was inconclusive, iron and sulphide grades greater than 20% were used to define the footwall contact of the massive sulphide.

  • A north–south post-mineralisation fault (Main fault) is interpreted to offset all sulphide mineralisation domains into two separate lenses (east and west).

Interpretation of massive and disseminated mineralisation was initially undertaken using all available drill holes in Seequent Leapfrog Geo software. Intercepts correlating to massive sulphide and disseminated mineralisation and underpinned by strike continuity implied from lithology wireframes were independently identified and manually selected in Seequent Leapfrog Geo prior to the creation of an implicit vein model. Interpretation was a collaborative process with DVP’s geologists to ensure Entech’s modelling approach represented observations and the current understanding of geological and mineralisation controls.

Entech interpreted and modelled metallurgical and regolith weathering profiles to assist with delineating sulphide mineralisation relationships and recoveries. The metallurgical weathering profile comprised four distinctive zones – leached, oxide, transitional and fresh – and were determined from field-based observations by DVP personnel of available core photographs to identify areas of vugging or oxidation of sulphides and secondly with sequential copper digestion. The leached zone, which overlies the oxide zone, has been depleted of all base and precious metal grades and excluded from Mineral Resource tabulations.

Further definition of the metallurgical weathering profiles is presented below:

  • Oxide is defined when chalcocite and covellite represented >50% of copper species. Well-developed vuggy sulphides. Gossanous and/ or cavernous textures were evident.

  • Transitional is defined when chalcocite and covellite represented <50% of copper species. Bornite/covellite may be present along with chalcopyrite. Tarnishing was evident on other sulphides (e.g., pyrite). Vugs related to secondary processes were poorly to moderately well developed in sulphide (other than copper species).

  • Fresh is defined when fresh chalcopyrite was the dominant copper sulphide species. No evidence or trace development of vugs. Any vug development was interpreted to have formed due to the dissolution of nonsulphide minerals (e.g., carbonates). No tarnishing of other sulphide species (e.g., pyrite) or secondary copper species was evident.

Zinc and copper metallurgical recovery algorithms were created for each weathering horizon based on metallurgical testwork and were factored into net smelter return (NSR) calculations to reflect recoverable metal in each metallurgical weathering horizon.

==> picture [466 x 240] intentionally omitted <==

Figure 3 Long section of Sulphur Springs zinc-copper deposit (looking towards 145°) showing drill hole traces, massive sulphide and disseminated domains, and topography extents

Note: Mineralised domains (as interpreted) do not represent Mineral Resource classification extents.

==> picture [466 x 239] intentionally omitted <==

Figure 4 Plan view of Sulphur Springs zinc-copper deposit showing drill hole traces and massive and disseminated sulphide domains

Note: Mineralised domains (as interpreted) do not represent Mineral Resource classification extents.

==> picture [478 x 246] intentionally omitted <==

Figure 5 Long section of Sulphur Springs zinc-copper deposit (looking south) showing geological mapping, drill hole traces, massive sulphide domain, and topography extents

Note: Mineralised domains (as interpreted) do not represent Mineral Resource classification extents.

Estimation Methodology

Compositing approaches were selected to honour the mineralisation style, geometry, expected grade variability and potential mining selectivity. Drilling samples were composited to 1 m lengths honouring lode domain boundaries. Composites with a best-fit approach were compiled, whereby any small residual intervals less than 1 m were divided evenly between the composites to mitigate metal loss.

Exploratory data analysis (EDA) of the declustered (20 mN, 5 mE, 20 mZ) composited (density weighted) zinc, lead, copper, gold and silver variables in the mineralised domain groups was undertaken using Supervisor™ software. Analysis for sample bias, domain homogeneity and top capping was undertaken. Further sub-domaining of composite data by weathering (regolith or metallurgical) or lithology boundaries, for the purposes of interpolation, was not supported by statistical and spatial analysis.

Assessment and application of top-capping was undertaken on the zinc, lead, copper, gold, silver and iron variables within individual (and grouped) domains. Domains were capped to address instances where outliers were defined as both statistical and spatial outliers, presented below:

  • Massive: zinc 30%, lead 3%, copper (no cap), silver 300 g/t, gold 1.5 g/t

  • Disseminated: zinc 10%, lead 2%, copper 10%, silver 50 g/t, gold 0.5 g/t

  • Metal reductions from the above caps were minor in nature averaging <3% across all variables within the massive and disseminated domains. Application of silver top cap in the disseminated domain resulted in an 8.5% metal reduction.

  • Iron was not capped.

Variography was undertaken on the capped, declustered zinc, lead, copper, gold, silver and iron variables grouped

by mineralisation style (massive, disseminated). Robust variogram models with a low to moderate nugget for zinc, copper and lead (8–10%), gold and silver (10–11%) and iron (15%) were delineated and used in Kriging Neighbourhood Analysis (KNA) to determine parent cell estimation size and optimise search neighbourhoods. Due to statistical and spatial similarities, the variogram and search parameters for zinc were applied to lead. It should be noted that although the maximum continuity modelled in the variograms ranged from 70 m to 80 m (zinc, lead, copper) and from 120 m to 202 m (silver, gold, iron), approximately 35–55% of spatial variability and subsequent kriging weights were applied within 15–60 m.

Interpolation was undertaken using Ordinary Kriging in GEOVIA Surpac™ within parent cell blocks. Dimensions for the interpolation were Y: 5 mN, X: 10 mE, Z: 5 mRL, with sub-celling of Y: 0.312 mN, X: 0.625 mE, Z: 0.312 mRL. The parent block size was selected to provide suitable volume fill, given the available data spacing and mining selectivity. The drill hole spacing for geological and grade domain interpretations averages 40 m × 40 m over the sulphide mineralisation extents. Considerations relating to appropriate block size include drill hole data spacing, conceptual mining method, variogram continuity ranges and search neighbourhood optimisations (KNA).

A two-pass estimation strategy was used, whereby search ranges reflected variogram maximum modelled continuity and a minimum of 6, maximum of 16 composites for zinc, lead and copper, and a minimum of 6, maximum of 12 for gold, silver and iron. The second search reduced the minimum composite required in the neighbourhood to 4; all other parameters (e.g., range and maximum composites) remained the same. Search neighbourhoods broadly reflected the direction of maximum continuity within the plane of mineralisation, ranges, and anisotropy ratios from the variogram models. All blocks which did not meet the criteria to trigger an estimate were not estimated and were excluded from Mineral Resource classification.

Domain and sub-domain boundaries represented hard boundaries, whereby composite samples within that domain were used to estimate blocks within the domain. Global and local validation of the zinc, lead, copper, gold, silver and iron variables estimated outcomes was undertaken with statistical analysis, swath plots and visual comparison (cross and long sections) against input data.

Global comparison of declustered and capped composite mean against estimated mean (by domain and variable) highlighted less than 10% variation for zinc and silver and within 5% variation for copper.

The 3D block model was coded with geology, regolith and metallurgical weathering, mineralisation style, NSR and Mineral Resource classification prior to evaluation for Mineral Resource reporting. Multivariate regressions were calculated for density and sulphur, by metallurgical weathering horizon, and applied directly into the block model.

Classification Criteria

Mineral Resources were classified as Indicated and Inferred to appropriately represent confidence and risk with respect to data quality, drill hole spacing, geological and grade continuity and mineralisation volumes. In Entech’s opinion, the drilling, surveying and sampling undertaken, and the analytical methods and quality controls used, are appropriate for the style of deposit under consideration.

Mineral Resources were classified based on geological and grade continuity confidence drawn directly from:

  • Drill hole methodology, data quality, spacing and orientation

  • Geological domaining

  • Estimation quality parameters

  • Historical mining strike lengths, widths, stope orientations and remnant mining areas.

Indicated Mineral Resources were defined where a moderate level of geological confidence in geometry, continuity, and grade was demonstrated, and were identified as areas where:

  • Blocks were well supported by drill hole data, with drilling averaging a nominal 40 m × 40 m or less between drill holes, or where drilling was within 50 m of the block estimate.

  • Blocks were interpolated with a neighbourhood informed by a 12–16 composites and slope of regression above 0.5.

Inferred Mineral Resources were defined where a lower level of geological confidence in geometry, continuity and grade was demonstrated, and were identified as areas where:

  • Drill spacing was averaging a nominal 60 m or less, or where drilling was within 70 m of the block estimate

  • Blocks were interpolated with a neighbourhood informed by a minimum of 10 samples and slope of regression above 0.2.

Consideration has been given to all factors material to Mineral Resource outcomes, including but not limited to:

  • Confidence in volume and grade delineation, continuity and preferential orientation of mineralisation tenor

  • Quality of data underpinning Mineral Resources

  • Nominal drill hole spacing and estimation quality (conditional bias slope, number of samples, distance to informing samples).

The reported Mineral Resource was constrained at depth by the available drill hole spacing outlined for Inferred classification, nominally 400 m below surface topography. Mineralisation within the model which did not satisfy the criteria for classification as Mineral Resources remained unclassified.

Mineral Resources that are not Ore Reserves do not have demonstrated economic viability. The MRE does not account for selectivity, mining loss and dilution. This MRE update includes Inferred Mineral Resources which are unable to have economic considerations applied to them, nor is there certainty that further sampling will enable them to be converted to Measured or Indicated Mineral Resources.

The delineation of Indicated and Inferred Mineral Resources appropriately reflects the Competent Person’s view on continuity and risk at the deposit.

Cut-off Grade

The NSR cut-off grade used for reporting of Mineral Resources at Sulphur Springs was A$80/t, which is approximately 80% of the break-even stoping cut-off value underpinning DVP’s current Life of Mine Plan (LOMP). The NSR cut-off reflects costs associated with metal recovery and was selected based on discussions with DVP engineers, and benchmarked against previous detailed studies[4] at the project.

The NSR cut-off considers revenue from saleable base metals – zinc, copper (percent) – and silver (ppm) and offsets site operating and sustaining capital costs, including underground operating development. The base metal and precious metals used in the NSR calculation all have reasonable potential of being saleable.

The NSR calculation determines a value for the saleable metals by applying the following modifying factors (presented in Table 3):

4 Venturex Resources Ltd, ASX release dated 10 October 2018 : Sulphur Springs Feasibility Study confirms long-life, high-margin Australian copper-zinc mine with outstanding economics

  • Metal prices

  • Metallurgical recoveries (by metallurgical weathering profile)

  • Payability factors, inclusive of concentrate treatment charges, metal refining charges, payment terms (concentrate), logistics costs and NSR royalties.

Table 35 Key NSR assumptions

Metal FX rate Metal Price Recovery Payability factors
Zinc A$0.69:US$1 A$5199.28/t Zinc recovery algorithm Concentrate treatment charges, metal
refining charges, payment terms
(concentrate), logistics costs and NSR
royalties
Copper A$11678.70/t Copper recovery algorithm
Silver A$27.54/oz 18%¹
28%²

¹Silver recovery for zinc concentrate which includes deportment from cost model.

²Silver recovery for copper concentrate which includes deportment from cost model.

The NSR has been calculated using metal pricing, recoveries and other payability assumptions for zinc, copper and silver as detailed in Section 3 under ‘Cut-off parameters’ in the JORC Code Table 1. It is Entech’s opinion that all metals used in the NSR calculation have reasonable potential to be extracted, recovered and sold.

The metallurgical recovery algorithms for zinc and copper by metallurgical weathering horizon are given in Table 6.

Table 6 Metallurgical recovery algorithms for copper and zinc by metallurgical weathering horizon

Metallurgical
weathering horizon
Zinc recovery algorithm Copper recovery algorithm
Oxide 0.5 * Zn% + 62 *(1 - exp (-0.85 * Zn%)) 92 (1 - exp (-1.0Cu%))
Transitional 0.2 * Zn% + 91 *(1 - exp (-0.7 * Zn%)) 94 *(1 - exp(-1.5 * Cu%))
Fresh 2.5 + 93 *(1 - exp (-1.4 * Zn%)) 1.5/Cu% + 94.5 *(1 - exp (-1.7 * Cu%))

Bulk Density

This MRE contains dry bulk density data collected on drill core from 212 holes (between 1990 and 2022). Density measurements were collected and measured using the water immersion density determination method for each sample.

The density samples were located between 7659400 mN and 7660200 mN, and 728400 mE and 729500 mE, and nominally from the surface to a depth of 550 m, providing a representative density profile between mineralised domains, weathering profile and depth profile within the Mineral Resource area. Analysis of the bulk density data indicated values between 1.64 and 5.01 g/cm[3] SG (specific gravity).

The metallurgical weathering profile comprises four key horizons: leached, oxide, transitional and fresh. Multielement regression indicated varying regression coefficients occur across the weathering horizons. Therefore, a separate regression formula was used for oxide, transitional and fresh materials. Note the leached zone is depleted of mineralisation and therefore did not comprise Mineral Resources. A background density was applied in this horizon with adjustments and depletions applied to represent the vuggy nature of the leached zone.

Validation of the regression concluded a correlation coefficient of 0.93 between measured and regression density. Ideally, sulphur would be included in this regression given the close correlation with iron. However, insufficient sampling of sulphur limited the ability to use all measured densities and derive a robust regression formula. In this instance, sulphur was therefore not used in density regressions. Given below are the density regressions applied within the MRE.

  • Oxide: 1.976418 +Zn%0.02795 +Pb%-0.092028 +Cu%-0.003506 +Fe%0.051415

  • Transitional: 2.472249 +Zn%0.022663 +Pb%0.023376 +Cu%0.000101 +Fe%0.043261

  • Fresh:2.526907 +Zn%0.020732 +Pb%0.052578 +Cu%-0.005445 +Fe%0.043606.

Regression formulas were applied in the block model on a block-by-block basis, using estimated zinc, lead, copper and iron values for the individual blocks and restricted by block model coding of metallurgical weathering horizons.

Project History and Historical Mineral Resources

A report of sulphur precipitating in a creek downstream from a felsic volcanic sequence led to the discovery of a sulphidic gossan in 1984 with the project named Sulphur Springs. Surface rock chip sampling revealed anomalous gold and base metal values.

Ashling Resources NL (Ashling) acquired the Sulphur Springs tenements in 1990 and entered a joint venture with Sipa Resources Ltd (Sipa), Guardian Resources NL (Guardian), and Outokumpu Zinc OY (Outokumpu) in 1993. This joint venture continued through until 2005, during which the Sulphur Springs orebody was explored by extensive RC and DD programs.

Regional alteration and geology mapping campaigns were completed over the whole Panorama Trend, producing a geological framework and model for the mineralisation of the belt. Various external geological and mineralisation studies and thesis have been completed on the Panorama Trend, with Sulphur Springs being the basis for many of these studies.

The Sulphur Springs tenements were wholly bought by CBH Sulphur Springs Pty Ltd (CBHSS) in 2006 from Sipa/Outokumpu. CBHSS completed further resource drilling for mineralogical and metallurgical testwork, including testwork of barren hangingwall, and updated resource/reserve estimations. CBHSS proposed mining through open pit method and completed feasibility studies and relevant heritage, biological and hydrological surveys, in preparation for mining and construction. Continuing optimisation studies were completed for plant design, mine design and other associated infrastructure.

In 2010, Venturex Resources Limited acquired CBHSS, which was subsequently renamed Venturex Sulphur Springs Pty Ltd. In December 2013, Venturex Resources Ltd published a definitive feasibility study (DFS) of all its Pilbara holdings, including Sulphur Springs, to evaluate all production options.

In February 2021, Venturex Resources Ltd announced a re-capitalisation plan and equity raising. The company subsequently changed its name from Venturex to Develop Global in October 2021.

Mineral resources (not prepared under the guidelines of the JORC Code) were publicly reported in annual reports of various companies in 1994, 1996, 2001 and 2006.

The published Ore Reserves reported in June 2006 for the Sulphur Springs deposit was 10 Mt grading at 3.5% zinc, 1.4% copper and 17 g/t silver.

The last publicly reported MRE was the 2018 Sulphur Springs Resource[5] , prepared by Mil Min Pty Ltd under the guidelines of the JORC Code, reported Indicated and Inferred Mineral Resources of 13.8 Mt grading at 3.8% zinc, 1.5% copper, 0.2% lead, 0.1 g/t gold and 18 g/t silver.

By comparison, Entechs approaches to domaining, classification, reasonable prospects for eventual economic extraction (RPEEE), application of an NSR cut-off and the addition of 77 RC and DD drilling completed by DVP in 2021– 2022 account for the variations from historical Mineral Resources.

Key differences in approach included:

  • Inclusion of 77 additional resource definition and infill drill holes providing increased volume of discrete lenses and zinc and copper sub-domains.

  • A geological based domaining approach was implemented across all lenses and varied from the Mil Min Pty Ltd approach, which included internal waste in broader sulphide domains.

  • Change in Mineral Resource classification and reporting criteria from ‘0.4% Cu or Cu less than 0.4 with more than 2% Zn[5] ’, in 2018 MRE to the current (2023) NSR-based approach.

Assessment of Reasonable Prospects for Eventual Economic Extraction

Entech assessed the Sulphur Springs MRE, as reported, as meeting the criterion for RPEEE based on the following considerations.

Mining

The Sulphur Springs MRE extends from the topographic surface to approximately 400 m below surface. Entech considers material at this depth, and at the grades estimated, would fall under the definition of RPEEE in an underground mining framework.

The MRE is reported using an NSR cut-off of A$80/t. For the purposes of NSR determination, NSR values were calculated, by metallurgical weathering domains, using estimated zinc, copper (per cent) and silver values (ppm), on a block-by-block basis prior to implementing reporting cut-offs. The metal components of the NSR calculation all have reasonable potential of being saleable. Entech considers the NSR cut-offs appropriately reflect costs associated with metal recovery and would fall within the definition of RPEEE in an underground framework.

Entech understands DVP plans to implement mechanised underground mining methods. No mining dilution or cost factors was applied to the estimate. No factors or assumptions were made within the MRE with respect to environmental considerations.

Variances to the tonnage, grade and metal of the Mineral Resources are expected with further definition drilling. The Mineral Resources may also be affected by subsequent assessment of mining, environmental, processing, permitting, taxation, socio-economic and other factors.

It is the Competent Person’s opinion that the proposed underground mining methods and cut-off grades applied satisfy the requirements for RPEEE.

5 MM_505_Sulphur_Springs_Resource_Report_March_2018

Metallurgy

Metallurgical recovery factors have been factored into NSR calculations based on inputs supplied by DVP and a review of previous detailed studies[4] at the project.

Metallurgical amenability and recovery factors for oxide, transitional and fresh material were addressed by a number of testwork programs based on historical metallurgical testwork. Most recent testwork occurred during feasibility studies (2018) when holes SSD089 to SSD102 sampled for testing of oxide and transitional material. DVP undertook geometallurgical logging of recent drillholes (see ASX releases 16 May 2022, 10 February 2022, and 8 December 2021) in February 2023 which informed the transitional, fresh boundary used to report the Mineral Resource inventory.

Historical metallurgical testwork focused on fresh material, resulting in a recommendation to use selective sequential flotation to produce separate copper- and zinc-rich concentrates with high mineral recoveries at target grades.

Recovery algorithms for copper and zinc have been determined for each metallurgical weathering horizon based on historical testwork and feasibility studies, and have been factored into NSR calculations.

A global silver recovery, including deportment from cost model of 18% and 28% for zinc and copper concentrates, respectively, was factored into NSR calculations.

Entech understands from discussions (with DVP personnel), documentation reviews (supplied by DVP) and project site inspections that no other deleterious variables, which would materially affect eventual economic extraction of Mineral Resources, have been identified at the project. No factors or assumptions were made within the MRE with respect to deleterious elements or by-products.

Table 1. Sulphur Springs Significant drilling intersections

Hole ID From Intercept Cu% Pb% Zn% Ag g/t Au g/t Geology
KCR020
-
N/A
-
-
-
-
-
Abandoned prior
_to Target Depth _
KCR021
-
N/A
-
-
-
-
-
Abandoned prior
to Target Depth
SSR011A
436.0
4.0
0.0
0.2
2.0
11.6
0.0
Eastern Lens
SSR012
-
NSI
-
-
-
-
-
Eastern Lens
SSR013
387.0
19.0
0.6
0.7
20.0
23.3
0.3
Eastern Lens
and
412.0
4.0
0.3
0.1
3.3
4.7
0.0
Eastern Lens
and
438.0
4.0
0.0
0.0
1.1
0.6
0.0
Eastern Lens
Foot Wall
SSR014
-
N/A
-
-
-
-
-
Abandoned prior
to Target Depth
SSR015
-
NSI
-
-
-
-
-
Western Lens
SSR016A
296.0
2.0
0.0
0.1
0.5
19.0
0.3
Western Lens
SSR017
406.0
4.0
0.0
0.5
2.9
0.8
0.0
Western Lens
HangingWall
SSR018
416.0
4.0
0.0
0.0
1.4
0.5
0.0
Western Lens
Hanging Wall
SSR019
-
NSI
-
-
-
-
-
Western Lens
SSR020
310.0
1.0
0.0
0.0
1.0
0.7
0.0
Western Lens
HangingWall
SSR021
264.0
4.0
0.0
0.0
4.0
0.7
0.0
Western Lens
Hanging Wall

1. Reported intercepts are determined using averages of length weighted contiguous mineralisation downhole. The lower cut-offs for are 1.0% for copper, lead and/or zinc. Significant intercepts may include samples below the cut-off values if the interval is less than or equal to 2m or two sample intervals down hole. Totals may not balance due to rounding.

2. It is the opinion of Develop Global and the Competent Person that all elements and products have a reasonable potential to be recovered and sold.

Table 2. Sulphur Springs drillhole data

Hole ID East North RL Depth Dip Azi Status
KCR020 733067 7654520 1200 546 -60 225 Abandoned
KCR021 733100 7654450 1200 198 -90 0 Abandoned
SSR011 729306 7660053 1250 42 -76 157 Abandoned
SSR011A 729303 7660052 1250 492 -76 157 Completed
SSR012 729301 7660053 1250 498 -81 190 Completed
SSR013 729303 7660051 1250 450 -65 166.5 Completed
SSR014 728857 7659925 1247 316 -79 288.5 Abandoned
SSR015 728861 7659925 1250 396 -74 312 Completed
SSR016 728862 7659923 1250 42 -85 29.5 Abandoned
SSR016A 728862 7659929 1250 426 -90 0 Completed
SSR017 728890 7659950 1250 462 -71 84 Completed
SSR018 728891 7659949 1250 468 -62 89 Completed
SSR019 728890 7659949 1247 444 -71 98.5 Completed
SSR020 728890 7659948 1247 414 -66 112.5 Completed
SSR021 728887 7659948 1250 396 -74 121 Completed
KCR020 733067 7654520 1200 546 -60 225 Abandoned
KCR021 733100 7654450 1200 198 -90 0 Abandoned

Section 1: Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.

The deposit was sampled with a combination of reverse circulation (RC)
and diamond drill (DD) holes completed on a variable spacing across the
deposit to a maximum vertical depth of approximately 800 m. The RC drill
holes were sampled via an industry-standard cyclone and riffle splitter
system from the recovered sample. Diamond drill core was sampled using
standard cut half-core, or where metallurgical samples were taken, quarter-
core was used.

Diamond core was oriented, aligned and cut on geologically determined
intervals in the range from 0.15 m to 2.1 m.

Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.

Industry-standard RC drilling produced whole metre RC drill samples that
were split at the rig using a cone splitter to produce samples weighing
approximately 3 kg. Diamond drilling was completed to industry standard
using predominantly NQ size core prior to 2017, with HQ being the most
common size used during 2017 and 2021 drilling.

The whole samples from the drilling were individually weighed, dried, stage
crushed and pulverised to nominally minus 75 μm or 200 mesh (total
preparation) toproduce apulpwhich was sub-sampled for analysis.

Aspects of the determination of mineralisation that are Material to the
Public Report. In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more explanation may be required,
such as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.

RC and DD drilling was used to obtain a 1 m sample (on average) from
which samples were crushed and then pulverised in a ring pulveriser (LM5)
to a nominal 90% passing 75 μm. For each interval, a 250 g pulp sub-
sample was taken; these were then split to a 50 g charge weight for fire
assaying, with checks routinely undertaken.
Drilling techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).

A total of 58,868 m of drilling from 149 diamond and diamond tails, and 85
RC drill holes were available for the Mineral Resource estimate (MRE).

RC drilling prior to 2007 concentrated on shallow, near-surface exploration
targets. More recent drilling targeted deep massive mineralisation with hole
depths averaging ~380 m.

DD procedures, core sizes and recoveries have varied over the years. Most
historical surface drill holes were cored at NQ size; more recent drilling has
been predominantly HQ, with some PQ in poor ground conditions or in
holes drilled for metallurgical testwork.

Drill core orientation has been performed on DD holes completed since
2000. The orientation line is preserved on the portion of core remaining in
the core trayafter sampling.
Criteria JORC Code explanation Commentary
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and
results assessed.

During DD campaigns, cores were laid out in standard core trays, marked
and oriented, and recoveries calculated.

Core recoveries are generally fair to good, with an average recovery of
about 98%. Some holes that started coring closer to surface encountered
more cavernous zones with poor recovery.

Historical documentation does not record RC recoveries. For the 2021 RC
drilling, the recovery is recorded on the sampling sheet, based on visual
inspection. About 23% of the 1 m splits reported recoveries of 10% to 50%.

Measures taken to maximise sample recovery and ensure representative
nature of the samples.

Powerful RC rigs were used during the 2021 drilling to improve the
recovery of chip samples from the deep drill holes.

Triple tube was used for some recent HQ and PQ core drilling to improve
drill core recoveries in areas ofpoorground.

Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.

No relationship between sample recovery and grade tenor was identified or
observed. However, a grain size analysis should be conducted to generate
a grade profile for the massive sulphide mineralisation due to the low
recoveries for some RC samples in this zone.
Logging
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.

DD holes were geologically logged in their entirety and photographed.
Representative areas of diamond drilling were logged for geotechnical
purposes. RC drill holes were all qualitatively logged and representative
sieved and washed chips collected and stored in chip trays.

Logging by all operators was at an appropriate detailed quantitative
standard to support future geological, Mineral Resource and Ore Reserve
estimations and technical/economic studies.

All holes were logged in full.

Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.

Entech’s review of available drill hole data in the database shows the level
of detail of geological logging varies year to year – from capture of base
lithology through to more comprehensive detail, including lithology,
structure, mineralogy, alteration and weathering (oxidation state) for both
RC samples and DD core.

Logging is both qualitative and quantitative. Visual percentage estimates
for lithology, mineralogy, mineralisation, structure (where possible in core
only), weathering and features were routinely recorded, with summary
comments provided.

All DD core has beenphotographed.

The total length and percentage of the relevant intersections logged.

No drill logs are available for the RC drill holes completed in 1986.

Less than 1% of all other drill holes in the database were not logged.
Sub-sampling
techniques and
sample preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

DD core was sawn with a diamond saw. Half-core samples (quarter-core in
some metallurgical holes) were taken for assay.

If non-core, whether riffled, tube sampled, rotary split, etc and whether
_sampled wet or dry. _

1 m RC samples were collected and split off the drill rig using a splitter.
Approximately90% of the samples were dry. In areas of no mineralisation,
Criteria JORC Code explanation Commentary
these 1 m samples were composited to 4 m samples. Zones of
mineralisation were sampled or re-split at 1 m intervals.

For all sample types, the nature, quality and appropriateness of the sample
preparation technique.

Based on the documentation review, Entech is of the opinion the sample
preparation techniques are appropriate for the style of deposit and
commodity under consideration, and reflect standard techniques available
at the time.

Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.

Prior to 2005, it appears the company did not include QAQC samples in the
sample submissions; however, the laboratory inserted its own internal
QAQC checks.

From 2005 to 2012, company QAQC samples were included with the drill
samples. Since 2017, the blanks and certified reference materials (CRMs)
were included at a rate of about 1:20 samples. Duplicate samples were
also collected at a rate of 1:20 samples.

Theprocedures implemented since 2017 meet current industrystandards.

Measures taken to ensure that the sampling is representative of the in-situ
material collected, including for instance results for field duplicate/second-
half sampling.

Approximately 200 field duplicate samples have been collected from chips
and 20 from quarter drill core at Sulphur Springs. The duplicate samples
correlate reasonably well, with some spread in results as expected. Some
individual assays do not correlate well.

Whether sample sizes are appropriate to the grain size of the material
being sampled.

In Entech’s opinion, the sample sizes are industry standard and appropriate
to represent mineralisation at the Sulphur Springs deposit based on the
style of mineralisation, thickness and consistency of mineralised
intersections, the samplingmethodologyand the observed assayranges.
Quality of assay
data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.

Over the project life, four different assaying facilities in Perth have been
used. Analytical techniques involve either a three-acid or a four-acid digest
with a multi-element suite ICP-MS finish (30 g fire assay (FA) with AAS for
precious metals). Samples were split into high sulphide and low sulphide
types on submission to ensure appropriate digestion and quality analysis.
Sulphur was determined by LECO methods. All methods of analysis are
considered to provide ‘total’ assay values.

QAQC using re-submitted pulps and external check assays, blind blanks
and reference standards has been applied to samples assayed. Depending
on the operator, between 5% and 10% of the assays relate to QAQC
procedures. An independent analysis of intra- and inter-laboratory bias and
precision was undertaken in 2007 by then-owner, CBH Resources. The
results of this and subsequent QAQC work indicate there is no material
bias to assay results used for this MRE.

Based on documentation review, Entech is of the opinion the assaying and
laboratory procedures are appropriate for the style of deposit and
commodity under consideration, and reflect standard techniques available
at the time.
The described analytical methods are considered to be total assaying techniques:
Criteria JORC Code explanation Commentary
o
Multi-element analyses by acid digestion and determination by AAS,
ICP, ICP-AES with the assumption that digestion is a total dissolution.
o
Multi-element analyses of a pulverised and pressed aliquot by XRD
and XRF.
o
Gold determination byFA with an AAS finish.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make
and model, reading times, calibrations factors applied and their derivation,
etc.

No geophysical tools were used to determine any element concentrations
reported.

Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.

Entech completed a review of QAQC procedures. Key points and findings
are summarised as follows:
o
Prior to 2005, it appears the company did not include QAQC samples
in the sample submissions; however, the laboratory inserted its own
internal QAQC checks. From 2005 to 2012, company QAQC samples
were included with the drill samples.
oSince 2017, blanks and CRMs were included at a rate of about 1:20
samples. Duplicate samples were also collected at a rate of 1:20
samples.
oThe procedures implemented since 2017 meet current industry
standards.
oNo gold CRMs have been used in the most recent drill programs;
however, several different commercially available gold CRMs were
used with the earlier drilling programs.
oThere is a small bias shown for some gold CRMs; however, the bias is
not consistently positive or negative.
oNumerous different commercially available base metal CRMs have
been used with the Sulphur Springs drilling. The most recently used
CRMs are commercially available and have been prepared by Ore
Research and Exploration P/L (OREAS).
oThere is a bias shown for some base metal CRMs; however, the bias
is not consistently positive or negative. Several CRMs have been
labelled incorrectly.
oThe base metal CRMs used for the 2017–2019 drilling are
commercially available and were prepared by Geostats Pty Ltd. These
CRMs had similar issues with samples being labelled incorrectly.
oOther CRMs were used for pre-2017 drilling but, based on the data
provided, Entech was not able to determine when they were used and
which drill programs they were associated with. These older CRMs are
generally within acceptable limits, with a small bias and the occasional
result outside acceptable limits.
oThe number of base metal CRMs submitted represents about 5% of
Criteria JORC Code explanation Commentary
the total samples assayed since 2005.
oA certified blank (OREAS c27e) prepared by OREAS was used during
the 2021 drilling program. Three other blanks of unknown origin were
used for the earlier drilling.
oThe number of blanks submitted represents about 3% of the total
samples assayed.
oMost blank assays are below acceptable limits; however, there is
evidence of contamination between some samples. Incorrect labelling
of blanks has also occurred. Entech is unable to determine if follow-up
and
re-assaying of drill samples due to contaminated blanks was
completed. The data provided to Entech are not in a form that allows
these contaminated samples to be correlated to specific drill holes or
intervals.
oApproximately 200 field duplicate samples have been collected from
chips and 20 from quarter drill core. The duplicate samples correlate
reasonably well, with some spread in results as expected.
oLaboratory checks have been conducted on approximately 2,600
samples of different sample types, including chips, high-sulphur drill
core, half-core and quarter-core. The correlation is better than the field
duplicates.
oNo umpire checks at alternative laboratories have been conducted.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or
alternative company personnel.

Prior to 2011, verification procedures are not documented. However,
inspection of retained core indicates that recorded locations of
mineralisation are correct. After 2011, significant intersections were
checked by senior company personnel. Significant intersections are also
verified by portable XRF data collected in the field and cross-checked
against the final assays when received.

A range of primary data collection methods were employed since 1989.
Since 2007, data recording used a set of standard MS Excel templates on
a data logger and uploaded to a Notebook computer. The data are sent to
Perth head office for verification and compilation into an SQL database by
the in-house database administrator. Full copies are stored off site. Full
database verification of all historical information was completed in 2007 by
CBH Resources. All data are loaded and stored in a DataShed database.
~~•~~
The historical data (pre-2007) have been adjusted – all negative assays,
representing below detection assays, were converted to positive assays of
half the stated assaydetection limit.

The use of twinned holes.

No twinned holes have been drilled.

Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.

A range of primary data collection methods have been employed since
1989. Since 2007, data recording used a set of standard MS Excel
templates on a data logger and uploaded to a Notebook computer. The
Criteria JORC Code explanation Commentary
data are sent to Perth office for verification and compilation into an SQL
database by the in-house database administrator. Full copies are stored off
site. Full database verification of all historical information was completed in
2007 by CBH Resources. All data are loaded and stored in a DataShed
database.

The historical data (pre-2007) have been adjusted – all negative assays,
representing below detection assays, were converted to positive assays of
half the stated assaydetection limit.

Discuss any adjustment to assay data.

No assay data have been adjusted for this MRE.
Location of data
points

Accuracy and quality of surveys used to locate drill holes (collar and down-
hole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.

MGA_GDA94, Zone 50 (MGA94_50) is the grid system covering the
region.

Drill hole collar locations:
o
A full independent re-survey of all pre-2007 hole positions was
completed by a licensed surveyor for CBH Resources in 2007. After
2007, all hole collar coordinates have been picked up by CBH/DVP
employees using a DGPS with all coordinates and elevation (RL) data
considered reliable.

Downhole surveying and accuracy:
o
Downhole surveys were performed on all holes by either single-shot
Eastman camera or REFLEX gyroscope readings at 10–50 m
downhole intervals.

Adjustments to the collar elevations of 36 drill holes for instances where
GPS elevations did not correlate with adjacent DGPS drill holes on the
same drill pad.

Downhole survey azimuths for drill holes SSD001 to SSD088 were re-
converted from local minegrid to MGA94_50 usinga correction of +22°.

Specification of thegrid system used.

All MRE coordinates are in MGA94_50grid coordinate system.

Quality and adequacy of topographic control.

A digital terrain model (DTM) dated 2016 correlates with DGPS collar
elevations; however, the source data origins and accuracy of the DTM are
unknown.

Topographic control is provided by combination of external survey control,
photogrammetryanalysis and DGPS readings.
Data spacing and
distribution

Data spacing for reporting of Exploration Results.

No Exploration Results are beingreported aspart of this MRE

Whether the data spacing, and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.

The resource definition drilling is variably spaced, nominally 40 m × 40 m
centres.

Entech considers the data spacing to be sufficient to demonstrate the
continuity of both the geology and the mineralisation. The spacing is
sufficient to define a Mineral Resource for the Sulphur Springs zinc-copper
deposit.

Mostlengthsrange between0.1 mand1.1 m,with longersamplelengths
Criteria JORC Code explanation Commentary
limited to composited samples.

Whether sample compositing has been applied.

For MRE purposes, a 1 m composite (base and other metals) was
generated.
Orientation of data
in relation to
geological structure

Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.

Sulphur Springs comprises massive pyrite and base metal mineralisation
bound within a 550 m × 550 m area and 600 m depth extent, and consists
of an upper zone of massive sulphide overlying a disseminated/stringer
zone. A subparallel hangingwall horizon lies 10–40 m above the massive
sulphide. Across-strike widths vary from 1 m to <40 m.

Mineralisation is offset by a steeply dipping north–south oriented fault (Main
fault) which divides the mineralisation into the east and west lenses.

The average orientation of the sulphide mineralisation is east–west, dipping
on average 50° to the north, plunging slightly (003) to the northeast.

All holes have been collared from surface. The RC and DD holes were
drilled in a fan array from a limited number of drill pad locations constrained
by topography.

Drill hole coverage for geological and grade domain interpretations
averages 40 m × 40 m over the sulphide mineralisation extents.

Both RC and DD holes were drilled from locations in the hangingwall, with
some hole orientations at a low angle to mineralisation due to fan drill
angles and spatial constraints associated with topography.

If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias,
this should be assessed and reported if material.

Entech considers the predominant drilling orientation is suitable for
mineralisation volume delineation at the Sulphur Springs deposit and does
not introduce bias orpose a material risk to the MRE.
Sample security
The measures taken to ensure sample security.

Independent audits of the data in 2002 and 2006 concluded that the
sampling protocols were adequate.

After 2011, the chain of custody was managed by Venturex. The samples
were transported by Venturex personnel to Whim Creek, stored in a secure
facility and collected from site by Toll IPEC and delivered to the assay
laboratory in Perth. Online tracking was used to track the progress of
batches of samples.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.

Independent audits of the sampling techniques and data were completed
as part of previous and current feasibility studies in 2002 (McDonald
Spiejers Pty Ltd), 2006 (Golder Associates), 2008 (Zilloc Pty Ltd) and 2011
(Snowden).

The studies were comprehensive and cover all industry standard issues.
There does not appear to be any significant risk in accepting the data as
valid.

Entechconducteda site visit in 2021 and did not identify any material issues or
risks pertaining to the MRE

SECTION 2 REPORTING OF EXPLORATION RESULTS

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status

Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.

The Sulphur Springs deposit is located within M45/454. The registered
owner of the tenement is Venturex Sulphur Springs Pty Ltd, a wholly owned
subsidiary of Develop Global Ltd (DVP). The prospects are held by
Venturex Sulphur Springs Pty Ltd.

The following is extracted from the annual report on exploration activities
during 2011, prepared by GEOS Mineral Consultants:
o
A licence covering 952 ha was granted to Ashling Resources NL
(Ashling) on 22 October 1990 for a period of 21 years, expiring on 21
October 2011.
o
On 7 May 1991, a joint venture agreement was registered between
Burmine Exploration and Development and Ashling. At the same time,
a 10% share in M45/494 was registered in favour of Guardian
Resources NL (the name was subsequently changed to Guardian
Resources Limited, and the company was later acquired by Compass
Resources NL).
o
On 10 March 1993, a farm-in and joint venture and Heads of
Agreement was registered between Sipa Resources Limited (Sipa),
Guardian Resources NL, Sipa Resources International NL, Outokumpu
Zinc OY (Outokumpu) and Ashling. On 23 June 1993, Guardian’s 10%
share was transferred to Sipa and later that year (1 October 1993)
Guardian’s interest was assigned to Sipa and Outokumpu’s interest
was assigned to Outokumpu Zinc Australia Pty Ltd (Outokumpu Aus).
o
On 5 July 1994, Outokumpu Aus was registered as having a 60%
ownership while Ashling retained 15.6% and Sipa retained 24.4%. Sipa
later (30 April 2004) transferred its interest to a wholly owned
subsidiary, Sipa Resources (1987) Limited (Sipa 1987).
o
On 7 June 2005, the 60% interest of Outokumpu Aus was transferred
back to Sipa 1987.
o
On 24 May 2006, 100% title was transferred to CBH Sulphur Springs
Pty Ltd, under the terms of the Agreement for Sale of Sulphur Springs
tenements dated 11 May 2005 between Outokumpu Aus, Outokumpu,
Sipa 1987, Ashling, Sipa, CBHSS and CBH Resources. As part of this
agreement, a mortgage was lodged on 29 November 2006 in favour of
Outokumpu Aus in respect of the 100% ownership by CBHSS. The
mortgage was discharged on 25 January 2008.
o
In 2010, Venturex Resources Limited acquired CBHSS, which was
subsequently renamed to Venturex Sulphur Springs Pty Ltd.

The tenement is within Njamal Native Title Claim (WC99/8) where native
titlehas beendetermined. The traditionalowners oftheland are theNjamal
Criteria JORC Code explanation Commentary
People. The grant of the tenement predates native title and the tenement is
not subject to native title claim.

The security of the tenure held at the time of reporting along with any
known impediments to obtaining a license to operate in the area.

The tenement is subject to two third-party royalties on any production from
the tenement.

The tenement is ingood standingand no known impediments exist.
Exploration done
by other parties

Acknowledgment and appraisal of exploration by other parties.

Previous exploration has been undertaken by several parties going back
over 30 years. Modern exploration has been undertaken by Sipa
Resources, CBH Resources, Homestake Mining and Venturex Resources.

The following are excerpts taken from various company annual reports:
o
Ashling Resources NL (Ashling) acquired the Sulphur Springs
tenements in 1990 and entered a joint venture with Sipa Resources Ltd
(Sipa), Guardian Resources NL (Guardian), and Outokumpu Zinc OY
(Outokumpu) in 1993. This joint venture continued through until 2005,
during which the Sulphur Springs orebody was explored by extensive
RC and DD programs.
o
Regional alteration and geology mapping campaigns were completed
over the whole Panorama Trend district, producing a geological
framework and model for the mineralisation of the belt. Various
external geological and mineralisation studies and theses have been
completed on the Panorama Trend, with Sulphur Springs being the
basis for many of these studies.
o
The Sulphur Springs tenements were wholly bought by CBH Sulphur
Springs Pty Ltd (CBHSS) in 2006 from Sipa/Outokumpu. CBHSS
completed further resource drilling for mineralogical and metallurgical
testwork, including testwork of barren hangingwall material, and
updated the resource/reserve estimations. CBHSS proposed mining
through open pit method and completed feasibility studies and relevant
heritage, biological and hydrological surveys in preparation for mining
and construction. Continuing optimisation studies were completed for
plant design, mine design and other associated infrastructure.
o
In 2010, Venturex Resources Limited acquired CBHSS, which was
subsequently renamed Venturex Sulphur Springs Pty Ltd. In late 2013,
Venturex purchased the mining lease containing the Kangaroo Caves
deposit and several prospecting licences to the southwest from Sipa
Resources Ltd.
o
In December 2013, Venturex Resources Ltd published a definitive
feasibility study (DFS) on all its Pilbara holdings, including Sulphur
Springs, to evaluate all production options.
o
In February 2021, Venturex Resources Ltd announced a re-
capitalisation plan and equity raising. Subsequent to this, the company
changed its name from Venturex to Develop Global Ltd in October
2021.

The following is an executive summary of the exploration history of the
Criteria JORC Code explanation Commentary
Sulphur Springs project:
o
A report of sulphur precipitating in a creek downstream from a felsic
volcanic sequence led to the discovery of a sulphidic gossan in 1984.
Surface rock chip sampling revealed anomalous gold and base metal
values.
o
1987 to 1989 - Drilling and mapping carried out on behalf of Miralga
Mining was centred on an 8 km2area around the gossan outcrop. Nine
shallow RC holes were centred over the gossan, but target depths
were not achieved because of cavernous ground conditions within the
gossan.
o
1989 - Homestake withdrew from the joint venture during the March
quarter. Miralga Mining entered a joint venture with Sipa/Ashling in
June 1989 on tenements 845/419 and E45/581.
o
1989 to 1992 - Discovery of volcanogenic massive sulphide (VMS) at
Sulphur Springs by Sipa Resources and Ashling Resources NL.
o
1993 to 2000 - Continued exploration and discovery of other VMS
potential areas by Sipa Resources and Ashling Resources NL in joint
venture with Outokumpu Zinc Australia Pty Ltd.
o
1993 - A total of 18 drill holes for 7,869 m were completed geophysical
surveying including SIROTEM (fixed loop, in loop, FREM and
DHTEM), ground magnetics, gravity and Crone DHTEM.
o
1994 - A total of 16 DD holes for 6,458 m were drilled and a maiden
MRE (Indicated and Inferred) of 3.3 Mt grading at 11% zinc and 2.9 Mt
grading at 4% copper and 1% zinc, was declared.
o
1995 - Three DD holes and two extensions for 2,423 m were
completed, and 171 geochemical samples were collected.
o
1996 - Indicated and Inferred MRE of 2.8 Mt grading at 10.7% zinc and
0.6% copper
o
1999 - Pre-feasibility study (PFS), including geological review,
preliminary mine plan, review of surface infrastructure, water resource
assessment, process modelling, CAPEX/OPEX estimates.
o
2000 to 2002 - Outokumpu Zinc Australia Pty Ltd completed a total of
19 RC-DD holes to infill the drill pattern. A revised MRE was produced,
and other studies relating to mining, metallurgy, mineralogy,
environment, and native title commenced. Completion of Stage 1 of the
feasibility study and commencement of Stage 2. Other studies relating
to mining, metallurgy, mineralogy, environment, and native title
commenced.
o
2002 to 2004 - RC drilling (23 holes for 1,941 m) and collection of 14
metallurgical samples by Sipa Resources.
o
2004 - Project was taken over by CBH Resources
o
2004 to 2012 - Water bore drilling (14 holes for 1,287 m). Mineralogical
characterisation, metallurgical testwork, flora and fauna studies, and
Criteria JORC Code explanation Commentary
native title survey were carried out.
o
2012 - Venturex Resources acquired the Sulphur Springs project from
CBH Resources.
o
2012 to 2020 - Various resource definition and exploration drilling
campaigns completed. Re-optimisation study and reprocessing of
existing DHTEM data from seven holes drilled into the Sulphur Springs
deposit.
o
2020 - Primary approval for the Sulphur Springs project was granted
by the Western Australian Minister for Environment.
o
2021 - Venturex Resources Ltd announced a re-capitalisation plan and
name change to Develop Global Ltd (DVP).
o
2021 - 89 RC and DD holes drilled for a total of 21,148.7 m, including
72 resource infill holes and 17geotechnical DD holes.
Geology
Deposit type, geological setting and style of mineralisation.

Project is located approximately 144 km southeast of Port Hedland and 57
km west of Marble Bar along the 27 km Panorama Trend within the Sulphur
Springs Group and has been classified as a VMS zinc-copper deposit
located in the central east of the Archaean Pilbara Craton.

The Sulphur Springs Group lies within a north–northeasterly trending litho-
tectonic zone known as the Lalla Rookh-Western Shaw Structural Corridor
(LWSC) that is bound by regional-scale faults.

Deposit lithologies in the upper part of the Kangaroo Caves Formation
which are intersected in drill holes comprise polymict breccia, chert,
massive and stringer sulphide mineralisation, and felsic volcanic rocks of
dacitic composition.

Base metal mineralisation lies within the upper part of the Kangaroo Caves
Formation.

The massive pyrite and base metal mineralisation occurs over a 550 m
strike length and 600 m down dip extent, and consists of an upper zone of
massive sulphide overlying a disseminated/stringer zone. The upper
contact of the massive sulphide unit is generally sharp, while the lower
contact with the underlying disseminated/stringer mineralisation is
diffuse/gradational. Sulphide mineralisation appears to have been
structurally thickened, which has obscured primary morphology and metal
zonation, resulting in distinctive geospatial distribution of base metals.

Massive sulphide horizon widths vary from less than 2 m at the periphery
up to 40 m in the central part of the east and west lenses, while the lower
disseminated stringer zone has more variable widths – between 2 m and
20 m.

The following major mineralisation styles and relationships are recognised:
o
Zinc-rich mineralisation is most prominent towards the hangingwall of
the massive sulphide. Discrete zones of zinc occur towards the
footwall of the massive sulphide and are interpreted to be structural
emplacement. Lowertenor zinc-rich mineralisation is also defined
Criteria JORC Code explanation Commentary
within the footwall.
o
Copper-rich mineralisation is most prominent towards the footwall of
the massive and upper disseminated area of sulphide mineralisation.
o
Hangingwall zinc mineralisation that lies 10–40 m above the massive
sulphide is interpreted to be structural repetition of the massive
sulphides. There is low marker breccia below the hangingwall
mineralisation that is interpreted as localised thrust faulting.

The principal zinc mineral is a pale brown–coloured, iron-poor sphalerite
occurring as fine-grained disseminations throughout the sulphide
mineralisation, but is preferentially concentrated with pyrite in massive
sulphide lenses towards the hangingwall of the massive sulphides. Fine-
grained galena occurs as discrete, localised mineralisation.

The principal copper mineral is chalcopyrite, occurring as pervasive coarse
disseminations, veins and fracture infill concentrated towards the footwall of
the massive sulphide and hangingwall of the disseminated sulphide. Minor
amounts of bornite and tennantite–tetrahedrite have been noted.
Chalcocite has been noted in some of the shallower weathered
intersections. Malachite is prominent in the gossan.

Sulphide mineralisation is offset by a steeply dipping north–south oriented
fault (Main fault) which divides the mineralisation into the east and west
lenses.

Drill holes intersecting the Main fault area show significant intersections of
breccia, which is interpreted to be growth fault breccia that is not
mineralised.
Drill hole
Information

A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres)
of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.

Details of the drill holes are provided in Tables 1 & 2 within the body of this
report.

All relevant drill holes used for the modelling and estimation of the Sulphur
Springs Mineral Resources are reported in the Appendices of this Report.

If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
Data aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.

No top-cuts have been applied

Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of lowgrade results, theprocedure used for such

All results are reported on a length weighting interval,

Anyzones of cavity/no sample are assigned agrade of zero.
Criteria JORC Code explanation Commentary
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should
be clearly stated.

A metal equivalent in the form of net smelter return (NSR) has been applied
to Mineral Resources for reporting purposes and is further detailed in
Section 3 Estimation and Reportingof Mineral Resources.
Relationship
between
mineralisation
widths and
intercept lengths

These relationships are particularly important in the reporting of Exploration
Results.

If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.

If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (e.g. ‘down hole length, true width not
known’).

The geometry of mineralisation is well known and tested at this deposit by
way of DD and RC drilling and detailed prospect-scale mapping. Across the
drill hole dataset, angles to mineralisation are considered to represent a
drill intercept perpendicular to lens strike orientation.

Drillholes are designed to intersect the orebodies at a nominal 90 degrees,
however the local access, including mine design and topography required
all drillholes to be designed taking these limitations into consideration to
intersect the mineralisation.

True widths are estimated to be 65-95% of the downhole width unless
otherwise indicated.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These
should include, but not be limited to a plan view of drill hole collar locations
and appropriate sectional views.

Refer to Figures in the body of text within this announcement.
Balanced reporting
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.

Tables 1 & 2 present assays status for the current batch of RC drill holes.
Other substantive
exploration data

Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or contaminating
substances.

A substantive drilling campaign was completed during Q3 and Q4 2021 and
was designed to infill and test Inferred Mineral Resource material at depth
and support conversion to Indicated status within an MRE update.

Geotechnical, metallurgical, bulk density, rock mass characterisation
testwork was completed to feasibility study level of detail in 2018 by
Venturex Resources Ltd.

Entech does not consider there are any outstanding meaningful or material
exploration data relevant or material to this MRE.
Further work
The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).

Results from the current programme are planned to be used to produce an
update to the Sulphur Springs Resources and Reserves, along with
providing geometallurgical data.

Future drilling programmes (including DHEM) are also being planned to
target the depth/plunge extensions to mineralisation intersect in the current
drilling.

Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.

Refer to previous statement.

SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria JORC Code explanation Commentary
Database integrity
Measures taken to ensure that data has not been corrupted by, for
example, transcription or keying errors, between its initial collection and its
use for Mineral Resource estimation purposes.

The database has been audited by Entech for validation errors and
physical comparison of drill hole core photography against geological and
assay data undertaken for 170 holes underpinning the Mineral Resource.

DVP’s database to April 2022 comprised 301 Collar records, 4,310 Survey
records, 19,911 Assay records and 10,087 Lithology records.

Data from a total of 58,868 m of drilling from 149 DD and 85 RC drill holes
were available for the MRE. Mineralisation interpretations were informed by
104 DD holes intersecting the resource and 66 RC drill holes intersecting
the resource, for a total of 5954 m of drilling intersecting the resource.

Adjustments to the collar elevations of 36 drill holes for instances where
GPS elevations did not correlate with adjacent DGPS drill holes on the
same drill pad.

Downhole survey azimuths for drill holes SSD001 to SSD088 were re-
converted from local mine grid to MGA94_50 using a correction of +22°.

During the site visit in October 2021, the Competent Person conducted an
additional check of the database against known drill holes being drilled,
logged and sampled. It was determined that the drill holes being processed
at the time (e.g. stage of drilling or assayed) matched the compiled dataset
detailed above and that these data fairly represented the most recent
drillinginformation available at theproject at the time ofproject cessation.

Data validation procedures used.

Entech completed various validation checks using built-in validation tools in
GEOVIA Surpac™ and data queries in MS Access such as overlapping
samples, duplicate entries, missing data, sample length exceeding hole
length, unusual assay values and a review of below detection limit
samples. A visual examination of the data was also completed to check for
erroneous downhole surveys.

The data validation process identified no major drill hole data issues that
would materially affect the MRE outcomes.

Entech’s database checks included the following:
o
Checking for duplicate drill hole names and duplicate coordinates in
the collar table.
o
Checking for missing drill holes in the collar, survey, assay and
geology tables based on drill hole names.
o
Checking for survey inconsistencies including dips and azimuths <0°,
dips >90°, azimuths >360° and negative depth values.
o
Checking for inconsistencies in the‘From’and‘To’fields of the assay
Criteria JORC Code explanation Commentary
and geology tables. The inconsistency checks included the
identification of negative values, overlapping intervals, duplicate
intervals, gaps and intervals where the ‘From’ value is greater than the
‘To’ value.
Site visits
Comment on any site visits undertaken by the Competent Person and the
outcome of those visits.

Entech undertook a site visit to the Sulphur Springs deposit on 21 October
2021 while an RC and DD drilling campaign was in progress. During the
visit, Entech personnel inspected mineralised intersections in drill core
(SSD133, hangingwall chert, massive and disseminated sulphide
mineralisation, footwall dacite) and observed drilling, logging, sampling,
QAQC and metadata collection operations.

If no site visits have been undertaken indicate why this is the case.

Refer toprevious statement.
Geological
interpretation

Confidence in (or conversely, the uncertainty of) the geological
interpretation of the mineral deposit.

Lithology and structure are considered the predominant controls on both
the base metals (zinc, lead, copper), precious metal (silver, gold) and
gangue (iron) mineralisation at the Sulphur Springs deposit.

Entech relied on historical geological documentation, database-derived
geological and assay data, outcrop geological and structural mapping and
site-based observations to evaluate geological, structural and
mineralisation continuity.

Entech interpreted major lithological units to assist with the definition of
deposit-scale geology and sulphide mineralisation sequencing as follows:
o
Footwall dacite contact
o
Rhyodacite hangingwall
o
Footwall and hangingwall marker chert horizons
o
Hangingwall marker breccia (interpreted to be represent a thrust).

Sulphide and regolith weathering profiles were interpreted and modelled by
Entech to assist with understanding sulphide mineralisation relationships
and recoveries.

The metallurgical weathering profile comprised four distinctive zones –
leached, oxide, transitional and fresh – based on field-based observations
with re-logging by DVP personnel of available core photographs to identify
area areas of vugging and/or oxidation of sulphides, with sequential copper
digestion used to further differentiate the boundary between transitional
and fresh. The weather zones are summarised as follows:
o
Leached zone: gossan, cavernous ground conditions; depleted in zinc,
lead and copper.
o
Oxide zone: chalcocite and covellite represented >50% of copper
species; well-developed vuggy sulphides; gossanous and/or cavernous
textures evident.
o
Transitional zone: chalcocite and covellite represented <50% of copper
species; bornite/covellite may be present along with chalcopyrite;
tarnishing evident on other sulphides (e.g. pyrite); vugs related to
secondary processeswere poorly tomoderatelywelldevelopedin
Criteria JORC Code explanation Commentary
sulphide (other than copper species).
o
Fresh zone: ‘fresh' chalcopyrite was the dominant copper sulphide
species; no evidence or trace development of vugs; any vug
development was interpreted to have formed due to the dissolution of
non-sulphide minerals (e.g. carbonates), no tarnishing of other
sulphide species (e.g. pyrite) or secondary copper species was
evident.

Based on observations from downhole logging data, the regolith profile
comprises three zones: oxide (BOPO), transitional (BOCO) and fresh.

Mineralisation domains were interpreted primarily on geological logging and
downhole geological contacts, based on lithology, sulphide distribution,
grade distribution, major faults and geometry. This combination provided a
mineralisation characterisation which effectively domained the
mineralisation style and sub-domained the higher-tenor zinc and copper
mineralisation.

Confidence in the mineralisation continuity was based on geological,
mineralogical and assay data that were cross-referenced with available
core photography and mapped outcrop geology and structural features.

The massive pyrite and base metal mineralisation occurs over a 550 m
strike length and 600 m down dip extent, and consists of an upper zone of
massive sulphide overlying a disseminated/stringer zone. The upper
contact of the massive sulphide unit is generally sharp, while the lower
contact with the underlying disseminated/stringer mineralisation is
diffuse/gradational.

Sulphide mineralisation strikes east–west with an average dip of 50° to the
north.

A north–south striking late-stage fault has split and offset sulphide
mineralisation into two separate lenses.

Where logging information was inconclusive, iron and sulphide grades of
less than 20% were used to define the footwall contact of the massive
sulphide.

The following base metal mineralisation types previously identified by DVP
are recognised:
o
Zinc-rich mineralisation is most prominent towards the hangingwall of
the massive sulphide. Discrete zones of zinc occur towards the
footwall of the massive sulphide and are interpreted to be structurally
emplaced. Lower-tenor zinc-rich mineralisation is also defined within
the footwall disseminated/stringer horizon.
o
Copper-rich mineralisation occurs as a lobate, semi-continuous zone of
mineralisation towards the footwall of the massive sulphide and
hangingwall of disseminated/stringer sulphide mineralisation.
o
Hangingwall zinc mineralisation that lies 10–40 m above the massive
sulphide is interpreted to be structural repletion of the massive
sulphides. There is lower marker breccia below the hangingwall
Criteria JORC Code explanation Commentary
mineralisation that is interpreted as localised thrust faulting. Within the
hangingwall mineralisation horizon, there are two distinctive high-grade
shoots (40–60 m in strike width) with very high zinc tenor.

Data from a total of 58,868 m of drilling from 149 DD and 85 RC drill holes
were available for the MRE. Mineralisation interpretations were informed by
104 DD holes intersecting the resource and 66 RC drill holes intersecting
the resource, for a total of 5954 m of drilling intersecting the resource.

Interpretation of the two mineralisation types was initially undertaken using
all available drill holes in Seequent Leapfrog GEO™ software. Intercepts
correlating to massive sulphide and copper-rich mineralisation and
underpinned by strike continuity implied from lithology wireframes were
independently identified and manually selected in Seequent Leapfrog
GEO™prior to creating an implicit vein model.
Massive sulphide mineralisation

Entech considers confidence is moderate to high in the geological
interpretation and continuity of mineralisation domains within the massive
sulphides.

Massive sulphide mineralisation intercepts were flagged by sharp a
hangingwall contact with unmineralised country rock, logged massive
sulphide intervals and where logging information was inconclusive, iron and
sulphide grades >20% were used to define the footwall contact of the
massive sulphide.

Within the massive sulphide lode domains, correlation and statistical
analysis and visual review of the mineralisation tenor, orientation and
continuity underpinned base metal (zinc, lead, copper), precious metal
(silver, gold) and gangue (iron) sub-domain approaches.

Statistical distributions highlighted a bimodal distribution for copper and
zinc in the massive sulphide lens.

Copper and zinc in these horizons have a distinctive geospatial
relationship, with zinc primarily towards the hangingwall and copper
towards the footwall of the massive sulphide. Copper mineralisation occurs
as a semi-continuous lobate lens that straddles the footwall contact
between the massive sulphide and underlying disseminated/stringer zone,
with most of the copper mineralisation falling in the massive sulphide
horizon.

Based on these conclusions, indicator numerical modelling was used to
capture spatially continuous sub-domains of zinc (including lead) and
copper. These sub-domains were exclusive of each other and used as hard
boundaries in the massive sulphide geological envelopes, whereby zinc
and lead were composited and estimated within the zinc sub-domain, and
copper was composited and estimated within the copper sub-domain.

Correlation analysis indicated gold, silver and iron were similarly distributed
across massive sulphide domains and thus were composited and
estimated inside this boundarywith no sub-domainingundertaken.
Criteria JORC Code explanation Commentary

To maintain continuity, some material below 1% zinc and 1% copper has
been included in the lodes.

Weathering and oxidation horizons have been modelled from downhole
logged geology and assay data and have been used for sub-domaining
purposes.
Copper-rich mineralisation

Copper occurs as a lobate, semi-continuous zone of mineralisation towards
the footwall of the massive and hangingwall of disseminated sulphide
mineralisation and straddles the boundary between the massive and lower
disseminated sulphides.

The copper mineralisation may contribute to the softer lower boundary
definition of the massive sulphide.

Entech considers confidence is moderate to high in the geological
interpretation and continuity of the copper mineralisation. Entech considers
that any alternate interpretations would be unlikely to result in significant
differences to lodes spatiallyand/or volumetrically.

Nature of the data used and of any assumptions made.

Assumptions with respect to mineralisation continuity (plunge, strike and
dip) within the underground Mineral Resource were drawn directly from:
o
Drill hole lithological logging
o
Drill hole core photography (where available)
o
Mapped and interpreted north–south trending major fault
o
Mapped and interpreted outcrop geology (Archibald, 1993)
o
Variably spaced resource definition drilling, nominally 40 m × 40 m
centres
o
Historical resource and open file documentation/records/files.

The effect, if any, of alternative interpretations on Mineral Resource
estimation.

Entech is of the opinion that alternate interpretations and additional drill
hole information would be unlikely to result in significant spatial or volume
variations. This conclusion was based on undertaking grade-based
probabilistic volume modelling(numerical modelling).

The use of geology in guiding and controlling Mineral Resource estimation.

The geological sequence, sulphide mineralisation styles and major
structural faults defined thegeospatial framework for numerical modelling.

The factors affecting continuity both of grade and geology.

The topography has restricted the location and position of drill holes;
however, drill hole coverage for geological and grade domain
interpretations averages 40 m × 40 m over the sulphide mineralisation.
Dimensions
The extent and variability of the Mineral Resource expressed as length
(along strike or otherwise), plan width, and depth below surface to the
upper and lower limits of the Mineral Resource.

The Sulphur Springs deposit comprises massive pyrite and base metal
mineralisation is bound within a 550 m × 550 m area and 600 m depth
extent. Across-strike widths vary from 1 m to <40 m.

The MRE for zinc, lead, copper, silver and gold on which this Table 1 is
based has the following extents:
o
Above 750 mRL
o
From 728400 mE to 729500 mE
Criteria JORC Code explanation Commentary
o
From 7659400 mN to 7660200 mN.
Estimation and
modelling
techniques

The nature and appropriateness of the estimation technique(s) applied and
key assumptions, including treatment of extreme grade values, domaining,
interpolation parameters and maximum distance of extrapolation from data
points. If a computer assisted estimation method was chosen include a
description of computer software and parameters used.

Domain intercepts were flagged and implicitly modelled in Seequent
Leapfrog GEO™ software.

Interpretation was a collaborative process with DVP geologists to ensure
Entech’s modelling represented observations and understanding of
geological and mineralisation controls.

Domain interpretations used all available RC and DD drill hole data. All
interpreted intervals were snapped to sample intervals prior to the
construction of implicitly modelled 3D lode solids.

All drill hole samples and block model blocks were coded for lens and
oxidation domain.

Compositing approaches were selected to honour the mineralisation style,
geometry, expected grade variability and potential mining selectivity.

Drilling samples were composited to 1 m lengths honouring lode domain
boundaries using a best-fit approach whereby any small uncomposited
intervals (residuals) were divided evenly between the composites.

Composites were declustered and reviewed for statistical outliers and top-
caps were applied by domain and variable. Top-caps were applied where
outliers were determined to be both statistical and spatial in nature.

Exploratory data analysis (EDA), variogram modelling and estimation
validation was completed in GeoAccess, Supervisor V8.8 and Isatis™.

Linear estimation techniques were considered suitable due to the style, and
commodity, of deposit, available data density and geological knowledge.

Variography analyses for zinc, copper, lead, gold, silver and iron were
completed on declustered and capped downhole composites grouped by
mineralisation style (massive, disseminated, stringer). Robust variogram
models with a low to moderate nugget for zinc, copper and lead (8–10%),
gold and silver (10–11%) and iron (15%) were delineated and used in
Kriging Neighbourhood Analysis (KNA) to determine parent cell estimation
size and optimise search neighbourhoods. Variogram and search
parameters for zinc were applied to lead due to statistical and spatial
similarities. It should be noted that although the maximum continuity
modelled in the variograms ranged from 70 m to 80 m (zinc, lead, copper)
and from 120 m to 202 m (silver, gold, iron), approximately 35–55% of
spatial variability and subsequent kriging weights were applied within 15–
60 m.

Search neighbourhoods broadly reflected the direction of maximum
continuity within the plane of mineralisation, ranges, and anisotropy ratios
from the variogram models. Neighbourhood parameters were optimised
through KNA and validation of interpolation outcomes.

All estimation was completed within respective mineralisation domains as
outlined in previous sections:
oSilverppm,goldppm and ironper cent. Massive sulphide domain.
Criteria JORC Code explanation Commentary
oZinc per cent and lead per cent. Zinc sub-domain inside massive
sulphide domain.
oCopper per cent. Copper sub-domain inside massive sulphide domain
and also as footwall stringer domain.

Statistical analysis was undertaken to confirm correlated variables and
tenor relationships with weathering (regolith and metallurgical domains),
mineralisation style and decisions pertaining to sub-domain delineation. As
a result of this analysis, no other hard boundaries were applied (i.e.,
weathering profile).

The maximum distance of extrapolation from data points was
approximately half the drill hole data spacing. Using this approach, the
maximum distance of classified blocks estimated from known data points
was ~40 m.

The availability of check estimates, previous estimates and/or mine
production records and whether the Mineral Resource estimate takes
appropriate account of such data.

A check estimate was undertaken for zinc and copper on a selection of
domains using Inverse Distance Weighting Squared (IDW2) with <2%
grade variance for zinc and an average of 15% increase in copper for the
IDW outcome.

The last publicly reported MRE was the 2018 Sulphur Springs Resource6,
prepared by Mil Min Pty Ltd under the guidelines of the JORC Code,
reported Indicated and Inferred Mineral Resources of 13.8 Mt at 3.8% zinc,
1.5% copper, 0.2% lead, 0.1 g/t gold and 18 g/t silver.

By comparison, approaches to domaining, classification, reasonable
prospects for eventual economic extraction (RPPEEE) (application of net
smelter return (NSR) cut-off) undertaken by Entech and the inclusion of
data from additional RC and DD drill holes completed by DVP in 2021–
2022 account for the variations to historical Mineral Resources. Key
differences in approach included:
o
Inclusion of 77 resource definition and infill drill holes providing
increased volume delineation of discrete lenses and zinc and copper
sub-domains. This approach was implemented across all other lenses
and varied from the Mil Min Pty Ltd approach, which included internal
waste in broader sulphide domains.
o
Change in Mineral Resource classification and reporting criteria from
0.4% Cu or Cu less than 0.4 with more than 2% Zn’, in 2018 MRE to
the current NSR-based approach.

The project has not been mined historically or via artisanal methods and
therefore no historicalproduction records exist for comparisonpurposes.

The assumptions made regarding recovery of by-products.

No assumptions were made with respect to by-product recovery.

Estimation of deleterious elements or other non-grade variables of
economic significance (e.g. sulfur for acid mine drainage characterisation).

Entech understands that both iron and sulphur require monitoring for mine
planningand metallurgical amenability purposes.

6 MM_505_Sulphur_Springs_Resource_Report_March_2018

Criteria JORC Code explanation Commentary

Iron was composited, estimated and validated using the same domains as
for silver and gold.

Sulphur was selectively assayed and there were insufficient data for
sulphur to support estimation. A regression was calculated for sulphur and
applied in the final block model using estimated block grades for zinc,
copper and iron as input values.

No assumptions were made within the MRE with respect to other
deleterious variables or by-products.

In the case of block model interpolation, the block size in relation to the
average sample spacing and the search employed.

Block sizes used were Y: 5 mN, X: 10 mE, Z: 5 mRL, with sub-celling of Y:
0.312 mN, X: 0.625 mE, Z: 0.312 mRL. The parent block size was selected
to provide suitable volume fill, given the available data spacing and mining
selectivity.

The drill data spacing was 40 m × 40 m. Holes were drilled from pads on a
fan basis to cover the sulphide mineralisation at depth.

A two-pass estimation strategy was used, whereby search ranges reflected
variogram maximum modelled continuity and a minimum of 6, maximum of
16 composites for zinc, lead and copper, and a minimum of 6, maximum of
12 for gold, silver and iron. The second search reduced the minimum
composite required in the neighbourhood to 4; all other parameters (e.g.,
range and maximum composites) remained the same. All blocks which did
not meet the criteria to trigger an estimate were not estimated and were
excluded from Mineral Resource classification.

Any assumptions behind modelling of selective mining units.

No selective miningunits were assumed for this MRE.

Any assumptions about correlation between variables.

Correlation analyses were completed for all variables within sulphide
domains (Domains 1 to 4), which contributed to the grouping of elements
for compositing and estimation within domains and sub-domains.

Correlation trends are consistent across massive and disseminated/stringer
sulphide mineralisation

Grouping of elements for compositing and estimation was based on the
following positive correlations:
o
Zinc + lead (and associated high tenor sub-domain)
o
Copper and copper sub-domain
o
Gold, silver and iron are moderately correlated
o
Iron and sulphur are strongly correlated with greater than 90%
correlation
o
Iron, sulphur and density are strongly correlated with greater than 85%
correlation.

Description of how the geological interpretation was used to control the
resource estimates.

Four sulphide domains were defined as follows:
o
Domain 1: Massive sulphide mineralisation with a sharp hangingwall
contact. The footwall contact was defined either by drill hole logging or
by iron and sulphur grades greater than 20%.
o
Domain 2: Disseminated/stringer mineralisationunderlying themassive
Criteria JORC Code explanation Commentary
sulphide.
o
Domain 3: Hangingwall massive sulphide mineralisation with two
discrete shoots 40–60 m in width of high-tenor zinc mineralisation.
o
Domain 4: Footwall massive sulphide mineralisation.

All estimation was completed within either a geologically defined massive
sulphide domain (silver, gold, iron) or within higher-tenor zinc or copper
sub-domains inside the massive domains. Hard boundaries for estimation
were:
o
Silver ppm, gold ppm and iron per cent: Massive sulphide domain
o
Zinc per cent and lead per cent: Zinc sub-domain inside massive
sulphide domain
o
Copper per cent: Copper sub-domain, a semi-continuous lobate lens
that straddles the footwall contact between the massive sulphide
(Domain 1) and underlying disseminated/stringer zone (Domain 2) with
most of the copper mineralisation falling within the massive sulphide
horizon.

Each sub-domain used for estimation hard boundaries was delineated with
probability-based numerical modelling and reflected findings of geospatial,
statistical and correlation analysis.

Interpretation of lens strike extents included modelling of a key north–south
post-mineralisation fault (Main fault) that offsets the sulphide mineralisation
between 10 m and 35m.

Metallurgical domaining: Metallurgical weathering horizons were defined by
re-logging of sulphide oxidation state from core photography of 65 DD
holes and interpreted to comprise three horizons: oxide, transitional and
fresh. DVP personnel outlined the following criteria for classification of the
metallurgical weathering zones:
o
Oxide is defined when chalcocite and covellite represented >50% of
copper species. Well-developed vuggy sulphides. Gossanous and/or
cavernous textures were evident.
o
Transitional is defined when chalcocite and covellite represented <50%
of copper species. Bornite/covellite may be present along with
chalcopyrite. Tarnishing was evident on other sulphides (e.g., pyrite).
Vugs related to secondary processes were poorly to moderately well
developed in sulphide (other than copper species).
o
Fresh is defined when fresh chalcopyrite was the dominant copper
sulphide species. No evidence or trace development of vugs. Any vug
development was interpreted to have formed due to the dissolution of
non-sulphide minerals (e.g., carbonates). No tarnishing of other
sulphide species (e.g., pyrite) or secondary copper species was
evident.
o
DVP undertook a review of historical flotation testwork and identified
distinctivemetallurgicaldifferentiatorswithintransitional material. The
Criteria JORC Code explanation Commentary
review highlighted that “a distinguishing issue with transitional ores is
that mobile copper or lead ions will activate sphalerite, causing it to
recover into the copper or lead flotation stages”. DVP identified 16
tests in 15 diamond drill holes that did not have this issue that were
previously classified as transitional material based on observations
from relogging of available core photographs. These instances were
re-tagged as ‘fresh’ material and the relevant MRE surfaces and
statements were updated to reflect the changes. This resulted in
1.7Mt of transitional material being reallocated to fresh material.

These metallurgical horizons were used in an NSR calculation to reflect
recoverable metal in each metallurgical weatheringhorizon.

Discussion of basis for using or not using grade cutting or capping.

Assessment and application of top-capping was undertaken on the zinc,
lead, copper, gold, silver and iron variables by mineralisation style (massive
or disseminated). Domains were capped to address instances where
outliers were defined as both statistical and spatial in nature, presented
below:
o
Massive: zinc 30%, lead 3%, copper (no cap), silver 300 g/t, gold 1.5
g/t.
o
Disseminated: zinc 10%, lead 2%, copper 10%, silver 50 g/t, gold 0.5
g/t.
o
Metal reductions from the above caps were minor in nature averaging
<3% across all variables in the massive and disseminated domains.
Capping of the silver variable in the disseminated domain resulted in
an 8.5% metal reduction.
o
Iron was not capped.

The process of validation, the checking process used, the comparison of
model data to drill hole data, and use of reconciliation data if available.

Global and local validation of the zinc, lead, copper, gold, silver and iron
estimated outcomes was undertaken with statistical analysis, swath plots
and visual comparison (cross and long sections) against input data.

Global comparison of declustered and capped composite mean against
estimated mean (by domain and variable) highlighted less than 10%
variation for zinc and silver and within 5% variation for copper.
Moisture
Whether the tonnages are estimated on a dry basis or with natural
moisture, and the method of determination of the moisture content.

The tonnages were estimated on a dry basis.
Cut-off parameters
The basis of the adopted cut-off grade(s) or quality parameters applied.

The NSR cut-off grade used for reporting of Mineral Resources at Sulphur
Springs was A$80/t, which is approximately 80% of the break-even stoping
cut-off value underpinning DVP’s current Life of Mine Plan (LOMP). The
NSR cut-off reflects costs associated with metal recovery and was selected
based on discussions with DVP engineers, and benchmarked against
previous detailed studies at the project.

The NSR cut-off considers revenue from saleable base metals – zinc,
copper (per cent) – and silver (ppm) and offsets site operating and
sustaining capital costs, including underground operating development.
The basemetaland preciousmetals usedintheNSRcalculationall have
Criteria JORC Code explanation Commentary
reasonable potential of being saleable.

The NSR calculation determines a value for the saleable metals by
applying the following modifying factors, presented in Table 1:
o
Metal prices
oMetallurgical recoveries (by metallurgical weathering profile)
o
Payability factors, inclusive of concentrate treatment charges, metal
refining charges, payment terms (concentrate), logistics costs and
NSR royalties.

Silver metal price is A$25.54/oz.

Silver recovery average of 18% for zinc concentrate and includes
deportment from cost model.

Silver recovery average of 28% for copper concentrate and includes
deportment from cost model.
Table 1: Key NSR assumptions

For the purposes of NSR determination, NSR values were calculated, by
metallurgical domain, on a block-by-block basis prior to implementing
reporting cut-offs.

It is the Competent Person’s opinion that these methods and cut-off grades
satisfy the requirements to test, assess and define the Sulphur Springs
Mineral Resources within the context of RPEEE.
Mining factors or
assumptions

Assumptions made regarding possible mining methods, minimum mining
dimensions and internal (or, if applicable, external) mining dilution. It is
always necessary as part of the process of determining reasonable
prospects for eventual economic extraction to consider potential mining
methods, but the assumptions made regarding mining methods and
parameters when estimating Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation
of the basis of the mining assumptions made.

Outcomes from the 2018 DFS study demonstrated recoverable material
both open pit and underground development.

The MRE extends nominally 400 m below the topographic surface. Entech
considers material at this depth, and at the grades estimated, would fall
under the definition of RPEEE in an underground mining framework.

Entech considers the NSR cut-offs used for MRE reporting reflect costs
associated with metal recovery from remnant mining areas and would fall
within the definition of RPEEE in an underground framework.

No miningdilution or cost factors were applied to the MRE.
Metallurgical
factors or
assumptions

The basis for assumptions or predictions regarding metallurgical
amenability. It is always necessary as part of the process of determining
reasonable prospects for eventual economic extraction to consider potential
metallurgical methods, but the assumptions regarding metallurgical
_treatment processes and parameters made when reporting Mineral _

Metallurgical recovery factors have been applied within the NSR based on
Criteria JORC Code explanation Commentary
Resources may not always be rigorous. Where this is the case, this should
be reported with an explanation of the basis of the metallurgical
assumptions made.
inputs supplied by DVP and a review of previous feasibility-level studies7
(2018).

Entech understands from the 2018 feasibility report that metallurgical
viability and recovery factors for oxide (supergene), transitional and fresh
were addressed by a number of testwork programs based on historical
metallurgical testwork for fresh material and during the 2018 DFS, with
holes SSD089 to SSD102 sampled for testing of oxide and transitional
material.

Previous work focused on the fresh ore, resulting in a recommendation to
use selective sequential flotation to produce separate copper- and zinc-rich
concentrates with high mineral recoveries at target grades.

Estimated metallurgical recoveries for copper and zinc have been
determined for oxide, transitional and fresh material based on metallurgical
testwork.

A global silver recovery, including deportment from cost model of 18% and
28% for zinc and copper concentrates, respectively.

Total recoveries calculated in the NSR, inclusive of all concentrate products
for each material type, were based on the following recovery algorithms for
copper and zinc:

Entech understands from discussions (with DVP personnel),
documentation reviews (supplied by DVP) and project site inspections that
no other deleterious variables, which would materially affect eventual
economic extraction of Mineral Resources, have been identified at the
project.

No factors or assumptions were made within the MRE with respect to other
deleterious variables or by-products.
Environmental
factors or
assumptions

Assumptions made regarding possible waste and process residue disposal
options. It is always necessary as part of the process of determining
reasonable prospects for eventual economic extraction to consider the
potential environmental impacts of the mining and processing operation.
While at this stage the determination of potential environmental impacts,
particularly for a greenfields project, may not always be well advanced, the
status of early consideration of these potential environmental impacts

No environmental factors were applied to the Mineral Resources or
resource tabulations.

7 Venturex Resources Ltd, ASX release dated 10 October 2018: Sulphur Springs Feasibility Study confirms long-life, high-margin Australian copper-zinc mine with outstanding economics

Criteria JORC Code explanation Commentary
should be reported. Where these aspects have not been considered this
should be reported with an explanation of the environmental assumptions
made.
Bulk density
Whether assumed or determined. If assumed, the basis for the
assumptions. If determined, the method used, whether wet or dry, the
frequency of the measurements, the nature, size and representativeness of
the samples.

This MRE contains dry bulk density data which was collected on drill core
from 212 holes (between 1990 and 2022).

The density samples were located between 7659400 mN and 7660200 mN,
728400 mE and 729500 mE and nominally from the surface to a depth of
550 m, providing a representative density profile between mineralised
domains, sulphide and regolith weathering profiles and depth profile within
the MRE.

The bulk density for bulk material must have been measured by methods
that adequately account for void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones within the deposit.

Density measurements were collected and measured using an industry-
accepted water immersion density determination method for each sample.

It should be noted that cavities and core loss experienced in the ‘leached
zone’, a depleted and weathered sub-surface zone, were taken into
account during compilation of the MRE. Minor cavities (documented as
core loss) from millimetres to 1 m were modelled as voids for stamping into
the block model. Additionally, density was reduced within this weathered
zone by 20% to account for the known vuggy nature of leached material. It
should be noted Entech considers this a conservative approach to assist in
future mine planning and no mineralised or resource material is located
within this weathered horizon.

Discuss assumptions for bulk density estimates used in the evaluation
process of the different materials.

Entech applied a multivariate regression equation (zinc %, lead %, copper
% and iron %), by metallurgical weathering profile, to the block model and
derived density values on a block-by-block basis.

Within the mineralised domains, 3,090 of 5,855 samples have a measured
density value. Of these samples, 2,975 samples have complete analyses
for zinc %, lead %, copper % and iron %.

The metallurgical weathering profile comprises four key horizons – leached,
oxide, transitional and fresh. Multi-element regression indicated varying
regression co-efficients occur across the weathering horizons. Therefore, a
separate regression formula was used for oxide, transitional and fresh
material.

The leached zone is depleted of mineralisation and therefore did not
compriseMineral Resources. Abackground densitywas appliedinthis
Criteria JORC Code explanation Commentary
horizon with adjustments and depletions applied to represent the vuggy
nature of this zone (as previously discussed).

Within the fresh weathering horizon, evaluation of the copper high-tenor
sub-domain mineralisation was undertaken with no definitive variation in
regression outcomes from zinc-dominant sub-domains. Thus, one
regression formula for fresh material was applied across all mineralisation
domains.

Validation of the regression concluded a correlation co-efficient of 0.93
between measured and regression density. Ideally sulphur would be
included in this regression given the close correlation with iron. However
insufficient sampling of this element limited the ability to use all measured
densities and derive a robust a regression formula, so in this instance
sulphur was not used within density regressions.

Calculated density regression was applied on a block-by-block basis on
estimated grade values:
o
Oxide: Density=1.976418+Zn Pct0.02795+Pb Pct-0.092028+Cu Pct-
0.003506+Fe Pct
0.051415
o
Transitional: Density=2.472249+Zn Pct0.022663+Pb
Pct
0.023376+Cu Pct0.000101+Fe Pct0.043261
o
Fresh: Density=2.526907+Zn Pct0.020732+Pb Pct0.052578+Cu
Pct-0.005445+Fe Pct0.043606.
Classification
The basis for the classification of the Mineral Resources into varying
confidence categories.

The underground zinc-copper deposit contains Indicated and Inferred
Mineral Resources.

Mineral Resources were classified based on geological and grade
continuity confidence drawn directly from:
o
Drill hole methodology, data quality, spacing and orientation
o
Geological domaining
o
Estimation quality parameters

IndicatedMineral Resources were defined where a moderate level of
geological confidence in geometry, continuity, and grade was
demonstrated, and were identified as areas where:
o
Blocks were well supported by drill hole data, with drilling averaging a
nominal 40 m × 40 m or less between drill holes
o
Blocks were interpolated with a neighbourhood informed by a minimum
12–16 composites
o
Estimation quality, slope of regression above 0.5.

InferredMineral Resources were defined where a lower level of geological
confidence in geometry, continuity and grade was demonstrated, and were
identified as areas where:
o
Drill spacing was averaging a nominal 60 m or less, or where drilling
was within 70 m of the block estimate
o
Blockswereinterpolatedwithaneighbourhoodinformed by aminimum
Criteria JORC Code explanation Commentary
of 10 composite
o
Estimation quality, slope of regression above 0.2.

Mineralisation within the model which did not satisfy the criteria for
classification as Mineral Resources remained unclassified.

Whether appropriate account has been taken of all relevant factors (ie
relative confidence in tonnage/grade estimations, reliability of input data,
confidence in continuity of geology and metal values, quality, quantity and
distribution of the data).

Consideration has been given to all factors material to Mineral Resource
outcomes, including but not limited to confidence in volume and grade
delineation, continuity and preferential orientation mineralisation; quality of
data underpinning Mineral Resources, nominal drill hole spacing and
estimation quality (conditional bias slope, number of samples, distance to
informingsamples).

Whether the result appropriately reflects the Competent Person’s view of
the deposit.

The delineation of Indicated and Inferred Mineral Resources appropriately
reflects the Competent Person’s view on continuityand risk at the deposit.
Audits or reviews
The results of any audits or reviews of Mineral Resource estimates.

Internal audits and peer review were undertaken by Entech with a focus on
independent resource tabulation, block model validation, verification of
technical inputs, and approaches to domaining, interpolation and
classification.
Discussion of
relative
accuracy/confidenc
e

Where appropriate a statement of the relative accuracy and confidence
level in the Mineral Resource estimate using an approach or procedure
deemed appropriate by the Competent Person. For example, the
application of statistical or geostatistical procedures to quantify the relative
accuracy of the resource within stated confidence limits, or, if such an
approach is not deemed appropriate, a qualitative discussion of the factors
that could affect the relative accuracy and confidence of the estimate.

Local variances to the tonnage, grade and metal distribution are expected
with further definition drilling. It is the opinion of the Competent Person that
these variances will not significantly affect the economic extraction of the
deposit and the application of the Indicated and Inferred classification
extents appropriately convey this risk.

The MRE is considered fit for the purpose of feasibility level studies, life of
mineplanningand economic evaluation.

The statement should specify whether it relates to global or local estimates,
and, if local, state the relevant tonnages, which should be relevant to
technical and economic evaluation. Documentation should include
assumptions made and the procedures used.

The Mineral Resource Statement relates to global tonnage and grade
estimates.

No formal confidence intervals nor recoverable resources were undertaken
or derived.

These statements of relative accuracy and confidence of the estimate
should be compared with production data, where available.

The project has not undergone historical, recent or artisanal mining and
therefore no historicalproduction records are available for comparison.