ASX Announcement 27 September 2023

Correction to ASX Announcement: Updated mine plan shows Woodlawn set to generate exceptional financial returns

Develop Global Limited (ABN 28 122 180 205) (ASX: DVP) ( Develop or the Company ) refers to its announcement dated 12 September 2023 titled “Updated mine plan shows Woodlawn set to generate exceptional financial returns” (Announcement).

Develop confirms the Announcement refers to a previous mine plan which was released by Heron Resources to the ASX on 29 June 2016 and titled ‘Heron Resources delivers robust Feasibility Study for Woodlawn Project’.

Develop also advises that as the Announcement included tonnage classified as an exploration target within its forecast financial information, it has now included in the Announcement a full set of forecast financial information without the exploration target pursuant to Listing Rule 5.17.3 by way of an additional column that has been added to each financial table. The Company has also included a further cautionary statement as a footnote to Table 4 on page 4.

All other information reported in the Announcement are correct and remain unchanged, and no further updates have been made to the Announcement which is attached in full to this release.

This announcement was authorised for lodgement by the Board of Develop.

Investor Enquiries

Bill Beament DEVELOP Global Limited T: +61 8 6389 7400

E: [email protected]

Media Enquiries

Paul Armstrong Read Corporate P: +61 8 9388 1474 E: [email protected]

1

September 27, 2023

- Woodlawn Copper Zinc Project, NSW

Updated mine plan shows Woodlawn set to generate exceptional financial returns

Restart capital cost of just A$32m and increased copper inventory underpins IRR of 367% with strong upside from leveraged exposure to commodities rebound; Revenue split equally between copper and zinc

Key Findings of Updated Mine Plan

y Findings of Updated Mine Plan
Project Revenue A$1,809 million
Free Cash-Flow (pre-tax real) A$626 million
Pre-Production Capital A$32 million
Pre-Tax NPV7% A$481 million
Internal Rate of Return (pre-tax) 367%
  • Mine life of 7.0 years with significant potential to grow, The mine plan averages A$90M per year of pre-tax cashflow including pre-production period; This figure increases significantly even with minor commodity price rises

  • Exceptional economics driven in part by the significant sunk capital from previous owner and Develop

  • Restart capital of just A$32M to improve the current processing plant and other site infrastructure

  • Flexible restart timeline means the project is perfectly positioned to maximise its significant financial leverage from the commodity price cycle; Production takes approximately 6 months to come online

  • Average annual production of 10,000t of copper metal and 35,000t of zinc metal in payable streams; Total mine plan payable metal of 60,000t copper and 190,000t zinc

  • Copper concentrate grade of 21% and zinc concentrate grade of 50%; No offtake commitments

  • Reserve increased by 10% to 3.4Mt at 1.6% copper and 3.8% zinc through optimised mine design

  • Further opportunities to add significant value through ongoing Resource and Reserve upgrades; A Resource update is scheduled for December 2023 quarter. This will include drilling up to middle of this year. An additional Resource and Reserve update will be delivered in the March 2024 quarter which will feed into the final mine plan used for the Final Investment Decision and funding options

Updated Mine Plan Reveals Increased Inventory, Production and Financial Returns

  • The significant amount of underground capital development undertaken by Develop since acquisition has opened up multiple production fronts. This is important because it allows for mining optionality and blending capacity to increase recoveries when processing the various ore types

  • Capital development and production fronts are now decoupled with decline development ~200 vertical metres ahead of the production levels contained in the updated mine plan

  • Reserves account for ~66% of the mineral inventory, underpinning the updated mine plan

  • Capital and operating parameters re-priced in line with latest industry-wide inputs. This process utilised Develop’s in-depth understanding of underground costs from its mining services division and extensive operating experience, as well as input from leading independent consultants

o
  • Underground Ore Reserve increased by 10% to 3.4Mt at 1.6% copper and 3.8% zinc; this Reserve update does not include any drilling since 2022. Further reserve update due in the Mar-Qtr 2024

Key Project Achievements Since Acquisition by Develop:

  • Completed 3.2km of underground capital development, including advance rates up to 389m per month with a single jumbo drill

  • Current decline has extended ~100 vertical metres below previous owner’s position

  • Currently 1.0Mt @ 1.9% copper, 4.9% zinc, 1.5% lead, 42gpt silver and 0.8gpt gold of underground developed stocks in the first production front (Kate lens); equates to first 18 months of production

  • 40,000m of diamond drilling completed resulting in significant mineralised intercepts outside current Resource (ASX announcements 05 April-23, 16 May-23 and 31 August-23), including:

  • 75.0m @ 2.1% Cu, 3.1% Zn and 9gpt Ag

  • 20.0m @ 5.5% Cu, 2.1% Zn and 17gpt Ag

  • ▪ 8.80m @ 7.6% Cu, 1.6% Zn and 29gpt Ag

  • 13.0m@ 1.3% Cu, 16.6% Zn, 9.7% Pb, 182gpt Ag and 2.8gpt Au

  • 5.7m @ 1.2% Cu, 23.0% Zn, 14.1% Pb, 272gpt Ag and 2.1gpt Au

  • Improved understanding of mining ground conditions given extensive development through known structures and production ore zones

  • A$44M spent on pre-production capital activities, significantly mitigating the risks associated with the production ramp-up and re-start. This is on top of the ~A$340M spent by previous owners

  • Highly skilled people have been embedded in each discipline across the project, resulting in a strong operational team producing exceptional productivities to date

Develop (ASX: DVP) is pleased to announce the results of the Updated Mine Plan for its Woodlawn Copper-Zinc mine in NSW.

The Mine Plan shows Woodlawn is set to generate exceptionally strong financial returns, with a pre-tax internal rate of return of 367 per cent and free cashflow of A$626 million over a seven year mine life.

The results reflect the fundamentally different development and operational strategy adopted by Develop compared with previous management.

The new approach has Woodlawn capital development being mined well ahead of the production fronts. This will deliver significant benefits, including an increased production profile compared to previous mine plans and the ability for fast and effective production ramp-up.

It will also enable Develop to blend the feed to the concentrator to maximise operational stability.

Develop Managing Director Bill Beament said: “This mine plan shows Woodlawn is set to create significant value for Develop.

“The exceptional financial results stem from two key factors. First, the extremely favourable price we paid for the asset, which included extensive near-new infrastructure, vast underground development and an existing high-grade mineral inventory.

“Second, our operational team over the past year has completed further capital activities including extensive underground development, extending primary ventilation/escapeway systems, significant metallurgical testwork and process flowsheet optimisation, which greatly de-risks a production restart.

“The 40,000m of underground diamond drilling completed since late 2022, which consistently hit extensive mineralisation, is not included in this mine plan update and hence we are extremely excited about the Resource update next quarter and the next mine plan update in the March quarter 2024, both of which will include the latest results.

“Woodlawn now boasts extremely strong technical and financial foundations. These ensure the project can maximise its leveraged exposure to an upturn in commodity prices, especially copper and zinc, while continuing to grow the inventory, mine life and production rates”.

EXECUTIVE SUMMARY

Australian energy transition metals company Develop Global Ltd (“Develop”, "DVP" or “the Company”) (ASX: DVP) is pleased to announce that it has completed the updated mine plan study on its flagship 100%-owned Woodlawn Copper-Zinc Project (“Woodlawn” or the “Project”) located approximately 250 km southwest of Sydney.

The results confirm the Project’s exceptionally strong financial and technical merits based on a 0.85 million tonne per annum (“Mtpa”) underground mine. The mine plan confirms that Woodlawn has the potential to be a very profitable mine with low cash operating costs, robust margins and outstanding economic returns.

The mine plan indicates Woodlawn will produce an average annual production 10kt of Copper and 35kt of Zinc metal in payable streams. Life of mine payable metal of 60kt copper and 190kt zinc.

The project is forecast to generate revenue of A$1.8 billion and pre-tax free cash flow of A$626 million over an estimated 7-year mine life.

Financial Summary and Key Outcomes

A summary of financial model outputs and inputs is presented in Table 1 1, key commodity price assumptions are presented in Table 2 and 3 with key mine plan outcomes shown in 1 below:

Table 1: Financial Model Outputs

Description Unit With Exploration
Target
Without
Exploration Target
Pre Tax NPV7%1
Pre-Tax IRR
Payback
Free Cash-flow
Maximum Cash Down
$AM
%
mths
$AM
$AM
481
367%
12
626
53
363
372%
12
450
53

1 NPV discount factors are presented on a real basis.

Table 2: Average Commodity Price Realised

Pricing Index(USD) Pricing Index(USD) Copper Lead Zinc Ag Au Forex
Average Realised Mine Plan Price 9,474 2,120 2,851 24 1,841 0.68
Table 3: Commodity Price Deck Forecast
Y1 Y2 Y3 Y4 Y5 Y6 Y7
Cu: USD$ / t 8,774 9,083 9,458 9,965 9,634 9,855 9,546
Pb: USD$ / t 2,116 2,116 2,094 2,116 2,205 2,205 1,984
Zn: USD$ / t 2,822 2,812 2,823 2,874 2,874 2,874 2,874
Ag: USD$ / oz 23 23 23 25 24 24 24
Au: USD$ / oz 1,850 1,821 1,795 1,883 1,757 1,832 1,950

==> picture [593 x 55] intentionally omitted <==

Table 4: Key Financial Statistics

Study Outcomes With Exploration Target4 Without Exploration Target
Production Rate
Mine plan Project revenue (real)
Mine plan Free Cash flow (pre-tax real)
Infrastructure capital
Pre-tax NPV7%
Internal Pre-tax Rate of Return (IRR)
Max Negative Cash flow
Project payback
Average Annual Free Cash flow (real)
Mine plan assumed revenue per tonne
Average cash operating costs3
Royalties
Capital Cost
Margin
0.85 Mtpa
A$1,809 million
A$626 million
A$25 million
A$481 million
367%
A$53 million
~1 year
A$90 million
A$353/tonne
A$178/tonne
A$16/tonne
A$36/tonne
A$123/tonne
0.85 Mtpa
A$1,392 million
A$450 million
A$25 million
A$363 million
372%
A$53 million
~1 year
A$75 million
A$331/tonne
A$172/tonne
A$16/tonne
A$36/tonne
A$107/tonne

3Cash operating costs include all mining, processing, transport, port, shipping/freight and site based general, TCRC’s and concentrate charges and administration costs.

4Of Woodlawn’s Production Target, 17% is comprised of Exploration Target. These tonnes are conceptual in nature and are based on material that has been geologically modelled around the historic voids from historic information. The voids have been depleted and the remaining material forms the basis of the Exploration Target. The Exploration Target material sits outside of the current Mineral Resource Estimate and there is no certainty that further work will result in the determination of Mineral Resources or that the Production Target itself will be realised. The material attributed to the Exploration Target has been planned in the same fashion as the Ore Reserve with no distinction made between any Mineral Resource class or Exploration Target in the process. All material has been evaluated based on NSR cut-off, stope and development designs have been completed for the planned material. The material forms part of the mine schedule and economic analysis and has all costs and time constraints associated with extraction applied resulting in positive cashflows.

Figure 1: Mine plan Mining Schedule –Tonnes and Grade Mined

==> picture [463 x 298] intentionally omitted <==

==> picture [593 x 11] intentionally omitted <==

`

Figure 2: Mine plan Processing Schedule – Tonnes and Grades

==> picture [463 x 283] intentionally omitted <==

Figure 3: Pre-Tax Cash Flow –Annual and Cumulative

==> picture [463 x 284] intentionally omitted <==

Next Steps

Updated Mineral Resource Estimate is planned for December Quarter, 2023. A further Resource and Reserve update is scheduled for the March quarter 2024 which will feed into the final mine plan used for the Final Investment Decision on the restart of production, in March quarter 2024. Pre-production activities will continue to de-risk the project even further.

==> picture [593 x 11] intentionally omitted <==

`

Mine Plan Summary

Develop’s Woodlawn mine plan work has been completed to a high standard with the assistance of a group of highly experienced independent consultants and contractors, including:

  • Process Plant Infrastructure and Non-Process Infrastructure – GR Engineering Services and RangeCon

  • Historical and newly conducted Metallurgical Test work – AMML, Heron Resources, Develop, ALS Metallurgy and Auralia Metallurgy

  • Geology and Resources and Geotechnical – Develop and Entech Pty Ltd

  • Tailings Management Facility and Geotechnical – Fitton Tailings Consultants

The Company would like to extend its thanks to all consultants and staff that assisted during the completion of this study.

ORE RESERVES

The Ore Reserves are based on the updated Mineral Resource Estimate announced in August 2022 (see ASX release dated 02 August 2022). The Ore Reserve estimate, which was prepared by Develop, is presented in Table 5: below. The Ore Reserve represents a 10% increase in total ore tonnes from the previous estimate in 2019 (see ASX release 30 June 2019). The mine plan supporting this estimate is outlined in this document.

Table 5: Woodlawn Ore Reserve

Ore Reserve
Estimate
Ore
(Mt)
Cu
Grade
(%)
Cu
Metal
(kt)
Pb
Grade
(%)
Pb
Metal
(kt)
Zn
Grade
(%)
Zn
Metal
(kt)
Ag
Grade
(g/t)
Ag
Metal
(koz)
Au
Grade
(g/t)
Au
Metal
(koz)
UG Proved
Reserve
- -
-
-
-
-
-
-
-
-
-
UG
Probable
Reserve
3.4 1.6
54
1.3
44
3.8
131
31.7
3,462
0.5
60
UG Total
Reserve
3.4 1.6
54
1.3
44
3.8
131
32.1
3,462
0.5
60

*Calculations have been rounded to the nearest 100,000t of ore, 0.1% Zn/Pb/Cu grade, 0.1g/t Ag/Au grade, 1,000 t of Zn/Pb/Cu metal, and 1,000 oz. of Ag/Au metal.

PROJECT BACKGROUND

The Woodlawn Project is located approximately 250 km south west of Sydney in the state of New South Wales (NSW).

==> picture [593 x 11] intentionally omitted <==

`

Figure 4: Woodlawn’s Location

==> picture [377 x 319] intentionally omitted <==

PROJECT TENURE

The Woodlawn Project is 100% owned by Develop through its subsidiaries Tarago Operations Pty Ltd, Tarago Exploration Pty Ltd and Ochre Resources Pty Ltd. The Project comprises one mining lease and ten exploration licences.

Tenement ID Project Date
granted
Date expire Registered Holder Area
km2
Ownership
S(C&PL)L0020 Woodlawn 31/10/1973 16/11/2029 Tarago Operations PtyLtd 0.2368 100%
EL7257 Woodlawn 14/11/2008 14/11/2026 Tarago Exploration PtyLtd 174.3 100%
EL7468 Woodlawn 4/03/2010 4/03/2026 Tarago Exploration PtyLtd 19.72 100%
EL7469 Woodlawn 4/03/2010 4/03/2026 Tarago Exploration PtyLtd 61.7 100%
EL8325 Woodlawn 3/12/2014 2/12/2023 Tarago Exploration PtyLtd 179.8 100%
EL8353 Woodlawn 17/03/2015 17/03/2024 Tarago Exploration PtyLtd 44.94 100%
EL8623 Woodlawn 17/07/2017 17/07/2026 Ochre Resources PtyLtd 153.7 100%
EL8712 Woodlawn 5/03/2018 5/03/2024 Ochre Resources PtyLtd 92.8 100%
EL8796 Woodlawn 25/09/2018 2509/2024 Ochre Resources PtyLtd 66.7 100%
EL8797 Woodlawn 25/09/2018 2509/2024 Ochre Resources PtyLtd 72.5 100%
EL8945 Woodlawn 19/02/2020 19/02/2026 Tarago Exploration PtyLtd 290 100%

GEOLOGY & MINERALISATION

The Woodlawn deposit is a stratiform volcanogenic massive sulphide (VMS) deposit that is hosted within the central part of the mid Silurian to early Devonian Goulburn Basin: a deep water, back-arc basin which developed within Ordovician to early Silurian sediments of the Lachlan Fold Belt that hosts numerous metalliferous deposits. Woodlawn lies on the eastern limb of the asymmetric north-northwest plunging Woodlawn Syncline.

==> picture [593 x 11] intentionally omitted <==

`

Mineralisation for base metal (copper, zinc, lead) and precious metal (silver, gold) is hosted in regionally metamorphosed (greenschist facies) fine to coarse-grained felsic to intermediate volcanic rocks, volcanogenic sedimentary rocks and minor carbonaceous shale, known as the Woodlawn Volcanics.

Three mineralised horizons (Lower, Middle and Upper) hosting 11 known massive sulphide lenses occur within a 400 m × 600 m wide and 900 m deep northwest plunging corridor which remains open at depth.

RESOURCES

The underground Mineral Resource Estimate (MRE) for the Woodlawn copper-zinc mine was prepared by Entech (see ASX announcement dated 02 August 2022) and is reported according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) 2012 edition.

The MRE includes 198,718m of drilling from 1,067 diamond drillholes (DD), including reverse circulation with diamond tails, and 39 reverse circulation (RC) drillholes, completed since 1969. Of the drill metres underpinning the Mineral Resource, 26% were completed by Heron Resources Limited, with the remaining historical drilling completed by previous owners between 1969 and 2013. The depth from surface to the current vertical limit of the Mineral Resources is approximately 900 m.

The Measured, Indicated and Inferred Mineral Resources are reported excluding historical mining voids, sterilised material and exclusion zones, comprise wholly of fresh rock material and use a Net Smelter Return (NSR) cut-off value.

The NSR cut-off values chosen to constrain and report Mineral Resource blocks were A$140/t for historical remnant lenses and A$100/t for all other lenses. Entech considered these cut-offs to reflect values required to obtain metal recovery from the respective areas using mechanised underground mining methods. The Mineral Resource Statement is presented in Table 6.

Table 6: Woodlawn underground Mineral Resource, at NSR cut-off of A$100/t, with A$140/t used for remnant lenses

Resource Category Tonnes (kt) NSR Zinc (%) Lead (%) Copper (%) Gold (ppm) Silver
(ppm)
Measured 104 404 4.3 1.9 2.1 1.4 100.0
Indicated 4,776 348 5.0 1.8 1.8 0.7 42.2
Inferred 2,461 408 6.9 2.5 1.8 0.3 47.8
Total 7,341 369 5.7 2.0 1.8 0.6 44.9

Notes: The NSR has been calculated using metal pricing, recoveries and other payability assumptions detailed in ‘Cut-off parameters’ in Section 11.14.1.1 of this report and Section 3 of the attached JORC Code Table 1. It is Entech’s opinion that all metals used in the NSR calculation have reasonable potential to be extracted, recovered and sold. Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding

ESG

Develop’s strategic approach is to revolutionise underground mining by providing services and solutions that are safe, efficient and sustainable. Our commitment to sustainability is deeply ingrained in our company values. Our sustainability strategy defines how we integrate environmental and social science into our business model and guide us in our efforts to achieve a neutral or restorative relationship with all key measures of planetary stability.

We are applying this ambitious approach to our planning for Woodlawn, by embedding sustainability-driven designs, decisions, planning and operation into the project.

Since the acquisition of the site by Develop, focus has been placed on improving the standard of environmental and social management on site, through the lens of the company’s over-arching approach to ESG.

==> picture [593 x 11] intentionally omitted <==

`

The main two focuses for the site Environment and Sustainability team over the previous year has been management of the site water balance as well as the rehabilitation of the site legacy tailings and waste rock storage facilities.

Rehabilitation work on the legacy dams has progressed much more rapidly under Develop leadership and significant progress has been made on an industry-leading approach to disturbed area rehabilitation using composted material in replacement of the difficult to source topsoil. This is a research project under development and has shown remarkable success in accelerating the rate of rehabilitation possible as well as reducing the consumption of natural resources that would otherwise have to be sourced.

Figure 5: Composted rehab trial area

==> picture [511 x 239] intentionally omitted <==

Most of the rehabilitation on site is conducted using by-product material from other facilities in the region including crushed fines, clays, composts and alkaline materials. The work is completed using local contracting teams and a large amount of local stakeholder engagement is conducted to deliver the best and most cost-effective outcome for the operation with community buy-in.

UNDERGROUND MINING

Develop has completed the mining portion of a study update for Woodlawn, including an Ore Reserve update.

The mine operating costs have been completed by Develop using its own mining services division to price the works required, the cost estimate accuracy is +/- 15%.

Based on the inputs and constraints, the assumed mining method for the deposit is a mixture of overhand and underhand long-hole stoping with cemented paste fill as the main method for backfilling with some requirements for cemented rockfill (CRF) and rockfill in the lower levels of Kate Lens during start-up re-commissioning of the pastefill system.

Net Smelter Return (NSR) Calculation and Stope Optimisation

The NSR values were calculated on a cell-by-cell basis and used in the cut-off calculation and stope optimisation process.

The NSR calculation considers ore being broken into two distinct products:

==> picture [593 x 11] intentionally omitted <==

`

  • Copper (Cu)

  • Zinc (Zn)

The suitability of ore for each product is determined by its grade for each metal and its metallurgical weathering category.

Stope optimisations were run on the Mineral Resource models using Deswik’s Stope Optimiser® (SO®) software. All Resource categories (Measured, Indicated and Inferred) were included during the optimisation process.

Table 7: MSO parameters

Optimisation Parameter Unit Value
Stope Cut-off Grade NSR 120
Min. Mining Width (True Width) m 3.0
Vertical Level Interval m 22.6
Section Length m 20
HW Dilution (True Width) m Calculated in Schedule based on Thickness
FW Dilution (True Width) m Calculated in Schedule based on Thickness
Min. Parallel Waste Pillar Width m 10
Min. FW Dip Angle ° 45

The cut-off value of $120/t was used in the stope optimisation process. A value of $60/t was used as a development cut-off and an incremental stope cut-off which includes the cost of mining and processing but excludes the cost of development.

Table 8: mine plan NSR cut-off grade

NSR Cut-off for fresh rock underground material NSR Cut-off for fresh rock underground material
Site Operating Costs Units Total Op
Cost
Incremental
Stoping
Incremental
Development
General & Administration AUD / t ore 5.8 - -
Processing - Flotation AUD / t ore 60.0 60.0 60.0
Total AUD / t ore 65.8 60.0 60.0
Mining Operating Costs
Lateral Development AUD / t ore 36.0 - -
Vertical Development AUD / t ore 3.5 - -
Ore Stoping AUD / t ore 45.3 45.3 -
Mine Backfill AUD / t ore 6.7 6.7 -
Mine Services AUD / t ore 24.9 8.3 -
Geology AUD / t ore 2.0 - -
Surface Road Haulage to Plant AUD / t ore 3.0 3.0 3.0
Total AUD / t ore 121.4 63.3 3.0
Calculated NSR Cut-offs Units NSR NSR NSR
Economic Stope cut-off NSR AUD / t ore 187.2
Incremental Stope cut-off NSR AUD / t ore 123.3
Incremental Development cut-off NSR AUD / t ore 63.0

==> picture [593 x 11] intentionally omitted <==

`

Mining

The mining method in the mine plan is consistent with previous studies: top-down, long hole open stoping utilising paste fill. The majority of the mine development is planned to access stopes as end on and retreat stoping to abutments, the exception to this is the Kate lens where central access drives have been designed where stoping will be mined to a retreating pillar.

Ore is scheduled from a combination of new and remnant areas. The ore will be truck to surface then transferred 2.1km overland to the processing plant.

Significant changes in decline strategy from previous studies is incorporated into the current mine plan planning. Scheduling of the mine plan capital development and production areas are now decoupled with decline development ~200 vertical metres ahead of the stoping front. Decline path has been adjusted away from remnant areas and access the historic workings will be from new development.

The new approach with capital development being mined well ahead of production fronts delivers significant benefits, including increased production profile compared to previous mine plans and ability for fast and effective production ramp-up with multiple production fronts available and stope flexibility. It will also give the ability to effectively blend and process both copper and polymetallic ores given flexibility of multiple production fronts.

The current south decline has been developed to exploit the Kate Lens orebody. This development is all but complete and the south decline is planned to continue towards the footwall of D and I lenses.

Figure 6: Developed Stoping Stock - Kate Lens

==> picture [338 x 246] intentionally omitted <==

Table 9: Developed Stoping Stock - Kate Lens

Level Ore (kt) Cu Grade
(%)
Pb Grade
(%)
Zn Grade
(%)
Ag Grade
(g/t)
Au Grade
(g/t)
2510 101 0.9
2.1
5.7
64.0
0.9
2490 141 1.2
1.9
5.9
51.4
0.9
2470 212 1.7
1.6
5.5
46.4
0.8
2440 338 2.5
1.2
4.3
36.0
0.7
2410 209 2.2
1.2
4.3
28.5
0.6
Total 1,000 1.9
1.5
4.9
41.6
0.7

==> picture [593 x 11] intentionally omitted <==

`

Figure 7 Capital development layout

==> picture [465 x 562] intentionally omitted <==

==> picture [593 x 11] intentionally omitted <==

`

Figure 8: Mine plan

==> picture [465 x 578] intentionally omitted <==

==> picture [593 x 11] intentionally omitted <==

`

The current 2490 exploration drive is being extended to the south to link with the D and I lens decline to act as a return airway and path for electrical and pumping infrastructure.

Upper E, G and H Lenses are accessed from the primary decline and from an incline that joins the primary decline at the 2700mRL.

Stope dilution parameters used in the generation of the current mine plan are outlined in Table 10

Table 10 Stope dilution factors

Area Design HR Indicative ELOS Indicative ELOS
HW FW
A, B, C and J
Lenses
(indicated
resources)
Talc-chlorite altered
zones
3.0 1.0 m 0.5 m
Faulted zones 3.5 1.0 m 0.5 m
Other remnants
(except faulted and
altered zones)
3.5 1.0 m 0.5 m
Extensions (except
faulted and altered
zones)
5.0 0.5 m 0.25 m
D Lens (indicated resources) 6.0 0.5 m 0.25 m
Upper E Lens
(indicated
resources)
<15 m from 790 and
795 faults
3.5 1.0 m 0.5 m
>15 m from 790 and
795 faults
6.0 0.5 m 0.25 m
G Lens (indicated resources) 3.5 1.0 m 0.5 m
H Lens (indicated resources) 3.5 1.0 m 0.5 m
Kate Lens
(indicated
resources)
<15 m from 790 and
795 faults
3.5 1.0 m 0.5 m
>15 m from 790 and
795 faults
6.0 0.5 m 0.25 m
Inferred
resources in D
and I Lenses
<15 m from major
faults
3.5 1.0 m 0.5 m
>15 m from major
faults
5.0 0.5 m 0.25 m

==> picture [593 x 11] intentionally omitted <==

`

Figure 9: Total underground yearly mined ore tonnes by activity type

==> picture [463 x 282] intentionally omitted <==

Figure 10: Total underground yearly mined ore tonnes by resource category

==> picture [463 x 280] intentionally omitted <==

==> picture [593 x 11] intentionally omitted <==

`

METALLURGICAL TESTING AND PROCESSING

The prior operations at Woodlawn were focussed on tailings retreatment and underground ore as a supplementary high-grade source. Develop are developing the initial mine plan to treat underground ore exclusively and the circuit will be configured to optimise this flowsheet.

In assessing what an improved Woodlawn processing flowsheet should look like, many sources of information were consulted. These included Denehurst historical production records, Heron operational documents, feedback from prior staff, metallurgical testing carried out by Heron in anticipation of returning from care and maintenance and metallurgical testing on recent Develop drilling programs.

The major problems to be addressed include 1) availability and operability issues in the crushing circuit would starve the flotation circuit of stable feed; 2) insufficient crushing and/or grinding power to achieve desired consistent throughput rates and product size; 3) water quality issues creating scaling and activation issues.

Installation of a tertiary crusher and increasing crushed ore storage capacity will address the comminution capacity issues and support a processing rate of 850kt per annum.

Water recycled from internal streams and tailing return decant water will be treated via a cation and solids removal circuit which upscales the Heron strategy by repurposing a thickener previously used for tailings retreatment to settle out precipitated cations and solids before overflowing to the process water pond. Anti-scalants will be dosed at strategic locations to control scale formation during operation.

Figure 11: Updated Woodlawn Process Flowsheet

==> picture [511 x 189] intentionally omitted <==

A further change to the flowsheet is the removal of the 3MW IsaMill which was previously used to treat the tailings of the copper circuit prior to lead and zinc flotation. It was necessary for the tailings retreat process to rejuvenate the particle surfaces of tailings. Historical test work indicated it was beneficial for lead/zinc separation, but not copper flotation. The installed unit is oversized for the underground ore duty, leading to excessive fines generation that impacted froth stability and flotation performance. The Metso SMD regrind mills in the lead and zinc circuits will provide sufficient liberation in a more energy-efficient manner in lieu of the IsaMill.

Metallurgical testing is ongoing to evaluate the best conditions for flotation selectivity in copper, lead and zinc stages. Starvation dosing of collector reagents has been found to be beneficial and attention will be put on automating dosing at plant scale driven by feed grades and tonnages. The incorporation of starch into the conditioning stage shows promise for reducing the lead content of copper concentrates.

==> picture [593 x 11] intentionally omitted <==

`

METALLURGICAL RECOVERIES

Expected copper performance has been reviewed and Develop will be able to increase based on the comparisons with the recoveries used in Heron’s DFS and operating targets. This is supported by actual performance results achieved during the historical Denehurst operation from 1978 to 1998. By treating copper only ore discretely rather than blending with polymetallic ore, average copper recoveries of 84% were achieved. Recovery of copper from polymetallic ore averaged 64%. A key parameter for copper performance, the copper to lead ratio, is favourably higher than historical for the initial years of operation.

The updated mine plan has assumed the following processing recoveries;

  • (a) Copper – 84% for Cu only ore, 64% for polymetallic ore (Zn)

  • (b) Zinc – 85%

  • (c) Lead – 67%

  • (d) Silver – 90%

  • (e) Gold – 50%

Figure 12: Cu recoveries via campaigning Cu only and mixed poly ores during historic Denehurst operation

==> picture [347 x 179] intentionally omitted <==

Figure 13: Favourable Cu:Pb ratio of polymetallic ores in mine plan compared to historical Denehurst operations

==> picture [347 x 178] intentionally omitted <==

LOGISTICS AND TRANSPORT

A consultant has been engaged on behalf of Develop to assess options for transport and logistics of Woodlawn concentrate and is still in development. It is envisaged this will closely resemble the strategies used by Heron Resources and transport out of Botany and Port Kembla.

A$120/t for road transport and shipping of concentrate has been used for financial evaluation.

==> picture [593 x 11] intentionally omitted <==

`

COST ESTIMATION

Capital Cost Estimate

Capital costs are presented in Table 11 and are calculated on pricing received during the study as well as first principles build up. They have been calculated as at Sept quarter 2023 (calendar year) to an accuracy of +/-15%.

Table 11: Capital Cost Estimate Summary (+/- 15%)

Infrastructure Capital Capital (A$M)
Processing Plant
Site Infrastructure
Sub Total
21.0
4.0
25.0
Operating Capital Capital (A$M)
Site Infrastructure
Mining (includes UG fleet)
Mine Fixed Plant
Closure
Salvage / residual value
Sub Total
3.0
169.7
6.5
6.8
-25.0
161.0
Total 186.0

Operating Cost Estimate

Mining and processing and all operating costs are summarised below in Table 12.

Table 12: Operating Cost Estimate Summary (+/- 15%)

Operating Cost $/t
Cost Per Unit
Mining
Processing
G and A
Treatment & Refining
Shipping
C1
Capital
AISC
Royalties
Total Cost (including royalties)
72.2
46.2
4.4
35.4
20.1
178.3
36.3
214.7
16.3
231.0

*Variances may appear in table due to rounding

FINANCIAL EVALUATION

The mine plan financial model (the “ Financial Model ”) demonstrates the robust economics of the Project.

The Woodlawn Mineral Resource and Ore Reserve has been used as the basis to design a detailed underground mine plan and optimised mining schedule to deliver ore grading 1.5% Copper and 4.4% Zinc to a 0.85Mpta processing plant over 7 years in order to produce an annual average of 10kt copper and 35kt of zinc metal in payable streams.

==> picture [593 x 11] intentionally omitted <==

`

Using industry experts to guide and facilitate the cost estimation and process design a strong understanding of real costs given inflationary market have been built into the Woodlawn project ensuring successful implementation and execution can be achieved. It has been determined the Project has an upfront capital requirement of A$32M including:

  • Upgraded crushing circuit

  • Upgrades to site buildings and infrastructure; and

  • Underground ore development and stoping activities

The mine plan average onsite operating cost including mining, processing, and on-site administration are A$178 per ore tonne processed, on a real basis.

Given the assumed metal prices and AUD:USD exchange rate the project delivers gross revenue of A$1,809M and a net pre-tax operating cash flow of $A626M and averaging A$90M per annum.

On this basis, the Project has a pre-tax NPV7% of A$481M and IRR of 367% and a payback period of one year.

Annual cash flows are represented in Figure 14 and 13 represents the mine plan summary.

Figure 14: Annual Cashflow Graph

==> picture [463 x 283] intentionally omitted <==

==> picture [593 x 11] intentionally omitted <==

`

Table 13: Financial Summary

Mining Unit With Exploration
Target
Without
Exploration Target
Mined Ore Tonnes Mt 5.1 4.2
Nominal Throughput Mtpa 0.85 0.85
Mine plan (Mining) Yrs 7.0 5.8
Processed Tonnes Mt 5.1 4.2
Avg Zn Grade % 4.4 3.9
Avg. Copper Grade % 1.5 1.5
Avg. Silver Grade g/t 36.6 30.0
Payable Zinc Metal kt 159.3 115.8
Payable Copper Metal kt 55.9 46.9
Payable Silver Metal koz 4,145.7 2,735.0
Economic Assumptions Unit Amount Amount
Avg. Zinc Price USD/t 2,851 2,847
Avg. Copper Price USD/t 9,474 9,462
Avg. Silver Price USD/oz 24 24
Avg. Exchange Rate AUD:USD 0.68 0.68
Cash Flow Unit Amount Amount
Gross Revenue A$M 1,809 1,392
TC/RC, Transport & Royalties A$M 367 279
On Site Operating Costs A$M 629 512
Net Operating Cash Flow Pre-Tax A$M
Upfront CAPEX A$M 25 25
-
Processing plant & Infrastructure
A$M 21 21
-
Other Pre-Production Capital Infrastructure

A$M
4 4
Sustaining CAPEX A$M 161 126
Net Cash Flow Pre-Tax A$M 626 450
Value Metrics Unit Amount Amount
Pre-Tax NPV8% A$M 481 363
Pre-Tax IRR % 367% 372%
Pre-Tax Payback Period Yrs 1.0 1.0

Sensitivity Analysis

The sensitivity of the pre-tax NPV and IRR was evaluated for changes in key driven variables and parameters such as:

  • Exchange rate between USD:AUD

  • All commodity prices

  • Variable costs including: mining rates, diesel price, power cost and grade control

  • Fixed costs including: site establishment, mobilisation, demobilisation, plant and equipment

==> picture [593 x 11] intentionally omitted <==

`

Figure 15: NPV Sensitivity Analysis (+/-15%)

==> picture [463 x 277] intentionally omitted <==

This announcement is authorised for release by the Board of Directors.

Investor Enquiries Bill Beament Develop T: +61 8 6389 7400 E: [email protected]

Media Enquiries

Paul Armstrong Read Corporate P: +61 8 9388 1474 E: [email protected]

About Develop

Develop (ASX: DVP) has a twin-pronged strategy for creating value. The first of these centres on the exploration and production of future-facing metals. As part of this, the Company owns the Woodlawn zinc-copper-silver project in WA’s Pilbara region. This project is currently the focus of ongoing exploration to grow the inventory and various development studies. Develop also owns the Woodlawn zinc-copper project in NSW. Woodlawn, which is on care and maintenance, comprises an underground mine and a new processing plant. The second plank of Develop’s strategy centres on the provision of underground mining services. As part of this, Develop has an agreement with Bellevue Gold (ASX: BGL) to provide underground mining services at its Bellevue Gold Project in WA.

Woodlawn Mineral Resources Statement

WOODLAWN
(DVP 100%)
WOODLAWN Classification Tonnes(kt)
Zn %
Pb %
Cu %
Ag g/t
**Aug/t **
Tonnes(kt)
Zn %
Pb %
Cu %
Ag g/t
**Aug/t **
Tonnes(kt)
Zn %
Pb %
Cu %
Ag g/t
**Aug/t **
Tonnes(kt)
Zn %
Pb %
Cu %
Ag g/t
**Aug/t **
Tonnes(kt)
Zn %
Pb %
Cu %
Ag g/t
**Aug/t **
Tonnes(kt)
Zn %
Pb %
Cu %
Ag g/t
**Aug/t **
Measured 104 4.3 1.9 2.1 100 1.4
Indicated 4,776 5 1.8 1.8 42.2 0.7
Inferred 2,461 6.9 2.5 1.8 47.8 0.3
Total 7,341
5.7
2
1.8
44.9
0.6

Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.

References

==> picture [593 x 11] intentionally omitted <==

`

1. The zinc equivalent grades for Woodlawn (Zn Eq) are based on copper, lead, zinc, silver and gold prices of US$8330t Copper, US$2160/t Lead, US$2315/t Zinc and US$23.5/oz Silver, and US$1926/oz Gold (price deck based on LME spot as 23/08/2023), with metallurgical metal recoveries of 75% Cu, 67% Pb, 85% Zn, 77% Ag and 50% Au respectively based on historical recoveries at Woodlawn and supported by metallurgical test work undertaken. The zinc equivalent calculation is as follows: Zn Eq = (Cu grade % * Cu recovery % * (Cu price $/t/Zn price $/t)) + ((Pb grade % * Pb recovery % * (Pb price $/t/Zn price$/t)) + ( Zn grade% * Zn recovery) + (Ag grade g/t /31.103 * Ag recovery % * (Ag price $/oz/Zn price $/t)) + (Au grade g/t /31.103 * Au recovery % * (Au price $/oz/Zn price $/t))

2. The Woodlawn Mineral Resource Estimate has been extracted from the Company’s ASX announcements “Woodlawn Updated Mineral Resource Estimate” issued 2 August 2022 (Original Announcement).

  1. The information in this Announcement regarding previous operations at the Woodlawn Project, including information relating to historic production, recoveries, mineral resources and financial information has been sourced using publicly available information and cross-referenced against internal data for confirmation.

4. Historic IP geophysical anomaly at Woodlawn and Bucklands a data from Heron Resource ASX announcement dated 7 May 2019.

The Company confirms that it is not aware of any information or data that materially affects the information included in the relevant market announcement and all material assumptions and technical parameters underpinning the estimates in the Original Announcement continue to apply and have not materially changed

Competent Person Statements

The information in this announcement that relates to Metallurgical Results at the Woodlawn Project is based on information complied or reviewed by Mr Kurt Tiedemann who is an employee of the Company. Mr Tiedemann is a member of the Australasian Institute of Mining and Metallurgy and Mr Tiedemann n has sufficient experience with the style of mineralisation and the type of deposit under consideration to qualify as Competent Persons as defined in the JORC Code 2012 Edition. Mr Tiedemann consents to the inclusion in the report of the results reported here and the form and context in which it appears.

The information contained in this announcement relating to the Woodlawn Ore Reserves is based on information compiled or reviewed by Mr Tristan Sommerford who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Sommerford is a full time employee of Develop Global and has sufficient experience relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaking to qualify as Competent Persons as defined in the JORC Code 2012 Edition – Mr Sommerford consents to the inclusion in the announcement of the matters based on their information in the form and context in which it appears.

Forward-looking Statements

The information contained in this document (“Announcement”) has been prepared by DEVELOP Global Limited (“Company”). This Announcement is being used with summarised information. See DEVELOP’s other and periodic disclosure announcements lodged with the Australian Securities Exchange, which are available at www.asx.com.au or at www.develop.com.au for more information.

While the information contained in this Announcement has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers give any representations or warranties (express or implied) as to the accuracy, reliability or completeness of the information in this Announcement, or of any other written or oral information made or to be made available to any interested party or its advisers (all such information being referred to as “Information”) and liability therefore is expressly disclaimed. Accordingly, to the full extent permitted by law, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers take any responsibility for, or will accept any liability whether direct or indirect, express or implied, contractual, tortious, statutory or otherwise, in respect of, the accuracy or completeness of the Information or for any of the opinions contained in this Announcement or for any errors, omissions or misstatements or for any loss, howsoever arising, from the use of this Announcement.

This Announcement may include certain statements that may be deemed “forward-looking statements”. All statements in this Announcement, other than statements of historical facts, that address future activities and events or developments that the Company expects, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. The Company, its shareholders, directors, officers, agents, employees or advisers, do not represent, warrant or guarantee, expressly or impliedly, that the information in this Announcement is complete or accurate. To the maximum extent permitted by law, the Company disclaims any responsibility to inform any recipient of this Announcement of any matter that subsequently comes to its notice which may affect any of the information contained in this Announcement. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, continued availability of capital and financing, and general economic, market or business conditions. DEVELOP assumes no obligation to update such information.

Investors are cautioned that any forward-looking statements are not guarantees of future performance and that actual results or developments may differ materially from those projected in forward looking statements. Please undertake your own evaluation of the information in this Announcement and consult your professional advisers if you wish to buy or sell DEVELOP shares.

This Announcement has been prepared in compliance with the JORC Code 2012 Edition. The ‘forward-looking information’ is based on the Company’s expectations, estimates and projections as of the date on which the statements were made. The Company disclaims any intent or obligations to update or revise any forward looking statements whether as a result of new information, estimates or options, future events or results or otherwise, unless required to do so by law.

Cautionary Statement

==> picture [593 x 11] intentionally omitted <==

`

The mine plan outcomes in this announcement comprise a Production Target and forecast financial information for the Woodlawn Zinc-Copper Project and are based on an updated mine plan for the Woodlawn Zinc-Copper Project.

The Ore Reserves and Mineral Resources underpinning the Production Target (and the forecast financial information based on that Production Target) have been prepared by a competent person in accordance with the requirements in the JORC Code 2012 Edition. Refer to the Competent Person Statements at the back of this announcement.

The Production Target is based on Develop’s current expectations of future results or events and should not be relied upon by investors when making investment decisions. All material assumptions upon which the Production Target (and forecast financial information based on the Production Target) are disclosed in this announcement. Develop has concluded that it has a reasonable basis for providing the Production Target and forecast financial information included in this announcement.

The Production Target (and the forecast financial information based on the Production Target) contained in this announcement includes material classified as Ore Reserves, Inferred Mineral Resources and Exploration Target. Material classified as Ore Reserves contributes ~66% of the material within the Production Target, Inferred Mineral Resources contribute ~17% of material included within the Production Target and Exploration Targets contribute 17% of material within the production target. Accordingly, a proportion of the Production Target (and the forecast financial information based on that Production Target) is based on Inferred Mineral Resources and Exploration Target and the Company notes there is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the Production Target insofar as it relates to the Inferred Mineral Resources will be realised.

Of Woodlawn’s Production Target, 17% is comprised of Exploration Target. These tonnes are conceptual in nature and are based on material that has been geologically modelled around the historic voids from historic information. The voids have been depleted and the remaining material forms the basis of the Exploration Target. The Exploration Target material sits outside of the current Mineral Resource Estimate and there is no certainty that further work will result in the determination of Mineral Resources or that the Production Target itself will be realised. The material attributed to the Exploration Target has been planned in the same fashion as the Ore Reserve with no distinction made between any Mineral Resource class or Exploration Target in the process. All material has been evaluated based on NSR cut-off, stope and development designs have been completed for the planned material. The material forms part of the mine schedule and economic analysis and has all costs and time constraints associated with extraction applied resulting in positive cashflows.

Investors are cautioned not to assume that any part or all of the exploration target will ever be confirmed or converted into mineral resources. The Company may decide not to undertake further exploration work, or may decide to revise or abandon the exploration target as a result of exploration results or other relevant factors.

==> picture [593 x 11] intentionally omitted <==

`

Section 1: Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
**Sampling techniques **
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as limiting the
broad meaning of sampling.

Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.

Aspects of the determination of mineralisation that are
Material to the Public Report.

In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In other cases, more
explanation may be required such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.

No new sampling data reported.
Drilling techniques
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and
_if so, by what method, etc.). _

No new drilling data reported.
Drill sample recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.

Measures taken to maximise sample recovery and ensure
representative nature of the samples.

Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.

No new drilling data reported.
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc.) photography.

The total length and percentage of the relevant intersections
logged.

No new drilling data reported.
Sub-sampling techniques and sample preparation
If core, whether cut or sawn and whether quarter, half or all
core taken.

If non-core, whether riffled, tube sampled, rotary split, etc. and
_whether sampled wet or dry. _

No new drilling data reported.
Criteria JORC Code explanation Commentary

For all sample types, the nature, quality and appropriateness
of the sample preparation technique.

Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.

Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the
material being sampled.
Quality of assay data and laboratory tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.

For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.

No new assay data reported.
Verification of sampling and assaying
The verification of significant intersections by either
independent or alternative company personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.

Discuss any adjustment to assay data.

No new assay data reported.
Location of data points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.

No new spatial data reported.
Data spacing and distribution
Data spacing for reporting of Exploration Results.

Whether the data-spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

Whether sample compositing has been applied.

No new spatial data reported.
Orientation of data in relation to geological structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.

If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.

No new data reported.
Sample security
The measures taken to ensure sample security.

No new sample data reported.
Audits or reviews
The results of any audits or reviews of sampling techniques

No reviews have been undertaken.

==> picture [593 x 12] intentionally omitted <==

`

JORC Code explanation

Criteria

Commentary

and data.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement and land tenure status
Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.

Tarago Operations Pty Ltd (Tarago Operations), a wholly owned subsidiary
of Develop Global Ltd, has held Special (Crown & Private Lands) Lease No.
20 [S(C&PL)L20] since March 2014. The lease was renewed on 21 January
2015 for a further 15 years and expires on 16 November 2029.

In November 2000, Collex Pty Ltd obtained development consent to operate
a waste bioreactor on the old Woodlawn mine site using the open cut void.
The waste facility was within S(C&PL)L20 and is now operated by Veolia
Energy Services Australia Pty Ltd.
Exploration done by other parties
Acknowledgment and appraisal of exploration by other parties.

Previous exploration has been undertaken by a number of parties going
back over 45 years. Modern exploration has been undertaken by TriAusMin
and Herron Resources.

Several drillholes reported in this announcement were completed by
previous owners Heron Resources. These holes were not previously logged
or sampled.
Geology
Deposit type, geological setting and style of mineralisation.

The Woodlawn deposit is described in historical documents as a
stratiform syngenetic polymetallic volcanogenic massive sulphide
(VMS) deposit.

The Woodlawn deposit lies on the eastern limb of the asymmetric
north-northwest plunging Woodlawn Syncline.

Base metal (zinc, lead, copper) and precious (silver, gold)
mineralisation is hosted within regionally metamorphosed
(greenschist facies) fine- to coarse-grained felsic to intermediate
volcanic rocks, volcanogenic sedimentary rocks and minor
carbonaceous shale, known as the Woodlawn Volcanics.

Threemineralised horizons (Lower, Middle and Upper) hosting
twelveknown massive sulphide lenses occur within a 400 m × 600
m wide and 900 m deep northwest plunging corridor which remains
open at depth.

Major northwest trending faults have an impact on the distribution of
the lenses, with several having been disrupted or offset by these
faults.

Two major mineralisation types were historically recognised:
o Polymetallic mineralisation:fine- to medium grained, banded
tomassive pyrite–sphalerite–galena–chalcopyrite,withthe

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
gangue mineralogy including talc, quartz, chlorite, phlogopite,
muscovite and barite
o Copper-rich mineralisation:includes pyrite–chalcopyrite,
lesser pyrrhotite as well as chlorite, quartz and calcite as
massive sulphide and stockwork veins.

Base metal mineralisation is principally associated with the
polymetallic assemblage in the massive sulphide lenses. The ore is
typically massive pyrite and has splays and thickened zones, which
may be associated with faulting. Grades in the massive ore may
reach >20% Zn with copper and lead grades of several percent.

Copper-rich assemblages are concentrated along the footwall in the
massive sulphides or as stockwork veins proximal to the footwall or
hanging wall of the massive sulphides with felsic and
metasediments.

Precious metal (Ag, Au) mineralisation occurs mostly in association
with the sulphide mineralisation, occurring in both massive and
stockwork systems.
Drill hole Information
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar

dip and azimuth of the hole

down hole length and interception depth

hole length.

If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.

No new drilling data reported.
Data aggregation methods
In
reporting
Exploration
Results,
weighting
averaging
techniques, maximum and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades are usually Material
and should be stated.

Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown
in detail.

The assumptions used for any reporting of metal equivalent
values should be clearly stated.

No new data reported.
Relationship between mineralisation widths and intercept
lengths

These relationships are particularly important in the reporting of
Exploration Results.

If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.

If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g.‘down hole

No new drilling data reported.

==> picture [593 x 12] intentionally omitted <==

`

Criteria JORC Code explanation Commentary
length, true width not known’).
Diagrams
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.

Refer to Figures in the body of text within this announcement.
Balanced reporting
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.

No new assay data reported.
Other substantive exploration data
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics;
potential
deleterious
or
contaminating
substances.

Given this is a mature stage project with historical mining and regularised
resource and grade control drilling underpinning Mineral Resources, no
substantive exploration data has been recently collected at the project.
Further work
The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).

Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive

Results from the current programme are planned to be used to produce an
update to the Woodlawn Resource, along with providing ongoing
geometallurgical data.

Future drilling programmes (including DHEM) are also being planned to
target the depth/plunge extensions to mineralisation intersect in the current
drilling.

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria JORC Code explanation Commentary
Database integrity
Measures taken to ensure that data has not been corrupted
by, for example, transcription or keying errors, between its
initial collection and its use for Mineral Resource estimation
purposes.

The database has been audited by Entech for validation errors and physical
comparison of drill hole core photography against geological and assay data
undertaken for 1,106 holes underpinning the Mineral Resource.

Heron’s Datashed database and original laboratory assay certificates could
not be sourced, with key personnel having left the company since the
Woodlawn Project was put on care and maintenance in March 2020 and
Heron being placed into voluntary administration in July 2021.

The drill hole database was reconstructed from two data sources:
o
Query extraction of .csv files date stamped 20210921 (21 September
2021) provided by Voluntary Administrators during the project tender
phase in September 2021
o
DVP’s Geology Manager retrieved .csv backup of the database date
stamped 20200305 (5 March 2020) during a site visit in March 2022.
This date stamp was the most recent backup aside from the dataset
provided in September 2021.

Entech completed a comparison of the two datasets. For Sample-IDs that
were identical, downhole intervals and assay results matched except for

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
minor rounding differences to three decimals places for a small portion
(considered not material).

An additional check was made by the Competent Person of the database
against known drill holes being drilled, logged and sampled at the time of the
site visit in March 2020. It was determined that the drill holes being
processed at the time (e.g. stage of drilling or assayed) matched the
compiled dataset detailed above and that these data fairly represented the
most recent drilling information available at the project at the time of project
cessation.

Heron’s database to March 2020 comprised 1,555 Collar records, 17,245
Survey records, 33,542 Assay records and 28,068 Lithology records. The
compiled database used for resource estimation comprised 1,106 Collar
records, 16,078 Survey records, 30,592 Assay records and 27,009 Lithology
records.

Data validation procedures used.

Entech completed various validation checks using built-in validation tools in
GEOVIA Surpac™ and data queries in Microsoft Access such as
overlapping samples, duplicate entries, missing data, sample length
exceeding hole length, unusual assay values and a review of below
detection limit samples. A visual examination of the data was also
completed to check for erroneous downhole surveys.

The data validation process identified no major drill hole data issues that
would materially affect the MRE outcomes.

Entech’s database checks included the following:
o
Checking for duplicate drill hole names and duplicate coordinates in the
collar table.
o
Checking for missing drill holes in the collar, survey, assay and geology
tables based on drill hole names.
o
Checking for survey inconsistencies including dips and azimuths <0˚,
dips >90˚, azimuths >360˚ and negative depth values.
o
Checking for inconsistencies in the ‘From’ and ‘To’ fields of the assay
and geology tables. The inconsistency checks included the
identification of negative values, overlapping intervals, duplicate
intervals, gaps and intervals where the ‘From’ value is greater than the
‘To’ value.
Site visits
Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.

The Competent Person undertook a site visit to the Woodlawn deposit between
10 and 18 March 2020. During the visit Entech inspected mineralised
intersections from the Woodlawn deposit in drill core (Kate and G lenses) in
underground exposures (G lens) and observed drilling, logging, sampling,
QAQC and metadata collection operations.

Travel restrictions associated with COVID-19 pandemic and the operations
being closed from late March 2020 until change of ownership to DVP in
February 2022 have limited the opportunity to access site and undertake more
recent observations. However, given the previous site visit occurred a few
weeks prior to operations being suspended in March 2020, Entech is of the
opinion that project observations and conclusions made at the time reflect
processes, procedures and mineralisation styles inherited by DVP at the time
of project acquisition in February 2022.

If no site visits have been undertaken indicate why this is the

Refer to previous statement.

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
case.
Geological interpretation
Confidence in (or conversely, the uncertainty of) the
geological interpretation of the mineral deposit.

Lithology and structure are considered the predominant controls on both the
base metals (zinc, lead, copper), precious metal (silver, gold) and gangue
(iron) mineralisation at the Woodlawn deposit.

Entech relied on historical Heron geological documentation, database
derived geological and assay data, historical mineralisation wireframes,
mining voids and site-based observations to evaluate geological, structural
and mineralisation continuity.

Entech reviewed historical lithological units of the footwall sequence and
found them fit for purpose for the MRE.

Entech interpreted and modelled base of complete oxidation (BOCO) and
base of partial oxidation (BOPO) surfaces from downhole logging data.

Mineralisation domains were interpreted primarily on geological logging and
downhole geological contacts, based on lithology, sulphide distribution,
grade distribution, major faults and geometry. This combination provided a
mineralisation characterisation which effectively domained mineralisation
style and sub-domained higher tenor zinc and copper mineralisation.

Confidence in the mineralisation continuity was based on geological,
mineralogical and assay data that were cross referenced with available core
photography and historical mine development and stopes wireframes. Two
major mineralisation types previously identified by Heron are recognised:
o
Polymetallic mineralisation: fine- to medium-grained, banded to
massive pyrite–sphalerite–galena–chalcopyrite, with the gangue
mineralogy including talc, quartz, chlorite, phlogopite, muscovite and
barite
o
Copper-rich mineralisation: includes pyrite–chalcopyrite, lesser
pyrrhotite as well as chlorite, quartz and calcite as massive sulphide
and stockwork veins.
A total of 198,718 m of drilling from 1,067 DD holes (including RC with diamond
tails) and 39 RC drill holes was available for the MRE. Interpretation of the two
mineralisation types were initially undertaken using all available drill holes within
Seequent Leapfrog GEO™ software. Intercepts correlating to massive sulphide
and copper-rich mineralisation and underpinned by strike continuity implied from
lithology wireframes were independently identified and manually selected within
Seequent Leapfrog GEO™prior to creation of an implicit vein model.
Two sulphide mineralisation domains based on sulphide content were defined: a
massive sulphide mineralisation domain for polymetallic and copper-rich
mineralisation, and a stringer mineralisation domain for copper in the footwall
associated with disseminated and stringer sulphide mineralisation.
Massive sulphide mineralisation

Entech considers confidence is moderate to high in the geological
interpretation and continuity of mineralisation domains within the massive
sulphides.

Geological contacts with unmineralised footwall and hanging wall
metasediments and felsics were the primary boundaries used for defining
massive sulphide lode domain volumes.

Within the massive sulphide lode domains, correlation and statistical analysis
and visual review of the mineralisation tenor, orientation and continuity

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
underpinned base metal (zinc, lead, copper), precious metal (silver, gold)
and gangue (iron) sub-domain approaches. Statistical distributions
highlighted a bimodal distribution for both copper and zinc in the Middle and
Upper massive sulphide lenses. Copper and zinc in these horizons have a
distinctive geospatial relationship, with zinc primarily on the northern flank
and copper on the southern flank. This distinction is less evident in the
Upper horizon, which may be due to a combination of sparser drill hole
coverage, differing controls on mineralisation and lode geometry.

Based on these conclusions, Indicator numerical modelling was used (in
massive domains) to capture spatially continuous sub-domains of zinc
(including lead) and copper, with resulting grade populations ranging from
Min: 0.0015% – Max: 44.6%, Mean – 8.8% (zinc); Min: 0.001%, Max:
27.81%, Mean: 3.4% (lead) and Min: 0.002%, Max: 20.8%, Mean: 1.5%
(copper). These sub-domains were exclusive of each other and used as hard
boundaries in the massive sulphide geological envelopes, whereby zinc and
lead were composited and estimated within the zinc sub-domain, and copper
was composited and estimated within the copper sub-domain.

Correlation analysis indicated gold, silver and iron were similarly distributed
across massive sulphide domains and thus were composited and estimated
inside this boundary with no sub-domaining undertaken.

To maintain continuity, some material below 0.6% Zn and 0.6% Cu has been
included in the lodes.

Historical underground mining documentation, stope and development void
locations, preferential orientations, and widths were also used to ground-
truth interpretations of higher grade/tenor zinc and copper sub-domains and
verify the selected hard boundaries which would control estimated metal
outcomes.

Weathering and oxidation horizons have had negligible impact on base and
precious metals, with all mineralised domains lying within fresh material.
Copper stringer mineralisation

In addition to copper in massive sulphide domains, copper occurs as footwall
disseminated and stringer sulphide mineralisation.

Entech considers confidence is moderate to high in the geological
interpretation and continuity of the copper stringer mineralisation. Entech
considers that any alternate interpretations would be unlikely to result in
significant difference to lodes spatially and/or volumetrically.

Copper-rich domains within the disseminated and stringer sulphides showed
poor continuity due to the nature and geological setting for this style of
sulphide mineralisation.

Sampling of core was based primarily on the presence and/or abundance of
sulphides, with sampling of massive sulphides prioritised over sampling of
disseminated or stringer sulphide mineralisation. Consequently, sample
coverage of stringer mineralisation is more variable and wider spaced.

Nature of the data used and of any assumptions made.

Assumptions with respect to mineralisation continuity (plunge, strike and dip)
within the underground Mineral Resource were drawn directly from:
o
Drill hole lithological logging
o
Drill hole core photography (where available)
o
Mapped and interpreted northwest trending major faults

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
o
Variably spaced resource definition drilling, nominally 15 m × 15 m
centres in the upper and central area of the deposit, with the down
plunge lens extensions having one or two holes intersecting
mineralisation at depth
o
Underground void shapes of development and stopes
o
Underground production drilling (sludge and face sampling) was used
to assist with modelling of mineralisation geometries but not used for
estimation purposes
o
Historical resource and mining documentation/records/files.

The effect, if any, of alternative interpretations on Mineral
Resource estimation.

Entech is of the opinion that alternate interpretations and additional drill hole
information would be unlikely to result in significant spatial or volume
variations. This conclusion was based on undertaking grade-based
probabilistic volume modelling (numerical modelling).

The use of geology in guiding and controlling Mineral
Resource estimation.

The geological sequence, sulphide mineralisation styles and major structural
faults defined the geospatial framework for numerical modelling.

The factors affecting continuity both of grade and geology.

Drill hole coverage for geological and grade domain interpretations varies
from 15 m × 15 m in some mining areas of the historical mine to greater than
80 m × 80 m in some exploration areas, with one or two holes intersecting
mineralisation in down-plunge lens extensions at depth.
Dimensions
The extent and variability of the Mineral Resource expressed
as length (along strike or otherwise), plan width, and depth
below surface to the upper and lower limits of the Mineral
Resource.

The mineralisation extent of the Woodlawn deposit comprises three
mineralised horizons (Lower, Middle and Upper) hosting twelve known
massive sulphide lenses occur within a 400 m × 600 m wide and 900 m deep
northwest plunging corridor which remains open at depth. Across-strike
widths vary from 1 m to <35 m.

The MRE for zinc, lead, copper, silver and gold on which this Table 1 is based
has the following extents:
o
Above 1850 mRL
o
From 8750 mE to 10050 mE
o
From 18950 mN to 19850 mN.
Estimation and modelling techniques
The nature and appropriateness of the estimation
technique(s) applied and key assumptions, including
treatment of extreme grade values, domaining, interpolation
parameters and maximum distance of extrapolation from
data points. If a computer assisted estimation method was
chosen include a description of computer software and
parameters used.

Domain intercepts were flagged and implicitly modelled in Seequent
Leapfrog GEOTMsoftware.

Interpretation was a collaborative process with DVP geologists to ensure
Entech’s modelling approach aligned with project restart objectives,
represented observations and understanding of geological and
mineralisation controls.

Domain interpretations used all available drill hole data with sludge and
wall chip samples excluded from downhole compositing. All interpreted
intervals were snapped to sample intervals prior to construction of
implicitly modelled 3D lode solids.

All drill hole samples and block model blocks were coded for lens and
oxidation domain.

Compositing approaches were selected to honour the mineralisation
style, geometry, expected grade variability and potential mining
selectivity.

Drilling samples were composited to 1 m lengths honouring lode domain

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
boundaries. The Seequent Leapfrog length composite (best fit) was
used, whereby any small uncomposited intervals (residuals) were divided
evenly between the composites.

Composites were declustered and reviewed for statistical outliers and
top-caps were applied by domain and variable. Top-caps were applied
where outliers were determined to be statistical and spatial in nature.

Exploratory Data Analysis (EDA), variogram modelling and estimation
validation was completed in GeoAccess, Supervisor V8.8 and Isatis™.

Linear estimation techniques were considered suitable due to the style
of deposit and available data density.

Variography analyses for zinc, copper, lead, gold, silver and iron were
completed on declustered and capped downhole composites grouped by
mineralisation style (massive, stringer) and horizon (Lower, Middle,
Upper). Robust variogram models with a low to moderate nugget for zinc
and lead (6–18%), copper (10%), gold and silver (6–22%) were
delineated and used in Kriging Neighbourhood Analysis (KNA) to
determine
parent
cell
estimation
size
and
optimise
search
neighbourhoods. Variogram and search parameters for zinc were applied
to lead due to statistical and spatial similarities. It should be noted that
although the maximum continuity modelled in the variograms ranged
from 20-190m, the bulk of spatial variability (~60%) and subsequent
kriging weights was applied within 30–50 m in the Lower and Middle
horizons and 10–30 m in the Upper horizon.

Maximum ranges of continuity were:
o
Zinc and lead. Lower 150 m, Middle 60 m, Upper 20 m
o
Copper. Lower 60 m, Middle 130 m, Upper 30 m
o
Gold and silver. Lower 165 m, Middle 135-190 m, Upper 120
m.

Search neighbourhoods broadly reflected the direction of maximum
continuity within the plane of mineralisation, ranges, and anisotropy
ratios from the variogram models. Neighbourhood parameters were
optimised through Kriging Neighbourhood Analysis (KNA) and validation
of interpolation outcomes.

All estimation was completed within respective mineralisation domains
as outlined in previous sections:
o
Silver ppm, gold ppm and iron percent. Massive sulphide
domain.
o
Zinc percent and lead percent. Zinc subdomain inside
massive sulphide domain.
o
Copper percent. Copper subdomain inside massive sulphide
domain and also as footwall stringer domain.

No other hard boundaries were applied (i.e. weathering profile).

Maximum distance of extrapolation from data points was approximately
half the drill hole data spacing. With this approach, the maximum
distance blocks estimated from known data points was ~80 m.

The availability of check estimates, previous estimates
and/or mine production records and whether the Mineral

A check estimate was undertaken for zinc, copper and gold on a
selection of domains using Inverse Distance Squared (IDW) with < 3%
grade variance for zinc, copper and an average of 7% increase in gold

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
Resource estimate takes appropriate account of such data. grade for the IDW outcome.

The most recent Heron Mineral Resource documentation (Heron 2019)
states a global Mineral Resource (inclusive of TSF and underground
Mineral Resources of 18.2 Mt at 9.8% ZnEq) prepared under the
guidelines of the JORC Code, which includes a high-grade
underground Mineral Resource of 7.4 Mt at 15.2% ZnEq. Heron’s
Underground MRE is presented in the table below.Referenced directly
from Heron’s ASX Release dated 30 October 2019 - Woodlawn Project
Mineral Resource and Ore Reserve Statement June 2019).

By comparison, approaches to domaining, classification, RPEEE
(sterilisation and NSR) undertaken by Entech account for the variations
to historical Mineral Resources. Key differences in approach included.
o
Inclusion of resource and grade control diamond drill holes
for the Kate and G lodes which identified multiple discrete
lenses and zinc, copper sub-domains. This approach was
implemented across all other lenses and varied from the
Heron approach which included internal waste in broader
massive sulphide domains.
o
Classification approach which considered the key
challenges experienced by Heron during mining, and
immediately prior to closure of operations.
o
Definition of sterilised volumes via review of MSO (Mineable
Stope Optimiser) shapes, NSR values, and DVP’s Life of
LOMP for accessing remnant areas.
o
Change in resource classification and reporting criteria from
zinc equivalent (ZnEq) in 2019 MRE to the current (2022)
NSR based approach.

Mineral Resource accounts for historical mined voids, material sterilised
by historical mining and operational challenges experienced by Heron
prior to closure in 2020.

The assumptions made regarding recovery of by-products.

No assumptions were made with respect to by-product recovery.

Estimation of deleterious elements or other non-grade
variables of economic significance (e.g. sulfur for acid mine
drainage characterisation).

Entech understands that both iron and sulphur require monitoring for mine
planning and metallurgical amenability purposes.

Iron was composited, estimated and validated using the same process as for
value elements of gold and silver.

Sulphur was selectively assayed and did not comprise sufficient data to

==> picture [593 x 12] intentionally omitted <==

`

Criteria JORC Code explanation Commentary
support estimation. A regression was calculated for sulphur and applied
within the final block model using estimated block grades for zinc, lead,
copper and iron as input values.

No assumptions were made within the MRE with respect to other deleterious
variables or by-products.

In the case of block model interpolation, the block size in
relation to the average sample spacing and the search
employed.

Block sizes used were 5 mE × 10 mN and 10 mRL with sub-blocks of 0.625
mE × 0.3125 mN and 0.3125 mRL. The parent block size was selected to
provide suitable volume fill given the available data spacing and mining
selectivity. The drilling data spacing varies from nominal 15 m × 15 m
spacing in the central area of the deposit and increases to exploration
spacing of 80 m to test continuity of mineralisation at depth. Block model
origins were selected to correlate with the Heron 2019 block model.

A two-pass estimation strategy was used, whereby search ranges reflected
variogram maximum modelled continuity and a minimum of 6, maximum of
12 composites for zinc, lead and copper, and a minimum of 6, maximum of
16 for gold and silver. The second search reduced the minimum composite
required in the neighbourhood to 4, all other parameters (e.g. range and
maximum composites) remained the same. All blocks which did not meet the
criteria to trigger an estimate remained un-estimated and were excluded
from classification.

Any assumptions behind modelling of selective mining units.

No selective mining units were assumed for this Mineral Resource update.

Any assumptions about correlation between variables.

Correlation analyses was completed for the Lower, Middle and Upper
massive sulphide domains which contributed to the grouping of elements for
compositing and estimation within these domains.

There was insufficient sample population for estimation of sulphur; however,
there is a strong positive correlation between iron and sulphur. A sulphur
regression was calculated in the final block model using estimated grades for
zinc, lead, copper and iron grades as inputs based on strong positive
correlation.

Grouping of elements for compositing and estimation was based on the
following positive correlations:
o
Zinc + lead
o
Gold + silver + iron
o
Copper.

Description of how the geological interpretation was used to
control the resource estimates.

All estimation was completed within either a geologically defined massive
sulphide domain (silver, gold, iron) or within higher tenor zinc or copper sub-
domains inside the massive domains. Hard boundaries for estimation were:
o
Silver ppm, gold ppm and iron percent: Massive sulphide domain
o
Zinc percent and lead percent: Zinc subdomain inside massive sulphide
domain
o
Copper percent:
o
Copper subdomain inside massive sulphide domain, and
o
Stringer domain to footwall of massive domain.

Note that 28 massive and 18 stringer domains were interpreted across the
deposit. The domains were grouped as per historical nomenclature into lenses
A, B, C, D, E, G, H, I, J, Kate(K) and Lisa (L).

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary

Each massive sulphide domain comprised a sub-domain volume for zinc and
sub-domain volume for copper estimation, which reflected findings of
geospatial, statistical and correlation analysis.

For the purposes of Exploratory Data Analysis, including variography and
kriging neighbourhood analysis for the elements of zinc, lead, copper, silver,
gold and iron, these domains were also grouped by their mineralisation style
(massive or stringer) or by horizon:
o
Lower: A, B, C, J
o
Middle: D, E, Kate
o
Upper: G, H, I, Lisa.

Geological interpretation of lithology, weathering and structure was not used
to control the Mineral Resource estimation as the domains outlined above
represent the key controls on mineralisation at the deposit. Note that
interpretations of lens strike extents included consideration of interpreted
structural offsets.

Discussion of basis for using or not using grade cutting or
capping.

Assessment and application of top-capping was undertaken on the zinc,
lead, copper, gold and silver variables within individual (and grouped)
domains. Domains were capped to address instances where outliers were
defined as both statistical and spatial outliers, presented below:

All domains – zinc 15%, lead 10% and copper 15%:
o
Zinc, caps applied across Lower, Middle, Upper horizons: < 1% metal
reduction
o
Lead, caps applied across Lower, Middle, Upper horizons: < 1% metal
reduction
o
Copper, caps applied in Lower Horizon: < 1% metal reduction

Individual domains – gold ranging from 4 to 15 g/t:
o
Caps applied in Lower Horizon: 2 % metal reduction
o
Caps applied in Middle Horizon: < 1% metal reduction
o
Caps applied in Upper Horizon: 4 % metal reduction

Individual domains – silver ranging from 100 to 1,000 g/t:
o
Caps applied in Lower Horizon: < 1% metal reduction
o
Caps applied in Middle Horizon: < 1% metal reduction
o
Caps applied in Upper Horizon: 11 % metal reduction.

The process of validation, the checking process used, the
comparison of model data to drill hole data, and use of
reconciliation data if available.

Global and local validation of the zinc, lead, copper, gold, silver and iron
estimated outcomes was undertaken with statistical analysis, swath plots
and visual comparison (cross and long sections) against input data. Global
comparison of declustered and capped composite mean against estimated
mean (by domain and variable) highlighted less than 1% variation for zinc,
lead, copper. Silver estimated outcome was 6% lower than global composite
mean. Gold estimated outcome was 5% lower than global composite mean.

Reconciliation data for Heron’s recently mined areas (G lode) were not
considered suitable for comparison as both mining and milling data during
the months prior to closure were compromised by operational challenges.
Moisture
Whether the tonnages are estimated on a dry basis or with
natural moisture, and the method of determination of the
moisture content.

The tonnages were estimated on a dry basis.

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
Cut-off parameters
The basis of the adopted cut-off grade(s) or quality
parameters applied.

The MRE is reported exclusive of mineralisation which has been mined and
also mineralisation which was considered sterilised by adjacent mining.

The NSR of A$100/t is approximately 76% of the break-even stoping cut-off
value underpinning the current DVP Life of Mine Plan (LOMP). The NSR of
A$140/t for remnant areas reflects higher associated costs with metal
recovery from remnant mining areas and was selected based upon
discussions with DVP engineers and benchmarked against analogous peer
operations (comparable deposit style, commodities, project maturity).

The NSR cut-off considers revenue from base (zinc, lead, copper percent)
and precious metals (gold, silver ppm) and offsets site operating and
sustaining capital costs, including underground operating development.
Metallurgical recoveries are factored in the NSR calculation. The base metal
and precious metals used in the NSR calculation all have reasonable
potential of being saleable.

For the purposes of the NSR calculation, assumed metal prices, exchange
rates, recoveries and other payability assumptions are listed in Table 1.
Table 1

For the purposes of NSR determination, NSR values were calculated on a
block by block basis prior to implementing reporting cut-offs for remnant
mining and virgin areas.

It was noted that the Woodlawn inventory included 8.1 Mt of material
adjacent to, or within 10 m, of historical mining voids. The consideration of
this material as either sterilised or as a Mineral Resource within the context
of Reasonable Prospects for Eventual Economic Extraction (RPEEE) was
considered material to MRE outcomes.

The process to define material as sterilised or Mineral Resource material
included a review of the Mineral Resources within the context of RPEEE.
The process included stamping into the block model all estimated blocks
within 0–5 m and 5–10 m from open development and stoping voids, running
MSO (Mineable Stope Optimiser) on all material in remnant areas and
holding discussions with DVP and Entech mining engineers on the likelihood
of achieving access, on a lens by lens basis.

A key assumption underpinning these discussions and caveats to accessing
these Mineral Resources included DVP gaining re-entry to sections of
historical workings (pre-2014). Entech included or excluded material based
on the understanding that a re-entry plan is defined and planned for
execution as part of the LOMP.The Competent Person reviewed individual
lenses against historical and recent (Heron) mining voids, MSO shapes and
NSR cut-offs above A$140/t to identify contiguous areas on strike extents, up
ordowndip of historical miningwhichcould be considered potentially

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
extractable by DVP within a reasonable timeframe of 15 years.

Using this approach approximately ~3 Mt of material from lenses A, B, C, E
and J were incorporated as remnant Inferred Mineral Resources. This
comprises 41% of the tonnage in the Woodlawn Mineral Resources. All
remaining material (~5.1 Mt) was classified as sterilised, not meeting RPEEE
considerations, and is excluded from Mineral Resource tabulations.

It is the Competent Person’s opinion that these methods and cut-off grades
satisfy the requirements to test, assess and define the Woodlawn Mineral
Resources within the context of RPEEE.
Mining factors or assumptions
Assumptions made regarding possible mining methods,
minimum mining dimensions and internal (or, if applicable,
external) mining dilution. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider potential mining methods,
but the assumptions made regarding mining methods and
parameters when estimating Mineral Resources may not
always be rigorous. Where this is the case, this should be
reported with an explanation of the basis of the mining
assumptions made.

Entech understands DVP plans to implement similar-scale mechanised
underground mining methods used previously at Woodlawn. This
assumption was based on discussions with DVP’s senior geologists and
engineers.

The MRE extends nominally 900 m below the topographic surface. Entech
considers material at this depth, and at the grades estimated, would fall
under the definition of RPEEE (reasonable prospects for eventual economic
extraction) in an underground mining framework.

Entech considers the two NSR cut-offs used for MRE reporting of material
from virgin and remnant mining areas, being A$140/t and A$100/t,
respectively, reflect higher costs associated with metal recovery from
remnant mining areas and would fall within the definition of RPEEE in an
underground framework.

No mining dilution or cost factors were applied to the estimate.
Metallurgical factors or assumptions
The basis for assumptions or predictions regarding
metallurgical amenability. It is always necessary as part of
the process of determining reasonable prospects for
eventual economic extraction to consider potential
metallurgical methods, but the assumptions regarding
metallurgical treatment processes and parameters made
when reporting Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with
an explanation of the basis of the metallurgical assumptions
made.

Metallurgical recovery factors have been applied within the NSR.
Metallurgical recovery factors were based on initial metallurgical testwork
during the 2016 feasibility study, a metallurgical review by Mineralis (Ref:
Review of Woodlawn Metallurgical Operations, Mineralis Consultants, April
2020) and later flow process studies conducted by Heron in 2021 (Ref:
Proposed flotation circuit flowsheet and pumping upgrades; high level design
and cost estimation, internal company report, June 2021)

Metallurgical testwork was based on crushing and grinding underground
mineralisation from Kate lens to produce float concentrates for copper, lead
and zinc in order to assess recoveries of saleable concentrates for each
metal type. Mineralis observed that zinc performance was the most
consistent of the three metals (copper, lead, zinc) with the worst result being
50% zinc concentrate at 70% recovery.

Estimated metallurgical recoveries are factored into NSR calculations. Total
recoveries calculated in the NSR, inclusive of all concentrate products are
92% Zn, 85% Pb, 89% Cu, 43% Au and 78% Ag.

Entech understands that both iron and sulphur require monitoring for mine
planning and metallurgical amenability purposes. Both variables were
included in the final Mineral Resource block model. Entech was not aware of
other deleterious variables which would materially affect eventual economic
extraction of Mineral Resources.

No factors or assumptions were made within the MRE with respect to other
deleterious variables or by-products.
Environmental factors or assumptions
Assumptions made regarding possible waste and process
residue disposal options. It is always necessary as part of

No environmental factors were applied to the Mineral Resources or resource
tabulations.
`
Criteria JORC Code explanation Commentary
the process of determining reasonable prospects for
eventual economic extraction to consider the potential
environmental impacts of the mining and processing
operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfields project,
may not always be well advanced, the status of early
consideration of these potential environmental impacts
should be reported. Where these aspects have not been
considered this should be reported with an explanation of the
environmental assumptions made.
Bulk density
Whether assumed or determined. If assumed, the basis for
the assumptions. If determined, the method used, whether
wet or dry, the frequency of the measurements, the nature,
size and representativeness of the samples.

This MRE contains dry bulk density data which was collected on drill core
from 188 holes (between 2014 and 2020).

The density samples were located between 19100 mN and 19800 mN, 8800
mE and 9600 mE and nominally from the surface to a depth of 800 m,
providing a representative density profile between mineralised domains, and
depth profile within a centralised portion of the MRE.

The bulk density for bulk material must have been measured
by methods that adequately account for void spaces (vugs,
porosity, etc), moisture and differences between rock and
alteration zones within the deposit.

Density measurements were collected on all samples sent to the laboratory.
It was measured using an industry-accepted water immersion density
determination method for each sample.

The testing area was inspected by a third-party geology resource consultant
in December 2018 and reported as industry standard.

Discuss assumptions for bulk density estimates used in the
evaluation process of the different materials.

Entech investigated a multi-element regression using Zn %, Pb %, Cu % and
Fe % grouped by horizon and for all domains combined. Of the available
density values, 85% came from the Upper and Middle horizons. The
outcomes for these two horizons were very similar, with good correlation,
particularly with respect to Fe. The regression for the Lower horizon was
inconclusive. Only 15% of the density data were located in the Lower
horizon.

Entech chose to use a multiple regression formula across all domains, using
all available samples, which results in a >95% correlation between the
original density value and predicted value. The formula uses coefficients for
Zn %, Pb %, Cu % and Fe %.

Bulk density is estimated into the block model via a multivariate regression
equation, using the block grade estimations:
Density = 2.5179+(Zn%0.0241) + (Pb%0.0282) + (Cu%-
0.0014) + (Fe%
0.0460)

No verifiable historical density data have been located, although the
collection of density measurements is mentioned in a number of historical
Woodlawn Mineral Resource reports.
Classification
The basis for the classification of the Mineral Resources into
varying confidence categories.

The Woodlawn underground zinc-copper deposit contains Measured,
Indicated and Inferred Mineral Resources.

Mineral Resources were classified based on geological and grade continuity
confidence drawn directly from:
o
Drill hole methodology, data quality, spacing and orientation
o
Geological domaining
o
Estimation quality parameters
o
Historical mining strike lengths, widths, stope orientations and remnant
`
Criteria JORC Code explanation Commentary
mining areas.

MeasuredMineral Resources were defined where a high level of geological
confidence in geometry, continuity, and grade was demonstrated, and were
identified as areas where:
o
Blocks were well supported by drill hole data, with drilling averaging a
nominal 15 × 15 m or less between drill holes
o
Lens was intercepted by Heron on two sublevels and blocks are within
20–30 m from a lens development drive
o
Estimation quality, slope of regression above 0.8.

IndicatedMineral Resources were defined where a moderate level of
geological confidence in geometry, continuity, and grade was demonstrated,
and were identified as areas where:
o
Blocks were well supported by drill hole data, with drilling averaging a
nominal 40 × 40 m or less between drill holes
o
Blocks were interpolated with a neighbourhood informed by a minimum
of 10 samples

InferredMineral Resources were defined where a lower level of geological
confidence in geometry, continuity and grade was demonstrated, and were
identified as areas where:
o
Drill spacing was averaging a nominal 60 m or less, or where drilling
was within 70 m of the block estimate
o
Blocks were interpolated with a neighbourhood informed by a minimum
of 4 samples

Mineralisation within the model which did not satisfy the criteria for
classification as Mineral Resources remained unclassified.

Whether appropriate account has been taken of all relevant
factors (ie relative confidence in tonnage/grade estimations,
reliability of input data, confidence in continuity of geology
and metal values, quality, quantity and distribution of the
data).

Consideration has been given to all factors material to Mineral Resource
outcomes, including but not limited to confidence in volume and grade
delineation, continuity and preferential orientation mineralisation; quality of
data underpinning Mineral Resources, mineralisation continuity experienced
during previous underground operations, nominal drill hole spacing and
estimation quality (conditional bias slope, number of samples, distance to
informing samples).

Whether the result appropriately reflects the Competent
Person’s view of the deposit.

The delineation of Measured, Indicated and Inferred Mineral Resources
appropriately reflect the Competent Person’s view on continuity and risk at
the deposit.
Audits or reviews
The results of any audits or reviews of Mineral Resource
estimates.

Internal audits and peer review were undertaken by Entech with a focus on
independent resource tabulation, block model validation, verification of
technical inputs, and approaches to domaining, interpolation, and
classification.
Discussion of relative accuracy/confidence
Where appropriate a statement of the relative accuracy and
confidence level in the Mineral Resource estimate using an
approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical
or geostatistical procedures to quantify the relative accuracy
of the resource within stated confidence limits, or, if such an
approach is not deemed appropriate, a qualitative discussion
of the factors that could affect the relative accuracy and

The MRE is globally representative of zinc, lead, copper, gold and silver
Mineral Resources; however, there is uncertainty relating to local
representation of volume and grade in Indicated and Inferred Mineral
Resources due to the mine-scale localised fault structures which terminate
and/or offset mineralisation and are locally discontinuous.

Local variances to the tonnage, grade, and metal distribution are expected
with further definition drilling. It is the opinion of the Competent Person that
thesevarianceswill not significantly affect economic extractionofthe

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
confidence of the estimate. deposit.

The MRE is considered fit for the purpose for project re-start objectives that
include both strategic and operational mine planning activities.

The statement should specify whether it relates to global or
local estimates, and, if local, state the relevant tonnages,
which should be relevant to technical and economic
evaluation. Documentation should include assumptions
made and the procedures used.

The Mineral Resource statement relates to global tonnage and grade
estimates.

No formal confidence intervals nor recoverable resources were undertaken
or derived.

These statements of relative accuracy and confidence of the
estimate should be compared with production data, where
available.

Reconciliation data for Heron’s recently mined areas (G lode) were not
considered suitable for comparison as both mining and milling data during
the months prior to closure were compromised by operational challenges.
However, historical documentation indicates comparable contained metal
and metal recoveries from historically mined areas. The project is currently at
a restart phase having been on care and maintenance since March 2020.

==> picture [593 x 12] intentionally omitted <==

`

Section 4 Estimation and Reporting of ore reserves

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral Resource estimate for
conversion to Ore Reserves
Description of the Mineral Resource estimate used as a basis for the conversion to
an Ore Reserve.
The Ore Reserve is based on Mineral Resource estimates by Entech as contained in this
announcement.
Clear statement as to whether the Mineral Resources are reported additional to, or
inclusive of, the Ore Reserves.
Mineral Resources are inclusive of Reserves.
Site visits Comment on any site visits undertaken by the Competent Person and the outcome
of those visits.
The Competent Person (Tristan Sommerford, Group Principal Mining Engineer) is a full time
employee of Develop Global and has visited site numerous times being during the Reserve
process and is comfortable with the viability of the Ore Reserve.
If no site visits have been undertaken indicate why this is the case.
Study status The type and level of study undertaken to enable Mineral Resources to be converted
to Ore Reserves.
Pre-Feasibility level estimation of upfront capital costs, all other costs, modifying factors and
parameters are completed to Feasibility level, resulting in a mine plan that is technically
achievable and economic using the determined Ore Reserve.
The Code requires that a study to at least Pre-Feasibility Study level has been
undertaken to convert Mineral Resources to Ore Reserves. Such studies will have
been carried out and will have determined a mine plan that is technically achievable
and economically viable, and that material Modifying Factors have been considered.
Ore Reserves are declared based upon a Study that included mine plans and mine designs that
are deemed technically achievable and have been tested for economic viability using input costs,
metallurgical recovery and expected long term metal prices, after due allowances for royalties.
Cut-off parameters The basis of the cut-off grade(s) or quality parameters applied. Calculated value is based on a Net Smelter Return (NSR) to take account of the revenue from the
copper, lead, zinc, gold and silver metals allowing for metallurgical recoveries and payabilities for
each and then offsets for royalties, shipping and smelter deductions (penalty elements). A
stoping cut-off value of $140/t ore and a development ore cut-off value of $80/t ore has been
applied based on the NSR inputs and relevant cost estimates provided by Develop Global Ltd.
Mining factors or assumptions The method and assumptions used as reported in the Pre-Feasibility or Feasibility
Study to convert the Mineral Resource to an Ore Reserve (i.e. either by application
of appropriate factors by optimisation or by preliminary or detailed design).
Optimisations have been completed by Develop Global to generate a detailed mine design and
schedule. The mining method selected is longhole stoping with backfill using paste fill. Stope
access and extraction is a combination of longitudinal and transverse orientation. Stoping is
primarily top-down but some instances of bottom-up sequencing exist.
The choice, nature and appropriateness of the selected mining method(s) and other
mining parameters including associated design issues such as pre-strip, access, etc.
Geotechnical analysis by Beck Engineering has been used from previous Feasibility Studies to
confirm the mining method and determine appropriate stope sizes, sequences and ground
support requirements for incorporation into the mine design and schedule.
The assumptions made regarding geotechnical parameters (eg pit slopes, stope
sizes, etc), grade control and pre-production drilling.
Geotechnical parameters were taken from 2016 Feasibility study conducted by Beck
Engineering. The underground designs conform to these recommendations.
The major assumptions made and Mineral Resource model used for pit and stope
optimisation (if appropriate).
The Mineral Resource model used for optimisation was as detailed previously.
The mining dilution factors used. Stope designs expand based on factors outlined in geotechnical studies and are controlled by the
ground that the material sits, generally 0.5 m into the hangingwall and 0.5 m into the footwall to
account for blasting dilution and a 3% dilution factor at zero grade has been applied for every
stope wall adjacent to paste fill.

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
The mining recovery factors used. A mining recovery factor of 95% was applied to all stoping activities and 100% to all ore drives.
Any minimum mining widths used. A minimum mining with of 3.0 mW was applied.
The manner in which Inferred Mineral Resources are utilised in mining studies and
the sensitivity of the outcome to their inclusion.
Mine designs inclusive of Inferred resource material were removed from the plan and the Ore
Reserve is technically and economically viable without them.
The infrastructure requirements of the selected mining methods. Mobilisation, establishment and all site and mine infrastructure to support underground mining
has been accounted for in the study. The underground mine design includes suitable
infrastructure to support the mining method including an access decline, ventilation shaft, pump
stations and electrical substations.
Metallurgical factors or
assumptions
The metallurgical process proposed and the appropriateness of that process to the
style of mineralisation.
Whether the metallurgical process is well-tested technology or novel in nature.
The nature, amount and representativeness of metallurgical test work undertaken,
the nature of the metallurgical domaining applied and the corresponding
metallurgical recovery factors applied.
Any assumptions or allowances made for deleterious elements.
The existence of any bulk sample or pilot scale test work and the degree to which
such samples are considered representative of the orebody as a whole.
For minerals that are defined by a specification, has the ore reserve estimation been
based on the appropriate mineralogy to meet the specifications?
The process recovery is based on the plant installed by Heron Resources Limited.
Some changes have been designed including:

Installation of a tertiary crusher and increased crushed ore storage

treatment of process water to reduce effect on flotation separation

Simplication of flotation circuit flows in line with proven historical Denehurst
operations
Historical metallurgical test work from prior Denehurst operations, Heron Feasbility studies and
restart optimisation work, as well as new testwork on Develop drilling campaigns aligns with
flowsheet strategy Metallurgical assumptions for this Ore Reserve are based on historical
achievements as Woodlawn for the relevant copper or polymetallic ore types.
Environmental The status of studies of potential environmental impacts of the mining and
processing operation. Details of waste rock characterisation and the consideration
of potential sites, status of design options considered and, where applicable, the
status of approvals for process residue storage and waste dumps should be
reported.
Major Project approval was received on 4 July 2013 from the NSW Minister for Planning and
Infrastructure under Section 75J of the EP & A Act for both the tailings retreatment and
underground project
Tailings storage will be within an already approved and permitted facility. Storage of tailings will
be reduced due to the incorporation of a paste plant, which will place cemented tailings back
underground in voids.
Infrastructure The existence of appropriate infrastructure: availability of land for plant
development, power, water, transportation (particularly for bulk commodities),
labour, accommodation; or the ease with which the infrastructure can be provided,
or accessed.
The operation uses the existing access road.
New site buildings including processing plant, offices and car park have been constructed and
utilized previously by Heron Resources Limited
Power is supplied from the grid which has sufficient capacity. The current substation on site also
has sufficient spare capacity to service the operation.
Water is be sourced from surface site and underground water plus the Willeroo borefield with
potable water being generated from reverse osmosisplant.
Costs The derivation of, or assumptions made, regarding projected capital costs in the
study.
The methodology used to estimate operating costs.
Allowances made for the content of deleterious elements.
The derivation of assumptions made of metal or commodity price(s), for the
principal minerals and co- products.
Capital costs for the construction of the processing plant have been provided by GR Engineering
Services.
The operating costs used for the economic assessment are based on the site’s 2024 Business
Plan.
Capital expenditure requirements are based on the site’s 2024 Business Plan.
Royalties that are applied by the NSW government have been taken into account.
All calculations have been undertaken in Australian dollars.Processing operating costs were

`

==> picture [593 x 12] intentionally omitted <==

Criteria JORC Code explanation Commentary
The source of exchange rates used in the study.
Derivation of transportation charges.
The basis for forecasting or source of treatment and refining charges, penalties for
failure to meet specification, etc.
The allowances made for royalties payable, both Government and private.
determined based on:
Revenue factors The derivation of, or assumptions made regarding revenue factors including head
grade, metal or commodity price(s) exchange rates, transportation and treatment
charges, penalties, net smelter returns, etc.
The derivation of assumptions made of metal or commodity price(s), for the
principal metals, minerals and co-products.
A Net Smelter Return (NSR) was used for revenue. The NSR takes revenue from the copper, zinc,
lead, gold and silver metals allowing for metallurgical recoveries and payabilities for each and
then offsets royalties, shipping and smelter deductions (penalty elements).
The following prices were applied to determine financial viability:

Copper - US$9,474 / t

Lead - US$2,120 / t

Zinc - US$2,851 / t

Silver – US$24 / oz

Gold - US$1,841 / oz

USD:AUD Exchange rate – 0.68
These prices are averaged across the life of the project and are based on forward looking metal
prices supplied by Canaccord Genuity Australia Limited
The Competent Person considers this to be an appropriate commodity price assumption based
on the current level of study and price environment at the time of the completion of the Ore
Reserve work.
Market assessment The demand, supply and stock situation for the particular commodity, consumption
trends and factors likely to affect supply and demand into the future.
A customer and competitor analysis along with the identification of likely market
windows for the product.
Price and volume forecasts and the basis for these forecasts.
For industrial minerals the customer specification, testing and acceptance
requirements prior to a supply contract.
A market study has been provided by AFX Commodities for the purpose of this FS.
The quality of the concentrate to be produced from Woodlawn is within the range of peers
within the Australian market, such as Aurelia and 29 Metals.
Economic The inputs to the economic analysis to produce the net present value (NPV) in the
study, the source and confidence of these economic inputs including estimated
inflation, discount rate, etc.
NPV ranges and sensitivity to variations in the significant assumptions and inputs.
The Ore Reserve estimate is supported by a financial model that has been prepared from
operating cost inputs to a Feasibility level. The model covers the current 7-year life of the
Project.
All major cost inputs have been sourced from contractors and suppliers.
A discount rate of 7% has been applied.
The resulting NPV and IRR is positive and sensitivity analysis has been completed for commodity
price movements.
Social The status of agreements with key stakeholders and matters leading to social
licence to operate.
The Woodlawn deposit is located within the land owned by Veolia Environmental Services Pty
Ltd (Veolia). There has been community consultation including government agencies, local
government,the communityand non-government stakeholders.

==> picture [593 x 12] intentionally omitted <==

`

Criteria JORC Code explanation Commentary
Other To the extent relevant, the impact of the following on the project and/or on the
estimation and classification of the Ore Reserves:
Any identified material naturally occurring risks.
The status of material legal agreements and marketing arrangements.
The status of governmental agreements and approvals critical to the viability of the
project, such as mineral tenement status, and government and statutory approvals.
There must be reasonable grounds to expect that all necessary Government
approvals will be received within the timeframes anticipated in the Pre-Feasibility or
Feasibility study. Highlight and discuss the materiality of any unresolved matter that
is dependent on a third party on which extraction of the reserve is contingent.
No material naturally occurring risks have been identified for the project
It is expected that future agreements and Government approvals will be granted in the
necessary timeframes for the successful implementation of the project.
There are no known matters pertaining to any third parties to affect the development of the
project.
Classification The basis for the classification of the Ore Reserves into varying confidence
categories.
Whether the result appropriately reflects the Competent Person’s view of the
deposit.
The proportion of Probable Ore Reserves that have been derived from Measured
Mineral Resources (if any).
Classification of the Ore Reserve is based on the Indicated Mineral Resource classification only.
The Indicated Mineral Resource has been converted to a Probable Ore Reserve.
The result appropriately reflects the Competent Person’s view of the deposit.
Audits or reviews The results of any audits or reviews of Ore Reserve estimates. The Ore Reserve estimate has not been independently audited or reviewed.
Discussion of relative accuracy/
confidence
Where appropriate a statement of the relative accuracy and confidence level in the
Ore Reserve estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the reserve within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of
the factors which could affect the relative accuracy and confidence of the estimate.
The statement should specify whether it relates to global or local estimates, and, if
local, state the relevant tonnages, which should be relevant to technical and
economic evaluation. Documentation should include assumptions made and the
procedures used.
Accuracy and confidence discussions should extend to specific discussions of any
applied Modifying Factors that may have a material impact on Ore Reserve viability,
or for which there are remaining areas of uncertainty at the current study stage.
It is recognised that this may not be possible or appropriate in all circumstances.
These statements of relative accuracy and confidence of the estimate should be
compared with production data, where available.
The mine designs, schedule and financial model for the Ore Reserve have been completed to a
Feasibility standard with a better than +/- 25% level of confidence.
A degree of uncertainty is associated with geological estimates and the Ore Reserve
classification reflects the level of confidence in the Mineral Resource.
There is a degree of uncertainty regarding estimates of modifying mining factors, geotechnical
and processing parameters that are of a confidence level reflected in the level of the study.
There is a degree of uncertainty in the commodity price used however the Competent person(s)
are satisfied that the assumptions used to determine the economic viability of the Ore Reserve
are based on reasonable current data. The Project is sensitive to adverse movements in
commodity prices and/or exchange rates.