Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

DEVELOP GLOBAL LIMITED Capital/Financing Update 2008

Jul 22, 2008

64801_rns_2008-07-22_2ce58ef9-1b80-4e7e-8437-79e95e087ff9.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT

23 July 2008

==> picture [172 x 92] intentionally omitted <==

ASX Code

Shares : JUT 31 July Options : JUTO 15 June Options : JUTOA

Share Price

Close 22/7/08 : $0.145 52 week high : $0.275 52 week low : $0.0495

Issued Capital 65.2M Shares 58.5M Options

Market Capitalisation $9.5M (at 22 July)

EVELYN DRILLING COMPLETED INTERSECTS SULPHIDES OVER 700 METRES STRIKE LENGTH

Highlights

  • 3,215 metre Phase 3 RC and diamond drilling program at Evelyn Prospect completed

  • Total of 20 drill holes

  • Mineralisation has been extended from 300 metres to over 700 metre strike length, remains open in all directions

  • Visual inspection shows zones of massive sulphides have been intersected (up to 7 metres) within large zones of disseminated sulphides (up to 40 metres)

  • Assay results pending

Cash at Bank

$1.5M (as at 1 June)

Board of Directors

Charles Morgan (Non-Executive Chairman)

Ayaz Khan (Managing Director)

Cyril Geach (Executive Director)

Michael Mulroney (Non-Executive Director)

Substantial Shareholders

Argonaut – 10.0% Ayaz Khan – 7.3% Craig Burton – 6.4% Liberty Mining - 6.1%

Projects Liberty Indee (Cu-Pb-Zn-Au-Ag)

Onslow (Ag-Pb-Cu)

Tay Munglinup (Ni-Cu)

==> picture [244 x 162] intentionally omitted <==

Figure 1 Massive Sulphides in diamond drill core

A total of 3,215 metres of drilling have been completed at the Evelyn Prospect including 16 RC holes and 4 RC/Diamond holes totalling 395 metres over a strike length of 700 metres covering part of a broad series of EM conductors that extend over a total strike length of approximately 900 metres and up to 250 metres below surface.(Figure 2)

Initial results indicate that the majority of holes completed have intersected one or more zones of massive sulphide mineralisation over widths of 1 to 7 metres within broader zones of disseminated sulphide mineralisation. Visual inspection of the core and RC cuttings indicates the presence of sphalerite, chalcopyrite, pyrite and galena consistent with the previously announced results from earlier drilling at the Evelyn Prospect.

==> picture [64 x 18] intentionally omitted <==

==> picture [64 x 17] intentionally omitted <==

Liberty-Indee Project (Jutt Earning up to 90%)

The Liberty-Indee Project is located 50 kilometres south of Whim Creek in the Pilbara region of Western Australia (see map).

Previous drilling at the Evelyn Prospect located significant intersections of high grade poly-metallic volcanogenic massive sulphide (VMS) style mineralisation heralding the emergence of a new VMS province within the Liberty–Indee Project.

Phase 3 drilling program at Evelyn Prospect completed

Jutt has just completed the Phase 3 RC and diamond drilling program at the Evelyn Prospect which aimed to extend the existing mineralisation and provide an initial test of the modelled EM conductors.

A total of 16 RC and 4 RC/diamond drill holes were drilled (3,215 metres) over a strike length of 700 metres covering part of a broad series of EM conductors that extend over a total strike length of approximately 900 metres and up to 250 metres below surface (Figure 2).

==> picture [92 x 52] intentionally omitted <==

==> picture [271 x 182] intentionally omitted <==

Initial results indicate that the majority of holes completed have intersected one or more zones of massive sulphide mineralisation over widths of 1 to 7 metres within broader zones of disseminated sulphide mineralisation. Visual inspection of the core and RC cuttings indicates the presence of sphalerite, chalcopyrite, pyrite and galena consistent with the previously announced results from earlier drilling at the Evelyn Prospect including:

  • JER 020 – 19 metres grading 2.6% Cu, 5.1% Zn, 0.5% Pb, 61g/t Ag, 1.3g/t Au from 87metres downhole;

  • JER 011 – 15 metres grading 1.8% Cu, 0.8% Zn, 0.2% Pb, 38g/t Ag, 0.7g/t Au from 85 metres down hole; and

  • JER 006 – 10 metres grading 6.4% Cu, 2.4% Zn, 67g/t Ag, 0.86 g/t Au from 33 metres down hole

==> picture [64 x 18] intentionally omitted <==

==> picture [64 x 17] intentionally omitted <==

The drilling results have confirmed the existence of a significant polymetallic VMS system over a strike length of 700 metres. The mineralisation remains open in both directions and at depth.

The northernmost VTEM conductor remains only partially tested to date with the anomalous modelled EM plate extending a further 200 metres north of the last drill hole JER038. Upon analysis of the results of this drilling program, it is anticipated a significant drilling program will be planned to fully test the extent of this mineralisation.

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 8] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 8] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [148 x 51] intentionally omitted <==

==> picture [459 x 8] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 8] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 8] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 8] intentionally omitted <==

==> picture [459 x 7] intentionally omitted <==

==> picture [459 x 26] intentionally omitted <==

----- Start of picture text -----

Approximate
pierce point
----- End of picture text -----

==> picture [459 x 4] intentionally omitted <==

==> picture [494 x 20] intentionally omitted <==

----- Start of picture text -----

Approximate drill hole pierce points of current drill program
Figure 2- Long Section showing modelled geophysical drilling targets
----- End of picture text -----

A summary of the drill hole intersections from the drilling program is as follows:

RC Drilling

rilling
Hole_ID EASTING NORTHING Azi Dip EOH Intersection
JER016 5038.0 10334 320o -60o Existing Pre-collar JED003
JER017 4910.0 10159.5 120o -60o 60.0 NSI
JER018 4901.5 10201.5 120o -60o 110.0 41-47m - disseminated sulphide
51-55m - massive and disseminated sulphide
65-110m–disseminated sulphide
JER024 4897.5 10221.5 120o -60o 140.0 42-48m - disseminated sulphide
61-67m - massive and disseminated sulphide
71-120m disseminated sulphide
JER025 4880.0 10242 120o -60o 178.0 91-100m – massive and disseminated sulphide
113-169m–disseminated sulphide
JER026 4947.0 10302 120o -60o 90.0 65-72m - disseminated sulphide
75-87m–disseminated sulphide
JER027 5018.0 10288 290.5o -60o 168.0 59-99m – disseminated sulphide
JER028 4936.5 10337 108.5o -58o 120.0 61-72m – disseminated sulphide
JER029 4947.0 10402.5 110o -55o 90.0 39-50m – disseminated sulphide
68-77m – massive and disseminated sulphide
77-90m–disseminated sulphide
JER030 4946.5 10420 110o -55o 114.0 67-114m – massive and disseminated sulphides
JER031 4942.0 10440.5 108o -55o 30.0 Pre-collar JED002
JER032 4945.5 10476.5 108o -66o 168.0 153-164m – disseminated sulphide
JER033 4934.0 10473 118.5o -54o 30.0 Pre-collar JED001
JER034 4930.0 10520 108o -70o 215.0 110-116m – disseminated sulphide
161-165m – disseminated sulphide
169-204m–disseminated sulphide
JER035 4931.0 10620 108o -57o 220.0 156-177m – massive and disseminated sulphide
186-210m–massive and disseminated sulphide

==> picture [64 x 18] intentionally omitted <==

==> picture [64 x 17] intentionally omitted <==

JER036 4945.0 10704 108o -58o 216.0 137-164m – disseminated sulphide
167-207m–massive and disseminated sulphide
JER037 4944.0 10783 108o -58o 246.0 41-55m – disseminated sulphide
173-186m-massive and disseminated sulphide
JER038 4955.0 10853 108o -70o 260.0 Logginginprogress
JER039 4792.0 10281.5 120o -60o 120.0 NSI
JER040 4875.0 10220 108o -58o 71.0 NSI
JER041 5000.0 10261 305o -58o 174.0 130-158m – disseminated sulphide
NSI = No significant intersection

Diamond Drilling

JED001 4950.0 10474.5 118.5o -54o 132.3 77-91m – disseminated sulphide
91-108m–massive sulphide
JED002 4942.0 10440.5 108o -55o 150.2 78-81m – disseminated sulphide
81-87 – massive sulphide
87-93.5–disseminated sulphide
JED003 5032.0 10374 320o -60o 225.3 132-145m – disseminated sulphide
JED004 4875.0 10220 110o -58o 133.3 83-86m - disseminated sulphide
86-89.7m – massive sulphide
89.7-93m–disseminated sulphide

The majority of the drill hole sample has been submitted for assay with results expected to be available in 4-6 weeks.

A full update on the drilling results will be released to the market once all the assay results have been received.

Jutt Holdings Managing Director, Mr Ayaz Khan said:

“We are very excited by the results achieved in the drilling program. We believe the results highlight the potential of the high grade Evelyn VMS discovery. We anticipate accelerating the pace and extent of Jutt’s exploration program at Liberty-Indee to rapidly evaluate the long term potential of this mineralised province. We are enthusiastic not only about the discovery at Evelyn but also the numerous other targets we have located to date.”

For further information contact:

Ayaz Khan Michael Mulroney Managing Director Non-Executive Director Mobile: 0414 941 481 Mobile: 0412 443 806

The information in this announcement that relates to exploration results is based on information compiled by Jutt Holdings Limited and is based on information provided by Mr Cyril Leslie Geach BSc (Hons-Geology) who is a member of the Australian Institute of Geoscientists. Mr Geach has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a competent person as defined in the 2004 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Geach is an Executive Officer of Jutt Holdings Limited and consents to the inclusion in the announcement of the matters based on his information in the form and content in which it appears.