EUREKA & WARRIEDAR GOLD PROJECTS
I N V E S T O R P R E S E N TAT I O N | J U N E 2 0 2 1 | A S X : T I N
==> picture [175 x 240] intentionally omitted <==
----- Start of picture text -----
and
not a
certainly
and the
----- End of picture text -----
Disclaimer
This presentation does not constitute an offer that is capable of acceptance nor is it a disclosure document under the Corporations Act. This presentation is intended for recipients collectively and does not take into account the investment objectives, financial situations and particular needs of any particular person. It does not constitute financial advice. In all cases recipients of this presentation should carry out their own independent enquiries and investigations into, and independent assessment and review of TNT Mines and the information contained in this presentation as well as forming their own views on all general economic, commercial, financial, technological and regulatory risks that may be associated with an investment in TNT Mines.
Forward looking Statements
This presentation contains forward looking and other subjective information. Such exemptions, projections and information are not a guarantee of future performance and involve unknown risks and uncertainties. Actual results and developments will almost certainly differ from those expressed or implied and should make your own assessment of the expectations, estimates, projections and the relevant assumptions and calculations based on which opinions, estimates and projections are based. No representation or warranty, express or implied, is given as to the accuracy of the information or opinions contained in this document and no liability is accepted by the company or director, member, officer, employee, agent or adviser for any such information or opinions.
Competent Persons Statement
Exploration information in this Announcement is based upon work undertaken by Mr Matthew Boyes who is a Fellow of the Australasian Institute of Mining and Metallurgy (AUSIMM). Mr Boyes has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr Boyes is an employee of TNT Mines Pty Ltd and consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.
The Company refers to previous announcements in respect of exploration results dated 22 June 2021, 15 June 2021 and 10 March 2021. The resource for the Eureka Project was disclosed in the ASX announcement dated 24 June 2021. The Company is not aware of any new information or data that materially affects the information included in the relevant market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed.
This presentation is authorised for release by the Board of Directors of the Company.
| 2 TNT Mines | Investor Presentation
CORPORATE STRUCTURE
HIGHLY EXPERIENCED BOARD AND MANAGEMENT
-
MATT BOYES • Qualified geologist with 25 years’ industry experience and a strong background CHIEF EXECUTIVE in mineral resource estimation, project development and operations OFFICER management. Recently Chief Operating Officer for AIM-listed Patagonia Gold, overseeing construction of two gold-silver heap leach projects
-
ALEX HEWLETT • Qualified geologist highly skilled at project identification and acquisition and NON-EXECUTIVE was previously Chairman of Spectrum Metals Limited, overseeing its growth CHAIRMAN from mid-2018 to being taken over by Ramelius Resources in early 2020.
-
BRETT MITCHELL • Corporate finance executive with over 25 years of experience in finance & NON-EXECUTIVE capital markets, specialising in project generation, financing of early-stage DIRECTOR resources and technology companies. Chairman of ASX listed MGC Pharmaceuticals Ltd (ASX:MXC)
-
JAMES CROSER • Qualified mining engineer with 20 years’ operational, technical and NON-EXECUTIVE management experience in the Australian mining sector, Served as an executive DIRECTOR on the boards of Spectrum Metals Ltd, Kalgoorlie Mining Company Ltd and Resources & Energy Group Ltd
-
NADER EL SAYED • Holds a Bachelor of Commerce (Banking & Finance) and a Masters (Accounting) NON-EXECUTIVE from Curtin University of Technology in Western Australia and is currently the DIRECTOR Chief Executive Officer of Multiplant Holdings, a mining and civil services business based in Perth.
| TOP HOLDERS1 | TOP HOLDERS1 | % | |||||
|---|---|---|---|---|---|---|---|
| ~~ANTHONY BARTON AND ASSOCIATES~~ | ~~6.53~~ | ||||||
| JAMES CROSER AND ASSOCIATES | 5.34 | ||||||
| ALEX HEWLETT AND ASSOCIATES | 5.26 | ||||||
| ROCK THE POLO PTY | LTD | 4.04 | |||||
| CITYSCAPE ASSET PTY LTD |
3.68 |
- As at 28 June 2021
| CAPITAL STRUCTURE ASX: TIN CURRENT SHARE PRICE 17c SHARES ON ISSUE 131.4M MARKET CAP (at $0.17) $22.34M CASH & RECEIVABLES @ END OF Q2 CY2021 ~$6.25M ENTERPRISE VALUE $16.1M |
CAPITAL STRUCTURE ASX: TIN CURRENT SHARE PRICE 17c SHARES ON ISSUE 131.4M MARKET CAP (at $0.17) $22.34M CASH & RECEIVABLES @ END OF Q2 CY2021 ~$6.25M ENTERPRISE VALUE $16.1M |
|---|---|
| CAPITAL STRUCTURE | ASX: TIN |
| CURRENT SHARE PRICE | 17c |
| SHARES ON ISSUE * | 131.4M |
| MARKET CAP (at $0.17)* | $22.34M |
| CASH & RECEIVABLES @ END OF Q2 CY2021* |
~$6.25M |
| ENTERPRISE VALUE * |
$16.1M |
*pro-forma including capital raising announced 30 June 2021
SHARE PRICE MOVEMENT
==> picture [392 x 203] intentionally omitted <==
3
TNT Mines | Investor Presentation
AN OUTSTANDING INVESTMENT OPPORTUNITY
==> picture [11 x 15] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
==> picture [11 x 16] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
-
Company-making potential in underexplored gold projects, Eureka and Warriedar, in wellknown WA mining districts
-
Both projects feature historic high-grade production close to infrastructure including operating gold mills
-
Opportunity for rapid delineation of significant shallow high grade gold resources
-
Exposure to Earaheedy with large tenement pegged and now awaiting granting
-
Exposure to US Uranium and Zinc through highly prospective East Canyon uranium project in south-eastern Utah and the Pelley Ridge Project in Montana
==> picture [418 x 402] intentionally omitted <==
Eureka and Warriedar Gold Project Locations
4
TNT Mines | Investor Presentation
EUREKA PROJECT
==> picture [12 x 16] intentionally omitted <==
Eureka Project comprises of 5 tenements including 4 mining leases and 1 exploration permit to the west of existing pit
==> picture [12 x 16] intentionally omitted <==
Ground position sits 50km North of Kalgoorlie - excellent access and supporting infrastructure
==> picture [12 x 16] intentionally omitted <==
Minimal exploration completed outside of known pit area
==> picture [12 x 16] intentionally omitted <==
15,200m of RC drilling completed since November 2020
==> picture [12 x 16] intentionally omitted <==
Aircore programme now underway
==> picture [431 x 487] intentionally omitted <==
==> picture [95 x 55] intentionally omitted <==
Eureka Project Location Map
TNT Mines | Investor Presentation
5
RECENT DRILLING AT EUREKA ADDING TO STRIKE EXTENSION IN PREVIOUSLY UNTESTED AREAS
==> picture [95 x 55] intentionally omitted <==
==> picture [948 x 353] intentionally omitted <==
----- Start of picture text -----
Good Mineralisation
Widths of
is not closed
oxidized
off in either
material
direction
intersected
North or
close to
South of
existing pit
boundary existing
Resource
Down dip
extensions
have now
been tested
with a high
capacity RC
rig, results
pending
----- End of picture text -----
TNT Mines | Investor Presentation 6
RESOURCE UPDATE COMPLETED
==> picture [9 x 13] intentionally omitted <==
New Eureka Independent JORC 2012 resource of 112,000 oz gold @ 1.42 g/t gold reported at cut-off of 0.5g/t gold
==> picture [9 x 12] intentionally omitted <==
- TNT Mines drilling at Eureka has delivered the resource increase of 68,900oz at an exploration cost of $21 per ounce
==> picture [9 x 13] intentionally omitted <==
- 62,500oz @ 1.53g/t gold in Indicated category at cut-off of 0.5g/t gold
==> picture [9 x 13] intentionally omitted <==
- At 0.5 g/t gold cut-ff an increase of 68,900oz has been delivered on the historically reported resource
| Resource Category | Cutoff Grade | Tonnes | Grade | Contained Metal |
|---|---|---|---|---|
| (t) | (g/t Au) | (Oz Au) | ||
| Indicated | 0.3 | 1,437,000 | 1.4 | 65,000 |
| 0.5 | 1,269,000 | 1.5 | 62,000 | |
| 0.8 | 983,000 | 1.8 | 56,000 | |
| 1.0 | 811,000 | 2.0 | 52,000 | |
| Inferred | 0.3 | 1,341,000 | 1.2 | 52,000 |
| 0.5 | 1,183,000 | 1.3 | 50,000 | |
| 0.8 | 887,000 | 1.5 | 43,000 | |
| 1.0 | 666,000 | 1.7 | 37,000 | |
| ALL Resources | 0.3 | 2,778,000 | 1.3 | 116,000 |
| 0.5 | 2,452,000 | 1.4 | 112,000 | |
| 0.8 | 1,870,000 | 1.7 | 100,000 | |
| 1.0 | 1,477,000 | 1.9 | 88,000 |
==> picture [400 x 291] intentionally omitted <==
==> picture [95 x 55] intentionally omitted <==
Table 1 Eureka Gold Project– In Situ Mineral Resources (as of 30 June 2021) Refer ASX announcement dated 24 June 2021 for further details.
TNT Mines | Investor Presentation
7
==> picture [95 x 55] intentionally omitted <==
EUREKA – DRILLING COMMENCED ON NORTHERN TARGET AREA
==> picture [369 x 475] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
Mineralisation open to North and South of existing old workings, structure visible in surface trenching and intersected in multiple holes,
-
WRRC0018 5m @ 2.88 g/t Au including 1m @ 10.58/g/t from 27m in thick qtz vein
-
WWRC0019, 4m @ 11.0 g/t Au from 42m inc. 2m @ 19.2 g/t Au
==> picture [11 x 15] intentionally omitted <==
Second round of drilling now completed into zone with assays pending
==> picture [11 x 15] intentionally omitted <==
Mineralisation intersected close to contact with large cross cutting Gabbro dykes
==> picture [11 x 15] intentionally omitted <==
Controls over high grade structure still not fully understood
8
TNT Mines | Investor Presentation
NEAR PIT EXPLORATION TARGETS
==> picture [12 x 17] intentionally omitted <==
4 main areas now tested
==> picture [12 x 16] intentionally omitted <==
Additional 3700m completed in Q2 with targets including NE extension and northern High grade zone
==> picture [12 x 16] intentionally omitted <==
Best results to date included 34m @ 1.75/gt Au in WRRC0081, 14m @ 2.09 in WRRC0001 and 4m @ 6.56g/t Au in hole WRRC0082 located within the southern pit extension area
==> picture [392 x 500] intentionally omitted <==
9
TNT Mines | Investor Presentation
==> picture [12 x 16] intentionally omitted <==
==> picture [12 x 16] intentionally omitted <==
==> picture [12 x 16] intentionally omitted <==
==> picture [12 x 16] intentionally omitted <==
==> picture [12 x 16] intentionally omitted <==
==> picture [12 x 16] intentionally omitted <==
AUGER GEOCHEM TARGET SOUTH EUREKA
860 Auger sites sampled on a 200m x 50m spaced pattern
Significant anomaly discovered 1.2km south of Eureka pit
Structural setting similar to Zoroastrian deposit (350Koz) at Bardoc Gold 1.4km to east
Mineralisation coincident with regional scale Bardoc Shear which is major structure within the Bardoc tectonic zone
Major gold deposits such as Paddington (>4Moz) hosted with same black flag sequence
Aircore programme to start June 21[st] with 5000m programmed
==> picture [391 x 502] intentionally omitted <==
==> picture [95 x 55] intentionally omitted <==
TNT Mines | Investor Presentation
10
WARRIEDAR PROJECT
==> picture [12 x 16] intentionally omitted <==
45km2 tenements including granted Mining Leases
==> picture [12 x 16] intentionally omitted <==
Close to Perth and existing infrastructure
==> picture [12 x 16] intentionally omitted <==
Tenements feature historic mine workings that produced high-grade gold
==> picture [12 x 16] intentionally omitted <==
RRRC0011 recently intersected 44m @ 1.12g/t Au including 20m @ 2.12
==> picture [12 x 16] intentionally omitted <==
Intrusive hosted target large tonnage potential now primary target for future exploration
==> picture [12 x 16] intentionally omitted <==
GAIP commencing first week in July with follow up Pole Dipole IP programme to better define targets for RC programme
==> picture [417 x 490] intentionally omitted <==
==> picture [95 x 55] intentionally omitted <==
TNT Mines | Investor Presentation
11
NORTHERN REIDS RIDGE INTRUSIVE TARGET
==> picture [12 x 17] intentionally omitted <==
RRRC0011 is anomalous for gold from 0m to 116m within granodiorite intrusive
==> picture [12 x 16] intentionally omitted <==
Mineralisation intersected is at the eastern border of the Reids Ridge intrusive granodiorite with an untested conceptual target length of >2km in strike
==> picture [12 x 17] intentionally omitted <==
returned from drill Significant assays hole RRRC0011 include;
-
20m @ 2.12 g/t gold from 88m to 108m within
-
44m @ 1.12g/t gold from 68m
==> picture [414 x 484] intentionally omitted <==
==> picture [95 x 55] intentionally omitted <==
TNT Mines | Investor Presentation
12
REIDS RIDGE MINE & COMMODORE TARGET
==> picture [12 x 16] intentionally omitted <==
Large fault mappable over 3km in length
==> picture [12 x 16] intentionally omitted <==
Multiple Au occurrences along strike with Reids Ridge mine and Commodore prospect
==> picture [12 x 16] intentionally omitted <==
Relatively little exploration below existing workings
==> picture [12 x 16] intentionally omitted <==
High grade targets outside of Granodiorite
==> picture [385 x 492] intentionally omitted <==
==> picture [95 x 55] intentionally omitted <==
Au Occurrences over Reids Ridge and Commodore Prospects
TNT Mines | Investor Presentation 13
==> picture [95 x 55] intentionally omitted <==
LARGE LAND POSITION MULTIPLE TARGETS TO TEST IN 2H 2021
==> picture [314 x 355] intentionally omitted <==
==> picture [12 x 16] intentionally omitted <==
Regional targets to be tested in 2H 2021 including Mt Laws extension, Langs Find AC programs designed to test geochem anomalies across BIF horizons RC program to test southern strike extent of Golden Eagle
==> picture [12 x 16] intentionally omitted <==
==> picture [12 x 16] intentionally omitted <==
Geochem Anomalies Over air Mag survey highlighting regional targets
TNT Mines | Investor Presentation
14
==> picture [12 x 16] intentionally omitted <==
==> picture [12 x 16] intentionally omitted <==
==> picture [12 x 16] intentionally omitted <==
LOCKERIDGE FAULT PROJECT-EARAHEEDY BASIN
Application E69-3871 submitted for large tenement position in the Earaheedy Basin Encompasses the Lockeridge fault considered to play integral part in control of SEDEX-MVT Zn-Pb mineralisation at Chinook discovery (Rumble Resources)
Initial Geochemical and Geophysical programme planned to start upon approval of tenement
==> picture [95 x 55] intentionally omitted <==
TNT Mines | Investor Presentation
15