Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

DELTA LITHIUM LIMITED Capital/Financing Update 2021

Jun 23, 2021

64775_rns_2021-06-23_58f5c95b-316f-4999-a6fb-2db0ab1a304c.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

TNT Mines drilling increases Eureka Resource to 112,000oz gold

Highlights:

  • New Eureka Independent JORC 2012 resource of 112,000 oz gold @ 1.42 g/t gold reported at cut-off of 0.5g/t gold

  • At 0.5 g/t gold cut-off an increase of 68,900oz has been delivered on the historically reported resource

  • 62,500oz @ 1.53g/t gold in Indicated category at cut-off of 0.5g/t gold

  • TNT Mines drilling at Eureka has delivered the resource increase of 68,900oz at an exploration cost of $21 per ounce

  • Second round of drilling at Eureka was recently completed with 3,769m drilled predominantly testing extensional new northeast corridor and the northern highgrade area, with assays currently pending

Resource Update

TNT Mines Ltd (ASX: TIN) (“TNT” or the “Company”) is pleased to provide an independent JORC 2012 resource update for its 100% owned Eureka project.

Resource Category Cutoff Grade Tonnes Grade Contained Metal
(t) (g/t Au) (Oz Au)
Indicated 0.3 1,437,000 1.4 65,000
0.5 1,269,000 1.5 62,000
0.8 983,000 1.8 56,000
1.0 811,000 2.0 52,000
Inferred 0.3 1,341,000 1.2 52,000
0.5 1,183,000 1.3 50,000
0.8 887,000 1.5 43,000
1.0 666,000 1.7 37,000
ALL Resources 0.3 2,778,000 1.3 116,000
0.5 2,452,000 1.4 112,000
0.8 1,870,000 1.7 100,000
1.0 1,477,000 1.9 88,000

Table 1 Eureka Gold Project– In Situ Mineral Resources (as of 23 June 2021)

*See Notes to Table 1

1

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

The resource update was completed by CUBE Consulting Pty Ltd and has incorporated all drilling completed in the first quarter of 2021. A follow up drill programme at Eureka was recently completed with assays currently pending. The basis of this programme was to test extensions of the Eureka mineralisation within the Bardoc tectonic zone.

==> picture [401 x 452] intentionally omitted <==

Figure 1; Location Map showing Eureka project with Geology and Tenements

CEO Matthew Boyes commented on the Eureka Resource growth, “We have seen a significant increase in the contained ounces in the resource model at Eureka. This is an excellent result considering the limited time we have been working at the asset and highlights the quality of the Eureka orebody and the greater tenement package. The Eureka project now has a solid base from which to continue to grow and exploration has now recommenced on site with drilling into the Southern geochemical anomaly starting today.”

2

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

As can be seen in Figure 2, the majority of the resource is in the immediate vicinity of the Eureka open pit, along strike and down-dip. The mineralisation is hosted within several steeply dipping sheared zones dipping at approximately 75 degrees to the east. The gold is interpolated to have a shallow southerly plunge within the modelled wireframes. Further investigations will assess the economic viability of cutting back the Eureka pit to exploit these ounces.

==> picture [460 x 332] intentionally omitted <==

Figure 2; Block Model with existing Pit and long section

Additional drilling and future resource growth targets have been identified and are now being tested. A follow up programme consisting of 3,769m of RC was recently completed into the Northeast extension and Northern high-grade targets, while an aircore drill

programme commenced this week testing an extensive auger geochemical anomaly to the Southeast of the main Eureka mining area. Results from these programmes are expected to be received over the coming weeks.

Notes to Table 1:

  • Figures may not add up due to rounding.

  • All resources have been depleted by open pit mining based on the most recent surface topography DTM. No resources have been depleted by historical UG mining.

  • 3 3

  • The average bulk density assigned to the mineralisation is 2.2 g/cm for oxide material, 2.4 g/cm for transition, and 2.75 g/cm3 for fresh rock.

  • Mineral Resources that are not Mineral Reserves have not demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

  • No mining or metallurgical factors have been applied to the In Situ Mineral Resources

3

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

Authorised for ASX lodgment by the Board.

Ends

For further information, please contact:

TNT Mines Ltd Matt Boyes Chief Executive Officer +61 8 6319 1900 [email protected]

Competent Persons Statement

Exploration information in this Announcement is based upon work undertaken by Mr Matthew Boyes who is a Fellow of the Australasian Institute of Mining and Metallurgy (AUSIMM). Mr Boyes has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr Boyes is an employee of TNT Mines Limited and consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

The information in this announcement that relates to estimation and reporting of Mineral Resources Is based on information compiled by Mr Brian Fitzpatrick. Mr Fitzpatrick is a member of the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person (CP) as defined in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mr Fitzpatrick is a full time employee of Cube Consulting Pty Ltd , which specialises in mineral resource estimation, evaluation and exploration. Neither Mr Fitzpatrick nor Cube Consulting Pty Ltd holds any interest in TNT Mines, its related parties, or in any of the mineral properties that are the subject of this announcement. Mr Fitzpatrick contents to the inclusion in this announcement of all technical statements based on his information in the form and context in which it appears.

4

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

APPENDIX 1 - Summary of JORC Table 1 and Listing Rule 5.8.1

The following is a summary of material information used to estimate the Mineral Resource, as required by Listing Rule 5.8.1 and JORC 2012 Reporting Guidelines.

Mining History

The Eureka gold deposit was first discovered in the 1890s, with historical underground mining worked until 1940. Historical information sourced from WAMEX noted that gold mineralisation is associated with shearing and quartz veining within easterly dipping oxidised fine grained mafic rocks. Recorded production from 1897 up to 1940 totalled 809 tonnes averaging 27.8 g/t Au (Ransted, 1985).

More recently, the Eureka tenement area has been explored and operated by numerous companies, with the major work completed outlines as follows:

  • CSR (1982-83) – included 4.4km of RC drilling

  • West Coast Holdings (WCH) (1984-87)

  • Surface geochemistry (including Augur drilling), aero-mag surveys, vacuum drilling, Percussion, DC and DD drilling; surface mapping and gridding

  • Evaluation and mining of oxide resources (Open Pit) and evaluation of UG resources

  • Eureka Open Pit - mining produced 45,865 tonnes at 4.64g/t Au, for 6,842 oz Au (WCH, 1986).

  • Glengarry Mining NL (1994) – Aeromag Interpretation, RAB Drilling

  • Jasper Mining NL (+ JV partners) (1996-2004)

    • UG mine evaluation, refurbishment & trial mining

    • Limited ore drive development from November 1998 to June 1999 produced 400 t @ 6g/t Au from 80m Level (JMM, 2000);

  • Sherlock Bay Nickel Corp (SBNC) (2004-2006) – Ground Mag survey; gridding; surface mapping; RC drilling (ERC holes)

  • International Gold P/L (2007-2010) – Mag-radiometric survey, Augur drilling; UG design study (41,000 t @ 10.1 g/t, for 13,300 oz Au)

  • Central Iron Ore Ltd (2011-14) – Resource evaluation (451,000t @ 4.4g/t for 64,200 oz Au); Geophysical data review

5

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

Mineral Tenement and Land Tenure Status

The Eureka project is situated on tenement numbers M24/189, M24/584, M24/585 and M24/586 and P24/5116. The suite of five tenements is located 50 Kilometres north-west of Kalgoorlie. The tenements are owned 100% by Warriedar Mining (WRM). WRM is the operator of the tenement package. All licences are in good standing with no known impediments.

Eureka Deposit Geology and Mineralisation

Regional Geology

The Eureka gold deposit occurs on the eastern limb of the major south-east plunging Goongarrie-Mt. Pleasant Anticline. The eastern limb consists predominantly of north-north-west trending mafic and ultramafic lithologies, with minor thin mainly interflow sediments, bounded to the west by pre-to syntectonic granitoid forming the core of the regional anticline.

To the east, the Bardoc-Broad Arrow Synform occurring between the major Goongarrie- Mt. Pleasant and Scotia-Kanowma Anticlines is subject to significant disruption by the broad Bardoc Tectonic Zone.

This zone consists of multiple shear zones occurring within intercalated felsic, mafic and ultramafic lithologies in the vicinity of the synformal axis. The Bardoc Tectonic Zone is host to the Paddington and Bardoc gold deposits.

Local Geology and Mineralisation

The Eureka deposit is located within a sequence of mafic and ultramafic rocks forming part of the Kalgoorlie – Menzies greenstone belt. The layered sequence is approximatley 6 km wide with a northerly trend (Figure 1). The sequence is intruded by east-west trending Proterozoic mafic dykes and is bunded to the east and west by complex granitic plutons.

6

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

==> picture [295 x 397] intentionally omitted <==

----- Start of picture text -----

North
Zone
Main Zone
----- End of picture text -----

Figure 1: Eureka Gold Project - Simplified Local Geology (from Hodgins, 2014, based on historical work)

In the vicinity of the Eureka Mine the sequence has a generally easterly dip of 65° to 70°, parallel by the regional foliation. Regional metamorphism of the sequence is lower greenschist facies.

Two distinct shale units are present, the western or footwall unit being the Copper Mine Shale which marks the top of the sill and the hanging wall unit, an interflow unit amongst the basalt (Figure 2).

Weathering profile is extensive with the deepest weathering along the main shear zones and contacts causing a weathering trough of highly oxidised rock that extends down the main shear to the bottom of the pit exposures. Both the north end and south end exposures of the pit show massive and blocky clay altered rock masses bounded by narrow, highly sheared zones, commonly containing limonitic quartz veining. The quartz vein hosted shears run parallel or sub-parallel to the main N-S shear trend, and less commonly cross cutting, shallow dipping quartz veins (Figure 2).

High grade gold mineralisation at Eureka is associated with veining within the altered lower mafics. The vein system typically consists of quartz, carbonate and sulphide and has a variable thickness of up to 20m. The mineralisation exploited in the open pit consists of a number of lens shaped shoots up to 10m wide within an intensely sheared zone some 30m wide .

7

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

==> picture [461 x 348] intentionally omitted <==

Figure 2: Eureka Open Pit – Recent view of Open Pit workings, looking south (Cube, June 2021)

Drilling Techniques and Hole Spacing

Historically, the project has been drilled using rotary air blast (RAB), percussion (Perc), reverse circulation (RC) and diamond core drilling (DD) over numerous campaigns by several companies and currently by TIN.

Eureka Open Pit – Recent view of Open Pit workings, looking south (Cube, June 2021)

For the 2020-2021 all drilling was completing using RC rigs. The RC rig specs are as follows:

  • Schramm T450 RC rig - 5 ½ inch diameter face sampling hammer

  • LC36 KWL700 RC rig (for deep holes) – 5 inch face sampling hammer

  • X350 RC rig - 4 ½ inch diameter face sampling hammer; drilling since May 2021)

The majority of holes are on a grid either infilling within or surrounding historical pit and underground (UG) workings or extending along strike into geochemical or geophysical (areomag) anomalies. The recent programs drilled in 2020 and 2021 have all been RC drilling. The majority of drill holes have a dip of -55 or -60° and azimuths mostly drilled to 270° MGA grid

Historical exploration and drilling at Eureka targeted discrete areas based on surface geochemical and geophysical anomalies, historical workings that identified the location of host mineralisation. Consequently, current drilling is not grid based, but across the historical open pit and UG workings the drill spacing is nominally 10m N x 10m E. Extensions to the north and south have been nominally drilled at 20m N x 20m/10m spaced drilling. A plan view showing the drill spacing of holes used for the 2021 MRE within the Eureka project area are highlighted in Figure 3.

8

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

==> picture [300 x 418] intentionally omitted <==

----- Start of picture text -----

2021 Resource
Area
ML
Boundary:
M 2400189
Eureka Pit Waste
Dump
----- End of picture text -----

Figure 3: Drillhole Location Plan with Resource Estimation Area and Project Mineral Licences

Sampling Methods

Historical drilling reviewed from WAMEX files and carried out from 1982, included Vacuum, Augur, open hole percussion/ RAB, RC and diamond core drilling (mostly NQ, also PQ and HQ). Sampling methods included chip samples collected and split in even 1 metre or 4 metre composite intervals for dry samples. Wet samples were speared or on occasion scoopsampled. Diamond core was half core sampled at selected intervals where the geologist recorded evidence of the presence of mineralisation.

For the recent drilling by TNT Mines Ltd (TIN), reverse circulation (RC) drill samples are collected from rig mounted cyclone cone splitter at 1m intervals. Duplicate samples are collected from reject bags every 10m (by spear sampling). Calico samples are weighed to ensure minimum size of 2.5kg are collected. Rarely where wet samples were encountered, the samples were speared or on occasion scoop-sampled. RC drill chips from each metre were examined visually and logged by the geologist. Duplicate samples were collected at 1 m intervals by scoop sampling reject bags.

9

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

Certified reference materials (CRM), analytical blanks, and field duplicates were used as part of the QAQC procedures used for the 2020-2021 RC drilling programs at Eureka and summarised as follows:

  • Insertion of CRMs after every 10 samples which represents approximately 5% of total samples. No blanks were inserted for the 2020-2021 RC drilling programs.

  • Insertion of field duplicates at a rate of one duplicate submitted for every 10 samples. Duplicates samples represent approximately 5% of total samples.

  • Based on the independent statistical analysis of the QAQC results, there is no evidence to suggest the samples are not representative. Analysis of the results to date show an acceptable level of precision and accuracy.

Sample Security and Laboratory Analysis

Chain of custody is managed by TIN staff at the site office and core storage facility at Eureka. Between 300-400 samples are delivered in a batch directly by TIN personnel to the assay laboratory in Kalgoorlie by light vehicle and trailer with enclosed cage. Samples are securely packed in wire-tied, large hessian bags.

Two laboratories have been used for the 2020-2021 RC drilling, sample preparation and analysis: -

  • ALS, Kalgoorlie, certified ISO 9001

  • SGS, Kalgoorlie, certified ISO 9001

At the commercial laboratory, RC samples are dried at minimum 60° C. If the sample weight is greater than 3 kg, the sample is riffle split. It is then pulverised to a grind size where 85% of the sample passes 75 micron. All samples have been analysed using a 30g fire assay technique with an AAS finish.

All assay results are forwarded electronically to TIN for review by the CEO prior to validation and importing into the TIN database by contract database administrator.

Estimation Methodology

Data is sourced from the recent and historical drill logging and RC chip logging/ DD core logging, and surface mapping interpretations from previous work. Interpreted projections for structures and local mineralisation trends were made between drill sections and extending along strike and down dip based on a drill spacing down to 10 m x 10 m. The logging and mining information has been used to inform the mineralisation domains used for the estimation.

Weathering surfaces were interpreted for oxide, transitional and primary weathering boundaries from available logging data. This data allowed the density values for the mineral resource estimate to be sub-divided by weathering domains.

Mineralisation continuity in the Main zone mineralisation consisting of 2 main zones in close proximity, following the trend of the main shear. Along the hanging wall and in the North zone, mineralisation is more inconsistent, although many old holes have selective sampling. Several significant gold intersections footwall to the FW graphitic shale were modelled into Au domain, and may indicate anomalous Au mineralisation along the footwall sequence.

Estimation domains were based on grouping of the gold mineralisation domains into five zones as defined by domain boundary threshold, nominally at 0.5g/t Au:

  • Domain 1001 to 1008 – Main Zone Au mineralisation

  • Domain 2001 to 2004 – North Zone Au mineralisation

  • Domain 3001 – Laterite Au mineralisation

  • Domain 100 – Min/Waste halo domain covering background mineralisation across the Main and North zones.

10

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

Drill hole sample data was flagged using domain codes generated from three-dimensional mineralisation domains. Sample data was composited to one-metre downhole lengths using a best fit-method. No residuals were generated. Statistical analysis was carried out on data from all estimated domains, with hard boundary techniques employed within each estimation domain.

Gold grade distributions within the estimation domains were assessed to determine if high grade cuts or distance limiting should be applied. Distance limiting thresholds and the effects of grade capping were reviewed and applied on a domain basis where it was deemed appropriate i.e., for extreme high-grade outliers, high grade clustering or a high coefficient of variation (CV).

The mineralised domain wireframes were used to code the block model and the volume between the wireframe models and the coded block model were checked in order to ensure that the sub-blocking size are appropriate for the interpreted domains. Estimation was carried out on capped and uncapped gold grade. Hard domain boundaries were used between the mineralised domains, meaning only composites within the domain are used to estimate inside that domain. The variogram orientations were used as the orientation of the search ellipse. The variogram and search parameters for well-informed were used to represent the poorly informed domains.

Gold was estimated in two passes – first pass using optimum search distances for each domain (mostly 40 m) as determined through the KNA process, second pass set at longer distances in order to populate all blocks (2nd = max 120 m). A waste domain boundary encompassing the mineralisation domains and within the limits of the drilling and host units was modelled for each deposit and included in the grade estimation runs. This allowed for any isolated zones and any mineralised haloes proximal to the hard boundary mineralised blocks to be estimated for estimation of dilution within pit optimisation limits. Interpolation parameters were set to a minimum number of 6 composites and a maximum number of 16 composites for the estimate. A maximum of 6 samples per hole was used.

The parent block dimensions used in the block model were:

  • 5 m N by 2.5 m E by 2.5 m RL, with sub-cells of 2.5 m by 1.25 m by 1.25 m.

The parent block size was selected on the basis one half/one quarter of the minimum drill spacing of 10/20 m E by 10 m N in Indicated areas and one quarter of the maximum drill spacing of 40 m E by 20 m N in Inferred areas. For the block model definition parameters, the primary block size and sub-blocking deemed appropriate for the mineralisation and to provide adequate volume definition where there are narrow zones or terminations, or disrupted zones due to contacts or surface boundaries.

The block model definition parameters included a primary block size and sub-blocking deemed appropriate for the mineralisation and to provide adequate volume definition where there are narrow or complex zones modelled. These dimensions are suitable for block estimation and modelling the selectivity for an open pit operation. A view of the block model constrained within the estimation domains is illustrated in Figure 4.

11

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

==> picture [452 x 276] intentionally omitted <==

----- Start of picture text -----

Cross Section
Ref. Line:
Eureka Pit & 6643780 N
North Zone
Main Zone
----- End of picture text -----

Figure 4 Eureka Project – Composite Long Section (looking west) with block grades within defined estimation domains and drilling density (May 2021)

The block model was validated using a combination of visual and statistical techniques including global statistics comparisons, correlation coefficients comparisons, and trend plots.

A cross section looking north with estimated block grades constrained by the estimation domains within the Main Zone is presented in Figure 5.

12

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

==> picture [368 x 330] intentionally omitted <==

----- Start of picture text -----

Topo Surface
----- End of picture text -----

Figure 5 Eureka Project – Main Zone Cross section 6643780N (looking north) with block grades compared with downhole 1m composite grades (May 2021)

Resource Classification

A range of criteria was considered by Cube when addressing the suitability of the classification boundaries. These criteria include:

  • Geological continuity and volume;

  • Drill spacing and drill data quality;

  • Modelling technique; and

  • Estimation properties, including search strategy, number of informing composites, average distance of composites from blocks and kriging quality parameters.

Blocks have been classified in both the Indicated (56% of total metal) and Inferred (44%) categories, primarily based on drill data spacing and well-defined Au mineralisation continuity, in combination with other model estimate quality parameters.

For Eureka, the following criteria was adopted for identifying the resource classification boundaries:

  • The Indicated Mineral Resource was defined within areas of close spaced diamond and RC drilling (mostly 2020-2021 drilling) of less than 20 m by 20 m, and where the continuity and predictability of the lode positions was good.

  • The Inferred Mineral Resource was assigned to areas of the deposit where drill hole spacing was greater than 20 m by 20 m and where small, isolated pods of mineralisation occur outside the main mineralised trends

13

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

Reporting

In situ Resources

A summary of the in-situ Eureka Mineral Resources, as of 30 June 2021 is presented in Table 2. All resources have been depleted by previous open pit mining activity and are reported at a range of cut-off grades (COG). As the resources occur at or near surface, the models were constructed with a view towards selective open pit mining. Therefore, the selected Au lower cut-off ranges were deemed appropriate

Table 2 Eureka Gold Project– In Situ Mineral Resources (as of 23 June 2021)

Resource Tonnes Grade Contained
COG
Category (t) (g/t Au) (Oz Au)
Indicated 0.3 1,437,000 1.4 65,000
0.5 1,269,000 1.5 62,000
0.8 983,000 1.8 56,000
1.0 811,000 2.0 52,000
Inferred 0.3 1,341,000 1.2 52,000
0.5 1,183,000 1.3 50,000
0.8 887,000 1.5 43,000
1.0 666,000 1.7 37,000
ALL Resources 0.3 2,778,000 1.3 116,000
0.5 2,452,000 1.4 112,000
0.8 1,870,000 1.7 100,000
1.0 1,477,000 1.9 88,000

Notes:

  • Figures may not add up due to rounding.

  • All resources have been depleted by open pit mining based on the most recent surface topography DTM. No resources have been depleted by historical UG mining.

  • 3

  • • The average bulk density assigned to the mineralisation is 2.2 g/cm for oxide material, 2.4 g/cm3 for transition, and 2.75 g/cm3 for fresh rock.

  • Mineral Resources that are not Mineral Reserves have not demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

  • No mining or metallurgical factors have been applied to the In Situ Mineral Resources

Cut-off Grade

As the resources occur at or near surface, and have been mined previously by this method, the models were constructed with a view towards selective open pit mining.

14

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

Reporting of Mineral Resources have been assessed against a resource limiting optimisation shell using appropriate cost, metallurgical recovery, and price assumptions. Material within the optimised pit shell has, in the opinion of the Competent Person, met the conditions for reporting of a Mineral Resource with reasonable prospects of economic extraction.

A COG of 0.5 g/t Au was applied to all material within mineral resource defined by specific open optimisation pit shells.

Mining and Metallurgy

Development of this Mineral Resource assumes mining using standard equipment and methods. The assumed mining method is conventional truck and shovel, open pit mining at an appropriate bench height.

No recent metallurgical testwork and reporting has been reviewed as part of the 2021 MRE. Metallurgical factors have been considered for the pit optimisation analysis. Metallurgical recoveries have taken into consideration the previous mining results and similar gold deposits:

  • Oxide and Transition Ore: Process recovery = 95%

  • Fresh Ore: Process recovery = 90%

15

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

APPENDIX 2 - Significant 2020-2021 Drilling Intercept Table

Cut-off grade of 0.5 g/t Gold allowing for 2m internal dilution (NSI – No significant Intercept).

All co-ordinates in GDA94/ MGA Zone 51

Hole ID Easting Northing Elevation Depth (m) Collar Dip Collar
Azi
From
(m)
To
(m)
Length
(m)
Grade
(g/t Au)
WRRC0001 332,521 6,643,448 429.45 151 -60 277 51 64 13 2.22
including 58 60 2 8.66
and 75 79 4 1.57
WRRC0002 332,478 6,643,455 428.51 100 -55 273 3 6 3 0.68
and 13 14 1 0.5
and 51 52 1 0.66
WRRC0003 332,530 6,643,452 429.91 160 -75 275 65 66 1 1.1
and 78 79 1 1.96
and 102 107 5 1.66
WRRC0004 332,461 6,643,430 428.22 100 -55 275 75 79 4 0.41
WRRC0005 332,496 6,643,428 429.28 120 -55 276 6 10 4 0.4
WRRC0006 332,442 6,643,398 425.45 80 -55 272 NSI
WRRC0007 332,480 6,643,399 428.48 100 -55 272 NSI
WRRC0008 332,700 6,643,806 426.43 340 -63 257 148 156 8 2.51
and 232 233 1 0.63
and 242 243 1 0.75
WRRC0009 332,531 6,643,884 430.58 120 -60 273 4 12 8 0.66
and 51 52 1 1.26
and 69 70 1 0.75
and 99 100 1 0.83
WRRC0010 332,657 6,643,859 427.86 230 -61 271 181 182 1 2.54
WRRC0011 332,684 6,643,695 429.32 330 -56 250 144 146 2 0.84
and 152 153 1 1.02
and 183 184 1 0.59
and 239 250 11 0.78
and 257 259 2 0.59
and 291 292 1 13.22
WRRC0013 332,554 6,643,348 444.29 272 -60 272 8 16 8 1.2
WRRC0014 332,867 6,642,690 421.39 200 -57 274 NSI
WRRC0015 332,848 6,642,604 419.31 200 -57 272 NSI
WRRC0017 332,376 6,644,448 426.09 75 -60 268 9 12 3 0.97
WRRC0018 332,391 6,644,470 426.48 90 -57 273 24 29 5 2.88
including 27 28 1 10.52
and 42 43 1 0.5
and 54 55 1 1.07
WRRC0019 332,412 6,644,473 426.65 120 -57 272 42 46 4 10.99
and 74 75 1 0.84

16

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

WRRC0021 332,337 6,644,400 425.2 120 -57 272 107 108 1 6.72
WRRC0022 332,373 6,644,399 425.44 120 -57 266 70 71 1 1.29
WRRC0023 332,399 6,644,399 425.94 150 -57 269 48 49 1 0.63
and 84 87 3 1.97
WRRC0024 332,400 6,644,436 426.16 141 -51 275 33 37 4 0.41
and 42 43 1 0.51
and 109 110 1 1.35
WRRC0025 332,411 6,643,849 431.78 30 -60 270 NSI
WRRC0026 332,431 6,643,844 435.06 55 -60 270 - 3 3 0.89
WRRC0027 332,454 6,643,850 434.44 65 -60 270 2 8 6 0.71
WRRC0028 332,477 6,643,851 433.32 80 -60 270 6 10 4 1.44
WRRC0029 332,495 6,643,847 432.28 90 -60 270 2 6 4 1.01
and 51 53 2 0.77
WRRC0030 332,518 6,643,846 431.23 90 -60 245 1 8 7 0.94
and 27 28 1 3.21
and 47 48 1 0.75
WRRC0031 332,427 6,643,862 434.1 30 -60 272 - 2 2 1.32
WRRC0032 332,444 6,643,861 435.14 55 -60 270 6 8 2 0.62
WRRC0033 332,466 6,643,860 434.18 65 -60 270 5 10 5 1.23
WRRC0034 332,487 6,643,859 433.09 90 -60 270 10 11 1 1.56
WRRC0035 332,509 6,643,861 431.96 100 -60 273 3 8 5 1.08
WRRC0036 332,530 6,643,859 430.82 110 -60 270 4 9 5 1.07
and 52 54 2 0.5
WRRC0037 332,550 6,643,857 429.94 120 -61 271 4 5 1 0.98
and 47 51 4 1.13
and 55 60 5 0.9
including 55 56 1 3.46
WRRC0038 332,600 6,643,853 429.17 160 -61 273 93 94 1 0.61
WRRC0039 332,341 6,644,329 425.95 80 -57 270 NSI
WRRC0040 332,368 6,644,328 426.14 100 -57 273 NSI
WRRC0041 332,341 6,644,378 425.13 90 -60 270 17 18 1 0.97
and 37 38 1 0.69
and 45 46 1 0.64
WRRC0042 332,374 6,644,375 425.61 120 -60 273 41 42 1 0.71
and 75 76 1 0.52
WRRC0043 332,266 6,644,550 425.61 100 -57 273 NSI
WRRC0044 332,317 6,644,550 426.23 100 -60 270 NSI
WRRC0045 332,341 6,644,520 426.34 100 -57 270 NSI
WRRC0046 332,395 6,644,501 426.87 100 -60 270 NSI
WRRC0047 332,446 6,644,508 427.58 150 -57 270 52 56 4 1.04
WRRC0048 332,486 6,643,923 431.25 75 -55 270 NSI
WRRC0049 332,444 6,643,984 427.03 80 -60 270 NSI

17

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

WRRC0051 332,673 6,643,739 429.26 295 -67 274 - 4 4 1.19
and 136 140 4 1.47
and 247 255 8 1.69
including 248 249 1 10.07
and 271 275 4 1.63
including 272 273 1 4.04
WRRC0052 332,599 6,643,953 429.88 200 -61 269 114 120 6 2.78
WRRC0053 332,685 6,643,695 429.31 330 -66 251 152 156 4 1.18
and 160 164 4 1.12
and 201 202 1 0.99
and 264 269 5 0.9
and 275 276 1 2.67
WRRC0054 332,552 6,643,476 428.02 200 -60 290 - 4 4 1.74
and 81 82 1 0.51
and 93 96 3 2.52
and 140 141 1 2.22
WRRC0055 332,528 6,644,499 428.3 150 -60 210 NSI
WRRC0056 332,518 6,644,418 427.21 150 -60 210 NSI
WRRC0057 332,278 6,644,531 425.53 150 -60 200 NSI
WRRC0058 332,283 6,644,588 426.11 150 -60 200 NSI
WRRC0059 332,647 6,644,120 431.08 130 -60 268 112 120 8 1.14
WRRC0061 332,993 6,642,500 417.57 150 -60 270 NSI
WRRC0062 333,244 6,642,543 417.25 178 -60 270 NSI
WRRC0064 332,551 6,644,302 429.64 250 -61 270 NSI
WRRC0065 332,426 6,644,135 427.89 150 -57 267 44 46 2 0.27
WRRC0066 332,620 6,643,431 445.49 214 -57 270 171 181 10 1.03
and 188 189 1 0.75
WRRC0067 332,682 6,643,485 446.41 290 -62 289 NSI
WRRC0070 332,437 6,643,875 434.44 30 -60 269 3 4 1 1.57
WRRC0071 332,454 6,643,877 434.59 30 -60 270 NSI
WRRC0072 332,469 6,643,876 433.76 80 -60 271 8 9 1 0.59
and 45 46 1 1.2
WRRC0073 332,494 6,643,872 432.6 80 -60 270 6 10 4 2.39
WRRC0074 332,507 6,643,872 431.94 90 -60 270 - 12 12 0.51
WRRC0075 332,550 6,643,878 430.02 110 -60 273 10 11 1 0.51
and 48 58 10 1.7
including 52 53 1 12.99
and 67 69 2 6.95
and 78 79 1 0.62
WRRC0077 332,350 6,644,265 427.06 150 -55 272 88 89 1 6.47
and 103 104 1 0.67
WRRC0078 332,419 6,644,265 429.29 150 -55 270 NSI

18

ASX Announcement

24 June 2021

==> picture [150 x 52] intentionally omitted <==

WRRC0079 332,637 6,643,803 427.95 192 -55 279 118 119 1 1.38
and 130 132 2 2.04
and 156 157 1 3.62
WRRC0080 332,660 6,643,804 427.2 250 -68 275 112 116 4 0.75
and 165 166 1 0.96
and 201 203 2 6.13
and 209 210 1 1.67
and 217 218 1 1.19
WRRC0081 332,520 6,643,476 429.35 190 -60 329 69 71 2 1.34
and 77 79 2 0.75
and 99 105 6 0.6
and 110 123 13 2.13
including 121 122 1 9.34
and 127 136 9 3.15
including 131 134 3 7.9
WRRC0082 332,550 6,643,475 428.27 170 -52 285 3 5 2 0.68
and 74 77 3 8.59
and 120 121 1 0.59
and 129 136 7 1.27
WRRC0083 332,559 6,643,576 350.97 140 -55 200 53 54 1 3.44
and 125 127 2 0.67
WRRC0085 332,481 6,643,226 422.89 154 -55 270 NSI
WRRC0086 332,672 6,643,002 421.53 200 -55 270 NSI
WRRC0087 332,361 6,644,638 427.68 46 -55 271 36 40 4 0.5
WRRC0088 332,469 6,643,891 433.52 75 -60 266 NSI
WRRC0089 332,507 6,643,894 431.36 85 -60 269 NSI
WRRC0090 332,515 6,643,926 429.94 80 -60 269 26 27 1 14.72
WRRC0091 332,573 6,643,930 429.63 120 -60 270 103 104 1 1.32
WRRC0092 332,555 6,643,399 439.85 180 -60 274 112 113 1 1.24
WRRC0093 332,518 6,643,396 435.59 140 -61 273 NSI
WRRC0094 332,551 6,643,429 436.69 170 -59 266 8 9 1 0.59
and 82 86 4 1.4
and 99 100 1 4.78
WRRC0095 332,427 6,644,481 427.02 100 -61 272 48 58 10 2.65
WRRC0096 332,416 6,644,573 428.18 100 -56 270 NSI
WRRC0097 332,423 6,644,527 427.59 100 -55 273 29 30 1 0.66
WRRC0098 332,428 6,644,501 427.28 100 -61 267 41 42 1 0.98

19

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

APPENDIX 3 - JORC Table 1

Eureka Gold Project MRE, June 2021

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria
JORC Code explanation
Commentary
Sampling
techniques

Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of
sampling.

For the recent drilling by TNT Mines Ltd (TIN), reverse circulation (RC) drill
samples were collected and split in even metre intervals when sample was dry.
Wet samples were speared or on occasion scoop-sampled. RC drill chips from
each metre were examined visually and logged by the geologist. Duplicate
samples were collected at 1 m intervals by scoop sampling reject bags.

Historical drilling reviewed from WAMEX files and carried out from 1982,
included Vacuum, Augur, open hole percussion/ RAB, RC and diamond core
drilling (mostly NQ, also PQ and HQ). Sampling methods included chip samples
collected and split in even 1 metre or 4 metre composite intervals for dry
samples. Wet samples were speared or on occasion scoop-sampled. Diamond
core was half core sampled at selected intervals where the geologist recorded
evidence ofthe presence of mineralisation.

Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.

Samples are collected from rig mounted cyclone cone splitter at 1m intervals.
Duplicate samples are collected from reject bags every 10m (by spear
sampling). Calico samples are weighed to ensure minimum size of 2.5kg are
collected.

Current QAQC protocols include the analysis of field duplicates and the
insertion of appropriate commercial standards (I, e., certified reference material
(CRM).

Sample protocols where they are described from historical reports sourced
from WAMEX followed by historic operators are in line with industry standards
at the time.

Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to
produce a 30g charge for fire assay’). In other cases

RC drilling was used to obtain 1 m samples from which a 1 m samples
(mineralisation zones) or 2 m and 4 m composite samples (waste zones) of
approximately 2.5 to 5 kg was also collected.

For all samples sent to the laboratories, each sample was pulverised to produce
a 30 g charge for fire assay.
20
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
more explanation may be required, such as where there
is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
Drilling techniques

Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).

For the 2020-2021 drilling the RC rig specs are as follows:

Schramm T450 RC rig - 5 ½ inch diameter face sampling hammer

LC36 KWL700 RC rig (for deep holes) – 5 inch face sampling hammer

X350 RC rig - 4 ½ inch diameter face sampling hammer; drilling since May
2021)

Historically, the project has been drilled using rotary air blast (RAB), percussion
(Perc), reverse circulation (RC) and diamond core drilling (DD) over numerous
campaigns by several companies and currently by TIN.

The majority of holes are on a grid either infilling within or surrounding historical
pit and underground (UG) workings or extending along strike into geochemical
or geophysical (areo-mag) anomalies. The recent programs drilled in 2020 and
2021 have all been RC drilling. The majority of drill holes have a dip of -55 or -
60° and azimuths mostly drilled to 270°MGA grid.
Drill
sample
recovery

Method of recording and assessing core and chip
sample recoveries and results assessed.

RC sample recovery is visually assessed and recorded in drill logs. Very little
sample loss has been noted. Field inspection by the CP of reject plastic bags
from the 2020-2021 RC drilling programs showed good recoveries.

From WAMEX records, descriptions noted that the majority of DD drilling had
good recoveries >90%, although several holes recorded recoveries of ~50%
or lower within highly fractured quartz vein intervals, and also where there
was intersection of historical UG workings.

Measures taken to maximise sample recovery and
ensure representative nature of the samples.

RC samples were visually checked for recovery, moisture, and contamination.
A cyclone and splitter were used to provide a uniform sample and these were
routinely cleaned. Wet samples and logged barren zone, 4 m composites were
speared to obtain the most representative samplepossible.

Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.

Sample recoveries are mostly high with only a very small number of wet
samples recorded by WRD geologists. No significant sample loss has been
recorded with a corresponding increase in Au present. No sample bias is
anticipated, and nopreferential loss/gain ofgrade material has been noted.

Whether core and chip samples have beengeologically

Current RC chips aregeologicallylogged at 1 metre intervals. RC chiptrays
21
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Logging
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
have been stored for future reference.

Detailed logging exists for more recent drilled prior to WRD holes (18EKDD,
and 19ERC prefix holes, but most of the historical RC and DD holes drilled do
not have the logging digitally recorded in WRD database files provided,
although the WAMEX files do contain PDF copies of RC and DDgeologylogs.

Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.

WRD RC chip logging included the recording of colour, lithology, regolith,
oxidation state, colour, alteration, mineralisation, and veining/quartz content.
The entire length of each hole was logged.

Previous RC and DD drilling completed by previous owners contained similar
detailed geological descriptions in PDF logs.

Remaining core was examined from the 18EKDD drilling program at the Eureka
project field office. The core remaining is in good condition but has been poorly
labelled, with intervals and hole identification often indistinguishable as no
aluminium tags or more permanent markers were used on core blocks or to
label the core trays.

The total length and percentage of the relevant
intersections logged.

Percentage of drilling logged that was used in the 2021 MRE are record as
follows:

2020-21 RC drilling – WRRC holes = 96% logged, abandoned holes not
logged records in WRD DB

19ERC prefix – RC drilling 93% logged records in WRD DB

18EKDD – RC/DD drilling 88% logged records in WRD DB

ERC holes – RC drilling – 4% logged records in WRD DB

DEK,WEK – RC/DDdrilling–8%loggedrecordsin WRD DB
Sub-sampling
techniques
and
sample preparation

If core, whether cut or sawn and whether quarter, half or
all core taken.

No recent diamond drilling has been completed by WRD. Previous companies
have conducted diamond drilling; WAMEX records have noted that ½ core
sampling was mostly conducted, generally in highly selective intervals based
around loggedpresence of mineralisation.

If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.

RC chips were collected from rig mounted cyclone cone splitter as 1m samples.
2 and 4m composites using a sample scoop were taken from the 1m RC plastic
sample bags. Samples weregenerallydry. 1m RC samples are also speared.

For all sample types, the nature, quality, and
appropriateness of the sample preparation technique.

At the commercial laboratory, RC samples are dried at minimum 60°C. If the
sample weight is greater than 3 kg, the sample is riffle split. It is then pulverised
to agrind size where 85% of the samplepasses 75 micron.

Quality controlprocedures adopted for all sub-sampling

Field QAQCprocedures included the insertion of CRMs and field duplicates for
22
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
stages to maximise representivity of samples.
RC drilling after every 10 samples.

CRMs represented approximately5% of total samples.

Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.

Field duplicates were collected during the RC drilling programs in 2020-21.

Duplicate samples are submitted at a rate of one duplicate submitted for every
10 samples. Duplicates samples represent approximately 5% of total samples.

Based on statistical analysis of the field duplicate results, there is no evidence
to suggest the samples are not representative.

Whether sample sizes are appropriate to the grain size
of the material being sampled.

A sample size of between 2.5 and 5 kg was collected. This size is considered
appropriate and representative of the material being sampled given the width
and continuity of the intersections, and the grain size of the material being
collected.
Quality of assay
data and laboratory
tests

The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is consideredpartial or total.

Both single 1 metre samples and 2 m or 4 m composite samples have been
analysed using a 30g fire assay technique with an AAS finish.

For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.

No geophysical tools etc. have been used at Eureka.

Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.

Field QAQC by TIN procedures include the insertion of both field duplicates
and CRMs. No blanks were inserted by TIN. Assay results to date have been
satisfactory and demonstrate an acceptable level of accuracy and precision.
Laboratory QAQC involves the use of internal certified reference standards,
blanks, splits, and replicates. Analysis of these results to date show an
acceptable level ofprecision and accuracy.
Verification
of
sampling
and
assaying

The verification of significant intersections by either
independent or alternative company personnel.

All significant intersections are forwarded to TIN for review by the CEO prior to
importing into the TIN database by contract database administrator.

Significant intersection calculation and results have also been verified onscreen
and tabulated bythe CP

The use of twinned holes.

No specific twinned holes have been drilled to date by TIN. Recent drilling from
2018 to the current programs have some infill holes in close proximity to
historical drilling, and mostly confirm the presence of Au mineralisation, and
also intersect significant mineralisation where historical hole intervals that were
23
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
not sampled.

Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.

Field data and logging is collected and entered using Toughbook field
computers. The data is sent via a SharePoint site, to a contract database
administrator for validation and compilation into an MS Access database.

Discuss any adjustment to assay data.

No adjustments have been made to assay data apart from values below the
detection limit which are assigned a value of negative the detection limit for the
2021 MRE work.
Location of data
points

Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource
estimation.

All recently drilled hole collars have been surveyed by hand-held GPS (Garmin
64 GPS) to an accuracy of about 3m. The drill holes are then picked up using
a DGPS by Cardno Spectrum Survey, Kalgoorlie at the completion of each drill
program.

Downhole surveying is conducted by the drilling contractor, using EZ-Shot
single shot downhole camera at 30 m intervals at the completion of each hole.

Specification of the grid system used.

The grid system is MGA_GDA94 Zone 51. Topographic datum is AHD71
(Australian Height Datum 1971).

Quality and adequacy of topographic control.

The topographic surfaces include a very high resolution DTM surface (LiDAR
survey) was initially used for hole collar location verification. TIN noted that the
historical open pit floor is deeper than what is recorded in the Lidar file. TIN
then provided a more recent open pit DTM surface.

Part of the project area that was not covered by the DTM surfaces was
validated or edited using the collar coordinates based on DGPS surveys.
Data spacing and
distribution

Data spacing for reporting of Exploration Results.

Historical exploration and drilling at Eureka targeted discrete areas based on
surface geochemical and geophysical anomalies, historical workings that
identified the location of host mineralisation. Consequently current drilling is
not grid based, but across the historical open pit and UG workings the drill
spacing is nominally 10m N x 10m E. Extensions to the north and south have
been nominallydrilled at 20m N x 20m/10m spaced drilling.

Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimationprocedure(s) and classifications applied.

The mineralised domains have sufficient continuity in both geology and grade
to be considered appropriate for the Mineral Resource and Ore Reserve
estimation procedures and classification applied under the 2012 JORC Code.

Whether sample compositing has been applied.

4m composite samples were collected from RC drill holes within the logged

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
barren intervals. Where anomalous results were expected, the single metre
samples were collected for subsequent analysis.
Orientation of data
in
relation
to
geological
structure

Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.

Drill hole collars are set-out on the MGA grid and drill lines were generally at E-
W direction Drilling sections are orientated perpendicular to the strike of the
overall shear orientation and mineralised host rocks.

Several shallow dipping vein structures are noted in the southern pit wall, but
overall the mineralised vein structures appear parallel to sub-parallel with the
shear orientation from north to south.

The drilling is angled at either -55°or -60°which is close to perpendicular to the
dipof the shear trend and host units.

If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered
to have introduced a sampling bias, this should be
assessed and reported if material.

No orientation based sampling bias has been identified in the data at this point.
Sample security

The measures taken to ensure sample security.

Chain of custody is managed by TIN. Staff at the site office facility and core
storage area at Eureka. Between 300-400 samples are delivered in a batch
directly by TIN personnel to the assay laboratory in Kalgoorlie by light vehicle
and trailer with enclosed cage.
Audits or reviews

The results of any audits or reviews of sampling
techniques and data.

Data is validated by the contract database administrator whilst loading into the
TIN MS Access database.

Cube Consulting (Cube) carried out a site visit and reviewed drilling, sampling
procedures and analytical methods used for Eureka. All processes were
deemed appropriate for the type of deposit and are carried out in accordance
with standard industry practice.

Cube also conducted a data compilation review and validation of the drilling
data set prior to undertaking the 2021 MRE work. This involved checks for
duplicate surveys, downhole surveys errors, assays, and geological intervals
beyond drillhole total depths, overlapping intervals, and gaps between
intervals.

Data validation issues noted were reported back to TIN for review and
feedback. Drill holes with validation issues were either resolved or if not
resolved, ignored in the 2021 MRE work.

Further validation of historical data not used in the 2021 MRE work is ongoing.
25
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section)

Criteria JORC Code explanation JORC Code explanation JORC Code explanation Commentary
Mineral tenement and Type, reference name/number, location
and
The Eureka project is situated on tenement numbers M24/189, M24/584,
land tenure status ownership including agreements or material issues M24/585 and M24/586 and P24/5116. The suite of five tenements is located 50
with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical
sites, wilderness or national park and environmental
Kilometres north-west of Kalgoorlie.
The tenements are owned 100% by TNT Mines Ltd (TIN) is the operator of the
tenement package.
settings.
The security of the tenure held at the time of reporting The tenements are in good standing and no known impediments exist.
along with any known impediments to obtaining a
licence to operate in the area.
Exploration done by Acknowledgment and appraisal of exploration by Discovery and initial UG workings commenced 1897. UG mining up to 1941
other parties other parties. produced 797 oz Au from 809 tonnes at 27g/t Au (Ransted, 1985)
More recently, the tenement area has been previously explored by numerous
companies including:
CSR (1982-83) – included 4.4km of RC drilling
West Coast Holdings (WCH) (1984-87) – Surface geochemistry (including
Augur drilling), aero-mag surveys, vacuum drilling, Percussion, DC and DD
drilling; surface mapping and gridding; evaluation and mining of oxide
resources Open Pit) and evaluation of UG resources – open pit mining
produced 45,865 tonnes at 4.64g/t Au, for 6,842 oz Au (WCH, 1986).
Glengarry Mining NL (1994) – Aeromag Interpretation, RAB Drilling
Jasper Mining NL (+ JV partners) (1996-2004) – UG mine refurbishment &
trial mining from November 1998 to June 1999 – approx. 400t @ 6g/t Au
from 80m Level (JMM, 2000); Project management plan (1998-99)
Sherlock Bay Nickel Corp (SBNC) (2004-2006) – Ground Mag survey;
gridding; surface mapping; RC drilling (ERC)
International Gold P/L (2007-2010) – Mag-radiometric survey, Augur
drilling; UG design study (41,000 t @ 10.1 g/t, 13.3k Oz Au)
Central Iron Ore Ltd (2011-14) – Resource evaluation (451,000y @ 4.4g/t,
64,200 oz Au);Geophysical data review.
Geology Deposit type, geological setting, and style of Summarised from Hodgins, 2014, collated from previous reports.
mineralisation. Regional Setting:
The Eureka gold deposit occurs on the eastern limb of the major south-east
plungingGoongarrie-Mt. Pleasant Anticline. The eastern limb consists

26

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
predominantly of north-north-west trending mafic and ultramafic lithologies,
with minor thin mainly interflow sediments, bounded to the west by pre-to
syntectonic granitoid forming the core of the regional anticline.

To the east, the Bardoc-Broad Arrow Synform occurring between the major
Goongarrie- Mt. Pleasant and Scotia-Kanowma Anticlines is subject to
significant disruption by the broad Bardoc Tectonic Zone.

This zone consists of multiple shear zones occurring within intercalated felsic,
mafic, and ultramafic lithologies in the vicinity of the synformal axis. The Bardoc
Tectonic Zone is host to the Paddington and Bardoc gold deposits.

Local Geology & Mineralisation:

The Eureka Gold Project lies at the top end of the Mt Pleasant Sill. The deposit
is located within a sequence of mafic and ultramafic rocks forming part of the
Kalgoorlie – Menzies greenstone belt. The layered sequence is approximately
6 km wide with a northerly trend. The sequence is intruded by east-west
trending Proterozoic mafic dykes and is bunded to the east and west by
complex granitic plutons.

In the vicinity of the Eureka Mine the sequence has a generally easterly dip of
65° to 70°, parallel by the regional foliation. Regional metamorphism of the
sequence is lower greenschist facies.

Two distinct shale units are present, the western or footwall unit being the
Copper Mine Shale which marks the top of the sill and the hanging wall unit, an
interflow unit amongst the basalt.

Weathering profile is extensive with the deepest weathering along the main
shear zones and contacts causing a weathering trough of highly oxidised rock
that extends down the main shear to the bottom of the pit exposures. Both the
north end and south end exposures of the pit show massive and blocky clay
altered rock masses bounded by narrow, highly sheared zones, commonly
containing limonitic quartz veining, both parallel to the main N-S shear trend,
and less commonly cross cutting, shallow dipping quartz veins.

High grade gold mineralisation at Eureka is associated with veining within the
altered lower mafics. The vein system typically consists of quartz, carbonate
and sulphide and has a variable thickness of up to 20m. The mineralisation
exploited in the open pit consists of a number of lens shaped shoots up to 10m
widewithinan intensely shearedzone some 30m wide.
Drill hole Information

A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:

All relevant drill hole details were presented in ASX release in Appendix 1
27
TNT Mines

High grade gold mineralisation at Eureka is associated with veining within the
altered lower mafics. The vein system typically consists of quartz, carbonate
and sulphide and has a variable thickness of up to 20m. The mineralisation
exploited in the open pit consists of a number of lens shaped shoots up to 10m
widewithinan intensely shearedzone some 30m wide.
Drill hole Information A summary of all information material to the All relevant drill hole details were presented in ASX release in Appendix 1
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
27
TNT Mines ACN 107 244 039 tntmines.com.au
ASX:TIN

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.

If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.

Not applicable – refer above.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging
techniques,
maximum
and/or
minimum
grade
truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.

All reported assays have been length weighted if appropriate. No top cuts have
been applied. A nominal 0.5g/t Au lower cut off has been applied, with only
intersections >0.5g/t considered significant.

Where aggregate intercepts incorporate short lengths
of high grade results and longer lengths of low grade
results, the procedure used for such aggregation
should be stated and some typical examples of such
aggregations should be shown in detail.

High grade Au intervals lying within broader zones of Au mineralisation are
reported as included intervals. In calculating the zones of mineralisation a
maximum of 2 metres of internal dilution is allowed.

The assumptions used for any reporting of metal
equivalent values should be clearly stated.

Metal equivalent values have not been used. Only gold grade is reported.
Relationship between
mineralisation widths
and intercept lengths

These relationships are particularly important in the
reporting of Exploration Results.

The mineralised zones vary in strike between the Main and North prospects.
Gold mineralisation is steeply dipping in the Main zone but more shallow drilling
in the Northprospect.

If the geometry of the mineralisation with respect to
the drill hole angle is known, its nature should be
reported.

Drill hole orientation reflects the change in strike of the rocks.

If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect(e.g. ‘down hole length, true width not known’).

Reported down hole intersections are believed to approximate true width.
Diagrams

Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should

All relevant drill hole details were presented in ASX release.
28
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Balanced reporting Where comprehensive reporting of all Exploration
All results are reported.
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
Other substantive Other exploration data, if meaningful and material,
No other significant exploration work had been reported by TNT.
exploration data should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density,
groundwater,
geotechnical
and
rock
characteristics; potential deleterious or contaminating
substances.
Further work The nature and scale of planned further work (e.g.
The Eureka project will continue to be drilled to extend the known Au
tests for lateral extensions or depth extensions or mineralisation and delineate further Au mineralisation and potential resources
_large-scale step-out drilling). _ at other nearby prospects.
Diagrams clearly highlighting the areas of possible
All relevant drill hole details were presented in ASX release.
extensions,
including
the
main
geological
interpretations and future drilling areas, provided this
information is not commercially sensitive.

==> picture [458 x 107] intentionally omitted <==

----- Start of picture text -----

TNT Mines | ACN 107 244 039 | tntmines.com.au ASX:TIN
----- End of picture text -----

29

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria
JORC Code explanation
Commentary
Database integrity

Measures taken to ensure that data has not been
corrupted by, for example, transcription or keying
errors, between its initial collection and its use for
Mineral Resource estimation purposes.

The drilling database for the Eureka deposit is maintained by a contract
database administrator.

The Eureka drilling data was supplied to Cube in two MS Access files formats:

EUREKA_HIST_DB_Extract_Z51_20210323.accdb = (old holes)

EUREKA_WAR_DB_Extract_Z51_20210430.accdb = (TIN holes, 2020-
21)

Cube compiled the data for importing into a standard resource database in MS
Access for use in the May 2021 Mineral Resource estimate.

This database has been relied upon as the source of data for the 2021 MRE
work.

Data validation procedures used.

Cube carried out a database validation review of the supplied drilling data,
supplied digital terrain models (DTM) prior to undertaking the resource
estimation update.

There were no old survey plans in digital format and no survey 3DM wireframes
of the historical UG workings from 1897-1940, or the recent UG trial mining in
1998.

Validation checks completed prior to MRE work for the MRE included the
following:

Collar duplications, hole collar checks with natural surface topography

Downhole survey deviation checks in 3D software, survey quality ranking

Maximum hole depths check between sample/logging tables and the collar
records

Checking for sample and logging overlaps; Reporting of missing assay
intervals

A validated assay field was included into the Assay table (au_use) to
convert any intercepts that have negative values or blanks in the primary
Au field (Au ppm).

QAQC data checks

Cube conduced independent data research on WAMEX to source historical
reports and information on previous drilling programs conduced at Eureka prior
to 2020. Current database records was reviewed for the drilling, sampling, and
assayingconducted within the deposit area.
Site visits

Comment on any site visits undertaken by the
Competent Person and the outcome of those visits.

Brian Fitzpatrick (Principal Geologist at Cube is the CP for Sections 1, 2 and 3
of Table 1 and has conducted a site visit on 9 June 2021.
30
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary

The CP carried out the following activities during the site visit:

Inspection and reconnaissance mapping of the open pit workings

Locate and GPS survey pickup of the approximate location of 26 WRRC
holes

Inspect available core from the 18EKDD program at the site field office
facilities

Review sample despatch and sample security facilities and procedures at
the site field office.

Review hard copies of CRMs, lab forms and logging documentation

Discussions with geology and field staff regarding drilling and sampling
protocols, QAQC procedures, drilling methods and equipment used,
surveying, logging.

The site visit noted that no bulk density (BD) sampling has been conducted
and recommends that BD sampling take place in the near future. No
previous BD information was source from historical documentation.

The CP concluded from the site visit that apart from lack of BD sampling,
other processes were deemed appropriate for the type of deposit and are
carried outinaccordancewithstandardindustry practice.

If no site visits have been undertaken indicate why
this is the case.

Not applicable.
Geological
Interpretation

Confidence in (or conversely, the uncertainty of)
the geological interpretation of the mineral deposit.

The confidence in the geological interpretation of the mineral deposit is good
as a result of the close, optimally spaced RC drilling confirming the location and
tenor of mineralisation previously intersected by historical RC and DD drilling.

In addition, previous mining activities such as the historical UG workings and
open pit mining in 1985-86 indicate the presence of economic gold
mineralisation based on the historical production figures:

UG Mining - 1897 to 1940: 809 tonnes at 27g/t Au, produced 797oz Au
(Ransted, 1985)

Open Pit Production – 1985 to 1986: 45,865 tonnes at 4.64g/t Au, for 6,842
oz Au (WCH, 1986).

The historical underground Eureka Gold Mine consists of several parallel gold
lodes in a Main zone mineralisation modelled for the 2021 MRE. The gold is
associated with quartz veins inside a north south trending, steeply east dipping
shear zone.

Within the northern zone the gold lodes appear to be parallel to the more
shallow, east dipping shear planes. Grades are highly inconsistent within two
main mineralised envelopes and appear to be offset by a NE-SW trend fault
structure.
31
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary

A significant and highly visible footwall maker unit – a thin graphitic shale
horizon follows the N-S shear trend continuously within the Main zone
mineralisation and is also highly visible I the current open pit workings. The
footwall shale has been readily logged in most drill holes intersecting through
the Main zone workings. A similar hanging wall shale is also visible in the NE
corner of the pit but is more inconsistent and clearly pinches out in the pit
outcrops.

In summary, mineralisation continuity in the Main zone mineralisation
consisting of 2 main zones in close proximity, following the trend of the main
shear. Along the hanging wall and in the North zone, mineralisation is more
inconsistent, although many old holes have selective sampling.

Several significant gold intersections footwall to the FW graphitic shale were
modelled into a single Au domain and may indicate further mineralisation along
the footwall sequenceyet to be uncovered.

Nature of the data used and of any assumptions
made.

Data is sourced from the recent and historical drill logging and RC chip logging/
DD core logging, and surface mapping interpretations from previous work.

Interpreted projections for structures and local mineralisation trends were made
between drill sections and extending along strike and down dip based on a drill
spacing down to 10 m x 10 m.

The logging and mining information has been used to inform the mineralisation
domains used for the estimation.

Weathering surfaces were interpreted for oxide, transitional and primary
weathering boundaries from available logging data. This data allowed the
density values for the mineral resource estimate to be sub-divided by
weathering domains.

The effect, if any, of alternative interpretations on
Mineral Resource estimation.

Previous mineralisation interpretations used for an UG study in 2008, and
further studies for pit and UG development in 2011 were reviewed by Cube
from reports sourced from WAMEX.

The 2008 UG study defined three ‘ore shoots’ based on DD drilling at a cut-off
grade (COG) of 4.0g/t. The shoots were defined over an area of 350m north to
south strike, 170m wide and 110m deep area.

It appears the 2011 study, relied on historical interpretations and assumptions
from work done in 2003, and 2008, but assuming a lower COG applied for the
open pit resource. The 2011 resource was classified entirely as Measure
Resources

Cube has not relied on any of this previous information or the underlying
assumptionsforthe2021 MRE.

The use ofgeology inguiding and controlling

Drillholegeologylogginginformation containinglithologycodes,weathering,
32
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Mineral Resource estimation.
quartz vein percentages, and general lithological descriptions were used to
assist and guide geology and mineralisation interpretations informing the
estimate.

Surface geology mapping provide exposure to some of the deposit rock types,
structures and styles of mineralisation.

Historical documents contain minimal information on UG backs mapping of
development, stopes or rises on no 3DM modelling was completed due to the
uncertainty with converting the local coordinates back to MGA

Geological and mineralisation interpretations in plan and cross section views
have been followed up with 3D wireframe models based on analysis of the
collated historical and recent drilling information.

The factors affecting continuity both of grade and
geology.

The bulk of the mineralisation in the Main zone has been constrained within
two main mineralised zones within the overall shear zone striking north to south
and dipping to the east at 70°. The north zone mineralisation has a similar strike
orientation but with a shallower dip averaging 42°to the east and bisected by
apparent NE-SW fault.

Gold mineralisation are mostly restricted in 2 parallel to the quartz vein hosted
shear orientations, although there is evidence of discontinuous linking quartz
vein structures are evident within the main shear zones and may contain
significant high grade mineralisation. These oblique vein structures are clearly
visible in the southern wall of the pit.

A mineralised laterite zone has been modelled horizontally across the north
end of the Eureka Pit. A COG of 0.2g/t Au has been applied in order to maintain
wireframe continuityand thickness amenable to surface miningdimensions.
Dimensions

The extent and variability of the Mineral Resource
expressed as length (along strike or otherwise),
plan width, and depth below surface to the upper
and lower limits of the Mineral Resource.

The resource area extends over 2 zones:

Main Zone – approximate strike length of 550m, over a combined width of
150m, extending from surface to a known vertical depth of 250 m

North Zone - approximate strike length of 150m, over a combined width of
50m, extending from surface to a known vertical depth of 100 m.

13 mineralisation domains have been modelled for the 2021 MRE, with 8
domains modelled in Main zone or Eureka Pit area, and 4 small domains
located in the North zone. The laterite domain covers an approximate area
200 m x 120 m, immediately north of the open pit where economic
mineralisation occurs to a maximum depth of 10 m.
Estimation
and
modelling techniques

The nature and appropriateness of the estimation
technique(s)
applied
and
key
assumptions,
including treatment of extremegrade values,

One block model was constructed to enable efficient gold estimation of all
mineralisation domains
Estimation Methods:
33
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
domaining, interpolation parameters and maximum
Ordinary Kriging (OK) and Inverse distance to the power of 2 (ID2) were the
distance of extrapolation from data points. If a estimation methods used for the May 2021 MRE. The data is informed by good
computer assisted estimation method was chosen quality drilling on regular drill spacing – down to 10 m x 10 m for the central
include a description of computer software and area, broadening out to a nominal 25mE x 25 mN to the north and south of the
parameters used. Main zone. Maximum extrapolation of wireframes from drilling was 20m along
strike or 10m down-dip. Maximum extrapolation along strike and below the
deepest drilling was generally half drill hole spacing.
Domaining and Compositing:
Drill hole sample data was flagged using domain codes generated from 3D
mineralisation domains. Sample data was composited over the full downhole
interval. Intervals with no assays were initially assigned background grades for
the compositing routine as these un-assayed intervals in the drill holes were
assumed to be waste or ‘barren’ during logging and sampling. It was apparent
however that in recent drilling by TIN, where more rigorous sampling down each
hole was carried out, many intervals in older holes should have been sampled,
as the TIN intersected significant Au mineralisation in many instances. It was
decided therefore that unsampled intervals in the old holes used for the 2021
MRE were to be ignored in the compositing routine.
Assessment of the raw assay interval lengths and raw gold assay values were
completed in order to determine the most appropriate length for compositing of
the samples. The most common sample length is 1.0 m and covers the range
of the Au grades. Therefore, 1 m composes were used as the source data for
the gold grade estimates.
All domain composites included coding by weathering for oxide/transition
versus fresh material. Statistical analysis of grade distribution for the well-
informed domains by weathering was conducted, mainly to assess if further
sub-domaining was required (e.g., evidence of supergene enrichment). No
consistent variability in the sub-domaining by weathering was noted across the
zones.
Treatment of Extreme Grades:
Gold grade distributions within the estimation domains were assessed to
determine if high grade cuts or distance limiting should be applied. Distance
limiting thresholds and the effects of grade capping were reviewed and applied
on a domain basis where it was deemed appropriate i.e. for extreme high-grade
outliers, high grade clustering or a high coefficient of variation (CV).
Variography:
Variogram calculations were carried out on the 1m composites for three well
informed domains (1001, 1002, 1004). Variography failed to produce
satisfactoryresults for other domains due to lack of samples.

34

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
Indicator estimation was considered but did not provide sufficient data in the
higher bins to produce well-structured variograms.
Grade Interpolation and Search Parameters:
The mineralised domain wireframes were used to code the block model and
the volume between the wireframe models and the coded block model were
checked in order to ensure that the sub-blocking size are appropriate for the
interpreted domains.
Estimation was carried out on capped and uncapped gold grade. Hard domain
boundaries were used between the mineralised domains, meaning only
composites within the domain are used to estimate inside that domain. The
variogram orientations were used as the orientation of the search ellipse.
The variogram and search parameters for well-informed were used to represent
the poorly informed domains.
Gold was estimated in two passes – first pass using optimum search distances
for each domain (mostly 40 m) as determined through the KNA process,
second pass set at longer distances in order to populate all blocks (2nd = max
120 m).
A waste domain boundary encompassing the mineralisation domains and
within the limits of the drilling and host units was modelled for each deposit and
included in the grade estimation runs. This allowed for any isolated zones and
any mineralised haloes proximal to the hard boundary mineralised blocks to be
estimated for estimation of dilution within pit optimisation limits.
Interpolation parameters were set to a minimum number of 6 composites and
a maximum number of 16 composites for the estimate. A maximum of 6
samples per hole was used.
Software Used:
Leapfrog Geo – Database validation, mineralisation zone economic
compositing at lower grade cut-offs, mineralisation trends
Surpac v6.9.0 – Drillhole validation, weathering surface DTMs, final
mineralisation interpretation and wireframe modelling and minor zones OK
estimation
Supervisor v8.13–geostatistics,variography,KNAanalysis.
The availability of check estimates, previous
Check Estimates: This estimate used ID2estimation as a check estimate
estimates and/or mine production records and against the OK estimation, with no significant variations in global estimate
whether the Mineral Resource estimate takes results for the well-informed mineralisation domains for each zone.
appropriate account of such data. Previous estimates were not considered suitable due to the higher COG applied
and because significantly more drilling has been completed since the previous
work.

35

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary

The 2021 MRE has been depleted by open pit mining from 1985 to 1986

MRE does not include any UG depletion from historical workings (1897-1941)
or the recent trial mining in 1998, as no digital survey records or historical UG
plans wereprovided in order to create 3DM depletion voids.

The assumptions made regarding recovery of by-
products.

No recovery of by-products is anticipated.

Estimation of deleterious elements or other non-
grade variables of economic significance (e.g.
sulphur for acid mine drainage characterisation).

Only gold was interpolated into the block model.

In the case of block model interpolation, the block
size in relation to the average sample spacing and
the search employed.

The parent block dimensions used in the block model were:

5 m N by 2.5 m E by 2.5 m RL, with sub-cells of 2.5 m by 1.25 m by 1.25 m.

The parent block size was selected on the basis one half/one quarter of the
minimum drill spacing of 10/20 m E by 10 m N in Indicated areas and one
quarter of the maximum drill spacing of 40 m E by 20 m N in Inferred areas.

For the block model definition parameters, the primary block size and sub-
blocking deemed appropriate for the mineralisation and to provide adequate
volume definition where there are narrow zones or terminations, or disrupted
zones due to contacts orsurface boundaries.

Any assumptions behind modelling of selective
mining units.

The block model definition parameters included a primary block size and sub-
blocking deemed appropriate for the mineralisation and to provide adequate
volume definition where there are narrow or complex zones modelled. These
dimensions are suitable for block estimation and modelling the selectivity for an
openpit operation.

Any assumptions about correlation between
variables.

No correlation analysis has been undertaken due to limited number of multi-
element samplesinthe database provided.

Description of how the geological interpretation
was used to control the resource estimates.

The mineralisation domain interpretation was used at all stages to control the
estimation. Overall, the mineralisation was constrained by wireframes
constructed using a nominal 0.5 g/t Au cut-off grade lower threshold within
shear-hosted, quartz veins and vein selvedges within a predominantly
mafic/interflow sediments host units.

Discussion of basis for using or not using grade
cutting or capping.

Statistical analysis was carried out for all domains. This involved a combination
of grade capping analysis tools (grade histograms, log probability plots and
coefficient of variation (CV)), and spatial analysis. The high CV and the
presence of extreme grade values observed on the histogram for some of the
domains suggested that high grade cuts were required for subsequent
geostatistical analysis. The remaining domains were left uncut.

Top cuts were applied on a domain basis by application of grade capping for a
domain composite data or usingagrade distance threshold option in the
36
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
interpolation module in Surpac.

The influence of extreme grade values was reduced by applying a grade-
distance threshold limit for the estimation domains containing high grade
outliers. Outside a distance of 20 m diameter (overall average drill spacing
distance), a top cut was applied to the estimation domains.

Grade capping values and effects are summarised as follows:

range of top cut values = 10 g/t to 40 g/t (total of 17 samples cut)

Metal loss based on composite mean and ratio of samples = -16%.

The process of validation, the checking process
used, the comparison of model data to drill hole
data, and use of reconciliation data if available.

Block model validation was conducted by the following means:

Visual inspection of block model estimation in relation to raw drill data on
a section by section basis.

Volumetric comparison of the wireframe/solid volume to that of the block
model volume for each domain.

A global statistical comparisons of input and block grades, and local
composite grade (by Easting and RL) relationship plots (swath plots), to
the block model estimated grade for each domain.

Comparison of the cut grade drill hole composites with the block model
grades for each lode domain in 3D.

Comparison with check estimates (OK or ID2)

No significant validation issues were noted from the model validation process.
During interpolation runs, adjustments were made to search parameters to
improve local and semi-local representation of grades where possible.

Historical UG mining operations have taken place at Hibernia to a maximum
depth of 44m (Dahl, 1998).

Previously recorded gold production for the Eureka area during the period 1912
to 1953 includes 7,242 tonnes of rock crushed for the recovery of 218.9kg of
gold at an average grade of 30.2 g/t Au (GCY, 2013).
Moisture

Whether the tonnages are estimated on a dry basis
or with natural moisture, and the method of
determination of the moisture content.

The tonnages are estimated on a dry tonnes basis. Moisture was not
considered in the density assignment.
Cut-off parameters

The basis of the adopted cut-off grade(s) or quality
parameters applied.

For Open Pit areas a Cut-off grade of 0.4 g/t Au was applied to all material
within mineral resource defined byspecific open optimisationpit shells.
Mining
factors
or
assumptions

Assumptions made regarding possible mining
methods, minimum mining dimensions and internal
(or, if applicable, external) mining dilution. It is

For Open pit areas Optimisation pit shells were generated in Whittle based on:

Gold Price assumption of $AUD 2500/oz

Cost experience for Mining,Processingand Administration

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
always necessary as part of the process of
determining reasonable prospects for eventual
economic extraction to consider potential mining
methods, but the assumptions made regarding
mining methods and parameters when estimating
Mineral Resources may not always be rigorous.
Where this is the case, this should be reported with
an explanation of the basis of the mining
_assumptions made. _
Metallurgical factors or
assumptions

The basis for assumptions or predictions regarding
metallurgical amenability. It is always necessary as
part of the process of determining reasonable
prospects for eventual economic extraction to
consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment
processes and parameters made when reporting
Mineral Resources may not always be rigorous.
Where this is the case, this should be reported with
an explanation of the basis of the metallurgical
assumptions made.

No recent metallurgical testwork and reporting have been conducted.

Metallurgical factors and assumption are based on similar mineralisation styles
from examples in Western Australia.

For oxide and transition a recovery of 95% has been assumed for the pit
optimisation input parameters

For fresh rock, a recovery of 90% has been assumed for the pit
optimisation input parameters
Environmental
factors
or assumptions

Assumptions made regarding possible waste and
process residue disposal options. It is always
necessary as part of the process of determining
reasonable prospects for eventual economic
extraction to consider the potential environmental
impacts of the mining and processing operation.
While at this stage the determination of potential
environmental
impacts,
particularly
for
a
greenfields project, may not always be well
advanced, the status of early consideration of
these potential environmental impacts should be
reported. Where these aspects have not been
considered this should be reported with an
explanation of the environmental assumptions
made.

No environmental factors have been considered as part of the May 2021 MRE.

The deposit areas have previous been the subject of historical underground
and open pit mining and extensive surface work.
Bulk density

Whether assumed or determined. If assumed, the
basis for the assumptions. If determined, the
method used, whether wet or dry, the frequency of
the
measurements,
the
nature,
size,
and

There were no bulk density (BD) results available for review for the 2021 MRE.
No BD data was found from reports found in WAMEX. For preliminary resource
work conducted in 2011, a BD of 2.65 was applied for all material rock types,
regardless of degree of weathering.
38
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
representativeness of the samples.

BD assignment for the 2021 MRE has therefore been estimated from industry
experience of similar material types in moderately to deeply weathered
greenstonehosted gold depositsin Western Australia.

The bulk density for bulk material must have been
measured by methods that adequately account for
void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones
withinthe deposit.

No descriptions of any previous BD methodology have been located in order to
make assumptions for the 2021 MRE.

Discuss assumptions for bulk density estimates
used in the evaluation process of the different
materials.

For the 2021 MRE, Cube assigned BD values for laterite, oxide, transitional,
and fresh material for both ore and waste:
Material
Type
Ore
Waste
gm/cm3
gm/cm3
Laterite
2.2
2.2
Oxide
2.2
2.2
Transition
2.4
2.4
Fresh
2.75
2.8
Voids
0
0

It is assumed that the bulk density will have little variation within the separate
material types across the breadth of the project area. Therefore, a single value
applied to each material type is considered acceptable.

Recommendations have been made to TIN to conduct BD sampling and
determinations in all material types.
Classification

The basis for the classification of the Mineral
Resources into varying confidence categories.

The Mineral Resource estimate is reported here in compliance with the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’ by the Joint Ore Reserves Committee (JORC).
The resource was classified as Indicated, and Inferred Mineral Resource based
on data quality, sample spacing, and lode continuity.

The Indicated Mineral Resource was defined within areas of close spaced
diamond and RC drilling (mostly2020-2021 drilling)of less than 20 m by20 m,
39
TNT Mines
Criteria
JORC Code explanation
Commentary
representativeness of the samples.

BD assignment for the 2021 MRE has therefore been estimated from industry
experience of similar material types in moderately to deeply weathered
greenstonehosted gold depositsin Western Australia.

The bulk density for bulk material must have been
measured by methods that adequately account for
void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones
withinthe deposit.

No descriptions of any previous BD methodology have been located in order to
make assumptions for the 2021 MRE.

Discuss assumptions for bulk density estimates
used in the evaluation process of the different
materials.

For the 2021 MRE, Cube assigned BD values for laterite, oxide, transitional,
and fresh material for both ore and waste:
Material
Type
Ore
Waste
gm/cm3
gm/cm3
Laterite
2.2
2.2
Oxide
2.2
2.2
Transition
2.4
2.4
Fresh
2.75
2.8
Voids
0
0

It is assumed that the bulk density will have little variation within the separate
material types across the breadth of the project area. Therefore, a single value
applied to each material type is considered acceptable.

Recommendations have been made to TIN to conduct BD sampling and
determinations in all material types.
Classification

The basis for the classification of the Mineral
Resources into varying confidence categories.

The Mineral Resource estimate is reported here in compliance with the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’ by the Joint Ore Reserves Committee (JORC).
The resource was classified as Indicated, and Inferred Mineral Resource based
on data quality, sample spacing, and lode continuity.

The Indicated Mineral Resource was defined within areas of close spaced
diamond and RC drilling (mostly2020-2021 drilling)of less than 20 m by20 m,
39
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
and where the continuity and predictability of the lode positions was good.

The Inferred Mineral Resource was assigned to areas of the deposit where drill
hole spacing was greater than 20 m by 20 m and where small, isolated pods of
mineralisation occur outside the main mineralised trends.

Whether appropriate account has been taken of all
relevant factors (i.e. relative confidence in
tonnage/grade estimations, reliability of input data,
confidence in continuity of geology and metal
values, quality, quantity, and distribution of the
data).

The resource classification is based on the quality of information for the drill
types (recent RC and DD), geological domaining, as well as the drill spacing
and geostatistical measures to provide confidence in the tonnage and grade
estimates

The input data is comprehensive in its coverage of the mineralisation and does
not favour or misrepresent in-situ mineralisation. The definition of mineralised
zones is based on high level geological understanding producing a robust
model of mineralised domains.

Validation of the block model shows good correlation of the input data to the
estimated grades.

Open hole percussion holes (RAB and Perc) and some older RC holes were
excluded from the estimation and data spacing when determining relative
confidenceforclassification.

Whether the result appropriately reflects the
Competent Person’s view of the deposit.

The Mineral Resource estimate appropriately reflects the Competent Person’s
view of the deposit.
Audits or reviews

The results of any audits or reviews of Mineral
Resource estimates.

The current estimation domaining, MRE parameters, classification and
reporting have all been internally peer reviewed by qualified professionals at
Cube.
Discussion of relative
accuracy/ confidence

Where appropriate a statement of the relative
accuracy and confidence level in the Mineral
Resource
estimate
using
an
approach
or
procedure deemed appropriate by the Competent
Person. For example, the application of statistical
or geostatistical procedures to quantify the relative
accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed
appropriate, a qualitative discussion of the factors
that could affect the relative accuracy and
confidence of the estimate.

The Eureka 2021 MRE is made up predominantly of moderately thick to narrow,
very continuous mineralised gold zones hosted within sheared alteration zones
containing high grade quartz veining.

The close density of drilling supports the classification of 56% of the Mineral
Resource to be classified as Indicated (by contained metal).

The deposit geometry and continuity has been adequately interpreted to reflect
the applied level for Indicated and Inferred Mineral Resources. The data quality
is good, and the drill holes have detailed logs produced by qualified geologists.
A recognised laboratory has been used for all analyses.

The statement should specify whether it relates to
global or local estimates, and, if local, state the
relevant tonnages, which should be relevant to
technical and economic evaluation. Documentation
should include assumptions made and the

The current modelled MRE is a reasonable representation of the global
contained metal but not a local estimation.

Confidence in the 2021 MRE is such that it will provide adequate accuracy for
global resource evaluation for selective open pit mining.
40
TNT Mines

ASX Announcement

24 June 2021

==> picture [151 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
_procedures used. _
These statements of relative accuracy and
1897 to 1940 includes 809 tonnes recovery of 797oz of gold at an average
confidence of the estimate should be compared grade of 27 g/t Au (Ransted, 1985).
with production data, where available. Previously recorded gold production for the Eureka open pit mine during the
period 1985 to 1986 includes 45,865 tonnes at an average grade of 4.64 g/t
Au. Gold recovered has not been recorded. (WCH, 1987).
UG mine refurbishment & trial mining from November 1998 to June 1999 –
approx. 400t @ 6g/t Au from 80m Level (JMM, 2000).
The historical mining figures indicate the presence of high-grade quartz vein
hosted mineralisation also logged and sampled by more recent drilling.
The May 2021 MRE has been depleted by open pit mining based on open pit
survey DTM provided by TIN. The accuracy of the depleted resource is affected
to a minor degree by the exclusion of historical voids, although as only 809
tonnes was recorded as being mined (Ransted, 1985), it is not deemed
significant for theglobal estimate.

==> picture [458 x 107] intentionally omitted <==

----- Start of picture text -----

TNT Mines | ACN 107 244 039 | tntmines.com.au ASX:TIN
----- End of picture text -----

41