NEWS RELEASE
25 May 2021
CORPORATE PRESENTATION 121 MINING INVESTMENT EMEA CONFERENCE
We attach a Corporate Presentation for the 121 Mining Investment EMEA Conference.
Yours faithfully
JOHN BORSHOFF Managing Director/CEO Deep Yellow Limited
This ASX announcement was authorised for release by Mr John Borshoff, Managing Director/CEO, for and on behalf of the Board of Deep Yellow Limited.
For further information contact:
John Borshoff Managing Director/CEO
T: +61 8 9286 6999 E: [email protected]
E [email protected] W www.deepyellow.com.au @deepyellowltd deep‐yellow‐limited
Unit 17, Spectrum Building, 100–104 Railway Road Subiaco, Western Australia 6008 PO Box 1770 Subiaco, Western Australia 6904 +61 8 9286 6999 ABN 97 006 391 948
About Deep Yellow Limited
Deep Yellow Limited is a differentiated, advanced uranium exploration company in predevelopment phase, implementing a contrarian strategy to grow shareholder wealth. This strategy is founded upon growing the existing uranium resources across the Company’s uranium projects in Namibia (a Definitive Feasibility Study is in progress on the Tumas Project) and the pursuit of accretive, counter-cyclical acquisitions to build a global, geographically diverse asset portfolio. The Company’s cornerstone suite of projects in Namibia is situated within a top-ranked African mining destination in a jurisdiction that has a long, well-regarded history of safely and effectively developing and regulating its considerable uranium mining industry.
ABN 97 006 391 948
Unit 17, Spectrum Building 100–104 Railway Road Subiaco, Western Australia 6008
PO Box 1770 Subiaco, Western Australia 6904
DYL: ASX & NSX (Namibia) DYLLF: OTCQX
www.deepyellow.com.au @deepyellowltd deep-yellow-limited
==> picture [18 x 14] intentionally omitted <==
==> picture [16 x 16] intentionally omitted <==
==> picture [110 x 54] intentionally omitted <==
Page 2 of 2
Building a Tier-One Click to edit Master title style Uranium Producer Click to edit Master text styles
● Second level o Third level Fourth level 121 Mining Investment Conference Fifth level EMEA
- May 25 27, 2021 John Borshoff Managing Director/CEO
DYL: ASX / NSX (Namibia) DYLLF: OCTQX
==> picture [110 x 54] intentionally omitted <==
1
1
==> picture [51 x 109] intentionally omitted <==
Disclaimer, Previously Reported Information and Competent Person Statement
developed based on assumptions about such risks, uncertainties and other factors, including but not limited to general business, economic, competitive, political and social uncertainties; the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of uranium; possible variations of ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accident, labour disputes and other risks of the mining industry; and delays in obtaining governmental approvals or financing or in the completion of development or construction activities. This list is not exhaustive of the factors that may affect the Company’s forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on such forward-looking information. The Company disclaims any intent or obligations to or revise any forward-looking statements whether as a result of new information, estimates, or options, future events or results or otherwise, unless required to do so by law. Statements regarding plans with respect to the Company’s mineral properties may contain forward-looking statements in relation to future matters that can be only made where the Company has a reasonable basis for making those statements. Competent Person Statements regarding plans with respect to the Company’s mineral properties are forward looking statements. There can be no assurance that the Company’s plans for development of its mineral properties will proceed as expected. There can be no assurance that the Company will be able to confirm the presence of mineral deposits, that any mineralisation will prove to be economic or that a mine will successfully be developed on any of the Company’s mineral properties.
underpinning the Mineral Resource and Ore Reserve estimates have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.
Disclaimer
This presentation has been prepared by Deep Yellow Limited ABN 97 006 391 948 (Company or Deep Yellow) for general information purposes only. The presentation is not and should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company, or as an inducement to make an offer or invitation with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of this presentation. Due care and attention has been taken in the preparation of this presentation, however the information contained in this presentation (other than as specifically stated) has not been independently verified for the Company or its directors and officers, nor has it been audited. Accordingly, the Company does not warrant or represent that the information contained in this presentation is accurate or complete. To the fullest extent permitted by law, no liability, however arising, will be accepted by Deep Yellow, its subsidiaries or its directors, officers or advisers, for the fairness, accuracy or completeness of the information contained in the presentation. No responsibility or liability is assumed by the Company, its subsidiaries or any of its directors, officers or advisers for updating any information in this document or to inform any recipient of any new or more accurate information or any errors of mis-descriptions of which the Company or any of its directors, officers or advisers may become aware.
There is information in this announcement relating to the outcomes of the Tumas Project Pre-feasibility Study announced to the market on 10 February 2021 in the release entitled ‘Deep Yellow Proceeding with Tumas DFS Following Positive PFS’. The Company confirms that all material assumptions underpinning the Production Target and the forecast financial information derived from the Production Target in the original announcement continue to apply and have not materially changed.
Competent Person Statement
The information in this presentation in so far as it relates to Mineral Resource estimates is based on and fairly represents information and supporting documentation prepared or reviewed by Mr Martin Hirsch, a Competent Person who is a Member of the Institute of Materials, Mining and Metallurgy (IMMM) in the UK. Mr Hirsch, who is currently the Manager Resources and Pre-Development for Deep Yellow’s subsidiary, Reptile Mineral Resources and Exploration (Pty) Ltd, has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ and the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Hirsch consents to the inclusion in this presentation of the matters based on the information in the form and context in which it appears. Mineral Resource estimates disclosed in this presentation and compiled under the JORC Code 2004 have not yet been updated to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.
Forward looking statements
This presentation contains “forward-looking information” that is based on the Company’s expectations, estimates and projections as of the date on which the statements were made. This forward-looking information includes, among other things, statements with respect to the pre-feasibility and any feasibility studies, the Company’s business strategy, plan, development, objectives, performance, outlook, growth, cash flow, projections, targets and expectations, mineral resources, results of exploration and related expenses. Generally, this forward-looking information can be identified by the use of forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘likely’,’ believe’, ’estimate’, ‘expect’, ’intend’, ’may’, ’would’, ’could’, ’should’, ’scheduled’, ’will’, ’plan’, ’forecast’, ’evolve’ and similar expressions. Persons reading this presentation are cautioned that such statements are only predictions, and that the Company’s actual future results or performance may be materially different. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Forward-looking information is
Previously reported information
This presentation refers to the following previously reported information:
-
Exploration Results in the ASX announcement entitled ”Breakthrough Results from Nova JV Drilling” and dated 9 July 2020;and
-
Mineral Resource estimates and Ore Reserve estimates in the announcement entitled ‘Deep Yellow to Proceed Directly to Tumas DFS Following Positive PFS’ and dated 10 February 2021.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements referred to above, and that all material assumptions and technical parameters
==> picture [126 x 32] intentionally omitted <==
2
Deep Yellow Differentiated
==> picture [126 x 32] intentionally omitted <==
~~3~~
==> picture [51 x 109] intentionally omitted <==
Deep Yellow Well Positioned for Growth
● Project portfolio is located in Namibia, a premier uranium mining jurisdiction with a long history of mining
- Dual-pillar growth strategy to establish a multi-platform, 5-10Mlb per annum, low-cost, tier one uranium producer
● Led by a standout uranium team
-
Well-credentialed Chairman appointed as part of DYL Board revamp
-
A highly-credentialed and experienced team (majority ex-Paladin Energy) with proven success in the uranium sector, strong project development, operational and corporate capabilities
-
Majority of this team successfully built and operated two innovative conventional uranium operations (Langer Heinrich, Namibia and Kayelekera, Malawi)
-
Grew Paladin from a market capitalisation of A$2M to A$4Bn – pre-Fukushima
● Well-funded for future growth with cash balance of A$51M (+A$27M through option conversion June 2022)
- Nuclear energy becoming the moral imperative, with positive momentum building globally
==> picture [126 x 32] intentionally omitted <==
4
==> picture [51 x 109] intentionally omitted <==
75 Year Nuclear History – 3 Cycles, Prices and Production
==> picture [126 x 32] intentionally omitted <==
5
==> picture [51 x 109] intentionally omitted <==
Emerging Cycle 4 – A Decarbonisation-Inspired Exploration Boom
- In addition to looming supply shortage the situation will be further exacerbated by ambitious decarbonisation targets that have been set to achieve over next 30 years
==> picture [437 x 349] intentionally omitted <==
==> picture [81 x 33] intentionally omitted <==
6
==> picture [51 x 109] intentionally omitted <==
Who Will Build The New Mines? Only three Juniors outside US went into Production in 75 Years
==> picture [126 x 32] intentionally omitted <==
7
==> picture [51 x 109] intentionally omitted <==
Uranium Price Primed for Recovery
==> picture [784 x 289] intentionally omitted <==
----- Start of picture text -----
NUCLEAR DEMAND STRONG CLEAR URANIUM PRICE LAG
Prevailing
Date/Event Operable Reactors ConstructionUnder Planned Proposed Required U308 U308 Price
USD
Feb 2011
(pre- 443 62 156 322 80kt $73/lb
Fukushima)
May 2021 442 54 102 325 80.5kt $30.25/lb
Source: WNA
Source: WNA Sept 2019
----- End of picture text -----
TradeTech, a globally recognised uranium market analysis and price reporting organisation, shows increasing uranium prices through the remainder of the decade reaching $60-65/lb U3O8 by mid-decade rising to $70/lb U3O8 by late 2020s
Deep Yellow has chosen to incorporate a uranium price of $65/lb U3O8 in its financial analysis, which reasonably represents the expected global uranium market for newly negotiated multi-year (term) sales agreements by mid-to-late decade
==> picture [126 x 32] intentionally omitted <==
8
==> picture [51 x 109] intentionally omitted <==
Advancing the Dual-Pillar Expansion Strategy
==> picture [252 x 379] intentionally omitted <==
Key Ingredients Remain for Execution of Stated Growth Strategy
Comprising both organic (Namibian project portfolio) and inorganic growth (targeted M&A)
Fundamental supply/demand disconnect remains unresponsive to the post 2023/24 predicted uranium shortage
Majors in a non-expansionary/contraction mode with a key major exiting Sector consolidation essential for restoring health and competency of the sector Appointment of Head of Business Development to increase focus on our M&A program
==> picture [126 x 32] intentionally omitted <==
9
==> picture [51 x 109] intentionally omitted <==
Right Team, Right Time, Right Commodity
The Key Pillars Available to Deep Yellow to Build a Tier 1 Uranium Platform
==> picture [577 x 297] intentionally omitted <==
----- Start of picture text -----
Experienced
Proven Vision
& Cohesive Growth Funding
Track &
Team Strategy Support
Record Leadership
Across All
Disciplines
APPLIED
TO
Existing
Namibian Sector
Projects Consolidation
Enhancement
----- End of picture text -----
==> picture [126 x 32] intentionally omitted <==
==> picture [406 x 45] intentionally omitted <==
----- Start of picture text -----
INCREASED SHAREHOLDER VALUE
----- End of picture text -----
10
The Tumas Project PFS completed/DFS underway
==> picture [126 x 32] intentionally omitted <==
11
==> picture [51 x 109] intentionally omitted <==
Operating in a Premier Uranium Mining Jurisdiction
==> picture [368 x 391] intentionally omitted <==
Excellent jurisdiction and infrastructure for development and mining
Responsible for ~6% of global uranium output
Namibia has a long history of uranium mining - currently the world’s 4th largest uranium producer producing 320Mlb since 1974
Large Province contains nearly 2Blb U3O8 Measured and Indicated and Inferred Resources with exceptional prospectivity
Large capacity, long-life mining operations established Rössing – 11Mlb/pa design
Husab – 15Mlb/pa design
Langer Heinrich – 5Mlb/pa design
==> picture [126 x 32] intentionally omitted <==
Namibian Uranium Province
12
==> picture [51 x 109] intentionally omitted <==
Tumas Overview
Multiple deposits discovered along 55km of the 125km of regional channel explored to date
Tumas Project within 100% owned Reptile tenements Only 50% of the 125km highly prospective palaeochannel system has been tested
Exploration since early 2017 has increased the resources over threefold at an impressive discovery cost of 11.5cents/lb (A$)
Tumas Project is similar to deposit mined at the Heinrich which is well understood Langer very by the Deep Yellow team
==> picture [455 x 326] intentionally omitted <==
Tumas Project Overview
==> picture [126 x 32] intentionally omitted <==
13
==> picture [51 x 109] intentionally omitted <==
Tumas Project DFS Underway following PFS
-
Focused on an open-pit mining operation, with a production capacity of 3Mlb U3O8 per annum
-
Positive PFS completed Jan’21 using only 50% of the total Mineral Resources with strong economic and growth characteristic on a 12-year LOM
Impressive 63% conversion rate from Indicated Mineral Resources to Probable Reserves
- Significant upside potential
Remaining 50% of Mineral Resources available for conversion for the DFS to achieve the stated goal of a +20-year LOM operation
First of a three-phase resource upgrade drilling program completed with ongoing positive results 50% of the highly prospective Tumas palaeochannel still remains to be tested
- Tumas DFS commenced Feb’21, advancing in line with forecasts of significant uranium price improvements expected from 2022, due to the looming uranium shortage likely late 2023/24 and beyond
==> picture [126 x 32] intentionally omitted <==
14
==> picture [51 x 109] intentionally omitted <==
DFS - 20 year LoM Target Showing Significant Upside
-
Commencement of detailed trade-off and optimisation studies
-
Metallurgical test work and analysis commenced
-
Resource upgrade drilling – phase 1 of 3 completed, phase 2 underway
| FORECAST FINANCIAL OUTCOMES US$ | FORECAST FINANCIAL OUTCOMES US$ | FORECAST FINANCIAL OUTCOMES US$ | FORECAST FINANCIAL OUTCOMES US$ |
|---|---|---|---|
| Item | Units | PFS- 12yr LOM |
DFS-20 yr LOM TARGETS |
| Plant Capacity | 3Mlb | 3Mlb(min) | |
| Operating Margin (EBITDA1) (U3O8 @ US$65/lb & V2O5 @ US$7/lb2) | $1,034M | $2,051M | |
| Initial CAPEX | $M | 295 | 295 |
| C1 Costs (incl vanadium offset as by-product) | $M | 27.28 | 26.80 |
| All-in-Sustaining-Cost (U3O8 basis with V2O5 by-product2): Real | $/lb U3O8 | 30.69 | 30.20 |
| Project NPV8.6: Post tax, ungeared | $M | 207 | 415 |
| Project IRR: Post tax, ungeared | % | 21.2 | 23.6 |
| Project Payback Period from Production Start: Nominal | Years | 3.8 | 3.8 |
| Breakeven U3O8 Price: ungeared | $/lb U3O8 | 47.56 | 41.86 |
==> picture [126 x 32] intentionally omitted <==
1 $90M per operating year @ 2.53Mlb per year 2 Vanadium represents 3.6% of total income
15
Looking Ahead
==> picture [126 x 32] intentionally omitted <==
16
Well Funded - Efficient and Effective Capital Spend
==> picture [58 x 27] intentionally omitted <==
----- Start of picture text -----
$27M
----- End of picture text -----
==> picture [126 x 32] intentionally omitted <==
17
==> picture [51 x 109] intentionally omitted <==
Corporate Overview
| BOARD | BOARD |
|---|---|
| Chris Salisbury | Non-Exec Chairman |
| John Borshoff * | MD/CEO |
| Gillian Swaby * Rudolf Brunovs |
Exec Director Non-Exec Director |
| Christophe Urtel | Non-Exec Director |
| Mervyn Greene | Non-Exec Director |
| Justin Reid * | Non-Exec Director |
| Mark Pitts | CFO/Co Sec |
| SENIOR TECHNICAL TEAM | SENIOR TECHNICAL TEAM |
|---|---|
| Perth | |
| Ed Becker* | Head of Exploration |
| Darryl Butcher Andrew Mirco |
Head of Project Development Head of Business Development |
| Dr Andy Wilde* | Senior Geologist - Specialist |
| Namibia | |
| Dr Katrin Kärner* | Exploration Manager |
| Martin Hirsch | Mgr Resources/Pre-Devel |
| Dr J C Corbin* | Senior Geologist-Specialist |
* Ex-Paladin
CAPITAL STRUCTURE – 25 May 2021
| Shares on Issue | 328M |
|---|---|
| Listed Options (A$0.50/1 June 2022*) | 54M |
| Market Cap (@ A$0.84/share) 25 May 2021 | A$276M |
| Net Cash (31 March 2021) | A$51M |
| Major Shareholders | |
| Board/Management | 10.8% |
| Paradice Investment Management | 9.8% |
| Collines Investments | 7.1% |
| Sprott Group Affiliate | 3% |
* Acceleration of exercise clause at 78 cents share price
12 MONTH PERFORMANCE (20c to 95c)
| ASX OTC |
2,300,000(4 week average) 350,000(4 week average) |
0.84c | |||||
|---|---|---|---|---|---|---|---|
18
==> picture [51 x 109] intentionally omitted <==
Strong Pipeline of Newsflow
-
16,000m DFS resource upgrade drilling currently underway
-
Drilling focussed on converting the remaining Mineral Resources to Ore Reserve status:
February: Drilling Tumas 3 East (3,000 to 3,500m) COMPLETED AND ANNOUNCED (4 MAY) May: Drilling Tumas 3 West (4,500 to 6,000m) COMMENCED - DRILLING UPDATE (LATE MAY) May -June: Drilling Tumas 1 East (4,500 to 6,500m)
Mineral Resource Estimate Upgrades to Indicated Resource status - reporting late June
-
Commencement of detailed trade-off and optimisation studies - reporting throughout year
-
● Metallurgical optimisation test work utilising available 1,000kg of sample - reporting throughout year
-
● Mining Lease application submission - June quarter 2021
==> picture [126 x 32] intentionally omitted <==
19
==> picture [51 x 109] intentionally omitted <==
A Different and Exciting Investment Thesis
● Deep Yellow has a differentiated approach for value creation built around a looming uranium shortage
-
Substantial new production will be required with the sector is ill-prepared to deliver
-
Lack of sufficient proven expertise and experience to build new mines due to severe impact of Chernobyl and Fukushima
-
These factors will exacerbate the anticipated supply deficit
● Deep Yellow has formed its strategy to effectively dovetail into this emerging scenario
-
Establish a project development pipeline via both organic and inorganic (sector consolidation) growth
-
Develop as a globally diversified, multi-project Tier 1 uranium miner producing 5-10Mlb pa
-
Utilise its in-house team having truly unique qualities as the only group that built 2 successful conventional uranium operations in the last 30 years coming from the mid-cap company sector
-
Deep Yellow aims to become a reliable, multi-project supplier of uranium able to provide safe, long-term supply, production optionality and geographic diversity
==> picture [126 x 32] intentionally omitted <==
20
==> picture [352 x 370] intentionally omitted <==
==> picture [515 x 131] intentionally omitted <==
For further information: T: +61 8 9286 6999 E: [email protected] W: www.deepyellow.com.au : @deepyellowltd : deep-yellow-limited
21