Deep Yellow Limited

Australian Uranium Conference “Enhanced Palaeochannel Prospectivity Confirmed” 15 July 2015

Greg Cochran – Managing Director

ASX: DYL

==> picture [189 x 66] intentionally omitted <==

www.deepyellow.com.au

This document has been prepared by Deep Yellow Limited (Deep Yellow, DYL or the Company) in connection with providing an overview to interested analysts and investors.

This presentation is being provided for the sole purpose of providing information to enable recipients to review the business activities of Deep Yellow. This presentation is thus by its nature limited in scope and is not intended to provide all available information regarding Deep Yellow. This presentation is not intended as an offer, invitation, solicitation, or recommendation with respect to the purchase or sale of any securities. This presentation should not be relied upon as a representation of any matter that a potential investor should consider in evaluating Deep Yellow.

Deep Yellow and its affiliates, subsidiaries, directors, agents, officers, advisers or employees do not make any representation or warranty, express or implied, as to or endorsement of, the accuracy or completeness of any information, statements, representations or forecasts contained in this presentation, and they do not accept any liability or responsibility for any statement made in, or omitted from, this presentation. Deep Yellow accepts no obligation to correct or update anything in this presentation.

No responsibility or liability is accepted and any and all responsibility and liability is expressly disclaimed by Deep Yellow and its affiliates, subsidiaries, directors, agents, officers, advisers or employees for any errors, misstatements, misrepresentations in or omissions from this presentation.

Any statements, estimates, forecasts or projections with respect to the future performance of Deep Yellow and/or its subsidiaries contained in this presentation are based on subjective assumptions made by Deep Yellow’s management and about circumstances and events that have not yet taken place. Such statements, estimates, forecasts and projections involve significant elements of subjective judgement and analysis which, whilst reasonably formulated, cannot be guaranteed to occur. Accordingly, no representations are made by Deep Yellow or its affiliates, subsidiaries, directors, officers, agents, advisers or employees as to the accuracy of such information; such statements, estimates, forecasts and projections should not be relied upon as indicative of future value or as a guaranteed of value or future results; and there can be no assurance that the projected results will be achieved.

Prospective investors should make their own independent evaluation of an investment in Deep Yellow.

Nothing in this presentation should be construed as financial product advice, whether personal or general, for the purposes of section 766B of the Corporations Act 2001 (Cth). This presentation consists purely of factual information and does not involve or imply a recommendation or a statement of opinion in respect of whether to buy, sell or hold a financial product. This presentation does not take into account the objectives, financial situation or needs of any person, and independent personal advice should be obtained.

This presentation and its contents have been made available in confidence and may not be reproduced, or disclosed to third parties or made public in any way without the express written permission of Deep Yellow.

2

==> picture [19 x 21] intentionally omitted <==

==> picture [19 x 20] intentionally omitted <==

==> picture [19 x 21] intentionally omitted <==

==> picture [19 x 20] intentionally omitted <==

==> picture [19 x 21] intentionally omitted <==

==> picture [19 x 21] intentionally omitted <==

==> picture [19 x 20] intentionally omitted <==

Corporate Snapshot Market Overview Project Locations Palaeochannel Prospectivity Omahola Project Tubas Sand Project Conclusions

==> picture [242 x 182] intentionally omitted <==

==> picture [242 x 182] intentionally omitted <==

3

The Board

Tim Netscher Chairman (Independent)
Greg Cochran ManagingDirector
Gillian Swaby N.E.D
Rudolf Brunovs N.E.D(Independent)
Christophe Urtel N.E.D
Mervyn Greene N.E.D

Executives & Management

Ca ital Structure – as at 14 Jul 2015 p y

Shares on Issue 1,910M
Performance Rights 36.6M
Market Cap (@ 1.0) ~ AUD 19.1M
Net Cash ~AUD 3.9M
Major shareholders:
Paladin Energy Limited 16.7%
HSBC* 13.4%
National Nominees** 9.3%
  • Including Raptor Partners Limited

Greg Cochran Managing Director

Peter Christians Country Manager: Namibia Ursula Pretorius Financial Controller Martin Hirsch Exploration Manager

  • ** Including Laurium L.P. Fund

==> picture [313 x 151] intentionally omitted <==

4

Global Financial Markets

Ongoing volatility means continued uncertainty Capital remains the biggest challenge Little appetite for investment in exploration

Uranium Demand

Nuclear growth confirmed (underestimated?) China, India, Russia and Middle East are key drivers Forecast growth 180 Mlbs to 250 Mlbs by 2020

2013 Contract sales – 10-year low, now increasing

Uranium Supply Project development mostly stalled HEU (secondary supply source) finished Widespread curtailment of production 12 to 15 (large) new mines needed by 2020

Conclusions and Strategic Response

Perfect storm brewing – trigger prices >US$80/lb required Timing of recovery remains uncertain (likely 2016-2020) Protect assets and skill base

Progress projects cautiously to be well positioned at recovery

5

==> picture [254 x 272] intentionally omitted <==

3,109 km[2] in exploration area*

93.8 Mlbs at 306ppm in resources _Notes:**_

Exploration in Namibia is conducted by DYL’s whollyowned subsidiary Reptile Uranium Namibia (RUN)

* On a 100% basis

==> picture [377 x 452] intentionally omitted <==

** Assuming tank leach for Omahola

6

Tubas Sand Project: Summary JORC 2004 Resource: 22.2 Mt at 368 ppm for 18 Mlbs U3O8

==> picture [652 x 304] intentionally omitted <==

7

Tubas Sand Project: Summary JORC 2004 Resource: 22.2 Mt at 368 ppm for 18 Mlbs U3O8

==> picture [14 x 16] intentionally omitted <==

Known deposits from 1970’s/80’s Reason behind original claims being lodged Was the total focus of DYL/RUN (with the Tubas Sand) until INCA discovery AeroTEM HEM Survey flown & Interpreted 2008 Extensive drilling campaigns 2008 - 2011 Scoping EIA completed 2013 Intermittent Metallurgical testwork over the years Recent mineral characterisation to assess amenability to various forms of physical beneficiation, including Marenica’s U-pgrade[TM] process

8

Flight lines at 500m gave good coverage however with limited granularity

==> picture [407 x 412] intentionally omitted <==

9

Tubas Sand Project: Summary Encouraging results from mineral characterisation tests prompted a fresh look at the current resource base & geological understanding

==> picture [557 x 372] intentionally omitted <==

Tumas Palaeochannel on EPLs 3497 and 3496 showing location of Infill Drilling Area

10

Effectively a “grade control” program with 12.5mx12.5m spacing Tubas Sand Project: Summary Infilling previous 50mx100m drill spacing

==> picture [600 x 391] intentionally omitted <==

Drilling & Section from recent Infill Drilling Program showing uranium distribution and channel program

11

21 of 90 Holes delivered GTM’s over 2000m eU3O8* Tubas Sand Project: Summary

Drillhole UTM EAST UTM NORTH Azi
UTM
Dip TD From To Interval
(m)
eU3O8 (ppm) GTM
TUMR7110 514887.60 7451300.00 0 -90 19.0 0.00 14.00 14.00 207 2898
TUMR7111 514887.50 7451313.00 0 -90 19.0 2.00 15.00 13.00 243 3159
TUMR7112 514887.50 7451325.00 0 -90 19.0 0.00 11.00 11.00 255 2805
TUMR7116 514887.60 7451375.00 0 -90 19.0 1.00 12.00 11.00 304 3344
TUMR7117 514887.50 7451388.00 0 -90 19.0 2.00 11.00 9.00 371 3339
TUMR7119 514887.50 7451413.00 0 -90 19.0 1.00 9.00 8.00 307 2456
TUMR7129 514900.10 7451325.00 0 -90 19.0 2.00 10.00 8.00 291 2328
TUMR7131 514900.00 7451350.00 0 -90 19.0 1.00 10.00 9.00 284 2556
TUMR7134 514900.00 7451388.00 0 -90 20.0 1.00 11.00 10.00 209 2090
TUMR7137 514899.90 7451425.00 0 -90 19.0 2.00 16.00 14.00 154 2156

Importantly, mineralisation was mostly from surface or with minimal cover

12

* ASX Release 16 July 2015

What have we learned from these drilling results?*

==> picture [16 x 18] intentionally omitted <==

==> picture [16 x 17] intentionally omitted <==

==> picture [16 x 18] intentionally omitted <==

==> picture [16 x 18] intentionally omitted <==

==> picture [16 x 18] intentionally omitted <==

==> picture [16 x 18] intentionally omitted <==

==> picture [16 x 18] intentionally omitted <==

Confirmed a continuously mineralised north-south front of 160m(NS)x50m(EW) Consistent with previous drilling results done on a 50mx100m grid Grades matched the historical results and the existing mineral resource model

Mineralisation confined to channel sediments and not bedrock which simplifies mining and processing Limited amounts of internal dilution Gently undulating palaeochannel base has no influence on mineralisation grade or thickness Mineralisation may be present even in areas with as little as 2 metres of channel fill

* ASX Release 16 July 2015

13

==> picture [16 x 18] intentionally omitted <==

==> picture [16 x 17] intentionally omitted <==

==> picture [16 x 18] intentionally omitted <==

==> picture [16 x 18] intentionally omitted <==

==> picture [16 x 17] intentionally omitted <==

==> picture [16 x 18] intentionally omitted <==

What else can we infer from these drilling results? An internal study predicted the calcrete-hosted tonnes uranium per lineal kilometre along the Tumas drainage Assumptions were made for grade/thickness consistency interpolated from wide-spaced drilling Assumptions referenced against other deposits in the region Numbers range between 1.8 and 3Mlbs/km Conservatively discount by 50% due to low definition The Drilling results provide the evidence to support these assumptions*

Next steps – generate an estimate of the extent of palaeochannels by: Geophysical interpretation – done! Prove via further drilling

* ASX Release 16 July 2015

14

Tubas Sand Project: Summary Resource Potentials commissioned to re-interpret AeroTEM HEM data* Step 1: Convert the AeroTEM EM time domain data to conductivity-depth values shot Step 2: Run an auto-picking processing routine on the conductivity-depth imaging data to determine the thickness of conductive cover above fresh bedrock “basement” Step 3: Produce a set of georeferenced data products This allows an estimate of the extent of palaeochannels to be made

15

* ASX Release 16 July 2015

Tubas Sand Project: Summary Layered Earth Inversion (“LEI”) Techniques Produced Reliable Results*

==> picture [600 x 348] intentionally omitted <==

Layered Earth Inversion section showing good correlation between bedrock depth from drilling and the depth-to-bedrock from auto-picking routine

* ASX Release 16 July 2015

16

Tubas Sand Project: Summary LEI Conductance Image with additional interpretation*

==> picture [616 x 353] intentionally omitted <==

More clearly defined palaeochannel visible from this interpretation

Well over 100 kilometres in length

* ASX Release 16 July 2015

17

Tubas Sand Project: Summary Further analysis delivers the “money shot”*

==> picture [583 x 356] intentionally omitted <==

Map showing interpretation of depth to basement of the palaeochannel system across EPL 3496

* ASX Release 16 July 2015

18

JORC 2004 Resource: 48.7 Mt at 420 ppm for 45.1 Mlbs U3O8 (tank leach)*

==> picture [13 x 14] intentionally omitted <==

==> picture [13 x 15] intentionally omitted <==

==> picture [13 x 14] intentionally omitted <==

==> picture [13 x 14] intentionally omitted <==

==> picture [13 x 15] intentionally omitted <==

‘PEA’ – preliminary economic analysis completed (Internal study – ASX release 4 June 2014) Heap leach operation more economically attractive

Results included:

  • Average strip ratios similar at 4.2:1 (waste:ore)

  • MS7 had the lowest strip ratio and INCA the highest

  • Ongolo, the lowest grade deposit, had the highest estimated operating cost and low resource recovery.

  • Rates of production between 2.5 to 3.5 Mlbspa U3O8 were modelled (7 ~ 10 Mtpa or ore)

  • Life of mine of between 10 and 14 years

  • Down dip potential of MS7 confirmed

Metallurgical testwork required to prove concept Next Steps (underway):

  • Review & update preliminary economic analysis using independent consultants

  • Plan scoping level metallurgical testwork

==> picture [281 x 414] intentionally omitted <==

19

*ASX Release, 4 February 2013

Tubas Sand Project: Summary JORC 2012 Resource: 34 Mt at 170 ppm for 12.7 Mlbs U3O8[*]

==> picture [14 x 15] intentionally omitted <==

==> picture [14 x 15] intentionally omitted <==

==> picture [14 x 15] intentionally omitted <==

==> picture [14 x 15] intentionally omitted <==

==> picture [14 x 15] intentionally omitted <==

Resource update completed:

==> picture [270 x 349] intentionally omitted <==

==> picture [11 x 13] intentionally omitted <==

Covered smaller, selected area

==> picture [11 x 12] intentionally omitted <==

Average grade up but resource smaller

==> picture [11 x 12] intentionally omitted <==

Upside potential remains – drill program designed to infill & extend resource

DRA techno-economic study completed

==> picture [11 x 12] intentionally omitted <==

Intermediate product preferred strategy Production ~750,000 lbs/year U3O8 FOB minesite costs below US$25/lb

==> picture [11 x 13] intentionally omitted <==

==> picture [11 x 12] intentionally omitted <==

Offtake contract essential

==> picture [11 x 12] intentionally omitted <==

Existing Namibian mines & projects approached Unable to commit

==> picture [11 x 12] intentionally omitted <==

Other metallurgical testwork

==> picture [11 x 12] intentionally omitted <==

Samples tested by Marenica Energy Limited U-pgrade[TM] process may work

==> picture [11 x 13] intentionally omitted <==

Further work planned but dependent on offtaker Infill & expansion drill program Supplemental metallurgical testwork

*ASX Release, 24 March 2014 ** DRA Study, ASX Release, 8 May 2014

20

Recent Palaeochannel Exploration has Demonstrated Exciting Upside

Palaeochannels

  • Recent drill program confirmed grade and thickness over selected area

  • Used as an analogue for the remainder of the palaeochannel

  • Calcrete-hosted tonnes uranium per lineal kilometre has been estimated

  • Drill program underpins these assumptions

  • Reinterpretation of existing Geophysical datasets reinforced extent of channels

  • Potential ready to be tapped

Omahola Project – Ongoing progress

  • Update preliminary economic analysis with independent consultants

  • Plan MS7 deeper drilling campaign & scoping level metallurgical test work

  • Assess nearby targets to supplement resource base

Tubas Sand Project – On hold due to lack of offtaker

  • Expansion & Infill drilling program ready to go

  • Metallurgical testwork planning completed

Improving uranium market sentiment

  • Highly leveraged to any movement in uranium spot price

Leading location, Clear focus, High prospectivity, Proven delivery record

21

Greg Cochran Managing Director

Deep Yellow Limited Level 4, 502 Hay Street Subiaco, Western Australia 6008 T +61 8 9286 6999 M +61 409 938-784 F +61 8 9286 6969 Email: [email protected] Email: [email protected] Website: www.deepyellow.com.au

Appendices

JORC Resources (in this presentation) JORC Resources (in this presentation) JORC Resources (in this presentation) JORC Resources (in this presentation) JORC Resources (in this presentation) JORC Resources (in this presentation) JORC Resources (in this presentation) JORC Resources (in this presentation) JORC Resources (in this presentation)
Cut-off Tonnes U3O8 U3O8 U3O8
Deposit Category (ppm U3O8) (M) (ppm) (t) (Mlb)
Omahola Project - JORC 2004
INCA Deposit Indicated 250 7.0 470 3,300 7.2
INCA Deposit Inferred 250 5.4 520 2,800 6.2
Ongolo Deposit # Measured 250 7.7 395 3,000 6.7
Ongolo Deposit # Indicated 250 9.5 372 3,500 7.8
Ongolo Deposit # Inferred 250 12.4 387 4,800 10.6
MS7 Deposit # Measured 250 4.4 441 2,000 4.3
MS7 Deposit # Indicated 250 1.0 433 400 1.0
MS7 Deposit # Inferred 250 1.3 449 600 1.3
Omahola Project Total 48.7 420 20,400 45.1
Tubas Sand Project - JORC 2012
Tubas Sand Deposit # Indicated 100 10.0 187 1,900 4.1
Tubas Sand Deposit # Inferred 100 24.0 163 3,900 8.6
Tubas Sand Project Total 34.0 170 5,800 12.7
Tubas-Tumas Palaeochannel - JORC 2004
Tumas Deposit Indicated 200 14.4 366 5,300 11.6
Deposit Inferred 200 0.4 360 100 0.3
Tubas Calcrete Deposit Inferred 100 7.4 374 2,800 6.1
Tubas-Tumas Palaeochannel Total 22.2 369 8,200 18.0
TOTAL RESOURCES 104.9 328 34,400 75.8
Notes: Figures have been rounded and totals mayreflect small roundingerrors.
XRF chemical analysis unless annotated otherwise.
eU3O8 - equivalent uraniumgrade as determined by downholegamma logging.
#Combined XRF Fusion Chemical Assays and eU3O8 values.
Where eU3O8values are reported it relates to values attained from radiometricallyloggingboreholes.
Gammaprobes were calibrated at Pelindaba,South Africa in 2007 and sensitivitychecks are conducted
by periodic re-loggingof a test hole to confirm operation between 2008 and 2013.
Duringdrilling, probes are checked dailyagainst a standard source.

Omahola Project

The information in this report that relates to Exploration Results for the Ongolo, MS7 and INCA deposits is based on information compiled by Dr Katrin Kärner who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM CP(Geo)). Dr Katrin Kärner, who was the Exploration Manager for Reptile Uranium Namibia (Pty) Ltd, has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition). Dr Katrin Kärner consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

The information in this Report that relates to the Ongolo and MS7 Mineral Resources is based on information compiled by Malcolm Titley of CSA Global UK Ltd. Malcolm Titley takes overall responsibility for the Report. He is a Member of the Australasian Institute of Geoscientists (‘AIG’) and the Australasian Institute of Mining and Metallurgy (‘AusIMM’) and has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition). Malcolm Titley consents to the inclusion of such information in this Report in the form and context in which it appears.

The information in this report that relates to the INCA Mineral Resource Estimates is based on information compiled by Neil Inwood who is a Fellow of the AUSIMM. Mr Inwood was employed by Coffey Mining as a consultant to the Company at the time of the resource estimates and public release of results. As Mr Inwood is no longer employed by Coffey Mining, Coffey Mining has reviewed this report and consents to the inclusion, form and context of the relevant information herein as derived from the original resource reports for which Mr Inwood’s consents have previously been given. Mr Inwood has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which is being undertaken to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition).

The information relating to the Omahola Project Exploration Results and Mineral Resource Estimates was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.

Tubas Sand Project

The information in this release that relates to the Tubas Sand Mineral Resource Estimate is based on information compiled by Dr Katrin Kärner* of Reptile Uranium (Pty) Ltd and Malcolm Titley of CSA Global Pty Ltd. Malcolm Titley takes overall responsibility for the MRE. He is a Member of the Australasian Institute of Geoscientists (“AIG”) and the Australasian Institute of Mining and Metallurgy (“AusIMM”) and has sufficient experience, which is relevant to the style of mineralization and type of deposit under consideration, and to the activity he is undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2012 Edition). Malcolm Titley consents to the inclusion of such information in this Report in the form and context in which it appears.

Dr Katrin Kärner of RUN was the Competent Person responsible for the exploration activities and drill hole database and assaying who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM CP(Geo)). Dr Katrin Kärner, who was the Exploration Manager for Reptile Uranium Namibia (Pty) Ltd, has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2012 Edition). Dr Katrin Kärner consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

CSA is an independent geological consultancy. Fees were charged to RUN at a commercial rate for the work completed and preparation of the Tubas Sand Deposit Mineral Resource Estimate, the payment of which is not contingent upon the conclusions of the Resource Estimate. No member or employee of CSA is, or is intended to be, a director, officer or other direct employee of RUN. There is no formal agreement between CSA and RUN as to RUN providing further work for CSA.

Tubas-Tumas Project

The information in this report that relates to the Tumas Zone 1 Infill Drilling Exploration Results is based on and fairly represents information and supporting documentation prepared or reviewed by Mr Geoffrey Gee, a Competent Person who is a Member of the Australasian Institute of Geoscientists. Mr Gee, who is employed as a contract Exploration Geologist with Deep Yellow Limited, has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Gee consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.

The information in this report that relates to previous Exploration Results for the Tubas Calcrete and Tumas Mineral Resources is based on information compiled by Dr Katrin Kärner who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM CP(Geo)). Dr Katrin Kärner, who was the Exploration Manager for Reptile Uranium Namibia (Pty) Ltd during 2013, has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition). Dr Katrin Kärner consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

The information in this report that relates to the Tubas Calcrete Mineral Resource is based on information compiled by Mr Willem H. Kotzé Pr.Sci.Nat MSAIMM. Mr Kotzé is a Member and Professional Geoscientist Consultant of Geomine Consulting Namibia CC. Mr Kotzé has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition). Mr Kotzé consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the Tumas Mineral Resources is based on work completed by Mr Jonathon Abbott who is a full time employee of MPR Geological Consultants Pty Lt and a Member of the Australian Institute of Geoscientists. Mr Abbott has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition’) and as a Qualified Person as defined in the AIM Rules. Mr Abbott consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information relating to Tubas-Tumas Mineral Resource Estimates was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.

Geophysical Results: Resource Potentials

The information in this report that relates to Geophysical Results is based on information compiled by Dr Jayson Meyers who is a Fellow of the Australian Institute of Geoscientists. Dr Meyers is a full time employee of Resource Potentials Pty Ltd. Dr Meyers has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Dr Meyers consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.