DEEP YELLOW LIMITED — Investor Presentation 2012
Oct 31, 2012
64808_rns_2012-10-31_59c2608c-2a9a-4949-85b8-9d7e6da45ee2.pdf
Investor Presentation
Open in viewerOpens in your device viewer
==> picture [263 x 540] intentionally omitted <==
==> picture [112 x 120] intentionally omitted <==
Deep Yellow Limited
Mining 2012
Resources Convention
Brisbane, 1 November 2012 Greg Cochran – Managing Director
ASX: DYL www.deepyellow.com.au
==> picture [221 x 61] intentionally omitted <==
==> picture [201 x 53] intentionally omitted <==
This document has been prepared by Deep Yellow Limited (Deep Yellow, DYL or the Company) in connection with providing an overview to interested analysts and investors.
This presentation is being provided for the sole purpose of providing information to enable recipients to review the business activities of Deep Yellow. This presentation is thus by its nature limited in scope and is not intended to provide all available information regarding Deep Yellow. This presentation is not intended as an offer, invitation, solicitation, or recommendation with respect to the purchase or sale of any securities. This presentation should not be relied upon as a representation of any matter that a potential investor should consider in evaluating Deep Yellow.
Deep Yellow and its affiliates, subsidiaries, directors, agents, officers, advisers or employees do not make any representation or warranty, express or implied, as to or endorsement of, the accuracy or completeness of any information, statements, representations or forecasts contained in this presentation, and they do not accept any liability or responsibility for any statement made in, or omitted from, this presentation. Deep Yellow accepts no obligation to correct or update anything in this presentation.
No responsibility or liability is accepted and any and all responsibility and liability is expressly disclaimed by Deep Yellow and its affiliates, subsidiaries, directors, agents, officers, advisers or employees for any errors, misstatements, misrepresentations in or omissions from this presentation.
Any statements, estimates, forecasts or projections with respect to the future performance of Deep Yellow and/or its subsidiaries contained in this presentation are based on subjective assumptions made by Deep Yellow’s management and about circumstances and events that have not yet taken place. Such statements, estimates, forecasts and projections involve significant elements of subjective judgement and analysis which, whilst reasonably formulated, cannot be guaranteed to occur. Accordingly, no representations are made by Deep Yellow or its affiliates, subsidiaries, directors, officers, agents, advisers or employees as to the accuracy of such information; such statements, estimates, forecasts and projections should not be relied upon as indicative of future value or as a guaranteed of value or future results; and there can be no assurance that the projected results will be achieved.
Prospective investors should make their own independent evaluation of an investment in Deep Yellow.
Nothing in this presentation should be construed as financial product advice, whether personal or general, for the purposes of section 766B of the Corporations Act 2001 (Cth). This presentation consists purely of factual information and does not involve or imply a recommendation or a statement of opinion in respect of whether to buy, sell or hold a financial product. This presentation does not take into account the objectives, financial situation or needs of any person, and independent personal advice should be obtained.
This presentation and its contents have been made available in confidence and may not be reproduced, or disclosed to third parties or made public in any way without the express written permission of Deep Yellow.
==> picture [21 x 23] intentionally omitted <==
==> picture [21 x 24] intentionally omitted <==
==> picture [21 x 23] intentionally omitted <==
==> picture [21 x 23] intentionally omitted <==
==> picture [21 x 24] intentionally omitted <==
==> picture [21 x 23] intentionally omitted <==
==> picture [21 x 24] intentionally omitted <==
Corporate Profile Market Overview Uranium in Namibia Deep Yellow’s Portfolio Omahola Project Tubas Sand Project Conclusion
==> picture [240 x 181] intentionally omitted <==
==> picture [242 x 182] intentionally omitted <==
3
The Board
Mervyn Greene – Chairman
Greg Cochran – Managing Director
Martin Kavanagh – Executive Director
Gillian Swaby – N.E.D
Rudolf Brunovs – N.E.D (independent) Christophe Urtel – N.E.D
Mark Pitts – Company Secretary
Executives & Management
Greg Cochran – Managing Director
Martin Kavanagh – Executive Director
Leon Pretorius – MD: Namibia
Ursula Pretorius – Financial Controller Klaus Frielingsdorf – GM: Technical
Capital Structure – as at 24 Oct 2012
| Shares on Issue | 1,424.174 M |
|---|---|
| Unlisted Performance Rights | 12.258 M |
| Market Cap (@ 8c) | ~ 114 M |
| Net Cash | ~9.8 M |
| Major shareholders: | |
| Paladin Energy | 20.87% |
| Laurium Fund | 10.87% |
| Board & Management | 12.22% |
==> picture [291 x 141] intentionally omitted <==
5
==> picture [44 x 7] intentionally omitted <==
----- Start of picture text -----
Source : WNA
----- End of picture text -----
==> picture [624 x 371] intentionally omitted <==
Consistently optimistic forecasting leads to industry complacency 6
Source : WNA
Demand remains strong, underpinned by:
-
Growth in China, Russia, India and Korea
-
New entrants, primary in the Middle East
-
Sustained demand from existing players (USA, UK)
Supply constrained by:
-
Inadequate incentive price for new projects
-
Operational issues for existing products
-
New projects face other challenges
-
Secondary supply evaporating (End of HEU 2013)
Balance - What Balance?*
7
- Source: Paladin Energy
| Date | Target | Acquirer | EV US$/lb |
|---|---|---|---|
| Aug – 12 | Yeelirrie Uranium Project | Cameco | 3.48 |
| Mar – 12 | Millenium Project(AREVA 27.9% Stake) | Cameco | 8.00 |
| Feb – 12 | Extract | CGNPC | 7.10 |
| Dec – 11 | Kalahari | CGNPC | 7.10 |
| Nov – 11 | Hathor Exploration | Rio Tinto | 10.10 |
| Aug – 11 | Gas Hills Project(Strathmore) | KEPCO | 9.40 |
| Mar – 11 | Mantra Resources | ARMZ | 9.40 |
| Average | 7.80 |
Enterprise Value (EV) equal to 100% of the equity value based on the offer price plus net debt and minority interests Source : RBC, Mergermarket, Capital IQ, SDC, Paladin Energy
==> picture [625 x 206] intentionally omitted <==
8
Incentive Price: Price required to achieve a 15% nominal rate of return Source: J.P. Morgan
Trekkopje – Areva (100 ppm cut-off) 335 Mt @ 149 ppm: 110 Mlbs
==> picture [48 x 48] intentionally omitted <==
Valenica – Forsys Metals (67 ppm cut-off) 176 Mt @ 156 ppm: 61 Mlbs
Marenica – Marenica Energy Limited (100 ppm cut-off) 196 Mt @ 169 ppm: 73 Mlbs
Etango – Bannerman Resources Limited (100 ppm cut-off) 336 Mt @ 201 ppm: 149 Mlbs
Rossing – Rossing Uranium Limited ( 100 ppm cut-off) 246 Mt @ 252 ppm: 137 Mlbs
Husab – Extract Resources Limited (100 ppm cut-off) 241 Mt @ 480 ppm: 257 Mlbs
Langer Heinrich – Paladin Energy Limited (250 ppm cut-off) 110 Mt @ 550 ppm: 134 Mlbs
==> picture [521 x 49] intentionally omitted <==
----- Start of picture text -----
Grade counts, not just size…
----- End of picture text -----
==> picture [670 x 356] intentionally omitted <==
==> picture [521 x 49] intentionally omitted <==
----- Start of picture text -----
Grade counts, not just size…
----- End of picture text -----
==> picture [366 x 426] intentionally omitted <==
==> picture [254 x 272] intentionally omitted <==
4,195 km[2] exploration area: 101.4 Mlbs in
resources
Note: Exploration in Namibia is conducted by DYL’s wholly-owned subsidiary Reptile Uranium Namibia (RUN)
==> picture [14 x 15] intentionally omitted <==
==> picture [14 x 15] intentionally omitted <==
==> picture [14 x 15] intentionally omitted <==
==> picture [14 x 15] intentionally omitted <==
Located in Namibia’s “Alaskite Alley” Trend includes Rossing Uranium Mine (Rio Tinto) and the Husab Project (Formerly Extract Resources) Three Deposits to feed one plant:
-
Ongolo – high grade alaskite hosted uranium mineralisation
-
MS7 – Ongolo satellite, high grade alaskite hosted uranium mineralisation
-
INCA – unique high grade uranium, magnetite and pyrite mineralisation
Objective: Achieve predominantly alaskite Resource of 50 Mlbs U3O8 for “critical mass”
==> picture [172 x 410] intentionally omitted <==
----- Start of picture text -----
Alaskite alley
----- End of picture text -----
12
Ongolo & MS7 (250 ppm cut-off) 25.8 Mt @ 416 ppm: 23.6 Mlbs EIA Commencing 2012 Typically 2 Year Process
INCA
( 250 ppm cut-off) 12.4 Mt @ 492 ppm: 13.4 Mlbs Environmental Clearance achieved Mining Licence Application submitted
Tubas-TRS (option to include) ( 70 ppm cut-off) 87 Mt @ 148 ppm: 28.4 Mlbs Environmental Clearance achieved Mining Licence Application submitted
Omahola JORC Resource: 38.2 Mt at 441 ppm for 37 Mlbs U3O8
13
==> picture [15 x 16] intentionally omitted <==
Interim PFS results on INCA/TRS Deposits (SNC-Lavalin – Jan 2011)
-
2.2 Mlbs pa design capacity, assumed 12 year mine life
-
Open pit mining, conventional acid leach processing plant
-
Capex: ~US$330m and Opex: ~US$30/lb
==> picture [15 x 17] intentionally omitted <==
==> picture [15 x 16] intentionally omitted <==
Objective: finalise Pre-Feasibility Study in 2013 Drill programme designed to achieve critical mass by:
-
Increasing size and confidence of Ongolo and MS7
-
Systematically drilling the Ongolo-MS7 trend to identify additional high-grade satellite deposits
-
Recent Ongolo South and MS7 footwall discoveries reinforce ongoing success and blue sky potential
==> picture [15 x 16] intentionally omitted <==
Next steps for Ongolo and MS7 – scheduled H2 2012 and 2013:
-
Drilling results feeding into resource upgrades
-
Pit Optimisation and mining cost studies
-
Metallurgical testwork
14
==> picture [720 x 540] intentionally omitted <==
----- Start of picture text -----
Omahola Project: Exploration Success…
…is rapidly growing the resource base…
----- End of picture text -----
==> picture [587 x 379] intentionally omitted <==
Typical section showing shallow high grade mineralisation in lower grade alaskite envelope
==> picture [720 x 540] intentionally omitted <==
----- Start of picture text -----
Tubas Sand Project: Location
Tubas Sand Deposit showing area with known red sand
----- End of picture text -----
Strategy:
Develop a small low capex standalone operation initially supplying loaded resin to an existing producer
Deposit Characteristics: Large area of well-sorted windblown sands Free flowing/weakly consolidated Low grade by DYL standards (economic?) Bulk of uranium (carnotite) mostly in sub 20 µ fraction Objective: Concentrate maximum uranium in minimum volume through physical beneficiation to enhance economics
Process:
Hydrosort®- II Scrubbing Hydrosort®- I 3 X Hydrocyclones
Successful Pilot Plant Test: Simple process Uranium Recovery >80% Carbonate reduction >80% Hydrocyclone Mass pull between 10% ~ 20% Schematic Uranium upgrade factor 7.9 (at 10% mass pull) Process guarantee offered Product is easily leached (pH 2.5) and loaded onto resin Environmental clearance in place
==> picture [18 x 19] intentionally omitted <==
==> picture [18 x 19] intentionally omitted <==
==> picture [18 x 19] intentionally omitted <==
==> picture [18 x 19] intentionally omitted <==
==> picture [18 x 19] intentionally omitted <==
==> picture [18 x 19] intentionally omitted <==
==> picture [18 x 19] intentionally omitted <==
Develop sand mining operation with Schauenburg Plant Construct Resin-In-Leach Circuit on the INCA MLA Produce loaded resin for sale to existing producers Schauenburg plants are modular, ~ 250 tpa U3O8 per module Allows gradual up scaling Indicative Capital Cost from Scoping: • ~ U$35 M for one module Longer term, supplemental feed to the Omahola Project
Accelerate project progress: Additional bulk sample testwork (underway) Drill programme to increase resource confidence Mining studies Integrated pre-feasibility and feasibility studies Negotiate offtake agreement and project funding
Offtake arrangement with an existing producer will reduce technical and financial risk and reduce development schedule
==> picture [594 x 395] intentionally omitted <==
RC Programme to infill and upgrade existing inferred resource
==> picture [352 x 349] intentionally omitted <==
==> picture [353 x 349] intentionally omitted <==
Trench for Bulk Sample Spoil Pile
==> picture [268 x 353] intentionally omitted <==
==> picture [435 x 354] intentionally omitted <==
Pilot Plant Mineral Liberation
==> picture [698 x 270] intentionally omitted <==
Successfully Loaded IX Resin @ pH 2.5
==> picture [15 x 16] intentionally omitted <==
Two advanced stage uranium projects in one of the world’s most prominent uranium mining districts in Namibia
- Omahola is the only independent high grade Namibian uranium project and it has a rapidly growing resource base
==> picture [15 x 16] intentionally omitted <==
==> picture [15 x 16] intentionally omitted <==
-
Tubas Sand Project, low capex early start up standalone project with potential to ultimately provide supplemental feed to the Omahola plant
-
Divestment or joint venture of non-core uranium projects ensures focus
Namibian Shiyela Iron Project divestment will allow
-
Accelerated project development
-
Possible source of non-dilutionary funding
==> picture [15 x 16] intentionally omitted <==
==> picture [15 x 16] intentionally omitted <==
Experienced management team Strong medium-long term uranium market fundamentals
Leading location, High grade, Growing scale, Proven delivery record
26
Greg Cochran Managing Director Deep Yellow Limited Level 1, 329 Hay Street Subiaco, Western Australia 6008 T +61 8 9286 6999 M +61 409 938-784 F +61 8 9286 6969 Email: [email protected]
Email: [email protected] Website: www.deepyellow.com.au
Appendices
| Deposit | Category | Cut-off (ppm U3O8) |
Tonnes (M) |
U3O8 (ppm) |
U3O8 (t) |
U3O8 (Mlb) |
|---|---|---|---|---|---|---|
| NAMIBIA | ||||||
| Omahola Project | ||||||
| INCA | Indicated | 250 | 7.0 | 470 | 3,300 | 7.2 |
| INCA | Inferred | 250 | 5.4 | 520 | 2,800 | 6.2 |
| Ongolo # | Indicated | 250 | 14.7 | 410 | 6,027 | 13.2 |
| Ongolo # | Inferred | 250 | 5.8 | 380 | 2,204 | 4.8 |
| MS7 # | Indicated | 250 | 3.3 | 430 | 1,400 | 3.2 |
| MS7 # | Inferred | 250 | 2.0 | 540 | 1,100 | 2.4 |
| Omahola Project Total | 38.2 | 441 | 16,831 | 37.0 | ||
| Tubas-TRS Project | ||||||
| Tubas-TRS | Inferred | 70 | 87.0 | 148 | 12,876 | 28.4 |
| Tubas-TRS Project | Total | 87.0 | 148 | 12,876 | 28.4 | |
| Tubas-Tumas Palaeochannel | ||||||
| Tumas | Indicated | 200 | 14.4 | 366 | 5,270 | 11.6 |
| Tumas | Inferred | 200 | 0.4 | 360 | 144 | 0.3 |
| Tubas–Calcrete | Inferred | 100 | 7.4 | 374 | 2,767 | 6.1 |
| Tubas-Tumas Palaeochannel Total | 22.2 | 369 | 8,181 | 18.0 | ||
| Aussinanis Project | ||||||
| Aussinanis | Indicated | 150 | 5.6 | 222 | 1,243 | 2.7 |
| Aussinanis | Inferred | 150 | 29.0 | 240 | 6,960 | 15.3 |
| Aussinanis Project | Total | 34.6 | 237 | 8,203 | 18.0 | |
| TOTAL - NAMIBIA | 182.0 | 253 | 46,091 | 101.4 | ||
| AUSTRALIA | ||||||
| Napperby Project (NT) | ||||||
| Napperby | Inferred | 200 | 9.3 | 359 | 3,351 | 7.4 |
| Napperby Total | 9.3 | 359 | 3,351 | 7.4 | ||
| Mount Isa Project (QLD) | ||||||
| Mount Isa | Indicated | 300 | 2.2 | 470 | 1,050 | 2.3 |
| Mount Isa | Inferred | 300 | 2.5 | 450 | 1,120 | 2.5 |
| Mount Isa Total | 4.7 | 460 | 2,170 | 4.8 | ||
| TOTAL - AUSTRALIA | 14.0 | 394 | 5,521 | 12.2 | ||
| TOTAL INDICATED | RESOURCES | 47.2 | 387 | 18,290 | 40.2 | |
| TOTAL INFERRED RESOURCES | 148.8 | 224 | 33,322 | 73.4 | ||
| TOTAL RESOURCES | 196.0 | 263 | 51,612 | 113.6 |
Notes: Figures have been rounded and totals may reflect small rounding errors XRF chemical analysis unless annotated otherwise
eU3O8 - equivalent uranium grade as determined by downhole gamma logging # Combined XRF Fusion Chemical Assays and eU3O8 values
Namibia
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Dr Leon Pretorius, a Fellow of the Australasian Institute of Mining and Metallurgy. Dr Pretorius, Managing Director of Reptile Uranium Namibia (Pty) Ltd has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Pretorius consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to the Ongolo, MS7 and INCA Mineral Resources is based on work completed by Mr Neil Inwood and Mr Doug Corley. Mr Inwood is a Fellow of the Australasian Institute of Mining and Metallurgy and Mr Corley is a member of the Australian Institute of Geoscientists. Messrs Inwood and Corley have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Persons as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Messrs Inwood and Corley consent to the inclusion in the report of the matters based on his information in the form and context in which it appears. Messrs Inwood and Corley are full-time employees of Coffey Mining.
The information in this report that relates to the TRS and Tubas Mineral Resource is based on information compiled by Mr Willem H. Kotzé Pr.Sci.Nat MSAIMM. Mr Kotzé is a Member and Professional Geoscientist Consultant of Geomine Consulting Namibia CC. Mr Kotzé has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Kotzé consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.
The information in this report that relates to the Aussinanis and Tumas Mineral Resources is based on work completed by Mr Jonathon Abbott who is a full time employee of Hellman and Schofield Pty Ltd and a Member of the Australasian Institute of Mining and Metallurgy. Mr Abbott has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ and as a Qualified Person as defined in the AIM Rules. Mr Abbott consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Queensland
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Martin Kavanagh, a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Kavanagh is an Executive Director of Deep Yellow Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Kavanagh consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to the Queensland Mineral Resource is based on information compiled by Mr Neil Inwood. Mr Inwood is a Member of The Australasian Institute of Mining and Metallurgy. Mr Inwood is employed by Coffey Mining Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Inwood consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Northern Territory
The information in this report that relates to the Napperby Project Mineral Resource is based on information compiled by Mr Daniel Guibal who is a Fellow (CP) of the Australasian Institute of Mining and Metallurgy. Mr Guibal is a full time employee of SRK Consulting and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Guibal consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Where eU3O8 values are reported it relates to values attained from radiometrically logging boreholes with Auslog equipment using an A675 slimline gamma ray tool. All probes are calibrated either at the Pelindaba Calibration facility in South Africa or at the Adelaide Calibration facility in South Australia.