DEEP YELLOW LIMITED Interim / Quarterly Report 2010

Jan 24, 2011

64808_rns_2011-01-24_a43c0b0c-d056-4ce7-87e2-cbef54e9944c.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

ASX Code: DYL

==> picture [280 x 59] intentionally omitted <==

ASX Announcement

25 January 2011

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 31 DECEMBER 2010

HIGHLIGHTS

NAMIBIA

OMAHOLA PROJECT PRE-FEASIBILITY STUDY

SNC Lavalin (SNCL) has provided positive interim Pre-Feasibility Study (PFS) results for the Omahola uranium project in Namibia, which includes the INCA and Tubas Red Sand uranium deposits comprising:

  • Conventional processing plant with crushing, grinding, sulphuric acid leach and solvent extraction followed by uranium precipitation, drying and packaging of yellowcake

  • Production rate of 1,000 tonnes (2.2 Mlbs) U3O8 per annum beginning 2014 and targeting resources to provide a minimum 12 year mine life

  • Capital costs estimated to be US$324 to US$336 million with 10% contingency

  • Operating costs estimated to be US$24.90 to US$25.30 per pound U3O8

The timeline for completion of PFS has been extended to the 2nd Quarter 2011 in order to evaluate the inclusion of material from the recently discovered Ongolo Alaskite Project as an additional source of ore for the Omahola Project. Ongolo Alaskite offers the potential to increase the production rate and/or extend the life of the project.

ONGOLO ALASKITE PROJECT

  • Re-analysis of previously announced sample intervals from Ongolo has resulted in an increase of uranium grade by an average of approximately 30% from 453 ppm U3O8 on a weighted average basis to 587 ppm using alternative fusion-XRF analytical procedure.

  • RC and diamond drilling has been completed over approximately 1 kilometre of the 2 kilometre strike of the interpreted high-grade mineralised zone.

  • Five RC rigs and one diamond rig are currently drilling at Ongolo on a nominal 80 x 50 metre grid in order to provide an initial JORC Code mineral resource estimate by end March 2011.

Level 1, 329 Hay Street, Subiaco, WA 6008 / PO Box 1770, Subiaco, WA 6904 Tel : 61 8 9286 6999 / Fax : 61 8 9286 6969 / ABN 97 006 391 948 Email: [email protected] / Website: www.deepyellow.com.au

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

TUBAS-TUMAS PALAEOCHANNEL

Follow-up infill drilling at Tumas Zone 3 of the Tubas-Tumas palaeochannel identified high-grade uranium mineralisation in the basement rocks beneath the palaeochannel; in Red Sand adjacent to the channel similar to the Tubas Red Sand (TRS) deposit material, as well as additional high-grade mineralisation within the palaeochannel itself as follows:

  • High-grade basement-hosted secondary uranium mineralisation with drillhole ORXR1 returning a mineralised intercept of:

  • 47 metres at 830 ppm cU3O8 from 29 metres depth

  • Reverse Circulation infill drilling around ORXR1 also identified Red Sand hosted mineralisation with drillhole ORXR37 intercepting:

  • 8 metres at 516 ppm cU3O8 from 5 metres depth

  • ORXR37 is located approximately 20 kilometres east of the current Tubas Red Sand (TRS) deposit and demonstrates that mineralised Red Sand is not restricted to a single area adjacent to the palaeochannel

  • Infill drilling within the palaeochannel also outlined additional high-grade mineralisation with selected intercepts of:

  • 8 metres at 614 ppm cU3O8 from 7 metres

  • o 11 metres at 1,097 ppm cU3O8 from 5 metres o 7 metres at 782 ppm cU3O8 from 3 metres

SHIYELA IRON PROJECT

  • A total of 69 RC holes and 1 DC hole for 11,052 metres was drilled during the Quarter and takes the total to 112 RC holes and 4 DC holes for 18,592 metres since drilling started at Shiyela in June 2010.

  • Golders Associates Pty Ltd has been appointed to complete a JORC Code Mineral Resource estimate for the M62 and M63 deposits.

  • Promet Engineers Pty Ltd (Perth) has been contracted to assist with engineering and to complete a Scoping Study.

  • Testwork carried out by Promet / Ammtec / ALS on 150 kilogram of core samples is nearing completion with results to date being positive.

RUN DRILLING PROGRAMME

  • During the Quarter RUN drilled a total of 377 holes for 39,195 metres.

CORPORATE

  • DYL completed the Quarter in a strong cash position, including liquid assets, of $20 million at 31 December 2010

  • Mr Greg Cochran was appointed to executive team as Managing Director effective 24 January 2011.

Page 2

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

Summary

Deep Yellow Limited (DYL) continued with its ongoing exploration and pre-development programmes in Namibia and Australia. In Namibia, all exploration and pre-development work is conducted by DYL’s wholly-owned subsidiary Reptile Uranium Namibia (Pty) Ltd (RUN).

Table 1: Summary of DYL’s Mineral Resource Estimates in accordance with the JORC Code

JORC MINERAL RESOURCE ESTIMATES SUMMARY – DECEMBER 2010

Deposit Category Cut-off
**(ppm U3O8) **
Tonnes
(M)
U3O8
(ppm)
U3O8
(t)
U3O8
(Mlb)
REPTILE URANIUM NAMIBIA (NAMIBIA)
Omahola Project
INCA Inferred 250 5.5 445 2,449 5.4
INCA Indicated 250 9.4 385 3,628 8.0
Tubas Red Sand Inferred 100 10.7 158 1,685 3.7
Tubas Red Sand Measured/Indicated 100 3.2 168 532 1.2
Omahola Project Total 28.8 288 8,294 18.3
Tubas-Tumas Palaeochannel Project
Tumas Inferred 200 0.4 360 144 0.3
Tumas Indicated 200 14.4 366 5,270 11.6
Tubas Inferred 100 77.3 228 17,620 38.9
Tubas-Tumas Project Total 92.1 250 23,034 50.8
Aussinanis Project
Aussinanis Inferred 150 29.0 240 6,960 15.3
Aussinanis Indicated 150 5.6 222 1,243 2.7
Aussinanis Project Total 34.6 237 8,203 18.0
RUN TOTAL 155.5 254 39,531 87.2
NAPPERBY PROJECT (NT, AUSTRALIA)
Napperby Inferred 200 9.3 359 3,351 7.4
NAPPERBY TOTAL 9.3 359 3,351 7.4
MOUNT ISA PROJECT (QLD, AUSTRALIA)
Mount Isa Inferred 300 2.0 440 890 2.0
Mount Isa Indicated 300 1.6 400 650 1.4
MOUNT ISA TOTAL 3.6 428 1,540 3.4
TOTAL INFERRED RESOURCES 134.2 247 33,099 73.0
TOTAL INDICATED RESOURCES 34.2 331 11,323 25.0
TOTAL RESOURCES 168.4 264 44,422 98.0

Notes: Figures have been rounded and totals may reflect small rounding errors.

 eU3O8 - equivalent uranium grade as determined by downhole gamma logging.

Page 3

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

EXPLORATION – NAMIBIA

==> picture [483 x 519] intentionally omitted <==

Figure 1: RUN Tenements and Project Location Map in Namibia

Omahola Project Pre-Feasibility Study

SNC-Lavalin (SNCL) has provided positive interim Pre-Feasibility Study (PFS) results for the Omahola uranium project which includes the INCA and Tubas Red Sand (TRS ) uranium deposits (ASX 10 January 2011).

The PFS was launched in March 2010 and includes the INCA and TRS uranium deposits. These deposits have combined resources containing 8,294 tonnes (18.3 million pounds) U3O8 (Table 1), with additional resources anticipated from both deposit types.

Page 4

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

Key Project Assumptions and Interim PFS Results

Key project assumptions and interim Omahola Project PFS results include mining by open-cut methods with conventional uranium processing using sulphuric acid. The planned production rate is 1,000 tonnes (2.2 million pounds) U3O8 per annum beginning in 2014, with resources targeted to provide a minimum 12 year mine life and with anticipated phased increases in production as JORC Code Resources are further increased.

Detailed mine planning for the INCA deposit is underway, with the bulk of the mineralisation sufficiently shallow (starting from 20 metres) for open-cut mining.

It is anticipated that a conventional processing plant will be constructed near the INCA deposit which will include crushing, grinding, sulphuric acid leaching, followed by solvent extraction, uranium precipitation, and drying and packaging of yellowcake.

Mining of the TRS deposit will be by simple surface mining techniques as the mineralisation is located from one metre to a maximum depth of approximately 15 metres. A mobile beneficiation plant will be located at the TRS deposit. This satellite plant will be designed to concentrate approximately 90% of the uranium into approximately 25% of the mass, with the resulting concentrate grading +400 ppm U3O8 assumed to be transported via slurry pipeline to the main processing plant near INCA for uranium recovery.

The main processing plant will be equipped with a magnetic recovery circuit at the end of the process to recover magnetite (iron) from the tailings stream. It is anticipated that this iron will be a saleable byproduct for use in third party producers’ uranium acid leach circuits to enhance uranium extraction.

The main plant will also be equipped with a pressure oxidation autoclave to generate a significant quantity of sulphuric acid on-site from pyrite in the INCA ore, thus reducing the quantity of sulphuric acid required to be purchased and transported to the site.

A conceptual design of the main processing plant is included as Appendix 1.

While the supply of water for a mining project in Namibia is one of the key risk areas, RUN has completed pump testing of aquifers close to the proposed mine site that has confirmed the availability of significant amounts of groundwater (albeit saline) at INCA and in the nearby palaeochannel system. Aquifer recharge tests and Government licensing will determine how much (if not all) of the total water supply required for the Omahola Project can be sourced from this natural, local water supply. Consequently, provisions have been included in the initial project design and costing for an on-site desalination plant. RUN is also pursuing an alternative option of securing desalinated sea water to be supplied by Namibia’s water services provider NamWater.

Importantly, due to the proximity of the proposed mine and processing plant to the coastal towns of Swakopmund and Walvis Bay (both within 40 kilometre radius), and access to the mine area via a sealed, black-top road (C28) it is anticipated there will be no need for on-site housing for construction and operation personnel.

Capital and Operating Cost Estimates

SNCL has estimated preliminary project capital costs for the assumptions outlined above in the range of US$324 to US$336 million, including mining pre-stripping and the construction of a tailings storage facility. Capital costs for utility infrastructure (water and power) to the mine gate have not been included; however, operating costs include electricity costs with an allowance for funded electrical infrastructure. Water is assumed to be supplied on-site as desalinated ground water and the cost for a reverse osmosis unit has been included.

SNCL has estimated operating costs should range from US$24.90 to US$25.30 per pound U3O8 including the cost of iron recovery.

Page 5

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

Capital costs include a 10% contingency and both capital and operating costs are reported with an accuracy of -15% to +25%.

Inclusion of Ongolo Alaskite Project and Extension of PFS

In addition, the style of uranium mineralisation at Ongolo is the same as that in ore mined and processed at the Rossing Uranium Mine for the past 30+ years, and is therefore well understood from the standpoint of metallurgy, processing and costs. Uraninite is the only primary uranium mineral identified in mineralogical studies to-date and is therefore similar to the INCA deposit and is expected to be compatible with the process proposed for the Omahola Project.

As a result of the fact that the exciting discovery at Ongolo is close to INCA; has the potential to add significant high-grade uranium resources; is similar to well-understood ore being processed at Rossing; and, is expected to be compatible with the proposed acid leach process for the Omahola Project, DYL has decided to extend the timeframe for the completion of the PFS to the second Quarter of 2011 in order to incorporate the Ongolo mineralisation into the PFS as a source of ore for the Omahola Project.

DYL is confident that the inclusion of Ongolo Alaskite material has the potential to positively impact the overall PFS results for the Omahola Project.

Detailed reverse circulation (RC) and diamond drilling within the interpreted two kilometre strike length at Ongolo is ongoing for resource delineation and an initial Mineral Resource estimate is anticipated by the end of March 2011.

Omahola Project Uranium Resources

The Omahola Project currently includes the INCA and TRS uranium deposits. INCA contains Indicated and Inferred Mineral Resources totalling 14.9 million tonnes at 405 ppm eU3O8 for 6,077 tonnes (13.4 Mlbs) U3O8 (ASX 29 October 2010). The TRS deposit contains Measured, Indicated and Inferred Resources totalling 13.9 million tonnes at 160 ppm eU3O8 for 2,217 tonnes (4.9 Mlbs) U3O8 (ASX 22 April 2010). Therefore, the Omahola Project has total resources containing 8,294 tonnes (18.3 Mlbs) U3O8 (Table 2).

Table 2: Omahola Project Mineral Resource Estimate

Deposit – JORC Category Cut-Off
**(ppm U3O8) **
Tonnes
(Million)
U3O8
(ppm)
U3O8
(ppm)
U3O8
(tonnes)
U3O8
(Million
Pounds)
INCA - Inferred 250 5.5 445 0.044 2,449 5.4
INCA - Indicated 250 9.4 385 0.039 3,628 8.0
TRS - Inferred 100 10.7 158 0.016 1,685 3.7
TRS - Measured/Indicated 100 3.2 168 0.017 532 1.2
Omahola Project – Total 28.8 288 0.029 8,294 18.3

 eU3O8 - equivalent uranium grade as determined by downhole gamma logging.

The TRS deposit contains lower grade material, but the material has been demonstrated to be amenable to beneficiation and is anticipated to be upgraded to 400+ ppm U3O8 using a portable beneficiation plant located at the TRS deposit. Additional TRS material has been identified along the flanks of the 30+ kilometre long Tubas-Tumas palaeochannel and has the potential for significant additional resources with further drilling. RUN has purchased a beneficiation pilot plant to demonstrate TRS beneficiation. Operation of the pilot plant will commence during the 1st Quarter 2011 after commissioning by the German supplier Schauenburg.

Page 6

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

It is anticipated that the Ongolo Alaskite Project will also provide feed material to the Omahola Project. As indicated above, Ongolo is currently being drilled extensively in anticipation of an initial JORC Mineral Resource estimate in March 2011 to boost the total resources for the Omahola Project.

Environmental Studies

Environmental studies have also been progressing since November 2009 and continuing in parallel with the PFS. On 3 and 5 November 2010, RUN held open-forum public meetings and presentations in Windhoek and Swakopmund respectively on the findings of the environmental studies and overall Environmental Impact Assessment of the proposed Omahola Project. As part of the public information process, documents, providing more detail of the proposed project, including conceptual plant and process description, are available on DYL’s website.

Reconnaissance Drilling

Drillhole INCR388 at target area IT-3 returned an intercept of 11 metres at 1,064 ppm eU3O8 from 84 metres (ASX 17 November 2010).

Drillhole INCR388 is a 60º angle reverse circulation (RC) drillhole on a line of reconnaissance drilling across magnetic target IT-3, which is the first of 10 such targets recently interpreted within RUN’s EPL 3496 to be drill tested (see Figure 2). INCR388 returned an intercept of 11 metres at 1,064 ppm eU3O8 * from 84 metres as presented in Table 3.

Table 3: Drillhole INCR388 – Gamma Log Assay Result

Drillhole mE mN Azi Dip TD From To Interval
(m)
eU3O8
(ppm)
GTM
INCR388 487700 7474600 090 -60 199 84 95 11 1,064 12,608

Note: GTM is grade thickness metre and is calculated by multiplying the interval (m) x eU3O8 (ppm).

Target Generation

DYL/RUN embarked on an iterative process of reviewing and interpreting RUN’s extensive airborne geophysical data to determine if a ‘fingerprint’ of the INCA deposit could be identified in the complex magnetic structure at INCA. The goal was to use that fingerprint to identify other magnetic anomalies for targeted reconnaissance drilling. This work has led to DYL’s geophysical consultants Resource Potentials (Perth) identifying ten priority INCA-Type (IT) targets (IT-1 to IT-10 in Figure 2) based on the geophysical signature (‘fingerprint’) of INCA.

Target IT-3, located 3 kilometres southwest of INCA was selected as the first drill target as it was on a continuation of the INCA ‘magnetic unit’ along a magnetic feature through the previously drilled INCA South Prospect located 1 kilometre southwest of INCA. INCA South was drilled as a reconnaissance target in 2008 as an initial test of the extension of uranium mineralisation based on magnetics, and, as previously reported, vertical diamond drillhole INCD15 intersected 27 metres at 1,471 ppm cU3O8 from 39 metres depth. INCA South has yet to be drilled out in detail.


  • eU3O8 - equivalent uranium grade as determined by downhole gamma logging (as used throughout the report).

Page 7

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

==> picture [483 x 77] intentionally omitted <==

==> picture [483 x 78] intentionally omitted <==

==> picture [483 x 78] intentionally omitted <==

==> picture [483 x 78] intentionally omitted <==

==> picture [483 x 77] intentionally omitted <==

Figure 2: Regional TDR aeromagnetic image showing location of INCA-Type Targets within EPL 3496

Note: The background image to Figure 2 is a Tilt Derivative (TDR) processed image which shows the horizontal width of the magnetic zone as well as its intensity using the usual convention of white-red as high to dark blue-purple as low.

ONGOLO ALASKITE PROJECT

A change of analytical procedure for drill samples has resulted in a significant, positive grade correction for the alaskite-hosted uranium mineralisation (ASX 13 December 2010).

Re-analysis of previously announced sample intervals from Ongolo have resulted in an increase of uranium grade by an average of approximately 30% from 453 ppm U3O8 on a weighted average basis to 587 ppm using alternative fusion-XRF analytical procedure.

Chemical assays reported in the 29 April 2010 ASX announcement on the discovery of alaskite-hosted uranium mineralisation, and in subsequent announcements on 23 August and 9 September 2010, were obtained using X-ray florescence (XRF) analysis of powder samples (powder-XRF). These samples were re-assayed using XRF analysis of ‘fused’ samples (fusion-XRF), and resulted in an average increase in uranium grade of approximately 30%. As shown in Table 4, the weighted average grade increased from 453 ppm U3O8 with powder-XRF assays to 587 ppm U3O8 with fusion-XRF assays.

Page 8

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

The change in analytical procedure for the Ongolo Alaskite project samples stemmed from observed differences between powder-XRF assays and downhole gamma logging results (eU3O8); confirmation from ANSTO that the eU3O8 was not erroneous due to disequilibrium of uranium and its daughters; and confirmation from ANSTO and Mintek that using alternative analytical procedures resulted in higher uranium grades than reported by RUN using powder-XRF.

==> picture [483 x 31] intentionally omitted <==

==> picture [483 x 31] intentionally omitted <==

==> picture [483 x 31] intentionally omitted <==

==> picture [483 x 31] intentionally omitted <==

==> picture [483 x 32] intentionally omitted <==

==> picture [483 x 31] intentionally omitted <==

==> picture [483 x 31] intentionally omitted <==

==> picture [483 x 31] intentionally omitted <==

==> picture [483 x 31] intentionally omitted <==

==> picture [483 x 31] intentionally omitted <==

==> picture [483 x 31] intentionally omitted <==

==> picture [483 x 31] intentionally omitted <==

RC Drilling Rigs at the Ongolo Alaskite Project – January 2011

Assays from the fusion-XRF analytical procedure serve to further substantiate the significance of the discovery of alaskite-hosted uranium mineralisation at Ongolo by significantly increasing the uranium grade. The fusion-XRF procedure will be used for chemical analyses of all samples of alaskite-hosted uranium mineralisation going forward.

Five RC rigs and one diamond rig are currently drilling at Ongolo on nominal 80 x 50 metre grid in order to provide an initial JORC Code mineral resource estimate by end March. Approximately 1 kilometre of the 2 kilometre strike mineralised zone has been drilled out to date (Figure 3).

Page 9

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

==> picture [483 x 575] intentionally omitted <==

Figure 3: Ongolo Project Drilling Status

Page 10

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

Table 4: Comparison of Results Between Powder-XRF and Fusion-XRF Chemical Assays

Table 4: Comparison of Results Between Powder-XRF and Fusion-XRF Chemical Assays Table 4: Comparison of Results Between Powder-XRF and Fusion-XRF Chemical Assays Table 4: Comparison of Results Between Powder-XRF and Fusion-XRF Chemical Assays Table 4: Comparison of Results Between Powder-XRF and Fusion-XRF Chemical Assays Table 4: Comparison of Results Between Powder-XRF and Fusion-XRF Chemical Assays Table 4: Comparison of Results Between Powder-XRF and Fusion-XRF Chemical Assays Table 4: Comparison of Results Between Powder-XRF and Fusion-XRF Chemical Assays Table 4: Comparison of Results Between Powder-XRF and Fusion-XRF Chemical Assays Table 4: Comparison of Results Between Powder-XRF and Fusion-XRF Chemical Assays
Original
Powder
XRF
Re-assay
Fusion XRF
Hole mE mN Azi TD Dip Depth (m) Interval
(m)
U3O8
(ppm)
GTM U3O8 (ppm) GTM Grade
Increase
From To
ALAR13 499490 7482690 315 223 -60 128 217 89 400 35,600 503 44,767 25.8%
including 182 193 11 710 7,810 983 10,813 38.5%
and 199 215 16 600 9,600 751 12,016 25.2%
ALAR16 499350 7482850 315 191 -60 147 158 11 399 4,389 510 5,610 27.8%
ALAR46 499430 7482756 0 302 -90 246 254 8 405 3,240 555 4,440 37.0%
ALAR47 499354 7482854 135 300 -60 192 206 14 395 5,530 522 7,308 32.2%
and 250 260 10 414 4,140 506 5,060 22.2%
ALAR48 499453 7482753 135 213 -60 44 46 2 557 1,114 801 1,602 43.8%
and 74 84 10 460 4,600 587 5,870 27.6%
ALAR62 498951 7482649 135 261 -60 62 69 7 394 2,758 443 3,101 12.4%
and 110 125 15 449 6,735 521 7,815 16.0%
and 138 167 29 422 12,238 511 14,819 21.1%
ALAR63 498867 7482718 135 261 -60 198 208 10 411 4,110 552 5,520 34.3%
ALAR64 498800 7482800 135 251 -60 179 192 13 412 5,356 515 6,695 25.0%
and 199 206 7 402 2,814 467 3,269 16.2%
ALAR107 499693 7480696 135 245 -60 96 100 4 459 1,836 799 3,196 74.1%
ALAR125 498050 7482350 135 226 -60 68 84 16 655 10,480 964 15,424 47.2%
including 73 81 8 1,029 8,232 1,536 12,288 49.3%
ALAR126 497975 7482425 135 261 -60 137 149 12 615 7,380 915 10,980 48.8%
and 497975 7482425 135 261 -60 171 198 27 513 13,851 692 18,684 34.9%
Weighted averages
17
453
7,543
587
9,788
29.8%

Notes: TD is total depth of hole; cU3O8 is chemical assay U3O8; GTM is grade thickness metre and is calculated by multiplying the interval (m) x cU3O8 (ppm). RUN considers approximately 400 ppm U3O8 is required to be deemed significant for hardrock hosted uranium given current market conditions. Therefore lesser values are not reported at this time.

Page 11

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

TUBAS-TUMAS PALAEOCHANNEL

Follow-up infill drilling at Tumas Zone 3 (ASX 13 December 2010) of the Tubas-Tumas palaeochannel identified high-grade uranium mineralisation in the basement rocks beneath the palaeochannel; mineralised Red Sand adjacent to the channel similar to the Tubas Red Sand (TRS) deposit material, as well as additional high-grade mineralisation within the palaeochannel as follows:

Basement Hosted Mineralisation: In November 2010 RUN conducted follow-up infill drilling at the Oryx Prospect within the Tumas Zone 3 area of the Tubas-Tumas palaeochannel to investigate reverse circulation (RC) drilling results indicating the potential for basement mineralisation below a relatively high-grade section of the palaeochannel on RUN’s EPL 3496.

The investigation confirmed that drillhole ORXR1 intercepted high-grade secondary uranium mineralisation hosted in granitic basement below the palaeochannel with a mineralised intercept of:

  • 47 metres at 830 ppm U3O8 from 29 metres.

Three scissor holes drilled on the ORXR1 section (Figure 4) suggests the mineralisation in ORXR1 may be limited in extent in the immediate area, but provides evidence for and may provide a model for new basement hosted targets.

A 60º angle hole ORXR3 also returned basement intercepts with mineralisation being carnotite in both holes. Intercepts are listed in Table 5 and a drill section is given in Figure 4.

Table 5: RC Drill Intercepts Oryx Prospect Area – XRF Chemical Assays

Hole WGS84 Zone 33 WGS84 Zone 33 Azi TD Dip Depth (m) Depth (m) Interval
(m)
U3O8
(ppm)
GTM Host Type
mE mN From To
ORXR1 511579 7462705 0 77 -90 29 76 47 830 39,010 Basement
ORXR3 511615 7462699 270 100 -60 30 34 4 405 1,620 Basement
43 48 5 412 2,060 Basement
53 58 5 420 2,100 Basement
ORXR4 511642 7462690 270 120 -60 7 15 8 614 4,912 Channel
ORXR5 511613 7462650 270 97 -60 4 16 12 269 3,228 Channel
ORXR6 511604 7462657 0 28 -90 5 16 11 1,097 12,067 Channel
ORXR7 511552 7462658 0 28 -90 3 10 7 782 5,474 Channel
19 24 5 332 1,660 Channel
ORXR8 511502 7462659 0 34 -90 6 17 11 355 3,905 Channel
ORXR9 511457 7462659 0 43 -90 22 26 4 377 1,508 Channel
ORXR12 511402 7462604 0 28 -90 11 14 3 1,808 5,424 Channel
ORXR22 511349 7462550 0 25 -90 13 18 5 454 2,270 Channel
ORXR23 511304 7462555 0 31 -90 4 6 2 1,816 3,632 Channel
ORXR33 511100 7462648 0 25 -90 6 8 2 223 446 Channel
ORXR37 511256 7462447 0 19 -90 5 13 8 516 4,128 Red Sand

Note: TD is total depth of hole; U3O8 is a XRF chemical assay; GTM is grade thickness metre and is calculated by multiplying the interval (m) x U3O8 (ppm).

Page 12

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

==> picture [401 x 64] intentionally omitted <==

==> picture [401 x 63] intentionally omitted <==

==> picture [401 x 64] intentionally omitted <==

==> picture [401 x 64] intentionally omitted <==

==> picture [401 x 64] intentionally omitted <==

==> picture [401 x 63] intentionally omitted <==

==> picture [401 x 64] intentionally omitted <==

==> picture [401 x 64] intentionally omitted <==

==> picture [401 x 63] intentionally omitted <==

Figure 4: West to East Drill Section 7462700mN through plane of RC Hole ORXR1

Figure 4 is an interpreted drill section through holes ORXR1 and ORXR3 showing basement-hosted secondary uranium mineralisation (carnotite) located at a granite – biotite gneiss contact as well as secondary carnotite mineralisation in overlying channel sediments (ORXR4).

The basement mineralisation appears to be associated with the contact zone between granite and gneiss (metasedimentary rocks). Microscopic studies show that the granite is a pegmatitic-leucogranite phase (alaskite). Mineralisation is secondary carnotite. Diamond drilling will be carried out in 2011 to determine the potential of this contact zone.

Page 13

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

==> picture [503 x 409] intentionally omitted <==

Figure 5: Infill RC Drilling - Tumas Zone 3 area in the Tubas-Tumas Palaeochannel

Red Sand Mineralisation: Reverse Circulation infill drilling around ORXR1 also identified aeolian Red Sand hosted mineralisation with drillhole ORXR37 intercepting:

  • 8 metres at 516 ppm U3O8 from 5 metres

Figure 5 above shows the position of ORXR37 (circled) and the yellow lines outline the deeper palaeochannel position.

As can be seen from the photograph in Figure 6, mineralised aeolian red sand from ORXR37 has very similar characteristics to the Tubas Red Sand (TRS) deposit which is part of the Omahola Project located 20 kilometres to the west. The TRS deposit contains 13.9 million tonnes at 160 ppm U3O8 for 2,217 tonnes (4.9 million pounds) contained U3O8. This new discovery, on the flank of the palaeochannel, is consistent with mineralisation at the TRS deposit and further confirms the possible extent of this unique style of uranium mineralisation over 10’s of kilometre of the main Tubas-Tumas palaeochannel system.

The red sand sample from 9 to 10 metres depth in ORXR37 assayed 249 ppm U3O8 and the TRS sample from 4 to 6 metres depth assayed 327 ppm U3O8.

Page 14

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

==> picture [431 x 41] intentionally omitted <==

==> picture [431 x 41] intentionally omitted <==

==> picture [431 x 41] intentionally omitted <==

==> picture [431 x 41] intentionally omitted <==

==> picture [431 x 41] intentionally omitted <==

==> picture [431 x 41] intentionally omitted <==

Figure 6: Comparison of Oryx Red Sand with the Tubas Red Sand (TRS) Material

Palaeochannel Mineralisation: Infill drilling on a 50 metre grid to the original reconnaissance drilling has outlined further high-grade palaeochannel mineralisation with an intercepts of:

  • 8 metres at 614 ppm U3O8 from 7 metres

  • 11 metres at 1,097 ppm U3O8 from 5 metres

  • 7 metres at 782 ppm U3O8 from 3 metres

The November infill holes are labelled ‘ORYX’ in Figure 5. The earlier reconnaissance holes are unlabelled. Significant mineralised intercepts are given in Table 5. The palaeochannel mineralisation remains open upstream (east).

Only 49 holes were completed in the restricted campaign and the various styles of mineralisation (palaeochannel, aeolian and primary) remain open in most directions (Figure 5) and will be subjected to further evaluation by drilling in 2011.

SHIYELA IRON PROJECT

Drilling continued through the Quarter at Shiyela with an additional 69 RC holes and 1 DC hole for 11,052 metres in an effort to expand the magnetite mineralisation in both the M62 and M63 deposits and to correlate that footprint with the geophysical magnetic signature for future evaluation of the greater anomalous area.

Drilling results at the M63 deposit indicates a potential mineralised interval average of 40 metres through a medium to high grade magnetite mineral zone while the M62 deposit shows a 20 metre average interval of similar grade. The width across strike varies to 500 metres and strike length drilled is 400 to 700 metres.

Geophysical signatures show a possible connection between the M63 NW deposit and the M62 SE deposit and could warrant further investigation (see Figure 7).

At both deposits the main ore body consists of a mixture of coarse grained magnetite-quartz rock and fine grain quartz-biotite gneiss with smaller low grade ore bodies of fine grained magnetic granitized gneiss.

Page 15

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

Three bulk samples (50 kilogram each) of whole HQ diamond core from holes SHID2, SHID3 (M62) and SHID4 (M63) were shipped to Promet in Perth (Australia) for physical and metallurgical testwork at Ammtec and chemical assays at ALS. This included optimum grind size tests to determine the percentage of magnetite recovery and iron grade.

Results from analyses and testing of these samples are imminent and will be used by Promet for an initial Scoping Study of the deposits.

Additional representative samples from the Diamond Core were used by RUN and were assayed for total iron content and density tests. Initial data shows a good correlation between RUN’s laboratory total iron by loose powder XRF analysis and head-grade iron external assay results by ALS.

Table 6: Showing Correlation of Total Iron Oxide Assays

MATERIAL RUN ALS
Fe2O3 (%)
Fine Grain 21.81 22.24
Coarse Grain 31.69 40.80
Hematite 23.08 27.94

A total of 470 RC and Diamond hole one metre samples have been assayed for total iron content by the RUN Laboratory to date and this ongoing programme will ultimately assay all the mineralised zones with external laboratory checks and Davis Tube Recovery determinations.

==> picture [409 x 326] intentionally omitted <==

Figure 7: Shiyela Iron Project – Drill Status M62 and M63 Prospects

  • Note: The background image to Figure 7 is a Tilt Derivative (TDR) processed image which shows the horizontal width of the magnetic zone as well as its intensity using the usual convention of whitered as high to dark blue-purple as low.

Page 16

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

Scientific Services (Cape Town) laboratories are conducting density determinations by gas pycnometry on RC drill material to augment RUN’s density determinations on the diamond core.

All this analytical work is to enable RUN to provide quality data to Golders to produce an JORC Code Mineral Resource estimate.

RUN commenced its formal environmental baseline studies in mid-2009 and presented the project to the MET (in the company of the MME) late 2009. Subsequently RUN’s consultants published the EIA scoping study at a public forum in Windhoek and Swakopmund early November 2010. Pending positive scoping and feasibility studies RUN plans to submit its application for a Mining Licence during 2011 with a planned production profile of two million tonne of high-grade magnetite product (~70% iron) per year.

Drilling will continue during the first quarter of 2011 with the planned closing-off at the M63 deposit with 2 RC rigs for approximately 6 weeks. Drilling at the M62 deposit has been completed for the initial resource estimate. Mineralisation is however open along strike in both directions and to depth.

A cross-section through M62 (Figure 8) and M63 (Figure 9) show a typical high-grade magnetite layer (+ 50%) extending to approximately 200 metres vertical depth at each prospect.

Two completed diamond holes will be sampled to supply a continuous sample through each deposit for additional test work.

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 20] intentionally omitted <==

Figure 8: Map showing a West to East cross-section of line 7464980mNE at M62

Page 17

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 22] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

==> picture [483 x 21] intentionally omitted <==

Figure 9: Map showing a South to North cross-section of line 484000mE at M63

RUN GENERAL DRILLING SUMMARY

RUN continues its aggressive exploration drilling programme in Namibia and has continued to operate on average eight rigs across its various exploration project areas. As shown in Table 7 RUN has completed a total of 337 holes during the Quarter for 39,195 metres.

Table 7: Drilling Statistics

Drilling Summary
Project Number of Holes Total Metre Drilled
INCA RC 28 5,902
INCA DD 1 146
Ongolo Alaskite RC 91 19,548
Ongolo Alaskite DD 1 140
Oryx 48 1,556
S-Bend East 97 730
Shiyela RC 69 10,851
Shiyela DD 1 201
Gawib West 1 121
Total 337 39,195

Page 18

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

RUN has also continued to successfully conduct in-house sample preparation and uranium analysis and turned out more than 3,113 analytical results during the quarter (Table 8).

Table 8: Laboratory Performance Indicators

Job Description October November December TOTAL
Samples Received (total metre drilled for
October to December 2010)
12,389 15,256 10,583 38,228
Samples Crushed 19 11 58 88
Samples Split 0 32 0 32
Samples Checked in Pb-Block 13,899 16,237 10,955 41,091
Samples > 15 CPS 988 1,205 1,226 3,419
Samples Weighed 1,608 2,683 2,087 6,378
Samples packed & stored 13,903 16,237 10,955 41,095
Samples Milled 1,663 2,761 2,152 6,576
Samples Analysed (Repeats, QC’s & Daily
checks included)
2,048 2,555 974 5,577
Sample results reported for July to
September 2010
1,573 1,244 296 3,113

Page 19

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

EXPLORATION - AUSTRALIA

Mount Isa District

Exploration programmes for the Quarter comprised:

Ewen EPM 14916

  • RC drilling at the Conquest, Athena and Falcon Prospects

  • Diamond drilling at Slance Prospect

  • Receipt of chemical assay results

Isa West Project

  • RC drilling programmes at Mistletoe Flat, Horse Shoe, The Granites, Flat Tyre North and Eldorado South

  • Receipt of chemical assay results

==> picture [483 x 358] intentionally omitted <==

Figure 10: Mount Isa District Tenement Plan

Page 20

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

Table 9: Summary of Isa District RC drilling for the December Quarter 2010

Prospect No of Holes Metres Drilled Samples Taken
Conquest 2 390 26
Athena 6 456 44
Falcon 5 360 84
Isa West 19 1678 367
Total
32
2884 521

Table 10: Summary of Isa District diamond drilling for the December Quarter 2010

Prospect No of Holes No of Holes Metres Drilled Metres Drilled Samples Taken
Slance 5 894.7 210
Table 11: Summary of Isa District RC drilling for six months to December 2010
Project Name No. of Holes Total Meters
Isa West 19 1,678
Queens Gift 4 750
Ewen 54 4,806
Total 77 7,234

Table 12: Summary of Isa District diamond drilling for six months to December 2010

Project Name No. of Holes Precollar (RC)
Meters Drilled
Diamond Core
Meters Drilled
Total Meters
Isa West 2 252 709.3 961.3
Queens Gift 3 480 1,024.02 1,504.02
Ewen 6 903 546.9 1,449.9
Total 11 1635 2,280.22 3,915.22

ISA NORTH PROJECT

Ewen EPM 14916 Slance Prospect

During the Quarter a diamond drilling programme was completed at the Slance Prospect. In total five diamond tails were drilled, extending RC holes drilled during the previous Quarter.

All core was cut, sampled and sent to Amdel for chemical assay. Results are indicated in the Table 13. Note SLRC054 is a water bore hole (RC drilling) aimed to provide a source of water for potential additional diamond drilling.

Best intercepts include:

SLDC048 18 metres at 1,751 ppm U3O8 from 142 metres Incl 8 metres at 2,394 ppm U3O8 from 152 metres SLDC052 10 metres at 448 ppm U3O8 from 248 metres

SLDC053 10 metres at 412 ppm U3O8 from 79 metres and 43 metres at 268 ppm U3O8from 102 metres and 3 metres at 1,112 ppm U3O8 from 193 metres

Page 21

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

Table 13: Slance Prospect 2010 Intercept Table – Diamond Drilling

Drillhole MGA Zone 54 Azi Dip TD (m) Depth(m) Depth(m) Interval
(m)
U3O8
(ppm)
mE mN From To
SLDC048 352147.1 7798324 90 -75 264.8 97 98 1 310
127 131 4 950
134 135 1 555
142 160 18 1,751
incl. 152 160 8 2,394
224 227 3 1,485
SLDC049 352325 7798385 260 -68 371.8 300 301 1 590
311 319 8 387
323 324 1 450
SLDC050 352406 7798340 262 -66 475.5 245 246 1 285
SLDC051 352419 7797967 88 -65 324.8 15 16 1 380
24 30 6 279
137 138 1 625
207 208 1 415
214 215 1 405
223 234 1 480
289 290 1 440
SLDC052 352398 7797917 90 -63 306.8 67 68 1 470
74 76 2 320
83 84 1 355
91 92 1 255
238 258 20 287
incl 248 251 3 943
248 258 10 448
SLDC053 352198 7798298 5 -60 240.8 27 30 3 412
45 48 3 440
68 69 1 295
72 73 1 350
79 89 10 432
incl. 80 81 1 840
and 87 89 2 1,188
102 145 43 268
incl. 102 108 6 675
and 120 122 2 775
and 126 127 1 600
and 136 145 9 337
193 196 3 1,112
SLRC054 352205 7798320 360 -90 42 36 38 2 342

All intercepts are chemical XRF assays.

Page 22

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

==> picture [358 x 206] intentionally omitted <==

==> picture [356 x 146] intentionally omitted <==

Slance NW Prospect –High grade uranium mineralisation in SLDC048 showing typical hematite alteration of sheared host rock (basalt) and later carbonate-quartz brecciation (in core tray)

==> picture [246 x 242] intentionally omitted <==

==> picture [246 x 241] intentionally omitted <==

Figure 11: Airborne radiometric image with intense (white) uranium anomalies striking N-S. Right hand image 1VD magnetic showing NNW regional trend cut by later NS structures which host uranium mineralisation

Page 23

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

RC drilling at Conquest, Athena and Falcon

During the reporting period RC drilling programme was completed on the Ewen Tenement. In total thirteen holes for 1,206 metres was completed. . Results are indicated in the Table 15 below.

Table 14: Ewen RC Drilling Summary, December Quarter 2010

Prospect No of Holes Metres Drilled Samples Taken
Conquest 2 390 26
Athena 6 456 44
Falcon 5 360 84
Total 13 1,206 154

Table 15: Ewen RC Drilling Intercept Table December Quarter 2010

Prospect Drillhole MGA Zone 54 MGA Zone 54 Azi Dip TD
(m)
Depth(m) Depth(m) Interval
(m)
U3O8
(ppm)
mE mN From To
Athena ATRC002 346201 7800122 270 -60 72 44 46 2 285
Athena ATRC003 346220 7800139 270 -60 102 82 83 1 185
Athena ATRC006 346054 7801372 260 -60 54 29 30 1 150
Conquest CQRC025 348591 7783611 90 -60 84 40 41 1 200
Conquest CQRC026 348679 7783519 270 -60 168 152 153 1 525
Conquest CQRC028 348666 7783490 270 -60 210 153 158 5 638
175 180 5 309
Falcon FCRC001 348539 7799093 270 -60 60 18 21 3 323
25 26 1 245
Falcon FCRC002 348501 7798647 90 -60 54 11 12 1 205
Falcon FCRC003 348505 7798626 90 -60 54 11 12 1 215
Falcon FCRC004 348564 7799095 270 -60 120 82 83 1 295
incl. 89 90 1 205
Falcon FCRC005 348531 7799644 90 -60 72 17 18 1 715
47 48 1 330

All intercepts are chemical XRF assays

ISA WEST PROJECT

During the Quarter a scout drilling programme covered six prospects and was designed to test discreet surface radiometric anomalies that may have shoot development at depth. Nineteen holes for 1,678 metres were drilled and 358 samples submitted for chemical assay.

Table 16 : Prospect Drilling Summary

Prospect Name No. of Holes Metres Drilled No. Of Samples Taken
Mistletoe Flat 8 838 273
Eldorado South 3 180 21
Eldorado North 1 180 13
Horseshoe 4 300 31
The Granites 1 60 0
Flat Tyre South 2 120 20
Total 19 1,678 358

Page 24

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

Chemical assay results received during the Quarter are given in Table 17.

Table 17: Isa West December Quarter Scout Drilling Intercept Table

Drillhole MGA Zone 54 MGA Zone 54 Azi Dip TD (m) Depth(m) Depth(m) Interval
(m)
U3O8
(ppm)
mE mN From To
MFRC001 337527 7707376 90 -60 108 26 31 5 467
59 61 2 233
69 70 1 330
75 76 1 280
MFRC002 337526 7707436 90 -60 120 49 57 8 213
88 89 1 220
94 96 2 225
MFRC003 337524 7707399 90 -60 120 25 36 11 201
inc 31 33 2 545
46 51 5 177
MFRC004 337532 7707320 90 -60 90 NSA
MFRC005 337550 7707469 90 -60 120 44 45 1 220
64 65 1 350
82 83 1 240
MFRC006 337621 7707559 90 -60 120 9 18 9 273
inc 9 13 4 427
MFRC007 337624 7707652 90 -60 52 30 31 1 275
MFRC008 337625 7707701 90 -60 108 43 45 2 380
49 50 1 220
71 72 1 300
ESRC001 337637 7709899 80 -60 60 40 41 1 1,650
ESRC002 337633 7707929 80 -60 60 41 42 1 190
ESRC003 337641 7709893 80 -60 60 44 45 1 665
ENRC015 337452 7710541 75 -60 180 123 124 1 280
HSRC001 333908 7715558 120 -60 90 NSA
HSRC002 334050 7715570 70 -60 90 27 29 2
HSRC003 334087 7715451 60 -60 60 NSA
HSRC004 334144 7715415 80 -60 60 NSA
GCRC001 331465 7718845 156 -60 60 NSA
FLRC001 336255 7716355 90 -60 60 15 17 2 1,093
FLRC002 336243 7716289 90 -60 60 10 12 2 205

All intercepts are chemical XRF assays.

JORC Resources

During December, Surtron Ltd were contracted to collect downhole survey data from holes drilled during 2010 on prospects where there is either an existing JORC resource or the potential for a resource to be created. Twenty six holes in three prospect areas, Isa West, Queens Gift and Slance were surveyed.

Coffey Mining will update the Mount Isa JORC Resource in the March Quarter.

Page 25

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

CORPORATE

The Board received a resignation from Mr Tony McDonald effective 31 December 2010. Mr McDonald advised that his other business activities meant he was unable to continue as a Non-Executive Director.

Subsequent to the end of the Quarter the Board also received a resignation from Mr Patrick Mutz for personal and family reasons.

The Board has thanked Tony and Patrick for their contributions and wishes them well in their respective future endeavours.

Subsequent to the end of the Quarter the Board was pleased to secure Mr Greg Cochran’s agreement to join the executive team and the Board as Managing Director with effect from 24 January 2011.

The Board is pleased to welcome Greg to the Deep Yellow team and is looking forward to working with him on the development of our flagship Omahola Project as well as our other prospects in Namibia and Australia.

FINANCIAL

DYL completed the Quarter in a strong cash position, including liquid assets, of $20 million at 31 December 2010.

UNLISTED OPTIONS

Options Lapse

During the Quarter 2,437,500 employee options and 12,500,000 unlisted Director Options recently lapsed in accordance with the terms of the Deep Yellow Limited Directors, Employees and Other Permitted Persons Option Plan.

Options Exercised

The Directors of DYL have resolved to issue 720,000 fully paid ordinary shares in the Company following receipt of valid option exercise notices from employees during the Quarter to acquire shares at 27.5 cents.

For further information regarding this announcement, contact:

==> picture [109 x 93] intentionally omitted <==

Greg Cochran Managing Director

DEEP YELLOW LIMITED Phone: +61 8 9286 6999 Email: [email protected]

Further information relating to the Company and its various exploration projects can be found on the Company’s website at www.deepyellow.com.au.

Page 26

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

Compliance Statements:

The information in this report that relates mineral resource estimation for Tumas and Aussinanis is based on work completed by Mr Jonathon Abbott who is a full time employee of Hellman and Schofield Pty Ltd and a member of the Australasian Institute of Mining and Metallurgy. Mr Abbott has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ and as a Qualified Person as defined in the AIM Rules. Mr Abbott consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the Mineral Resource estimation for the INCA deposit is based on work completed by Mr Neil Inwood who is a full-time employee of Coffey Mining and a Member of the Australasian Institute of Mining and Metallurgy. Mr Inwood has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Inwood consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the Mineral Resource estimation for the INCA deposit is based on information compiled by Mr Steve Le Brun, who is a full-time employee of Coffey Mining and a Member of The Australasian Institute of Mining and Metallurgy. Mr Le Brun has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Mineral Resources and Reserves’. Mr Le Brun consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the Mineral Resource for the Tubas Red Sand deposits is based on information compiled by Mr Mike Hall, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Hall is Consulting Geologist Resources with The MSA Group and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Mineral Resources and Reserves’. Mr Hall consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. Information in this report has also been verified by Mr Mike Venter, who is a member of the South African Council for Natural and Scientific Professions (SACNASP), a “Recognised Overseas Professional Organization” (‘ROPO’). Mr Venter is Regional Consulting Geologist, with The MSA Group and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Mineral Resources and Reserves’. Mr Venter has visited the project sites to review drilling, sampling and other aspects of the work relevant to this report and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates Mineral Resource estimation for the Tubas deposit is based on work completed by Mr Willem H. Kotzé Pr. Sci. Nat MSAIMM. Mr Kotzé who is a full time employee of Hellman and Schofield Pty Ltd and a Member of the Australasian Institute of Mining and Metallurgy. Mr Kotzé has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ and as a Qualified Person as defined in the AIM Rules. Mr Kotzé consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Exploration Results and to Mineral Resources or Ore Reserves for the Tubas, Tumas, Aussinanis, Tubas Red Sand and INCA deposits is based on information compiled by Dr Leon Pretorius a Fellow of The Australasian Institute of Mining and Metallurgy. Dr Pretorius is a full-time employee of Deep Yellow Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Pretorius consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Mineral Resource estimation for the Mount Isa Projects is based on work compiled by Mr Neil Inwood, a Member of the Australasian Institute of Mining and Metallurgy. Mr Inwood is employed by Coffey Mining Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Inwood consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Page 27

11-08

Quarterly Report - 31 December 2010

==> picture [35 x 37] intentionally omitted <==

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves for the Mount Isa Projects is based on information compiled by Mr Martin Kavanagh a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Kavanagh is a full-time employee of Deep Yellow Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Kavanagh consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Mineral Resource estimation for the Napperby Project is based on information compiled by Mr Daniel Guibal who is a Fellow (CP) of the Australasian Institute of Mining and Metallurgy. Mr Guibal is a full time employee of SRK Consulting and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Guibal consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Exploration Results for the Napperby Project is based on information compiled by Dr David Rawlings who is a Member of The Australasian Institute of Mining and Metallurgy. Dr Rawlings is a full-time employee of Toro Energy Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Rawlings consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Disequilibrium Results for the Napperby Project is based on information compiled by Mr David Wilson BSc MSc who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Wilson is a full-time employee of 3D Exploration Limited, a consultant to Toro and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Wilson consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Where eU3O8 is reported it relates to values attained from radiometrically logging boreholes with Auslog equipment using an A675 slimline gamma ray tool. All probes are calibrated either at the Pelindaba Calibration facility in South Africa or at the Adelaide Calibration facility in South Australia.

Deep Yellow Limited (DYL) is an Australian-based predominantly uranium focused Company with extensive operations in the southern African nation of Namibia and in Australia. Listed on ASX and NSX.

DYL’s principal exploration and development activity is in Namibia through its 100% owned subsidiary Reptile Uranium Namibia (Pty) Ltd (RUN) with a focus on the Omahola Project Pre-Feasibility Study with concurrent resource drill-outs on the high grade Ongolo Alaskite basement hosted primary mineralisation and on secondary uranium mineralisation in the Tumas-Tubas palaeochannel/fluviatile sheetwash systems.

JORC Code resources in Namibia total 39,531 tonnes – 87.2 million pounds U3O8.

In Australia the Company is focused on resource delineation of mid to high grade discoveries in the Mount Isa district - Queensland, including the Queens Gift, Conquest, Slance, Eldorado, Thanksgiving, Bambino and Turpentine Prospects. The Company also owns the Napperby Uranium Project and numerous exploration tenements in the Northern Territory.

DYL’s drill programmes in Namibia and Australia are aimed at increasing its JORC Code Mineral Resource inventory which currently totals 44,442 tonnes – 98.0 million pounds of U3O8.

Page 28

11-08

Quarterly Report - 31 December 2010

==> picture [34 x 37] intentionally omitted <==

Appendix 1: Omahola Conceptual Process Plant – Schematic View

==> picture [726 x 394] intentionally omitted <==

Page 29