Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

DEEP YELLOW LIMITED Capital/Financing Update 2016

Oct 11, 2016

64808_rns_2016-10-11_4f876652-f1be-4957-8777-001fa89491ec.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [276 x 56] intentionally omitted <==

ASX Announcement

ASX: DYL

12 October 2016

Tumas Project Resource Update: Increase in Size and Confidence

KEY POINTS

  • An updated Mineral Resource Estimate has been completed for the Tumas Project, resulting in a 12% increase in metal content at the same average grade and cut-off.

  • The Tumas Mineral Resource Estimate is now 16.6 million tonnes at 366 ppm U3O8 for 13.4 million pounds of U3O8 at a cut-off of 200 ppm U3O8.

  • For the first time the Tumas Project (Zones 1 and 2) has resources classified in the Measured Category (62%), 36% Indicated and only 2% in the Inferred Category.

  • For Tumas Zone 3 an exploration target has been confirmed which holds the potential to more than double the total Tumas Project resource.

  • The results from earlier drilling programs and the 2014 infill drilling program, as well as the sophisticated geophysical modelling exercise conducted in 2015 and the recent bulk sample metallurgical testwork were considered in order to deliver these excellent results.

  • The results reinforce DYL’s confidence in proceeding with the next phases of the Project; specifically, a geometallurgical drill program will shortly be commenced.

Advanced stage uranium explorer Deep Yellow Limited (ASX: DYL) is pleased to announce a JORC 2012 compliant Mineral Resource Estimate (“MRE”) for its Tumas Project in Namibia. Apart from a 12% increase in metal content (at the same average grade and cut-off as the previous MRE) the confidence in the resource has been significantly enhanced with 62% now classified in the Measured Resource Category, 36% in Indicated and the remaining 2% in the Inferred Resource Category.

Multiple sources of information were used to derive the MRE, including results from the original drilling program conducted between 2008 and 2010, more recent infill drilling in 2014 and a sophisticated geophysical modelling exercise in 2015. The recent highly successful U-pgrade[TM] metallurgical testwork program conducted on a bulk sample excavated from Tumas also provided complimentary geological data.

Greg Cochran, DYL’s Managing Director, said “This is another step towards the ultimate development of the Tumas Project. This MRE will give us certainty for the critical first few years of production whilst the exploration target demonstrates the longer life potential of the Project.” He added “we are looking forward to completing the geometallurgical drilling program shortly which will further enhance our geological and metallurgical knowledge and commencing a fast PFS. With the recent milestones achieved it is no surprise that Tumas is rapidly becoming recognised as Namibia’s next uranium mine.”

ENDS

Unit 1, Spectrum Building, 100-104 Railway Road, Subiaco, WA 6008 Tel: 61 8 9286 6999 / Fax: 61 8 9286 6969 / ABN 97 006 391 948 Email: [email protected] / Website: www.deepyellow.com.au

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

Tumas Project Mineral Resource Estimate

The MRE is presented in Table 1 below at a range of U3O8 cut-off grades whilst the previous (JORC 2004) MRE is shown in Table 2 for ease of comparison. Primarily, the change in resource size has been driven by an increase in the density assumption which was made possible by the recent work in that area.

The decision was made at this stage to maintain the 200 ppm U3O8 cut-off for the preferred resource however the Company believes that the use of Marenica’s U-pgrade[TM] process at Tumas will likely enable a lower cutoff grade resulting in a larger project resource. Note that the figures in the table are rounded to reflect the precision of estimates and may exhibit rounding errors.

Table 1. Tumas MRE at varying cut-off grades

Cut-off
(ppm U3O8)
Category
Cut-off
(ppm U3O8)
Category
Tonnes
eU3O8
U3O8
U3O8
(M)
(ppm)
(t)
(Mlb)
Tonnes
eU3O8
U3O8
U3O8
(M)
(ppm)
(t)
(Mlb)
Tonnes
eU3O8
U3O8
U3O8
(M)
(ppm)
(t)
(Mlb)
Tonnes
eU3O8
U3O8
U3O8
(M)
(ppm)
(t)
(Mlb)
Measured 200 9.7 386 3,700 8.2
Indicated 200 6.5 336 2,200 4.8
Inferred 200 0.4 351 150 0.3
Total
200
16.6
366
6,050
13.4
Measured 150 16 302 4,800 10.7
Indicated 150 10.8 272 2,900 6.5
Inferred 150 0.6 280 200 0.4
Total
150
27.4
289
7,900
17.5
Measured 100 29.7 219 6,500 14.3
Indicated 100 18 212 3,800 8.4
Inferred 100 1.1 208 250 0.5
Total
100
48.9
216
10,550
23.3

Notes: Figures have been rounded and totals may reflect small rounding errors. eU3O8 - equivalent uranium grade as determined by downhole gamma logging. Gamma probes were calibrated at Pelindaba, South Africa in 2007 and sensitivity checks were conducted by periodic re-logging of a test hole to confirm operation between 2008 and 2013. During drilling, probes were checked daily against a standard source.

Auslog probes were re-calibrated at the calibration pit located at Langer Heinrich Minesite in 2014 and 2015.

Table 2. Previous JORC 2004 Tumas MRE at preferred cut-off grade

Cut-off
Tonnes
eU3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Category
Cut-off
Tonnes
eU3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Category
Cut-off
Tonnes
eU3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Category
Cut-off
Tonnes
eU3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Category
Cut-off
Tonnes
eU3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Category
Cut-off
Tonnes
eU3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Category
Indicated 200 14.4 366 5,300 11.6
Inferred 200 0.4 360 100 0.3
Total
200
14.8
365
5,400
11.9

Page 2

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

Background Information on the Tumas Mineral Resource Estimate

The Tumas palaeochannel straddles DYL’s two wholly owned exclusive prospecting licences (“EPLs”) 3496 and 3497 and is divided into three zones (See Figures 1 and 2). Zones 1 and 2 contain the new mineral resource whilst Zone 3 contains the exploration target. Prior to committing to the Marenica testwork the Company conducted a comprehensive review of the geological potential of Tumas in 2014 and 2015 and concluded that the palaeochannel had extensive upside potential.

During that period an infill drilling program (See Figure 3) was completed within Zone 1 and a sophisticated geophysical modelling exercise covering both EPLs was completed which provided confidence in the Tumas deposit and its extended palaeochannel. (See ASX release dated 16 July 2015 titled “Enhanced Palaeochannel Prospectivity” for more information.)

Also, bulk samples were excavated from the infill drilling area in December 2015 and January 2016 and sent to Perth to conduct the first phase of U-pgrade[TM] metallurgical testwork. This was successfully completed at the end of June 2016.

Tumas mineralisation occurs as secondary carnotite enrichment of variably calcretised palaeochannel and sheetwash sediments and adjacent weathered bedrock.

Summary of Recent Work Contributing to the MRE

Infill Drill Program

The 90-hole close-spaced infill program completed in December 2014 (at 12.5m x 12.5m centres for approximately 1,450m in total) confirmed a continuously mineralised north-south front over 160 metres and 50 metres wide (east-west) which was entirely consistent with previous drilling results. This was highly encouraging as the previous resource model was based on the results of earlier drill programs that typically had wider spacing. In the 2014 program the grades obtained by downhole gamma logging and validated by ICP-MS assay were a good match in tenor with the historical results and the previous mineral resource model.

Mineralisation within the infill drill area was found to be confined to the channel sediments only and not in the bedrock which will make mining simpler and improves the prospects for successful beneficiation. Only limited amounts of internal dilution were found to be present which further enhances the level of confidence one can expect in regard to beneficiation.

The topography of the base of the palaeochannel was confirmed to be gently undulating and appears to have no influence on the ‘blanket’ mineralisation and not to be a significant influence on the uranium grade, thickness or mineralisation. The saucer-like geometry of some of the channel margins indicates that mineralisation may be present even in areas with as little as 2 metres of channel fill. This can in future be delineated by detailed mapping of the channel margins.

At the same time as the infill drill program an internal study predicted the calcrete-hosted tonnes of uranium per lineal kilometre that might be present along the Tumas drainage channel. For this prediction certain assumptions pertaining to the consistency of the grade and thickness of the mineralisation within the channels had to be made via interpolation from historical more widely spaced drilling. The evidence from the drilling supported these assumptions, albeit over a limited area and allowed DYL to predict a range of between 1.8 and 3Mlbs U3O8 per kilometre.

The study assisted with the confirmation of the exploration target for Zone 3 even when the figures are discounted by up to 50% to build in some conservatism in recognition of the relatively low level of definition across that part of the palaeochannel system.

Page 3

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

==> picture [382 x 389] intentionally omitted <==

Figure 1: Namibian Locality Map Showing Position of the Tumas Project

==> picture [430 x 293] intentionally omitted <==

Figure 2: Tumas Project Resource Outlines for Zones 1 and 2 and Exploration Target Zone 3

Page 4

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

Importantly, the infill drilling program also allowed a reassessment of density in the palaeochannel which seemed to have been underreported in previous work. Probing during the infill drilling program confirmed this suspicion as density measurements encountered were in ranges varying from 1.81 for loose, sandy gypcrete to 2.64 – 2.71 for massive calcrete. With the bulk of the measurements between 2.26 – 2.41 an average density of 2.35 was adopted for this MRE compared to the previous average of 2.1.

==> picture [438 x 246] intentionally omitted <==

Figure 3: Tumas Project Infill Drilling Campaign, December 2014

Resource Potentials Geophysical Interpretation

In 2008 an extensive AeroTEM helicopter electromagnetic (“HEM”) survey (Figure 4) was flown for DYL by Aeroquest Ltd of Canada covering EPLs 3496 and 3497. A total of 4,107 survey line kilometres were flown at a relatively broad 500m line spacing.

The HEM survey area was known to be prospective for uranium mineralisation located in near-surface palaeochannels which may be expected to have a positive conductivity contrast with underlying fresh basement bedrock. Palaeochannel conductivity varies based on a number of factors including clay type and content, porosity, permeability and most importantly the salinity of the ground water. A saline palaeochannel would be expected to be much more conductive and produce a stronger electromagnetic signal compared to one containing fresh water.

Resource Potentials was commissioned in 2015 to convert the AeroTEM EM time channel data to conductivitydepth values and then run an auto-picking processing routine on the conductivity-depth data to determine the thickness of conductive cover above fresh bedrock “basement”, and produce a set of georeferenced data products.

Selected AeroTEM survey flight lines were initially processed using the industry standard conductivity-depth imaging (“CDI”) software EMFlow but did not produce reliable results. An alternative software code, Layered Earth Inversion (“LEI”) recently released by Geoscience Australia was trialled and proved to be much more robust. The complete AeroTEM dataset was then processed using the LEI program to generate conductivitydepth values for all flight lines.

The auto depth-picking routine process was then run on the LEI data along each flight line to calculate the thickness of conductive cover, as represented by the conductivity variation in the LEI sections. A suite of georeferenced images was created, together with a range of data products encapsulating the LEI and auto depth-picking results; such as grid surfaces and images of the fresh rock depth, conductivity depth slices and other processed EM data. LEI conductivity sections and EM decay multiplots were produced for each AeroTEM survey flight line to display the final depth of conductive cover thickness along each survey line.

Page 5

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

==> picture [407 x 412] intentionally omitted <==

Figure 4: Flight lines of the 2008 AeroTEM HEM Survey

Depth to fresh bedrock from drilling was also gridded and imaged for selected prospect areas, and compared to the LEI results. The calculated conductive cover thickness results were compared to drilling data supplied by DYL over the known palaeochannels hosting uranium mineralisation. In general, the calculated conductive cover thickness broadly agreed with the palaeochannel thickness determined from drilling (Figure 5). It should be noted that gridded images and resulting contours of the calculated conductive cover thickness model may only broadly represent the palaeochannels, because of the very broad 500m flight line spacing for this survey; i.e. modelling of the palaeochannels is limited by the survey flight line orientational resolution.

The drillholes shown in Figure 5 appear slightly vertically offset because the “envelope” of displayed drillholes is 50 m each side of the survey line. Therefore, their collar elevations are likely to be slightly different to the survey line elevation given the slope of the ground on either side of the profile and the 3D geometry of meandering palaeochannels. Despite this, the logged bedrock lithologies generally reflect the same shape of the LEI auto-picked depth-to-basement well. Furthermore, the HEM results identified new zones of palaeochannel deposits that have not been drill tested and will form the basis for future direct drill targeting.

Page 6

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

==> picture [435 x 250] intentionally omitted <==

Figure 5: LEI-section showing the good correlation between bedrock depth from drilling and the depth-to-bedrock from the auto-picking routine

The palaeochannel depth map in this area can now be used to interpret uranium potential of undrilled areas and help to plan focussed drilling on new targets; despite the wide 500m survey line spacing. The most encouraging result of this interpretation is the confirmation of the lateral extent and potential depth of the palaeochannel system across the two EPLs. The palaeochannel system was independently confirmed to be well over 100 kilometres in extent and in places reaches depths of 130 metres.

Marenica U-pgrade[TM] Metallurgical Testwork Program

The U-pgrade[TM] metallurgical testwork program was successfully completed at the end of June 2016 (see DYL ASX releases dated 20 May, 31 May and 1 July 2016). The success of the program gave DYL the confidence to progress with the next phases of the Tumas Project and to execute a Technology Licencing Agreement with Marenica Energy Limited for the right to use its proprietary beneficiation process.

The testwork was conducted on a bulk sample that was excavated from the Tumas deposit late in 2015 and early 2016 (Figures 6 and 7). Apart from enabling the bulk sample to be excavated the trench also used for a detailed channel sampling exercise which allowed DYL to compare channel sample grades to those of the infill drilling program.

The grades compared favourably and are shown in Figure 8 below. Of particular interest was an improved understanding of the higher grades that were contained in the higher sulphate containing gypcrete layer compared to the underlying calcrete mineralisation. Particle size distribution tests were also conducted for metallurgical testwork purposes.

The U-pgrade[TM] metallurgical testwork program showed that more than 95% of the carbonate minerals in the Tumas bulk sample could be removed with a loss of less than 5% of the uranium whilst the de-sliming step rejected ~27% of the mass as fine particulate material. These results demonstrated that the critical carbonate and de-slime removal steps of the U-pgrade[TM] process work on the bulk samples provided and that it was effective in treating both a low and a medium sulphate sample. As a result DYL and Marenica concluded that the application of the U-pgrade[TM] process would enable a significant reduction in the mass being handled with only a minor loss of uranium, allowing the upgrading of uranium into a low mass concentrate at the Tumas Project.

Page 7

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

==> picture [241 x 321] intentionally omitted <==

Figure 6. Tumas Excavation December 2015

==> picture [240 x 320] intentionally omitted <==

Figure 7. Tumas Trench January 2016

In summary the results indicated that a concentrate containing less than 3% of the ore feed mass grading between 10,000 and 15,000 ppm U3O8 and containing greater than 82% of the uranium could be generated from the Tumas bulk samples by the U-pgradeTM process.

==> picture [423 x 238] intentionally omitted <==

Figure 8: Image of the Tumas Trench showing channel sampling results.

Page 8

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

Summary of 2008-2010 Drilling Campaigns

Tumas Zones 1 and 2

Zones 1 and 2 were drill-tested in the period 2008 to 2010 with a total of 4,555 reverse circulation (RC) holes being drilled by DYL’s wholly owned Namibian operating subsidiary Reptile Uranium Namibia Pty Ltd (“RUN”) for a total of 85,092 metres of drilling (Table 3).

The generally east-west striking Zone 1 mineralisation was drilled on a consistent, staggered 50 x 50 metre pattern giving a spacing along strike of approximately 100 metres between drill holes. The north-south trending Zone 2 mineralisation was sampled on a 50 x 50 metre square grid with some infilling to a 25 x 50 metre pattern generally along the margins of the mineralised zones.

The mineralisation domains used for the current study were interpreted to capture continuous zones of mineralisation above 50 ppm U3O8. The mineralisation contained in Zones 1 and 2 included in this MRE has a combined strike length of approximately 16 kilometres with an average width of around 400 metres and extends to a maximum depth of 47 metres.

Data available for the Tumas drilling includes in-rod and open-hole gamma logging, XRF assay results and scintillometer measurements from samples placed in lead shielded box as well as more recently ICP-MS . The current estimates are based primarily on one-metre down-hole composited U3O8 grades derived from gamma logging. For the composite dataset compiled for the current estimates, grades derived from gamma logging were assigned a higher priority than XRF assay results, and scintillometer derived grades were used for intervals without logging or XRF results.

Tumas Zones 1 and 2 resources were estimated by Multiple Indicator Kriging (MIK) with block support correction, and reflect open-cut mining selectivity. As requested by RUN, the estimates assume one metre mining bench heights with 5 x 5 metre grade control sampling. Estimates for mineralisation tested by consistently 50 x 50 metre spaced drilling are classified as Indicated and all other estimates are classified as Inferred.

Table 3. Tumas Zones 1 and 2 Drilling Campaigns (2008-2010)

Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Zone 1 2,312 27,942 2,312 27,942
Zone 2 1,185 29,772 1,053 27,378 2,238 57,150
Total 2,312 27,942 1,185 29,772 1,053 27,378 4,550 85,092

Tumas Zone 3

In addition to the Tumas 1 and 2 resource estimates presented in Table 1 the current study included construction of a MIK model for the Tumas 3 area. This modelling suggests that, at a cut-off grade of 200 ppm U3O8, the Tumas 3 area has the potential to host an exploration target of approximately 20 to 30 million tonnes at a grade of approximately 200 to 250 ppm U3O8 which would more than double the Tumas Project Mineral Resource Estimate. This potential mineralisation is based on broadly spaced drilling (Table 4) and has had insufficient exploration to define a Mineral Resource, and the estimates of tonnage are conceptual in nature. It is uncertain that further drilling will convert any of the exploration potential to a Mineral Resource.

Drilling included 50 metre spaced holes along sets of east-west and north-south traverses separated by 600 to 2,000 metres, and some locally tight-spaced infill drilling. When combined with geophysical survey results, this wide-spaced sampling provides an indication of the extent and general orientation of mineralisation in Tumas Zone 3, however the mineralisation is too poorly defined at this stage for inclusion in resource estimates.

Interpretation of the Tumas 3 mineralisation is further hindered by the number of drill holes without gamma logging, XRF or scintillometer measurements which is notably higher than for the other Tumas areas. These un-sampled holes include holes surrounded by mineralised drilling, with around 10% of drill holes within the plan-view extents of the mineralised domain interpreted for the study having no grade data.

Page 9

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

Table 4. Tumas Zone 3 Drilling Campaigns (2008-2010)

Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Deposit
Zone
Holes
Metres
Holes
Metres
Holes
Metres
Holes
Metres
2008
2009
2010
Total
Zone 3 184 3,606 1,222 23,583 1,406 27,189
Total 184 3,606 1,222 23,583 - - 1,406 27,189

Next Steps

A draft project schedule (which is reliant on further funding) has been prepared by DYL in consultation with Marenica. The immediate activities that will be undertaken are:

  • The first phase of a two-phased 600 metre geometallurgical drill program has been approved and will commence shortly.

  • The first phase will consist of an HQ triple tube diamond drilling campaign (to maximise core recovery) which will enhance overall geotechnical knowledge and inform the location of the holes for the second phase of the program

  • The second phase of the program will consist of a PQ triple tube diamond drilling campaign and will also enhance geotechnical knowledge but is primarily to generate the samples to be used in the second phase metallurgical (variability) testwork program.

  • A prefeasibility study is to be conducted in parallel with the drilling campaign, based on the technical work completed to date and will be completed prior to the commencement of the metallurgical variability testwork program.

DYL is extremely pleased with its recent success and is increasingly confident that the Tumas Project is ideally positioned to become Namibia’s next uranium mine.

For further information regarding this announcement, contact: Greg Cochran Phone: +61 8 9286 6999 Managing Director Email: [email protected] For further information on the Company and its projects visit the website at www.deepyellow.com.au

About Deep Yellow Limited

Deep Yellow Limited is an ASX-listed, Namibian-focussed advanced stage uranium exploration company. It also has a listing on the Namibian Stock Exchange. Deep Yellow’s operations in Namibia are conducted by its 100% owned subsidiary Reptile Uranium Namibia (Pty) Ltd.

The Company recently completed metallurgical testwork and is evaluating fast track development options for its Tumas Project which consists of extensive surficial calcrete palaeochannel deposits which are amenable to physical beneficiation and upgrading techniques.

Deep Yellow also holds the Omahola Open Pit Alaskite Heap Leach Project on which value engineering studies are being conducted to supplement the recently completed preliminary economic analysis.

Page 10

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

APPENDIX 1

Deep Yellow – Namibia Mineral Resources Table

Cut-off
Tonnes
U3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Deposit
Category
Cut-off
Tonnes
U3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Deposit
Category
Cut-off
Tonnes
U3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Deposit
Category
Cut-off
Tonnes
U3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Deposit
Category
Cut-off
Tonnes
U3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Deposit
Category
Cut-off
Tonnes
U3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Deposit
Category
Cut-off
Tonnes
U3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Deposit
Category
Cut-off
Tonnes
U3O8
U3O8
U3O8
(ppm U3O8)
(M)
(ppm)
(t)
(Mlb)
Deposit
Category
Omahola Project - JORC 2004
INCA Deposit♦ Indicated 250 7.0 470 3,300 7.2
INCA Deposit♦ Inferred 250 5.4 520 2,800 6.2
Ongolo Deposit # Measured 250 7.7 395 3,000 6.7
Ongolo Deposit # Indicated 250 9.5 372 3,500 7.8
Ongolo Deposit # Inferred 250 12.4 387 4,800 10.6
MS7 Deposit # Measured 250 4.4 441 2,000 4.3
MS7 Deposit # Indicated 250 1.0 433 400 1.0
MS7 Deposit # Inferred 250 1.3 449 600 1.3
48.7
420
20,400
45.1
Omahola Project Total
Tubas Sand Project - JORC 2012
Tubas Sand Deposit # Indicated 100 10.0 187 1,900 4.1
Tubas Sand Deposit # Inferred 100 24.0 163 3,900 8.6
34.0
170
5,800
12.7
Tubas Sand Project Total
Tumas Project - JORC 2012
Tumas Deposit♦ Measured 200 9.7 386 3,700 8.2
Tumas Deposit♦ Indicated 200 6.5 336 2,200 4.8
Tumas Deposit♦ Inferred 200 0.4 351 150 0.3
16.6
366
6,050
13.4
Tumas Project Total
Tubas Calcrete Resource - JORC 2004
Tubas Calcrete Deposit Inferred 100 7.4 374 2,800 6.1
7.4
Tubas Calcrete Total
374
2,800
6.1
Aussinanis Project - JORC 2004
Aussinanis Deposit♦ Indicated 150 5.6 222 1,200 2.7
Aussinanis Deposit♦ Inferred 150 29.0 240 7,000 15.3
34.6
Aussinanis Project Total
237
8,200
18.0
141.3
TOTAL RESOURCES
306
43,250
95.3
Notes: Figures have been rounded and totals may reflect small rounding errors.
XRF chemical analysis unless annotated otherwise.
♦eU3O8 - equivalent uranium grade as determined by downhole gamma logging.
#Combined XRF Fusion Chemical Assays and eU3O8 values.
Where eU3O8 values are reported it relates to values attained from radiometrically logging boreholes.
Gamma probes were calibrated at Pelindaba, South Africa in 2007 and sensitivity checks are conducted
by periodic re-logging of a test hole to confirm operation between 2008 and 2013.
During drilling, probes are checked daily against a standard source.

Page 11

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

Competent Persons’ Statements

Omahola Project – JORC 2004

The information in this report that relates to Exploration Results for the Ongolo, MS7 and INCA deposits is based on information compiled by Dr Katrin Kärner who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM CP(Geo)). Dr Kärner, who was the Exploration Manager for Reptile Uranium Namibia (Pty) Ltd, has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition). Dr Kärner consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

The information in this report that relates to the Ongolo and MS7 Mineral Resources is based on information compiled by Malcolm Titley of CSA Global UK Ltd. Malcolm Titley takes overall responsibility for the Report. He is a Member of the Australasian Institute of Geoscientists (‘AIG’) and the Australasian Institute of Mining and Metallurgy (‘AusIMM’) and has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition). Malcolm Titley consents to the inclusion of such information in this Report in the form and context in which it appears.

The information in this report that relates to the INCA Mineral Resource Estimates is based on information compiled by Neil Inwood who is a Fellow of the AUSIMM. Mr Inwood was employed by Coffey Mining as a consultant to the Company at the time of the resource estimates and public release of results. As Mr Inwood is no longer employed by Coffey Mining, Coffey Mining has reviewed this report and consents to the inclusion, form and context of the relevant information herein as derived from the original resource reports for which Mr Inwood’s consents have previously been given. Mr Inwood has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which is being undertaken to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition).

The information in this report relating to the Omahola Project Exploration Results and Mineral Resource Estimates was prepared and first disclosed under the JORC Code 2004 and has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.

Tubas Sand Project – JORC 2012

Where the Company refers to the Tubas Sand Project resource in this report (referencing the release made to the ASX on 24 March 2014 entitled “Tubas Sand Project – Resource Update”), it confirms that it is not aware of any new information or data that materially affects the information included in that announcement and all material assumptions and technical parameters underpinning the resource estimate with that announcement continue to apply and have not materially changed.

Tumas Project – JORC 2012

Exploration Results and Mineral Resource Estimate:

The information in this report that relates to Exploration Results for the Tumas Deposit Resource Estimate, Resource Database and Bulk Densities are based on information compiled by Mr. Martin Hirsch, M.Sc .Geology, who is a member of the Institute of Materials, Minerals and Mining (UK) and the South African Council for Natural Science Professionals. Mr. Hirsch is the Exploration Manager for Reptile Uranium Namibia (Pty) Ltd, has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2012 Edition). Mr. Hirsch consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the Tumas Mineral Resource Estimate is based on work completed by Mr. Martin Hirsch, M.Sc .Geology, who is a member of the Institute of Materials, Minerals and Mining (UK) and the South African Council for Natural Science Professionals. Mr. Hirsch is the Exploration Manager for Reptile Uranium Namibia (Pty) Ltd, has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2012 Edition). Mr. Hirsch consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Geophysical Results:

Where the Company refers to the geophysical results for the Tumas Project in this report (referencing the release made to the ASX dated 16 July 2015 titled “Enhanced Palaeochannel Prospectivity”), it confirms that it is not aware of any new

Page 12

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

information or data that materially affects the information included in that announcement and all material assumptions and technical parameters underpinning those results continue to apply and have not materially changed.

Tubas Calcrete Deposit – JORC 200

The information in this report that relates to previous Exploration Results for the Tubas Calcrete Mineral Resources is based on information compiled by Dr Katrin Kärner who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM CP(Geo)). Dr Katrin Kärner, who was the Exploration Manager for Reptile Uranium Namibia (Pty) Ltd during 2013, has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition). Dr Katrin Kärner consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

The information in this report that relates to the Tubas Calcrete Mineral Resource is based on information compiled by Mr Willem H. Kotzé Pr.Sci.Nat MSAIMM. Mr Kotzé is a Member and Professional Geoscientist Consultant of Geomine Consulting Namibia CC. Mr Kotzé has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition). Mr Kotzé consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.

The information relating to Tubas Calcrete Mineral Resource Estimates was prepared and first disclosed under the JORC Code 2004. These have not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.

Aussinanis Deposit – JORC 2004

The information in this report that relates to the Aussinanis Mineral Resources is based on work completed by Mr Jonathon Abbott who is a full time employee of MPR Geological Consultants Pty Ltd and a Member of the Australian Institute of Geoscientists. Mr Abbott has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition’). Mr Abbott consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information relating to the Aussinanis Mineral Resource Estimate was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.

Page 13

Tumas Project Resource Update

==> picture [34 x 37] intentionally omitted <==

APPENDIX 2

JORC Code – Table 1 Tumas Project Mineral Resource Estimate 12 October 2016

Page 14

JORC Code, 2012 Edition – Table 1 report template

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling Nature and quality of sampling (eg cut channels, random chips, or U3O8values are derived from both down-hole total gamma counting
techniques specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc). These
(eU3O8) and chemical assay data.
Total gamma eU3O8
examples should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any measurement

33 mm Auslog total gamma probes were used and operated by
company personnel.
Gamma probes were calibrated at Pelindaba, South Africa, in May
tools or systems used. 2007 (T029, T030) and in December 2007 (T161, T162, T164,
Aspects of the determination of mineralisation that are Material to T165).
the Public Report. Between 2008 and 2013 sensitivity checks were conducted by
In cases where ‘industry standard’ work has been done this would
be relatively simple (eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases, more explanation may be
required, such as where there is coarse gold that has inherent

periodic re-logging of a test hole (Hole-ALAD1480) to confirm
operation.
During drilling, probes were checked daily against a standard
source. Majority of probing was done with probe T161 and T165
sampling problems. Unusual commodities or mineralisation types Auslog probes were re-calibrated at the calibration pit located at
(eg submarine nodules) may warrant disclosure of detailed Langer Heinrich Mine site in December 2014 and probes 003, T029,
information. T030, T161, T162, T164, T165 and T274 again in May 2015.
Gamma measurements were taken at 5 cm intervals at a logging
speed of approximately 2 m per minute.
Probing was done immediately after drilling mainly through the drill
rods and in some cases in the open holes. Rod factors were
established to compensate for the reduced gamma counts when
logging was done through the rods. No correction for water was
done.
The gamma measurements were recorded in counts per second
(c/s) and were converted to equivalent eU3O8values over 1m
intervals using the probe-specific K-factor. Disequilibrium studies on
22 samples byANSTO Minerals in 2008 confirmed that the U238

1

Criteria JORC Code explanation Commentary
decay chains of the wider Tumas deposit are within an analytical
error of ± 10%, in secular equilibrium.
Chemical assay data
Geochemical samples were derived from Reverse Circulation (RC)
drilling at intervals of 1 m. Samples were spilt at the drill site using
either a riffle or cone splitter to obtain a 1 to 4 kg sample from which
90 g was pulverized to produce a subset for XRF-analysis.
A total of 16,048 samples from Tumas 1, 2 and 3 were taken and
assayed for U3O8by loose powder XRF. 15 364 assays were
completed at the company owned laboratory in Swakopmund
Namibia, 646 at Set Point Laboratories, RSA and 38 samples were
analysed at Scientific Services, RSA.
In the 2014 drill program 240 samples were taken for confirmatory
assay and submitted to Bureau Veritas laboratory in Swakopmund
for U3O8ICP-MS following the procedure above.
The external laboratory and repeat assays indicate a positive bias
for samples above 300ppm and analysed before April 2009.
A factor was applied for those of -22.6% to compensate for this
effect.
All other assay results confirm equivalent uranium grades correctly
correlated and remain within a statistically acceptable margin of
error.
5,800 one meter Tumas 2 sample intervals were estimated both via
XRF and lead-block scintillometer measurements. The resulting
correlation fitted well with XRF assay results and subsequently was
used to assign eU3O8grade to drilling intervals where grade was
available from scintillometer readings, only.
Drilling Drill type (eg core, reverse circulation, open-hole hammer, rotary air RC drilling was used throughout the Tumas Project.
techniques blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
_type, whether core is oriented and if so, by what method, etc). _

All holes were drilled vertically and intersections measured present
true thicknesses.
Drill sample Method of recording and assessing core and chip sample recoveries
Drill chip recoveries were good, in excess of 90%.
recovery and results assessed. Drill chip recoveries were assessed by weighing 1 m drill chip

2

Criteria
JORC Code explanation
Commentary Commentary Commentary Commentary Commentary Commentary Commentary Commentary Commentary Commentary Commentary Commentary Commentary
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
samples at the drill site. Weights were recorded in sample tag
books.
Sample loss was minimized by placing the sample bags directly
underneath cyclone/splitter
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.






All drill holes were geologically logged. Zone 1 and 2 logging is well
in excess of 95%.
The logging was qualitative in nature. The lithology type was
determined for all samples.
Other parameters routinely logged include color, color intensity,
weathering, oxidation, grain size, hardness, carbonate (CaCO3)
content, sample condition (wet, dry) and total gamma count (by Rad-
eye monitor).
In the 2014 infill drilling program 1,430m was geologically logged,
which represents more than 99% of the meters drilled.
Lithology codes were used to generate wireframes for the different
host-rocks, which are from top to bottom: scree, sandy gypcrete or
non-calcareous and calcareous sand, gravel, massive calcrete and
metamorphosed bedrock.
This information was used in the reporting process.
Infill drilling in Zone 1 during 2014 confirmed mineralisation
continuity at grade control scale.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.


Two types of sample splitters were used at Tumas: 1) Tier riffle
splitter mounted on the rig giving an 87.5% (reject) and a 12.5%
sample (assay sample). A portable 2-tier (75%/25%) splitter was on
hand to treat any oversize assay sample. All sampling was dry.
The above sub-sampling techniques are common industry practice
and appropriate.
Sample sizes are considered appropriate to the grain size of the
material beingsampled.
Number of assays
Number of standards
Number of blanks
Number of field
duplicates
Number of
Lab repeats
RUN
SS
SP
RUN
SS
SP
RUN
SP
SS
RUN
SP
RUN
SS
15364
38
646
7
145
65
122
19
130
419
2
1033
193
Number of ass ays Number of standards Number of blanks Number
duplic
of field
ates
Number of
Lab repeats
**RUN ** SS **SP ** **RUN ** SS **SP ** **RUN ** **SP ** SS **RUN ** **SP ** **RUN ** SS
15364 38 646 7 145 65 122 19 130 419 2 1033 193

3

Criteria
JORC Code explanation
Commentary


RUN (DYL’s in-house laboratory in Swakopmund); SP (Setpoint
Laboratories RSA), SS (Scientific Services Laboratories RSA).
SS used three different standards, namely AMIS-91, DH-1 and
SARM 78 see table below:
In 2014 field duplicates were inserted into the assay batch at an
approximate rate of one for every 7 samples which is compatible
with industry norm.
Standard
Number of
assays
Expected
value (ppm)
Two standard
deviation
Assay
average
Min
Max
AMIS-91
13
264 (U)
18
280
272
289
DH-1
267
2,083 (U3O8)
35
2,063
1,983
2,140
SARM 78
2
(U)
234
233
234
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and precision have been
established.





The analytical method employed was XRF. The technique is industry
standard and considered appropriate.
The analytical method employed for the 2014 drill program was ICP-
MS which is also considered industry standard and appropriate
Downhole gamma tools were used as explained under ‘Sampling
techniques’. This is the principal evaluating technique.
The ratio of duplicates to primary samples is 53%, with duplicates
reporting within a 10% precision.
DYL monitored the performance of its XRF instrument through the
analysis of standards and replicates. The standards (certified
reference materials) were assayed and then used to monitor
instrument accuracy and consistency.
AMIS standards P0090, P0092 plus a RUN Internal Standard were
submitted in a ratio of 1: 24.
Verification of
sampling and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Paper logs were recorded in the field; sample tag books than filed at
the RUN’s office in Swakopmund. The field drill data of those logs
and tag books (lithology, sample specifications etc.) is captured by
designated personnel and after passing validation imported into a
geological database.

4

Criteria JORC Code explanation Commentary
Discuss any adjustment to assay data. Twinning RC holes was not considered due to the high variability in
grade distribution.
Data was uploaded following a strict validation protocol hardcoded
into the SQL database upload routines.
Equivalent uranium (“eU3O8”) values are calculated from raw gamma
files by applying calibration factors and casing factors where
applicable.
The adjustment factors are stored in the database.
eU3O8data is composited to 1m intervals.
The ratio of eU3O8vs assayed U3O8for matching composites was
used to quantify the statistical error. It was found that they all lie
within statistically acceptable margins.
Location of Accuracy and quality of surveys used to locate drill holes (collar and The collars were surveyed by in-house operators using a differential
data points down-hole surveys), trenches, mine workings and other locations GPS.
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.

All drill holes are vertical and shallow, therefore, no down-hole
surveying was required.
Thegrid system is World Geodetic System(WGS)1984, Zone 33.
Data spacing Data spacing for reporting of Exploration Results. The data spacing and distribution is optimized along channel
and
distribution
Whether the data spacing and distribution is sufficient to establish
the degree of geological and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.

direction. The drill grid is close to 50m by 50m in EW and NS
rectangular directions following the main channel.
The drill pattern is considered sufficient to establish an optimised
Mineral Resource.
The total gamma count data, which is recorded at 5 cm intervals, is
composited to 1 m composites down hole and correlates to the 1 m
geochemical sampling.
The 2014 infill drilling program in Zone 1 (90 holes) was drilled at
12.5m collar centres which is sufficient to establish degree of
geological continuity.
Orientation of
Whether the orientation of sampling achieves unbiased sampling of
Uranium mineralisation is strata bound and distributed in fairly
data in
relation to
geological
structure
possible structures and the extent to which this is known,
considering the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
continuous horizontal layers. Holes were drilled vertically and
mineralised intercepts represent the true width.
All holes were sampled down-hole from surface. Geochemical
samples were collected at 1 m intervals. Total-gamma count data

5

Criteria JORC Code explanation Commentary
sampling bias, this should be assessed and reported if material. was collected at 5 cm intervals.
Sample The measures taken to ensure sample security. 1m RC drill chip samples were prepared at the drill site. The assay
security samples were stored in plastic bags. Sample tags were placed
inside the bags. The samples were placed into plastic crates and
transported from the drill site to RUN’s site premises in Swakopmund
by company personnel, prior to analyses and from there to the
external laboratories when used.
Upon completion of the assay work the remainder of the drill chip
sample bags for each hole was packed back into crates and then
stored in designated containers in chronological order, locked up
and kept safe at RUN’s dedicated sample storage yard at Rocky
Point located outside Swakopmund.
Audits or The results of any audits or reviews of sampling techniques and Various in house audits were conducted.
reviews data. D. M. Barrett (PhD MAIG) conducted an audit of gross count gamma
logging procedures and log reduction methods used by Deep Yellow
Limited.
He concludes his audit commenting: “In summary, it is my belief that
the equivalent uranium grades reported by Reptile from their gamma
logging program are reliable and are probably within a few percent
to the true grade”.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral Type, reference name/number, location and ownership including •The work to which the Exploration Results relate was undertaken on
tenement and
land tenure
status

agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
exclusive prospecting grant EPL3497 (Tumas Zone 1 & 2) and
EPL3496 (Tumas Zone 3).
•The EPLs were originally granted to Reptile Uranium Namibia (Pty)
Ltd (RUN) in 2006. The EPLs are in good standing and are valid until
05 June 2017.
•The EPLs are located within the Namib Naukluft-National Park in

6

Criteria JORC Code explanation Commentary Commentary
Namibia.
The EPLs are subject to an agreement with a Namibian Black
Empowerment partner whereby the partner has the right to acquire
5% of the project for historical costs.
There are no known impediments to the project beyond Namibia’s
standard permitting procedures.
Exploration Acknowledgment and appraisal of exploration by other parties. Prior to RUN’s ownership of these EPLs, extensive work was
done by other
parties
conducted by Anglo American Prospecting Services (AAPS), General
Mining and Falconbridge in the 1970s.
Assay results from the historical drilling are available to RUN on
paper logs. They were not captured digitally and were not used for
estimating the Tumas Mineral Resource.
Geology Deposit type, geological setting and style of mineralisation. Tumas mineralisation occurs as secondary carnotite enrichment of
variably calcretised palaeochannel and sheet wash sediments and
adjacent weathered bedrock.
Uranium mineralisation at Tumas is surficial, stratabound and hosted
by Cenozoic sediments, which include from top to bottom scree
sand, gypcrete, calcareous sand and calcrete.
The majority of the mineralisation is hosted in calcrete. Locally, the
underlying weathered Proterozoic bedrock is occasionally also
mineralized.
Drill hole A summary of all information material to the understanding of the 4,550 RC holes over 85,092m were used for estimating the Tumas
Information exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
Zones 1 & 2, with all relevant drilling being done between 2008 and
2010.
All holes were drilled vertically and intersections measured present
true thicknesses.
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.

7

Criteria JORC Code explanation Commentary
Data In reporting Exploration Results, weighting averaging techniques, •5 cm gamma intervals were composited to 1 m intervals.
aggregation
methods
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade
•1 m composites of eU3O8were used for estimate.
•No grade truncations were applied.
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
Relationship These relationships are particularly important in the reporting of •The mineralisation is sub-horizontal and all drilling vertical,
between
mineralisation
widths and

Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
therefore, mineralised intercepts are considered to represent true
widths.
intercept
lengths
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
_width not known’). _
Diagrams Appropriate maps and sections (with scales) and tabulations of •No new drilling intercepts are being reported thus no tabulations are
intercepts should be included for any significant discovery being included.
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
•All relevant intercepts were included within the text and appendices
of previous releases.
Balanced Where comprehensive reporting of all Exploration Results is not •Comprehensive reporting of all Exploration Results was practiced
reporting practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
throughout the program.
Exploration Results.
Other Other exploration data, if meaningful and material, should be reported
•The wider area and Tumas deposit was subject to extensive drilling
substantive
exploration
data
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
in the 1970’s and 1980’s by Anglo American Prospecting Services,
Falconbridge and General Mining.
• Downhole gamma-gamma density logging for bulk density was
conducted by Terratec.
Further work The nature and scale of planned further work (eg tests for lateral •Further work is planned east of Tumas Zone 1. An area extending
extensions or depth extensions or large-scale step-out drilling). for at least another 2 km towards the East and North-East is
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
mineralised showing carnotite in calcrete in shallow diggings less
than 1/2 meter below surface; in this region Rad-eye readings are
typically between 200-300cps.
•The area isplanned for inclusion in a future drilling program.

8

Criteria JORC Code explanation Commentary
•Further resource extension drilling is expected as mineralisation is
open along and across strike.

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria JORC Code explanation Commentary
Database Measures taken to ensure that data has not been corrupted by, for A set of SOP’s (Standard Operating Procedures) were defined that
integrity example, transcription or keying errors, between its initial collection safeguard data integrity which cover the following aspects:
and its use for Mineral Resource estimation purposes.
Data validation procedures used.

Capturing of all exploration data; geology and probing;

QA/QC of all drilling, geophysical and laboratory data;

Data storage (database management), security and back-up;

Reporting and statistical analyses on the data using the Micromine
(MM) software package.
Site visits Comment on any site visits undertaken by the Competent Person and •During all drilling programs regular site visits were conducted by the
the outcome of those visits. Company’s then Competent Person who signed off on all exploration
If no site visits have been undertaken indicate why this is the case. data.
•More recently, the Company’s current Competent Person has
undertaken visits since April 2015, with the most recent visit being in
October 2016.
•This Competent Person oversaw the excavation of a pit in December
2015 and January 2016 for the generation of a bulk sample for
metallurgical test work purposes.
Geological Confidence in (or conversely, the uncertainty of) the geological •Confidence in the geological interpretation and modelling of the
interpretation interpretation of the mineral deposit. sedimentary channel fill is high.
Nature of the data used and of any assumptions made. •The factors affecting grade distribution are channel morphology and
The effect, if any, of alternative interpretations on Mineral Resource potentially bedrock profile. Additional mineralisation is evident beyond
estimation. the main channel in surface screes filling shallow incised, undulating
The use of geology in guiding and controlling Mineral Resource bedrock topography; these are not reflected in the Resource Estimate.
estimation.
• _The factors affecting continuity both ofgrade andgeology. _
Dimensions The extent and variability of the Mineral Resource expressed as •The Tumas Zones 1 and 2 orebody has a combined strike length of
length (along strike or otherwise), plan width, and depth below surface
to the upper and lower limits of the Mineral Resource.

approximately 16 km and an average width of between 400 to 500
metres.

9

Criteria JORC Code explanation JORC Code explanation Commentary
•The mineralised calcrete reaches from a shallow depth below surface
of 2 to 3m deep down to 40 meters in places in Tumas Zone 2 and can
be deeper in Zone 3.
Estimation
and modelling

The nature and appropriateness of the estimation technique(s)
applied and key assumptions, including treatment of extreme grade
•The present estimates were previously composed by Hellman &
techniques values, domaining, interpolation parameters and maximum distance Schofield (Pty) Ltd in 2009 and updated in 2010.
of extrapolation from data points. If a computer assisted estimation •Resources were estimated by Multiple Indicator Kriging (MIK) with block
method was chosen include a description of computer software and
parameters used.
The availability of check estimates, previous estimates and/or mine
production records and whether the Mineral Resource estimate

support correction reflecting open cut mining selectivity.
The estimates include scenarios with one, two and three metre mining
bench heights. The three metre bench height option assumes selectivity
takes appropriate account of such data. of 4.0 by 4.0 by 3.0 metres (east, north, elevation) with grade control
The assumptions made regarding recovery of by-products. sampling on a 3.2 by 3.6 by 1.0 metre pattern.

Estimation of deleterious elements or other non-grade variables of
economic significance (eg sulphur for acid mine drainage
characterisation).
In the case of block model interpolation, the block size in relation to
the average sample spacing and the search employed.
•The one and two metre bench height scenarios assume 5 by 5 metre
mining selectivity with 5 by 5 metre grade control sampling.
•The estimation methodology is comparable to those used at the nearby
Langer Heinrich Uranium Mine as reported by Paladin Energy Ltd.
Any assumptions behind modelling of selective mining units. •Langer Heinrich has a similar style of mineralisation.
Any assumptions about correlation between variables.
Description of how the geological interpretation was used to control
the resource estimates.
Discussion of basis for using or not using grade cutting or capping.
The process of validation, the checking process used, the
comparison of model data to drill hole data, and use of
reconciliation data if available.
Moisture Whether the tonnages are estimated on a dry basis or with natural •An optical assessment of sample material was done during the
moisture, and the method of determination of the moisture content. sampling process and samples were classified as either “dry” or “wet”.
•Tonnages are estimated dry.
Cut-off The basis of the adopted cut-off grade(s) or quality parameters •1m composites below eU3O8of 50ppm were excluded from the 2010
parameters applied. estimation process.
•The range of cut-off grades were chosen based on “potentially
economic” criteria and the fact that mineralization is continuous.

10

Criteria JORC Code explanation Commentary
Mining factors
Assumptions made regarding possible mining methods, minimum
•Possible scenarios considered are open cast mining with one, two or
or mining dimensions and internal (or, if applicable, external) mining three-meter mining bench heights.
assumptions dilution. It is always necessary as part of the process of determining •A three-meter bench height option assumes selectivity of 4.0 by 4.0 by
reasonable prospects for eventual economic extraction to consider 3.0 meters (east, north and elevation) with grade control sampling on a
potential mining methods, but the assumptions made regarding mining 3.2 by 3.6 by 1.0-meter pattern. The one and two-meter bench height
methods and parameters when estimating Mineral Resources may not scenarios assume 5 by 5-meter mining selectivity with 5 by 5-meter
always be rigorous. Where this is the case, this should be reported grade control sampling.
with an explanation of the basis of the mining assumptions made. •A surface miner will be considered as an alternative method of mining
during future feasibility studies.
Metallurgical The basis for assumptions or predictions regarding metallurgical Initially, detailed mineralogical characterisation tests were conducted
factors or amenability. It is always necessary as part of the process of which allowed the Company to derive a sound understanding of how a
assumptions determining reasonable prospects for eventual economic extraction to calcrete ore from Tumas would respond to beneficiation and further
consider potential metallurgical methods, but the assumptions downstream processing.
regarding metallurgical treatment processes and parameters made Successful metallurgical test work has been carried out in Perth,
when reporting Mineral Resources may not always be rigorous. Where Western Australia that has demonstrated that calcrete ore from Tumas
this is the case, this should be reported with an explanation of the Zone 1 can be efficiently and cost effectively beneficiated using
basis of the metallurgical assumptions made. Marenica Energy Limited’s proprietary_U-pgradeTM_process.
Marenica enjoyed significant success in conducting similar tests on bulk
samples from its own Namibian calcrete deposit which, apart from the
much lower grade, shares the same mineralogical characteristics as
Tumas.
Also, the nearby Langer Heinrich Uranium Mine has successfully mined
and processed calcrete ore for almost a decade. Although its grade is
higher the mineralogical characteristics are also similar.
Environmen- Assumptions made regarding possible waste and process residue Independent consultant SoftChem completed a scoping level
tal factors or
assumptions
disposal options. It is always necessary as part of the process of
determining reasonable prospects for eventual economic extraction to
consider the potential environmental impacts of the mining and
processing operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfields project, may not

Environmental Impact Assessment for the Tumas Project in 2013.
As the mining progresses to different sections of the mine, waste
material will be backfilled into some of the mined out areas.
The Marenica_U-pgradeTM_process has a further benefit in that the non-
always be well advanced, the status of early consideration of these chemical beneficiation produces a clean waste product that can be
potential environmental impacts should be reported. Where these reintroduced into the mining void.
aspects have not been considered this should be reported with an
explanation of the environmental assumptions made.
Rehabilitation of the mined out areas and stockpile facility will be
progressive throughout the life of the mine. Any remaining waste rock
stockpiles will be shaped and contoured to blend into the surrounding
environment.
Bulk density Whether assumed or determined. If assumed, the basis for the Bulk density was derived from borehole density logging (gamma-

11

Criteria JORC Code explanation Commentary
assumptions. If determined, the method used, whether wet or dry, the gamma) during the 2014 campaign.
frequency of the measurements, the nature, size and
representativeness of the samples.
The bulk density for bulk material must have been measured by
•284 1m composites where measured in that process resulting in an
average density of 2.35.
methods that adequately account for void spaces (vugs, porosity, etc),
moisture and differences between rock and alteration zones within the
deposit.
Discuss assumptions for bulk density estimates used in the evaluation
process of the different materials.
Classification The basis for the classification of the Mineral Resources into varying
confidence categories.
•This mineral resource estimate reflects a partial change in the
Whether appropriate account has been taken of all relevant factors (ie
classification of resource blocks from the 2010 H&S resource model.
relative confidence in tonnage/grade estimations, reliability of input •Post 2010 geological work including a close-spaced Infill drilling
data, confidence in continuity of geology and metal values, quality,
quantity and distribution of the data).
Whether the result appropriately reflects the Competent Person’s view
of the deposit.

program
demonstrated
significantly
improved
continuities
of
mineralisation across the channel.
•New semi-variography presented improved structures with ranges of up
to 55m.
•Search ranges were used accordingly and blocks were re-assigned
categories according to drilling data-density.
•A search radius of 55m was used to assign “measured” blocks if more
than 50 data points (1m composites) were encountered.
•No changes were made to block grade or proportions.
•The Competent Person is satisfied that the applied methodology is
appropriate and the resultingblock re-classification beingappropriate.
Audits or The results of any audits or reviews of Mineral Resource estimates. •No additional reviews were conducted beyond those carried out by the
reviews various Competent Persons over time.
Discussion of Where appropriate a statement of the relative accuracy and •The applied geostatistical approach to arrive at the 2010 resource (MIK)
relative
accuracy/
confidence
confidence level in the Mineral Resource estimate using an approach
or procedure deemed appropriate by the Competent Person. For
example, the application of statistical or geostatistical procedures to
quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative
is considered sound and is applied by geostatisticians across the globe
and industry.
•The applied geostatistical approach to re-allocate confidence levels of
the pre-existing resource model is sound and unbiased and presents a
discussion of the factors that could affect the relative accuracy and true representation of drilling data.
confidence of the estimate. •It is this Competent Person’s opinion that the classification of resource
The statement should specify whether it relates to global or local blocks reflects data density correctly and appropriately.
estimates, and, if local, state the relevant tonnages, which should be

12

Criteria JORC Code explanation Commentary
relevant to technical and economic evaluation. Documentation should
include assumptions made and the procedures used.
These statements of relative accuracy and confidence of the estimate
should be compared withproduction data, where available.

13