ASX Release 31 October 2019

DATELINERESOURCES LIMITED

(ACN 149 105653) ASX Code:DTR

==> picture [73 x 73] intentionally omitted <==

September 2019 Quarterly Report

Dateline Resources Limited (ASX:DSE) (“Dateline” or the “Company”), is pleased to provide this Activities Report on the Company’s Gold Links project, Colorado, for the three-month period ending 30 September 2019.

Gold Links drilling program:

CAPITALSTRUCTURE

Share Price (30/10/19) $0.002 Shares on issue 8,135million Market Cap $16.3million Unlisted Options 45 million

MAJOR SHAREHOLDERS

Southern Cross Exploration NL 32.5% Mr. Mark Johnson AO 19.6% National Nominees Ltd 15.4%

DIRECTORS & MANAGEMENT

Mark JohnsonAO Chairman

Stephen Baghdadi ManagingDirector

Greg Hall Non-Executive Director

Anthony John Ferguson Non-Executive Director

John Smith Company Secretary

CONTACT John Smith Phone: +61 2 9375 2353 Postal Address: P.O. Box 553 South Hurstville NSW 2221 Email: [email protected]

During the quarter, the Company continued its 8,000metre RC drilling program at the Gold Links project.

The primary objective for the program was to prove the down-dip extension of both the Sacramento and 2150 veins. The extension of these high-grade veins has been successfully confirmed.

As at today’s date, Dateline confirms that it has completed the majority of the program and successfully drilled high priority holes through the northern section of the Gold Links project and will report all drill hole data completed post September 30 in a separate release.

Sacramento Vein:

Drilling has provided a more structural understanding of the geology of the Sacramento Vein, located on the northern side of the project. To September 30, a total of 16 holes over 1628 metres have been drilled, with the following being the most notable:

  • SAC 13 – 1.75m at 24.9g/t Au and 153g/t Ag (inc. 0.5m at 80.1g/t Au and 489g/t Ag.

  • SAC06 – 0.5m at 14g/t Au and 97.4g/t Ag.

  • SAC16 – 0.7m at 18.1g/t Au and 241g/t Ag.

These results have defined a number of deeper targets that have been assessed for follow-up drilling.

==> picture [387 x 213] intentionally omitted <==

Figure 1: Holes drilled towards the Sacramento vein

ASX Release 31 October 2019

2150 Vein:

Drilling of the extension of the 2150 vein commenced during the period with a total of 13 holes drilled totaling 2445 metres. As advised on September 4, the Company has completed six holes, all of which intercepted gold and silver mineralisation in the down-dip extension of the 2150 vein and has since pre-collared a further six holes. The most prominent intercept during the September Quarter included:

GL03 – 1.57m at 30.4g/t Au and 78g/t Ag (inc. 0.3m at 151.g/t Au and 143g/t/ Ag)

Following a review of the program and assays generated, management will begin planning a follow up program to commence early 2020. The Company expects remaining assays from the current drill campaign will be reported in the coming weeks.

==> picture [518 x 284] intentionally omitted <==

Figure 2: Holes drilled towards the 2150 vein

Further exploration initiatives:

Geophysics

Early stage core property testing shows that veins usually have a strong IP response (>50 msec) and that most wall rocks have a low IP response (<15 msec). While there is some overlap, the segregation of results is promising in that it at appears to distinguish between the mineralized vein and the barren wall rock.

Logging of the longer holes has identified very significantly changed rock types. Further relogging should be complete in the December Quarter at which stage it will be used to create a geologic model to assess the IP response and determine whether downhole IP is a viable tool.

==> picture [74 x 73] intentionally omitted <==

2 | ASX Release 31 October 2019

ASX Release 31 October 2019

New “Hill” Vein discovery:

In October 2018, Dateline acquired LIDAR data that covered 3,623 hectares which essentially covers the entire project area. Following the digitisation of this data, follow up mapping and sampling was undertaken during the period that resulted in the discovered of the Hill Vein.

The Hill Vein is located to the south of the Sacramento workings. Mapping has traced the vein for 100m to the south-east. Opening the northern most adit on the Hill Vein allowed sampling to occur. These samples returned promising assay values of:

  • 56.5g/t Au and 200g/t Ag.

  • 12g/t Au and 193 g/t Ag.

Dateline’s technical team is encouraged by these initial results and will progress additional mapping, sampling and drilling of the Hill Vein.

==> picture [389 x 313] intentionally omitted <==

Lucky Strike and Mineral Hill tenements

Dateline undertook a first pass soil sampling program during the period with approximately 500 samples taken from Lucky Strike and Mineral Hill tenements located in the Green Mountain district of Gunnison and Saguache Counties in Colorado. ALS Geochemistry is assaying these samples at present with results expected shortly.

Further, the Company commenced a Ground Magnetic Survey and Surface Mapping program to identify additional high priority targets for follow-up exploration.

==> picture [73 x 73] intentionally omitted <==

3 | ASX Release 31 October 2019

ASX Release 31 October 2019

Grab sampling defines mineralisation extension:

Surface sampling, in conjunction with previously underground sampling and drilling, confirmed that mineralisation extended for at least 225m along the Sacramento Vein. Drill hole SAC14 (pictured above) showed that gold values extended 65m into the footwall. The recently discovered Hill Vein is currently mapped on the surface over a length of 100m and to within 120m of the Sacramento Vein.

The data indicates that mineralisation extends from 325m north to south, across the currently identified portions of the Sacramento Vein and Hill Vein systems. Both are open along strike and down-dip.

Operations at Udu Project – Fiji:

Management advises that metallurgical test work at the Udu polymetallic project in Fiji is ongoing. The project contains a JORC compliant inferred resource estimate of 4.53 million tonnes averaging 3.9% Zn, 1.2% Cu, 0.14% Pb, 0.26g/t Au, 29g/t Ag and 635ppm As using a 0.5% Zn cut off.

Results from test work are expected in the coming months. Board and management have determined to spend the minimum amount required to retain ownership of the project with joint venture or farm in partner being pursued.

Appointment of Anthony John Ferguson as Non-Executive Director:

During the quarter Dateline further strengthened its Board with the appointment of Anthony John Ferguson as a NonExecutive Director. Mr. Ferguson is an investor, entrepreneur and investment banker with considerable resource sector experience.

The majority of his career was spent with Macquarie Group where he led the natural resources team. He was responsible for advising on multiple large transactions in the mining industry in Australia and internationally. Mr. Ferguson also established Macquarie’s presence in Canada, led its Asian investment banking operations and established the Asia Resources Fund. His career also included three years in senior roles at Rothschild Investment Bank.

Corporate:

The Company expended $1,525m during the current period, predominately on exploration activities with corporate costs remaining low. Dateline is well capitalised with ~$3.3m of cash at bank as at 30 September 2019.

Management commentary:

Managing Director Stephen Baghdadi said: “The September quarter has been a period of solid achievement for Dateline. The Company continued to advance exploration activities predominantly with the ongoing comprehensive RC drilling program which was undertaken to determine if existing veins continued below the known workings. We have successfully confirmed this through the initial phase of this drill program.

“The discovery of the Hill Vein and the extension of mineralisation across the project area provides Dateline with considerable optionality and potential upside as it plans the next phase of the works program at the Gold Links Project.

“Dateline maintains a healthy cash balance matched with a low-cost base with the vast majority of funds deployed in the ground. We look forward to progressing additional exploration initiatives this quarter and reporting assay results progressively over the coming months.”

-ENDS-

==> picture [73 x 73] intentionally omitted <==

4 | ASX Release 31 October 2019

ASX Release 31 October 2019

For more information, please contact:

John Smith CFO / Company Secretary +61 2 9375 2353

www.datelineresources.com.au

About Dateline Resources Limited

Dateline Resources Limited (ASX: DTR) is an Australian publicly listed company focused on gold mining and exploration in Colorado, United States of America. The Company owns 100% of the Gold Links project which is located in Gunnison County

The Gold Links is comprised of several contiguous historic gold mines that have been consolidated by the company. Gold Links has produced up to 150,000 oz of highgrade gold (see ASX announcement of 8 February 2019)

Mineralisation can be traced on surface and underground for almost 6km from the Northern to the Southern sections of the project. Well documented records indicate that there are large areas that remain untested at surface and little to no exploration has been done below the valley floor.

Dateline also owns the Lucky Strike and Mineral Hill permitted gold properties and has recommissioned a gold processing plant located at the Lucky Strike Mine. The Gold Links and the Lucky Strike are located approximately 50km apart.

Competent Person’s Statement

Exploration information in this announcement is based upon work reviewed by Mr Gregory Hall who is a Chartered Professional of Australasian Institute of Mining and Metallurgy (CP-IMM) and undertaken by L.J. Karr an employee of CRG Mining LLC which is a 100% owned subsidiary of Dateline Resources. Mr Gregory Hall has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr Gregory Hall is a non-executive Director of Dateline Resources Ltd and consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

Forward Looking Statement s

This Announcement is provided on the basis that neither the Company nor its representatives make any warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the Announcement and nothing contained in the Announcement is, or may be relied upon as a promise, representation or warranty, whether as to the past or the future. The Company hereby excludes all warranties that can be excluded by law. The Announcement contains material which is predictive in nature and may be affected by inaccurate assumptions or by known and unknown risks and uncertainties and may differ materially from results ultimately achieved.

The Announcement contains “forward-looking statements”. All statements other than those of historical facts included in the Announcement are forward-looking statements including estimates of Mineral Resources. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, copper, gold and other metals price volatility, currency fluctuations, increased production costs and variances in ore grade recovery rates from those assumed in mining plans, as well as political and operational risks and governmental regulation and judicial outcomes. The Company does not undertake any obligation to release publicly any revisions to any “forward-looking statement” to reflect events or circumstances after the date of the Announcement, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. All persons should consider seeking appropriate professional advice in reviewing the Announcement and all other information with respect to the Company and evaluating the business, financial performance and operations of the Company.

==> picture [74 x 73] intentionally omitted <==

5 | ASX Release 31 October 2019

==> picture [569 x 323] intentionally omitted <==

----- Start of picture text -----

ASX Release 31 October 2019
Sacramento
Adit
Raymond
Reynolds Adit
Carter
Adit
Adit
Gold Links North Gold Links Centre Gold Links South
This image is intended as a guide only and is not a surveyed map of our true boundaries
----- End of picture text -----

Gold Links North includes Gold Links Centre includes Gold Links South includes
Sacramento Adit Raymond Adit Carter Adit
Sacramento vein 600 vein 100 vein
950 vein 300 vein
Reynolds Adit 1100 vein 800 vein
1200 vein 1200 vein 1320 vein
1740 vein 1700 vein 1440 vein
2100 vein 1800 vein 1480 vein
2150 vein 1825 vein 1550 vein
2200 vein 2457 vein 1925 vein
2600 vein 3300 vein 2385 vein
2800 vein Jessie vein 2500 vein
3300 vein Gold Monument vein 2835 vein
Maggie Mitchell vein 3040 vein
Dateline discovered Volunteer vein 3131 vein
Hill vein Upper Raymond vein 3640 vein
3750 vein
Veins starting with digits represent the number of feet from the start of
the portal and were discovered and mapped from inside the adit
4085 vein
4778 vein
4868 vein
Veins that don't start with digits were discovered from surface outcrops 4883 vein
6300 vein
Farleyvein
Only the 2150 vein has been drilled below the valley floor Grand Prize vein
Volunteer vein
Chloride vein

==> picture [474 x 4] intentionally omitted <==

==> picture [74 x 73] intentionally omitted <==

6 | ASX Release 31 October 2019

ASX Release 31 October 2019

2019 Drill-hole Collar Co-ordinates

2150 Vein Holes 2150 Vein Holes 2150 Vein Holes 2150 Vein Holes
Hole ID Easting Northing Elevation (feet) Total Depth
(feet)
Total Depth
(metres)
GL01 2,693,923 1292494.694 9,877 730 222.50
GL02 2,693,993 1292570.608 9,928 480 146.30
GL03 2,694,064 1292624.466 9,974 672 204.83
GL04 2,694,082 1292737.603 10,025 703 214.27
GL05 2,694,170 1292917.234 10,108 848 258.47
GL06 2,694,142 1292819.61 10,071 771 235.00
GL07 2,694,202 1293012.962 10,143 984 299.92
GL08 2,693,979 1292560.065 9,926 Incomplete Incomplete
150 45.72
GL09 2,694,082 1292737.603 10,025 Incomplete Incomplete
560 170.69
GL10 2,693,702 1292255.377 9,987 Incomplete Incomplete
485 147.83
GL11 2,693,704 1292254.72 9,987 Incomplete Incomplete
600 182.88
GL12 2,693,704 1292254.72 9,987 Incomplete Incomplete
540 164.59
GL13 2,694,064 1292624.466 9,974 Incomplete Incomplete
500 152.40
Sacramento Vein Holes Sacramento Vein Holes Sacramento Vein Holes Sacramento Vein Holes Sacramento Vein Holes Sacramento Vein Holes
Hole ID Easting Northing Elevation (feet) Total Depth
(feet)
Total Depth
(metres)
SAC01 2694836.664 1292465.865 9963.355 48 14.63
SAC02 2695290.447 1292610.363 10186.087 363 110.64
SAC03 2695304.245 1292713.754 10193.827 335 102.11
SAC04 2695369.898 1292903.305 10187.859 322.5 98.30
SAC05 2695454.532 1293082.552 10201.065 370 112.78
SAC06 2695338.818 1292814.038 10189.241 326.5 99.52
SAC07 2695402.116 1292987.732 10190.786 330 100.58
SAC08 2695399.677 1292988.868 10191.011 445 135.64
SAC09 2695458.447 1293101.346 10200.814 559 170.38
SAC10 Abandoned Abandoned Abandoned 54.5 16.61
SAC11 2695369.415 1292905.369 10185.401 450 137.16
SAC12 2695332.278 1292810.609 10191.047 358 109.12
SAC13 2695304.257 1292715.637 10193.972 353 107.59
SAC14 2695304.196 1292379.239 10133.392 385 117.35
SAC15 2695093.18 1292603.624 10083.158 500 152.40
SAC16 2695304.698 1292377.795 10134.123 142.5 43.43

Dateline Resources Drill Hole Collar Coordinates Colorado State Plane Central Zone, feet

==> picture [74 x 73] intentionally omitted <==

7 | ASX Release 31 October 2019

ASX Release 13 August 2019

Drill-hole table

Sample_ID Hole_ID/ Area Type From To Length Au_ppm Ag_ppm
P359525 GL02 RC 68.90 70.54 1.64 1.2 13.3
P359530 GL02 RC 77.10 78.74 1.64 0.686 3.01
P359439 GL03 Core 186.45 186.71 0.26 0.309 7.15
P359440 GL03 Core 187.53 187.83 0.30 0.446 7.39
P359444 GL03 Core 188.35 188.65 0.30 151 143
P359446 GL03 Core 188.91 189.37 0.46 1.47 150
P359447 GL03 Core 189.37 189.93 0.56 3.87 21.2
P359462 GL04 Core 217.85 218.18 0.33 6.96 107
P359464 GL04 Core 218.67 219.09 0.43 4.83 17.8
P359467 GL04 Core 219.59 219.95 0.36 0.24 6.36
P359468 GL04 Core 219.95 220.34 0.39 3.69 11.5
P359476 GL05 Core 209.15 209.48 0.33 7.82 7.66
P359480 GL05 Core 210.56 211.12 0.56 17.9 22.2
P359481 GL05 Core 211.12 211.61 0.49 1.27 4.25
P359483 GL05 Core 212.14 212.73 0.59 6.52 19.1
P359651 GL05 Core 250.82 251.05 0.23 7.27 30.2
P359489 GL06 Core 229.79 230.38 0.00 0.514 33.9
P359491 GL06 Core 230.38 230.94 0.00 3.05 34
P359496 GL06 Core 235.56 235.86 0.30 6.92 9.41
P359498 GL06 Core 235.86 236.09 0.23 0.343 3.3
P359253 SAC02 RC 80.38 82.02 1.64 0.343 23.4
P359330 SAC03 Core 92.78 93.11 0.33 0.343 10.6
P359278 SAC04 RC 83.66 85.30 0.00 0.514 35.4
P359280 SAC04 RC 85.30 86.94 0.00 0.309 10.1
P359355 SAC05 RC 101.71 103.35 1.64 0.651 8.66
P359390 SAC05 RC 86.94 88.58 1.64 0.377 11.1
P359310 SAC06 Core 85.76 86.25 0.00 0.24 7.12
P359311 SAC06 Core 86.25 86.58 0.00 0.309 56.5
P359317 SAC06 Core 90.39 90.88 0.00 14 94.7
P359319 SAC06 Core 91.37 91.86 0.00 1.71 21.3
P359341 SAC07 RC 88.58 90.22 1.64 0.549 6.79
P359342 SAC07 RC 90.22 91.86 1.64 4.08 47.2
P359432 SAC09 Core 81.20 81.66 0.46 0.309 5.54
P359436 SAC09 Core 118.21 118.50 0.30 6 18.7
P359433 SAC11 RC 98.43 100.07 1.64 0.446 16.9
P359425 SAC12 Core 101.02 101.64 0.62 2.16 49.1
P359426 SAC12 Core 101.64 101.90 0.26 8.12 268
P359414 SAC13 Core 96.69 97.15 0.46 80.1 489
P359415 SAC13 Core 97.15 97.64 0.49 9.8 61.6
P359416 SAC13 Core 97.64 98.43 0.79 2.06 14.7
P359401 SAC14 RC 111.55 113.19 1.64 0.274 4.19
P359407 SAC14 RC 119.75 121.39 1.64 0.309 5.35
P359502 SAC14 RC 19.69 21.33 1.64 0.309 5.43
P359516 SAC14 RC 103.35 104.99 1.64 0.309 4.58
P359518 SAC15 RC 96.78 98.43 1.64 2.91 21.6
P359430 SAC16 Core 31.46 32.15 0.69 18.1 241
P359431 SAC16 Core 40.55 40.98 0.43 0.377 16.8

==> picture [74 x 73] intentionally omitted <==

8| ASX Release 31 October 2019

ASX Release 4 September 2019

Grab and Channel sample tables

Location - Sacramento Area Location - Sacramento Area Location - Sacramento Area Location - Sacramento Area Location - Sacramento Area
Sample_ID Name Sample type Au_ppm Ag_ppm
P358968 Middle Sacramento Grab 67.4 816
P358971 Upper Sacramento Grab 1.99 65.5
P358972 Upper Sacramento Grab 9.12 161
P358973 Upper Sacramento Channel 12.4 320
P358974 Upper Sacramento Grab 7.64 214
P358966 Sacramento Grab 23.6 301
P358967 Sacramento Grab 16.8 118
P358963 Sacramento Channel 4.53 116
P358965 Sacramento Channel 2.19 26
P358964 Sacramento Channel 2.02 20.7
Location – New “Hill” Vein - 120m SE of Sacramento vein Location – New “Hill” Vein - 120m SE of Sacramento vein Location – New “Hill” Vein - 120m SE of Sacramento vein Location – New “Hill” Vein - 120m SE of Sacramento vein Location – New “Hill” Vein - 120m SE of Sacramento vein
Sample_ID Name Sample type Au_ppm Ag_ppm
P358969 Hill vein Grab 56.5 200
P358970 Hill vein Grab 12 193

==> picture [74 x 73] intentionally omitted <==

9 | ASX Release 31 October 2019