ASX Release

19 May 2023

Gold-Antimony-Arsenic Association identified at Rushworth Gold Project

Dart Mining NL (ASX:DTM) (“Dart Mining” or “the Company”) has determined that antimony and arsenic co-occur with gold mineralisation at the Phoenix Hill prosect, Rushworth, indicating similarities in the mineralisation style to several nearby significant gold mines.

Highlights

  • Drill chips from previous Reverse Circulation drilling completed at the Phoenix Hill prospect at Rushworth, Central Victoria have been re-assayed by multielement methods

  • Sample assays indicate that gold mineralisation co-occurs with antimony & arsenic, providing similarities to the nearby Fosterville gold mine

  • Peak assay values include 10.6 g/t Au, 0.26% Sb, & 370 ppm As

  • These data also provide information on notable pathfinder elements for soil sampling undertaken across the Rushworth Goldfield

Chairman, James Chirnside commented:

“This fundamental exploration approach and results is very important in establishing the elemental pathfinder relationships that are so essential to forward looking exploration activities. The fact that Dart holds 100% of this important historic Goldfield is as exciting as it is prospective”.

Visit our webpage: For more information, contact: Dart Mining NL www.dartmining.com.au James Chirnside, Managing Director ABN: 84 119 904 880 Email: [email protected] 412 Collins Street Find us on LinkedIn: Phone: +61 447 447 613 Melbourne Dart Mining NL VIC 3000

Page | 1

==> picture [112 x 46] intentionally omitted <==

MULTIELEMENT ASSAY RESULTS

Reverse Circulation (RC) drill chips obtained from drilling undertaken by Dart Mining across the Phoenix Hill prospect in Rushworth, Central Victoria ( DTM ASX April 2023; DTM ASX April 2021 ; Figure 1), have been re-assayed by various techniques providing important insights into the nature of the mineralisation system. All 1253 drill pulps representing 1 metre drilling intervals were analysed by portable X-Ray Fluorescence (pXRF), with a subset of 270 samples submitted for multielement analysis by four-acid digest, and 65 samples submitted for 50g fire assay to provide comparison to the 2- kilogram cyanide leach analysis reported in DTM ASX April 2021.

Results of the pXRF analysis of As and Sb (validated by laboratory-based four acid digest) analysis demonstrate that gold mineralisation co-occurs with elevated arsenic and antimony (Figure 2). Downhole plots show a clear concordance in Au, As and Sb, with peak As and Sb enrichment occurring with elevated Au values (Figure 2). This is notable as observations of sulphides in the Rushworth Goldfield have been rare to date, although Cherry (1994) noted that stibnite was the primary sulphide species, with lesser arsenopyrite and pyrite. Trace pyrite was identified in drill chips, primarily diagenetic pyrite associated with black shales encountered at depth in hole RARC09, although rare arsenopyrite was also observed in addition to rare visible gold in drill chips and panned from pulps (Figure 3). The general absence of sulphides across most holes is attributed to the generally shallow nature of the 44 holes drilled across the project, almost all of which remained within the oxide zone.

==> picture [453 x 264] intentionally omitted <==

Figure 1 – Location of the Phoenix Hill project on an enhanced digital terrain model (eDTM) derived from LiDAR data across the Rushworth area (DTM ASX April 2023).

Page | 2

==> picture [112 x 46] intentionally omitted <==

==> picture [435 x 324] intentionally omitted <==

Figure 2 – Selected downhole plots for Au, As and Sb assays for RC holes drilled at Phoenix Hill. See DTM ASX April 2021 for further details on the RC drilling program and reported assays.

==> picture [440 x 297] intentionally omitted <==

Figure 3 – Gold panned from a 0.4kg sub-sample collected from drilled interval 18 - 19m in RDRC03, which assayed at 7.0 g/t Au.

Page | 3

==> picture [112 x 46] intentionally omitted <==

VALIDATION OF ANALYTICAL METHODS

Comparison of four acid digest and pXRF data for As and Sb demonstrate that the pXRF results provide an accurate representation of the drill pulp composition (Figure 4). Comparison of samples run through a 50g fire assay method compared to those processed by the 2kg cyanide leach demonstrates that the 50g fire assay produces results that are representative of the gold mineralisation, although some outliers in this data show that the fire assay under-reports some of the higher-grade gold mineralisation in this nuggety-gold dominated system (Figure 4).

==> picture [448 x 401] intentionally omitted <==

Figure 4 – Validation of assay methods. A) Comparison of As values by pXRF and four-acid digest (ALS method ME-MS61). B) Comparison of Sb values by pXRF and four-acid digest (ALS method ME-MS61). C) Comparison of Au methods, showing that 50g fire assay provided a consistent result compared with a 2kg cyanide leach, although some higher-grade assays are under-reported by the fire-assay method in the nuggety style of gold mineralisation.

Page | 4

==> picture [112 x 46] intentionally omitted <==

PROJECT OVERVIEW

The Rushworth Goldfield is located in Central Victoria, 140 km north of Melbourne, and 65 km east of Bendigo. The Rushworth Goldfield is well-exposed, with the host strata exposed at surface. These strata have been tightly folded into upright, east-west trending folds, and two primary lines of goldquartz veining that extend for a cumulative strike length of approximately 14 km. Gold mineralisation is interpreted to be an orogenic, epizonal style similar to that forming high-grade gold shoots at the nearby Fosterville Mine. Within the Rushworth Goldfield, mineralised quartz veins have been intersected at depths below 400m in a limited number of historical workings, and up to 200m in modern drill holes. Historical workings rarely proceeded beyond the water table, leaving most veins untouched at depth.

Following the recent success at Fosterville, and the currently heightened state of interest in Victorian goldfields, competition for tenure in this area of Central Victoria is fierce. Dart Mining’s strategic 254 km[2] landholding in Central Victoria spans the entire historic Rushworth Goldfield, and is bordered by Chalice Goldmines to the northwest, and Nagambie Resources to the south and east.

==> picture [454 x 319] intentionally omitted <==

Figure 5 – Location of the Rushworth orogenic gold project, Central Victoria.

References

Cherry (1994). Report on Geological Investigations on ELs 3155, 3130, 3055 and 3056, Rushworth, Central Victoria. New Holland Mining NL October 1994.

Page | 5

==> picture [112 x 46] intentionally omitted <==

Approved for release by the board of directors.

For more information contact:

James Chirnside

Managing Director Dart Mining NL [email protected] +61 447 447 613

Peter Taylor Investor Relations NWR Communications [email protected] +61 412 036 231

About Dart Mining

Dart Mining’s (ASX: DTM) objective is in exploring, evaluating, and developing, several historic goldfields, as well as validating a new porphyry province in Northeast Victoria. The area is prospective for precious, base, battery, and other strategic metals. These include Lithium, Gold, Silver, Copper, Molybdenum, Zinc, Tungsten, Tin, Tantalum, and other important minerals. Dart Mining has built a strategically important gold exploration footprint in the Central and Northeast regions of Victoria, where historic surface and alluvial gold mining proves the existence of a significant regional gold endowment.

––– END –––

Competent Person’s Statement

The information in this report has been compiled, and verified by Dr. Ben Hines PhD, MSc, a Competent Person who is a Member of the Australian Institute of Geoscientists. Dr. Hines is the Exploration Manager for Dart Mining. Dr. Hines has sufficient experience that is relevant to the style of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Dr. Hines consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Forward-Looking Statement

Certain statements contained in this document constitute forward-looking statements. Forward-looking statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections about the industry in which Dart operates, and beliefs and assumptions regarding Dart’s future performance. Such forward-looking statements are based on a number of estimates and assumptions made by the Company and its consultants in light of experience, current conditions and expectations of future developments which the Company believes are appropriate in the current circumstances. When used in this document, words such as; “anticipate”, “could”, “intends”, “estimate”, “potential”, “plan”, “seeks”, “may”, “should”, and similar expressions are forward-looking statements. Although Dart believes that its expectations presented in these forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other factors, which may cause the actual results, achievements and performance of the Company to be materially different from the future results and achievements expressed or implied by such forward-looking statements. Investors are cautioned that forward-looking information is no guarantee of future performance and accordingly, investors are cautioned not to place undue reliance on these forward-looking statements.

Page | 6

APPENDIX 1

==> picture [112 x 46] intentionally omitted <==

TENEMENT STATUS

All tenement applications continue to pass through the approvals process with the tenements remaining in good standing as of the 31[st] of March 2023 (Table 1.1 – Figure 5).

Table 1.1. TENEMENT STATUS

Tenement
Number
Name Tenement Type Area (km2)
Unless
specified
Interest Location
MIN006619 Mt View2 Mining License 224 Ha 100% NE Victoria
EL5315 Mitta Mitta4 Exploration Licence 148 100% NE Victoria
EL006016 Rushworth4 Exploration Licence 32 100% Central Victoria
EL006277 Empress Exploration Licence 87 100% NE Victoria
EL006300 Eskdale3 Exploration Licence 96 100% NE Victoria
EL006486 Mt Creek Exploration Licence 116 100% NE Victoria
EL006764 Cravensville Exploration Licence 170 100% NE Victoria
EL006861 Buckland Exploration Licence 414 100% NE Victoria
EL007007 Union Exploration Licence 3 100% Central Victoria
EL006994 Wangara Exploration Licence 190 100% Central Victoria
EL007008 Buckland West Exploration Licence 344 100% NE Victoria
EL007099 Sandy Creek Exploration Licence 437 100% NE Victoria
EL006865 Dart EL (Application) 567 100% NE Victoria
EL006866 Cudgewa EL (Application) 508 100% NE Victoria
EL007170 Berringama EL (Application) 27 100% NE Victoria
EL007430 Buchan EL (Application) 546 100% Gippsland
EL007435 Goonerah EL (Application) 587 100% Gippsland
EL007425 Deddick EL (Application) 341 100% Gippsland
EL007428 Boebuck EL (Application) 355 100% NE Victoria
EL007426 Walwa EL (Application) 499 100% NE Victoria
EL007754 Tallandoon EL (Application) 88 100% NE Victoria
RL006615 Fairley’s2 Retention License 340 Ha 100% NE Victoria
RL006616 Unicorn1&2 Retention License 23,243 Ha 100% NE Victoria
EL9476 Woomargama Exploration Licence 188 100% New South Wales
ELA6536 Yambacoona EL (Application) 549 100% New South Wales
ELA6548 Barellan EL (Application) 159 100% New South Wales

All tenements remain in good standing as of 31 March 2023.

NOTE 1: Unicorn Project area subject to a 2% NSR Royalty Agreement with Osisko Gold Royalties Ltd dated 29 April 2013.

NOTE 2: Areas subject to a 1.5% Founders NSR Royalty Agreement. NOTE 3: Areas are subject to a 1.0% NSR Royalty Agreement with Minvest Corporation Pty Ltd (See DTM ASX Release 1 June 2016).

NOTE 4: Areas are subject to a 0.75% Net Smelter Royalty on gold production, payable to Bruce William McLennan.

Page | 7

==> picture [113 x 46] intentionally omitted <==

APPENDIX 3

JORC CODE, 2012 EDITION – TABLE 1

SECTION 1 SAMPLING TECHNIQUES AND DATA

Criteria JORC Code Explanation Commentary
Sampling techniques
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should not be taken as
limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the
Public Report.

In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
• Reverse Circulation (RC) drilling was used to obtain 1m bulk samples (~30 kg) which
were collected in plastic bags and examined for lithological logging purposes.
• Samples off the cyclone were split via a riffle splitter and collected in a calico bag,
which was removed every 1m to produce 1m composite samples (~ 3.5kg). The
cyclone was cleaned out at the end of each hole and periodically during drilling.
• In interpreted unmineralised, mineralised or altered zones, 1m samples were
submitted for analysis.
• Samples submitted to Gekko were whole sample crushed to 90% <2mm,
riffle/rotary split off 2.0-2.4 kg, pulverise to >90% passing 75 microns, then assayed
by Gekko methods Leachwell (2kg sample by BLEG), followed by FA30 (30g fire
assay) on Leachwell tails.
• Certified Reference Materials OREAS 235, OREAS 237, OREAS 245, as well as CRM
blank OREAS C27e were inserted every 10-25 samples as part of a QA/QC system.
• Rock samples were dried, crushed and whole sample pulverized and riffle split. A
sample aliquot (2kg) is taken for analysis. Gold has been analysed by Gekko
Method Leachwell (BLEG), with fire assay on tails indicating it can be considered a
total extraction technique for Au at Rushworth (>99.5% recovery rate of Au in
samples)
Drilling techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc.).
• 44 RC drillholes were drilled by EDrill Pty Ltd limited over the extent of mineralised
structures.
• Face sampling 5.5” hammer Reverse Circulation drilling
• Holes surveyed using an Eastman single shot camera for collar shots. Verified using
clinometer and compass surveyof rods.
Drill sample recovery
Method of recording and assessing core and chip sample recoveries and
results assessed.

Measures taken to maximise sample recovery and ensure representative
nature of the samples.

Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
• Each 1m sample was weighed and results recorded to monitor sample recovery –
a high average recovery was achieved in all holes.
• Experienced geologists ensured best drilling and sampling practices were
maintained.
• Experienced drillers ensured best drilling and sampling practices were maintained,
including pausing drilling between sample intervals to ensure all sample is out of
the system and regular cleaning of the sampling equipment.
• There was no observable relationshipbetween sample recoveryandgrade.
Logging
Whether core and chip samples have beengeologically and
• All holes were logged in their entirety.

Page | 8

==> picture [113 x 46] intentionally omitted <==

geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc.) photography.

The total length and percentage of the relevant intersections logged.
• Sample sizes are considered appropriate to correctly represent the mineralisation
style, and the thickness and consistency of intersections being sampled.
• 100% of the drilling was logged.
• pXRF soil samples are located by GPS and notes taken where cultural
contamination is suspected or sample site is adjacent to historic workings.
• Chip/grab samples were logged for qualitative mineral percentages, mineral
species and habit, and each sample location is recorded.
• All drill related data are referenced to the original ASX report by date published.
All details appear in the original report.
Sub-sampling
techniques and sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc. and whether
sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the
sample preparation technique.

Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.

Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material
being sampled.
• RC samples were collected from a riffle splitter mounted directly beneath the
cyclone.
• RC samples from all intervals were collected as 1m composite samples at the
splitting stage at the drill site.
• 12.5% of the sample was split with the remainder collected in residue bags.
• All RC samples were dry across the whole drill program, largely due to the shallow
(30m) nature of the holes.
• The RC sampling procedure is appropriate for the mineralisation style of
disseminated gold and is better described in the body of the report. 2kg samples
were prepared for analysis by Leachwell (BLEG) technique, which is appropriate for
the style, setting and grainsize of the material being sampled.
• The rock chip sampling procedure is appropriate for the mineralisation style.
• The samples were sent to ALS Global Laboratories, Pooraka SA or Gekko Systems,
Ballarat, Victoria.
• Soil samples are collected from the top of the B-Horizon with a pick and scoop,
then dried prior to analysis. pXRF analysis is undertaken on the small sample cup
of the soil sample and the results reported in a digital csv file output per sample.
Standards and duplicates are inserted at regular intervals and reviewed.
• The sample size is considered representative to estimate the local metal content
of the soil developed above the disseminated style of gold mineralisation targeted.
• Sampling was conducted at a reconnaissance level with regular duplicate and CRM
samples inserted for analysis by pXRF. All results are in line with expectations.
• Individual <7kg chip / grab samples were collected from outcrop, individual chips
making up the sample were <40mm and chipped from a random selection of the
mineralisation to generate a representative average sample of the mineralisation
targeted.
• The whole sample was crushed and pulverised prior to sub-sampling at the
laboratory via riffle splitting.
• Chip sampling generally collects <7kg of finely chipped rock sample across outcrop
or underground openings with the entire sample sent for whole sample crush and
grind. The sample size and sub-samplingmethod is thought suitable for a sulphide

Page | 9

==> picture [113 x 46] intentionally omitted <==

/ fine gold and nuggety gold environment.
• All drill related data are referenced to the original ASX report by date published.
All details appear in the original report.
Quality of assay data
and laboratory tests

The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.

For geophysical tools, spectrometers, handheld XRF instruments, etc.,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.

Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have been established.
RC samples
• Samples were submitted to Gekko Systems and analysed for gold using the
Leachwell method (BLEG), followed by a 30g fire assay (FA30) of BLEG tails to
determine BLEG gold recovery rate.
• In all instances, Fire Assay showed >99.5% gold recovery by the Leachwell (BLEG)
analysis, indicating it can be considered a total extraction technique for gold
mineralisation at Rushworth.
• Samples were whole sample crushed, pulverised to P90 at 75um and assayed by
Gekko Leachwell Method followed by 30g Fire assay (Gekko method FA30) on the
Leachwell tails.
• Leachwell (BLEG) analysis included 2.0-2.5kg of split sample run through a
Leachwell cyanide solution of 50% m/v for 24 hours, with Au determination by
Atomic Absorption Spectrometry (AAS)
• Fire assay of Leachwell tails were processed by filtering off of Leachwell tail, dried,
rolled and sub-sampled to 30g; Lead collection fire assay with silver used as the
secondary collector, Au grade determined by AAS.
• Orogenic Au standards OREAS 235, OREAS 237, and OREAS 245, as well as
rhyodacite blanks (OREAS C27e) were included every 10 – 25 samples as part of
the internal QA/QC system. All results are within expected confidence limits.
• Gekko Systems conducted their own internal laboratory checks, which included 3
blanks and 6 certified reference materials within each batch of 100 analyses.
• Laboratory blanks, standards are reviewed per batch to monitor accuracy and
precision.
Rock Chip Samples
• Samples were submitted to ALS Global (Pooraka) and analysed for gold using ALS
methods AU-AA26 (fire assay is considered a total extraction technique for gold)
and ME-MS61 (four acid digest is considered a total extraction technique for
copper exploration), Cu-OG62 (ore grade copper by three acid digest and HCl
leach) and Ag-OG62 (ore grade silver by three acid digest and HCl leach). These
techniques are appropriate and considered a total extraction technique for Au &
Cu.
• Samples were whole sample crushed, pulverised and assayed by ALS method AU-
AA26, ME-MS61, Cu-OG62 and Ag-OG62.
• Au standards OREAS 235, OREAS 237, and OREAS 245, along with porphyry
copper standards OREAS 503d, OREAS 504c and OREAS 506, as well as rhyodacite
blanks (OREAS C27e) were included every 20 samples as part of the internal
QA/QC system. All results are within expected confidence limits.

Page | 10

==> picture [113 x 46] intentionally omitted <==

• A field duplicate sample was collected every 20 samples and analysed within the
same sample run.
• ALS conducted their own internal laboratory checks.
• Laboratory blanks, standards are reviewed per batch to monitor accuracy and
precision.
• A direct comparison between internal pXRF and laboratory analysis of arsenic is
referenced in the body of the report, a high correlation is evident from the dataset.
• QAQC procedures were adopted during the in-house pXRF analysis with regular
sample duplicates and CRM inserted, assay data is within expectation. Laboratory
analysis only uses internal laboratory CRM results.
• Chip and Grab samples were submitted to ALS Chemex and analysed for Au using
ALS method Au-AA26 – a fire assay technique for total digestion.
• Due to the reconnaissance nature of the sampling, no QAQC procedures were
adopted other than internal laboratoryCRM.
Verification of
sampling and assaying

The verification of significant intersections by either independent or
alternative company personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.

Discuss any adjustment to assay data.
• The laboratory supplies all assay data as an export to a CSV file. The raw data is
edited to separate all duplicates and CRM results into a QA/QC tab in the CSV file
and reviewed.
• Verification of significant intersections were made by alternative company
personnel.
• No independent review of assay data has been carried out.
• Data were logged into spreadsheet and checked.
• Electronic-only assay data is imported into a spreadsheet from the laboratory’s
electronic data.
• No holes were twinned at this early exploration stage.
• Below detection limit data is identified in Appendix 1 using a < character followed
by the detection limit.
• All drill related data are referenced to the original ASX report by date published.
All details appear in the original report.
• pXRF analysis requires the manual entry into the XRF unit of the Sample number
of the soil sample. The sample number and associated analysis is stored as a digital
file within the pXRF unit for later export to a CSV file. The raw data is edited to
separate all duplicates and CRM results into a QAQC tab in the CSV file and
reviewed. <LOD results are also deleted from the dataset to allow numerical fields
to beplotted.
Location of data points
Accuracy and quality of surveys used to locate drill holes (collar and down-
hole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.
• The location of drill hole collars and geological mapping confirmed using a
Garmin GPSMAP 66i GPS, set to MGA94 Grid Datum (Zone 55) with topographic
control taken from the GPS. Accuracy is variable but maintained <3m during the
mapping process with constant visual quality assessment conducted.
• Hand-held GPS was used to survey a control point and drill hole collar positions
are then measured bytape and compass relative to the GPS control. The

Page | 11

==> picture [113 x 46] intentionally omitted <==

accuracy between holes is <0.5m but absolute accuracy is relative to the original
GPS control point at <5m.
• All maps, plans and data are on an MGA datum and GDA94 zone 55 projection.
• Elevation is established from the GPS control point.
• The location of the chip / grab / soil samples and geological mapping used a
Garmin GPSMAP 62S GPS using the MGA94 Grid Datum (Zone 55) with
topographic control taken from the GPS. Accuracy is variable but maintained <5m
during the mapping process with constant visual quality assessment conducted.
• Mine workings are located using GPS control and then tape and compass survey
for underground development.
• All drill related data are referenced to the original ASX report by date published.
All details appear in the original report.
Data spacing and
distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.

Whether sample compositing has been applied.
• Drill sites were restricted to existing tracks. It was not intended to establish a drill
spacing for resource estimation although these holes may be used at a later date.
• All drill related data are referenced to the original ASX report by date published.
All details appear in the original report.
• Soil sample spacing may be variable and is designed to capture variability in the
key pathfinder element analysed with respect to the geological model of the
mineralisation under review. The regional soil program reported uses a nominal
50m sample spacing as this was considered the maximum spacing that would
capture regional mineralisation trends.
• Soil pXRF results are used for geochemical studies only and are not composited.
• Where exposure allows, multiple chip samples are collected across mineralised
structures to assess the continuity of Au grade.
• Rock chip sampling is limited by outcrop exposure.
• Reconnaissance-scale chip / grab samples are not presented or considered to be
representative of the average grade. Grab samples only represent the grade at a
single point within the rock exposure. Sample spacing is designed to allow an initial
assessment of gold mineralisation and is not suitable for future resource
estimation activities.
Orientation of data in
relation to geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit
type.

If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
• Drilling was restricted to existing tracks and pads. However, in all cases it was
possible to drill at a high angle to the host structures and achieve a suitable
orientation that cross cuts the mineralisation. True width intersections are
provided in drill sections, there appears to be no relationship between drill
orientation and mineralisation grades.
• Due to the steep grade of tracks and topography, hole orientation was limited or
dictated by landscape physiology in some instances.
• Regional 50m soil grid aligned north-south across a ~6.5x3 km area.
• No significant sample bias is considered to be introduced because of the
orientation of the soil lines without beingnoted in the bodyof the report.

Page | 12

==> picture [113 x 46] intentionally omitted <==

• Grab samples do not capture any aspect of the potential variation in grade in
relation to the orientation of the mineralisation and represents only a single point
inside the mineralisation. Chip samples are collected perpendicular to strike
where possible to avoid any sample bias and only where outcrop or subcrop exists.
The orientation of rock chipsamples is recorded and indicated in diagrams.
Sample security
The measures taken to ensure sample security.
• All samples submitted for analysis are placed in sealed poly-weave bags and
delivered to a commercial transport company for delivery to the laboratory. Any
evidence of sample damage or tampering is immediately reported by the
laboratory to the company and a decision made as to the integrity of the sample
and the remainingsamples within the damaged/tampered bag/s.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
• An internal review of procedures, operations, sampling techniques and analytical
techniques was made by Dart Mining.
• All drilling and assay data is validated upon entry into the EarthSQL Quest
database.
• The mapping and sampling methodology and results were documented and
reviewed by an independent expert who acts as the competent person for this
report.

SECTION 2 REPORTING OF EXPLORATION RESULTS

Criteria JORC Code Explanation Commentary
Mineral tenement
and land tenure
status

Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical sites, wilderness or
national park and environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.

All tenements remain in good standing as of 31stMarch 2023.

Details of Dart Mining tenements shown in Appendix 1
Exploration done
by other parties

Acknowledgment and appraisal of exploration by other parties.

Gold was discovered in Rushworth in August 1853, and for several years production
was from alluvial workings. This developed into reef workings by 1860. Mining had
almost completely ceased by 1914 and attempts to revitalise the goldfield since
have been met with no success.

Garratt (1985) calculated at least 97,000 oz of gold was produced from the
Rushworth Goldfield, with a further 40,000 oz from the Whroo Goldfield 6km to
the south of Rushworth. These figures are considered an absolute minimum for
production due to poor record keeping prior to the 1860’s and the number of small,
unrecorded workings in the district.

A detailed soil sampling survey of over 1200 samples were collected across a 6 km2
area byNew Holland MiningN. L.

Page | 13

==> picture [113 x 46] intentionally omitted <==


A series of 26 RAB holes were drilled across the Nuggety Hill – Specimen Hill
prospect by New Holland Mining N.L. in 1993. Several significant intersections
were identified, including 3m at 10.1 g/t, 3m at 3.16 g/t, and 3m at 3m at 2.83 g/t.
The highest grades typically occurred between 50-60m down hole, and grade
often displayed gold enrichment near the surface and approaching the water
table. Notably, drilling stopped at the water table.

In 1994 New Holland Mining N. L. drilled 909m across 14 RAB drill holes across the
Star of the West prospect, and 896m across 12 RC holes on the Nuggety prospect,
924m were drilled across 14 RC holes on the Fletchers Reef section of the Phoenix
prospect. A review and resampling of soil grids across workings and various
prospects showed little correlation between gold bearing structures and gold
grade,suggestingsoil samplingis of limited utilityin identifyingmineralisation.
Geology
Deposit type, geological setting and style of mineralisation.

EL006016 is located in the Melbourne structural zone of the Lachlan Fold Belt in
central Victoria. The EL is underlain by metamorphosed Upper Silurian to Lower
Devonian age Melbourne Group sediments. A Bendigo-style mineralisation model
in folded turbidite sequence with late-stage brittle faulting and late gold
mineralisation is interpreted across the Phoenix Hill-Appleton’s-Chinaman’s Hill
prospect at Rushworth, with nuggety gold mineralisation observed on thrust-fault
related flat veins, saddle reefs and AC joints.

The exploration rationale applied by Dart Mining is in line with the significant work
previously undertaken across the tenement, targeting large thrust fault style reef
systems and cross course faults, known to show high grade mineralisation and
having potential for large tonnage stockwork-relatedgold mineralisation.
Drill hole
Information

A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.

If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.

Additional historic drillhole collar information is presented in previous Dart Mining
ASX Announcements and Releases. An archive of historic Dart Mining ASX releases
is
held
at:
https://www2.asx.com.au/markets/trade-our-cash-
market/announcements.dtm

All down hole weighted average gold and copper grade data quoted as significant
intersections is provided as down hole widths and calculated using a lower cut-off
grade of 0.1 g/t Au with no more than 4m of internal dilution (unless otherwise
stated).

All drill-related data are referenced to the original ASX report by date published.
All details appear in the original report.
Data aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.

Where aggregate intercepts incorporate short lengths of high-grade results

All drill-related data are referenced to the original ASX report by date published.
All details appear in the original report.

Page | 14

==> picture [113 x 46] intentionally omitted <==

and longer lengths of low-grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be
clearly stated.
Relationship
between
mineralisation
widths and
intercept lengths

These relationships are particularly important in the reporting of Exploration
Results.

If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.

If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (e.g. ‘down hole length, true width not
_known’). _

The relationship between the drill hole and the geometry of the mineralised
structures is not presented at this preliminary stage.

All drill-related data are referenced to the original ASX report by date published.
All details appear in the original report.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.

All drill-related data are referenced to the original ASX report by date published.
All details appear in the original report.
Balanced reporting
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.

All drill-related data are referenced to the original ASX report by date published.
All details appear in the original report.

Soil As and Sb values are reported in full as graduated symbols for all soil lines, the
legend provides a guide to soil values. This method of reporting is considered to
be comprehensive and un-biased for early geochemical work.

Rock chip gold assay values are reported in full as graduated symbols for all soil
lines, the legend provides a guide to rock values. This method of reporting is
considered to be comprehensive and un-biased for early geochemical work.
Other substantive
exploration data

Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or contaminating substances.

Any other relevant information is discussed in the main body of the report.
Further work
The nature and scale of planned further work (e.g. tests for lateral extensions
or depth extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.

Planned work is discussed in the body of the report and is dependent on future
company direction.

Page | 15