AI assistant
DART MINING NL — Capital/Financing Update 2019
Mar 18, 2019
64792_rns_2019-03-18_f647cb75-f282-4895-ba42-9001f568064a.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
ASX Release
Dorchap Lithium Project Update
19[th] March 2019
LITHIUM EXPLORATION DRILLING TO COMMENCE AT THE DORCHAP PROJECT
==> picture [118 x 147] intentionally omitted <==
ASX Code: DTM
Key Prospects / Commodities:
GOLD
Dart Mining N L (DTM) advises that all statutory approvals required for roadside drilling at the Eagle and Hollow Way dykes in north-eastern Victoria (Figure 1) have now been received. A drill contractor has been appointed and drilling is scheduled to commence in the next 5 days.
Mountain View / New Discovery - Au Fairleys - Au Rushworth – Phoenix - Au Onslow – Au Saltpetre Gap - Au
LITHIUM / TIN / TANTALUM
As advised in the December Quarterly Report (DTM ASX 31 January 2019), up to 5 Reverse Circulation holes are to test the Hollow Way Dyke target (Figures 1 & 2) and up to 3 holes to test the Eagle Dyke target (Figures 1 & 3). This initial drilling program will allow a preliminary assessment of the dyke targets and, importantly, does not require expensive vegetation offset due to the use of existing road access.
As previously reported (DTM ASX 31 January 2019), surface chip sampling at the Hollow Way Dyke target shows up to 10m @ 1.37% Li2O from a dyke containing coarse petalite (Figure 2) and the Eagle Dyke target shows up to 10m @ 0.94% Li2O with fine spodumene identified as the main lithium mineral (Figure 3). This initial drilling program is the first drill testing of lithium-mineralised pegmatite dykes in the Dorchap Dyke Swarm. It is a significant milestone in the evaluation of this large, new Victorian lithium province first identified by Dart Mining.
James Chirnside
Managing Director Dart Mining NL
Empress – Li-Sn-Ta Eskdale / Mitta – Li-Sn-Ta
PORPHYRY GOLD / COPPER / MOLYBDENUM
Empress – Au-Cu Stacey’s – Au-Cu Copper Quarry: Cu+/- Au Gentle Annie: Cu Morgan Porphyry: Mo-Ag-Au Unicorn Porphyry: Mo-Cu-Ag
Investment Data:
Shares on issue: 928,042,803
Substantial Shareholders:
Top 20 Holdings: 50.33 %
Board & Management:
Managing Director: James Chirnside Non-Executive Director: Dr Denis Clarke Non-Executive Director: Luke Robinson Company Secretary: Julie Edwards
Dart Mining NL
ACN 119 904 880
Contact Details:
4 Bryant Street, Corryong VIC 3707 Australia
James Chirnside
Phone: +61 (0)260 762 336 Email: [email protected]
Visit our webpage: www.dartmining.com.au
==> picture [447 x 474] intentionally omitted <==
Figure 1. Proposed Phase 1 drilling dyke target locations (Hollow Way and Eagle dykes) within the north Dorchap Dyke geochemistry and fractionation target area (Magenta Ellipse) - interpretation (20x 8 km). Note the correlation of low K/Rb and K/Cs ratios (fractionation markers) and high Be assay data positions relative to the highest lithium chip sample values.
==> picture [596 x 94] intentionally omitted <==
Page | 2
==> picture [601 x 171] intentionally omitted <==
==> picture [601 x 172] intentionally omitted <==
==> picture [601 x 86] intentionally omitted <==
Figure 2. Proposed roadside Phase 1 RC drill program – Hollow Way Dyke Target (Dorchap Project).
Page | 3
==> picture [549 x 414] intentionally omitted <==
Figure 3. Proposed Phase 1 roadside RC drill program – Eagle Dyke Target (Dorchap Project).
Page | 4