ASX Release

Lithium Project Update

19 June 2019

Highlights

  • Restricted drilling at the Eagle dyke indicates dyke continuity below 100m from surface.

  • The reconnaissance drill programme indicates lithium zonation is likely within both the Eagle and Hollow Way Dykes conforming to typical LCT pegmatite dykes worldwide.

  • Ongoing fieldwork and helicopter surveys continue to identify pegmatite targets for follow-up with a focus on testing dykes with tonnage potential.

==> picture [118 x 147] intentionally omitted <==

ASX Code: DTM

Key Prospects / Commodities:

GOLD

Mountain View / New Discovery - Au Fairleys - Au Rushworth – Phoenix - Au Onslow – Au Saltpetre Gap - Au

LITHIUM / TIN / TANTALUM

Empress – Li-Sn-Ta Eskdale / Mitta – Li-Sn-Ta

Roadside Drill Results – Eagle and Hollow Way Dykes

Dart Mining NL (Dart Mining) has now received all drill sample assay results from its recent roadside drill program. Geological interpretation is complete from the reconnaissance reverse circulation (RC) drill program at both the Hollow Way and Eagle dykes. This roadside drilling program, which represents the first drilling to have been undertaken along the Dorchap Dyke Swarm for lithium, targeted two dykes with available roadside access within the Dorchap fractionation target area – Figure 1. The drilling was limited to targets that could be accessed without the need to incur vegetation offset costs. All drill holes intersected pegmatite below the mapped dyke outcrops. The Hollow Way dyke is interpreted to consist of a series of discontinuous plunging lenses of variable width and strike extent. The Eagle dyke (Figure 1) appears to be continuous down dip up to 100m below the outcrop where intersected by drilling. Lithium mineralization was confirmed at the Eagle dyke, but no significant lithium mineralization was returned at the Hollow Way dyke, despite strong rock chip assay results and coarse visible Petalite crystals in outcrop.

PORPHYRY GOLD / COPPER / MOLYBDENUM

Empress – Au-Cu Stacey’s – Au-Cu Copper Quarry – Cu+/- Au Gentle Annie – Cu Morgan Porphyry – Mo-Ag-Au Unicorn Porphyry – Mo-Cu-Ag

Investment Data:

Shares on issue: 1,002,673,136 Unlisted Options: 25,000,000

Substantial Shareholders:

Top 20 Holdings: 55.17 %

Board & Management:

Managing Director: James Chirnside Non-Executive Director: Dr Denis Clarke Non-Executive Director: Luke Robinson Company Secretary: Julie Edwards

Dart Mining NL

ACN 119 904 880

Contact Details:

4 Bryant Street, Corryong VIC 3707 Australia

James Chirnside

Phone: +61 (0)260 762 336 Email: [email protected]

Visit our webpage: www.dartmining.com.au

==> picture [447 x 598] intentionally omitted <==

Figure 1. Location map of the Dorchap Lithium Project roadside drill sites and Phase 7 helicopter survey area in relation to existing exploration tenements held 100% by Dart Mining NL.

==> picture [596 x 93] intentionally omitted <==

EAGLE DYKE

The Eagle dyke outcrop is 180m in length and up to 80m in width, narrowing at both ends of the dyke. A 50m strike length portion at the northern extent of the Eagle dyke outcrop has been tested by three RC holes for a total of 274m (Figure 2). Down dip continuity is interpreted from the three holes up to 100m below the outcrop. The dyke appears to narrow both down dip and along strike where intersected (Figures 3, 4 & 5). The drill hole intersections generally show low levels of lithium oxide. Hole MIEDRC003 shows the best intercept across the full width of the dyke with a weighted average of 20m @ 0.332% Li2O from 2m down hole, some 5.5m estimated true width (Figure 5). This hole also shows a peak lithium oxide grade of 2m @ 1.158% Li2O from 10m down hole. A complete assay listing is provided in Appendix A with drill hole collar location and hole orientations presented in Table 1. Oxidation is variable with depth across all of the holes with the oxidized pegmatite intersected in MIEDRC003 showing the most elevated Li2O values. Insufficient drilling has been completed to establish the relationship between oxidation and lithium grade, however it would appear there is potential for oxidation to locally increase grades.

The Eagle dyke prospect requires further drill testing as part of the ongoing evaluation of the entire Dorchap Dyke Swarm. Exploration teams continue the search for dykes with potential for both significant tonnage and lithium grades with ongoing mapping and sampling field programs following-up helicopter targets that have already been identified.

==> picture [503 x 380] intentionally omitted <==

Figure 2. Location map of the Eagle dyke prospect roadside drill collars and hole traces

Page | 3

==> picture [218 x 338] intentionally omitted <==

==> picture [218 x 338] intentionally omitted <==

Figure 3. MIEDRC001 Drill Section – Interpretation and results. Figure 4. MIEDRC002 Drill Section – Interpretation and results.

==> picture [214 x 332] intentionally omitted <==

Figure 5. MIEDRC003 Drill Section – Interpretation and results.

Page | 4

HOLLOW WAY DYKE

A 100m strike length of the Hollow Way dyke has been tested by four RC drill holes. The holes were drilled from existing road access (Figure 6) as low impact exploration work that did not require vegetation offset. A total of 304m of RC drilling has been completed on 4 drill sections with geological interpretation suggesting the Hollow Way dyke is a discontinuous system of dyke lenses with generally steep dip. Assay data from intersections below outcropping lithium mineralisation show low levels of lithium and associated trace elements, this is despite significant lithium in rock chips showing coarse visible Petalite in outcrop. The discontinuous nature of the dyke, narrow widths and low lithium grade at depth downgrade the prospectivity of the Hollow Way target. Table 1 shows a summary of both the Hollow Way and Eagle Dyke drill hole locations, orientation and lengths (Table 1). A full listing of lithium assay data from the complete drilling program is provided in Appendix A .

==> picture [490 x 348] intentionally omitted <==

Figure 6. Location map of the Hollow Way dyke prospect roadside drill collars and hole trace (note MCHWRC004 is a vertical hole).

==> picture [429 x 126] intentionally omitted <==

----- Start of picture text -----

Hole_ID PROSPECT DEPTH (m) MGA94_East MGA94_North AHD_RL AZIMUTH (GRID) DIP
MCHWRC001 HOLLOW WAY 98 534,252 5,943,496 972 242 -60
MCHWRC002 HOLLOW WAY 90 534,252 5,943,492 972 204 -60
MCHWRC003 HOLLOW WAY 79 534,279 5,943,420 978 19 -60
MCHWRC004 HOLLOW WAY 37 534,259 5,943,470 974 0 -90
MIEDRC001 EAGLE 140 523,992 5,949,234 1065 222.6 -60
MIEDRC002 EAGLE 79 523,965 5,949,227 1068 237 -60
MIEDRC003 EAGLE 55 523,927 5,949,225 1071 94.3 -84.7
----- End of picture text -----

Table 1 . Drill Hole Locations and Orientation – Hollow Way and Eagle Drill Program

Page | 5

DRILLING TECHNIQUES AND SAMPLING

A track mounted PDR1000 RC drill rig was used to carry out all roadside drilling using a face sampling hammer with residue samples collected every metre for geological logging and assay samples composited at a nominal two metre sample interval from the cyclone. Each sample was weighed at the rig to determine sample recovery and sample composites submitted for analysis based on geological logging of the interval. All pegmatite intervals were sent for lithium oxide analysis using a total digestion peroxide digest technique (ALS Method ME-ICP89) with associated trace element reporting. Sample size is considered adequate to allow a representative estimate of local lithium levels with two metre composites averaging 4.5kg. All samples are riffle split at the drill rig and bagged into calico bags for submission to the laboratory. There is a secure chain of custody for all sample bags from the drill rig to the laboratory. Samples are transported by Dart Mining personnel from the drill rig to a commercial transport facility for dispatch to the laboratory. Any missing or damaged sample bags are reported by the laboratory.

Dart Mining has adopted a QA/QC system across all drilling and use commercially available certified reference material (CRM) with known lithium and key trace element concentrations. A CRM sample is inserted at 1:10 samples into the laboratory stream and assay results compared with expectations, all CRM results are within expected confidence limits and indicate the results are not biased or inaccurate for the drilling conducted.

Interpretation of the assay data does not indicate any relationship between pegmatite width and lithium assay values (grade) or show any sample bias based on drill hole orientation, as such the assay data is considered representative of the local lithium concentration within intersections. Weighted average lithium oxide grades are reported on cross sections due to a small number of samples being one metre in width. The average grade is presented across the full intersection through the pegmatite with no top cut or bottom cut applied, this is considered appropriate at this early stage of exploration.

Drill hole collars are surveyed by a combination of GPS and local tape and compass surveys relative to a single GPS control point, this point is accurate to within 10m with relative hole locations accurate to within 2m from the GPS control point. Holes were surveyed for azimuth and dip as a combination of open hole and within rods based on hole collapse conditions. A nominal 30m down hole survey interval has been used.

HELICOPTER SURVEY PHASE 7

A further phase of helicopter survey (Phase 7) was also completed in April with additional dyke targets identified for ground based follow-up mapping and sampling - Figure 1. An upcoming helicopter survey (Phase 8) targeting a small section to the south of Hollow Way and to the north of Boones Dyke is planned as weather over the winter period allows, this will conclude the survey along the full length of the Dorchap Dyke Swarm.

TENEMENT STATUS UPDATE

Dart Mining reported (ASX 5 April 2019) the acquisition of the Rushworth exploration license EL006016 over the historic Rushworth Goldfield in Central Victoria. The granted exploration licence has since been transferred to Dart Mining with 100% beneficial interest. EL006016 covers the expired mining licenses MIN5246 and MIN5306 with a current exploration license application made over the expired MIN5538. Tenement applications continue to pass through the approvals process with the tenements remaining in good standing as at 31 May 2019 (Figure 7).

Page | 6

==> picture [319 x 305] intentionally omitted <==

Figure 7. Location map of existing tenements, held 100% by Dart Mining NL.

Table 2. Tenement Status

Table 2. Tenement Status
Tenement

Area(km2)

Name
Tenement Type
Number
EL5194
Mt. Alfred
Exploration
EL5315
Mitta Mitta4
Exploration
195
100%
NE Victoria
EL006277
Empress
Exploration
221
100%
NE Victoria
EL006300
Eskdale3
Exploration
245
100%
NE Victoria
EL006486
Mt Creek
Exploration
190
100%
NE Victoria
EL006764
Cravensville
EL(Application)
~170
100%
NE Victoria
EL006861
Buckland
EL(Application)
~414
100%
NE Victoria
EL006865
Dart
EL(Application)
~500
100%
NE Victoria
EL006866
Cudgewa
EL(Application)
~500
100%
NE Victoria
EL006016
Rushworth
Exploration
61
100%
Central Victoria
RL006615
Fairley’s2
Retention License Application
340 Ha
100%
NE Victoria
RL006616
Unicorn1&2
Retention License Application
23,243 Ha
100%
NE Victoria
MIN006619
Mt View2
MiningLicense Application
224 Ha
100%
NE Victoria

All tenements remain in good standing at 31 May 2019.

NOTE 1: Unicorn Project area subject to a 2% NSR Royalty agreement with Osisko Gold Royalties Ltd dated 29 April 2013. NOTE 2: Areas subject to a 1.5% Founders NSR Royalty Agreement. NOTE 3: Areas subject to a 1.0% NSR Royalty Agreement with Minvest Corporation Pty Ltd (See DTM ASX Release 1 June 2016).

Competent Person’s Statement

The information in this report that relates to Exploration Results is based on information compiled by Dean Turnbull B.App.Sc.(Geol) Hons. a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr Turnbull is an independent consultant. Mr Turnbull has sufficient experience that is relevant to the style of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Turnbull consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Page | 7

JORC CODE, 2012 EDITION – TABLE 1

SECTION 1 SAMPLING TECHNIQUES AND DATA

Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that
are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information.
Reverse Circulation (RC)
drilling was used to obtain 1
m bulk samples (~ 25 kg)
which were collected in
plastic bags and examined
for lithological logging
purposes.
Samples were split via a
riffle splitter mounted below
the cyclone and collected in
a calico bag, which was
removed every 2m to
produce 2m composite
samples (~ 4.5kg). The
cyclone was cleaned out at
the end of each hole and
periodically during drilling.
2m composite samples
selected based on logged
lithology were submitted for
analysis.
Samples submitted to ALS
were whole sample crushed
to 70% <2mm, riffle/rotary
split off 1 kg, pulverise to
>85% passing 75 microns,
then assayed by ALS ME-
ICP89 and ME-MS91.
Certified Reference Material
OREAS147, OREAS148
and OREAS149 as well as
silica blanks were inserted
every 10 samples as part of
a QA/QC system.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc.) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
7 RC Drillholes were drilled
by EDrill Pty Ltd limited over
two mineralised dyke
structures.
Face sampling 5 ¼” RC
drilling
Down hole surveys used a
Trueshot downhole camera
both in open hole and within

Page | 8

Criteria JORC Code explanation Commentary
rods (for dip).
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.



Each 2m composite sample
was weighed and results
recorded to monitor sample
recovery – a high average
recovery was achieved in all
holes.
Experienced geologists
ensured best drilling and
sampling practices were
maintained.
Experienced drillers
ensured best drilling and
sampling practices were
maintained, including
pausing drilling between
sample intervals to ensure
all sample is out of the
system and regular cleaning
of the sampling equipment.
There was no observable
relationship between
sample recovery and grade.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
The total length and percentage of the relevant
intersections logged.


Drill chips were geologically
logged at 1 m intervals for
lithology (including quartz
types and percentages),
alteration and
mineralisation, and drilling
conditions
Representative chips from
each metre were collected
in chip trays. Chip trays
were photographed.
100% of the drilling was
logged.
Sub-sampling If core, whether cut or sawn and whether quarter, Samples were collected
techniques half or all core taken. from a riffle splitter below
and sample If non-core, whether riffled, tube sampled, rotary the cyclone.
preparation split, etc. and whether sampled wet or dry. 12.5% of the sample was
For all sample types, the nature, quality and split with the remainder
appropriateness of the sample preparation collected in residue bags.
technique. The majority of samples
Quality control procedures adopted for all sub- were dry in the shallow
sampling stages to maximise representivity of holes, there were four wet

Page | 9

Criteria JORC Code explanation Commentary
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
samples collected during
the program.
The sampling procedure is
appropriate for the
mineralisation style of large
pegmatite dykes and is
better described in the body
of the report.
The samples were sent to
ALS Laboratories, Pooraka
SA.
Quality of The nature, quality and appropriateness of the Samples were submitted to
assay data assaying and laboratory procedures used and ALS Chemex and analysed
and
laboratory
tests
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
for a suite of trace elements
using ALS Methods ME-
ICP89 and ME-MS91 (a
peroxide leach is considered
XRF instruments, etc., the parameters used in a total extraction technique
determining the analysis including instrument for lithium). These
make and model, reading times, calibrations techniques are appropriate
factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
and considered a total
extraction technique for key
metals Rb, Sn, Nb, Ta, Cs,
Be and Li.
checks) and whether acceptable levels of Samples were whole
accuracy (i.e. lack of bias) and precision have sample crushed, pulverised
been established. and assayed by ALS ME-
ICP89 and ME-MS91.
Li standards OREAS147,
OREAS148 and
OREAS149 as well as silica
blanks were included every
10 samples as part of the
internal QA/QC system. All
results are within expected
confidence limits.
ALS conducted their own
internal laboratory checks.
Laboratory blanks,
standards are reviewed per
batch to monitor accuracy
and precision.

Page | 10

Criteria JORC Code explanation Commentary
Verification
of sampling
and assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.






The laboratory supplies all
assay data as an export to
a CSV file. The raw data is
edited to separate all
duplicates and CRM
results into a QA/QC tab in
the CSV file and reviewed.
Verification of significant
intersections were made by
alternative company
personnel.
No independent review of
assay data has been
carried out.
Data were logged onto
paper and transferred to a
spreadsheet and checked
Electronic-only assay data
is imported into a
spreadsheet from the
laboratory’s electronic data.
No holes were twinned at
this early exploration stage.
Below detection limit data
is identified in Appendix 1
using a < character
followed by the detection
limit.
Location of Accuracy and quality of surveys used to locate drill The location of drill hole
data points holes (collar and down-hole surveys), trenches, collars and geological
mine workings and other locations used in Mineral mapping used a Garmin
Resource estimation. GPSMAP 62S GPS using
Specification of the grid system used. the MGA94 Grid Datum
Quality and adequacy of topographic control. (Zone 55) with topographic
control taken from the GPS.
Accuracy is variable but
maintained <5m during the
mapping process with
constant visual quality
assessment conducted.
Hand held GPS is used to
survey a control point and
drill hole collar positions are
then measured by tape and
compass relative to the
GPS control. The accuracy
between holes is <2m but

Page | 11

Criteria JORC Code explanation Commentary
absolute accuracy is
relative to the original GPS
control point at <10m.
Down hole, multi-shot
surveys were taken at a
nominal 30 m interval where
possible in an open hole.
Where the hole was
suspected to have
collapsed a downhole,
multi-shot survey was
conducted within the rods to
determine dip.
All maps, plans and data
are on an MGA datum and
GDA94 zone 55 projection.
Elevation is established
from the GPS controlpoint.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
Drill sites were restricted to
existing tracks. It was not
intended to establish a drill
spacing for resource
estimation although these
holes can be used at a later
date.
2m assay composites were
collected at the splitter on
the drill rig. This sample
interval is considered
appropriate for the style of
pegmatite mineralisation
tested.
Orientation Whether the orientation of sampling achieves Drilling was restricted to
of data in unbiased sampling of possible structures and the existing tracks. However, in
relation to extent to which this is known, considering the all cases it was possible to
geological deposit type. drill at a high angle to the
structure If the relationship between the drilling orientation host structures (refer figures
and the orientation of key mineralised structures is 2 to 6), and achieve a
considered to have introduced a sampling bias, suitable orientation that
this should be assessed and reported if material. cross cuts the mineralised
dykes. True width
intersections are provided in
drill sections, there appears
to be no relationship
between drill orientation and
mineralisationgrades.

Page | 12

Criteria JORC Code explanation Commentary
Sample
security
The measures taken to ensure sample security. All samples submitted for
analysis are placed in
sealed poly-weave bags
and delivered to a
commercial transport
company for delivery to the
laboratory. Any evidence of
sample damage or
tampering is immediately
reported by the laboratory
to the company and a
decision made as to the
integrity of the sample and
the remaining samples
within the damaged /
tampered bag/s.
Audits or The results of any audits or reviews of sampling An internal review of
reviews techniques and data. procedures, operations,
sampling techniques and
analytical techniques was
made by Dart Mining.

Page | 13

SECTION 2 REPORTING OF EXPLORATION RESULTS

Mineral
tenement
and land
tenure status
Type, reference name/number,
location and ownership
including agreements or
material issues with third parties
such as joint ventures,
partnerships, overriding
royalties, native title interests,
historical sites, wilderness or
national park and environmental
settings.
The security of the tenure held
at the time of reporting along
with any known impediments to
obtaining a licence to operate in
the area.
All tenements remain in good standing at 31 May 2019.
Exploration
done by
other parties
Acknowledgment and appraisal
of exploration by other parties.
No commercial exploration for Li has previously
occurred, geological investigations as part of
academic research has been reported for the
pegmatite dykes of the area in:
Eagle, R. M., 2009. Petrology, petrogenesis and
mineralisation of granitic pegmatites of the Mount
Wills District, northeastern Victoria. Unpublished
thesis, University of Ballarat.
Eagle, R. M., Birch, W. D & McKnight, S., 2015.
Phosphate minerals in granitic pegmatites from the
Mount Wills district, northeastern Victoria. Royal
Society of Victoria. 127:55-68.
Previous exploration in the district has focused
on gold exploration at Glen Wills and historic
Sn production from pegmatite dykes.
Geology
Deposit type, geological setting
and style of mineralisation.

Lithium mineralisation is hosted within
highly evolved, late tectonic peraluminous
granite pegmatites of the complex Lithium,
Caesium, Tantalum (LCT) class. These
dykes are thought to be distal to a source
granitic body and are present as lenticular,
discontinuous bodies of variable length and
width (up to many hundreds of metres in
length and tens of metres in width).
Lithium mineralisation within the
pegmatites ispoorlyunderstood at this

Page | 14

early exploration stage but suspected to be
spatially related to the zonation within the
complex pegmatites. Lithium
mineralisation observed to date appears to
be as spodumene and Petalite with
Cassiterite also evident within some of the
dykes.
Drill hole
Information
A summary of all information
material to the understanding of
the exploration results including
a tabulation of the following
information for all Material drill
holes:
o easting and northing of the
drill hole collar
o elevation or RL (Reduced
Level – elevation above sea
level in metres) of the drill
hole collar
o dip and azimuth of the hole
o down hole length and
interception depth
o hole length.
If the exclusion of this
information is justified on the
basis that the information is not
Material and this exclusion does
not detract from the
understanding of the report, the
Competent Person should
clearly explain why this is the
case.
Table 1 provides all drill hole location and hole
orientation data in the body of the report.
All down hole weighted average lithium grade
data is provided on drill hole cross sections with
true widths noted per hole interpretation.
Weighted lithium oxide grade on cross sections
represents the full width of sampled pegmatites
and is not subject to top / bottom cutting or
grade hurdles – the full width is reported based
on logged lithology control.
Data In reporting Exploration Results, The length weighted average lithium content of
aggregation weighting averaging techniques, the pegmatite dykes are provided across the
methods maximum and/or minimum full intersection width in each drill hole and full
grade truncations (e.g. cutting of assay data tabulated in Appendix A for all
high grades) and cut-off grades holes. The nominal sample length is 2m with a
are usually Material and should limited frequency of 1m sample lengths
be stated. requiring a length weighted average technique
Where aggregate intercepts to be used for reporting dyke intersections. No
incorporate short lengths of high grade cutting or cut-off grade has been applied
grade results and longer lengths in reporting the average lithium grades across
of low grade results, the dyke drill intersections at this early stage of
procedure used for such exploration.
aggregation should be stated
and some typical examples of
such aggregations should be
shown in detail.

Page | 15

The assumptions used for any
reporting of metal equivalent
values should be clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are
particularly important in the
reporting of Exploration Results.
If the geometry of the
mineralisation with respect to
the drill hole angle is known, its
nature should be reported.
If it is not known and only the
down hole lengths are reported,
there should be a clear
statement to this effect (e.g.
‘down hole length, true width not
known’).
The relationship between the drill hole and the
geometry of the mineralised pegmatite dykes is
clearly presented in a series of summary cross
sections and drill plans. The angle between the
drill hole and the dyke structure is variable with
an interpretation of the relative geometry
presented as cross sections down hole, down
hole average grades are also presented on
these drill sections and are representative of
the current geological interpretation, this
interpretation may change over time as more
drilling information become available. Dyke
interpretation is constrained with surface
geological mapping and down hole lithology
logging.
Diagrams Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported These should include,
but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
A summary table showing the hole location and
orientation for all drilling is presented in Table
1. Drill plans and cross sections are also
presented for all holes to illustrate the
relationship between drill holes and average
grades from down hole intersections within the
target pegmatite dykes.
Balanced
reporting
Where comprehensive reporting
of all Exploration Results is not
practicable, representative
reporting of both low and high
grades and/or widths should be
practiced to avoid misleading
reporting of Exploration Results.
Both summary (weighted average) grade
intersections and full assay data is provided as
cross sections and tabulated data referenced in
the body of the report.
Other Other exploration data, if Any other relevant information is discussed in
substantive meaningful and material, should the main body of the report.
exploration be reported including (but not
data limited to): geological
observations; geophysical
survey results; geochemical
survey results; bulk samples –
size and method of treatment;
metallurgical test results; bulk
density, groundwater,
geotechnical and rock
characteristics; potential
deleterious or contaminating
substances.

Page | 16

Further work The nature and scale of planned Planned work is discussed in the body of the
further work (e.g. tests for lateral report and is dependent on future company
extensions or depth extensions direction.
or large-scale step-out drilling).
Diagrams clearly highlighting
the areas of possible
extensions, including the main
geological interpretations and
future drilling areas, provided
this information is not
commercially sensitive.

Page | 17

APPENDIX A – ROADSIDE DRILLING RESULTS

==> picture [739 x 502] intentionally omitted <==

----- Start of picture text -----

SampleID Hole_ID Hole_Type mFrom mTo Sample_Type Sample_Condition Batch_No Li_ppm Li2O_% Li_Method Cs_ppm Cs_Method Nb_ppm Nb_Method Rb_ppm Rb_Method Ta_ppm Ta_Method
203523 MCHWRC001 RC 30 32 COMP2 M AD19069428 130 0.028 ME-ICP89 23.6 ME-MS91 48 ME-MS91 249.0 ME-MS91 23.1 ME-MS91
203524 MCHWRC001 RC 32 34 COMP2 M AD19069428 110 0.0237 ME-ICP89 25.8 ME-MS91 15 ME-MS91 160.5 ME-MS91 5 ME-MS91
203525 MCHWRC001 RC 34 36 COMP2 D AD19069428 140 0.0301 ME-ICP89 13.4 ME-MS91 9 ME-MS91 92.9 ME-MS91 0.9 ME-MS91
203526 MCHWRC001 RC 36 38 COMP2 D AD19069428 100 0.0215 ME-ICP89 13.8 ME-MS91 6 ME-MS91 90.4 ME-MS91 <0.5 ME-MS91
203527 MCHWRC001 RC 38 40 COMP2 M AD19069428 130 0.028 ME-ICP89 12.2 ME-MS91 6 ME-MS91 89.5 ME-MS91 <0.5 ME-MS91
203530 MCHWRC001 RC 40 42 COMP2 D AD19069428 110 0.0237 ME-ICP89 10.9 ME-MS91 33 ME-MS91 77.7 ME-MS91 <0.5 ME-MS91
203531 MCHWRC001 RC 42 44 COMP2 D AD19069428 100 0.0215 ME-ICP89 10.1 ME-MS91 21 ME-MS91 79.7 ME-MS91 <0.5 ME-MS91
203532 MCHWRC001 RC 44 46 COMP2 M AD19069428 90 0.0194 ME-ICP89 8.2 ME-MS91 7 ME-MS91 66.2 ME-MS91 <0.5 ME-MS91
203533 MCHWRC001 RC 46 48 COMP2 M AD19069428 100 0.0215 ME-ICP89 5.9 ME-MS91 7 ME-MS91 73.3 ME-MS91 <0.5 ME-MS91
203534 MCHWRC001 RC 48 50 COMP2 M AD19069428 90 0.0194 ME-ICP89 6.9 ME-MS91 7 ME-MS91 71.7 ME-MS91 <0.5 ME-MS91
203535 MCHWRC001 RC 50 52 COMP2 M AD19069428 90 0.0194 ME-ICP89 12.6 ME-MS91 12 ME-MS91 151.5 ME-MS91 0.6 ME-MS91
203536 MCHWRC001 RC 52 54 COMP2 M AD19069428 90 0.0194 ME-ICP89 17.3 ME-MS91 15 ME-MS91 251.0 ME-MS91 1.1 ME-MS91
203537 MCHWRC001 RC 54 56 COMP2 M AD19069428 40 0.0086 ME-ICP89 12.1 ME-MS91 11 ME-MS91 167.0 ME-MS91 0.7 ME-MS91
203538 MCHWRC001 RC 56 58 COMP2 M AD19069428 20 0.0043 ME-ICP89 6.3 ME-MS91 10 ME-MS91 123.5 ME-MS91 0.6 ME-MS91
203539 MCHWRC001 RC 58 60 COMP2 M AD19069428 30 0.0065 ME-ICP89 7 ME-MS91 10 ME-MS91 121.0 ME-MS91 0.5 ME-MS91
203542 MCHWRC001 RC 60 62 COMP2 M AD19069428 20 0.0043 ME-ICP89 5.4 ME-MS91 19 ME-MS91 102.5 ME-MS91 0.7 ME-MS91
203543 MCHWRC001 RC 62 64 COMP2 M AD19069428 20 0.0043 ME-ICP89 5.4 ME-MS91 13 ME-MS91 102.0 ME-MS91 0.6 ME-MS91
203544 MCHWRC001 RC 64 66 COMP2 D AD19069428 20 0.0043 ME-ICP89 5.9 ME-MS91 11 ME-MS91 105.5 ME-MS91 0.5 ME-MS91
203545 MCHWRC001 RC 66 68 COMP2 M AD19069428 20 0.0043 ME-ICP89 6.3 ME-MS91 10 ME-MS91 103.5 ME-MS91 0.5 ME-MS91
203546 MCHWRC001 RC 68 70 COMP2 M AD19069428 20 0.0043 ME-ICP89 5.6 ME-MS91 10 ME-MS91 102.0 ME-MS91 0.5 ME-MS91
203547 MCHWRC001 RC 70 72 COMP2 M AD19069428 20 0.0043 ME-ICP89 6 ME-MS91 10 ME-MS91 110.5 ME-MS91 0.7 ME-MS91
203548 MCHWRC001 RC 72 74 COMP2 M AD19069428 20 0.0043 ME-ICP89 5.7 ME-MS91 9 ME-MS91 102.5 ME-MS91 0.6 ME-MS91
203549 MCHWRC001 RC 74 76 COMP2 M AD19069428 20 0.0043 ME-ICP89 5.6 ME-MS91 10 ME-MS91 106.5 ME-MS91 0.5 ME-MS91
203550 MCHWRC001 RC 76 78 COMP2 M AD19069428 20 0.0043 ME-ICP89 6.2 ME-MS91 9 ME-MS91 106.0 ME-MS91 0.6 ME-MS91
203551 MCHWRC001 RC 78 80 COMP2 M AD19069428 20 0.0043 ME-ICP89 4.8 ME-MS91 9 ME-MS91 106.0 ME-MS91 0.6 ME-MS91
203554 MCHWRC001 RC 80 82 COMP2 W AD19069428 20 0.0043 ME-ICP89 5.3 ME-MS91 58 ME-MS91 100.0 ME-MS91 0.7 ME-MS91
203555 MCHWRC001 RC 82 84 COMP2 M AD19069428 20 0.0043 ME-ICP89 5.2 ME-MS91 32 ME-MS91 104.0 ME-MS91 0.6 ME-MS91
----- End of picture text -----

Page | 18

203556 MCHWRC001 RC 84 85 1M W AD19069428 30 0.0065 ME-ICP89 6.2 ME-MS91 13 ME-MS91 109.5 ME-MS91 1.1 ME-MS91
203557 MCHWRC001 RC 85 86 1M W AD19069428 30 0.0065 ME-ICP89 6.4 ME-MS91 14 ME-MS91 110.0 ME-MS91 1.4 ME-MS91
203558 MCHWRC001 RC 86 88 COMP2 M AD19069428 20 0.0043 ME-ICP89 5.1 ME-MS91 12 ME-MS91 101.0 ME-MS91 1 ME-MS91
203559 MCHWRC001 RC 88 90 COMP2 M AD19069428 60 0.0129 ME-ICP89 10.2 ME-MS91 14 ME-MS91 155.0 ME-MS91 0.9 ME-MS91
203560 MCHWRC001 RC 90 91 1M D AD19069428 60 0.0129 ME-ICP89 10.1 ME-MS91 9 ME-MS91 81.6 ME-MS91 <0.5 ME-MS91
203561 MCHWRC001 RC 91 92 1M D AD19069428 80 0.0172 ME-ICP89 15.9 ME-MS91 8 ME-MS91 88.4 ME-MS91 <0.5 ME-MS91
203562 MCHWRC001 RC 92 94 COMP2 D AD19069428 80 0.0172 ME-ICP89 11.3 ME-MS91 13 ME-MS91 151.0 ME-MS91 1 ME-MS91
203563 MCHWRC001 RC 94 96 COMP2 M AD19069428 40 0.0086 ME-ICP89 12.2 ME-MS91 17 ME-MS91 185.5 ME-MS91 1.2 ME-MS91
203564 MCHWRC001 RC 96 98 COMP2 M AD19069428 40 0.0086 ME-ICP89 10.1 ME-MS91 18 ME-MS91 172.0 ME-MS91 1.3 ME-MS91
203567 MCHWRC002 RC 4 5 1M M AD19078950 350 0.0754 ME-ICP89 12.9 ME-MS91 25 ME-MS91 162.0 ME-MS91 6.5 ME-MS91
203568 MCHWRC002 RC 5 7 COMP2 M AD19078950 190 0.0409 ME-ICP89 9.3 ME-MS91 20 ME-MS91 142.5 ME-MS91 3.1 ME-MS91
203569 MCHWRC002 RC 7 8 1M M AD19078950 120 0.0258 ME-ICP89 8.5 ME-MS91 20 ME-MS91 137.0 ME-MS91 2 ME-MS91
203572 MCHWRC002 RC 8 10 COMP2 D AD19078950 90 0.0194 ME-ICP89 6.6 ME-MS91 20 ME-MS91 115.5 ME-MS91 1.2 ME-MS91
203573 MCHWRC002 RC 10 12 COMP2 M AD19078950 100 0.0215 ME-ICP89 6.8 ME-MS91 21 ME-MS91 120.0 ME-MS91 1.4 ME-MS91
203574 MCHWRC002 RC 12 14 COMP2 M AD19078950 140 0.0301 ME-ICP89 10.9 ME-MS91 93 ME-MS91 123.5 ME-MS91 3 ME-MS91
203575 MCHWRC002 RC 14 16 COMP2 M AD19078950 110 0.0237 ME-ICP89 8 ME-MS91 18 ME-MS91 127.0 ME-MS91 1.3 ME-MS91
203576 MCHWRC002 RC 16 18 COMP2 M AD19078950 110 0.0237 ME-ICP89 8.3 ME-MS91 19 ME-MS91 142.0 ME-MS91 1.3 ME-MS91
203577 MCHWRC002 RC 18 20 COMP2 M AD19078950 80 0.0172 ME-ICP89 10 ME-MS91 19 ME-MS91 152.5 ME-MS91 1.2 ME-MS91
203580 MCHWRC002 RC 20 22 COMP2 M AD19078950 90 0.0194 ME-ICP89 9.5 ME-MS91 28 ME-MS91 150.5 ME-MS91 1.2 ME-MS91
203581 MCHWRC002 RC 22 24 COMP2 M AD19078950 110 0.0237 ME-ICP89 9.5 ME-MS91 27 ME-MS91 145.5 ME-MS91 1.5 ME-MS91
203582 MCHWRC002 RC 24 26 COMP2 M AD19078950 100 0.0215 ME-ICP89 10.2 ME-MS91 20 ME-MS91 150.0 ME-MS91 1.2 ME-MS91
203583 MCHWRC002 RC 26 28 COMP2 M AD19078950 170 0.0366 ME-ICP89 10.1 ME-MS91 20 ME-MS91 145.0 ME-MS91 1.1 ME-MS91
203584 MCHWRC002 RC 28 30 COMP2 M AD19078950 260 0.056 ME-ICP89 58.2 ME-MS91 26 ME-MS91 452.0 ME-MS91 6.4 ME-MS91
203585 MCHWRC002 RC 30 32 COMP2 D AD19078950 70 0.0151 ME-ICP89 21.7 ME-MS91 106 ME-MS91 345.0 ME-MS91 50.7 ME-MS91
203586 MCHWRC002 RC 32 34 COMP2 M AD19078950 180 0.0388 ME-ICP89 72.1 ME-MS91 92 ME-MS91 396.0 ME-MS91 33.3 ME-MS91
203587 MCHWRC002 RC 34 36 COMP2 M AD19078950 300 0.0646 ME-ICP89 88.3 ME-MS91 31 ME-MS91 357.0 ME-MS91 5.8 ME-MS91
203596 MCHWRC002 RC 46 48 COMP2 D AD19095881 220 0.0474 ME-ICP89 49.2 ME-MS91 18 ME-MS91 276.0 ME-MS91 1.5 ME-MS91
203597 MCHWRC002 RC 48 50 COMP2 D AD19095881 140 0.0301 ME-ICP89 55.2 ME-MS91 15 ME-MS91 180.0 ME-MS91 1.4 ME-MS91
203598 MCHWRC002 RC 50 52 COMP2 D AD19095881 140 0.0301 ME-ICP89 66.4 ME-MS91 19 ME-MS91 211.0 ME-MS91 10.7 ME-MS91

Page | 19

203599 MCHWRC002 RC 52 54 COMP2 D AD19095881 120 0.0258 ME-ICP89 61.2 ME-MS91 14 ME-MS91 161.0 ME-MS91 2.2 ME-MS91
203600 MCHWRC002 RC 54 55 COMP2 D AD19095881 150 0.0323 ME-ICP89 82.1 ME-MS91 13 ME-MS91 253.0 ME-MS91 2.1 ME-MS91
203601 MCHWRC002 RC 55 56 COMP2 D AD19095881 120 0.0258 ME-ICP89 60.5 ME-MS91 16 ME-MS91 209.0 ME-MS91 1.9 ME-MS91
203602 MCHWRC002 RC 56 59 COMP3 D AD19095881 120 0.0258 ME-ICP89 42.1 ME-MS91 12 ME-MS91 221.0 ME-MS91 2.1 ME-MS91
203646 MCHWRC003 RC 58 60 COMP2 D AD19078950 330 0.071 ME-ICP89 38.2 ME-MS91 56 ME-MS91 212.0 ME-MS91 1.9 ME-MS91
203647 MCHWRC003 RC 60 62 COMP2 D AD19078950 480 0.1033 ME-ICP89 97.7 ME-MS91 22 ME-MS91 353.0 ME-MS91 2.5 ME-MS91
203648 MCHWRC003 RC 62 64 COMP2 D AD19078950 190 0.0409 ME-ICP89 43.7 ME-MS91 81 ME-MS91 508.0 ME-MS91 29.5 ME-MS91
203649 MCHWRC003 RC 64 66 COMP2 D AD19078950 60 0.0129 ME-ICP89 20.5 ME-MS91 112 ME-MS91 311.0 ME-MS91 42 ME-MS91
203650 MCHWRC003 RC 66 68 COMP2 W AD19078950 400 0.0861 ME-ICP89 51.1 ME-MS91 54 ME-MS91 611.0 ME-MS91 22.5 ME-MS91
203653 MCHWRC003 RC 68 70 COMP2 D AD19078950 480 0.1033 ME-ICP89 94.1 ME-MS91 88 ME-MS91 426.0 ME-MS91 4.2 ME-MS91
203659 MCHWRC004 RC 0 2 COMP2 D AD19078950 170 0.0366 ME-ICP89 42.1 ME-MS91 20 ME-MS91 82.5 ME-MS91 1.3 ME-MS91
203660 MCHWRC004 RC 2 4 COMP2 D AD19078950 450 0.0969 ME-ICP89 117 ME-MS91 23 ME-MS91 164.5 ME-MS91 1.4 ME-MS91
203670 MCHWRC004 RC 18 20 COMP2 M AD19078950 680 0.1464 ME-ICP89 95 ME-MS91 24 ME-MS91 297.0 ME-MS91 1.3 ME-MS91
203671 MCHWRC004 RC 20 22 COMP2 D AD19078950 780 0.1679 ME-ICP89 92.4 ME-MS91 23 ME-MS91 480.0 ME-MS91 1.4 ME-MS91
203672 MCHWRC004 RC 22 24 COMP2 D AD19078950 370 0.0797 ME-ICP89 69.3 ME-MS91 46 ME-MS91 833.0 ME-MS91 19.8 ME-MS91
203675 MCHWRC004 RC 24 26 COMP2 D AD19078950 220 0.0474 ME-ICP89 58.9 ME-MS91 68 ME-MS91 1105.0 ME-MS91 31.1 ME-MS91
203676 MCHWRC004 RC 26 28 COMP2 D AD19078950 60 0.0129 ME-ICP89 22.3 ME-MS91 112 ME-MS91 359.0 ME-MS91 54 ME-MS91
203677 MCHWRC004 RC 28 30 COMP2 D AD19078950 70 0.0151 ME-ICP89 39.5 ME-MS91 89 ME-MS91 502.0 ME-MS91 48.5 ME-MS91
203678 MCHWRC004 RC 30 32 COMP2 D AD19078950 310 0.0667 ME-ICP89 97.9 ME-MS91 38 ME-MS91 332.0 ME-MS91 16.7 ME-MS91
203679 MCHWRC004 RC 32 34 COMP2 D AD19078950 390 0.084 ME-ICP89 156 ME-MS91 22 ME-MS91 314.0 ME-MS91 1.7 ME-MS91
203685 MIEDRC001 RC 6 8 COMP2 D AD19095881 400 0.0861 ME-ICP89 76.6 ME-MS91 24 ME-MS91 257.0 ME-MS91 6.2 ME-MS91
203686 MIEDRC001 RC 8 10 COMP2 D AD19095881 400 0.0861 ME-ICP89 127.5 ME-MS91 23 ME-MS91 407.0 ME-MS91 5.3 ME-MS91
203687 MIEDRC001 RC 10 12 COMP2 D AD19095881 340 0.0732 ME-ICP89 135.5 ME-MS91 43 ME-MS91 665.0 ME-MS91 56.6 ME-MS91
203690 MIEDRC001 RC 12 14 COMP2 D AD19095881 150 0.0323 ME-ICP89 88.4 ME-MS91 115 ME-MS91 911.0 ME-MS91 223 ME-MS91
203691 MIEDRC001 RC 14 15 1M M AD19095881 440 0.0947 ME-ICP89 193 ME-MS91 31 ME-MS91 872.0 ME-MS91 12.7 ME-MS91
203692 MIEDRC001 RC 15 17 COMP2 D AD19095881 450 0.0969 ME-ICP89 221 ME-MS91 29 ME-MS91 746.0 ME-MS91 12.2 ME-MS91
203693 MIEDRC001 RC 17 18 1M M AD19095881 120 0.0258 ME-ICP89 76.7 ME-MS91 113 ME-MS91 423.0 ME-MS91 169 ME-MS91
203694 MIEDRC001 RC 18 20 COMP2 D AD19095881 310 0.0667 ME-ICP89 136 ME-MS91 46 ME-MS91 369.0 ME-MS91 60.6 ME-MS91
203697 MIEDRC001 RC 20 22 COMP2 D AD19095881 320 0.0689 ME-ICP89 147 ME-MS91 68 ME-MS91 466.0 ME-MS91 59.2 ME-MS91

Page | 20

203698 MIEDRC001 RC 22 24 COMP2 D AD19095881 360 0.0775 ME-ICP89 97.3 ME-MS91 11 ME-MS91 296.0 ME-MS91 2.3 ME-MS91
203731 MIEDRC001 RC 84 86 COMP2 D AD19095881 390 0.084 ME-ICP89 62.2 ME-MS91 67 ME-MS91 254.0 ME-MS91 279 ME-MS91
203732 MIEDRC001 RC 86 88 COMP2 D AD19095881 280 0.0603 ME-ICP89 32.7 ME-MS91 68 ME-MS91 385.0 ME-MS91 229 ME-MS91
203733 MIEDRC001 RC 88 90 COMP2 D AD19095881 240 0.0517 ME-ICP89 44.2 ME-MS91 25 ME-MS91 397.0 ME-MS91 14.8 ME-MS91
203734 MIEDRC001 RC 90 92 COMP2 D AD19095881 320 0.0689 ME-ICP89 54.8 ME-MS91 12 ME-MS91 394.0 ME-MS91 4.8 ME-MS91
203735 MIEDRC001 RC 92 94 COMP2 D AD19095881 630 0.1356 ME-ICP89 94.1 ME-MS91 63 ME-MS91 417.0 ME-MS91 293 ME-MS91
203736 MIEDRC001 RC 94 96 COMP2 D AD19095881 340 0.0732 ME-ICP89 32.5 ME-MS91 99 ME-MS91 656.0 ME-MS91 420 ME-MS91
203737 MIEDRC001 RC 96 98 COMP2 D AD19095881 530 0.1141 ME-ICP89 25.8 ME-MS91 87 ME-MS91 420.0 ME-MS91 313 ME-MS91
203738 MIEDRC001 RC 98 100 COMP2 D AD19095881 510 0.1098 ME-ICP89 29 ME-MS91 64 ME-MS91 502.0 ME-MS91 7.9 ME-MS91
203741 MIEDRC001 RC 100 102 COMP2 D AD19095881 660 0.1421 ME-ICP89 29 ME-MS91 35 ME-MS91 517.0 ME-MS91 11.8 ME-MS91
203742 MIEDRC001 RC 102 104 COMP2 D AD19095881 790 0.1701 ME-ICP89 56.9 ME-MS91 38 ME-MS91 660.0 ME-MS91 17 ME-MS91
203743 MIEDRC001 RC 104 106 COMP2 D AD19095881 730 0.1572 ME-ICP89 68.4 ME-MS91 12 ME-MS91 279.0 ME-MS91 1.7 ME-MS91
203782 MIEDRC002 RC 42 44 COMP2 D AD19095881 630 0.1356 ME-ICP89 73.8 ME-MS91 8 ME-MS91 229.0 ME-MS91 0.7 ME-MS91
203783 MIEDRC002 RC 44 46 COMP2 D AD19095881 750 0.1615 ME-ICP89 64.5 ME-MS91 10 ME-MS91 268.0 ME-MS91 1 ME-MS91
203784 MIEDRC002 RC 46 48 COMP2 D AD19095881 750 0.1615 ME-ICP89 82.6 ME-MS91 9 ME-MS91 296.0 ME-MS91 0.9 ME-MS91
203785 MIEDRC002 RC 48 50 COMP2 D AD19095881 260 0.056 ME-ICP89 43.3 ME-MS91 48 ME-MS91 482.0 ME-MS91 30.1 ME-MS91
203786 MIEDRC002 RC 50 52 COMP2 D AD19095881 990 0.2131 ME-ICP89 70.6 ME-MS91 44 ME-MS91 849.0 ME-MS91 25.3 ME-MS91
203787 MIEDRC002 RC 52 54 COMP2 D AD19095881 750 0.1615 ME-ICP89 51.4 ME-MS91 36 ME-MS91 927.0 ME-MS91 10.5 ME-MS91
203788 MIEDRC002 RC 54 56 COMP2 D AD19095881 500 0.1077 ME-ICP89 23.8 ME-MS91 39 ME-MS91 432.0 ME-MS91 13.1 ME-MS91
203789 MIEDRC002 RC 56 58 COMP2 D AD19095881 480 0.1033 ME-ICP89 26.7 ME-MS91 37 ME-MS91 502.0 ME-MS91 8.6 ME-MS91
203790 MIEDRC002 RC 58 60 COMP2 D AD19095881 450 0.0969 ME-ICP89 58.1 ME-MS91 38 ME-MS91 823.0 ME-MS91 13.3 ME-MS91
203795 MIEDRC002 RC 60 62 COMP2 D AD19095881 920 0.1981 ME-ICP89 143 ME-MS91 22 ME-MS91 570.0 ME-MS91 3.4 ME-MS91
203796 MIEDRC002 RC 62 64 COMP2 D AD19095881 840 0.1809 ME-ICP89 67 ME-MS91 18 ME-MS91 323.0 ME-MS91 1.6 ME-MS91
203797 MIEDRC002 RC 64 66 COMP2 D AD19095881 810 0.1744 ME-ICP89 49 ME-MS91 17 ME-MS91 283.0 ME-MS91 1.4 ME-MS91
203798 MIEDRC002 RC 66 68 COMP2 D AD19095881 720 0.155 ME-ICP89 44.8 ME-MS91 19 ME-MS91 295.0 ME-MS91 1.5 ME-MS91
203805 MIEDRC003 RC 0 2 COMP2 D AD19095881 1300 0.2799 ME-ICP89 166 ME-MS91 29 ME-MS91 900 ME-MS91 13.4 ME-MS91
203806 MIEDRC003 RC 2 4 COMP2 D AD19095881 320 0.0689 ME-ICP89 43.3 ME-MS91 51 ME-MS91 578 ME-MS91 23.1 ME-MS91
203809 MIEDRC003 RC 4 6 COMP2 M AD19095881 420 0.0904 ME-ICP89 53.2 ME-MS91 56 ME-MS91 870 ME-MS91 15.3 ME-MS91
203810 MIEDRC003 RC 6 8 COMP2 M AD19095881 460 0.099 ME-ICP89 89 ME-MS91 40 ME-MS91 1200 ME-MS91 17.7 ME-MS91

Page | 21

203811 MIEDRC003 RC 8 10 COMP2 M AD19095881 1440 0.31 ME-ICP89 81.6 ME-MS91 38 ME-MS91 1265 ME-MS91 12 ME-MS91
203812 MIEDRC003 RC 10 12 COMP2 D AD19095881 5380 1.1583 ME-ICP89 57.3 ME-MS91 35 ME-MS91 743 ME-MS91 5.5 ME-MS91
203813 MIEDRC003 RC 12 14 COMP2 D AD19095881 1020 0.2196 ME-ICP89 35.2 ME-MS91 45 ME-MS91 430 ME-MS91 12.8 ME-MS91
203814 MIEDRC003 RC 14 16 COMP2 D AD19095881 610 0.1313 ME-ICP89 41.2 ME-MS91 42 ME-MS91 616 ME-MS91 10.7 ME-MS91
203815 MIEDRC003 RC 16 18 COMP2 D AD19095881 1680 0.3617 ME-ICP89 53.2 ME-MS91 33 ME-MS91 670 ME-MS91 7.8 ME-MS91
203816 MIEDRC003 RC 18 20 COMP2 D AD19095881 680 0.1464 ME-ICP89 42.1 ME-MS91 41 ME-MS91 694 ME-MS91 10.6 ME-MS91
203819 MIEDRC003 RC 20 22 COMP2 D AD19095881 3390 0.7299 ME-ICP89 38.7 ME-MS91 34 ME-MS91 592 ME-MS91 12.3 ME-MS91
203820 MIEDRC003 RC 22 24 COMP2 D AD19095881 460 0.099 ME-ICP89 39.1 ME-MS91 72 ME-MS91 575 ME-MS91 34 ME-MS91
203821 MIEDRC003 RC 24 26 COMP2 D AD19095881 1340 0.2885 ME-ICP89 181 ME-MS91 34 ME-MS91 724 ME-MS91 11.8 ME-MS91
203822 MIEDRC003 RC 26 28 COMP2 D AD19095881 910 0.1959 ME-ICP89 153 ME-MS91 16 ME-MS91 406 ME-MS91 1.8 ME-MS91

Page | 22