Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

DALAROO METALS LTD Interim / Quarterly Report 2021

Jan 19, 2022

64756_rns_2022-01-19_ed923ec2-594e-47fd-a9fc-dc04be975920.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [595 x 110] intentionally omitted <==

----- Start of picture text -----

ASX ANNOUNCEMENT:
ASX: DAL 20 January 2022
----- End of picture text -----

Quarterly Activities Report For Period Ended 31 December 2021


Highlights

Namban in the Wheatbelt Region of Western Australia

  • Maiden UAV drone airborne magnetics surveys identify multiple targets.

  • Three targets with similar geophysical signatures to Minerals 260 Ltd (ASX: “MI6”) Mallory Anomaly outlined at Namban.

  • Strong PGE-Ni-Cu geochemical anomalism (Cattady anomaly) defined by wide-spaced geochemical sampling confirming exploration potential within the Namban Project over first area with sampling undertaken, resulting in PGE values of up to 97 ppb and peak anomalous values of 642 ppm Ni and 226 ppm Cu defined over a 1km strike length. This emerging anomaly remains open along strike.

  • Follow up 50 X 50m infill and strike extension geochemical sampling completed at the newly identified Cattady anomaly.

  • Further systematic geochemical surveys have commenced over magnetic intrusive target areas, following completion of the annual grain harvest

*PGE: Platinum Group Elements – palladium (Pd) and platinum (Pt)

Lyons River in the Gascoyne Region of Western Australia

  • Eight RC holes completed totalling 1,989 metres testing lead-zinc BHT/SEDEX and copper targets.

  • Multi-element analytical results from the RC drilling program expected during the March Quarter 2022.

Dalaroo Metals Ltd (“Dalaroo” or “Company”) is pleased to provide an update on its activities during the December Quarter 2021.

Three UAV surveys completed using a 50m line spacing and 25m ground clearance with lines flown eastwest have identified nine targets at the Namban Project located ~ 150km north-northeast of Perth and adjacent to the regional centre of Moora in Western Australia (Figures 1 and 2). These results have been used to generate a structural interpretation that is guiding the systematic soil geochemical sampling currently underway (Figure 3).

==> picture [596 x 58] intentionally omitted <==

==> picture [141 x 99] intentionally omitted <==

==> picture [440 x 622] intentionally omitted <==

Figure 1: Namban Project Location

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

2
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

==> picture [448 x 575] intentionally omitted <==

Figure 2: Namban Project – Cattady PGE anomaly location and drone survey identified magnetic targets.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

3
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

Analysis of the neighbouring Minerals 260 Limited’s Mallory PGE + Au Anomaly location suggests it may be structurally controlled and coincident with a “radiometric lateritic” signature in an apparent magnetic low. Similar lateritic signatures are evident in Dalaroo’s Moora area UAV magnetics survey results along with interpreted NW structures/trends extending from the Mallory anomaly into Dalaroo’s Namban tenement E70/4928. A large radiometric response can also be seen in the Government 200m spaced data extending into the southern part of E70/4928 (Figure 4).

==> picture [392 x 503] intentionally omitted <==

Figure 3: Namban Project - Total Magnetic Intensity - UAV 50m spaced airborne magnetics structure trends, magnetic targets/intrusions and Minerals 260’s Mallory anomaly outline

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

4
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

==> picture [444 x 569] intentionally omitted <==

Figure 4: Regional Radiometrics Ternary KThUr RGB Image with lateritic signature targets which are coincident with magnetic intrusions with Namban Project tenement E70/4928

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

5
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

Very encouraging results were received from initial wide-spaced, first pass geochemical sampling programme from Namban. The auger geochemical sampling programme totalled 81 samples covering an area of 1.0km by 1.5km. No modern systematic exploration has been undertaken over this area of the Archaean age Jimperding Metamporhic Belt prior to this recent work by Dalaroo. The Cattady PGE-Ni-Cu Anomaly is defined by sample spacing of 200 X 100m. Multi-element assays have delineated the Cattady anomaly covering an area of 1.0 X 0.25km with a peak Pd value of up to 82ppb associated with anomalous Pt values of up to 15 ppb for combined PGE value of 97ppb (Figures 5 and 6). Surrounding the geochemical anomaly the Pd and Pt values are complemented by values of up to 642ppm Ni and 226ppm Cu (Figure 6).

==> picture [388 x 455] intentionally omitted <==

Figure 5: Cattady anomaly – Images of PGE (Pd+Pt) and Ni geochemical results overlain on recently flown drone 1[st] Vertical Derivative magnetic data image.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

6
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

“The anomaly coincides with a broad residual lateritised topographic high, trending in a north-south direction. Residual laterite is commonly observed in the Jimperding Metamporhic Belt as the surface expression of underlying mafic and ultramafic lithologies,” said Mr Harjinder Kehal, Managing Director of Dalaroo Metals.

==> picture [452 x 294] intentionally omitted <==

Figure 6: Cattady Anomaly – Images of PGE (Pd+Pt) and Ni geochemical results.

Upcoming Exploration Milestones

With the grain harvest completed over the Namban Project area, large areas will now become available for systematic geochemical sampling programmes. Priority sampling will test the north-south strike extent of the Cattady PGE-Ni-Cu anomalous zone. First pass geochemical sampling of additional targets generated from the recent detailed UAV airborne magnetic surveys will follow during the March Quarter 2022. This will assist in subsequent aircore and RC drill targeting.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

7
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

Lyons River

Dalaroo’s Lyons River Project is a strategic (100% owned) land position of 703 km[2] within the Proterozoic Mutherbukin Zone of the Gascoyne Province. The Company believes the district is an emerging Broken Hill Type (“BHT”) / Sedimentary Exhalative (“SEDEX”) deposit setting.

A program of RC drilling has been successfully completed at the Four Corners prospect (Figures 7 and 8). A total of eight RC drill holes for 1,989 metres were completed at the Four Corners prospect with holes ranging in depth from 219 to 287 metres (Figure 1). The RC drill program at the Four Corners prospect was designed to test several base metal targets and obtain greater understanding of the metamorphosed stratabound sequence of pyritic psammitic and pelitic rocks and corresponding anomalous Pb-Zn geochemistry.

Multi-element assay results for 4m composite samples are expected to be available in the March Quarter 2022.

The Four Corners prospect is one of six regional Pb-Zn soil geochemical prospects identified at Lyons River within a Proterozoic basin setting covering an area of 30 km by 10 km (Figure 8).

Next Steps

Exploration activities planned for the Lyons River Project include:

  1. An assessment of gravity survey data for the Four Corners and Browns prospects and integration with the IP, magnetics and geochemistry is well underway. Targets generated will be drill tested early in the June Quarter 2022 following passing of the cyclone season.

  2. A specialist geophysical contractor engaged to conduct surface IP and radial/downhole IP survey has now been pushed back to the March quarter 2022 due to unprecedented demand for their services. The IP anomaly NE and SE zones remain open to the east, IP survey lines will be extended further to the east to determine the eventual size of the currently defined 2.5km strike length anomaly.

  3. Heritage surveys are being planned for the drill testing of the Browns prospect and other regional prospects/targets.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

8
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

==> picture [447 x 564] intentionally omitted <==

Figure 7: Lyons River Project, drill hole location map with historical holes and completed drill program RC holes.

*ASX announcement dated 16 November 2021 titled “Maiden RC drilling commences at Lyons River” and the Prospectus dated 16 August 2021.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

9
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

==> picture [485 x 315] intentionally omitted <==

Figure 8: Lyons River, Four Corners prospect and new five Pb-Zn soil geochemical prospects /targets

Table 1: Four Corners RC drill locations

Nominal Azimuth Depth
Drillhole IP anomaly MGAE MGAN Dip (°) Tenement
RL (mag) (m)
LRRC001 Extension to LRRD003 371905 7286696 280 -60 174° 256 E09/2098
LRRC002 Copper target 371886 7286986 280 -52 302° 256 E09/2098
LRRC003 Extension to LRRD003 371902 7286602 280 -60 186° 250 E09/2098
LRRC004 Extension to LRRD003 371703 7286391 280 -59 185° 219 E09/2098
LRRC005 Extension to LRRD003 371697 7286298 280 -60 178° 250 E09/2098
LRRC006 Extension to LRRD003 371899 7286895 280 -59 184° 250 E09/2098
LRRC007 Central Zone 370649 7285417 280 -60 182° 221 E09/1825
LRRC008 Inferred east dipping
basin transverse fault
371195 7286201 280 -69 190° 287 E09/2098

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

10
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

As at the date of this report, the Company has the following securities on issue:

**Security Type ** Number
FullyPaid OrdinaryShares 54,000,000
Vendor Options - nil issue price exercisable at $0.25 each and expiring on
28 September 2025
8,000,000
New Options – issue price of $0.001 each, exercisable at $0.25 each and
expiring on 28 September 2024
5,000,000

No further shares or options were issued during the quarter

Listing Rule 5.3.4 Use of Funds

DAL was admitted to trading on ASX on 28 September 2021. The 31 December 2021 quarter is included in a period covered by a Use of Funds statement in a prospectus dated 26 August 2021 and lodged with ASX under Listing Rule 1.1 condition 3. A comparison of the Company’s expenditure since listing against the estimated Use of Funds statement is set out below as required under Listing Rule 5.3.4.

Actual Use of Funds Variance
Expenditure Item ($’000) Estimate for the first year to 31 December 2021
Under/(Over)
after ASX Admission ($’000)
($’000) ($’000)
Exploration – Namban Project 830 101 729
Exploration – Lyons River Project 1,035 258 777
WorkingCapital and Administration 836 446 390
Estimated expenses of the Offer 541 554 (13)
TOTAL 3,242 1,359 1,883

Financial Commentary

The Appendix 5B for the quarter ended 31 December 2021 provides an overview of the Company’s financial activities. Exploration expenditure for the quarter was $291K. Corporate and other expenditure for the quarter was $341K. The total amount paid to Directors of the Company, their associates and other related parties was $175K and includes salary and fees.

The Company’s cash balance at the end of the quarter was $3,861,004.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

11
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

ENDS

For more Information:

Please visit our website for more information: www.dalaroometals.com.au

Harjinder Kehal, Managing Director on +61 400 044 890

COMPETENT PERSON

The information in this report that relates to Exploration results is based on information compiled by Dalaroo Metals Ltd and reviewed by Mr Harjinder Kehal who is the Managing Director of the Company and is a Registered Practicing Geologist and Member of the AusIMM and AIG. Mr Kehal has sufficient experience that is relevant to the style of mineralisation, the type of deposit under consideration and to the activities undertaken to qualify as a Competent person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Kehal consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.

FORWARD-LOOKING INFORMATION

This report may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning the planned exploration program and other statements that are not historical facts. When used in this report, the words "could", "plan", "estimate", "expect", "intend", "should" and similar expressions are forward-looking statements. Although Dalaroo believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements.

CAUTIONARY NOTE

The statements and information contained in this report are not investment or financial product advice and are not intended to be used by persons in deciding to make an investment decision. In releasing this report, Dalaroo has not considered the objectives, financial position or requirements of any particular recipient. Accordingly, potential investors should obtain financial advice from a qualified financial advisor prior to making an investment decision.

Authorised for release to the ASX by the Board of Dalaroo Metals Ltd.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

12
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

ASX Releases during the December Quarter 2021

Date Description
18 October 2021 Date of AGM and closingdate for Director nominations
25 October 2021 Lyons River DrillingResults
28 October 2021 2021 Annual Report
28 October 2021 Corporate Governance Statement & Appendix 4G
29 October 2021 September Qtr Activities Statement & Appendix 5B
8 November 2021 Chairman’s Cover Letter Notice of AGM
8 November 2021 Notice of Annual General Meeting/ProxyForm
15 November 2021 Maiden magnetic surveyidentifies multiple targets at Namban
16 November 2021 Maiden RC drillingcommences at Lyons River
7 December 2021 High-Order PGE results at Namban Project
8 December 2021 Chairman’s Address to Shareholders
8 December 2021 AGM Presentation
8 December 2021 Results of Meeting
10 December 2021 Retraction of Certain Statements
14 December 2021 Successful completion of RC drilling programme at Lyons River

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

13
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

About Namban

Namban Project comprises an under explored ground package totalling 437 km[2] located in the mid-north part of the wheatbelt region, deemed by Dalaroo to be prospective for magmatic intrusion related Ni-CuPGE deposits. The Company has a 100% controlling interest in the Namban Project, comprising six tenements extending from the townships of Moora in the south to Three Springs in the north (Figure 9).

==> picture [421 x 506] intentionally omitted <==

Figure 9 : Namban Project tenements location map.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

14
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

About the Lyons River Project

Lyons River is located approximately 1,100km north of Perth and approximately 220 km to the northeast of the coastal town of Carnarvon, Western Australia. The Lyons River Project lies within the Mutherbukin Zone of the Gascoyne Province, which is the deformed and high-grade metamorphic core zone of the early Proterozoic Capricorn Orogen (Figure 10).

==> picture [455 x 375] intentionally omitted <==

Figure 10: Lyons River Project location diagram

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

15
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

TENEMENT SCHEDULE AS AT 31 DECEMBER 2021

Project Name Location Tenement Licence Interest held at
31 December 2021
Lyons River WA E09/1824 100%
Lyons River WA E09/1825 100%
Lyons River WA E09/2098 100%
Lyons River WA E09/2102 100%
Lyons River WA E09/2304 100%
Lyons River WA E09/2305 100%
Lyons River WA E09/2312 100%
Namban WA E70/4694 100%
Namban WA E70/4928 100%
Namban WA E70/5702 100%
Namban WA E70/5494 100%
Namban WA E70/5502 100%
Namban WA E70/5604 100%

Note: All the Tenement Licences are granted.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

16
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

Appendix 1: Dalaroo Metals Ltd – UAV survey and geochemical sampling Namban Project - JORC Code Edition 2012: Table 1

Section 1: Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld x-ray fluorescence (XRF)
instruments, etc). These examples should not
be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
No drilling completed by Dalaroo.
Auger samples collected from 0.6 – 1m depth with 0.5-1kg
collected for assay.
Magnetic survey locations were measured with a dual
frequency GNSS receiver operating in autonomous mode,
with x,y,z accuracies accurate to better than 1-2m.
Elevations were derived using a laser altimeter.
Entire sample is submitted for sample prep and assay.
A UAV survey was conducted on 50m line spacing and
25m sensor height by Atlas Geophysics using PAS-H100
Rotary Wing helicopter.
The magnetic data was collected using a Scintrex CS-VL
Cesium Vapour magnetometer with the following
parameters:

Sensitivity 0.0006nT sq rt RMS

Noise envelope 0.002nT peak to peak

Headingerror +/_0.25nT
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
No drilling results reported.
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
No drilling results reported.
No drilling results reported.
No drilling results reported.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

17
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Logging Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc.)
photography.
The total length and percentage of the relevant
intersections logged.
No drilling results reported.
No drilling results reported.
Subsampling
techniques and
sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
subsampling stages to maximise representivity
of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
No core drilling completed.
No core drilling completed.
Sample preparation of samples follows industry best
practice standards and is conducted by internationally
recognized laboratories.
Oven drying, jaw crushing and pulverising so that 90%
passes -75 microns.
No drilling results reported.
Auger sampling completed on a regular grid spacings to
ensure representative sampling of area being assessed.
Entire sample submitted for assay.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

18
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Assay and laboratory procedures have been selected
following
a
review
of
techniques
provided
by
internationally certified laboratories.
Dalaroo samples are submitted for multi-element
analyses by Bureau Veritas using fire assay and 4-acid
digest.
The assay techniques used are total.
Tie lines were flown to analyse the cross overs and assist
with levelling the magnetic survey.
Lab standards checked for accuracy and precision
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
None undertaken.
None drilled.
All field data is manually collected, entered into excel
spreadsheets, validated and loaded into Access database
and processed by a number of different exploration
software.
None required.
Location of
data points
Accuracy and quality of surveys used to locate
drillholes (collar and downhole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
All samples collected are located using a handheld GPS.
Magnetic survey locations were measured with a dual
frequency GNSS receiver operating in autonomous mode,
with x,y,z accuracies accurate to better than 1-2m.
Elevations were derived using a laser altimeter.
Grid system used for geochemical sampling is GDA94
Zone 50.
Magnetic survey sample locations were collected and
reported using the WGS84_UTM grid system.
For geochemical sampling nominal RLs based on regional
topographic data sets and handheld GPS.
Magnetic survey altitude measurements were measured
with a laser altimeter with accuracies better than 1cm.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

19
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Data spacing
and distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
First pass sampling on 200m X 100m spacing based on
geology/structural framework.
MRE not being reported.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The location within the Jimperding Metamporhic Belt
where the magnetic surveys were undertaken includes an
areas with N-S and NW-SE magnetic grain and cross-
cutting magnetic bodies, and N-S and NW-SE faults. The
survey grids are unbiased.
No drilling results reported.
Sample security The measures taken to ensure sample security. Senior personnel supervise sampling and transport to
assay laboratory in Perth.
All magnetic data is digitally stored by the contractor and
geophysical consultant.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
For geochemical sampling non completed
Magnetic data has been independently checked by
geophysical consultant Core Geophysics.
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
The Namban Project tenements are wholly owned by
Dalaroo.
The Project is located 150km north of Perth on freehold
land.
Tenure in the form of Exploration Licences with standard
5-year expiry dates which may be renewed.
The Competent Person is unaware of any impediments to
development of these tenements.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration
by other parties.
No known exploration in Archaean age Jimperding
Metamporhic Belt, area covered by Proterozoic rocks
explored for potash with geological mapping and rock
chip sampling.
Government DMIRS 200m spaced airborne magnetics and
radiometrics data has been included.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

20
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Geology Deposit type, geological setting, and style of
mineralisation.
The primary mineralisation style being sought is nickel-
copper-PGE (Ni-Cu-PGE) intrusive related deposits such as
Julimar.
Drillhole
information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drillholes:
easting and northing of the drillhole collar
elevation or RL (Reduced Level – elevation
above sea level in metres) of the drillhole
collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on
the basis that the information is not Material
and this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
No drilling results reported.
No drilling results reported.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths
of low-grade results, the procedure used for
such aggregation should be stated and some
typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
No drilling results reported.
No metal equivalent values have been reported.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drillhole angle is known, its nature
should be reported.
If it is not known and only the downhole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘downhole length, true width
not known’).
No drilling results reported.
No drilling results reported.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

21
----- End of picture text -----

==> picture [141 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view
of drillhole collar locations and appropriate
sectional views.
Appropriate diagrams are included in the main body of
this report.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
Reporting of the magnetic results is considered
balanced.
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
No additional meaningful and material exploration data
has been excluded from this report.
Further work The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Structural and geophysical integration of data.
Infill and extension geochemical sampling.
Geological/regolith mapping
Drill testing (aircore and or RC percussion drilling) will be
undertaken on priority targets identified.
These diagrams are included in the main body of this
report.

==> picture [595 x 35] intentionally omitted <==

----- Start of picture text -----

22
----- End of picture text -----

Rule 5.5

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Name of entity

DALAROO METALS LTD

ABN Quarter ended (“current quarter”) 23 648 476 699 31 December 2021

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
-
-291
-
-
-183
-158
-
-
-
-
-
-147
-
-419
-
-
-183
-196
-
-
-
-
-
-168
-779 -966
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
-
-42
-
-
-
-
-
-42
-
-
-
-

==> picture [64 x 13] intentionally omitted <==

----- Start of picture text -----

1
----- End of picture text -----

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 1

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Consolidated statement of cash flows
2.2
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
Current quarter
$A’000
-
-
-
-
-
-
-
-
Year to date
(6 months)
$A’000
-
-
-
-
-
-
-
-
-42 -42
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
-
-
-
-426
-
-
-
-
-
5,005
-
-
-539
-
-
-
-
-
-426 4,466
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
5,106
-779
-42
-426
402
-966
-42
4,466

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 2

==> picture [64 x 13] intentionally omitted <==

----- Start of picture text -----

2
----- End of picture text -----

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
Current quarter
$A’000
-
Year to date
(6 months)
$A’000
-
3,860 3,860
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,860
-
-
-
5,106
-
-
-
3,860 5,106
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
175
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
175
-

==> picture [64 x 13] intentionally omitted <==

----- Start of picture text -----

3
----- End of picture text -----

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 3

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

7.
7.1
7.2
7.3
7.4
7.5
7.6
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
Loan facilities
-
-
Credit standby arrangements
-
-
Other (please specify)
-
-
Total financing facilities
-
-
Unused financing facilities available at quarter end
-
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
- -
- -
- -
- -
-
8. Estimated cash available for future operating activities $A’000
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
Net cash from / (used in) operating activities (item 1.9)
-779
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
-
Total relevant outgoings (item 8.1 + item 8.2)
-779
Cash and cash equivalents at quarter end (item 4.6)
3,860
Unused finance facilities available at quarter end (item 7.5)
-
Total available funding (item 8.4 + item 8.5)
3,860
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
5.0
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
-779
-
-779
3,860
-
3,860
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A

==> picture [64 x 13] intentionally omitted <==

----- Start of picture text -----

4
----- End of picture text -----

ASX Listing Rules Appendix 5B (17/07/20)

Page 4

  • See chapter 19 of the ASX Listing Rules for defined terms.

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

  • 8.8.3 Does the entity expect to be able to continue its operations and to meet its business objectives and, if so, on what basis?

Answer: N/A

Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

  • 2 This statement gives a true and fair view of the matters disclosed.

Date: 20 January 2022

Authorised by: The Board of Dalaroo Metals Ltd

(Name of body or officer authorising release – see note 4)

Notes

  1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.

  2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

  3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

  4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [ name of board committeeeg Audit and Risk Committee ]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”.

  5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations , the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.

==> picture [64 x 13] intentionally omitted <==

----- Start of picture text -----

5
----- End of picture text -----

ASX Listing Rules Appendix 5B (17/07/20)

Page 5

  • See chapter 19 of the ASX Listing Rules for defined terms.