CZR RESOURCES LTD Interim / Quarterly Report 2022

Oct 28, 2021

64748_rns_2021-10-28_96d7eb63-e96d-4238-97ff-62aa85e74924.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [174 x 84] intentionally omitted <==

CZR Resources Limited

ABN: 91 112 866 869 Suite 9, Level 3, 47 Havelock Street West Perth, WA 6005 PO Box 16 West Perth, WA 6872 Phone: +61 8 9468 2050 Website: www.czrresources.com

The Company Announcements Office, ASX Limited

29 October 2021

September 2021 Quarterly Activities Report

Strong progress at Robe Mesa iron ore project with feasibility study advancing and infill drilling underway

Highlights

Robe Mesa Iron-Ore Project – Pilbara

  • Definitive Feasibility Study progressing well

  • Process of securing mining approvals advancing rapidly

  • Infill RC drilling aimed at increasing the Resource/Reserve is underway

Corporate

  • $7.3 million raised through successful equity placements

  • New Directors appointed; Managing Director search well advanced

CZR Resources Ltd (ASX: CZR) (“ CZR ” or “ Company ”) has a controlling joint-venture interest in five exploration projects in Western Australia with Creasy Group (Yarraloola (CZR 85%), Yarrie (CZR 70%), Shepherds Well (CZR 70%), Buddadoo (CZR 85%) and Croydon (CZR 70%). Activities during the quarter were focused mainly on advancing the definitive feasibility study (DFS) for the Robe Mesa iron-ore deposit on the Yarraloola Project. Results from field programmes on the Yarrie, Shepherds Well and Buddadoo projects have been received and are undergoing detailed interpretation. ( Figure 1 ).

CZR Resources Ltd

Page 1

==> picture [161 x 30] intentionally omitted <==

==> picture [311 x 395] intentionally omitted <==

Figure 1 . Location of the five CZR exploration projects in Western Australia. The Robe Mesa deposit is hosted in the Yarraloola Project.

ROBE MESA IRON-ORE DEPOSIT (Yarraloola Project) – WEST PILBARA (CZR 85%)

The Robe Mesa is a channelised deposit of iron-ore ( Appendix A ). The Prefeasibility study (PFS) demonstrated the potential for the project to deliver strong financial returns. This was based on a maiden JORC 2012 Probable Ore Reserve of 8.2Mt at 56 % Fe and a two million tonne per annum mining operation, hauling by road to Port Hedland. A benchmark iron ore price of US$90/dmt and an Australian dollar exchange rate of US70c was used in the study ( Figure 2 ; CZR release to the ASX 10 December 2020).

CZR Resources Ltd

Page 2

==> picture [161 x 30] intentionally omitted <==

==> picture [411 x 330] intentionally omitted <==

Figure 2 Location of the Robe Mesa deposit on the Yarraloola project in the West Pilbara.

Activities and Results

Since the release of the December 2020 PFS, CZR has been advancing a range of activities designed to de-risk the project in preparation for development. Some of the significant studies undertaken and milestones achieved during the quarter include:

  • Mining lease application M08/533 which covers the proposed pit and processing plant area is progressing through the statutory processes towards being granted.

  • Acquisition of a granted tenement (E08/3180) and an application for a new exploration licence (E08/3399) to provide flexibility in the layout of the proposed mine-site infrastructure and the potential for the discovery of additional iron-ore resources.

  • The flora study over the proposed mine-site area is complete and most of the field-based programmes for fauna and stygofauna studies are well advanced and these will contribute to the base-line environmental surveys that are required for the future approval of mining.

  • A follow-up meeting in Karratha and an onsite-meeting with some members of the Robe River Kuruma (RRKAC) Native Title representative body provided an update on the process for the design and approval of the mining operation and discussion on the general areas that are likely to be disturbed.

  • A heritage clearance survey for the infill RC drilling programme has been completed, followed by clearing of the access and pads that has allowed the commencement of RC drilling.

  • The proposed processing site layout has been modified in response to heritage and environmental data from site and information being provided by potential mining and haulage contractors.

  • Additional exploration tenure is being acquired to provide additional targets for iron-ore mineralisation and access to areas that might provide flexibility for project development.

CZR Resources Ltd

Page 3

==> picture [161 x 30] intentionally omitted <==

  • Discussions are continuing with the operators of the Onslow Marine Support Base regarding the development of the Beadon Creek facility into an iron-ore transhipping operation able to support the export of 2Mt/annum from the Robe Mesa project. CZR wants to understand the environmental constraints, materials handling ability, the approvals process and timelines, and commercial opportunities of this alternative export facility. The Onslow opportunity represents 60% less haul distance than the PFS considered Port Hedland, and a significant saving on haulage costs.

Next Steps

Geological and assay data from the infill drilling will be used for a range of geotechnical, geochemical, metallurgical and mining-related studies that are underway. In addition, a range of stakeholder meetings are being scheduled to discuss options and the timelines towards development.

YARRIE PROJECT – NORTH PILBARA (CZR 70%)

The Yarrie Project consists of six granted exploration licences (E45/3725, E45/3728, E45/4065, E45/4433, E45/4604, and E45/4605) that cover a total of 360 square kilometres, about 160 kilometres east of Port Hedland. Yarrie is serviced by bitumen and gravel roads, a natural gas pipeline between Pt Hedland and the Telfer copper-gold mine and a BHP-owned rail connection between Yarrie mining area and Port Hedland. The Yarrie tenements are held for their potential to host high-grade (+62% Fe) iron-ore and have historical highgrade RC drill intercepts in the Cabbage Tree and Kennedy Gap prospects (CZR release to ASX; 6 August 2014).

Activities and Results

Late in the Quarter, CZR completed a field-trip to Yarrie to review access to the Cabbage Tree prospect which includes historical intercepts of up to 19 metres at 63% Fe from 67 metres downhole (CZR release to ASX, 6 August 2014, Figure 3 ). In addition, some areas with favourable geophysical responses were visited, mapped and any rocks with evidence of mineralisation were rock-chip sampled. Targets showing potential for mineralisation under cover were also pegged for drilling.

During the Quarter, assays were received from the 55 samples collected in proximity to the geophysical targets. Nine report Fe between 60 and 67.4% and these are being interpreted for follow-up work programmes.

CZR Resources Ltd

Page 4

==> picture [161 x 30] intentionally omitted <==

==> picture [441 x 307] intentionally omitted <==

Figure 3 Interpreted cross-section for the Cabbage Tree prospect at Yarrie.

BUDDADOO GOLD PROJECT – YILGARN (CZR 85%)

The Buddadoo project (E59/1350 and E59/2349), with a surface area of 303 square kilometres, is located about 200 kilometres east of Geraldton Port and 60 kilometres from a rail siding at Morawa and is accessible all year by bitumen-road. The tenement is prospective for orogenic lode-style gold deposits. It covers 25 kilometres of the regional-scale Salt Creek shear zone where it cuts through an area up to 10 kilometres wide of the underexplored Gullewa greenstone belt. This greenstone hosts the high-grade Deflector Gold Mine owned by Silver Lake Resources, approximately 5 kilometres from the western boundary of the tenement ( Figure 4 ) and as part of the Youanmi terrain of the Yilgarn, is the region that hosts large gold deposits near Mt Magnet, Cue and Meekatharra.

CZR Resources Ltd

Page 5

==> picture [161 x 30] intentionally omitted <==

==> picture [379 x 378] intentionally omitted <==

Figure 4 Location of the five priority areas for lode-style gold mineralisation in the Gullewa greenstone belt on the Buddadoo project overlain on a CZR modified summary of the Geological Survey of Western Australia 500k scale mapping of the area.

Activities and Results

During the Quarter, CZR received assays for the first-pass 4 metre RC drill composites for the 24 completed holes. Intervals with anomalous gold have been re-sampled on 1m intervals for both gold and pathfinder element analysis to determine the significance of the intercepts (Figures 4 to 6).

A drilling rig is scheduled to recommence work in November and will complete the drilling programme which was previously suspended due to rainfall events that prevented access to the drill sites.

CZR Resources Ltd

Page 6

==> picture [161 x 30] intentionally omitted <==

==> picture [454 x 454] intentionally omitted <==

Figure 5 Drill-hole and outcrop geology over drill prospect 1 at Buddadoo.

CZR Resources Ltd

Page 7

==> picture [161 x 30] intentionally omitted <==

==> picture [457 x 241] intentionally omitted <==

Figure 6 Interpreted geology for section 6839000N on drill prospect 1 at Buddadoo

CROYDON GOLD PROJECT (CZR 70%)

The 320 square kilometres Croydon project (E47/2150) is located in the Mallina Basin between Karratha and Port Hedland. The region contains De Grey Mining Limited’s Hemi gold deposit with an announced resource of 6.8 Moz (DEG release to ASX; 23 June 2021). This area has the potential to emerge as a major gold province. Croydon covers approximately 40 kilometres strike on the key regional structures, about 50 kilometres southeast of Hemi ( Figure 7 ). The Company has a compilation of historical drainage, rock-chip and gridded soils assays and been extending the amount of surface sampling on the project since 2018. There has also been selected follow-up RC and diamond drilling in 2019 and 2020 focussed on the Top Camp Prospect but with some initial work at Bottom Camp and Franks Patch. All prospects require follow-up drilling of intercepts that report gold at greater than 0.5g/t (CZR release to ASX: 6 February 2020; 2 September 2020, 6 October 2020, 31 March 2021).

The work to date at Top Camp has confirmed there is an effective relationship between gold in soils and significant gold intercepts in the underlying bedrock but as yet, neither the surface sampling nor the drilling has defined the limits of the mineralised system.

CZR Resources Ltd

Page 8

==> picture [161 x 30] intentionally omitted <==

==> picture [449 x 316] intentionally omitted <==

Figure 7 Location of the Top Camp and Bottom Camp prospects on a summary of the Geological Survey of Western Australia published 500K-scale regional geological framework of the Croydon Project (E47/2150) in the Pilbara of Western Australia.

Activities and Results

While CZR is progressing a heritage access agreement for the tenement so that the next round of drilling can be undertaken, an independent review of the style and potential origins of the mineralisation in the Top Camp, area has been geochemically compared to a number of major ore deposit types represented in the OSNACA (Ore Samples Normalised to Average Crustal Abundance) using machine learning technology that has been developed by SensOre Ltd.

Of the 110 extended multi-element drill-samples with gold greater than 250 ppb in the CZR database that were delivered to SensOre for processing and classification from the 2019 and 2020 RC and diamond drilling programmes, a total of 64.5% (i.e. 71) of the drill interval assay data were classified “IntrusiveRelated gold” type and 35.5% (i.e. 39) as "Orogenic gold” type with a high degree of confidence.

SensOre commented “ That the Top Camp drill-assay intervals classify as both “Intrusive" and “Orogenic” gold types has positive implications for the Croydon project area. Gold deposits that exhibit both types of signatures, for example the Fimiston and Mount Charlotte deposits in the Yilgarn Craton, are associated with larger gold endowment. The results from the study are also consistent with the geological setting of the mineralisation being drilled at the Hemi deposit by DeGrey some 90 kilometres to the north-east of the Top Camp area and along the trend of the major regional shear zone.”

CZR Resources Ltd

Page 9

==> picture [161 x 30] intentionally omitted <==

The SensOre study provides support for the CZR exploration model which has been identifying and sampling along a range of structures on the Croydon project as being potential sites for mineralisation from a large regional event.

SHEPHERDS WELL PROJECT – WEST PILBARA (CZR 70%)

Shepherd’s Well (E08/2361), with an area of 77 square kilometres, is located 60 kilometres south-west of Karratha and covers 15 kilometres of a regional shear-zone. It shares much of its geological history and prospectivity with the Croydon project. Shepherds Well is under-explored by modern exploration concepts and techniques and assay results from CZR sampling to date suggest that surface sampling provides an effective tool for identifying mineralisation. Amongst a focus on identifying targets for gold mineralisation, the Company has identified prospects for nickel sulphide at Dorper, a base-metals prospect (lead-zinc-silver) at Suffolk and rare-earths at Awassi ( Figure 8 ; CZR releases to ASX; 21 March 2017, 13 September 2016, 11 October 2017, 25 November 2019).

==> picture [351 x 350] intentionally omitted <==

Figure 8 Location of the Awassi, Dorper and Suffolk prospects on the Shepherds Well Project overlain on the Geological Survey of Western Australia 500k scale mapping of the Pilbara.

Activities and Results

During the Quarter, a field visit focussed on mapping and the collection of 12 rock-chip samples over the cores of the Dorper nickel and Awassi rare-earth anomalies.

At Dorper, mapping shows that the outcrop of altered mafic to ultramafic rocks beneath the area of anomalous nickel in soil contain bands and disseminations of iron-rich rocks with elevated nickel (to 0.44% Ni), gold and

CZR Resources Ltd

Page 10

==> picture [161 x 30] intentionally omitted <==

platinum group elements (Au+PGE up to 100ppb combined) that are similar to the concentrations previously reported in the soil (CZR release to ASX; 25 November 2019). This iron-rich material at surface is consistent with the potential for disseminated and segregated sulphide at depth, and as such, Dorper remains a priority target for the discovery of nickel mineralisation on Shepherds Well.

The outcrop underlying the Awassi rare-earth anomaly consist of a suite of coarsely banded, quartzofeldspathic rocks that are probably sedimentary in origin and are overlain by younger volcanic rocks from the Fortescue Group. Rock-chips from the core of the soil anomaly report rare-earth values at similar levels previously reported in the soil samples (CZR release to ASX; 25 November 2019) and the area requires further assessment before a drill target is finalised.

Corporate

During the quarter the Company completed a $7.3 million equity raising that was first announced on 7 June 2021. The announcement on the 7 June 2021 included a two tranche placement to sophisticated and professional investors to raise $7,000,000 at 1.15 cents a share ( Placement ) and Share Purchase Plan ( SPP ) that eventually raised $283,000 at the same price.

Tranche 1 Placement funds of $4,000,000 were received in the previous quarter in June.

Tranche 2 Placement Funds of $3,000,000 was received in this quarter during July, as it first required Shareholder approval as the shares were being issued to the Creasy Group. Following Shareholders approval at a General Meeting on 22 July 2021, the Company issued 260,869,600 shares to the Creasy Group at 1.15 cents per share to complete the transaction.

In July the Company issued 24,608,683 shares at 1.15 cents per share to raise $283,000 through the SPP.

On 10 September 2021, D. Flanagan, R. Ramsay, S. Jackson and A. Neuling resigned as directors of the Company. Mr Malcolm Carson and Mr. Russell Clark were appointed as new directors of the Company.

R. Ramsey has continued to work as Acting CEO and will provide an orderly transition to the new Managing Director, expected to be appointed in the next quarter.

Information required by Listing Rule 5.3.1:

During the Quarter, the Company spent $875k on exploration activities which included $240k on Buddadoo Project, $134K on Yarrie Project, $75k on the Croydon Project and $22k on the Shepherd’s Well Project. Also included was $404k of costs associated with advancing the feasibility study and approvals for the Robe Mesa iron-ore deposit at Yarraloola.

Information required by Listing Rule 5.3.5:

During the quarter, the Company made payments to related parties of $122k, encompassing Executive Director’s salary, Directors’ fees and associated superannuation costs.

This announcement is authorised for release to the market by the Board of Directors of CZR Resources Ltd.

For further information, contact:

Dr Rob Ramsay Media Chief Executive Officer Paul Armstrong CZR Resources Ltd Read Corporate +61 8 9468 2050 +61 8 9388 1474

CZR Resources Ltd

Page 11

==> picture [161 x 30] intentionally omitted <==

Forward Looking Statements

This announcement contains “forward-looking information” that is based on CZR’s expectations, estimates and projections as of the date on which the statements were made. This forward-looking information includes, among other things, statements with respect to the pre-feasibility study, CZR’s business strategy, plan, development, objectives, performance, outlook, growth, cashflow, projections, targets and expectations, mineral resources, ore reserves, results of exploration and related expenses. Generally, this forward looking information can be identified by the use of forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar expressions. Persons reading this announcement are cautioned that such statements are only predictions, and that CZR’s actual future results or performance may be materially different. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause CZR’s actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information.

Forward-looking information is developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to general business, economic, competitive, political and social uncertainties; the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices and demand of iron and other metals; possible variations of ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accident, labour disputes and other risks of the mining industry; and delays in obtaining governmental approvals or financing or in the completion of development or construction activities. This list and the further risk factors detailed in the remainder of this announcement are not exhaustive of the factors that may affect or impact forward-looking information. These and other factors should be considered carefully, and readers should not place undue reliance on such forward-looking information. CZR disclaims any intent or obligations to revise any forward-looking statements whether as a result of new information, estimates, or options, future events or results or otherwise, unless required to do so by law.

Statements regarding plans with respect to CZR’s mineral properties may contain forward-looking statements in relation to future matters that can only be made where CZR has a reasonable basis for making those statements. Competent Person Statements regarding plans with respect to CZR’s mineral properties are forward looking statements. There can be no assurance that CZR’s plans for development of its mineral properties will proceed as expected. There can be no assurance that CZR will be able to confirm the presence of mineral deposits, that any mineralisation will prove to be economic or that a mine will successfully be developed on any of CZR’s mineral properties.

CZR believes it has a reasonable basis for making the forward looking statements in this Announcement, including with respect to any production targets and economic evaluation, based on the information contained in CZR's ASX announcement entitled “Pre-Feasibility Study finds Robe Mesa iron ore project is technically robust with potential to generate strong financial returns” dated 10 December 2020. CZR confirms that it is not aware of any new information or data that materially affects the production targets contained in the previous announcement of the PFS and all material assumptions underpinning the production targets and economic valuation in the previous market announcement continue to apply and have not materially changed.

Competent Person Statement

The information in this report that relates to ore reserves, mineral resources, exploration activities and results is based on information compiled by Rob Ramsay (BSc Hons, MSc, PhD) who is a Member of the Australian Institute of Geoscientists. Rob Ramsay is the Chief Executive Officer of CZR Resources Ltd and a Geologist with over 35 years of experience and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Rob Ramsay has given his consent to the inclusion in this report of the matters based on the information in the form and context in which it appears.

Appendix A

Tabulated estimates of the JORC2012 ore-resources for Robe Mesa deposit and Robe East extension deposit which contribute to the combined Robe Mesa deposit and are inclusive of the +55%Fe ore-reserve estimate with relevant CZR releases to the ASX.

CZR Resources Ltd

Page 12

==> picture [161 x 30] intentionally omitted <==

Table A1 Robe Mesa JORC 2012 mineral resource estimate reported above a 50% Fe cut-off grade (CZR announcement to ASX; 8 February 2016) and outlined on Figures A1 and A2 .

Category Tonnes Fe SiO2 Al2O3 TiO2 LOI P S Feca
Mt % % % % % % % %
Indicated 65.7 53.8 8.27 3.43 0.14 10.63 0.041 0.018 60.2
Inferred 18.8 53.8 8.22 3.42 0.14 10.71 0.046 0.017 60.3
Total 84.5 53.8 8.26 3.43 0.14 10.64 0.042 0.018 60.2

Table A2 Robe Mesa JORC 2012 mineral resource estimate reported above a 55%Fe cut-off grade (CZR release to ASX; 8 February 2016) and within the +50%Fe ore-resource and is inclusive of the +55%Fe ore-reserve estimate in Table A5.

Category Tonnes Fe SiO2 Al2O3 TiO2 LOI P S Feca
Mt % % % % % % % %
Indicated 19.5 56.0 5.95 2.72 0.10 10.71 0.043 0.017 62.7
Inferred 5.2 56.0 5.79 2.76 0.10 10.71 0.047 0.016 62.7
Total 24.7 56.0 5.92 2.73 0.10 10.71 0.044 0.016 62.7

Table A3 Robe East JORC 2012 mineral resource estimate reported above a 50% Fe cut-off grade (CZR release to ASX; 26 April 2017) and is outlined on Figures A1 and A2 .

Category Tonnes Fe SiO2 Al2O3 TiO2 LOI P S Feca
Mt % % % % % % % %
Inferred 4.6 51.8 9.7 3.8 0.20 10.9 0.1 0.02 58.2
Total 4.6 51.8 9.9 3.8 0.20 10.9 0.1 0.02 58.3

Table A4 Combined Robe Mesa and Robe East JORC2012 mineral resource reported above a 50% Fe cut-off grade (CZR release to ASX; 26 April 2017) and are outlined on Figures A1 and A2 .

Category Tonnes Fe SiO2 Al2O3 TiO2 LOI P S Feca
Mt % % % % % % % %
Indicated 65.7 53.8 8.3 3.43 0.14 10.63 0.04 0.02 60.2
Inferred 23.4 53.4 8.5 3.49 0.15 10.75 0.06 0.02 59.9
Total 89.1 53.7 8.3 3.45 0.14 10.66 0.05 0.02 60.1

Feca is the calcined iron-content calculated as (Fe%/(100-LOI%))*100 and represents the amount iron after the volatiles (mainly held as weakly bound water in the structure of the hydrous iron-rich minerals) is excluded from the analysis.

CZR Resources Ltd

Page 13

==> picture [161 x 30] intentionally omitted <==

Table A5 – Robe Mesa JORC2012 ore-reserve reported above a cut-off grade of 55% Fe (CZR release to ASX; 10 December 2020) with the proposed pit outlines to recover the ore-reserve shown on Figures A1 and A2 .

Category Mt Fe % **Al2O3% ** P% **SiO2% ** S% LOI%
Probable 8.2 56.0 2.7 0.039 5.9 0.020 10.9
Total 8.2 56.0 2.7 0.039 5.9 0.020 10.9

Note 1: CZR confirms that it is not aware of any new information or data that materially affects the information included in the CZR announcements to the ASX on 8 February 2016, 26 April 2017 and 10 December 2020 and, in the case of estimates of the mineral resources in Tables A1 to A4 and the ore reserves in Table A5, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed .

==> picture [443 x 341] intentionally omitted <==

Figure A1 Outline of the Robe Mesa and Robe East +50%Fe JORC2012 resource model (CZR releases to the ASX; 8 February 2016, 26 April 2017) showing the proposed pit outlines on the +55%Fe probable ore-reserve and the proposed site layout (CZR release to the ASX; 10 December 2020).

CZR Resources Ltd

Page 14

==> picture [161 x 30] intentionally omitted <==

==> picture [490 x 308] intentionally omitted <==

Figure A2 Representative cross-section across the Robe Mesa and Robe East deposits on 7593950N showing the RC drilllocations, intercepts with calcined Fe>50% and the interpreted geology (CZR releases to the ASX; 8 February 2016, 26 April 2017) showing the proposed pit outlines on the +55%Fe probable ore-reserve (CZR release to the ASX; 10 December 2020).

CZR Resources Ltd

Page 15

==> picture [161 x 30] intentionally omitted <==

Mining Tenement changes during the Quarter

Project Location Tenement
Number
Economic Entity's
Interest at Start of
Quarter
Economic Entity's
Interest at Quarter
End
Yarraloola West Pilbara,WA E08/3180 0% 100%
Yarraloola West Pilbara,WA E08/3399 0% 100%

Farm-in / Farm-out Agreement changes during the Quarter

Project Location Tenement
Number
Economic Entity's
Interest at Start of
Quarter
Economic Entity's
Interest at Quarter
End
No change

Interests in Mining Tenements & Joint Ventures

Project Location Tenement
Number
Economic Entity's
Interest at Quarter
End
Comment
Yarraloola West Pilbara,WA E08/1060 85%
Yarraloola West Pilbara,WA E08/1686 85%
Yarraloola West Pilbara,WA E08/1826 85%
Yarraloola West Pilbara,WA M08/519 85% Application
Yarraloola West Pilbara,WA M08/533 85% Application
Yarraloola West Pilbara,WA E08/3399 100% Application
Yarraloola West Pilbara,WA E08/3180 100% Acquired
Shepherds
Well
West Pilbara, WA E08/2361 70%
Yarrie East Pilbara,WA E45/3725 70%
Yarrie East Pilbara,WA E45/3728 70%
Yarrie East Pilbara,WA E45/4065 70%
Yarrie East Pilbara, WA E45/4604 70%
Yarrie East Pilbara,WA E45/4605 70%
Yarrie East Pilbara,WA E45/4433 100%
Buddadoo Mid-west,WA E59/1350 85%
Buddadoo Mid-west,WA E59/2349 85%
Croydon Pilbara WA E47/2150 70%

CZR Resources Ltd

Page 16

Rule 5.5

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Name of entity CZR Resources Ltd ABN Quarter ended (“current quarter”) 91 112 866 869 30 September 2021

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other
1.9
Net cash from / (used in) operating
activities
(875)
-
-
(10)
(328)
-
-
-
-
-
-
(875)
-
-
(10)
(328)
-
-
-
-
-
-
(1,213) (1,213)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
-
(20)
-
-
-
-
-
(20)
-
-
-
-

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 1

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
2.2
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
(20) (20)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
3,283
-
-
(59)
-
-
-
-
-
3,283
-
-
(59)
-
-
-
-
-
3,224 3,224
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
5,117
(1,213)
(20)
3,224
5,117
(1,213)
(20)
3,224

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 2

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
- -
7,108 7,108
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (term deposits)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
7,108
-
-
-
5,117
-
-
-
7,108 5,117
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
6.1 Represents director fees paid during the quarter.
122
-
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
7.1
Loan facilities
-
7.2
Credit standby arrangements
-
7.3
Director Loans
-
7.4
Total financing facilities
-
7.5
Unused financing facilities available at quarter end
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
- -
- -
- -
- -
-

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 3

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

8. Estimated cash available for future operating activities $A’000
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
Net cash from / (used in) operating activities (item 1.9)
(1,213)
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
-
Total relevant outgoings (item 8.1 + item 8.2)
(1,213)
Cash and cash equivalents at quarter end (item 4.6)
7,108
Unused finance facilities available at quarter end (item 7.5)
-
Total available funding (item 8.4 + item 8.5)
7,108
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
5.86
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
(1,213)
-
(1,213)
7,108
-
7,108
Answer:
8.8.2
Answer:
8.8.3
Answer
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

  • 2 This statement gives a true and fair view of the matters disclosed.

Date: 29 October 2021

Authorised by: Board

(Name of body or officer authorising release – see note 4)

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 4

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Notes

  1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.

  2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

  3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

  4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [ name of board committeeeg Audit and Risk Committee ]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”.

  5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations , the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 5