==> picture [173 x 84] intentionally omitted <==

CZR Resources Ltd

ABN: 91 112 866 869 Level 24, 44 St George’s Terrace Perth Western Australia 6000 PO Box Z5183 Perth WA 6831 Phone: +61 8 6211 5099 Facsimile: +61 8 9218 8875 Website: www.czrresources.com

The Company Announcements Office, ASX Limited

10 December 2020

Pre-Feasibility Study finds Robe Mesa iron ore project is technically robust with potential to generate strong financial returns

Payback period of 19 months based on C1 cash cost of A$64.78/dmt and benchmark iron ore price of US$90/t (~US$145/t as at 4[th] December)[2]

  • Pre-Feasibility Study (PFS) on CZR’s 85%-owned Robe Mesa iron ore deposit in WA’s Pilbara shows the project has potential to generate strong financial returns based on the PFS production target of 2Mtpa of Direct Shipping Ore (DSO) over +5 years (64 months)

  • 89% of the Life of Mine (LOM) production schedule is based on Probable Ore Reserves

  • 11% of the Life of Mine production schedule is based on inferred resources which are a comparatively lower level of geological confidence and there is no certainty that further exploration work will result in the converting these tonnes to Indicated Mineral Resources and ultimately reserves[1] which then contribute to the production target.

  • The PFS underpins a maiden Probable Ore Reserve at Robe Mesa of 8.2Mt at 56% Fe

  • Key findings of the PFS are:

  • Pre-production capital estimate of A$51.1M

  • Life of Mine (LOM) average C1 cash operating cost of A$64.78/t (dry)

  • PFS LOM project cashflow of A$96.4M, based on a 62% Fe Index Price of US$90 per dry metric tonne (dmt) and a US$:A$ exchange rate of US70c

  • LOM Project cashflow of A$622M, using US$145 / dmt[2] as the 62% Fe Index Price and all other revenue drivers as per the PFS

  • Production of all-fines DSO product, using simple, proven crushing and screening

  • Export via the Utah Bulk Handling Facility (Utah Point ) in Port Hedland

  • Upside opportunities include:

  • Potential to reduce haulage costs by using a closer port between Onslow and Dampier

  • At the PFS production rate of 2Mtpa (dry)[ 1] , the processing plant and mining fleet will not be fully utilised; the PFS shows that increasing the production target to 3Mtpa (dry) would not require any additional processing capacity or additional load and haul fleet on site, and therefore the unit cost of mine operations would be reduced

  • Potential to reduce capital costs through more detailed investigation regarding access road and intersection works, and the infrastructure requirements for water supply

  • There are additional prospects on the exploration licences which are available to be drilltested

1 This production target must be read in conjunction with the production target cautionary statement on page 3. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realized.

2 Reported Platts 62% Fe Index price as at 4th December 2020

CZR Resources Ltd

Page 1

Legal/74259649_7

==> picture [162 x 30] intentionally omitted <==

CZR Resources Limited (ASX:CZR) is pleased to advise that a Pre-Feasibility Study (PFS) on its 85 percentowned Robe Mesa iron ore project in the Pilbara shows it is set to be technically robust and is likely to generate strong financial returns.

The findings are based on a PFS annual production rate of two million tonnes of DSO and a maiden JORC Probable Ore Reserve for Robe Mesa of 8.2Mt at 56 % Fe.

The PFS estimates an average C1 operating cost of A$64.78 per dry metric tonne over the +5 year life of the project.

This underpins a payback period of just 19 months using an assumed benchmark iron price of US$90/dmt and an assumed Australian dollar exchange rate of US70c.

In Iight of these strong findings, CZR will now undertake a Definitive Feasibility Study on Robe Mesa. This will be carried out in parallel with further drilling aimed at upgrading the Inferred Resource.

CZR Managing Director Rob Ramsay said: “The PFS shows Robe Mesa is well on track to becoming a significant Pilbara iron ore producer with strong financial returns based on low costs and its close proximity to existing infrastructure.

“With an estimated capital cost of only A$51m and a payback period of 19 months, the project has excellent potential to create substantial value for CZR shareholders.

“The study was based on conservative parameters and an assumed price which is significantly lower than the current market price. There is also scope for a reduction in the unit costs given that the processing and mining load and haul capacity exceeds the initial planned production rate of 2Mtpa.

“We will now move quickly to begin a DFS while looking for opportunities to further improve the financial returns”.

Forward Looking Statements

This announcement contains “forward-looking information” that is based on CZR’s expectations, estimates and projections as of the date on which the statements were made. This forward-looking information includes, among other things, statements with respect to the pre-feasibility study, CZR’s business strategy, plan, development, objectives, performance, outlook, growth, cashflow, projections, targets and expectations, mineral resources, ore reserves, results of exploration and related expenses. Generally, this forward looking information can be identified by the use of forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar expressions. Persons reading this announcement are cautioned that such statements are only predictions, and that CZR’s actual future results or performance may be materially different. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause CZR’s actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information.

Forward-looking information is developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to general business, economic, competitive, political and social uncertainties; the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices and demand of iron and other metals; possible variations of ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accident, labour disputes and other risks of the mining industry; and delays in obtaining governmental approvals or financing or in the completion of development or construction

CZR Resources Ltd

Page 2

==> picture [162 x 30] intentionally omitted <==

activities. This list and the further risk factors detailed in the remainder of this announcement are not exhaustive of the factors that may affect or impact forward-looking information. These and other factors should be considered carefully, and readers should not place undue reliance on such forward-looking information. CZR disclaims any intent or obligations to revise any forward-looking statements whether as a result of new information, estimates, or options, future events or results or otherwise, unless required to do so by law.

Statements regarding plans with respect to CZR’s mineral properties may contain forward-looking statements in relation to future matters that can only be made where CZR has a reasonable basis for making those statements. Competent Person Statements regarding plans with respect to CZR’s mineral properties are forward looking statements. There can be no assurance that CZR’s plans for development of its mineral properties will proceed as expected. There can be no assurance that CZR will be able to confirm the presence of mineral deposits, that any mineralisation will prove to be economic or that a mine will successfully be developed on any of CZR’s mineral properties.

Production Targets Cautionary Statement

CZR has concluded that it has a reasonable basis for providing the forward looking statements and forecast financial information included in this announcement. The detailed reasons for that conclusion are outlined throughout this announcement and all material risk factors, sensitivities and assumptions, including the JORC modifying factors, upon which the forecast financial information is based are disclosed in this announcement. This announcement has been prepared in accordance with JORC Code 2012 and the ASX Listing Rules.

The actual results could differ materially from a conclusion, forecast or projection in the forward-looking information. Certain modifying factors were applied in drawing a conclusion or making a forecast or projection as reflected in the forward looking and cautionary statements.

The production target and forecast financial information derived from the production target referred to in this announcement is based on 89% Probable Ore Reserves and 11% Inferred Mineral Resources. The modifying factors used in the estimation of the Ore Reserve were also applied to the Inferred Mineral Resource.

There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target reported itself will be realised.

CZR confirms that the use of Inferred Mineral Resources is not a determining factor of the Robe Mesa project's viability. In addition, the Inferred Mineral Resource does not feature as a significant proportion early in the mine plan, as described overleaf in ‘JORC Mineral Resource and Ore Reserve’. The production target for years 1 to 3 inclusive of the mine schedule is comprised of greater than 93% Ore Reserves, with the majority of the Inferred Mineral Resource within the mining schedule weighted to the back end of the schedule. CZR notes that the Robe Mesa project forecasts a positive financial performance when incorporating Ore Reserve tonnes only and is therefore satisfied that the use of Inferred Mineral Resources in the production target reporting and forecast financial information is not the determining factor in overall Robe Mesa project viability and that it is reasonable to report the PFS including the Inferred Mineral Resources.

The Ore Reserve and Mineral Resource estimates underpinning the production target and PFS were prepared by a Competent Person in accordance with the JORC Code 2012 and all relevant details are set out in this announcement.

CZR Resources Ltd

Page 3

==> picture [162 x 30] intentionally omitted <==

CZR believes there is a reasonable basis to assume the necessary funding for the Project will be obtained. CZR has been able to raise funding for its exploration and development over the past 10 years in order to progress its projects. The positive outcomes delivered by the PFS provide confidence to the Board in the ability of CZR to fund the next stage of development through conventional equity financing. Notwithstanding this, the normal risks for the raising of capital will apply to CZR, such as the state of equity capital and debt markets, the status of approvals required to advance the Project and the price of iron ore.

PFS has highlighted strong foundations for the project:

  • A saleable product specification with existing product reference points that are well established in the market (Rio Tinto Robe Fines, FMG SSF). This style of product comprises approximately 10% of the present Australian export volume for iron ore.

  • Robe Mesa is close to existing infrastructure and major regional hubs, and therefore well supported for access and the logistics of running an operation (Figure 1)

  • Whilst the PFS utilises Utah Point in Port Hedland for exports, closer port options (within 100km of Robe Mesa, refer Figure 1) along the coast between Onslow and Dampier may present significant opportunity to reduce the haulage distance to port.

  • The terrain is favourable making access to the Mesa for mining and the construction of infrastructure relatively straightforward.

  • A simple, low strip ratio mining operation, with the PFS making use of a single excavator and four dump trucks for the primary mining fleet, operating day shift only.

  • All mining is above water table

Table 1 - Mine Production Metrics Estimate

PFS Production rate(drytonnes) Mtpa 2.0
Life of Mine StripRatio(including pre-production) waste:ore 0.57
Total Pit Inventory (dryore tonnes) Mtpa 9.21
Mine Life Months 66
C1 Cash Cost(nominal – before inflation) $/dmt 64.78

1Total pit inventory comprised of Probable Ore Reserve (8.2Mt) and Inferred Mineral Resource (1.0Mt)

Table 2 - Project Economics Estimates

Life of Mine Revenue1 $M 956.4
Project Cashflow(at 62% Fe Index Price of$90/dmt)1,2 $M 96.4
C1 Cash Cost(nominal - no inflation) $/dmt 64.78
Payback Period(post construction)2 Months 19
Pre-production Capital costs (includes contingency & capitalised pre-production
opex)
$M 51.1
Capital Contingency & Pre-commissioning/ramp up capitalised mining and crush &
screen opex
$M 16.0
Life of Mine Capital costs (Pre-production capital + sustaining capital + mine
closure capital)
$M 60.1

1PFS cashflow modelling has used a flat 62% Fe Index Price of US$90/dmt (in addition to other revenue modifying factors assumed for the product) and a constant exchange rate of 0.70 for converting A$ to US$.

2Cashflow modelling and Project Payback period uses operating cost estimates inflated 1.25% annually over the life of the project

CZR Resources Ltd

Page 4

==> picture [162 x 30] intentionally omitted <==

Project Management

The PFS for the Project has been project managed by an external consultant to CZR and includes studies conducted by internal staff together with external consultants and with proposals and or quotations provided by experienced industry participants.

Project Ownership

The Robe Mesa project is located on part of the Yarraloola tenement package which is a joint-venture in which an 85% beneficial ownership is held by Zanthus Resources Pty Ltd for CZR Resources Ltd and 15% is held independently by ZanF Pty Ltd.

Unless stated otherwise all project metrics are stated on a 100% basis.

Project Location

The Robe Mesa project is located in the West Pilbara within the Shire of Ashburton, 200 kilometres by road south-west of the city of Karratha, 175 kilometres by road from the town of Onslow and 400 kilometres by road from Port Hedland (Figure 1). Robe Mesa is not an isolated deposit but part of a regional province. Robe Mesa is located between the Mesa A and Mesa J-K CID mines operated by RioTinto Ltd. Iron ore has been mined and exported from the Robe Valley since 1972.

==> picture [488 x 392] intentionally omitted <==

Figure 1 - Location of the Robe Mesa in the West Pilbara

CZR Resources Ltd

Page 5

==> picture [162 x 30] intentionally omitted <==

JORC Mineral Resource and Ore Reserve

The PFS is based on an independent JORC 2012 Mineral Resource for the Robe Mesa portion of the combined Robe Mesa and Robe East resource of 89.1Mt at 53.7% Fe, reported above a Fe (iron) cut-off grade of 50% Fe from two sub-horizontal zones of mineralisation (8 February 2016, 26 April 2017 ASX Announcement):

Table 3 – Total Robe Mesa and Robe East JORC 2012 Mineral Resource reported at a 50% Fe cut-off grade (26 April 2017 ASX Announcement)

Category Tonnes Fe SiO2 Al2O3 TiO2 LOI P S Feca
Mt % % % % % % % %
Indicated 65.7 53.8 8.3 3.43 0.14 10.63 0.04 0.02 60.2
Inferred 23.4 53.4 8.5 3.49 0.15 10.75 0.06 0.02 59.9
Total 89.1 53.7 8.3 3.45 0.14 10.66 0.05 0.02 60.1

Feca is the calcined iron-content calculated as (Fe%/(100-LOI%))*100 and represents the amount iron after the volatiles (mainly held as weakly bound water in the structure of the hydrous iron-rich minerals) is excluded from the analysis.

At a 55% Fe cut-off, a JORC 2012 Mineral Resource of 24.7Mt @ 56% Fe (calcining to 62.7%Fe) is reported in the upper parts of the upper zone of mineralisation and it is this material that was the focus of the PFS:

Table 4 - Robe Mesa JORC 2012 Mineral Resource reported above a 55% Fe cut-off grade, contained within the Resource reported above in Table 3 (8 February 2016 ASX Announcement)

Category Tonnes Fe SiO2 Al2O3 TiO2 LOI P S Feca
Mt % % % % % % % %
Indicated 19.5 56.0 5.95 2.72 0.10 10.71 0.043 0.017 62.7
Inferred 5.2 56.0 5.79 2.76 0.10 10.71 0.047 0.016 62.7
Total 24.7 56.0 5.92 2.73 0.10 10.71 0.044 0.016 62.7

Feca is the calcined iron-content calculated as (Fe%/(100-LOI%))*100 and represents the amount iron after the volatiles (mainly held as weakly bound water in the structure of the hydrous iron-rich minerals) is excluded from the analysis.

This Mineral Resource was used to complete pit optimisations, pit designs, site layout and a mine schedule that targeted a product specification. Outputs of the mine plan were combined with results of the comminution test-work to form the basis of a Request for Quote (RFQ) from an experienced contractor for crushing and screening, mining, and selected civil packages. Received proposals were then used as a basis for defining other remaining requirements of the project such as manning levels, village accommodation requirements, and other project details that could be used to ascertain estimates for capital. Qube Bulk and the Pilbara Ports Authority provided pricing and guidance on commercial terms for the purpose of modelling port operating costs at Utah. An experienced haulage contractor provided pricing and a methodology for product transport from site to port using quad combination road trains. The information provided was consolidated and used as a basis for developing capital and operating cost estimates and a project cashflow.

The Ore Reserve has been stated by Intermine Engineering based on the PFS modelled production rate of 2Mtpa (dry) of 100% Fines product with an average life of mine waste to ore strip ratio of 0.57:1.

CZR Resources Ltd

Page 6

==> picture [162 x 30] intentionally omitted <==

Table 5 - Ore Reserve reported above a cut-off grade of 55% Fe

Category Mt Fe % **Al2O3% ** P% **SiO2% ** S% LOI%
Probable 8.2 56.0 2.7 0.039 5.9 0.020 10.9
Total 8.2 56.0 2.7 0.039 5.9 0.020 10.9

The Indicated Mineral Resource classification has been converted to a Probable Ore Reserve with the Inferred Mineral Resource classification excluded. The production target for years 1 to 3 of the mine schedule is comprised of 94%, 93% and 96% Ore Reserves respectively, with the majority of the Inferred Mineral Resource within the mining schedule weighted to the back end of the schedule.

The Mineral Resource outlined above in Table 3 is inclusive of the Ore Reserve.

SUMMARY OF ORE RESERVE ESTIMATE AND REPORTING CRITERIA

A summary is provided below of the relevant information used in the estimation of the Ore Reserve with full details provided in JORC Table 1 – Checklist of Assessment and Reporting Criteria for the Robe Mesa Project. This announcement has been compiled in compliance with the JORC code (2012) and the ASX Listing Rules, in particular listing rule 5.9.

Material Assumptions

The material assumptions supporting the Ore Reserve are based on the outcomes of the PFS presented in this announcement. The assumptions specific to the PFS and Ore Reserve estimate are summarised below and are further detailed within the JORC Table 1 attached to this announcement.

Criteria used for the Classification of Ore Reserve

A Fe cut-off grade of 55% was applied to Domain 4 within the Mineral Resource. The resource block model was used to create a mining block model which was then used for pit optimisations, pit designs and a mine schedule. The mine schedule does not include an allowance for ore loss and or mining dilution.

Ore Reserves were estimated only on the Indicated Mineral Resource classification. The Ore Reserve has been compiled in accordance with the guidelines defined in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code – 2012 Edition).

Mining Method and Assumptions

The PFS has assumed a contractor model for the purpose of mining, utilising conventional drill and blast, truck and shovel (backhoe excavator) open pit mining practises. A contractor model is well suited to the production rate of 2Mtpa product and a mine life of just over 5 years (64 months). Bench heights adopted in the PFS are 5m, mined via 2 x 2.5m flitches using a single 120 tonne class backhoe excavator loading 90 tonne mine haul trucks. Following a RFQ to an experienced industry contractor, rates were received for mining and crush and screen, and lump sum pricing for civil works, mobilisation and demobilisation.

Processing Method and Assumptions

The company undertook a preliminary metallurgical test program to determine comminution parameters and initial materials handling parameters. Samples for this test-work originated from the previous sonic core

CZR Resources Ltd

Page 7

==> picture [162 x 30] intentionally omitted <==

drilling program conducted in 2016 with drill holes located within current pit shells. Samples are considered suitable for the preliminary metallurgical program undertaken as part of the PFS.

Metallurgical test-work was conducted by Bureau Veritas, Canning Vale and showed the ore to be easy to crush, yielding a product suitable for direct shipping and sintering.

Materials handling test-work conducted by Jenike & Johansen (Perth) showed the ore product to be within acceptable ranges for Dust Management and Transportable Moisture Limits.

The plant will utilize conventional three stage crushing and screening to produce a -9.5mm all Fines product. The plant is designed to meet a production target of 2Mtpa (dry) of Fines product and consists of mobile / semi mobile processing units.

Cut-off Grades

A cut-off grade of 55% Fe has been applied to the Mineral Resource in defining the Ore Reserve. Pit optimisations have been run using Whittle 4X software and ore production costs for mining, crushing and screening, haulage, and port operations and ship loading costs. Indicated and Inferred Mineral Resources have been included in the optimisation.

Estimation Methodology

Pit designs have followed Whittle optimisation shells and assumed an overall wall angle of 55[0] for wall heights of 10 to 20m. A minimum mining width of 25m is applied at the base of pits in the pit design process. The Probable Ore Reserve estimate is based upon the tonnage and grade of the Indicated Mineral Resource reported within the ultimate pit design using a cut-off grade of 55% Fe.

Other Material Modifying Factors

No additional modifying factors such as grade dilution or ore loss factors have been applied. Processing recovery has assumed 100% given the PFS has assumed a Direct Shipping Ore operation with no beneficiation designed in the process.

Environmental

The project is located within the 62,000km[2] Hammersley sub-region of the 178,000km[2] Pilbara bioregion of Western Australia.

Desktop studies for Flora and Fauna were completed by RPS Australia West Pty Ltd (RPS) and Bamford Consulting Ecologists (BCE) respectively. Their reviews show that there are no previous surveys of the flora or fauna for Environmental Impact Assessment within the CZR tenement areas. However, there have been extensive and multiple surveys in similar landscapes nearby and the general flora and vertebrate fauna assemblages are moderately well-documented.

The expectation for Environmental Protection Agency’s approval to operate is that it will be critical to obtain good information on the suite of conservation significant flora and fauna species from sites that will be disturbed by the project and in adjacent areas. In particular, survey work for the more mobile fauna will need to include survey parameters that might detect the Northern Quoll, Black-footed Rock-Wallaby, Pilbara Pebble-mound Mouse, Pilbara Leaf-nosed Bat, Ghost Bat, Pilbara Olive Python, Anilios ganei (blind snake) and Notoscincus butleri (skink lizard). There will also need to be surveys to document any short-range endemic species in the drainage systems and troglofauna and stygofauna which are known to occur on Mesa F which extends more than 5 kilometres to the south and south-west from the Robe Mesa.

CZR Resources Ltd

Page 8

==> picture [162 x 30] intentionally omitted <==

As part of progressing approvals, the Environmental Protection Agency requires as a minimum that the flora and fauna field sampling programmes are undertaken within seasonal intervals in the year where the greatest amounts of activity are expected. They may also request additional parameters to the surveys which will be defined prior to the commencement of any fieldwork.

Infrastructure

The project is approximately 200km by road, south-west of the city of Karratha and approximately 180km by road from the township of Onslow. The site is currently accessed via an existing unsealed 35km road that connects with the North West Coastal Highway. The sealed road between the intersection of the site access road with the North West Coastal Highway all the way to the Utah Point Multi-User Facility at Port Hedland is RAV Category 10 rated and therefore suitable for utilising quad configuration road trains in transporting product to port.

The PFS utilises existing and proven port infrastructure at the Utah Point Bulk Handling Facility in Port Hedland. Utah is a public access facility whereby the Pilbara Ports Authority provide access through a formal agreement process at a point in time when the project is in its execution phase. Access is provided subject to capacity and other product specific conditions being met. Provided proponents can maintain their allocated exported rate under agreed operating procedures, users will maintain their allocated capacity. Over time if a proponent is not able to maintain their agreed export rate, their capacity will be reduced accordingly. In addition to Utah, CZR is also investigating other port options for export along the coast between Onslow and Dampier. CZR believes it is reasonable that the PFS export capacity required for the project can be achieved at the point in time it is required.

Infrastructure allowed for in the PFS includes establishment of a Mine Ramp and ROM Pad, Mine Operations Infrastructure (Mine Operations Centre, Plant operations area, Product loadout and Magazine), infrastructure for raw water supply for mining operations and site access road maintenance and dust suppression, Mine Access Road upgrade and construction (all weather), North West Coastal Highway Intersection upgrade, Communications Infrastructure, on-site Accommodation Village (76 room) and water treatment infrastructure.

The workforce will be sourced from Perth and Karratha, with the Perth contingent utilising the airport at Karratha for transferring people to and from site.

Capital Costs

The estimate for capital is considered to have an accuracy of -25%/+25%. A contingency of 15% ($5.3M) has been applied to direct and indirect capital costs (not the pre-commissioning and ramp up capitalised operating costs) to account for any inaccuracies in the estimate that result from gaps in the basis of design linked to the early stage development of the project. The majority of costs have been derived from Requests for Quotations (RFQ). The capital estimate has allowed for mobilization and establishment, construction, demobilisation, mine closure and environmental monitoring post closure.

Operating Costs

The operating cost estimate includes the cost of mining, crushing and screening, site general and administration (including a corporate allocation linked to operations), road train loading and transport of product to port and port operations and ship loading. Operating costs for major operating activities have been derived from Requests for Quotations, with more minor cost elements based on first principle estimates and provisional sums provided by external consultants.

CZR Resources Ltd

Page 9

==> picture [162 x 30] intentionally omitted <==

Revenue Factors

The PFS assumes an iron ore price based upon a flat Platts 62% Fe Index Price of US$90/dmt CFR China over the life of the mine. A Value in Use discount of 12.5% of the base product price is also applied to adjust for product impurities. A flat foreign exchange rate of 0.70 has been used for converting A$ to US$. A Western Australia government royalty of 7.5% is applicable to iron ore and has been applied within the revenue calculation. An additional third-party royalty of 1% has also been assumed and used in the calculation of revenue.

Project Development Steps

The PFS has successfully outlined mining and processing plans, a target production rate, estimates for capital and operating costs and infrastructure requirements to support the Robe Mesa project. It has determined that the Project has strong financial and economic merit.

The next steps for the development of Robe Mesa will include the following:

  1. Application for the conversion of portions of exploration licences E08/1060 and E08/1686 to mining leases and this will require engagement with the Native Title holders for the granting of the tenure.

  2. Hydrogeological studies to locate sufficient quantities of ground-water sources to support the camp, mining and processing operations, dust suppression and maintenance of the site access-road, and determine the impacts of the operation on the ephemeral surface water systems. This will also support an increase in the confidence level in the cost of raw water infrastructure for the project.

  3. Baseline and more focussed surveys of the flora and fauna with a strong focus on determining the potential interactions and impacts on any of the suite of conservation significant species.

  4. Additional drilling to infill the resource to seek to increase the confidence in the resource model. Infill metallurgical core drilling or bulk sample extraction will be designed to further refine the metallurgical parameters for process design. In particular, crushing and screening performance for refinement of the process mass balance and equipment selection. Samples will also be used to produce a composite representing early years of production for sinter testwork and ironmaking performance evaluation.

  5. More detailed engineering studies of the proposed site access road linking with the North West Coastal Highway to provide a more detailed understanding of the construction process and increase the accuracy of the capital costs estimate.

  6. Continue to investigate additional port options for the project along the coast between Onslow and Dampier.

  7. Community and stakeholder engagement.

Market Assessment

The PFS performed a market assessment more generally with respect to the global steel and iron ore industries. The iron ore price improved in 2019 and has strengthened further in 2020 as a result of stimulus in China and supply disruption from Brazil.

There is a transparent, quoted and strongly traded market for the sale of iron ore. The market for Western Australian iron ore is well established and liquid.

The assessment focused also on the nature of the Robe Mesa product with reference to similar products currently selling in the market. The Ore Reserve and mine production schedule support a saleable product specification comparable with existing products that are well established in the market (Rio Tinto Robe Fines, FMG SSF). The style of product comprises approximately 10% of the current Australian export volume.

CZR Resources Ltd

Page 10

==> picture [162 x 30] intentionally omitted <==

The market assessment was used to guide Revenue Factors used in the PFS for the purpose of cash-flow modelling and estimating Ore Reserves.

Funding

CZR believes there is a reasonable basis to assume the necessary funding for the Project will be obtained. CZR has been able to raise funding for its exploration and development over the past 10 years in order to progress its projects. During this time, CZR has successfully raised approximately $25 Million to fund its various projects. During 2019/2020, CZR raised approximately $8 Million equity capital from professional and sophisticated investors. The positive outcomes delivered by the PFS provide confidence to the Board in the ability of CZR to fund the next stage of development through conventional equity financing. Notwithstanding this, the normal risks for the raising of capital will apply to CZR, such as the state of equity capital and debt markets, the status of approvals required to advance the Project and the price of iron ore.

Project Economics

The Ore Reserve estimate is supported by a pre-tax cashflow model that has been prepared using revenue inputs, capital and operating cost inputs at a Pre-Feasibility level of accuracy and a production plan modelling the full supply chain from pit to port. The production plan and cashflow model covers the current 5 year (64 month) life of the project. The majority of the major cost inputs have been sourced from contractors and suppliers. All operating costs have been inflated at a rate of 1.25% annually from commencement of production (post commissioning and ramp up).

A discount rate of 8% has been applied. The resulting NPV and Project Cashflow is positive and sensitivity analysis has been completed for the commodity price as contained in the PFS.

Exchange Rate

The currency of all estimates in the announcement are in Australian dollars (A$) unless otherwise stated. A constant exchange rate of 0.70 has been used for converting A$ to US$, across the life of the project within the cashflow model. This exchange rate is also used in the conversion of the Platts US$ 62% Fe Index Price and US$ sea freight costs.

PRE-FEASIBILITY STUDY SUMMARY

Capital Costs and Operating Costs

The mine life for Robe Mesa necessitates adoption of a contract mining model to reduce upfront capital costs. The majority of costs contributing to the estimate have been derived from Requests for Quotations (RFQ) by relevant contractors and suppliers. The capital estimate allows for the life cycle of the project including mobilization and establishment, construction, de-mobilisation and mine closure.

Table 6 - Robe Mesa Capital Costs Estimate

Item Start-up
Capital($M)
Deferred
Capital($M)
Source
MINE OPERATIONS ESTABLISHMENT
Mobilisation & Establishment (Mining, Crushing
& Screening,and Haulage)
2.2 Quoted
Mining Development Works (Ramp, Clearing,
Topsoil Stripping)
1.0 Quoted
Pre-commissioning capitalised Mining and
Crushingand Screening
10.7 Quoted

CZR Resources Ltd

Page 11

==> picture [162 x 30] intentionally omitted <==

NON-PROCESS INFRASTRUCTURE
Mine Operations Infrastructure
(included in Mine Operations Establishment)
Quoted
Water SupplyInfrastructure1 4.8 Provisional
Mine Access Road (34km) and North West
Coastal HighwayIntersection
17.4 Quoted
Accommodation Village, Water Treatment,
Communications Infrastructure
8.9 Quoted
OWNERS COSTS & CONTINGENCY
Owners Costs 0.9 Provisional
Contingency 5.3 Provisional
DEFERRED CAPITAL
SustainingCapital 4.4 Provisional
Mine Closure & Demobilisation 4.7 Quoted
TOTAL 51.12 9.1

1The estimate for raw water supply infrastructure is a provisional sum based on assumed bore flow rates typical of the Pilbara, assumed water demand for the nature of the project, and an assessment of current market pricing for respective water infrastructure. The PFS has assumed the project will need to establish its own water bores. The next stage of study will include a desktop hydrogeological study and field investigation for the project. Previous resource exploration drilling has intersected good flows of low-salinity water below the deposit.

2Discrepancy in summation is due to rounding of contributing items.

The operating cost estimate includes the cost of mining, crushing and screening, site general and administration (includes a corporate allocation for corporate services directly related to operations), site access road maintenance, road train loading and transport of product to port and port operations and ship loading. Operating costs for major operating activities have been derived from Requests for Quotations, with more minor cost elements based on published tariffs, first principle estimates and provisional sums provided by external consultants.

Table 7 - Robe Mesa C1 Cost Estimate Breakdown

Item $/dmt
Mining $8.77
Crushing& Screening $4.22
Site G&A* $4.87
Haulage $35.10
Port $11.83
TOTAL $ 64.78

The haulage cost represents 54% of the C1 Cost estimate.

Mine Production Schedule

The PFS has focused on a low strip ratio, low capex DSO operation, concentrating on the higher grade component of the Mineral Resource to achieve a target product specification, thereby avoiding additional approvals complexity and higher capital and operating costs associated with a beneficiation plant.

Mine scheduling has been completed by Intermine Engineering, targeting a 2Mtpa (dry) production rate. Schedules were run on a monthly basis to ensure the target product specification grade could be achieved

CZR Resources Ltd

Page 12

==> picture [162 x 30] intentionally omitted <==

on a periodic basis. Ore is scheduled from different areas of the mine to the ROM pad where material will be segregated into ROM fingers according to grade and or material characteristics. Multiple ore sources available at any one time in the pits, together with a blended plant feed off the ROM, enables the product specification ex-pit to be smoothed, supporting the delivery of satisfactory ship to ship variability.

==> picture [482 x 333] intentionally omitted <==

----- Start of picture text -----

Production schedule - Product tonnes (dry) and Fe grade - by quarter
600,000 60.0
Fe %
540,000 59.0
480,000 58.0
420,000 57.0
360,000 56.0
300,000 55.0
240,000 54.0
180,000 53.0
120,000 52.0
60,000 51.0
- 50.0
Qtr_1 Qtr_2 Qtr_3 Qtr_4 Qtr_5 Qtr_6 Qtr_7 Qtr_8 Qtr_9 Qtr_10 Qtr_11 Qtr_12 Qtr_13 Qtr_14 Qtr_15 Qtr_16 Qtr_17 Qtr_18 Qtr_19 Qtr_20 Qtr_21 Qtr_22
----- End of picture text -----

Figure 2 - Robe Mesa Production Schedule

The mine schedule achieved a 2Mtpa production rate over a mine life of just over 5 years (64 months) with an average grade of 56.0% Fe and a strip ratio of 0.57:1 (waste tonnes to ore tonnes), delivering on the objective to achieve a saleable product specification whilst maintaining a low strip ratio.

Mining

The PFS has assumed a contractor model for the purpose of mining, utilising conventional drill and blast, truck and shovel (backhoe excavator) open pit mining practises. A contractor model is well suited to the production rate of 2Mtpa product and a mine life of 64 months. Mining will utilise conventional drill and blast, truck and shovel (backhoe excavator) open pit mining practises. The PFS is based on 5m benches, mined via 2 x 2.5m flitches using a single 120 tonne class backhoe excavator loading 100 tonne mine haul trucks.

The Robe Mesa PFS mines and exports approximately 9.2Mt of ore over a mine life of just over 5 years (64 months), of which 8.2Mt is Probable Ore Reserve and 1.0Mt is Inferred Mineral Resource.

CZR Resources Ltd

Page 13

==> picture [162 x 30] intentionally omitted <==

==> picture [457 x 351] intentionally omitted <==

Figure 3 - Robe Mesa proposed site Layout

Processing

The PFS has focused on a project that utilises a simple dry crush and screen process with no form of beneficiation. Preliminary metallurgical test-work has confirmed a relatively soft and friable feed to the process. The plant will utilize a conventional three stage crushing and screening circuit. This is achieved by primary crushing ROM feed using a jaw crusher, followed by secondary and tertiary crushing and screening utilising 2 x cone crushers and twin deck vibratory screens to produce a 100% passing 12.0mm, 95% passing 9.5mm all Fines product. This style of plant for the nature of the envisaged operation is well proven in similar applications.

At the current production rate of the PFS, for the processing plant specified, operations are envisaged on dayshift only with a night shift operating every third week.

Haulage and Port

The PFS has assumed the use of 60m quad road trains hauling from the Robe Mesa product yard to the Utah Point Multi-User Facility (Utah Point), operating 24/7, 365 days per annum. This haul route is approximately 424km one way, made up of approximately 34km of unsealed mine access road with the remaining 390km on sealed road (North West Coastal Highway, Great Northern Highway, Utah Road). The sealed public roads from Utah Point to the turn-off to site are RAV10 rated and therefore suitable for utilising quad configuration road trains in transporting product to port. An additional permitting process is applicable to the use of 60m road trains.

CZR Resources Ltd

Page 14

==> picture [162 x 30] intentionally omitted <==

A reputable haulage contractor experienced in this task has provided budget pricing for the loading of road trains and haulage of product to port, together with other key information relevant to the PFS. Pastin Solutions Pty Ltd was engaged for the purpose of understanding the relevant approvals requirements for the use of 60m quad combination road trains along the route assumed in the PFS for Robe Mesa.

Qube Bulk and the Pilbara Ports Authority have provided commercial terms and pricing as a basis for the operating cost estimate for port in-loading and ship loading at Utah Point.

==> picture [488 x 392] intentionally omitted <==

Figure 4 - Transport Route to Port

Infrastructure

The project location is favourable in that it is relatively close to major towns and sealed public access road networks. The project is approximately 200km by road, south-west of the city of Karratha and 175km by road from the township of Onslow. The site is currently accessed via an existing unsealed 35km road that connects with the North West Coastal Highway.

The sealed public roads from Utah Point to the turn-off to site are RAV10 rated and therefore suitable for utilising quad configuration road trains in transporting product to port. The PFS utilises existing and proven port infrastructure at Utah Point in Port Hedland. Utah Point has been in operation since 2010 and is licensed for 24Mtpa of bulk export product. The next phase of study will further investigate other port

CZR Resources Ltd

Page 15

==> picture [162 x 30] intentionally omitted <==

options along the coast between Onslow and Dampier.

As part of mine development, early stage development will consist of the development of a ramp to access the mesa, followed by construction of a Skyway and ROM pad and delivery of material to pads for nonprocess infrastructure.

The PFS has allowed for a 76 room accommodation village on site to cater for a predominantly fly-in fly-out workforce. Other non-process infrastructure allowed for in the PFS includes:

  • Mine Operations Infrastructure – Mine Operations Centre and Magazine

  • Infrastructure for raw water supply for mining operations and site access road maintenance and dust suppression

  • Mine Access Road upgrade and construction (all weather), and North West Coastal Highway Intersection upgrade

  • Communications Infrastructure and Services

Whilst a site visit was conducted as part of the contractor quote for the access road, more detailed investigation is required in the next study phase with respect to the availability of suitable borrow material for construction of the access road. The next phase of study will also include a desktop hydrogeological study and field investigation to ascertain raw water supply solutions for the project.

The workforce will be sourced from Perth and Karratha, with the Perth contingent utilising the airport at Karratha for transferring people to and from site.

Project Economics

The mine schedule has been used as a basis to complete a production plan for the project that emulates production across the full supply chain from pit to port (including stockpile inventory positions), from the start of construction through to mine closure, so that working capital and timing of sales can be modelled. The production plan has been used in conjunction with input operating and capital costs to complete a cashflow model for the project.

The PFS cash-flow model used a flat 62% Fe Index Price of US$90/dmt (in addition to other revenue modifying factors assumed for the product) and a constant exchange rate of 0.70 when converting US$ to A$.

Table 8 - PFS Project Economics Estimates

Life of Mine Revenue $M 956.4
Project Cashflow(at 62% Fe Index Price of$90/dmt)1 $M 96.4
C1 Cash Cost(nominal - no inflation) $/dmt 64.78
Payback Period(post construction)2 months 19
Pre-production Capital costs(includes contingency& capitalisedpre-production opex) $M 51.1
Capital Contingency& Pre-commissioning/rampupcapitalised miningand crush & screen opex $M 16.0
Life of Mine Capital costs(Pre-production capital + sustainingcapital + mine closure capital) $M 60.1

1Cashflow modelling and Project Payback period use operating cost estimates inflated 1.25% annually over the life of the project

CZR Resources Ltd

Page 16

==> picture [162 x 30] intentionally omitted <==

Sensitivity Analysis

The project is most sensitive to the iron ore price, followed by exchange rate (US$:A$). For every US$1.00/dmt movement in the 62% Fe Index Price, Project Cashflow is impacted approximately $9.6M. The sensitivity of NPV to 5% changes in the 62% Fe Index Price, currency exchange rate, VIU discount, capital costs and operating costs, is shown below.

==> picture [459 x 274] intentionally omitted <==

----- Start of picture text -----

Sensitivity Analysis - Project Cashflow ($M)
$200.0
$180.0
$160.0
$140.0
$120.0
$100.0
$80.0
$60.0
$40.0
$20.0
$-
-10% -5% 0% 5% 10%
Operating Cost 62% Fe Index Price USD : AUD Capital Cost VIU Discount
----- End of picture text -----

Figure 5 - Project Financial Sensitivity

Risks

The key risks identified for the project include (without limitation and further to the risk factors described in the Forward Looking Statements disclaimer at the beginning of this announcement):

  1. Delays in securing Mining Leases

  2. Delays in obtaining licences and approvals to operate.

  3. A significant and extended decline in the iron-ore price.

  4. A significant strengthening of the Australian currency against the United States currency.

  5. Lack of port availability to support exports.

  6. Delays as a result of a range of economic, political, and social issues arising from the COVID-19 virus.

Opportunities

A key part of the project’s development going forward will be to focus on the potential for a closer port option, with the objective to increase cash-flow margins through a reduced haulage cost. The company has engaged other companies looking to develop new port infrastructure along the coast between Onslow and Dampier. The approximate range in haulage distance to the currently identified options is between 110km and 180km, versus the current PFS haulage distance of 424km. Whilst these options represent an opportunity to reduce the haul distance considerably, the benefit to haulage cost would need to be balanced with possible changes in vessel size and port handling costs that may result in a change away from Utah Point.

CZR Resources Ltd

Page 17

==> picture [162 x 30] intentionally omitted <==

At the PFS production rate of 2Mtpa (dry), the processing plant and mining fleet identified in the PFS will not be fully utilised. The PFS shows that increasing the production target to 3Mtpa (dry) would not require any additional processing capacity or additional load and haul fleet on site, and therefore the unit cost of mine operations would be reduced.

There is potential to reduce the capital estimate of the PFS with more detailed investigation to be conducted for the access road and intersection works. The estimate for raw water supply is considered to be conservative. If further work reveals existing infrastructure can be leveraged and or water exploration confirms higher flow rates than that assumed in the PFS, then the current capital estimate for raw water supply infrastructure may reduce.

There is also the potential to add material to the mineral resource estimates by completing drilling and sampling of the additional exploration prospects on the Yarraloola tenement, although that cannot be guaranteed.

Robe Mesa Iron-Ore Deposit Background

The Robe Mesa Iron-Ore Deposit (Robe Mesa) on the 85% CZR owned Yarraloola Project is located 150km southwest of Karratha and 20km to the east of a bitumen sealed highway that connects to all the ports and towns along the coast of the Pilbara (Figure 1). The deposit is a “CID” ore-type reflecting the depositional environment of the iron-rich pisolites and fragments of iron-replaced wood in an ancient river channel. Robe Mesa is not an isolated deposit but part of a regional province. Robe Mesa is located between the Mesa A and Mesa J-K CID mines operated by RioTinto Ltd, adjacent to a road transport corridor established by BCI Minerals Ltd for the 134Mt @ 56.7% Fe Bungaroo Valley CID deposit (BCI release to ASX 18 October 2020) which has recently been purchased by Mineral Resources Ltd (BCI release to ASX 31 March 2020). The deposit is also adjacent to the railway corridor identified for transport of future production from the Australian Premium Iron Joint Venture CID deposits extending from Cochrane to Cartho Well to the proposed port at Anketell.

CZR Resources Ltd

Page 18

==> picture [162 x 30] intentionally omitted <==

==> picture [488 x 391] intentionally omitted <==

Figure 1 Location of the Robe Mesa in the West Pilbara.

CZR has completed three programmes of RC drilling at Robe Mesa that have delineated the geology and distribution of Fe (Figure 2; Figure 3). The pisolitic iron-stone which was deposited in a riverine channel consists of two cycles of deposition that are separated by variable thickness sandy and silty material with the Fe content of each cycle increasing towards its upper surface (Figure 3). The resulting independent JORC 2012 mineral resource for the Robe Mesa Deposit (including Robe East) of 89.1Mt @ 53.7% Fe (calcining to 60.1% Fe) using a Fe cut-off of 50% includes material from both cycles of mineralisation (Table 4; (CZR release to ASX 26 April 2017). At a 55% Fe cut-off, the higher grade 24.7Mt @ 56% Fe (calcining to 62.7%Fe) JORC 2012 mineral resource estimate is from the upper parts of depositional cycles and it is this material that is the focus of the PFS (Table 2).

Future work to bring the Robe Mesa into production will require the conversion of the Exploration License to a Mining Lease and the completion of a range of studies to obtain the statutory approvals for mining.

CZR Resources Ltd

Page 19

==> picture [162 x 30] intentionally omitted <==

==> picture [433 x 333] intentionally omitted <==

Figure 2 Location of all reverse circulation drill-collars from Robe Mesa and Robe East that were used for the JORC2012 resource estimates (CZR release to the ASX 8 February 2016 and 26 April 2017).

==> picture [438 x 276] intentionally omitted <==

Figure 3 Robe Mesa and Robe East representative cross-section on 7593950N showing RC drill-locations, intercepts with calcined Fe>50% and the interpreted geology ( 8 February 2016, 26 April 2017 ASX Announcements).

CZR Resources Ltd

Page 20

==> picture [162 x 30] intentionally omitted <==

Table 1 Robe Mesa JORC 2012 mineral resource reported above a 50% Fe cut-off grade (8 February 2016 ASX Announcement).

Category Tonnes Fe SiO2 Al2O3 TiO2 LOI P S Feca
Mt % % % % % % % %
Indicated 65.7 53.8 8.27 3.43 0.14 10.63 0.041 0.018 60.2
Inferred 18.8 53.8 8.22 3.42 0.14 10.71 0.046 0.017 60.3
Total 84.5 53.8 8.26 3.43 0.14 10.64 0.042 0.018 60.2

Table 2 Robe Mesa JORC 2012 mineral resource reported above a 55% Fe cut-off grade (8 February 2016 ASX Announcement).

Category Tonnes Fe SiO2 Al2O3 TiO2 LOI P S Feca
Mt % % % % % % % %
Indicated 19.5 56.0 5.95 2.72 0.10 10.71 0.043 0.017 62.7
Inferred 5.2 56.0 5.79 2.76 0.10 10.71 0.047 0.016 62.7
Total 24.7 56.0 5.92 2.73 0.10 10.71 0.044 0.016 62.7

Table 3 Robe East JORC 2012 mineral resource reported above a 50% Fe cut-off grade (26 April 2017 ASX Announcement).

Category Tonnes Fe SiO2 Al2O3 TiO2 LOI P S Feca
Mt % % % % % % % %
Inferred 4.6 51.8 9.7 3.8 0.20 10.9 0.1 0.02 58.2
Total 4.6 51.8 9.9 3.8 0.20 10.9 0.1 0.02 58.3

Table 4 Combined Robe Mesa and Robe East JORC 2012 mineral resource reported above a 50% Fe cut-off grade (26 April 2017 ASX Announcement).

Category Tonnes Fe SiO2 Al2O3 TiO2 LOI P S Feca
Mt % % % % % % % %
Indicated 65.7 53.8 8.3 3.43 0.14 10.63 0.04 0.02 60.2
Inferred 23.4 53.4 8.5 3.49 0.15 10.75 0.06 0.02 59.9
Total 89.1 53.7 8.3 3.45 0.14 10.66 0.05 0.02 60.1

Feca is the calcined iron-content calculated as (Fe%/(100-LOI%))*100 and represents the amount iron after the volatiles (mainly held as weakly bound water in the structure of the hydrous iron-rich minerals) is excluded from the analysis.

This announcement is authorised for release to the market by the Board of Directors of CZR Resources Ltd.

Media For further information, contact: Paul Armstrong Read Corporate +61 8 9388 1474

CZR Resources Ltd

Page 21

==> picture [162 x 30] intentionally omitted <==

Competent Persons Statement

The information in this announcement that relates to exploration activities and exploration results is based on information compiled by Rob Ramsay (BSc Hons, MSc, PhD), a Competent Person who is a Member of the Australian Institute of Geoscientists. Rob Ramsay has worked for CZR since May 2012, initially as an independent geological contactor but was then appointed as a Non-executive Director in December 2012 and as Managing Director in December 2020. Rob Ramsay is a Geologist with over 35 years of experience and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Rob Ramsay has given his consent to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the Mineral Resources at the Robe Mesa project (including Robe East) are extracted from CZR's ASX Announcements entitled “Yarraloola Project – Robe Mesa resource confidence increased from Inferred to Indicated category” (dated 8 February 2016) and “Yarraloola Project – Robe Mesa resource upgrade from 2016 Robe East extension drilling” (dated 26 April 2017). The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements, and confirms that all material assumptions and technical parameters underpinning the Mineral Resources estimates in those announcements continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.

The information in this report that relates to Ore Reserves has been compiled by Stephen O’Grady, Principal of Intermine Engineering Consultants, a Competent Person who is who is a Member of the Australasian Institute of Mining and Metallurgy and is an independent consultant to CZR Resources Ltd. Mr O’Grady has had sufficient experience in Ore Reserve estimation relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr O’Grady consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

Section 1 – Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Samples for the resource calculations were all
collected from 5.5” (140mm) reverse
circulation drilling programmes with
continuous down-hole sampling.
Metallurgical samples were collected from a
100mm diameter sonic drilling programme that
provides a continuous down-hole core-sample.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
2-3kg of RC drill cuttings are spilt continuously
during drilling and collected at 1 metre
intervals in a pre-labelled calico sample bag. In
2014 and 2015, the rig used a continuously
operating rotary cone splitter, while in 2016
samples passed over a static cone splitter
attached to the drill-rig.
Continuously sampled sonic core was
recovered in a sealed plastic bag directly from
the core-barrel, labelled with start and end run-
intervals as measured from the rig and
weighed.

CZR Resources Ltd

Page 22

==> picture [162 x 30] intentionally omitted <==

Aspects of the determination of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
The entire 2-3kg RC drill-chip sample was
crushed, dried and pulverized at Ultratrace
Laboratories (now known as Bureau Veritas) in
Perth. Western Australia. A sub sample was
fused and the "extended iron-ore suite" of
major oxide and selected trace-element
analysis was obtained by XRF Spectrometry in
2014 and a basic iron-ore suite was reported
from the 2015 and 2016 programmes because
most trace elements are below detection.
Sonic drill-holes were located as “twins” near
an RC drill-hole with both a geological and
assay profile. Sonic core samples were selected
by comparison with results from the adjacent
RC hole and all the material in the interval
selected was used as a representative bulk-
sample for subsequent processing.
Drilling techniques Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what
method, etc).
All reverse circulation (RC) drill-holes used a
5.5” (140mm) face-sampling percussion
hammer.
Sonic drilling recovers intervals of 100mm
diameter cored material that is lifted in a core-
barrel to the surface.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.
RC sample size was monitored by Geologists
during the drilling programme. The volume of
sample derived from each metre drilled was
approximately equal.
After the sonic core intervals were transferred
from the barrel to a sealed plastic bag, it was
weighed, then the bag was opened, measured
for length and weighed. In friable intervals, the
weights of material recovered provide the
estimate of sampling quality. After being
photographed and logged for geology, the
intervals were transferred to labelled calico
bags for transport to the laboratory.
Measures taken to maximise sample
recovery and ensure representative nature of
the samples.
Standard RC sampling techniques were
employed and deemed adequate for sample
recovery. Some water was injected into the
sample stream during drilling to minimise the
loss of fine particles.
Sonic coring provides a continuous down-hole
sample in softer, semi-consolidated rocks in a
similar process to diamond-drilling in hard-rock.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
The loss of fine material has been minimised
during RC and sonic drilling. Sample recovery is
regarded as being representative.

CZR Resources Ltd

Page 23

==> picture [162 x 30] intentionally omitted <==

Logging Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Each metre of reverse circulation chips and all
sonic-core samples are described geologically
for colour, texture and have an estimate of
mineralogical abundance.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
Logging of RC chips is qualitative. All intervals of
the sonic core were photographed.
The total length and percentage of the
relevant intersections logged.
Entire drill-holes are logged.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
Sonic core was not cut and entire core is
sampled for metallurgical studies.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
Reverse circulation drill chip samples were
collected dry and split by a either a
continuously operating rotary-cone or static-
cone splitter duringdrilling.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Reverse circulation drilling is an appropriate
method of recovering representative samples
though the interval of mineralisation. The
drilling contractor used suitable sample
collection and handling procedures to maintain
sample integrity.
Sonic drilling provided a continuous core-
sample through the dry, semi-consolidated
material with a high-proportion of finer grained
material.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Duplicate RC samples were simultaneously
collected at a ratio of about 1:20 from the
mineralized intervals, using the splitters
attached to the rig to ensure representivity.
Sonic core samples are split at appropriate
stages in the metallurgical flow-sheet during
laboratory processing to ensure representivity.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
The reverse circulation method samples
continuously and the splitters attached to the
rig selects a representative proportion of the
sample, providing an indication of
compositional variations associated with each
lithology or mineralised interval.
Sonic drilling provides a continuous sample
from semi-consolidated rocks.
Whether sample sizes are appropriate to
the grain size of the material being sampled.
The 2-3kg of homogenised drill chips that was
recovered for each sample is sufficient to
provide a representative indication of the
material being sampled.
The 100mm diameter sonic core provides
sufficient volumes of sample from the
geological intervals of interest to complete the
study flow-sheets.

CZR Resources Ltd

Page 24

==> picture [162 x 30] intentionally omitted <==

Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
All samples were analysed at Bureau Veritas
(Ultratrace) Laboratories in Perth. A standard
suite of major-element oxides and trace
element oxides were determined by XRF
analysis on fused disks. Loss on Ignition (LOI)
was determined by thermogravimetric analysis
at 1000° C
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
No hand-held geophysical tools or hand-held
analytical tools were used for the reported
results.
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias)
and precision have been established.
Laboratory QAQC involves the use of internal
lab standards using certified reference
material, blanks, splits and replicates as part of
their in-house procedures. Results highlight
that sample assay values are accurate and that
contamination has been contained.
Verification of
sampling and
assaying
The verification of significant intersections
by either independent or alternative company
personnel.
No independent of alternative company
personnel were used to verify the intersections.
The use of twinned holes. Sonic drill-holes for the collection of
metallurgical sampling twin an adjacent RC
hole.
RC holes have not yet been twinned to
determine short-range variations geology and
geochemistry.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic) protocols.
All spatially located sample data is stored
electronically in an access data-base. Assay
data was received electronically and uploaded.
Printed and laboratory-released PDF copies of
analysis certificates are stored. All hand-held
GPS locations for drill-holes are confirmed by
an independent licensed surveyor.
Discuss any adjustment to assay data. No adjustment or calibrations are made to any
assaydata.
Location of data
points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Drill hole locations were initially derived from a
hand held Garmin 72h GPS units, with an
average accuracy of ±3m. All collars were then
recorded by an independent licensed surveyor
using a differential GPS with an accuracy of
0.1m
Specification of the grid system used. The grid system is MGA GDA94, zone 50, all
easting's and northing’s are reported in MGA
co-ordinates
Quality and adequacy of topographic
control.
SRTM30 data is used to provide topographic
control and is regarded as beingadequate for

CZR Resources Ltd

Page 25

==> picture [162 x 30] intentionally omitted <==

the stage exploration. This model is being
corrected using results from the differential
surveying of the drill-hole collars which has an
accuracy on the height of 0.1m
Data spacing and
distribution
Data spacing for reporting of Exploration
Results.
Drilling is located approximately on centres
from a 100m grid over an area of outcropping
mapped mineralisation.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
200m spaced drilling allowed the generation of
an Inferred Resource, reducing to 100m spacing
was sufficient for the conversion of a high-
proportion of the inferred to indicated and the
maiden probable reserve in the above
announcement.
Whether sample compositing has been
applied.
Sample results represent 1m interval reverse
circulation drill-chips and samples have not
been composited.
Orientation of
data in relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
Mineralisation is contained within a sub-
horizontal sheet and the vertical drill-holes and
associated sampling collects representative
material through the mineralised zone.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The drill orientation was selected to minimise
any sampling bias.
Sample security The measures taken to ensure sample
security.
Individually numbered samples are packed into
labelled bulka bags and transported by CZR
Geologists to independent intra-state transport
companies in Karratha from where they are
transported directly to Bureau Veritas
(Ultratrace) laboratories in Perth.
Audits or reviews The results of any audits or reviews of
sampling techniques and data.
No audits or reviews of the sampling
techniques and data have been obtained.

Section 2 – Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
All exploration licenses and prospecting licenses
owned 85% by Zanthus Resources Ltd and 15% by
ZanF Pty Ltd. The tenements are covered by the
Kuruma Marthudunera Native Title Claim and
relevant heritage agreements are in place.

CZR Resources Ltd

Page 26

==> picture [162 x 30] intentionally omitted <==

The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
The tenements are in good standing and no
known impediments exist.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by
other parties.
In 1990-1991, Aberfoyle Resources held
tenements covering the Ashburton Trough which
partially overlapped Yarraloola. They collected 26
rock-chip and 73 stream sediment samples for
gold and base-metal exploration but encountered
no significant results and surrendered theground.
In 1991-1992, Poseidon Exploration Ltd held
exploration tenements covering the Ashburton
Trough which partially overlapped Yarraloola for
base-metals, gold and iron-ore. They collected 54
rock-chips, 236 soil samples, 492 stream sediment
samples and completed 159 RAB holes for 2410m
but encountered no significant mineralisation and
surrendered the tenements.
In 1997-1998, Sipa Resources NL held tenements
over the Ashburton Trough that partially covered
Yarraloola for gold and base-metals. A field trip
after the interpretation of LANDSAT and air-
photos collected six rock-chip samples which
failed to detect mineralisation and the tenements
were surrendered.
In 2005-2009, Red Hill Iron Ltd held a tenement
15km northwest of Pannawonica which partially
overlapped Yarraloola for gold and base-metal
prospectivity. Following and aeromagnetic survey
and air-photo interpretation, 16 rock-chips and
207 soil samples were collected but no targets
were generated and the ground was surrendered.
Geology Deposit type, geological setting and style of
mineralisation.
The Robe Mesa is a fluvial deposit of goethite-rich
fragments of wood and pisolites supported by a
fine grained goethitic matrix. The deposit outlines
the trace of a Tertiary-aged channel from the
Robe River into older rocks of the Ashburton
Formation that have since eroded.
Deposits of the channelized-style of goethitic
ironstone are represented and mined in other
parts of the Pilbara region of Western Australia
and the material is commonly referred to a “CID”
for marketing purposes.
The Mesa contains two cycles of deposition that
each has a sharp basal contact and shows an
upwards increase the amount of iron-rich
fragments.

CZR Resources Ltd

Page 27

==> picture [162 x 30] intentionally omitted <==

Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
informationfor all Material drill holes:
Although not relevant because exploration results
are not being reported, the sections provide
background to the database that was used to
generate the ore-reserve.
o_easting and northing of the drill hole collar_ Drill-hole collar Eastings and Northings are
reported using map projection GDA Zone50,
entered into an Access database and the map
locations are checked by the competent person.
o_elevation or RL (Reduced Level – elevation_
above sea level in metres) of the drill hole collar
A differential GPS survey of the drill collars has
provided elevation data on an approximately
100m spacing which has been integrated into the
SRTM30 data.
o_dip and azimuth of the hole_ All holes are vertical.
o_down hole length and interception depth_ Down hole lengths and intercept depths from the
RC drilling are calculated from 1m interval
samples that are progressively collected as the
holes are drilled.
Any lengths or intercepts reported from the sonic
drilling are recovered from the down-hole logs
and sample intervals generated during drilling.
o_hole length._ Hole lengths are reported both on the geological
and driller logs, entered into the access database
and have been checked by a competent person.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Minimum intercept widths are defined as drill
intervals greater than 5m with samples reporting
Fe>55%. Some intercepts include a maximum of
2m of samples with Fe<55%. Intercept values are
numerical averages of the relevant 1m sample
results. No cuttingof highgrades has been used.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
All sample intervals used to calculate the
intercepts are of equal length.
The assumptions used for any reporting of
metal equivalent values should be clearly stated.
No metal equivalents are presented
Relationship
between
mineralisation
widths and
intercept
lengths
If the geometry of the mineralisation with
respect to the drill hole angle is known, its nature
should be reported.
Although not relevant because exploration results
are not being reported, the sections provide
background to the database that was used to
generate the ore-reserve.
Vertical drill-holes are designed to intercept the

CZR Resources Ltd

Page 28

==> picture [162 x 30] intentionally omitted <==

true widths of the horizontally-oriented sheets of
pisolitic iron-stone mineralisation.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length,
true width not known’).
Down-hole widths are regarded as true widths of
mineralisation.
Appropriate maps and sections (with scales)
and tabulations of intercepts should be included
for any significant discovery being reported
These should include, but not be limited to a plan
view of drill hole collar locations and appropriate
sectional views.
A map with the drill-hole locations and a
representative geological cross section is
presented.
Diagrams Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
Relevant diagrams have been included within the
Mineral Resource report main body of text
Balanced
reporting
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
The report is believed to include all representative
and relevant information and is believed to be
comprehensive.
Exploration results are not being reported for the
first time.
Other
substantive
exploration
data
The nature and scale of planned further work
(eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Extensional, infill and grade-control drilling is
being planned prior to the commencement of
mining.
Further work Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Areas of outcropping mineralisation that have yet
to be drilled are identified on the relevant maps.

Section 3 – Estimation and Reporting of Mineral Resources

Criteria JORC Code explanation Commentary
Database
integrity
Measures taken to ensure that data has not been
corrupted by, for example, transcription or keying
errors, between its initial collection and its use for
Mineral Resource estimation purposes.
Assay data has been supplied by the laboratory in
both excel format and as printed certificates for
verification. Data in digital format is electronically
loaded directly into an Access database to prevent
transcription errors.

CZR Resources Ltd

Page 29

==> picture [162 x 30] intentionally omitted <==

Data validation procedures used. Data tables were periodically compared to results
published in the assay certificates to ensure data
integrity.
Sample
outliers
were
routinely
compared to assay certificates as well.
Site visits Comment on any site visits undertaken by the
Competent Person and the outcome of those
visits.
Site visits were not undertaken by either Optiro
Pty Ltd or PayneGeo Pty Ltd.
If no site visits have been undertaken indicate why
this is the case.
The resource estimates were completed by
Experts who were fully familiar with the
geography and geology of the Robe deposit area
and site was closed due to seasonal weather
conditions at the time the work was being
undertaken.
Geological
interpretation
Confidence in (or conversely, the uncertainty of)
the geological interpretation of the mineral
deposit.
There is a reasonable level of confidence in the
geological
interpretation
due
published
information on adjacent deposits, the consistent
drilling results and the outcropping geology.
Wireframes are used to constrain the estimation
and are based on drill hole intercepts and
geological boundaries. All wireframes are
constructed to 55% FeCacut-off grades for shape
consistency.
Nature of the data used and of any assumptions
made.
The mineralisation is generally quite consistent
and drill intercepts clearly define the shape of the
mineralised body with limited options for large
scale alternate interpretations.
The effect, if any, of alternative interpretations on
Mineral Resource estimation.
The
controls
on
and
interpretation
of
mineralisation is relatively straightforward and no
alternative interpretations have been considered.
The use of geology in guiding and controlling
Mineral Resource estimation.
Wireframes are used to constrain the estimation
and are based on drill hole intercepts and
geological boundaries.
The factors affecting continuity both of grade and
geology.
Wireframes are constructed to 55% Fecacut-off
grade for shape consistency.
Dimensions The extent and variability of the Mineral Resource
expressed as length (along strike or otherwise),
plan width, and depth below surface to the upper
and lower limits of the Mineral Resource
The Mesa Robe deposit has a total length along
the trace of the palaeo-channel of 1700 m and a
width of 800 m across the channel and extends
vertically for approximately 70 m below surface.

CZR Resources Ltd

Page 30

==> picture [162 x 30] intentionally omitted <==

Estimation
and modelling
techniques
The nature and appropriateness of the estimation
technique(s)
applied
and
key
assumptions,
including treatment of extreme grade values,
domaining,
interpolation
parameters
and
maximum distance of extrapolation from data
points. If a computer assisted estimation method
was chosen include a description of computer
software and parameters used.
Grade estimation using Ordinary Kriging (OK) was
completed using Surpac software for seven
elements; Fe, SiO2, Al2O3, TiO2, LOI, P and S. Drill
grid spacing was between 100 m and 200 m.
Variogram orientations were largely controlled by
the strike of mineralisation and downhole
variography. Variograms for estimation were
determined individually for each element.
Other estimation parameters, such as search
distance,
minimum
and
maximum
sample
numbers was derived from KNA.
The availability of check estimates, previous
estimates and/or mine production records and
whether the Mineral Resource estimate takes
appropriate account of such data.
Compared to the previous estimate, tonnage has
increased with an associated minor decrease in
grade.
The resource model has not been compared to
any reconciliation data.
The assumptions made regarding recovery of by-
products.
No assumptions have been made regarding
recovery of any by-products.
Estimation of deleterious elements or other non-
grade variables of economic significance (e.g.
sulphur for acid mine drainage characterisation).
Oxides and elements such as SiO2, Al2O3, TiO2,
Phosphorous and sulphur are deleterious and
above detection and have been estimated.

CZR Resources Ltd

Page 31

==> picture [162 x 30] intentionally omitted <==

In the case of block model interpolation, the block
size in relation to the average sample spacing and
the search employed.
The block model dimensions and parameters were
based on the geological boundaries and average
drill grid spacing. Sub-blocks were used to ensure
that the block model honoured the domain
geometries and volume. Block estimates were
controlled
by
the
original
parent
block
dimensions.
The individual parent block dimensions were 100
mE by 100 mN by 5 mRL, with sub-blocking to 25
mE by 25 mN by 1.25 mRL.
Estimation into parent blocks used a discretisation
of 5 (X points) by 5 (Y points) by 2 (Z points) to
better represent estimated block volumes.
Any assumptions behind modelling of selective
mining units.
No selective mining units were modelled in this
estimate. It is assumed that the SMU is equal to
the block model parent cell or smaller.
Any assumptions about correlation between
variables.
Multi-element analysis was conducted on the
samples. There was a strong positive correlation
between SiO2and Al2O3and TiO2. There was a
strong negative correlation with Fe and SiO2, Al2O3
and TiO2.
Description of how the geological interpretation
was used to control the resource estimates.
Drillhole sample data was flagged using domain
codes
generated
from
three
dimensional
mineralisation domains.
Mineralisation domains were treated as hard
boundaries in the estimation process.
Discussion of basis for using or not using grade
cutting or capping.
No top cuts or bottom cuts were required as all
the elements had a low cv and there were no real
distinct outliers.
The process of validation, the checking process
used, the comparison of model data to drillhole
data, and use of reconciliation data if available.
Model validation was carried out using visual
comparisons between composites and estimated
blocks, checks for negative or absent grades, and
statistical comparison against the input drillhole
data and graphical profile (swath) plots.

CZR Resources Ltd

Page 32

==> picture [162 x 30] intentionally omitted <==

Moisture Whether the tonnages are estimated on a dry
basis or with natural moisture, and the method of
determination of the moisture content.
Tonnages are estimated on a dry basis.
Cut-off
parameters
The basis of the adopted cut-off grade(s) or
quality parameters applied
The resource model is modelled to a nominal
wireframe cut-off grade of 55% Fecawith a
minimum width of 5 m to encapsulate the entire
mineralised body.
Mining
factors or
assumptions
Assumptions made regarding possible mining
methods, minimum mining dimensions and
internal (or, if applicable, external) mining
dilution. It is always necessary as part of the
process of determining reasonable prospects for
eventual
economic
extraction
to
consider
potential mining methods, but the assumptions
made regarding mining methods and parameters
when estimating Mineral Resources may not
always be rigorous. Where this is the case, this
should be reported with an explanation of the
basis of the mining assumptions made.
No minimum mining assumptions were made
during the resource wireframing or estimation
process. Mining parameters, including minimum
width assumptions, will be applied during the
conversion to Ore Reserves.
Metallurgical
factors or
assumptions
The basis for assumptions or predictions regarding
metallurgical amenability. It is always necessary
as part of the process of determining reasonable
prospects for eventual economic extraction to
consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment
processes and parameters made when reporting
Mineral Resources may not always be rigorous.
Where this is the case, this should be reported
with an explanation of the basis of the
metallurgical assumptions made.
No metallurgical factors or assumptions are made
during the resource estimation process as this will
be addressed during conversion to Ore Reserve.
The resource block model has been populated
with multi-element data which is required for the
metallurgical analysis during the Ore Reserve
process.

CZR Resources Ltd

Page 33

==> picture [162 x 30] intentionally omitted <==

Environmenta
l factors or
assumptions
Assumptions made regarding possible waste and
process residue disposal options. It is always
necessary as part of the process of determining
reasonable prospects for eventual economic
extraction to consider the potential environmental
impacts of the mining and processing operation.
While at this stage the determination of potential
environmental
impacts,
particularly
for
a
greenfields project, may not always be well
advanced, the status of early consideration of
these potential environmental impacts should be
reported. Where these aspects have not been
considered this should be reported with an
explanation of the environmental assumptions
made
No environmental factors or assumptions are
made during the resource estimation process.
Bulk density Whether assumed or determined. If assumed, the
basis for the assumptions. If determined, the
method used, whether wet or dry, the frequency
of the measurements, the nature, size and
representativeness of the samples.
A bulk density of 2.6 was applied to the
mineralised zones. This was determined via
researched into other CID’s in the Pilbara.
The bulk density for bulk material must have been
measured by methods that adequately account
for void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones
within the deposit,
No bulk density measurements have been
undertaken because suitable drill-core material is
yet to be available.
Discuss assumptions for bulk density estimates
used in the evaluation process of the different
materials.
A bulk density of 2.6 is assumed for all mineralised
material in the Resource Estimate.
Classification The basis for the classification of the Mineral
Resources into varying confidence categories
Classification of the resource models is based
primarily on demonstrated assay data quality, drill
density and geological understanding.
Whether appropriate account has been taken of
all relevant factors (i.e. relative confidence in
tonnage/grade estimations, reliability of input
data, confidence in continuity of geology and
metal values, quality, quantity and distribution of
the data).
The classification takes into account the relative
contributions of geological and data quality and
confidence, as well as grade confidence and
continuity.
Whether the result appropriately reflects the
Competent Person’s view of the deposit.
The classification reflects the view of the
Competent Person.

CZR Resources Ltd

Page 34

==> picture [162 x 30] intentionally omitted <==

Audits or
reviews
The results of any audits or reviews of Mineral
Resource estimates.
This updated Mineral Resource estimate has not
been subjected to any independent audits or
reviews.
Discussion of
relative
accuracy/conf
idence
Where appropriate a statement of the relative
accuracy and confidence level in the Mineral
Resource
estimate
using
an
approach
or
procedure deemed appropriate by the Competent
Person. For example, the application of statistical
or geostatistical procedures to quantify the
relative accuracy of the resource within stated
confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of
the factors that could affect the relative accuracy
and confidence of the estimate
The relative accuracy of the Mineral Resource
estimate is reflected in the reporting of the
Mineral Resource as per the guidelines of the
2012 JORC Code. The statement relates to global
estimates of tonnes and grade.
The statement should specify whether it relates to
global or local estimates, and, if local, state the
relevant tonnages, which should be relevant to
technical
and
economic
evaluation.
Documentation should include assumptions made
and the procedures used
The estimate is considered to be relevant to a
global report of tonnage and grade.
These statements of relative accuracy and
confidence of the estimate should be compared
with production data, where available
No mining has been undertaken on any of the
resource and therefore there is no production
data is available.

Section 3 – Estimation and Reporting of Mineral Resources

Criteria JORC Code explanation Commentary
Database
integrity
Measures taken to ensure that data has not
been corrupted by, for example, transcription
or keying errors, between its initial collection
and its use for Mineral Resource estimation
purposes.
Assay data has been supplied by the laboratory in
both excel format and as printed certificates for
verification. Data in digital format is electronically
loaded directly into an Access database to
prevent transcription errors.
Data validation procedures used. Data tables were periodically compared to results
published in the assay certificates to ensure data
integrity.
Sample
outliers
were
routinely
compared to assay certificates as well.

CZR Resources Ltd

Page 35

==> picture [162 x 30] intentionally omitted <==

Site visits Comment on any site visits undertaken by the
Competent Person and the outcome of those
visits.
No site visit was undertaken by the Competent
Persons responsible for the Resource Estimates.
If no site visits have been undertaken indicate
why this is the case.
The Competent Persons were fully familiar with
the geology and geography of the Robe Mesa
area and the site was closed due to seasonal
weather conditions at the time the studies were
being completed.
Geological
interpretation
Confidence in (or conversely, the uncertainty
of) the geological interpretation of the mineral
deposit.
There is a reasonable level of confidence in the
geological interpretation due to the consistent
drilling results and the outcropping geology.
Wireframes are used to constrain the estimation
and are based on drill hole intercepts and
geological boundaries. All wireframes are
constructed to 55% FeCacut-off grades for shape
consistency.
Nature of the data used and of any
assumptions made.
The mineralisation is generally quite consistent
and drill intercepts clearly define the shape of the
mineralised body with limited options for large
scale alternate interpretations.
The effect, if any, of alternative interpretations
on Mineral Resource estimation.
The
controls
on
and
interpretation
of
mineralisation is relatively straightforward and no
alternative interpretations have been considered.
The use of geology in guiding and controlling
Mineral Resource estimation.
Wireframes are used to constrain the estimation
and are based on drill hole intercepts and
geological boundaries.
The factors affecting continuity both of grade
and geology.
Wireframes are constructed to 55% Fecacut-off
grade for shape consistency.
Dimensions The extent and variability of the Mineral
Resource expressed as length (along strike or
otherwise), plan width, and depth below
surface to the upper and lower limits of the
Mineral Resource
The Mesa Robe deposit has a total strike length of
1700 m, across strike width of 800 m and extend
vertically for approximately 70 m below surface.

CZR Resources Ltd

Page 36

==> picture [162 x 30] intentionally omitted <==

Estimation and
modelling
techniques
The nature and appropriateness of the
estimation technique(s) applied and key
assumptions, including treatment of extreme
grade
values,
domaining,
interpolation
parameters
and
maximum
distance
of
extrapolation from data points. If a computer
assisted estimation method was chosen
include a description of computer software
and parameters used.
Grade estimation using Ordinary Kriging (OK) was
completed using Surpac software for seven
elements; Fe, SiO2, Al2O3, TiO2, LOI, P and S. Drill
grid spacing was between 100 m and 200 m.
Variogram orientations were largely controlled by
the strike of mineralisation and downhole
variography. Variograms for estimation were
determined individually for each element.
Other estimation parameters, such as search
distance,
minimum
and
maximum
sample
numbers was derived from KNA.
The availability of check estimates, previous
estimates and/or mine production records and
whether the Mineral Resource estimate takes
appropriate account of such data.
Compared to the previous estimate, tonnage has
increased with an associated minor decrease in
grade.
The resource model has not been compared to
any reconciliation data.
The assumptions made regarding recovery of
by-products.
No assumptions have been made regarding
recovery of any by-products.
Estimation of deleterious elements or other
non-grade variables of economic significance
(e.g.
sulphur
for
acid
mine
drainage
characterisation).
Oxides and elements such as SiO2, Al2O3, TiO2,
Phosphorous and sulphur are deleterious and
above detection and have been estimated.

CZR Resources Ltd

Page 37

==> picture [162 x 30] intentionally omitted <==

In the case of block model interpolation, the
block size in relation to the average sample
spacing and the search employed.
The block model dimensions and parameters
were based on the geological boundaries and
average drill grid spacing. Sub-blocks were used
to ensure that the block model honoured the
domain geometries and volume. Block estimates
were controlled by the original parent block
dimensions.
The individual parent block dimensions were 100
mE by 100 mN by 5 mRL, with sub-blocking to 25
mE by 25 mN by 1.25 mRL.
Estimation
into
parent
blocks
used
a
discretisation of 5 (X points) by 5 (Y points) by 2 (Z
points) to better represent estimated block
volumes.
Any assumptions behind modelling of selective
mining units.
No selective mining units were modelled in this
estimate. It is assumed that the SMU is equal to
the block model parent cell or smaller.
Any assumptions about correlation between
variables.
Multi-element analysis was conducted on the
samples. There was a strong positive correlation
between SiO2and Al2O3and TiO2. There was a
strong negative correlation with Fe and SiO2,
Al2O3and TiO2.
Description
of
how
the
geological
interpretation was used to control the
resource estimates.
Drillhole sample data was flagged using domain
codes
generated
from
three
dimensional
mineralisation domains.
Mineralisation domains were treated as hard
boundaries in the estimation process.
Discussion of basis for using or not using grade
cutting or capping.
No top cuts or bottom cuts were required as all
the elements had a low cv and there were no real
distinct outliers.
The process of validation, the checking process
used, the comparison of model data to
drillhole data, and use of reconciliation data if
available.
Model validation was carried out using visual
comparisons between composites and estimated
blocks, checks for negative or absent grades, and
statistical comparison against the input drillhole
data and graphical profile (swath) plots.

CZR Resources Ltd

Page 38

==> picture [162 x 30] intentionally omitted <==

Moisture Whether the tonnages are estimated on a dry
basis or with natural moisture, and the
method of determination of the moisture
content.
Tonnages are estimated on a dry basis.
Cut-off
parameters
The basis of the adopted cut-off grade(s) or
quality parameters applied
The resource model is modelled to a nominal
wireframe cut-off grade of 55% Fecawith a
minimum width of 5 m to encapsulate the entire
mineralised body.
Mining factors or
assumptions
Assumptions made regarding possible mining
methods, minimum mining dimensions and
internal (or, if applicable, external) mining
dilution. It is always necessary as part of the
process of determining reasonable prospects
for eventual economic extraction to consider
potential
mining
methods,
but
the
assumptions made regarding mining methods
and parameters when estimating Mineral
Resources may not always be rigorous. Where
this is the case, this should be reported with an
explanation of the basis of the mining
assumptions made.
No minimum mining assumptions were made
during the resource wireframing or estimation
process. Mining parameters, including minimum
width assumptions, will be applied during the
conversion to Ore Reserves.
Metallurgical
factors or
assumptions
The basis for assumptions or predictions
regarding metallurgical amenability. It is
always necessary as part of the process of
determining reasonable prospects for eventual
economic extraction to consider potential
metallurgical methods, but the assumptions
regarding metallurgical treatment processes
and parameters made when reporting Mineral
Resources may not always be rigorous. Where
this is the case, this should be reported with an
explanation of the basis of the metallurgical
assumptions made.
No metallurgical factors or assumptions are made
during the resource estimation process as this will
be addressed during conversion to Ore Reserve.
The resource block model has been populated
with multi-element data which is required for the
metallurgical analysis during the Ore Reserve
process.

CZR Resources Ltd

Page 39

==> picture [162 x 30] intentionally omitted <==

Environmental
factors or
assumptions
Assumptions made regarding possible waste
and process residue disposal options. It is
always necessary as part of the process of
determining reasonable prospects for eventual
economic extraction to consider the potential
environmental impacts of the mining and
processing operation. While at this stage the
determination of potential environmental
impacts, particularly for a greenfields project,
may not always be well advanced, the status
of early consideration of these potential
environmental impacts should be reported.
Where these aspects have not been considered
this should be reported with an explanation of
the environmental assumptions made
No environmental factors or assumptions are
made during the resource estimation process.
Bulk density Whether assumed or determined. If assumed,
the basis for the assumptions. If determined,
the method used, whether wet or dry, the
frequency of the measurements, the nature,
size and representativeness of the samples.
A bulk density of 2.6 was applied to the
mineralised zones. This was determined via
researched into other CID’s in the Pilbara.
The bulk density for bulk material must have
been measured by methods that adequately
account for void spaces (vugs, porosity, etc),
moisture and differences between rock and
alteration zones within the deposit,
No bulk density measurements have been
undertaken because suitable drill-core material is
yet to be available.
Discuss assumptions for bulk density estimates
used in the evaluation process of the different
materials.
A bulk density of 2.6 is assumed for all
mineralised material in the Resource Estimate.
Classification The basis for the classification of the Mineral
Resources into varying confidence categories
Classification of the resource models is based
primarily on demonstrated assay data quality, drill
density and geological understanding.
Whether appropriate account has been taken
of all relevant factors (i.e. relative confidence
in tonnage/grade estimations, reliability of
input data, confidence in continuity of geology
and metal values, quality, quantity and
distribution of the data).
The classification takes into account the relative
contributions of geological and data quality and
confidence, as well as grade confidence and
continuity.
Whether the result appropriately reflects the
Competent Person’s view of the deposit.
The classification reflects the view of the
Competent Person.

CZR Resources Ltd

Page 40

==> picture [162 x 30] intentionally omitted <==

Audits or reviews The results of any audits or reviews of Mineral
Resource estimates.

This updated Mineral Resource estimate has not
been subjected to any independent audits or
reviews.
Discussion of
relative accuracy
and confidence
Where appropriate a statement of the relative
accuracy and confidence level in the Mineral
Resource estimate using an approach or
procedure
deemed
appropriate
by
the
Competent
Person.
For
example,
the
application of statistical or geostatistical
procedures to quantify the relative accuracy of
the resource within stated confidence limits,
or, if such an approach is not deemed
appropriate, a qualitative discussion of the
factors that could affect the relative accuracy
and confidence of the estimate











The relative accuracy of the Mineral Resource
estimate is reflected in the reporting of the
Mineral Resource as per the guidelines of the
2012 JORC Code. The statement relates to global
estimates of tonnes and grade.
The statement should specify whether it
relates to global or local estimates, and, if
local, state the relevant tonnages, which
should be relevant to technical and economic
evaluation. Documentation should include
assumptions made and the procedures used





The estimate is considered to be relevant to a
global report of tonnage and grade.
These statements of relative accuracy and
confidence
of
the
estimate
should
be
compared with production data, where
available



No mining has been undertaken on any of the
resource and therefore there is no production
data is available.

Section 4 – Estimation and Reporting of Ore Reserves

Criteria JORC Code explanation Commentary
Mineral
Resource
estimate for
conversion to
Ore Reserves
Description of the Mineral Resource estimate used
as a basis for the conversion to an Ore Reserve.
The Open Pit Ore Reserve is based on the
Mineral Resource estimate by Optiro
Consultants as reported in Jan 2016. The Model
is “rm_nov15.mdl”
Clear statement as to whether the Mineral
Resources are reported additional to, or inclusive
of, the Ore Reserves.
Mineral Resources are inclusive of Reserves
Site visits Comment on any site visits undertaken by the The Competent Person, Stephen O’Grady has

CZR Resources Ltd

Page 41

==> picture [162 x 30] intentionally omitted <==

Criteria JORC Code explanation Commentary
Competent Person and the outcome of those
visits.
If no site visits have been undertaken indicate why
this is the case.
visited site.
The Competent Person has also relied on reports
from other independent consultants and site
surveys in determining the viability of the Ore
Reserve.
Study status The type and level of study undertaken to enable
Mineral Resources to be converted to Ore
Reserves.
A Pre-Feasibility level estimation of costs,
modifying factors and parameters resulting in a
mine plan that is technically achievable and
economic using the determined Ore Reserve.
Cut-off
parameters
The basis of the cut-off grade(s) or quality
parameters applied.
A cut-off grade of 55% Fe was applied to enable
the product grade.
Mining factors
or
assumptions
The method and assumptions used as reported in
the Pre-Feasibility or Feasibility Study to convert
the Mineral Resource to an Ore Reserve (i.e. either
by application of appropriate factors by
optimisation or by preliminary or detailed design).
Optimisation using Whittle software has been
completed and is the basis for the final pit design
outline.
The choice, nature and appropriateness of the
selected mining method(s) and other mining
parameters including associated design issues
such as pre-strip, access, etc.
Conventional open cut mining methods of drill
and blast and load and haul utilizing 120t
excavators and 90t trucks would be employed
and are widely used in the mining industry and
production rates and budget costings have been
sourced and validated from a reputable mining
contractor.
The assumptions made regarding geotechnical
parameters (eg pit slopes, stope sizes, etc), grade
control and pre-production drilling.
Overall wall angles of 55° have been used. Final
wall heights will range from 10 to 20m in height.
A desktop geotechnical review was completed
and supports the wall angles used within the
context of the pit design and resulting wall
heights.
The major assumptions made and Mineral
Resource model used for pit and stope
optimisation (if appropriate).
The Optiro resource model “rm_nov15.mdl”was
not regularized for use in the Ore Reserve. The
original block size of 12.5m x 12.5m x 1.25m has
been used, given the scale of equipment
envisaged and the fact the grade distribution is
homogenous.
The mining modifying factors used. No additional modifying factors such as grade
dilution or ore tonnage loss factors have been
applied.
Any minimum mining widths used. The minimum mining width used is 25m at the

CZR Resources Ltd

Page 42

==> picture [162 x 30] intentionally omitted <==

Criteria JORC Code explanation Commentary
The manner in which Inferred Mineral Resources
are utilised in mining studies and the sensitivity of
the outcome to their inclusion.
base of pits.
The resource model classification comprised
Indicated and Inferred. Inferred has been
included in the optimization.
The mine plan includes 1.0 Mt of Inferred and
8.2Mt of Indicated.
The Ore Reserve does not include any Inferred
resource and the Ore Reserve is technically and
economically viable without the inclusion of the
Inferred resource.
The infrastructure requirements of the selected
mining methods.
Mobilisation, establishment and all site and mine
infrastructure to support mining has been
accounted for in the study.
The Fines product will be road hauled to the
Utah Point Multi User Facility in Port Hedland
where it will be stockpiled before being ship
loading for export
Metallurgical
factors or
assumptions
The metallurgical process proposed and the
appropriateness of that process to the style of
mineralisation.
Whether the metallurgical process is well-tested
technology or novel in nature.
The nature, amount and representativeness of
metallurgical test work undertaken, the nature of
the metallurgical domaining applied and the
corresponding metallurgical recovery factors
applied.
Any assumptions or allowances made for
deleterious elements.
The existence of any bulk sample or pilot scale test
work and the degree to which such samples are
considered representative of the orebody as a
whole.
For minerals that are defined by a specification,
has the ore reserve estimation been based on the
appropriate mineralogy to meet the
specifications?
All ore will be processed via a mobile dry crush
and screen plant established at the mine site.
The plant will utilize conventional three stage
crushing and screening (1 x Primary Jaw crusher
and 2 x Secondary Cone crushers) to produce a
100% passing 12.0mm, 95% passing 9.5mm all
Fines product. This style of plant for the nature
of the envisaged operation is well proven in
similar applications.
Recent metallurgical test-work was completed
by Bureau Veritas.
There are no yield or grade modifications
through the process.
No problematic levels of deleterious elements
have been detected during test work.
Metallurgical testwork has been completed on
Sonic drill core, no bulk samples have been
collected.

CZR Resources Ltd

Page 43

==> picture [162 x 30] intentionally omitted <==

Criteria JORC Code explanation Commentary
Environmental The status of studies of potential environmental
impacts of the mining and processing operation.
Details of waste rock characterisation and the
consideration of potential sites, status of design
options considered and, where applicable, the
status of approvals for process residue storage
and waste dumps should be reported.
Desk-top studies of the flora and fauna have
identified key species with conservation status
that will require consideration as part of the field
studies that are being planned so that any
potential impacts can be minimized.
At the PFS stage, the project has not identified
any need for waste rock encapsulation. More
comprehensive studies will be completed as the
project progresses to meet the approvals
requirements.
At this stage, CZR has not yet made an
application for any of the licenses to commence
mining.
Infrastructure The existence of appropriate infrastructure:
availability of land for plant development, power,
water, transportation (particularly for bulk
commodities), labour, accommodation; or the
ease with which the infrastructure can be
provided, or accessed.
The site is located approximately 200km by road,
south-west of the city of Karratha and 175km by
road from the township of Onslow. The site is
currently accessed via an existing unsealed 35km
road that connects with the North West Coastal
Highway.
The sealed road between the intersection of the
site access road with the North West Coastal
Highway all the way to the Utah Point Multi-User
Facility at Port Hedland is of a RAV10 rating and
therefore suitable for utilising quad
configuration road trains in transporting product
to port.
The PFS has assumed export of product from the
existing Utah Bulk Handling Facility in Port
Hedland.
Non-process infrastructure allowed for in the
PFS includes establishment of a Mine Ramp and
ROM Pad, Mine Operations Infrastructure (Mine
Operations Centre, Plant location, Product
loadout and Magazine), infrastructure for raw
water supply for mining operations and site
access road maintenance and dust suppression,
Mine Access Road upgrade and construction (all
weather), North West Coastal Highway
Intersection upgrade, Communications
Infrastructure, on-site Accommodation Village
(76 room) and water treatment infrastructure.
The workforce will be sourced from Perth and
Karatha.
Water supply is expected to be available from

CZR Resources Ltd

Page 44

==> picture [162 x 30] intentionally omitted <==

Criteria JORC Code explanation Commentary
bore-holes located in proximity to the mine site
as exploration drilling has intersected good flows
of low-salinity water when some holes extended
beneath the level of the adjacent Robe River.
Power will be generated on site using diesel
generators.
Costs The derivation of, or assumptions made,
regarding projected capital costs in the study.
The methodology used to estimate operating
costs.
Allowances made for the content of deleterious
elements.
The derivation of assumptions made of metal or
commodity price(s), for the principal minerals and
co- products.
The source of exchange rates used in the study.
Derivation of transportation charges.
The basis for forecasting or source of treatment
and refining charges, penalties for failure to meet
specification, etc.
The allowances made for royalties payable, both
Government and private.
Capital costs and operating costs have been
predominantly estimated on the basis of
submissions received in response to RFQs from
experienced contractors for the relevant capital
or operating estimate, and to a lesser extent
recent market soundings and first principle
estimates received from external consultants.
RFQs were based upon PFS determined scope
and project requirements.
Provisional sums have been assumed in the case
of raw water supply infrastructure until such
time as hydrogeological desktop studies and
field investigations are completed.
All costs and revenue are in A$ unless stated
otherwise
Transport costs were derived from a RFQ from
an experienced haulage contractor (haulage) and
current market information (sea freight rates).
Mine Closure, rehabilitation and environmental
monitoring post closure has been included in the
cashflow model and developed from first
principles by mine closure consultants

CZR Resources Ltd

Page 45

==> picture [162 x 30] intentionally omitted <==

Criteria JORC Code explanation Commentary
Revenue
factors
The derivation of, or assumptions made regarding
revenue factors including head grade, metal or
commodity price(s) exchange rates,
transportation and treatment charges, penalties,
net smelter returns, etc.
he derivation of assumptions made of metal or
commodity price(s), for the principal metals,
minerals and co-products.
The PFS assumes an iron ore price based upon a
flat 62% Fe Index Price of US$90/dmt CFR China
over the life of the mine. A Value in Use discount
of 12.5% of the base product price is also applied
to adjust for product impurities.
A flat foreign exchange rate of 0.70 has been
used for converting A$ to US$.
A Western Australia government royalty of 7.5%
is applicable to iron ore and has been applied
within the revenue calculation. An additional
third-party royalty of 1% has also been assumed
and used in the calculation of revenue.
The Competent Person considers this to be an
appropriate commodity price assumption based
on the current level of study and price
environment at the time of the completion of
the Ore Reserve work.
Market
assessment
The demand, supply and stock situation for the
particular commodity, consumption trends and
factors likely to affect supply and demand into the
future.
A customer and competitor analysis along with
the identification of likely market windows for the
product.
Price and volume forecasts and the basis for these
forecasts.
For industrial minerals the customer specification,
testing and acceptance requirements prior to a
supply contract.
The iron ore price improved in 2019 and has
strengthened further in 2020 as a result of
stimulus in China and supply disruption from
Brazil.
There is a transparent, quoted and strongly
traded market for the sale of iron ore. The
market for Western Australian iron ore is well
established and liquid.
The Ore Reserve and mine production schedule
support a saleable product comparable with
existing products that are well established in the
market (Rio Tinto Robe Fines, FMG SSF). The
style of product comprises approximately 10% of
the present Australian export volume.
A market assessment completed as part of the
PFS was used to guide Revenue Factors used in
the PFS for the purpose of cashflow modelling
and estimating Ore Reserves.

CZR Resources Ltd

Page 46

==> picture [162 x 30] intentionally omitted <==

Criteria JORC Code explanation Commentary
Economic The inputs to the economic analysis to produce
the net present value (NPV) in the study, the
source and confidence of these economic inputs
including estimated inflation, discount rate, etc.
NPV ranges and sensitivity to variations in the
significant assumptions and inputs.
The Ore Reserve estimate is supported by a pre-
tax cashflow model that has been prepared
using revenue inputs and capital and operating
cost inputs at a Pre-Feasibility level. The model
covers the current 5 year (64 month) life of the
project. The majority of the major cost inputs
have been sourced from contractors and
suppliers.
All operating costs have been inflated at a rate
of 1.25% annually.
A discount rate of 8% has been applied.
The resulting NPV and IRR is positive and
sensitivity analysis has been completed for the
commodity price as contained in the PFS.
Social The status of agreements with key stakeholders
and matters leading to social licence to operate.
The owners will commence discussions and
negotiations with the native title holders,
government and other key stakeholders as the
project progresses towards development.
Other To the extent relevant, the impact of the following
on the project and/or on the estimation and
classification of the Ore Reserves:
Any identified material naturally occurring risks.
The status of material legal agreements and
marketing arrangements.
The status of governmental agreements and
approvals critical to the viability of the project,
such as mineral tenement status, and government
and statutory approvals. There must be
reasonable grounds to expect that all necessary
Government approvals will be received within the
timeframes anticipated in the Pre-Feasibility or
Feasibility study. Highlight and discuss the
materiality of any unresolved matter that is
dependent on a third party on which extraction of
the reserve is contingent.
No material naturally occurring risks have been
identified for the project.
The conversion of the exploration license areas
to mining leases will require negotiation of an
access and compensation agreement that has
the potential to delay the development of the
project.
It is expected that other future agreements and
Government approvals will be required for the
successful implementation of the project.
Classification The basis for the classification of the Ore Reserves
into varying confidence categories.
Whether the result appropriately reflects the
Competent Person’s view of the deposit.
The proportion of Probable Ore Reserves that
have been derived from Measured Mineral
Resources (if any).
The Indicated Mineral Resource has been
converted to a Probable Ore Reserve.
The result appropriately reflects the Competent
Person’s view of the deposit.

CZR Resources Ltd

Page 47

==> picture [162 x 30] intentionally omitted <==

Criteria JORC Code explanation Commentary
Audits or
reviews
The results of any audits or reviews of Ore Reserve
estimates.
The Ore Reserve estimate has not been
independently audited or reviewed.
Discussion of
relative
accuracy/
confidence
Where appropriate a statement of the relative
accuracy and confidence level in the Ore Reserve
estimate using an approach or procedure deemed
appropriate by the Competent Person. For
example, the application of statistical or
geostatistical procedures to quantify the relative
accuracy of the reserve within stated confidence
limits, or, if such an approach is not deemed
appropriate, a qualitative discussion of the factors
which could affect the relative accuracy and
confidence of the estimate.
The statement should specify whether it relates to
global or local estimates, and, if local, state the
relevant tonnages, which should be relevant to
technical and economic evaluation.
Documentation should include assumptions made
and the procedures used.
Accuracy and confidence discussions should
extend to specific discussions of any applied
Modifying Factors that may have a material
impact on Ore Reserve viability, or for which there
are remaining areas of uncertainty at the current
study stage.
It is recognized that this may not be possible or
appropriate in all circumstances. These
statements of relative accuracy and confidence of
the estimate should be compared with production
data, where available.
The mine designs, schedule and financial model
for the Ore Reserve have been completed to a
Pre-Feasibility level with a corresponding +/-
25% level of confidence.
A degree of uncertainty is associated with
geological estimates and the Ore Reserve
classification reflects the level of confidence in
the Mineral Resource.
A degree of uncertainty regarding the estimate
of mining modifying factors exists; this will be
reviewed with further drilling density and mining
studies.
There is a degree of uncertainty in the
commodity price used however the Competent
person is satisfied that the assumptions used to
determine the economic viability of the Ore
Reserve are based on reasonable current data.

CZR Resources Ltd