CriticalElements Lithium Corporation

img-0.jpeg

CRITICAL ELEMENTS LITHIUM CORPORATION

(an exploration company)

MANAGEMENT DISCUSSION AND ANALYSIS

For the three- and nine-month periods ended May 31, 2025 and 2024
(Third quarter)


MANAGEMENT DISCUSSION AND ANALYSIS

This management discussion and analysis ("MD&A") of Critical Elements Lithium Corporation ("Critical Elements" or the "Corporation") complies with Rule 51-102A of the Canadian Securities Administrators regarding continuous disclosure.

The MD&A is a narrative explanation, through the eyes of the management of Critical Elements, of how the Corporation performed during the three- and nine-month periods ended May 31, 2025 and 2024, and of the Corporation's financial condition and future prospects. This discussion and analysis complements the unaudited condensed interim financial statements for the period ended May 31, 2025.

The financial statements have been prepared in accordance with the International Financial Reporting Standards ("IFRS") accounting standards.

All figures are in Canadian dollars unless otherwise stated. Additional information relating to the Corporation can be found on SEDAR + at www.sedarplus.ca. The shares of Critical Elements are listed on the TSX Venture Exchange under the symbol CRE, on the American Over-The-Counter QX stock exchange (OTCQX) under the symbol CRECF and on the Frankfurt Exchange under the symbol F12.

DATE

The MD&A was prepared on the basis of information available as at July 17, 2025.

CAUTION REGARDING FORWARD-LOOKING STATEMENTS

All statements, other than statements of historical fact, contained in this MD&A including, but not limited to, those relating to (i) management's belief that the Corporation has sufficient funds to meet its obligations and planned expenditures for the ensuing twelve months as they fall due, (ii) the Corporation's ability to secure additional financing in the future to complete the construction and commissioning of its Rose Lithium-Tantalum project and meet its financial needs, (iii) the successful completion of the current environmental assessment and permitting process to advance the Rose Lithium-Tantalum project, (iv) the development plans and timeline for the Rose Lithium-Tantalum project, (v) the results and operational highlights of the feasibility study on the Rose Lithium-Tantalum project, (vi) the project timeline, (vii) lithium demand growth and trends, (viii) the expected unfolding of construction and commissioning as well as the anticipated start of production at the Corporation's Rose Lithium-Tantalum project and, (ix) the engineering study, (x) the results of such study and lithium hydroxide plant feed, (xi) the capacity and production, (xii) the mineral reserve estimates, (xiii) the mineral resource estimates, (xiv) the capital and operating costs estimates, (xv) the timing and amount of future production, (xvi) the costs of production, (xvii) the success of mining operations, (xviii) the ranking of the Project in terms of cash cost and production, (xix) the permitting, economic return estimates, (xx) the power and storage facilities, (xxi) the life of mine, (xxii) the social, community and environmental impacts, (xxiii) the lithium and tantalum markets and sales prices, (xxiv) the off-take agreements and purchasers for the Corporation's products, (xxv) the environmental assessment and permitting, (xxvi) the securing sufficient financing on acceptable terms, (xxvii) the opportunities for short and long term optimization of the Project, (xxviii) the continued positive discussions and relationships with local communities and stakeholders, (xxviv) statements relating to the results and completion of the 2025 exploration program, (xxv) any information as to the future plans and outlook for the Corporation, constitute "forward-looking information" or "forward-looking statements" within the meaning of certain securities laws, and are based on expectations, estimates and projections as of the time of this MD&A. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Corporation as of the time of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. These estimates and assumptions may prove to be incorrect. Moreover, these forward-looking statements were based upon various underlying factors and assumptions, including the timely delivery and installation of the equipment supporting the production, the Corporation's business prospects and opportunities and estimates of the operational performance of the equipment, and are not guarantees of future performance.

The words "anticipates", "plans", "expects", "indicate", "intend", "scheduled", "estimates", "forecasts", "guidance", "initiative", "outlook", "potential", "projected", "pursue", "strategy", "study", "targets", or

CRITICAL ELEMENTS LITHIUM CORPORATION


"believes", or variations of or similar such words and phrases or statements that certain actions, events or results "may", "could", "would", or "should", "might", or "way forward", "will be taken", "will occur" or "will be achieved" and similar expressions identify forward-looking statements. Forward-looking information and statements are subject to known or unknown risks and uncertainties that may cause actual results to differ materially from those anticipated or implied in the forward-looking information and statements. Risk factors that could cause actual results or events to differ materially from current expectations include, among others, the lack of revenue, the Corporation's dependence upon the Rose Lithium-Tantalum Property, the exploration and mining risk, the title of property, the permits and licenses, the dividend policy, the conflicts of interest, the key employees, the labour relations, the mineral explorations and development activities inherently risky, the estimates of mineral resources and mineral reserves, the nature of the corporation's business, the unanticipated metallurgical processing problems, the life of mine plan, the need for funding and time of development, the construction and start-up of new mines and industrial plants, the infrastructures, supplies and inflation, the equipment shortages and access restrictions, the litigation and others legal proceedings, the climate change, the resource exploration and development is generally speculative in nature, the metal prices, the volatility of share price and market price of the common shares, the dilution, the sales per existing shareholders, the competition, the environmental and safety regulations, the environmental liabilities, the costs of environmental remediation, the stage of development, the uninsured hazard, the future financing, the Canada Revenue Agency, the public company obligations, the lithium demand as well as the change in technology. Unpredictable or unknown factors not discussed in this Cautionary Statement could also have material adverse effects on forward-looking statements. Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, actual results to differ materially from those expressed or implied in any forward-looking statements. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements are provided for the purpose of providing information about management's expectations and plans relating to the future. Readers are cautioned not to place undue reliance on these forward-looking statements as a number of important risk factors and future events could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such forward-looking statements. Such risk factors are more particularly set out hereinafter, under the section titled "Risks Factors" of this MD&A. The Corporation disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law.

NATURE OF ACTIVITIES

Critical Elements Lithium Corporation is incorporated under the Canada Business Corporations Act. The purpose of the Corporation is profitably delivering responsibly sourced lithium for sustainable green energy solutions through partnerships with all stakeholders. The Corporation is involved in the acquisition, exploration, development and processing of critical minerals mining properties. The Corporation is active in Canada.

The Corporation's vision is to be a global leading low-cost lithium producer aiming to positively contribute to global decarbonization and to position itself as an employer of choice, trusted partner for the communities and governments where it operates, as well as investors, customers and suppliers.

The Corporation's strategy is to develop and operate the Rose Lithium-Tantalum project ("Rose" or "the Project"), a high-purity spodumene deposit in Eeyou Istchee, Quebec, Canada, to continue to unlock value through active exploration of a land package of over 1,050 square kilometers and to achieve this vision with minimal environmental impact, including leveraging low carbon electricity available through Québec's established power grid, and in cooperation with the Cree Nation of Eastmain and other local Cree Nations communities, with whom relationships have been formalized.

CRITICAL ELEMENTS LITHIUM CORPORATION


HIGHLIGHTS

  • On September 6, 2024, the Corporation renewed a non-redeemable guaranteed certificate of deposit of $2,923,687, renewable with a Canadian financial institution, as security for the letter of credit issued by this financial institution. The certificate bears interest at 3.89% and matures in March 2025.
  • Between September and October 2024, the Corporation sold 445,500 common shares of Power Metallic Mines Inc. (formerly Power Nickel Inc.) for a total cash consideration of $338,610.
  • On October 16, 2024, the Corporation announced the grant of the occupancy lease for its worker camp, for its Rose Project. This lease is granted by the Ministère des Ressources naturelles et des Forêts for a period of one year starting October 1st, 2024 and automatically renewed every year.
  • On October 11, 2024, the Corporation received a $886,343 refundable tax credit on mining duties for the year ended August 31, 2023.
  • On November 4, 2024, the Corporation renewed a non-redeemable guaranteed certificate of deposit of $1,427,166, renewable with a Canadian financial institution, as security for the letter of credit issued by this financial institution. The certificate bears interest at 3.31% and matures in May 2025.
  • On November 12, 2024, the Corporation renewed a non-redeemable guaranteed certificate of deposit of $1,355,808, renewable with a Canadian financial institution, as security for the letter of credit issued by this financial institution. The certificate bears interest at 3.27% and matures in May 2025.
  • In December 2024, the Corporation sold 2,906,500 common shares of Power Metallic Mines Inc. for a total cash consideration of $2,682,031.
  • In December 2024, the Corporation received $640,325 in resource tax credits for the year ended August 31, 2024.
  • In January 2025, the Corporation acquired 474,115 common shares of Power Metallic Mines Inc. following the exercise of 474,115 warrants at a price of $0.50.
  • On February 6, 2025, the Corporation announced a conditional $20 million in federal funding for critical minerals infrastructure project.
  • On February 10, 2025, the Corporation announced receipt of a support letter for up to US$115 million from a leading financial institution.
  • In February 2025, the Corporation obtained its first environmental authorization to prepare the Rose Project site for construction.
  • On March 2025, the Corporation received a $1,062,282 refundable tax credit on mining duties for the year ended August 31, 2024.
  • In April 2025, the Corporation began a helicopter-borne electromagnetic VTEM survey on its 100%-owned Nemaska Belt properties.
  • In May 2025, the Corporation began a surface exploration program on the Nemaska Belt portion of the portfolio and the Rose blocks. Dahrouge Geological Consulting Ltd. has been mandated to perform the summer exploration program.

CRITICAL ELEMENTS LITHIUM CORPORATION


  • In May 2025, the Corporation received an amended decision statement from the Minister of Environment and Climate Change of Canada, which includes the construction and development of a permanent workers' camp and the use of two borrow pits.

SUBSEQUENT EVENTS

  • On June 23, 2025, the Corporation announced that the VTEM survey had confirmed the presence of multiple electromagnetic conductors on its 100%-owned Nemaska Belt properties.
  • On July 2, 2025, the Corporation announced that it has entered into an Asset Purchase Agreement with Lomiko Metals Inc. for the repurchase of the 49% interest in the Bourier property.

OVERALL PERFORMANCE

ROSE LITHIUM-TANTALUM – LITHIUM, TANTALUM PROJECT

Property Description

The Rose Lithium-Tantalum property is located in northern Québec's administrative region, on the territory of Eeyou Istchee James Bay. It is located on Category III land, on the Traditional Lands of the Eastmain Community, approximately 40 km north of the Cree village of Nemaska. The latter is located approximately 300 km north-west of Chibougamau.

The Rose Lithium-Tantalum property is accessible by road via the Route du Nord and Eastmain-1 Road, usable all year round from Chibougamau. The mine site can also be reached by Matagami, via Route 109, Route du Nord. Figure below shows the regional location of the Project. The Project is located 80 km south of Goldcorp's Éléonore gold mine and 45 km north-west of Nemaska's Whabouchi lithium project and 20 km south of Hydro-Québec's Eastmain 1 hydroelectricity generating plant. The Nemiscau airport services the regions air travel needs. The Rose Lithium-Tantalum property site is located 50 km by road from the Nemiscau airport.

The Rose Lithium-Tantalum property comprises 477 Exclusive Exploration Right ("EER") spread over a 24,711 ha area and a mining lease representing 157 hectares. Geologically, the Rose Lithium-Tantalum property is located at the north-east end of the Archean Lake Superior, Province of the Canadian Shield.

CRITICAL ELEMENTS LITHIUM CORPORATION


CRITICAL ELEMENTS LITHIUM CORPORATION

img-1.jpeg

Figure 1 - Rose Property Location

The new Technical Report was prepared in compliance with the standards required by National Instrument 43-101 Standards of disclosure for mineral projects (“NI 43-101”) and Form 43-101F1. The Corporation filed the Technical Report on Sedar + on October 11, 2023.

The Feasibility Study was prepared in accordance to NI 43-101 by WSP Canada Inc. (WSP), Bumigeme Inc, and InnovExplo Inc. InnovExplo was responsible for the resource estimate and the mine plan, Bumigeme was responsible for the mineral processing, WSP was responsible for environmental study, project infrastructure, financial modelling, and report integration. Information regarding the outlook for lithium comes from a market study prepared by Mr. Gerrit Fuelling on behalf of the Corporation. Mr. Fuelling is an independent consultant specializing in the lithium market.

The qualified persons for the study are:

InnovExplo Inc.
- Carl Pelletier, P.Geo, Geologist
- Simon Boudreau, P.Eng, Mining Engineer

Bumigeme
- Florent Baril, Eng, Metallurgical Engineer

WSP
- Eric Poirier, P.Eng, PMP, Project Manager
- Paul Gauthier, P.Eng., Mining Engineer
- Olivier Joyal, P.Geo, Geologist

5


Highlights

  • Expected 17-year mine life
  • Average production Year 2-17: 157,706 tonnes of chemical grade 5.56% spodumene concentrate
  • Average production Year 2-17: 46,059 tonnes of technical grade 6.16% spodumene concentrate
  • Average production Year 2-17: 580 tonnes of tantalum concentrate
  • Average operating costs: US$81.30 per tonne milled, US$587 per tonne of concentrate (all concentrate production combined)
  • Estimated initial capital cost: US$471 million (before working capital)
  • Average gross margin: 78.8%
  • After-tax NPV₈% of US$2,195 million, after-tax IRR of 65.7%
  • Anticipated construction time: 21 months to start of production
  • Average price assumptions of US$4,699 per tonne technical grade lithium concentrate, US$2,162 per tonne chemical grade lithium concentrate and US$150 per kg tantalum pentoxide (Ta₂O₅)

The feasibility is based on a conventional truck and shovel open pit operation and a conventional milling process to produce technical and chemical grade spodumene concentrates and a tantalite concentrate.

The mine will excavate a total of 26.3M tonnes ore grading an average of 0.87% Li₂O and 138 ppm Ta₂O₅ after dilution. The mill will process 1.61M tonnes of ore per year to produce an annual average of 203,765 tonnes of technical and chemical grade spodumene concentrates and 580 tonnes of tantalite concentrate. The ore is contained in several parallel and continuous shallow dipping pegmatite dykes outcropping on surface. The ore zones are open at depth and a future underground operation is possible.

Over the life of mine, the open pit will excavate a total of 182.4M tonnes of waste rock and 10.9 M tonnes of overburden. The average strip ratio is 7.3 tonnes of stripping per tonne of ore.

Table 1 - Rose Key FS Results

Item Units Value
Production
Project Life (from start of construction to closure) years 19
Mine Life years 17
Total Mill Feed tonnage M t 26.3
Average Mill Feed grade
Li₂O % Li₂O 0.87
Ta₂O₅ ppm Ta₂O₅ 138
Lithium Concentrate Production
% of Production, Chemical Grade % 75
% of Production, Technical Grade % 25
Mill Recoveries
Li₂O, Chemical Grade % 87.4
Li₂O, Technical Grade % 84.8
Ta₂O₅ % 54.4
Concentrate grade
Li₂O, Chemical Grade % 5.56
Li₂O, Technical Grade % 6.16
Ta₂O₅ Grade % 20.00
Payable
5.56% Li₂O Concentrate, Chemical Grade t 2,681,000

CRITICAL ELEMENTS LITHIUM CORPORATION


6.16% Li2O Concentrate, Technical Grade t 783,000
Ta2O5 Contained in Concentrate kg 1,971,000
Commodity Prices
5.5% Li2O Concentrate, Chemical Grade US$/tconc. 2,162
6% Li2O Concentrate, Technical Grade US$/tconc. 4,699
Ta2O5 Contained in Concentrate US$/kgContained 150
Exchange rate 1.00 US$ : 1.30 CAN$
0.77 US$ : 1.00 CAN$
Item Units Value
--- --- ---
Project Costs CA$
Average Mining Cost $/t milled 35.13
Average Milling Cost $/t milled 27.00
Average General & Administrative Cost $/t milled 20.70
Average Concentrate Transport Costs $/t milled 22.76
Project Economics CA$
Gross Revenue $M 12,692
Total Selling Cost Estimate $M 161
Total Operating Cost Estimate $M 2,776
Total Sustaining Capital Cost Estimate $M 310
Total Capital Cost Estimate $M 611
Duties and Taxes $M 3,688
Average Annual EBITDA $M 599
Average Gross Profit Margin %
Pre-Tax Cash Flow $M 8,835
After-Tax Cash Flow $M 5,147
Effective Tax Rate %
Discount Rate %
Pre-Tax Net Present Value @ 8% $M 5,048
Pre-Tax Internal Rate of Return %
Pre-Tax Payback Period years
After-Tax Net Present Value @ 8% $M 2,851
After-Tax Internal Rate of Return %
After-Tax payback Period years

Reserve Estimate

A Mineral Reserve Estimate for 17 mineralized zones was prepared during this study. The estimation assumed the production of a chemical grade spodumene concentrate with a price of US$20 per kg Li2O and a tantalite concentrate with a price of US$130 per Kg of Ta2O5. The recoveries were fixed at 85% and 64% for lithium and tantalum, respectively. The grade-recovery curve used for resource estimate, which became available after the mineral reserves were evaluated, was verified and found to have little influence on the reserve estimate. The production of a higher value technical grade spodumene concentrate was not assumed in the reserve estimate.

Based on compilation status, metal price parameters, and metallurgical recovery inputs, the effective date of the estimate is August 1, 2023.

CRITICAL ELEMENTS LITHIUM CORPORATION


The estimate was prepared in accordance with CIM's standards and guidelines for reporting mineral resources and reserves.

Table 2 displays the results of the Mineral Reserve Estimate for the Rose Lithium-Tantalum project at the $44.80 net smelter return ("NSR") per tonne cut-off for the open-pit scenario.

Table 2 - Mineral Reserve Estimate
| | Tonnage | NSR | Li_{2}O_{eq} | Li_{2}O | Li_{2}O | Ta_{2}O_{5} | Ta_{2}O_{5} |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Category | (Mt) | ($) | (%) | (%) | (000 t) | (ppm) | (000 t) |
| Probable | 26.3 | 165 | 0.92 | 0.87 | 193.8 | 138 | 2.3 |
| Total | 26.3 | 165 | 0.92 | 0.87 | 193.8 | 138 | 2.3 |

  • The Independent and Qualified Person for the Mineral Reserve Estimate, as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Project ("NI 43-101"), is Simon Boudreau, P.Eng, of InnovExplo Inc. The effective date of the estimate is August 1st, 2023.
  • The model includes 17 mineralized zones.
  • Calculations used metric units (metres, tonnes and ppm).
  • The number of metric tons was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects. Rounding followed the recommendations in NI43-101.
  • InnovExplo is not aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect the Mineral Reserve Estimate.

Resource Estimate

The current Mineral Resource Estimate ("MRE") is primarily based on changes made to the NSR parameters, supported by new assumptions concerning metal prices and the creation of potentially mineable shape to constrain the MRE for the potential underground extraction scenario. No changes to the interpretation and interpolation parameters were deemed necessary. The mineral resource model for the current MRE is based largely upon the model generated for the 2011 PEA.

The effective date of the estimate is August 1st, 2023, based on compilation status, metal price parameters, metallurgical recovery inputs and creation of the constraining volume.

Given the density of the processed data, the search ellipse criteria, the drill hole density and the specific interpolation parameters, the QP is of the opinion that the current MRE can be classified as Indicated and Inferred resources. The estimate was prepared in accordance with CIM's standards and guidelines for reporting mineral resources and reserves.

Table 3 displays the results of the MRE for the Rose Lithium-Tantalum project using CA$31.40 NSR/t cut-off for the open-pit potential extraction scenario and CA$121.12 NSR cut-off for the underground potential extraction scenario.

Table 3 - Mineral Resource Estimate
| Category | Tonnage | NSR | Li_{2}O_{Eq} | Li_{2}O | Ta_{2}O_{5} | |
| --- | --- | --- | --- | --- | --- | --- |
| | | (CA$) | (%) | (%) | (ppm) | |
| Indicated | Pit | 29,922,000 | 185 | 1.03 | 0.93 | 145 |
| | Underground | 624,000 | 177 | 0.96 | 0.91 | 82 |
| | Total Indicated | 30,561,000 | 185 | 1.03 | 0.93 | 118 |
| Inferred | Pit | 1,787,000 | 149 | 0.86 | 0.77 | 138 |
| | Underground | 597,000 | 150 | 0.87 | 0.80 | 101 |
| | Total Inferred | 2,384,000 | 149 | 0.86 | 0.78 | 129 |

CRITICAL ELEMENTS LITHIUM CORPORATION


  • The Independent and Qualified Person for the Mineral Resource Estimate, as defined by NI 43-101, is Carl Pelletier, P.Geo., of InnovExplo Inc. The effective date of the estimate is August 1st, 2023. The MRE follow 2014 CIM Definition Standards and the 2019 CIM MRMR Best Practice Guidelines.
  • These Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability.
  • The model includes 24 mineralized zones.
  • The reasonable prospect for eventual economic extraction is met by having constraining volumes applied to any blocks (potential open -pit or underground extraction scenario) using Whittle and the Deswik Stope Optimizer (DSO) and by the application of cut-off grades. The mineral resource is reported at a cut-off of CA$31.40 NSR for the open-pit potential; and of CA$121.12 NSR for the underground potential based on market conditions (metal price, exchange rate and production cost).
  • A range of densities was used on a per-zone basis based on statistical analysis of all available data.
  • A minimum true thickness of 2.0 m was applied, using the grade of the adjacent material when assayed or a value of zero when not assayed.
  • High grade capping was done on raw assay data based on the statistical analyses of individual mineralized zones.
  • Compositing was done on drill hole intercepts falling within mineralized zones (composite lengths vary from 1.5 m to 3.0 m to distribute the tails adequately).
  • Resources were evaluated from drill holes using a 2-pass OK interpolation method in a block model (block size = 5 m x 5 m x 5 m).
  • The inferred category is only defined within the areas where blocks were interpolated during pass 1 or pass 2 where continuity is sufficient to avoid isolated blocks being interpolated by only one drill hole. The indicated category is only defined by blocks interpolated by a minimum of two drill holes in areas where the maximum distance to the closest drill hole composite is less than 40 m for blocks interpolated in pass 1.
  • Results are presented in-situ. The number of metric tons was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects. Rounding followed the recommendations in NI 43-101.
  • The qualified persons are not aware of any known environmental, permitting, legal, title-related, taxation, socio-political or marketing issues, or any other relevant issue, that could materially affect the potential development of mineral resources other than those discussed in the MRE.

Feasibility Study

The parameters used for the feasibility study are the following:

  • Open pit mining rate of 1,610,000 tpy
  • Spodumene process plant with a 4,600 tpd capacity

Mining Operation

The mineralization is hosted within outcropping pegmatite dykes subparallel to surface. The ore body is relatively flat, close to surface and comprised of north oriented stacked lenses. Mineralization recognized to date on the Rose property includes rare elements of Lithium-Cesium-Tantalum or LCT-type pegmatites and molybdenum occurrences.

A conventional truck and shovel open-pit approach was considered to mine the Rose Lithium-Tantalum project's Probable Mineral Reserves. The dimensions of the engineered pit design are approximately 1,620m long x 900m wide x 200m deep.

The life of mine plan (LOM) proposes to mine 26.3 Mt of ore, 182.4 Mt of waste, and 10.9 Mt of overburden for a total of 219.6Mt of material. The average stripping ratio is 7.3 tonnes of stripping per tonne of ore. The nominal production rate is estimated at 4,600 tonnes per day and 350 operating days per year.

CRITICAL ELEMENTS LITHIUM CORPORATION


The mining operation production rate is set to approximately 15 Mt of material per year. An open pit mining schedule was planned and resulted in a mine life of 17 years.

Critical Elements will excavate the mine using its own fleet of equipment and operators. However, it is anticipated that a mining contractor will excavate the overburden and ore during the construction period and part of the first year of operation.

The main production fleet will consist of one (1) backhoe excavator, one (1) electric front shovel, one (1) wheel loader, eight (8) haul trucks (65t each), seven (7) haul trucks (135t each), two (2) rotary drills, one (1) DTH drill, two (2) bulldozers, one (1) wheel dozer, two (2) graders, one (1) auxiliary excavator, one (1) auxiliary wheel loader, and two (2) water trucks.

The Rose project pit was designed with a 10m single benching arrangement. A 57° inter-ramp angle and an overall pit slope angle of 55° were utilized for the ultimate pit design. A berm width of 7.0m corresponding to the recommended overall slope angle was used. The pit slopes in overburden have a face ratio of 2.5:1 with a 10m berm width.

The main in-pit haulage ramp is designed at 30.9m wide to allow a double-lane traffic, except for the last benches at the pit bottom that are designed at 20.4m wide for single lane traffic. A 2.0m drainage ditch is included to allow for water drainage and pipe installation. The maximum gradient of the inner curvature of all ramp segments is 10%.

img-2.jpeg
Figure 2 – Rose Pit Plan View

CRITICAL ELEMENTS LITHIUM CORPORATION


CRITICAL ELEMENTS LITHIUM CORPORATION

img-3.jpeg
Figure 3 – Rose Pit Side View Looking West

Mineral Processing

A standard froth flotation process will be utilized to produce technical grade and chemical grade lithium concentrates and a tantalum concentrate. The mineral process plant will consist of crushing, beneficiation, and dewatering areas. The technical grade lithium concentrate will grade 6.16% Li₂O while the chemical grade lithium concentrate will grade 5.56% Li₂O. The tantalum concentrate will grade 20% Ta₂O₅.

The beneficiation process includes crushing, grinding, magnetic separation and flotation. The crushing circuit will consist of a jaw crusher and two (secondary and tertiary) cone crushers, and screens. The crushed ore will have a P80 of 13 mm and will be stockpiled in a 24-hour live capacity dome. The grinding circuit will consist of a ball mill operating in a closed circuit with a set of cyclones. The tantalum will first be recovered at a grade of 2.0% Ta₂O₅ by high intensity magnetic separation then upgraded further to 20.0% Ta₂O₅ by gravity separation. Tantalum concentrate will be thickened, filtered, dried to 1% moisture, and bagged for shipment. The lithium flotation circuit will include removal of slimes (particles less than 20 um) after magnetic separation followed by mica flotation, scrubbing, and spodumene flotation to the required grades. The spodumene concentrate will then be thickened, pressure filtered with a 5% moisture content, and stored in a dome with a capacity of 24 hours and then be transported by trucks and trains to the port. The flotation tailings will be thickened, vacuum filtered to 15% moisture or less, and trucked to the waste rock / tailings piles where it will be dry stacked.

The spodumene plant will operate 24 hours per day, 7 days per week, and 52 weeks per year. The process plant was designed with an operating availability of 90%. The crushing circuit was designed using an operating availability of 50%. The plant has a capacity of 1,610,000 tonnes per year or 4,900 dry tonnes per day including availability.

The process plant flowsheet developed by Bumigeme Inc. is presented in Figure 4.

CRITICAL ELEMENTS LITHIUM CORPORATION


img-4.jpeg
Figure 4 – Rose Process Flowsheet

Metallurgy

Bench scale metallurgical testing was performed at ACME Metallurgical Limited in Vancouver in 2011. The results from these tests were used for the PEA study. Three composites; Rose (main structure), Rose South (South structure) and Tantalum (secondary structure with higher tantalum and lower lithium content) were subjected to various metallurgical tests.

SGS Canada Inc. in Lakefield conducted tests from 2013 to 2015 to improve lithium and tantalum recoveries. In 2015 SGS Canada Inc. developed a conceptual flowsheet based on a series of bench scale tests on various samples from the Rose deposit. The proposed flowsheet consists of conventional three-stage crushing and single stage grinding followed by magnetic separation for the recovery of tantalum, mica flotation, and spodumene flotation. This flowsheet was the basis of the process plant design.

SGS Canada also conducted a pilot plant program in early 2017 on two samples from the Rose project (Rose and Rose South). The main objective of the pilot plant program was to generate spodumene concentrate for testing in a lithium carbonate pilot plant which was conducted by Outotec in Germany and Finland. Secondary objectives were to prove metallurgical performance on a continuous pilot scale and to generate metallurgical and operating data for further studies. The spodumene pilot plant demonstrated the robustness of the design process.

The Feasibility Study assumes 84.8% and 87.4% recovery for technical and chemical grade lithium concentrates respectively and 54.4% minimum recovery for the tantalum concentrate.

Process water will be recycled releasing minimal amounts to the equalization pond and final effluent treatment plant.

Environmental and Social Impact Assessment

The final environmental impact assessment (EIA) was submitted to the governments of Canada and Quebec in February 2019. In August 2021, Critical Elements announced that the Federal Minister of

CRITICAL ELEMENTS LITHIUM CORPORATION


Environment and Climate Change had rendered a favorable decision in respect of the proposed Rose project. In a Decision Statement, which included the conditions to be complied with by the Corporation, the Minister confirmed that the Project is not likely to cause significant adverse environmental effects when mitigation measures are taken into account.

In September 2022, the Comité d'examen des répercussions sur l'environnement et le milieu social, an independent body made up of members appointed by the governments of Québec and the Cree Nation and responsible for assessing and reviewing the Project's environmental and social impacts, recommended that the Project be authorized. Consequently, the Corporation received the Certificate of Authorization under Section 164 of the Quebec Environment Quality Act for the Project from the Quebec Minister of the Environment, Climate Change, Wildlife and Parks.

Now that the Project has been approved by government authorities, the Corporation must obtain the various permits required to build and operate the mine. A workers' camp, previously planned 25 km to the north, is expected to be set up some 4 km south of the mine site, under the Corporation's responsibility.

On February 20, 2024, the Corporation received three industrial occupancy leases (storage and mining infrastructure) and tailings management facility leases, which are essential for the deployment of its Rose Lithium-Tantalum project.

On August 8, 2024, the Corporation received the amended certificate of authorization with the addition of the workers' camp for the Rose project from the Ministère de l'Environnement, de la Lutte contre les changements climatiques, de la Faune et des Parcs du Québec.

In October 2024, the Corporation received the occupancy lease for its worker camp. This lease is granted by the Ministère des Ressources naturelles et des Forêts for a period of one year starting October 1st, 2024 and automatically renewed every year.

In February 2025, the Corporation obtains its first environmental authorization required for the implementation of site site construction. This environmental authorization is the next essential step for site preparation leading to construction of the Project and permits the Corporation to carry out the following activities: Stripping of an equipment and materials storage area (in the area of the future pit); Stripping and developing part of the future overburden pile; Stacking of organic matter and overburden on the overburden pile; and Building temporary water management infrastructure. In accordance with the terms of the environmental authorization received by the Corporation, wetland site preparation activities must begin within two years of the date of issue of the authorization. Furthermore, the Corporation expects to be in a position to commence the activities subject to this authorization once all the conditions and the required Project financing has been obtained and a Final Investment Decision is made.

In May 2025, the Corporation received an amended decision statement from the Minister of Environment and Climate Change of Canada. The amendments to the original decision statement issued on August 11, 2021, include the addition of the construction and development of a permanent workers' camp and the use of two borrw pits.

Critical Elements has been working since the beginning with the Eastmain Community, on whose Traditional Lands the Project lies. The Corporation has also maintained good relations with the Grand Council of the Cree and with the neighbouring Nation of Nemaska. Consultations are planned throughout the life of the Project. In 2019, Critical Elements entered into an impact and benefits agreement with the Cree Nation of Eastmain, the Grand Council of the Cree (Eeyou Istchee), and the Cree Nation Government called the Pihkuutaau Agreement.

The Corporation's mine closure and restoration plan was accepted by the Ministry of Energy and Natural Resources of the Province of Québec (MERN) in May 2022.

CRITICAL ELEMENTS LITHIUM CORPORATION
13


Infrastructure

The Project infrastructure includes site main access, services and haulage roads, explosive and detonator storage, a spodumene processing plant, a maintenance facility, a warehouse, diesel and gasoline storage, ore stockpile, waste rock and dry tailings co-disposal stockpile, overburden stockpile, main electrical substation and distribution, fresh and potable water supply, sewage, surface water management, final effluent treatment, communication system, gate house, and an administrative building. A camp complex will be built near the junction between the site access and Eastmain 1 road.

The mine site layout is shown in Figure 5

img-5.jpeg
Figure 5 – Rose Site Layout

Waste rock and tailings samples were analyzed, and both were considered to be non-potentially acid generating. The dry tailings and the waste rock will be stored in the same facility which has sufficient capacity for the life of mine. Rain and snow melt water will be collected in ditches and pumped to the water treatment plant.

The industrial pad has an area of 254,000 m² and will contain the process plant, the maintenance facility, warehouse, administration building, diesel and gasoline storage tanks, and all associated services. The ore pad will have an area of 105,000 m² where low-grade material may be stored.

CRITICAL ELEMENTS LITHIUM CORPORATION


The hydrology study has suggested that water inflow to the open pit is to be expected. To maximize pit slopes, water wells will be constructed around the pit periphery to lower the water table below the pit floor. One of these wells will be used to supply the site with fresh water. Water from the other wells will be directed to sedimentation ponds and treated, if necessary, before being released to the effluent.

Water from the waste rock / dry tailings stockpile, the open pit, the industrial pad, the overburden stockpile, and the roads will be collected in an equalization pond and treated before being released as final effluent.

The mine site will have a 2.7 km main access road from the Eastmain 1 road to the industrial pad. Including the service roads, the site will total 16 km of roads.

A 315 kV electrical transport line (L3176), owned by Hydro-Québec, runs North-South over the eastern side of the Rose Property. It runs over the planned open pit. The portion running over the open pit representing 4.2 km will be rerouted to allow open pit operation.

Pre-project studies for the site connection and the 315 kV transmission power line relocation were done in 2018. In compliance with the Act to cap the rate of indexation of Hydro-Québec's domestic distribution rates and to increase the framework of the obligation to distribute electricity (Québec), a formal application for a 21MW block of energy was filed with Hydro-Québec dated May 17, 2023. At this stage, although Hydro-Québec confirms that our project is of interest, the decision is postponed in view of the leeway currently available in the electricity sector and according to the Project schedule.

img-6.jpeg
Figure 6 - Power line at Rose Site

Capital Costs

The capital and operating costs were estimated in Canadian dollars. An economic analysis was conducted with a discounted cash-flow before and after tax. The initial capital cost is estimated at US$471 M including all infrastructures described earlier with a 10% contingency. The sustaining capital is estimated at US$238 M over the life of mine.

CRITICAL ELEMENTS LITHIUM CORPORATION


The total payable products are estimated at 2,681,000 tonnes of chemical grade 5.56% Li₂O concentrate, 783,000 tonnes of technical grade 6.16% Li₂O concentrate, and 1,971 tonnes of 20% Ta₂O₅ concentrate.

Table 4 – Initial Capital and Sustaining Capital Costs

Item Initial Capital (C$M) Sustaining Capital (C$M) Initial Capital (US$M) Sustaining Capital (US$M)
Direct Capital Estimate 365.4 254.0 281.4 195.6
Mine Open Pit 7.6 207.5 5.8 159.8
Stockpiles 7.0 19.2 5.4 14.8
Infrastructure 108.9 14.2 83.8 10.9
Process Plant 166.8 10.4 128.4 8.0
Auxiliary Buildings & Equipment 75.2 2.7 57.9 2.1
Indirect Capital Estimate 189.1 0.5 145.6 0.4
Owner's Costs 77.7 - 59.9 -
Indirect Costs 111.4 0.5 85.8 0.4
Contingency 55.5 25.4 42.7 19.6
Mine Rehabilitation (Incl. Contingency) - 21.7 - 16.7
Mine Rehabilitation Bond & Costs 1.2 7.2 0.9 5.6
Total Capital Estimate 611.2 308.9 470.6 237.8

The waterfall chart of figure 7 illustrates the capital costs differences between 2022 and 2023 feasibility studies in

CRITICAL ELEMENTS LITHIUM CORPORATION


US$.

img-7.jpeg
Figure 7 - Waterfall Chart Capital Costs 2022 vs 2023

Operating Costs

The operating costs are estimated at US$81.30 per tonne of ore processed which include:

  • Mining: US$27.05 per tonne processed
  • Processing: US$20.79 per tonne processed
  • G&A: US$15.94 per tonne processed
  • Concentrate transportation: US$17.52 per tonne processed

The total operating costs are estimated at US$587/tonne of concentrate after Tantalite Credit, as summarized in Table 5.

Table 5 – Operating Costs per tonne of Concentrate

Item C$/t All Concentrate US$/t All Concentrate
Mining 266 205
Processing 205 158
General and Administrative 157 121
Transportation Concentrate 173 133

CRITICAL ELEMENTS LITHIUM CORPORATION


Energy unit costs are estimated to CA$0.055 per kWh for electricity and CA$1.35 per litre for diesel.

Figure 8 displays the waterfall chart of the operating cost details.

img-8.jpeg
Figure 8 - Waterfall Chart Operating Costs

Project Economics

The mine will process 1,610,000 tonnes ore per year grading an average of $0.87\%$ $\mathrm{Li}_2\mathrm{O}$ and 138 ppm $\mathrm{Ta}_2\mathrm{O}_5$ over a period of 17 years. Over the Life of Mine (LOM), the averages for the price assumptions are US$2,162 per tonne and US$4,699 per tonne of chemical grade and technical grade lithium concentrates respectively (FOB port) and US$150 per kg $\mathrm{Ta}_2\mathrm{O}_5$ contained in the tantalum concentrate (FOB mine site).

Figure 9 displays the prices per year for the lithium concentrate products.

CRITICAL ELEMENTS LITHIUM CORPORATION


CRITICAL ELEMENTS LITHIUM CORPORATION

img-9.jpeg
Figure 9 - Concentrate Selling Price Per Year

The pre-tax and after-tax NPV at various discount rates are presented in Table 6.

Table 6 - Pre-Tax and After-Tax NPV

Discount Rate Pre-Tax (C$M) After-Tax (C$M) Pre-Tax (US$M) After-Tax (US$M)
NPV @ 0% 8,835 5,147 6,803 3,963
NPV @ 5% 6,137 3,511 4,726 2,704
NPV @ 8% 5,048 2,851 3,887 2,195
NPV @ 10% 4,467 2,499 3,439 1,924
NPV @ 12% 3,975 2,201 3,061 1,695

The after-tax internal rate of return is 65.7%.

Sensitivity Analysis

The sensitivity of the NPV to exchange rate and chemical grade lithium concentrate price is presented in Table 7.

Table 7 After-Tax NPV Sensitivity to Exchange Rate and Chemical Grade Lithium Concentrate

Exchange Rate After-Tax NPV_{8%} Discount Rate (C$M)
Li_{2}O Price – Chemical Grade
-40% -20% Base Case 5% 10%
-10% 710M 1,415M 2,105M 2,278M 2,450M
Base Case 1,144M 1,978M 2,806M 3,012M 3,218M
10% 1,206M 2,052M 2,892M 3,101M 3,311M

CRITICAL ELEMENTS LITHIUM CORPORATION


Figures 10 to 12 present the sensitivity of the NPV at $8\%$ discount rate, the waterfall chart for NPV comparison between 2022 and 2023 studies, and IRR to prices, $\mathrm{Li}_2\mathrm{O}$ recovery, exchange rate, operating costs, and capital cost. The economics are most sensitive to $\mathrm{Li}_2\mathrm{O}$ price, exchange rate, and Li recovery.

img-10.jpeg
Figure 10 - Sensitivity on After-Tax NPV $8\%$

CRITICAL ELEMENTS LITHIUM CORPORATION


CRITICAL ELEMENTS LITHIUM CORPORATION

img-11.jpeg

Figure 11 - Sensitivity on After-Tax IRR

Figure 12 - Waterfall chart Post-Tax NPV 2022 versus 2023

Comparison 2022 to 2023 Post-Tax NPV @ 8%, in Millions of US$

img-12.jpeg


During the summer and fall of 2023, Critical Elements carried out a prospecting and mapping program on several areas of its project portfolio, including the Rose, Rose South, Rose North and selected Nemaska Belt projects. The objective of the field program was to identify new pegmatite bodies through systematic geochemical rock sampling of all pegmatite bodies, in order to refine the geological interpretation of the properties and prioritize further exploration work, including drilling. A total of 774 rock samples were collected during the prospecting and mapping campaign.

Selected sample results

Property Sample number UTM NAD 83 ZN18 Easting Northing Li_{2}O (%) T a_{2}O_{5} (ppm) Type
Rose E074801 411047 5764032 3.60 67 Grab
Rose E074802 411028 5763991 2.79 191 Grab
Rose E074803 410986 5763951 3.02 207 Grab
Rose E074804 411062 5763922 2.78 116 Grab
Rose E074805 411060 5763908 1.74 285 Grab
Rose E074806 411162 5763736 5.62 53 Grab
Rose E074807 411162 5763736 2.41 217 Grab
Rose E074808 411118 5763624 3.37 92 Grab
Rose E074809 411118 5763624 3.62 158 Grab
Rose E074811 411118 5763624 0.46 57 Grab
Rose H873531 421352 5768890 0.01 185 Grab
Rose H873532 421268 5768886 1.69 72 Boulder
Rose H873533 421093 5768907 1.66 86 Boulder
Rose H873536 420412 5768913 0.63 69 Grab
Rose H873538 420723 5768722 0.00 164 Grab
Rose H873539 421393 5768515 0.01 167 Boulder
Rose H873542 421543 5767658 0.99 107 Boulder
Rose H873675 421414 5768519 1.65 105 Boulder
Rose H873677 421332 5768427 0.01 298 Boulder
Rose H873679 421290 5768348 0.00 258 Grab
Rose H873681 420588 5768104 0.01 170 Grab
Rose H873684 421233 5767712 0.84 116 Boulder
Rose H873685 421314 5767757 1.88 76 Boulder
Rose H873686 421505 5768053 1.54 167 Boulder
Rose H873697 421495 5767336 0.93 136 Boulder
Rose H873698 421498 5767337 1.24 135 Boulder
Rose H874055 422629 5767034 0.01 195 Grab
Rose H874238 412188 5763913 0.01 365 Boulder
Rose H874242 416007 5759675 1.07 50 Boulder
Rose H874307 419413 5764506 1.69 57 Grab
Rose H874312 417940 5761003 0.01 108 Boulder
Rose H874317 411112 5763622 2.92 338 Grab
Rose H874404 420826 5765183 2.19 136 Boulder
Rose H874408 420600 5764228 0.01 471 Grab
Rose H874409 420604 5764235 0.01 183 Grab
Rose H874411 420576 5764152 0.01 123 Grab
Rose H874413 420511 5764032 0.08 410 Grab
Rose H874423 419508 5761920 3.18 204 Boulder
Rose H874425 411269 5763692 0.03 447 Grab
Rose H874427 411110 5763619 2.79 277 Grab
Rose H874428 411129 5763660 2.61 80 Grab

CRITICAL ELEMENTS LITHIUM CORPORATION


Rose H874429 411188 5763702 1.84 371 Grab
Rose H874431 411201 5763699 3.00 274 Grab
Rose H905009 411110 5763619 1.09 911 Grab
Rose H905011 411153 5763748 0.46 170 Grab
Rose H905013 411060 5763918 3.62 551 Grab
Rose H905204 411111 5763618 2.95 116 Grab
Rose H905205 411112 5763617 3.98 214 Grab
Rose H905206 411112 5763617 3.91 225 Grab
Rose H905207 411112 5763620 1.45 107 Grab
Rose H905208 411112 5763620 1.60 114 Grab
Rose H905209 411113 5763621 2.40 105 Grab
Rose H905211 411019 5763971 1.36 116 Grab
Rose H905212 411007 5763963 1.03 245 Grab
Rose H905213 411081 5763942 2.36 307 Grab
Rose H905214 411082 5763942 1.32 308 Grab
Rose H905215 411083 5763945 1.61 330 Grab
Rose H905216 411085 5763945 5.10 449 Grab
Rose H905241 411073 5763933 3.37 49 Grab
Rose H905242 411076 5763934 4.17 374 Grab
Rose H905243 411067 5763926 1.39 20 Grab
Rose H905244 411054 5763920 4.52 413 Grab
Rose H905245 411155 5763753 1.88 178 Grab
Rose H905246 411161 5763741 0.76 130 Grab
Rose H905247 411156 5763751 1.08 150 Grab
Rose H905248 411159 5763744 3.88 287 Grab
Rose H905249 411159 5763748 1.10 203 Grab
Rose H905256 410993 5763895 1.56 207 Boulder
Rose H905257 410985 5763961 3.39 314 Grab
Rose H905258 410987 5763959 0.71 151 Grab
Rose H905259 410992 5763958 0.02 226 Grab
Rose H905261 410991 5763960 1.15 3 Grab
Rose H905262 411047 5764028 0.21 85 Grab
Rose H905263 411047 5764026 0.02 177 Grab
Rose H905264 411188 5763703 2.17 142 Grab
Rose H905265 419289 5764026 1.13 137 Boulder
Rose H905266 419421 5764507 0.02 106 Grab
Rose H905267 419415 5764510 0.67 267 Grab
Rose H905268 410562 5763243 1.85 98 Boulder
Rose H905269 410562 5763243 5.19 98 Boulder
Rose H905271 410563 5763243 3.57 189 Boulder
Rose H905272 419431 5764492 0.95 68 Grab
Rose H905351 419576 5763409 1.85 423 Grab
Rose H905352 419596 5763391 0.93 155 Grab
Rose H905353 419596 5763388 1.60 254 Grab
Rose H905354 419594 5763453 1.15 158 Grab

Note: Grab samples are selective by nature and may not to represent average grades of the pegmatite.

During the 2024 winter drill campaign, Critical Elements successfully completed 3,670 meters of drilling in 31 holes on the spodumene-bearing pegmatite showings discovered during the 2023 summer prospection campaign, herein referred to as Rose West. Drilling results demonstrated the continuity of a mineralized pegmatite body thus far over $450\mathrm{m}$ strike, $370\mathrm{m}$ down dip and to a vertical depth of $140\mathrm{m}$ .

CRITICAL ELEMENTS LITHIUM CORPORATION


In the west, the body is comprised of multiple near surface mineralized pegmatites that range up to an apparent thickness of 12.4m individually. These bodies appear to coalesce into a more substantial spodumene-bearing pegmatite in the east with an apparent width of up to 40.4m. The near surface pegmatites appear to strike northwesterly with a gentle dip of 15°, while the thicker pegmatite appears to strike easterly with a near-horizontal dip of 13°. The body is still open in all directions, while the greatest exploration potential appears to be to the east.

Results from Rose West Discovery 2024 drill program

Drillhole UTM NAD 83 ZN18 Length Azimuth Dip From To Interval* Li_{2}O Ta_{2}O_{5} Lithology
Easting Northing (m) (°) (°) (m) (m) (m) (%) ppm (g/l)
RD-24-01 411119 5763973 153.00 235 -50 6.80 13.70 6.90 1.61 135 Pegmatite
including 7.70 12.00 4.30 2.17 77 Pegmatite
24.00 25.10 1.10 0.02 571 Aplite
95.10 102.80 7.70 0.03 374 Pegmatite
RD-24-02 411104 5763903 156.00 325 -50 10.60 19.25 8.65 1.00 285 Pegmatite
including 10.60 15.00 4.40 1.34 376 Pegmatite
100.80 102.20 1.40 0.04 394 Aplite
103.70 104.20 0.50 0.04 339 Aplite
126.30 128.50 2.20 0.04 145 Pegmatite
130.25 133.25 3.00 0.03 153 Pegmatite
145.20 147.10 1.90 0.03 239 Pegmatite
RD-24-03 411105 5763898 114.00 145 -50 21.90 24.40 2.50 0.99 142 Pegmatite
26.35 27.60 1.25 1.07 153 Pegmatite
34.80 37.50 2.70 1.26 72 Pegmatite
41.60 43.35 1.75 0.05 343 Pegmatite
103.5 106.5 3.00 0.03 65 Pegmatite
RD-24-04 411145 5763933 111.00 325 -70 16.40 20.20 3.80 1.11 163 Pegmatite
including 18.00 19.20 1.20 2.12 55 Pegmatite
67.60 72.60 5.00 0.94 256 Pegmatite
including 67.60 69.00 1.40 1.92 177 Pegmatite
103.80 108.00 4.20 2.24 170 Pegmatite
RD-24-05 411188 5763963 51.00 315 -70 24.30 27.25 2.95 0.83 506 Pegmatite
including 24.30 25.65 1.35 1.41 397 Pegmatite
including 26.55 27.25 0.70 0.21 1066 Pegmatite
RD-24-06 411244 5763876 69.00 315 -70 26.60 28.70 2.10 0.14 458 Pegmatite
46.60 49.80 3.20 1.08 273 Pegmatite
including 48.00 48.80 0.80 2.41 278 Pegmatite
56.60 63.30 6.70 2.16 81 Pegmatite
RD-24-07 411163 5763819 66.00 315 -70 3.60 4.30 0.70 0.04 2009 Aplite
17.80 30.00 12.20 1.66 180 Pegmatite
including 22.50 30.00 7.50 2.34 153 Pegmatite
50.90 52.40 1.50 0.02 423 Pegmatite
54.30 56.20 1.90 0.10 426 Pegmatite
RD-24-08 411122 5763795 57.00 315 -70 16.90 25.90 9.00 1.55 105 Pegmatite
including 19.50 24.00 4.50 2.41 90 Pegmatite

CRITICAL ELEMENTS LITHIUM CORPORATION


CRITICAL ELEMENTS LITHIUM CORPORATION

Drillhole UTM NAD 83 ZN18 Length (m) Azimuth (°) Dip (°) From (m) To (m) Interval^{b} (m) Li_{2}O (%) Ta_{2}O_{5} ppm (g/t) Lithology
Easting Northing 37.95 40.00 2.05 0.03 296 Pegmatite
RD-24-09 411080 5763759 60.00 315 -70 4.00 8.00 4.00 0.78 285 Pegmatite
Including 5.50 7.00 1.50 1.57 218 Pegmatite
23.60 31.70 8.10 1.70 357 Pegmatite
Including 23.60 29.50 5.90 2.03 403 Pegmatite
RD-24-10 411106 5763725 63.00 315 -70 3.55 10.50 6.95 2.21 111 Pegmatite
including 5.00 9.00 4.00 2.76 104 Pegmatite
RD-24-11 411139 5763690 66.00 315 -70 3.60 7.30 3.70 2.18 109 Pegmatite
RD-24-12 411176 5763719 102.00 315 -70 14.45 20.00 5.55 1.75 212 Pegmatite
including 17.45 18.95 1.50 2.67 133 Pegmatite
RD-24-13 411302 5763798 97.00 290 -70 8.00 9.50 1.50 0.01 311 Pegmatite
19.60 20.50 0.90 0.01 530 Pegmatite
55.10 55.80 0.70 0.46 201 Aplite
56.40 68.80 12.40 1.33 187 Pegmatite
Including 63.90 65.40 1.50 2.53 506 Pegmatite
RD-24-14 411357 5763709 117.00 290 -70 4.75 5.50 0.75 0.05 365 Aplite
22.90 23.70 0.80 0.07 143 Aplite
36.00 40.40 4.40 0.08 87 Aplite
43.80 45.80 2.00 0.93 265 Pegmatite
55.30 57.00 1.70 1.02 294 Pegmatite
RD-24-15 411438 5763775 114.00 300 -70 54.50 57.40 2.90 0.59 60 Pegmatite
96.40 99.20 2.80 2.08 221 Pegmatite
RD-24-16** 411384 5763852 113.5 300 -70 52.60 55.50 2.90 0.01 159 Pegmatite
111.65 113.5 1.85 1.14 110 Pegmatite
RD-24-16A 411385 5763851 144.00 300 -70 53.70 56.70 3.00 0.01 162 Pegmatite
109.60 112.25 2.65 1.36 77 Pegmatite
118.25 143.20 24.95 1.43 178 Pegmatite
including 119.75 133.25 13.50 1.91 145 Pegmatite
including 139.25 141.60 2.35 2.22 167 Pegmatite
RD-24-17 411320 5763930 159.00 300 -70 35.95 36.70 0.75 0.02 502 Aplite
76.70 79.70 3.00 1.16 156 Pegmatite
96.00 105.00 9.00 1.16 172 Pegmatite
Including 97.50 105.00 7.50 1.29 182 Pegmatite
127.00 147.50 20.50 1.22 250 Pegmatite
Including 127.00 142.00 15.00 1.60 181 Pegmatite
Including 142.00 147.50 5.50 0.18 437 Pegmatite
RD-24-18 411269 5764015 207.00 300 -70 67.40 81.20 13.80 1.59 127 Pegmatite
107.20 107.80 0.60 0.33 146 Pegmatite
110.00 111.40 1.40 0.16 584 Pegmatite
118.90 124.60 5.70 1.59 145 Pegmatite
including 120.40 121.90 1.50 2.92 52 Pegmatite
RD-24-19 411347 5764073 186.00 245 -70 71.40 76.60 5.20 1.91 242 Pegmatite

25


Drillhole UTM NAD 83 ZN18 Length Azimuth Dip From To Interval* Li2O Ta2O5ppm(g/t) Lithology
Easting Northing (m) (°) (°) (m) (m) (m) (%)
80.70 81.90 1.20 0.14 244 Aplite
91.00 101.10 10.10 1.75 201 Pegmatite
112.8 120.00 7.20 0.91 333 Pegmatite
including 114.00 118.50 4.50 1.32 114 Pegmatite
including 118.50 120.00 1.50 0.05 880 Pegmatite
129.80 135.40 5.60 0.03 266 Aplite
136.85 137.60 0.75 0.03 419 Aplite
RD-24-20 411408 5763990 177.00 245 -70 82.10 122.50 40.40 1.31 235 Pegmatite
including 82.10 104.60 22.50 1.64 219 Pegmatite
including 112.10 118.10 6.00 2.12 73 Pegmatite
141.30 144.30 3.00 0.02 339 Pegmatite
RD-24-21 411469 5763910 177.00 245 -70 120.40 144.70 24.30 1.16 145 Pegmatite
including 120.40 130.90 10.50 1.41 159 Pegmatite
including 127.90 130.90 3.00 2.27 137 Pegmatite
including 133.90 142.90 9.00 1.35 107 Pegmatite
including 133.90 136.90 3.00 2.28 183 Pegmatite
RD-24-22 411524 5763824 177.00 245 -70 128.20 159.80 31.60 1.30 142 Pegmatite
including 129.70 155.20 25.50 1.59 130 Pegmatite
RD-24-23 411605 5763887 18.00 245 -70 **
RD-24-23A 411606 5763887 153.00 245 -70 122.60 142.90 20.30 2.22 95 Pegmatite
including 125.60 136.10 10.50 2.78 92 Pegmatite
RD-24-24 411547 5763965 147.00 235 -70 104.50 136.00 31.50 1.29 121 Pegmatite
including 112.00 115.00 3.00 1.88 111 Pegmatite
including 122.50 136.00 13.50 1.69 127 Pegmatite
RD-24-25** 411490 5764049 84.60 245 -70 73.70 84.60 10.90 1.75 305 Pegmatite
RD-24-25A 411489 5764049 168.00 245 -70 72.30 107.60 35.30 1.39 157 Pegmatite
including 79.00 88.00 9.00 2.33 152 Pegmatite
including 91.00 98.50 7.50 1.84 151 Pegmatite
155.20 157.60 2.40 0.01 275 Pegmatite
RD-24-26 411431 5764131 117.00 245 -70 82.00 103.80 21.80 0.62 164 Pegmatite
including 85.00 89.50 4.50 1.28 126 Pegmatite
RD-24-27 411519 5764187 111.00 245 -70 84.20 102.85 18.65 1.27 192 Pegmatite
104.90 106.10 1.20 1.89 186 Pegmatite
RD-24-28 411569 5764115 135.00 235 -70 56.50 57.30 0.80 0.01 125 Pegmatite
65.00 65.50 0.50 0.01 122 Pegmatite
68.70 69.30 0.60 0.01 148 Pegmatite
71.70 72.50 0.80 1.91 59 Pegmatite
83.10 114.50 31.40 0.56 163 Pegmatite
including 99.00 105.00 6.00 1.81 188 Pegmatite
including 109.50 114.00 4.50 1.17 188 Pegmatite
121.70 126.20 4.50 0.80 189 Pegmatite
130.40 131.10 0.70 0.02 103 Aplite
  • Core length; the true thickness is between 80 to 95% of the core length.

CRITICAL ELEMENTS LITHIUM CORPORATION


** Hole abandoned before reaching target length.

Work done during the period

Evaluation and exploration expenses of $1,901,146 were incurred during the nine-month period ended May 31, 2025. These expenses are mainly related to environmental programs, permit applications, community consultations, detailed engineering, geology and drilling work as well as metallurgical tests carried out on the Rose Lithium-Tantalum property.

ROSE NORTH – LITHIUM AND TANTALUM PROJECT

Property Description

The Rose North property is located in northern Québec’s administrative region, on the territory of Eeyou Istchee James Bay. It is located on Category III land, on the Traditional Lands of the Eastmain Community, approximately 50 km north of the Cree village of Nemaska. The latter is located approximately 300 km north-west of Chibougamau.

The Rose North property is accessible by road via the Route du Nord and Eastmain-1 Road, usable all year round from Chibougamau. The site can also be reached by Matagami, via Route 109, Route du Nord and Eastmain-1 Road. The project is located 70 km south of Goldcorp’s Éléonore gold mine and 55 km north-west of Nemaska’s Whabouchi lithium project and 10 km south of Hydro-Québec’s Eastmain 1 hydroelectricity generating plant. The Nemiscau airport services the regions air travel needs. The Rose North property site is located 60 km by road from the Nemiscau airport.

The Rose North property consists of 31 EER covering a total area of 16.14 km². It lies in the northeastern part of Superior Province, within the Eastmain greenstone belt. It is wholly owned by the Corporation.

During the summer and fall of 2023, Critical Elements carried out a prospecting and mapping program on several areas of its project portfolio, including the Rose, Rose South, Rose North and selected Nemaska Belt projects. The objective of the field program was to identify new pegmatite bodies through systematic geochemical rock sampling of all pegmatite bodies, in order to refine the geological interpretation of the properties and prioritize further exploration work, including drilling. A total of 774 rock samples were collected during the prospecting and mapping campaign.

Work done during the period

No exploration and evaluation expenses were recorded during the nine-month period ended May 31, 2025.

Management will evaluate the potential of the property and may subsequently search to find a partner to continue exploration activities or to find a potential buyer.

ROSE SOUTH – LITHIUM AND TANTALUM PROJECT

Property Description

The Rose South property is located in northern Québec’s administrative region, on the territory of Eeyou Istchee James Bay. It is located on Category II and III land, on the Traditional Lands of the Eastmain and Nemaska Community, approximately 40 km north of the Cree village of Nemaska. The latter is located approximately 300 km north-west of Chibougamau.

The Rose South property is accessible by road via the Route du Nord and Eastmain-1 Road, usable all year round from Chibougamau. The site can also be reached by Matagami, via Route 109, Route du Nord and Eastmain-1 Road. The project is located 80 km south of Goldcorp’s Éléonore gold mine and 50 km north-west of Nemaska’s Whabouchi lithium project and 40 km south of Hydro-Québec’s Eastmain 1 hydroelectricity generating plant. The Nemiscau airport services the regions air travel needs. The Rose South property site is located 50 km by road from the Nemiscau airport.

CRITICAL ELEMENTS LITHIUM CORPORATION


The Rose South property consists of 280 EER covering a total area of 148.81 km². It lies in the northeastern part of Superior Province, within the Eastmain greenstone belt. It is wholly owned by the Corporation.

During the summer and fall of 2023, Critical Elements carried out a prospecting and mapping program on several areas of its project portfolio, including the Rose, Rose South, Rose North and selected Nemaska Belt projects. The objective of the field program was to identify new pegmatite bodies through systematic geochemical rock sampling of all pegmatite bodies, in order to refine the geological interpretation of the properties and prioritize further exploration work, including drilling. A total of 774 rock samples were collected during the prospecting and mapping campaign.

Work done during the period

Evaluation and exploration expenses of $95,537 were incurred during the nine-month period ended May 31, 2025.

In addition, during the month of May 2025, the Corporation began a surface exploration program on some of its projects, including Arques, Rose South, Lemare, Duval and Bloc 1 projects.

Management will evaluate the potential of the property and may subsequently search to find a partner to continue exploration activities or to find a potential buyer.

ARQUES – LITHIUM, RARE EARTH, NIOBIUM AND TANTALUM PROJECT

Property Description

The Arques property is composed of one block totalling 136 EER covering an area of 6,840.82 hectares and a distance of some 18 kilometres in a SW-NE direction. It is contiguous to the Lemare property on its southeast border. The property is traversed in a NE direction by a Hydro-Québec power line and a permanent gravel road that heads north to the Eastmain River and beyond to the La Grande River area. Secondary roads branching off from these also provide access to the property.

The Lac des Montagnes volcano-sedimentary formation runs just inside the southeast border of the Arques property. The primary observed geology is mainly composed of orthogneisses made up of metamorphosed felsic intrusives. In the winter of 2011, a major alkaline intrusion, the Arques Complex, was identified by diamond drilling.

The Arques Alkaline Complex shows similar characteristics to other deposits known for Rare Earth Elements (REE), Niobium (Nb) and Tantalum (Ta) mineralization.

The Arques project offers lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Arques property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.

During the summer and fall of 2023, Critical Elements carried out a prospecting and mapping program on several areas of its project portfolio, including the Rose, Rose South, Rose North and selected Nemaska Belt projects, including the Arques project. The objective of the field program was to identify new pegmatite bodies through systematic geochemical rock sampling of all pegmatite bodies, in order to refine the geological interpretation of the properties and prioritize further exploration work, including drilling. A total of 774 rock samples were collected during the prospecting and mapping campaign.

In addition, during the spring and summer of 2024, the Corporation carried out geological compilation work on some of its projects, including the Caumont, Duval, Valiquette, Arques and Lemare projects, to assess the potential for copper, nickel and platinum group elements (PGE) in preparation for future exploration.

CRITICAL ELEMENTS LITHIUM CORPORATION


CRITICAL ELEMENTS LITHIUM CORPORATION

Work done during the period

Evaluation and exploration expenses of $128,518 were incurred during the nine-month period ended May 31, 2025.

During the period, the Corporation carried out a helicopter-borne electromagnetic VTEM plus time-domain system survey covering the Nemaska Belt group of properties including Arques property. The 2,701-line kilometre VTEM survey executed by Geotech Airborne Geophysical Survey covers the entirety of Critical Elements' 100%-owned Nemaska Belt properties with flight lines at a 200-metre spacing. The objective of the survey was to identify conductors that could correlate with Nickel-Copper-PGE mineralization and define high-priority drill targets.

In addition, during the month of May 2025, the Corporation began a surface exploration program on some of its projects, including Arques, Rose South, Lemare, Duval and Bloc 1 projects.

Management continues to pursue its research to find a partner to continue exploration activities or to find a potential buyer.

BOURIER – LITHIUM COPPER, ZINC, GOLD AND SILVER PROJECT

Property Description

The Bourier property is composed of one block totaling 304 EER, covering an area of 15,616 hectares for some 30 kilometres in length. It is located just along the east side of the new Rupert hydroelectric complex.

The Lac des Montagnes volcano-sedimentary formation crosses the Bourier property in a NE direction. It is composed of paragneiss, amphibolites and granitic intrusions. To the north of the Lac des Montagnes Formation, mainly orthogneiss formed of metamorphosed granite has been observed, while the south area of this formation is composed mainly of paragneiss, also intruded by granites.

In the Bourier Lake area, what has been identified as an exhalative massive sulphide horizon in felsic rocks was discovered during fieldwork conducted north of Bourier Lake in the summers of 2010 and 2011. Soil samples taken over an 8-km strike length of this horizon returned anomalous values for Ni, Cu, Zn and Pb. Some channel samples and other grab samples returned anomalous values for Au, As, Ni and Cu. This exhalative horizon in felsic rocks is now known to extend more than 25 km over the property.

The Bourier project offers lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Bourier property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.

An exhaustive collection of compiled data, including assessment files, government data and academic studies. This dataset provided outcrop/sample description, bedrock geology, geochemical analyses, and geophysical surveys. Original data was cleaned and combined to create a comprehensive data set for geological interpretation and machine learning processes.

The compilation of discrete outcrop observations allowed a reliable update to existing geologic maps, resulting in a refined, lithium exploration-oriented pegmatite map. A total of 99 pegmatite bodies were added to the current geological map, highlighting previously unknown potential for economic lithium mineralization.

An up-to-date structural interpretation was created based on a high-resolution aeromagnetic survey commissioned by Critical Elements. This survey revealed structurally complex patterns, including large-scale folds and major ENE-trending ductile fault zones. A total of 15 lithium exploration targets were identified, reducing the area of investigation to approximately 9.5% of the total Bourier EER holding. Surface reconnaissance work led to the discovery of five new sectors of pegmatite. These discoveries were made within, or in the extension of, high- to moderate-confidence targets generated by GoldSpot.


CRITICAL ELEMENTS LITHIUM CORPORATION

AGREEMENT WITH LOMIKO

On April 24, 2021, the Corporation entered into an option agreement with Lomiko granting Lomiko the right to earn up to a 70% interest in the Bourier property. This option agreement was amended in December 2021 and December 2023.

On December 31, 2023, Lomiko sent a notice to the Corporation confirming the exercise of the first option, giving it an initial 49% interest in the Bourier property by issuing to Critical Elements an aggregate of 5,000,000 common shares of Lomiko, by making cash payments to Critical Elements totalling $50,000 and by incurring or funding Exploration Expenditures for a total amount of $1,300,000 on the Property.

On April 1, 2024, Lomiko informed the Corporation that it would not exercise its second option to acquire up to 70% of the Bourier property. As a result, and in accordance with the option agreement, the parties have formed a joint venture in which Critical Elements holds a 51% interest.

On July 2, 2025, the Corporation entered into an Asset Purchase Agreement with Lomiko for the repurchase of the 49% interest in the Bourier property that had been acquired by Lomiko following the signing of an Option Agreement in April 2021. The Corporation paid Lomiko $30,000 in cash to acquire their 49% interest in 203 EER, thereby regaining a 100% ownership in the Bourier property.

Work done during the period

Evaluation and exploration expenses of $68 were incurred during the nine-month period ended May 31, 2025.

CAUMONT – LITHIUM, COPPER, NICKEL, PGE AND GOLD PROJECT

Property Description

The Caumont property is made of four non-adjacent EER blocks totalling 94 EER spread over 50.37 kilometres in the eastern part of the Lac des Montagnes volcano-sedimentary formation. These blocks are identified as Nemiscau Lake, Kename, Caumont West and Caumont East. A Hydro-Québec power line crosses the southern part of the Nemiscau Lake block in a NW/SE direction. This block can easily be accessed by road up to Lac Nemiscau, located close to the west boundary of the block, and then by boat. The Kename block is located East of Lac Kanamakuskacik and South West of Lac de la Sicotière. It can also be accessed by road. The Caumont West block can be accessed by plane, landing on Lac Caumont, or directly by helicopter. The Caumont East block can be accessed by helicopter.

The property is located in the eastern part of the Lac des Montagnes volcano-sedimentary formation. The formation is locally composed of amphibolite quartz-rich paragneiss, biotite and sillimanite-bearing schist, pegmatite, basalt and ultramafic intrusives.

The property is currently recognized for its magmatic nickel (Ni), copper (Cu) and platinum group elements (PGE) potential. Geophysical surveys show the signature and extent of ultramafic intrusions and iron formations, with some of them confirmed by historic geological reports. In addition, some areas of the property show potential for gold mineralization associated with shear zone.

The Caumont project offers lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Caumont property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.

Work done during the period

Evaluation and exploration expenses of $62,867 were incurred during the nine-month period ended May 31, 2025.

During the period, the Corporation carried out a helicopter-borne electromagnetic VTEM plus time-domain system survey covering the Nemaska Belt group of properties including Caumont property. The


2,701-line kilometre VTEM survey executed by Geotech Airborne Geophysical Survey covers the entirety of Critical Elements' 100%-owned Nemaska Belt properties with flight lines at a 200-metre spacing. The objective of the survey was to identify conductors that could correlate with Nickel-Copper-PGE mineralization and define high-priority drill targets.

Management continues to pursue its research to find a partner to continue exploration activities or to find a potential buyer.

DUMOULON – LITHIUM, ZINC, LEAD AND GOLD PROJECT

Property Description

The Dumoulon property consists of 36 contiguous cells covering a total area of 1,929 hectares. The project is located 20 km south of the Nemiscau airport and can be accessed by helicopter.

The property is located in the central part of the Lac des Montagnes volcano-sedimentary formation. The geology covered by the property is mainly composed of paragneiss with local granitic intrusions. South of Indian Lake, discontinuous lenses of metabasalts and amphibolites were mapped. EM anomalies are associated with plurikilometric magnetic bands oriented NW70°.

The property is currently known for its SEDEX-type deposits and disseminated and replacement gold deposits potential. All conductive anomalies appear to be caused by a graphitic shear zone mineralized in pyrite and pyrrhotite. The Dumoulon showing is associated with a carbonate dyke, 60 cm wide, embedded in an outcrop of metasediments.

The Dumoulon project offers lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Dumoulon property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.

Work done during the period

Evaluation and exploration expenses of $62,800 were incurred during the nine-month period ended May 31, 2025.

During the period, the Corporation carried out a helicopter-borne electromagnetic VTEM plus time-domain system survey covering the Nemaska Belt group of properties including Dumoulon property. The 2,701-line kilometre VTEM survey executed by Geotech Airborne Geophysical Survey covers the entirety of Critical Elements' 100%-owned Nemaska Belt properties with flight lines at a 200-metre spacing. The objective of the survey was to identify conductors that could correlate with Nickel-Copper-PGE mineralization and define high-priority drill targets.

Management continues to pursue its research to find a partner to continue exploration activities or to find a potential buyer.

DUVAL – LITHIUM, GOLD, COPPER, NICKEL AND PGE PROJECT

Property Description

The Duval property is composed of one block totaling 98 EER covering a total area of 5,236.91 hectares and covers a distance of about 12 kilometres along a NW-SE axis. The Duval main block is contiguous to the Valiquette main block to the southwest. It lies about two kilometres south of the Route du Nord and is served by a Hydro-Québec power line and a gravel road, which cross the southern half of the block in a southeasterly direction.

The Duval main block can be accessed by the road leading to Lac des Montagnes and then by boat. An old winter road along the SE shore of Lac des Montagnes has been refurbished and can be used for winter drilling on the main block.

CRITICAL ELEMENTS LITHIUM CORPORATION


The property is located in the middle part of the Lac des Montagnes volcano-sedimentary formation. In the vicinity of the Duval block, the formation is about $8\mathrm{km}$ wide and is oriented NE. It is locally composed of amphibolite quartz-rich paragneiss, biotite and sillimanite-bearing schist, pegmatite, basalt and ultramafic intrusives. Geophysical surveys show the signature and extent of ultramafic intrusions and iron formations, with some of them confirmed by historical drilling.

As the Duval property is located in the same geological environment as the Valiquette property, it is currently recognized for its magmatic nickel, copper and platinum group elements potential. A gold showing, associated with a shearzone, is also present on the property.

The Duval project offers lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Duval property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.

The prospecting revealed a new two-kilometre-long trend of white pegmatite on the Corporation's $100\%$ owned Duval property that hosts several lithium, cesium and tantalum anomalies, including $0.62\%$ $\mathrm{Li}_2\mathrm{O}$ , $0.17\%$ $\mathrm{Li}_2\mathrm{O}$ , 464 ppm $\mathrm{Ta}_2\mathrm{O}_5$ , 321 ppm Cs in grab samples, and $2.08\%$ $\mathrm{Li}_2\mathrm{O}$ in an angular pegmatite boulder that may have been transported one kilometre from the main discoveries during glaciation. These mineralized pegmatites are spatially associated with mafic volcanics along an interpreted regional-scale shear zone that borders the Nemiscau Belt, in a similar geological setting that extends to the Whabouchi lithium deposit, three kilometres off the EER to the north-east. These results show the potential of the Corporation's Nemaska trend properties. The reader is cautioned that grab samples are selective by nature and may not represent average grades of the mineralization in the pegmatites.

During the summer and fall of 2023, Critical Elements carried out a prospecting and mapping program on several areas of its project portfolio, including the Rose, Rose South, Rose North and selected Nemaska Belt projects, including the Duval project. Prospecting confirmed the new two-kilometre-long white pegmatite corridor on the Corporation's $100\%$ -owned Duval property, which contains several lithium anomalies, including $2.22\%$ $\mathrm{Li}_2\mathrm{O}$ , $1.54\%$ $\mathrm{Li}_2\mathrm{O}$ and $0.54\%$ $\mathrm{Li}_2\mathrm{O}$ in an angular pegmatite boulder field that may have been transported one kilometer from the main discoveries in place during glaciation. These mineralized pegmatites are spatially associated with mafic volcanics along a regionally interpreted shear zone that borders the Nemiscau belt, in a similar geological context that extends to the Whabouchi lithium deposit, three kilometers from the claims to the northeast. These results tend to demonstrate the potential of the Corporation's Nemaska Belt properties. (Spot samples are selective by nature and are unlikely to represent average pegmatite grades).

The objective of the field program was to identify new pegmatite bodies through systematic geochemical rock sampling of all pegmatite bodies, in order to refine the geological interpretation of the properties and prioritize further exploration work, including drilling. A total of 774 rock samples were collected during the prospecting and mapping campaign.

In addition, during the spring and summer of 2024, the Corporation carried out geological compilation work on some of its projects, including the Caumont, Duval, Valiquette, Arques and Lemare projects, to assess the potential for copper, nickel and platinum group elements (PGE) in preparation for future exploration.

Duval - Selected Sample results

Property Sample number UTM NAD 83 ZN18 Easting Northing ( {\mathrm{{Li}}}_{2}\mathrm{O} ) (%) ( {\mathrm{T}}{{\mathrm{a}}{2}{\mathrm{O}}_{5}} ) (ppm) Cs (ppm)
Duval E073464 434666 5719893 0.01 183 15
Duval B565166 438458 5723314 0.11 1 40
Duval B565167 438612 5723304 0.00 464 34
Duval B565177 438627 5723180 0.09 66 51
Duval E073303 438624 5723083 0.02 59 48
Duval E073304 438524 5723096 0.03 65 42
Duval E073306 438518 5723090 0.02 60 44
Duval E073307 438494 5723032 0.01 73 33

CRITICAL ELEMENTS LITHIUM CORPORATION


Duval E073321 437590 5722597 2.08 100 15
Duval E073324 437360 5722449 0.01 183 4
Duval E074514 438824 5723594 0.62 73 82
Duval E074515 438574 5723431 0.17 147 321

Note: Grab samples are selective by nature and may not to represent average grades of the pegmatite. All samples are grabs except E073321 which is an angular boulder.

Work done during the period

Evaluation and exploration expenses of $67,346 were incurred during the nine-month period ended May 31, 2025.

During the period, the Corporation carried out a helicopter-borne electromagnetic VTEM plus time-domain system survey covering the Nemaska Belt group of properties including Duval property. The 2,701-line kilometre VTEM survey executed by Geotech Airborne Geophysical Survey covers the entirety of Critical Elements' 100%-owned Nemaska Belt properties with flight lines at a 200-metre spacing. The objective of the survey was to identify conductors that could correlate with Nickel-Copper-PGE mineralization and define high-priority drill targets.

In addition, during the month of May 2025, the Corporation began a surface exploration program on some of its projects, including Arques, Rose South, Lemare, Duval and Bloc 1 projects.

Management continues to pursue its research to find a partner to continue exploration activities or to find a potential buyer.

LEMARE – GOLD, COPPER, NICKEL, PGE AND LITHIUM PROJECT

Property Description

The Lemare property is composed of one block totaling 233 EER covering an area of 11,206.17 hectares for a length of over 20 kilometres in a SW-NE direction. It is contiguous to the Nisk property on its northwest border. Secondary roads running from a Hydro-Québec power line and permanent gravel roads that run along its northwest boundary provide access all through the property.

The Lac des Montagnes volcano-sedimentary formation crosses the Lemare property in a NE direction. It is composed of paragneiss (gneiss formed of metamorphosed sediment), amphibolites and granitic intrusives. The north part of the Lac des Montagnes formation is mainly composed by orthogneisses intruded by granites, while the south is composed principally of paragneisses, also intruded by felsic to intermediate intrusives.

Several areas of the property show potential for gold mineralization. There is substantial evidence of hydrothermal activity, such as the many silicified and oxidized corridors of mineralization associated with pyrite and pyrrhotite, the presence of quartz-tourmaline veins and the arsenopyrite and tourmaline mineralization hosted in shear zones.

The potential-copper-PGE mineralization is confirmed by the presence of the Nisk deposit nearby. Several magnetic anomalies are present on the property; these have not been drill tested.

The Lemare showing, a spodumene-bearing pegmatite, has been the focus of several drilling campaigns in recent years. During winter 2023, the Corporation completed a 5,554-meter drill program, encompassing thirty-one drillholes to test the known lithium bearing zone on the East-West extension, as well at depth.

The best results are shown in the table below:

CRITICAL ELEMENTS LITHIUM CORPORATION


CRITICAL ELEMENTS LITHIUM CORPORATION

Hole # UTM NAD 83 ZN18 Length (m) Azimuth (°) Dip (°) Number of samples From (m) To (m) Interval* (m) LI_{2}O (%) T a_{2}O_{5} (ppm)
Easting Northing
LE-23-32 471182 5734263 150.00 155 -70 32 25.10 58.95 33.85 1.04 67.91
including 30.30 58.15 27.85 1.23 70.99
including 30.30 49.10 18.80 1.42 74.24
LE-23-33 471143 5734249 150.00 160 -70 56 41.40 54.30 12.90 0.88 113.92
including 50.60 53.80 3.20 1.65 186.93
56.10 60.15 4.05 0.18 135.91
75.70 77.20 1.50 0.56 71.43
89.95 90.45 0.50 0.43 48.60
91.95 93.20 1.25 0.21 192.32
102.05 102.55 0.50 0.14 100.86
106.00 106.70 0.70 0.14 129.44
139.10 139.60 0.50 0.11 131.88
LE-23-34 471103 5734237 150 155 -60 64 46.00 60.15 14.15 1.12 78.80
including 48.25 52.25 4.00 1.99 63.53
68.00 69.50 1.50 0.39 727.78
69.80 70.35 0.55 1.97 4249.43
77.50 79.00 1.50 0.85 159.96
83.00 83.40 0.40 0.71 74.61
116.20 118.30 2.10 0.23 74.58
LE-23-35 471063 5734209 150 155 -70 54 70.10 71.85 1.75 1.09 38.70
91.00 92.20 1.20 0.46 192.32
93.65 98.90 5.25 1.63 104.30
LE-23-36 470993 5734175 253 155 -50 122 63.40 67.95 4.55 0.44 138.38
85.50 86.05 0.55 0.27 111.85
103.85 104.70 0.85 0.12 120.89
214.15 219.80 5.65 0.16 66.00
LE-23-37 470972 5734101 222 155 -50 88 2.10 2.65 0.55 0.10 337.02
35.30 35.85 0.55 0.12 307.72
53.10 56.40 3.30 0.83 141.66
144.9 149.50 4.60 0.11 83.60
LE-23-38 470923 5734095 286 155 -60 139 89.00 90.40 1.40 0.18 250.33
102.75 103.05 0.30 0.14 145.31
LE-23-39 470937 5733931 186 155 -50 68 No significant value
LE-23-40 470942 5733934 147 335 -50 33 81.45 81.90 0.45 0.11 119.42
LE-23-41 471062 5734018 150 155 -50 60 No significant value
LE-23-42 471490 5734606 300 155 -50 64 No significant value
LE-23-43 471412 5734532 276 155 -50 110 173.95 175.20 1.25 0.13 42.13
LE-23-44A 471344 5734464 18 155 -50 0 Abandoned hole
LE-23-44 471344 5734464 282 155 -50 72 113.50 136.25 22.75 0.44 87.41
including 130.50 135.45 4.95 1.51 54.15
LE-23-45 471344 5734464 234 155 -65 57 No significant value
LE-23-46 471339 5734460 207 200 -50 51 No significant value
LE-23-47 471263 5734428 201 155 -50 16 No significant value
LE-23-48 471177 5734368 225 155 -50 47 144.80 147.00 2.20 0.23 133.66
161.00 165.50 4.50 0.47 68.02
172.10 179.20 7.10 0.89 48.89
186.90 188.00 1.10 0.11 172.79
LE-23-49 471129 5734342 203.2 155 -50 51 181.75 190.60 8.85 0.97 64.43
including 181.75 184.15 2.40 1.59 61.34
including 187.50 190.60 3.10 1.13 79.87
LE-23-50A 471085 5734320 30 155 -55 0 Abandoned hole
LE-23-50 471085 5734320 213 155 -55 28 185.60 188.10 2.50 1.08 51.01
LE-23-51 470558 5733806 207 155 -50 45 No significant value
LE-23-52 470377 5733697 204 155 -50 124 No significant value
LE-23-53 471905 5734613 168 150 -50 41 37.20 45.00 7.80 0.13 35.24
77.20 88.35 11.15 0.12 37.47
LE-23-54 471947 5734638 165 155 -50 34 38.15 42.80 4.65 0.10 51.95
49.10 57.40 8.30 0.11 28.51
LE-23-55 472144 5734688 171 150 -50 9 No significant value
LE-23-56 472144 5734688 84 330 -45 47 No significant value

34


LE-23-57 472200 5734777 105 155 -50 28 No significant value
LE-23-58 472200 5734777 102 330 -45 78 No significant value
LE-23-59 472305 5734821 135 330 -50 75 No significant value
LE-23-60 472305 5734821 180 330 -63 123 No significant value

*Length along drill core. The Corporation does not have enough information at this stage to estimate the true width.

During the summer and fall of 2023, the Corporation carried out a prospecting and mapping program on several areas of its project portfolio, including the Rose, Rose South, Rose North and selected Nemaska Belt projects, including the Lemare project. The objective of the field program was to identify new pegmatite bodies through systematic geochemical rock sampling of all pegmatite bodies, in order to refine the geological interpretation of the properties and prioritize further exploration work, including drilling. A total of 774 rock samples were collected during the prospecting and mapping campaign.

The Corporation received results confirming the discovery made in 2022 of the extension of the spodumene pegmatite horizon on the Lemare property. These results confirm the summer 2022 discovery, which returned 0.38% Li₂O. Recent high-grade results include up to 2.44% Li₂O and 1.60% Li₂O in pegmatite outcrops in place. This highlights the potential for future drilling to extend the LCT pegmatite corridor over 5 kilometers on the Lemare property.

In addition, during the spring and summer of 2024, the Corporation carried out geological compilation work on some of its projects, including the Caumont, Duval, Valiquette, Arques and Lemare projects, to assess the potential for copper, nickel and platinum group elements (PGE) in preparation for future exploration.

Work done during the period

Evaluation and exploration expenses of $71,328 were incurred during the nine-month period ended May 31, 2025.

During the period, the Corporation carried out a helicopter-borne electromagnetic VTEM plus time-domain system survey covering the Nemaska Belt group of properties including Lemare property. The 2,701-line kilometre VTEM survey executed by Geotech Airborne Geophysical Survey covers the entirety of Critical Elements' 100%-owned Nemaska Belt properties with flight lines at a 200-metre spacing. The objective of the survey was to identify conductors that could correlate with Nickel-Copper-PGE mineralization and define high-priority drill targets.

In addition, during the month of May 2025, the Corporation began a surface exploration program on some of its projects, including Arques, Rose South, Lemare, Duval and Bloc 1 projects.

Management continues to pursue its research to find a partner to continue exploration activities or to find a potential buyer.

NISK – LITHIUM, COPPER, NICKEL, PGE AND GOLD PROJECT

Property Description

The Nisk property is composed of one block totaling 90 EER covering an area of 4,589.11 hectares and a length of over 20 kilometres. The Route du Nord from Chibougamau runs inside the south border of the property. The property is also traversed in a NE direction by a Hydro-Québec power line and a road that heads north to the Eastmain River and beyond to the La Grande River area.

The Lac des Montagnes volcano-sedimentary formation crosses the property in a NE direction. The geology covered by the property is mainly composed of biotite, sillimanite, staurotide and garnet-bearing gneisses and granites, pegmatites, amphibolites and ultramafic intrusive rocks. Geophysical surveys show the signature and extent of ultramafic intrusions, some of which have been historically confirmed by drilling. The north part of the Lac des Montagnes formation is mainly composed by orthogneisses intruded by granites, while the south is composed principally of paragneisses, also intruded by granites.

CRITICAL ELEMENTS LITHIUM CORPORATION


The property is currently known for its magmatic nickel-copper sulphide associated with ultramafic intrusion potential. It notably hosts the Nisk Ni-Cu-PGE project and the discovery of the new polymetallic Lion zone by Power Metallic Mines Inc. (for further information see Power Metallic Mines Inc.'s website).

Nisk Ni-Cu-PGE project

The Nisk project is located at UTM coordinates 459,950 mE / 5,728,500 mN. It is hosted in an elongated body of serpentinized ultramafic rocks that intrude the Lac des Montagnes paragneiss and amphibolite sequence. The ultramafic rock intrusion is a sill bordered by paragneisses and amphibolites. Quite similar on either side of the ultramafic sill, they still can be subdivided into a lower paragneiss sequence ("LPS") to the NW of the sill (stratigraphically older) and an upper paragneiss sequence ("UPS") to the SE of the sill (stratigraphically younger).

The ultramafic sill is not a single intrusion. At least two distinct lithological units can be identified. The first, a grey serpentinized peridotite with magnetite veinlets, does not contain any sulphide minerals. The second is a black serpentinized peridotite with chrysotile veinlets. The Ni-Cu-Co-Fe sulphide mineralization is invariably associated with this black serpentinite.

The Nisk project offers lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Nisk property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.

AGREEMENT WITH POWER METALLIC MINES INC.

On December 22, 2020, the Corporation signed an agreement with Power Metallic Mines Inc. which grant Power Metallic Mines Inc. the right to acquire an interest up to 80% of the Nisk Property, in Québec's Eeyou Istchee James Bay territory in Québec.

On July 17, 2023, Power Metallic Mines Inc. sent a notice to the Corporation confirming the exercise of the first option, earning an initial 50% interest in the Nisk property. To acquire this 50% interest, Power Metallic Mines Inc. made a cash payment of $500,000, issued 12,051,770 Power Metallic Mines Inc. shares to the Corporation and incurred $2,800,000 in exploration expenditures on the Nisk property.

On March 21, 2024, Power Metallic Mines Inc. informed the Corporation that it had completed a resource estimate and commitment to fund additional exploration work on the Nisk property, and proceeded to the exercise of the second option under the option agreement signed on December 22, 2020, to earn an 80% interest in the property. As a result, and in accordance with the option agreement, the parties have formed a joint venture in which Critical Elements holds a 20% interest.

Following the exercise of the Second Option and until such time as a definitive Feasibility regarding extraction and production activities on the Property is delivered to the Joint Venture, Critical shall maintain a 20% non-dilutive interest in the Joint Venture and shall not contribute to any Joint Venture costs.

Royalty

Following the exercise of the First and Second Option by Power Metallic Mines Inc., Critical Elements will receive, in the event of a Lithium discovery, a royalty equal to 2% net smelter returns resulting from the extraction and production of Lithium products, including Lithium ore, concentrate and chemical, resulting from the extraction and production activities on the Property, including transformation into chemical products. Power Metallic Mines Inc. shall have the right at any time to purchase 50% of the Royalty and thereby reduce the Royalty to 1% by paying to Critical Elements a total cash amount of $2,000,000.

Lithium Marketing Rights

In the event of a Lithium discovery, Critical Elements will retain Lithium Marketing Rights meaning the exclusive right of Critical Elements to market and act as selling agent for any and all Lithium products,

CRITICAL ELEMENTS LITHIUM CORPORATION
36


including Lithium ore, concentrate and chemical, resulting from the extraction and production activities on the Property, including transformation into chemical products.

Work done during the period

Evaluation and exploration expenses of $305 were incurred during the nine-month period ended May 31, 2025.

VALIQUETTE – LITHIUM, COPPER, NICKEL, PGE AND GOLD PROJECT

Property Description

The Valiquette Property is composed of one block totaling 104 EER covering an area of 5,563.07 hectares. It is measuring about 20 kilometers in a SE-NW direction and is contiguous South West to the Duval main block. The property can be accessed by a Hydro-Québec gravel road up to the Lac des Montagnes, and then by boat. An old winter road along the SE shore of Lac des Montagnes can be used for works.

The property is located in the middle part of the Lac des Montagnes volcano-sedimentary formation. In the vicinity of the Duval block the formation width is about 8 km and its orientation NE. It is locally composed of amphibolite quartz-rich paragneiss, biotite and sillimanite-bearing schist, pegmatite, basalt and ultramafic intrusives. Geophysical surveys show the signature and extent of ultramafic intrusions and iron formations, with some of them confirmed by historical drilling.

The property is currently recognized for its magmatic nickel (Ni), copper (Cu) and platinum group elements (PGE) potential and host the Valiquette showing. The Valiquette showing is associated with a peridotite intrusions at the contact of the volcanogenic sediment of the Lac des Montagne formation.

The Valiquette project offers lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Valiquette property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.

In addition, during the spring and summer of 2024, the Corporation carried out geological compilation work on some of its projects, including the Caumont, Duval, Valiquette, Arques and Lemare projects, to assess the potential for copper, nickel and platinum group elements (PGE) in preparation for future exploration.

Work done during the period

Evaluation and exploration expenses of $62,845 were incurred during the nine-month period ended May 31, 2025.

During the period, the Corporation carried out a helicopter-borne electromagnetic VTEM plus time-domain system survey covering the Nemaska Belt group of properties including Valiquette property. The 2,701-line kilometre VTEM survey executed by Geotech Airborne Geophysical Survey covers the entirety of Critical Elements' 100%-owned Nemaska Belt properties with flight lines at a 200-metre spacing. The objective of the survey was to identify conductors that could correlate with Nickel-Copper-PGE mineralization and define high-priority drill targets.

Management continues to pursue its research to find a partner to continue exploration activities or to find a potential buyer.

BLOC 1 – LITHIUM, NICKEL AND COPPER PROJECT

Property Description

The Bloc 1 Property is composed of one block totaling 84 EER covering an area of 4,478.54 hectares. It is measuring about 17 kilometers in a SW-NE direction and including 83 contiguous South West to the Nisk-South main block. It is wholly-owned by the Corporation.

CRITICAL ELEMENTS LITHIUM CORPORATION


A study conducted by GoldSpot is based on digital extraction from an exhaustive collection of compiled data, including assessment files, government data and academic studies. This dataset provided outcrop/sample description, bedrock geology, geochemical analyses, and geophysical surveys. Original data was cleaned and combined to create a comprehensive data set for geological interpretation and machine learning processes.

The compilation of discrete outcrop observations allowed a reliable update to existing geologic maps, resulting in a refined pegmatite map including metamorphic domains. A total of forty-two pegmatite bodies, on the properties Blocs 1 to 7, were added to the current government geological map, highlighting previously unknown potential for economic lithium-tantalum mineralization. An up-to-date structural interpretation was created based on a high-resolution aeromagnetic survey commissioned by Critical Elements. This survey revealed structurally complex patterns, including large-scale folds and major ENE-trending ductile fault zones. GoldSpot generated lithium-tantalum, copper-nickel and gold focused targets. A total of nineteen lithium-tantalum exploration targets were identified, reducing the area of investigation to approximately 16% of the total EER holding.

Work done during the period

Evaluation and exploration expenses of $120,083 were incurred during the nine-month period ended May 31, 2025.

During the period, the Corporation carried out a helicopter-borne electromagnetic VTEM plus time-domain system survey covering the Nemaska Belt group of properties including Bloc 1 property. The 2,701-line kilometre VTEM survey executed by Geotech Airborne Geophysical Survey covers the entirety of Critical Elements' 100%-owned Nemaska Belt properties with flight lines at a 200-metre spacing. The objective of the survey was to identify conductors that could correlate with Nickel-Copper-PGE mineralization and define high-priority drill targets.

In addition, during the month of May 2025, the Corporation began a surface exploration program on some of its projects, including Arques, Rose South, Lemare, Duval and Bloc 1 projects.

Management continues to pursue its research to find a partner to continue exploration activities or to find a potential buyer.

BLOCS 2 TO 6 – LITHIUM, NICKEL AND COPPER PROJECT

Property Description

The Blocs 2 to 6 Property is composed of one block totaling 10 EER covering an area of 534.68 hectares. The property Blocs 2 to 6 is located in the east, southeast of the Duval main block. It is wholly-owned by the Corporation.

A study conducted by GoldSpot is based on digital extraction from an exhaustive collection of compiled data, including assessment files, government data and academic studies. This dataset provided outcrop/sample description, bedrock geology, geochemical analyses, and geophysical surveys. Original data was cleaned and combined to create a comprehensive data set for geological interpretation and machine learning processes.

The compilation of discrete outcrop observations allowed a reliable update to existing geologic maps, resulting in a refined pegmatite map including metamorphic domains. A total of forty-two pegmatite bodies, on the properties Bloc 1 to 7, were added to the current government geological map, highlighting previously unknown potential for economic lithium-tantalum mineralization. An up-to-date structural interpretation was created based on a high-resolution aeromagnetic survey commissioned by Critical Elements. This survey revealed structurally complex patterns, including large-scale folds and major ENE-trending ductile fault zones. GoldSpot generated lithium-tantalum, copper-nickel and gold focused

CRITICAL ELEMENTS LITHIUM CORPORATION
38


targets. A total of nineteen lithium-tantalum exploration targets were identified, reducing the area of investigation to approximately 16% of the total EER holding.

Work done during the period

Evaluation and exploration expenses of $62,755 were incurred during the nine-month period ended May 31, 2025.

During the period, the Corporation carried out a helicopter-borne electromagnetic VTEM plus time-domain system survey covering the Nemaska Belt group of properties including Blocs 2 to 6 property. The 2,701-line kilometre VTEM survey executed by Geotech Airborne Geophysical Survey covers the entirety of Critical Elements' 100%-owned Nemaska Belt properties with flight lines at a 200-metre spacing. The objective of the survey was to identify conductors that could correlate with Nickel-Copper-PGE mineralization and define high-priority drill targets.

Management continues to pursue its research to find a partner to continue exploration activities or to find a potential buyer.

BLOC 7 – LITHIUM, NICKEL AND COPPER PROJECT

Property Description

The Bloc 7 Property is composed of one block totaling 54 EER covering an area of 2,890.54 hectares. It is measuring about 7 kilometers in a SW-NE direction and is contiguous to the Valiquette, Dumoulon and Caumont Est main blocks. It is located southwest of Valiquette block, north of Dumoulon block and east of Caumont Est block. It is wholly-owned by the Corporation.

A study conducted by GoldSpot is based on digital extraction from an exhaustive collection of compiled data, including assessment files, government data and academic studies. This dataset provided outcrop/sample description, bedrock geology, geochemical analyses, and geophysical surveys. Original data was cleaned and combined to create a comprehensive data set for geological interpretation and machine learning processes.

The compilation of discrete outcrop observations allowed a reliable update to existing geologic maps, resulting in a refined pegmatite map including metamorphic domains. A total of forty-two pegmatite bodies, on the properties Bloc 1 to 7, were added to the current government geological map, highlighting previously unknown potential for economic lithium-tantalum mineralization. An up-to-date structural interpretation was created based on a high-resolution aeromagnetic survey commissioned by Critical Elements. This survey revealed structurally complex patterns, including large-scale folds and major ENE-trending ductile fault zones. GoldSpot generated lithium-tantalum, copper-nickel and gold focused targets. A total of nineteen lithium-tantalum exploration targets were identified, reducing the area of investigation to approximately 16% of the total EER holding.

Work done during the period

Evaluation and exploration expenses of $62,755 were incurred during the nine-month period ended May 31, 2025.

During the period, the Corporation carried out a helicopter-borne electromagnetic VTEM plus time-domain system survey covering the Nemaska Belt group of properties including Bloc 7 property. The 2,701-line kilometre VTEM survey executed by Geotech Airborne Geophysical Survey covers the entirety of Critical Elements' 100%-owned Nemaska Belt properties with flight lines at a 200-metre spacing. The objective of the survey was to identify conductors that could correlate with Nickel-Copper-PGE mineralization and define high-priority drill targets.

Management continues to pursue its research to find a partner to continue exploration activities or to find a potential buyer.

CRITICAL ELEMENTS LITHIUM CORPORATION


CRITICAL ELEMENTS LITHIUM CORPORATION

Person In Charge of Technical Disclosure

Yves Perron, Eng., MBA, Vice-President Engineering, Construction and Operations of the Corporation, is the qualified person under NI 43-101 that has reviewed and approved the technical content of this MD&A for the properties.

RESULTS OF OPERATIONS

Critical Elements anticipates that, for the foreseeable future, quarterly results of operations will primarily be impacted by several factors, including the timing of exploration and the efforts and timing of expenditures related to the development of the Corporation. Due to fluctuations in these factors, the Corporation believes that the period-to-period comparisons of operating results are not a good indication of its future performance.

RESULTS FOR THE THREE-MONTH PERIOD

The comments below provide an analysis of the operating results for the three-month period ended May 31, 2025. The selected financial information shown below is taken from the unaudited condensed interim financial statements for each of the three-month periods indicated.

FINANCIAL HIGHLIGHTS

May 31 (3 months)
2025 2024
Interest income and other revenues $ 113,257 $ 260,974
General and administrative expenses $ 60,712 $ 89,621
Salaries and fringe benefits $ 534,071 $ 572,480
Registration, listing fees and shareholders' information $ 43,913 $ 36,812
Professional and consultant fees $ 103,005 $ 80,634
Share-based compensation $ 369,633 $ 49,390
Depreciation of fixed assets $ 10,931 $ 15,388
Depreciation of right-of-use assets $ 5,174 $ 87,600
Net change in fair value of marketable securities $ 4,903,194 $ (6,299,471)
Gain on disposal of fixed assets $ (11,382) $ -
Gain on lease modification $ (50,840) $ -
Foreign exchange loss $ 82 $ 1,197
Loss (income) before income taxes $ 5,855,236 $ (5,627,323)
Current tax recovery $ (810,875) $ 471,515
Deferred tax expense $ 810,875 $ 471,515
Net loss (income) and comprehensive loss (income) for the period $ 5,855,236 $ (5,627,323)
Cash & cash equivalents $ 10,362,368 $ 14,311,170

Interest Income and other revenues

Interest income and other revenues for the three-month period ended May 31, 2025, amounted to $113,257 and represent interest income compared to $260,974 for the three-month period ended May 31, 2024 which represented interest income and management fees. The decrease of $147,717 is mainly due to lower available cash balances and lower interest rates.

General and administrative expenses

General and administrative expenses for the three-month period ended May 31, 2025, consisted mainly of occupancy expenses, travel expenses, office expenses and the Corporation's claim renewal expenses. The decrease of $28,909 compared to the three-month period ended May 31, 2024, is mainly


due to a decrease in office expenses and expenses related to IT services, offset by a slight increase in insurance cost.

Salaries and fringe benefits

Salaries and benefits for the three-month period ended May 31, 2025, amounted to $534,071 (2024 - $572,480). This decrease is, among others due to salaries and fringe benefits applied to exploration and evaluation assets during the three-month period ended May 31, 2025 compared with the same period last year. Also a decrease in the group insurance item, following a reclassification of these expenses in a period subsequent to May 31, 2024. An increase in the exchange rate applicable to certain salaries and fringe benefits paid in euros also affected this item.

Stock-Based Compensation

Share-based payments and compensation for the three-month period ended May 31, 2025, represented the recognition of expense for tranches of performance share units, restricted share units and deferred share unit of the Corporation. A share-based compensation of $369,633 ($49,390 in 2024) was therefore granted during the three-month period ended May 31, 2025. The compensation cost included restricted share units and deferred share units which will be granted to officers and independent directors as soon as the blackout period imposed by the Corporation pursuant to its internal trading policies ends.

Change in the fair value of the marketable securities

The change in the value of marketable securities is related to fluctuations in the price of each security held on the TSX Venture Exchange. The change in the fair value of Power Metallic Mines Inc. securities held by the Corporation mainly affected this item.

Gain on lease modification

During the three-month period ended May 31, 2025, the Corporation ceded its lease for its Longueuil office including all obligations, to another tenant, before the end of its term. This disposal resulted in a gain on lease modification in the amount of $50,840.

The selected financial information below was taken from Critical Elements' unaudited condensed interim financial statements for each of the following quarters:

$000s of $ except for share data May 31 2025 Feb. 28 2025 Nov. 30 2024 August 31 2024 May 31 2024 Feb. 29 2024 Nov. 30 2023 August 31 2023
Interest income and other revenues 113 175 182 224 261 341 346 366
Net loss (income) 5,856 (7,786) (1,007) 4,148 (5,620) 931 665 1,715
Basic and diluted net loss (income) per share $ 0.03 $ (0.04) $ 0.00 $ 0.02 $ (0.03) $ 0.01 $ 0.00 $ 0.01

RESULTS FOR THE NINE-MONTH PERIOD

The comments below provide an analysis of the operating results for the nine-month period ended May 31, 2025. The selected financial information shown below is taken from the unaudited condensed interim financial statements for each of the nine-month periods indicated.

CRITICAL ELEMENTS LITHIUM CORPORATION


FINANCIAL HIGHLIGHTS

May 31 (9 months)
2025 2024
Interest income and other revenues $ 469,480 $ 948,594
General and administrative expenses $ 268,221 $ 310,103
Salaries and fringe benefits $ 1,676,814 $ 1,681,008
Registration, listing fees and shareholders' information $ 114,698 $ 137,423
Professional and consultant fees $ 313,019 $ 360,677
Share-based compensation $ 1,091,283 $ 243,143
Depreciation of fixed assets $ 32,135 $ 37,866
Depreciation of right-of-use assets $ 15,524 $ 123,665
Net change in fair value of marketable securities $ (5,917,893) $ (5,980,487)
Gain on disposal of fixed assets $ (11,382) $ -
Gain on lease modification $ (50,840) $ -
Foreign exchange loss $ 570 $ 11,849
Loss (income) before income taxes $ (2,937,331) $ (4,023,347)
Current tax recovery $ (1,516,745) $ (1,628,712)
Deferred tax expense $ 1,516,745 $ 1,628,712
Net loss (income) and comprehensive loss (income) for the period $ (2,937,331) $ (4,023,347)
Cash & cash equivalents $ 10,362,368 $ 14,311,170

Interest Income and other revenues

Interest income and other revenues for the nine-month period ended May 31, 2025, amounted to $469,480 consisted of interest income compared to $948,594 for the nine-month period ended May 31, 2024 consisted of interest income and management. The decrease of $479,114 is mainly due to lower available cash balances and lower interest rates.

General and administrative expenses

General and administrative expenses for the nine-month period ended May 31, 2025, consisted mainly of occupancy expenses, travel expenses, office expenses and the Corporation's claim renewal expenses. The decrease of $41,882 compared to the nine-month period ended May 31, 2024, is mainly due to a decrease in the claim renewal expenses of the Corporation, the expenses related to IT services and software renewed annually, offset by a slight increase in insurance cost and office expenses.

Professional and consultant fees

Professional and consulting fees for the nine-month period ended May 31, 2025, consisted primarily of expenses of a legal and accounting nature, as well as audit, business development and management expenses. The decrease of $47,658 over the comparative period is mainly due to a reduction in professional and consulting fees, expenditures of legal nature, as well as business development expenses, offset primarily by an increase in investor relations expenses.

Stock-Based Compensation

Share-based payments and compensation for the nine-month period ended May 31, 2025, represented the recognition of expense for a tranche of performance share units, deferred share units and restricted share units of the Corporation. A share-based compensation of $1,091,283 ($243,143 in 2024) was therefore granted during the nine-month period ended May 31, 2025. The compensation cost included restricted share units and deferred share units which will be granted to officers and independent directors as soon as the blackout period imposed by the Corporation pursuant to its internal trading policies ends.

CRITICAL ELEMENTS LITHIUM CORPORATION


CRITICAL ELEMENTS LITHIUM CORPORATION

Gain on lease modification

During the nine-month period ended May 31, 2025, the Corporation ceded its lease for its Longueuil office including all obligations, to another tenant, before the end of its term. This disposal resulted in a gain on lease modification in the amount of $50,840.

LIQUIDITY AND CAPITAL RESOURCES

Cash and cash equivalents as at May 31, 2025, totalled $10,362,368, compared to $14,311,170 as at May 31, 2024. It is management's intention to source further capital funding, either in the form of equity or debt, to support current and future exploration and evaluation of assets, as well as project development.

Financing sources table
Date Type Financings Amount General description of the use of proceeds
On April 12,2024 Exercise of share purchase options Common shares $26,000 The net proceeds of the financing will be used for exploration and development purposes, fund the general administrative expenses as well as for other working capital needs.

For the fiscal year 2025, the Corporation has budgeted $5,013,000 for administrative expenses.

The Corporation has been successful in the past in raising financing; however, it requires significant additional financing in the near and long-term and there is uncertainty as to the ability to raise such financing. Advanced exploration of some of the mineral properties would require substantially more financial resources. There is no assurance that such financing will be available when required, or under terms that are favourable to Critical Elements. The Corporation may also select to advance the exploration and development of exploration and evaluation assets through joint ventures. Management is currently considering opportunities for further financing.

CASH FLOWS

May 31 (9 months)
2025 2024
Operating activities $ (2,290,304) $ (4,195,477)
Financing activities $ 2,553,571 $ 1,900,488
Investing activities $ (657,494) $ (8,970,911)
Net change in cash & cash equivalents $ (394,227) $ (11,265,900)
Cash & cash equivalents $ 10,362,368 $ 14,311,170

During the nine-month periods ended May 31, 2025 and May 31, 2024 funds used for operating activities were spent primarily to administer the Corporation and advance its goals.

During the nine-month periods ended May 31, 2025 and May 31, 2024, financing activities consisted in the repayment of lease liabilities for the Blainville and Longueuil leases as well as the receipt of a mining tax credit. During the comparative period, the issuance of shares following the exercise of stock options was also included in financing activities.

During the nine-month period ended May 31, 2025, investing activities consisted primarily of exploration work for the development of the Corporation's mining properties, the acquisition of fixed assets, the disposal of fixed assets for its Longueuil office and the acquisition of an investment offset by the proceeds of an investment sale. These activities also involved the disposal of marketable securities and the exercise of warrants of Power Metallic Mines Inc. While during the nine-month period ended May 2024, investing activities consisted primarily of exploration work for the development of the Corporation's mining properties, the acquisition of fixed assets, the acquisition of a financial asset collateral and the acquisition of an investment offset by cashed-in of an investment.

CRITICAL ELEMENTS LITHIUM CORPORATION


CONTRACTUAL OBLIGATIONS AND OFF-BALANCE-SHEET ARRANGEMENTS

ROYALTIES ON THE MINING PROPERTIES

PROPERTY ROYALTY DESCRIPTION
Name Percentage
Rose Lithium-Tantalum Jean-Sébastien Lavallée 37.5% 2% NSR of which 1% may be purchased for an amount of $1,000,000
Jean-Raymond Lavallée 37.5%
Fiducie familiale St-Georges 25%
Arques Alain Champagne 100% 1.4% NSR on some of the claims of which 0.80% may be purchased for an amount of $800,000
Golden Goose 100% 2% NSR on some of the claims of which 1% may be purchased for an amount of $1,000,000
Bourier Alain Champagne 100% 1.4% NSR on some of the claims of which 0.80% may be purchased for an amount of $800,000
Caumont Golden Goose 100% 2% NSR on some of the claims of which 1% may be purchased for an amount of $1,000,000
Victor Cantore 100% 1.5% NSR on some of the claims of which 1% may be purchased for an amount of $1,000,000
Affinage Tectonic 100% 1% NSR on some of the claims that may be purchased for an amount of $1,000,000
Duval Jean-Sébastien Lavallée 50% 1% NSR on some of the claims
Jean-Raymond Lavallée 50%
Golden Goose 100% 2% NSR on some of the claims of which 1% may be purchased for an amount of $1,000,000
Lemare Jean-Sébastien Lavallée 50% 1% NSR on some of the claims
Jean-Raymond Lavallée 50%
Alain Champagne 100% 1.4% NSR on some of the claims of which 0.80% may be purchased for an amount of $800,000
Golden Goose 100% 2% NSR on some of the claims of which 1% may be purchased for an amount of $1,000,000
Nisk Jean-Sébastien Lavallée 50% 1% NSR on some of the claims
Jean-Raymond Lavallée 50%
Alain Champagne 100% 1.4% NSR on some of the claims of which 0.80% may be purchased for an amount of $800,000
Golden Goose 100% 2% NSR on some of the claims of which 1% may be purchased for an amount of $1,000,000
Valiquette Jean-Sébastien Lavallée 50% 1% NSR on some of the claims
Jean-Raymond Lavallée 50%
Alain Champagne 100% 2% NSR on some of the claims of which 1% may be purchased for an amount of $1,000,000
Golden Goose 100% 2% NSR on some of the claims of which 1% may be purchased for an amount of $1,000,000

NSR: Annual production net smelter return royalty

NATURE OF OPERATIONS AND BASIS OF PRESENTATION

The Corporation has determined that one of its mining properties, namely Rose Lithium-Tantalum, has economically recoverable ore reserves. As at May 31, 2025, the Corporation determined that it was still in the exploration stage with respect to its Rose Lithium-Tantalum property, because it has not yet obtained all the required financing and all permits to start the construction and development phase of the Rose Lithium-Tantalum project. The Corporation has not yet determined whether its other properties have economically recoverable ore reserves.

The exploration and development of mineral deposits involves significant financial risks. The success of the Corporation will be influenced by a number of factors, including exploration and extraction risks, regulatory issues, environmental regulations and other regulations, as well as available financing.

CRITICAL ELEMENTS LITHIUM CORPORATION


Although management has taken steps to verify titles of the mining properties in which the Corporation holds an interest, in accordance with industry standards for the current stage of exploration of such properties, these procedures do not guarantee the Corporation's property title. The property title may be subject to unregistered prior agreements and non-compliant with regulatory requirements.

For the nine-month period ended May 31, 2025, the Corporation recorded a net income of $2,937,331 (2024 - $4,023,347) and has negative cash flows from operations of $2,290,304 (2024 - $4,195,477). In addition, as at May 31, 2025, the Corporation has a deficit of $46,569,389 (2024 - $49,506,720). The Corporation is still in the exploration stage and, as such, no revenue or positive cash flows have yet been generated from its operating activities. Consequently, management periodically seeks financing through the issuance of shares and share purchase options to continue its operations and to discharge its commitments and liabilities in the normal course of operations.

The Corporation has been successful in the past in raising financing; however, it requires significant additional financing in the near and long-term and there is uncertainty as to the ability to raise such financing. Specifically, in order to move forward on its mining project Rose Lithium-Tantalum, the Corporation will have to raise additional funds. If management is unable to obtain new funding, the Corporation may be unable to continue its operations, and amounts realized for assets may be less than amounts reflected in these financial statements.

The accompanying financial statements have been prepared on a going concern basis, which contemplates the realization of assets and settlement of liabilities during the normal course of operations, and do not reflect the adjustments to the carrying value of assets and liabilities, the reported revenues and expenses and statement of financial position classification that would be necessary if the going concern assumption would not be appropriate. These adjustments could be material.

RELATED-PARTY TRANSACTIONS

Transactions with Key Executives and with members of the Board of Directors

During the nine-month period ended May 31, 2025, the Corporation incurred development expenses of $69,270 (2024 - $705,308) and for expenses capitalized to fixed assets of the Corporation of $6,363, with Consul-Teck Exploration Minière Inc., a company of which the Chief Executive Officer is a shareholder. An amount of $14,298 was payable as at May 31, 2025 (2024 - $66,294).

The Corporation's Chief Executive Officer owns 50% of 1% NSR on some of the EER of the Duval, Lemare, Nisk et Valiquette properties and 37.5% of 2% NSR on some of the EER of the Rose Lithium-Tantalum property.

These transactions are in the normal course of operations and are measured at the exchange amount, which is the amount of consideration established and agreed by the related parties.

The following table reflects the remuneration of key management and directors of the Corporation's:

May 31 (9 months)
2025 2024
Management salaries and fringe benefits $1,456,738 $1,440,996
Directors' fees $280,748 $282,413
Compensation and share-based payments $966,523 $145,510
$2,704,009 $1,868,919

As at May 31, 2025, the Corporation had an amount of $20,701 included in accrued liabilities relating to management salaries and fringe benefits (2024 - $20,740).

As at May 31, 2025, the Corporation had an amount of $94,044 included in accrued liabilities in respect of directors' fees (2024 - $94,239).

CRITICAL ELEMENTS LITHIUM CORPORATION


In September 2024, the Corporation approved compensation for executives of $748,000 payable in restricted share units and compensation for independent directors of $553,809 payable in deferred share units to be granted as soon as the blackout period imposed by the Corporation pursuant to its internal trading policies ends. The number of units to be issued will be determined at the time of the grant based on the share price. A tranche of the expense related to this stock-based compensation was recorded during the nine-month period ended May 31, 2025.

In September 2023, the Corporation approved compensation for executives of $708,000 payable in restricted share units and compensation for independent directors of $537,679 payable in deferred share units to be granted as soon as the blackout period imposed by the Corporation pursuant to its internal trading policies ends. The number of units to be issued will be determined at the time of the grant based on the share price. The expense related to this stock-based compensation was recorded during the year ended August 31, 2024.

EXPLORATION AND EVALUATION ASSETS

May 31 (9 months)
2025 2024
Balance, beginning of period $ 50,073,881 $ 39,630,450
Add:
Financial guarantee bond management fees 324,779 259,158
Occupancy leases and leases 37,912 77,990
Acquisition of mining property 317 -
Community consultations 90,922 96,258
Drilling 12,356 1,125,219
Geology, geochemical and geophysical 813,347 911,659
Environmental study 364,920 1,770,826
Feasibility study - 80,715
Engineering 605,061 4,864,631
Owner team 749,693 1,001,095
General exploration and evaluation expenses 62,054 16,633
3,061,361 10,204,184
Balance, before deduction 53,135,242 49,834,634
Rebilling - (455,493)
Tax credit related to resources (554,870) (562,977)
(554,870) (1,018,470)
Balance, end of period $ 52,580,372 $ 48,816,164

Financial guarantee bond management fees

The Corporation's rehabilitation and restoration plan for the Rose Lithium-Tantalum project was accepted by the Ministry of Energy and Natural Resources of the province of Québec (MERN) in May 2022. This plan is accompanied by a financial guarantee covering the cost of restoring the entire mine site amounting to $21,692,923. In September 2022, a payment equal to half of this amount was made in the form of a bond by an insurance company, in order to preserve the Corporation's liquidity. In May 2023 and 2024, a payment equal to half the September 2022 payment was made under the same terms as the September 2022 payment. The Corporation provided the insurance company with a guarantee in the form of an irrevocable letter of credit from a Canadian bank, for an amount equal to at least 25% of the bonded amount, adjustable with each subsequent change to the bonded balance to ensure that it is at

CRITICAL ELEMENTS LITHIUM CORPORATION


all times equal to at least 25% of the bonded amount. In connection with this bond, the Corporation must pay an annual fee equivalent to 2% of the bonded amount. These costs are presented as an increase in exploration and evaluation costs for the Rose Lithium-Tantalum property in the statement of financial position.

Occupancy leases and leases

During the nine-month period ended May 31, 2025, the Corporation incurred $37,912 compared to $77,990 during the nine-month period ended May 31, 2024 for occupancy leases and leases related to the Rose Lithium-Tantalum project. This change is due to the higher allocation to prepaid expenses during the nine-month period ended May 31, 2025, compared with the nine-month period ended May 31, 2024, when the allocation was made to occupancy leases and leases.

Drilling

During the nine-month period ended May 31, 2025, the Corporation incurred $12,356 in core storage costs, compared to $1,125,219 during the nine-month period ended May 31, 2024, for the planning, organization and execution of drilling on the Rose West discovery, as well as for core storage.

Geology, geochemistry and geophysical

During the nine-month period ended May 31, 2025, surface exploration work began on the Arques, Rose South, Lemare, Duval and Bloc 1 properties. The Corporation also completed a helicopter-borne electromagnetic VTEM on its properties Arques, Caumont, Dumoulon, Duval, Lemare, Valiquette, Bloc 1, Blocs 2 to 6 and Bloc 7. During the comparative nine-month period ended May 31, 2024, works to compile geological data and to carry out mapping and reconnaissance work based on the geological compilation, analysis and geophysical data on Rose Lithium-Tantalum, Rose South, Rose North, Valiquette, Arques, Lemare, Caumont, Dumoulon, Duval, Nisk and Bourier has been done. The work on the Bourier property was charged back under the terms of the option agreement with Lomiko.

Environmental study

During the nine-month periods ended May 31, 2025 and 2024, the environmental study involved the costs related to work on obtaining the environmental authorizations and commitments for the Rose Lithium-Tantalum project.

Feasibility Study

During the nine-month period ended May 31, 2025, the Corporation made no expenditure on updating the feasibility study on the Rose Lithium-Tantalum project, compared with $80,715 during the nine-month period ended May 31, 2024.

Engineering

During the nine-month period ended May 31, 2024, the main stages of detailed engineering to obtain the first construction permits for the Rose Lithium-Tantalum project were advanced. Following this engineering progress, the Corporation continued its engineering work at a reduced pace during the nine-month period ended May 31, 2025.

Owner Team

During the nine-month periods ended May 31, 2025 and 2024, the Corporation incurred expenses related to the owner team of the Corporation. The decrease of $251,402 over the comparative period is mainly due to a reduction in the number of employees.

Rebilling

During the nine-month period ended May 31, 2025, the Corporation did not charge back any work on its properties, compared with the nine-month period May 31, 2024, when $455,493 was re-invoiced for work performed on the Bourier and Nisk properties.

CRITICAL ELEMENTS LITHIUM CORPORATION
47


Tax credit related to resources

The Corporation is eligible for a refundable tax credit related to resources, to this end, during the nine-month period ended May 31, 2025, the Corporation recorded an amount of $554,870 an under exploration and evaluation expenses.

Additional information

MATERIAL COMPONENTS

May 31 (9 months)
2025 2024 2023
Statements of Comprehensive Income
Net (income) loss and comprehensive (income) loss for the period $ (2,937,331) $ (4,023,347) $ 1,537,759
Salaries and fringe benefits $ 1,676,814 $ 1,681,008 $ 1,681,698
Net change in fair value of marketable securities $ (5,917,893) $ (5,980,487) $ (1,559,100)
Stock-based compensation $ 1,091,283 $ 243,143 $ 13,897,787
Professional and consultants' fees $ 313,019 $ 360,677 $ 411,240
May 31 (9 months)
2025 2024 2023
Statements of Financial Position
Exploration and evaluation assets $ 52,580,372 $ 48,816,164 $ 35,630,222
Marketable securities $ 11,021,456 $ 9,245,272 $ 3,222,564
Financial asset collateral investments $ 5,637,306 $ 5,637,306 $ 4,210,140

DISCLOSURE OF OUTSTANDING SHARE DATA (as at July 17, 2025)

Common shares outstanding: 217,848,838
Share purchase options outstanding: 3,154,332
Average exercise price of: $ 1.38
Expiry date Number of shares Exercise price
Initially 2023¹ 1,450,000 $ 1.25
Initially 2025¹ 200,000 0.24
2026 300,000 Between 0.49 and 1.35
2027 1,204,332 Between 1.35 and 2.29
3,154,332
Deferred share units outstanding: 78,602
Restricted share units outstanding: 351,974
Performance share units: 40,416

¹ In accordance with the terms of the Omnibus Plan, the expiry date of share purchase options expiring in 2023 and 2025 will be extended to a date that is no later than 10 business days after the expiry of the blackout period imposed by the Corporation pursuant to its internal trading policies.

Estimates and assumptions are continually evaluated and are based on historical experience and other factors, including expectations of future events that are believed to be reasonable under the circumstances. The determination of estimates requires the exercise of judgment based on various

CRITICAL ELEMENTS LITHIUM CORPORATION


assumptions and other factors such as historical experience and current and expected economic conditions. Actual results could differ from those estimates.

A description of financial instruments and their fair value is detailed in Note 4 to the Annual Financial Statements, filed on SEDAR + (www.sedarplus.ca).

FINANCIAL INSTRUMENTS

Financial instruments are measured on initial recognition at fair value, plus, in the case of financial instruments other than those classified as fair value through profit or loss ("FVPL"), directly attributable transaction costs. Financial instruments are recognized when the Corporation becomes party to the contracts that give rise to them and are classified as amortized cost, FVPL or fair value through other comprehensive income, as appropriate.

A description of financial instruments and their fair value is included in Note 4 to the Annual Financial Statements filed on SEDAR + (www.sedarplus.ca).

CERTIFICATION OF INTERIM FILINGS

The Chief Executive Officer and Chief Financial Officer have signed the official basic certificates for venture issuers as required by Regulation 52-109 respecting certification of disclosure in issuers' annual and interim filings, confirming the review, absence of untrue or misleading information and fair presentation of the interim documents filed.

  • The Chief Executive Officer and Chief Financial Officer have confirmed that they have reviewed the interim financial statements and the interim MD&A (collectively referred to as the "interim filings") of the Company for the nine-month period ended May 31, 2025.
  • The Chief Executive Officer and Chief Financial Officer have confirmed that, based on their knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
  • The Chief Executive Officer and Chief Financial Officer have confirmed that, based on their knowledge, having exercised reasonable diligence, the interim financial statements together with the other financial information included in the interim filings fairly present in all material respects the financial condition, results of operations and cash flows of the issuer, as of the date and for the periods presented in the interim filings for these periods.

RISKS FACTORS

Critical Elements is subject to a variety of risks, some of which are described below. If any of the following risks occur, the Corporation's business, results of operations or financial condition could be adversely affected in a material manner. The risks described herein and in other documents forming part of the Corporation's disclosure record are not the only risks facing the Corporation. Additional risks and uncertainties not currently known to the Corporation, or that the Corporation currently deems immaterial, may also materially and adversely affect its business. Prospective purchasers or holders of Corporation's common shares should give careful consideration to all risk factors enumerated below.

Risks Factors Related to the Corporation

Lack of Revenue. As the Corporation does not have revenues, it is dependent upon future financings to continue its plan of operation and stay in business. The Corporation does not have a history of revenue or return on investment, and there can be no assurance that it will generate revenue, operate at a profit,

CRITICAL ELEMENTS LITHIUM CORPORATION


or yield return on investment in the future.

The Corporation's Dependence upon the Rose Lithium-Tantalum Property. Although the Corporation owns title interest in a number of properties, the Corporation expects future mining operations at the Rose Lithium-Tantalum Property to account for most or all of the Corporation's ore production unless additional properties are brought into production or other producing properties are acquired. Any adverse condition affecting the Rose Lithium-Tantalum Property could be expected to have a material adverse effect on the Corporation's financial performance, results of operations and prospects. While the Technical Report demonstrates the economic feasibility of the Rose Lithium-Tantalum Property, the inability to achieve commercial operations on a basis that is economically viable, will have a material adverse effect on the Corporation. The Corporation's ongoing development of the Rose Lithium-Tantalum Property involves the exploration of new areas although there is no assurance that additional mineral resources or mineral reserves will be discovered. Even if discovered, extraction of ore from new areas may present new or different challenges for the Corporation and may not be economic.

Exploration and Mining Risks. The business of exploration for minerals and mining involves a high degree of risk. Few properties that are explored are ultimately developed into producing mines. Unusual or unexpected formations, formation pressures, fires, power outages, labour disruptions, flooding, caveins, landslides and the inability to obtain suitable or adequate machinery, equipment or labour are other risks involved in the conduct of exploration programs. From time to time the Corporation increases its internal exploration and operating expertise with due advice from consultants and others as required. The economics of developing mineral properties is affected by many factors, including the cost of operations, variation of the grade of ore mined and fluctuations in the price of any minerals produced. There are no underground or surface plants or equipment on the Corporation's mineral properties, nor any known bodies of commercial ore. Programs conducted on the Corporation's mineral property would be an exploratory search for ore.

Titles to Property. While the Corporation has reviewed and is satisfied with the titles to its mineral properties, and, to the best of its knowledge, such titles are in good standing, there is no guarantee that titles to such properties will not be challenged or impugned. The properties may be subject to prior unregistered agreements of transfer or aboriginal land claims, and titles may be affected by undetected defects. In addition, according to the applicable mining legislation in the Province of Québec, the Corporation will need to incur expenditures on its properties and pay a rent in order to renew EER upon their expiry. There can be no assurance that the Corporation will be successful in renewing all such EER. The properties in which the Corporation holds an interest are not currently subject to territorial claims on behalf of First Nations. No insurance can however be provided to the effect that such will not be the case in the future.

Permits and Licenses. The Corporation's activities and operations may require licenses and permits from various governmental authorities. There can be no assurance that the Corporation will be able to obtain all necessary licenses and permits that may be required to carry out exploration, development and mining operations at its projects. There can be no assurance that various permits which the Corporation may require in the normal course for its current and anticipated exploration, development and construction activities as well as mining operations, including without limitation, on the Rose Lithium-Tantalum Property will be maintainable or obtainable on reasonable terms or on a timely basis. Furthermore, any delays in obtaining the anticipated construction permits would have an adverse effect on the Corporation's timing and costs.

Dividend Policy. No dividends on the common shares of the Corporation have been paid to date. The Corporation anticipates that, for the foreseeable future, it will retain future earnings and other cash resources for the operation and development of its business. Payment of any future dividends will be at the discretion of the Board of Directors ("Board") after taking into account many factors, including the Corporation's operating results, financial condition, and current and anticipated cash needs.

Conflicts of Interest. Certain directors or proposed directors of the Corporation are also directors, officers or shareholders of other companies that are similarly engaged in the business of acquiring,

CRITICAL ELEMENTS LITHIUM CORPORATION
50


developing and exploiting natural resource properties. Such associations may give rise to conflicts of interest from time to time. Conflicts, if any, will be dealt with in accordance with the relevant provisions of the CBCA. The directors of the Corporation are required by law to act honestly and in good faith with a view to the best interests of the Corporation and to disclose any interest which they may have in any project or opportunity of the Corporation. If a conflict of interest arises at a meeting of the Board, any director in a conflict will disclose his interest and abstain from voting on such matter. In determining whether or not the Corporation will participate in any project or opportunity, the directors will primarily consider the degree of risk to which the Corporation may be exposed and its financial position at that time.

Key Employees. The success of the Corporation is currently largely dependent on the performance of its directors and officers as well as its operations and technical leaders. The loss of the services of any of these persons could have a materially adverse effect on the Corporation's business and prospects. There is no assurance the Corporation can maintain the services of its directors, officers or other qualified personnel required to operate its business.

Labour Relations. While the Corporation has good relations with its employees, there can be no assurance that it will be able to maintain positive relationships with its employees. In addition, relations between the Corporation and its employees may be impacted by regulatory or governmental changes introduced by the relevant authorities in whose jurisdictions the Corporation carries on business. Adverse changes in such legislations or in the relationship between the Corporation and its employees could have a material adverse impact on the Corporation's business, results of operations and financial condition.

Mineral Exploration and Development Activities Inherently Risky. The business of exploration for minerals and mining involves a high degree of risk that even a combination of experience, knowledge and careful evaluation may not be able to overcome. Few properties that are explored are ultimately developed into mineral deposits with significant value. Unusual or unexpected ground or water conditions, geological formation pressures, fires, rock bursts, power outages, labor disruptions, flooding, earthquakes, explosions, cave-ins, landslides, mechanical equipment and facility performance problems, the inability to obtain suitable adequate machinery, equipment or labor and other unfavorable operating conditions are some of the risks involved in the operation of mines and the conduct of exploration and development programs. Unknown rock mechanics and hydrogeological conditions that cannot be predicted ahead of mining, such as faulting, zones of weak rock, or zones of unanticipated water inflow, may only be discovered during mining and may require significant changes to the mining plan. While lab testing may reduce uncertainty in some of the rock properties, it is never possible to identify all of these potential risks in advance. The Corporation's Rose Lithium-Tantalum Property and any future mining operations will be subject to all the hazards and risks normally incidental to exploration, development and production, any of which could result in work stoppages and damage to or destruction of exploration or development facilities, mines and other producing facilities, damage to life and property, environmental damage and possible legal liability for any or all damage.

Estimates of mineral resources and mineral reserves. The estimates of mineral resources and mineral reserves for the Rose Lithium-Tantalum Property have been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). There are numerous uncertainties inherent in estimating mineral resources and mineral reserves and no assurance can be given that the anticipated tonnages and grades will be achieved, that the indicated level of recovery will be realized or that any categories of mineral resources or reserves will be upgraded to higher categories. The estimation of mineralization is a subjective process and the accuracy of estimates is a function of quantity and quality of available data, the accuracy of statistical computation and the assumptions and judgments made in interpreting engineering and geological information. Mineral reserves at the Rose Lithium-Tantalum Property have been determined to be economic ore in the context of the Technical Report in accordance with NI 43-101. However, factors such as market price fluctuations, increased production costs, reduced recovery rates, and changes to other assumptions applied to the estimates, may render the mineral reserves uneconomic. It should be understood that the mineral resources and mineral reserves presented in the Technical Report are estimates of the size and grade of the deposits based on a number of drillings and samplings and on assumptions and parameters available. The level of confidence in the estimates depends upon a number of uncertainties. These

CRITICAL ELEMENTS LITHIUM CORPORATION
51


uncertainties include, but are not limited to, future changes in product prices and/or production costs, differences in size and grade and recovery rates from those expected, and changes in project parameters. There is no assurance that the Rose Lithium-Tantalum Property implementation will be realized or that the current estimates of volume and grade of minerals mined/processed or of cash flows derived from production will be achieved.

Nature of the Corporation's business

It is not anticipated that the Corporation will earn income from ongoing operations in the near future; those operations are aimed at the discovery and development of lithium deposits for economic value. There is no assurance that any deposits having economic value will be discovered or, if discovered, will be sufficient to sustain feasible mining activities or profitable operations.

The Corporation's operations are subject to all of the hazards and risks normally incidental to exploration and development of lithium properties, any of which could result in damage to life or property, environmental damage and possible legal liability for any or all damage. The Corporation's activities may be subject to prolonged disruption of activities or scheduled work programs, due to weather conditions, barriers to property access, whether natural (such as floods or road damage) or man-made (such as blockades), depending on the location of operations in which the Corporation has interests. In the course of exploration, development and production of mineral properties, certain risks, and in particular, unexpected or unusual geological operating conditions including cave-ins, fires, flooding, earthquakes or other conditions may occur. While the Corporation may obtain insurance against certain risks in such amounts as it considers adequate, the nature of these risks is such that liabilities could exceed policy limits or could be excluded from coverage. There are also risks against which the Corporation cannot insure or against which it may elect not to insure. The potential costs which could be associated with any liabilities not covered by insurance or in excess of insurance coverage or compliance with applicable laws and regulations may cause substantial delays and require significant capital outlays, adversely affecting the future earnings and competitive position of the Corporation and, potentially, its financial position.

Whether a lithium deposit will be commercially viable depends on a number of factors, some of which are the particular attributes of the deposit, such as its size and grade, proximity to infrastructure, financing costs and governmental regulations, including regulations relating to prices, taxes, royalties, infrastructure, land use, importing and exporting and environmental protection. The effect of these factors cannot be accurately predicted, and the combination of these factors may result in the Corporation not receiving an adequate return on invested capital.

Unanticipated metallurgical processing problems

Unanticipated metallurgical processing problems may occur during operations, including, without limitation, mechanical problems with milling or extraction equipment, unexpected grade anomalies in processed material, contaminants in processing or processed material, and the inability to operate tested processes at scale which can lead to lower metallurgical recoveries than expected and delay and impede operations, which may affect the profitability of the Rose Lithium-Tantalum Property. In addition, further metallurgical testing or operations may determine that the metals cannot be extracted as economically as anticipated.

Life of Mine Plan

The life of mine plan proposes to mine 26.3 Mt of ore, 182.4 Mt of waste, and 10.9 Mt of overburden for a total of 219.6 Mt of material. The average stripping ratio is 7.3 tonnes of stripping per tonne of ore. The nominal production rate is estimated at 4,600 tonnes per day and 350 operating days per year. The open pit mining schedule allows for a 17-year mine life. The mine will produce a total of 26.3 million tonnes of ore grading an average of 0.87% Li2O and 138 ppm Ta2O5, including dilution. The mill will process 1.61 million tonnes of ore per year to produce an annual average of 224,686 tonnes of technical and chemical grade spodumene concentrate and 441 tonnes of tantalite concentrate. However, significant changes in the life of mine plan can occur as a result of experience obtained in the course of carrying out the Corporation's mining activities, changes in mining methods and rates, process changes, investments in new equipment and technology and other factors. There can be no assurance that the estimates in the Corporation's plan will be consistent with future economic factors or actual results and performance or that the Corporation will not amend its existing life of mine plan for its Rose

CRITICAL ELEMENTS LITHIUM CORPORATION
52


Lithium-Tantalum Property in the future.

Need for Funding and Time of Development. There is a risk that the development of the Rose Lithium-Tantalum Property into commercial production will not be completed on time or on budget, or not at all. The development and construction schedule of the Rose Lithium-Tantalum Property is based on management's expectations, and may be delayed by a number of factors, some of which are beyond the Corporation's control. It is common in new mining operations to experience unexpected costs, problems and delays during permitting, construction, development and mine start-up. Most, if not all, projects of this kind suffer delays in start-up and commissioning due to late delivery of components, the inadequate availability of skilled labour and mining equipment, adverse weather or equipment failures, the rate at which expenditures are incurred, delays in construction schedules, or delays in obtaining the required permits or consents, or to obtain the required financing. In addition, delays in the early stages of mineral production often occur. During this time, the economic feasibility of production may change. Capital and operating costs are estimates based on the interpretation of geological data, pre-feasibility and feasibility studies and other conditions, and there can be no assurance that they will prove to be accurate. The costs, timing and complexities of developing the Rose Lithium-Tantalum Property may be significantly higher than anticipated, including because the availability of infrastructure such as surface access, skilled labour, and energy at an economic cost, cannot be assured. In addition, cost estimates may increase significantly as more detailed engineering work and studies are completed. The Corporation requires financing through equity and/or debt securities to complete the development, construction and commissioning of the Rose Lithium-Tantalum Property and to fund future working capital, capital expenditures, operating and exploration costs and other general corporate requirements. The success and the pricing of any such capital raising and/or debt financing is dependent upon the prevailing market conditions at that time and upon the Corporation's ability to attract significant amounts of debt and/or equity. There is no assurance that such financing will be obtained on terms satisfactory to the Corporation and, if raised by offering equity securities, any financing may involve a dilution to existing shareholders. Failure to obtain any financing necessary for the Corporation's capital expenditure could result in the delay or indefinite postponement of further construction and development of the Rose Lithium-Tantalum Property which in turn would materially and adversely affect the financial and operating results of the Corporation and the market price of the Corporation's securities and, ultimately, could result in the loss of its properties.

Construction and Start-Up of New Mines and Industrial Plants. The success of construction projects and the start-up of new mines and industrial plants by the Corporation is subject to a number of risks and challenges including the availability and performance of engineering and construction contractors, suppliers and consultants; unforeseen geological formations; the implementation of new mining and industrial processes; the receipt of required governmental approvals and permits in connection with the construction of mining and industrial facilities and the conduct of operations, including environmental and operating permits; price escalation on all components of construction and start-up; engineering and mine design adjustments; the underlying characteristics, quality and unpredictability of the exact nature of mineralogy of a deposit and the consequent accurate understanding of ore or concentrate production; and the successful completion and operation of haulage ramp and conveyors to move ore and other operational elements. Any delay in the performance of any one or more of the contractors, suppliers, consultants or other persons on which the Corporation is dependent in connection with its construction and development activities, a delay in or failure to receive the required governmental approvals and permits in a timely manner or on reasonable terms, or a delay in or failure in connection with the completion and successful operation of the operational elements in connection with the mine and the industrial facilities could delay or prevent the construction and start-up as planned and may result in additional costs being incurred by the Corporation beyond those budgeted. There can be no assurance that current or future construction and start-up plans implemented by the Corporation will be successful.

Infrastructure, Supplies and Inflation. The availability of skilled labour, electricity and other necessary supplies at an economic cost cannot be assured. These are integral requirements for exploration, development and production facilities on mineral properties. Prices for goods and services will fluctuate in relation to the level of investment in the mining sector; it is reasonable to expect that increased demand could impact the Corporation's future economic projections and competitiveness, as it may entail a

CRITICAL ELEMENTS LITHIUM CORPORATION
53


meaningful increase in costs for various goods and services.

Improvements in the economic conditions for the mining industry as a whole will typically result in increases to both the costs of planned exploration and development activities, which must also be factored into economic models used in projections for future development and potential operations. Increased demand for, and costs of, goods or services could result in delays if they cannot be obtained in a timely manner due to inadequate availability, and may cause scheduling difficulties and delays due to the need to coordinate their availability, any of which could materially increase project exploration, development and/or construction costs. These factors could have a material adverse impact on the Corporation's operations and profitability.

Equipment shortages and access restrictions

The Corporation's interest in the Rose Lithium-Tantalum Property will require adequate infrastructure, such as roads, bridges and sources of power and water, for future exploration and development activities. The lack of availability of these items on terms acceptable to the Corporation or the delay in availability of these items could prevent or delay exploitation or development of the Corporation's mineral properties. Natural resource exploration, development, processing and mining activities are dependent on the availability of mining, drilling and related equipment in the particular areas where such activities are conducted. A limited supply of such equipment or access restrictions may affect the availability of such equipment to the Corporation and may delay exploration, development or extraction activities. Certain equipment may not be immediately available, or may require long lead time orders. A delay in obtaining necessary equipment could have a material adverse effect on the Corporation's operations and financial results.

Litigation and Other Legal Proceedings

Like most companies, the Corporation is subject to the threat of litigation and may be involved in disputes with other parties which may result in litigation or other proceedings. The Corporation's operations are subject to the risk of legal claims by employees, unions, contractors, debt holders, lenders, suppliers, future joint venture partners, shareholders, governmental agencies or others through private actions, class actions, administrative proceedings, regulatory actions or other litigation.

General Risk Factors

Climate Change

Climate change is an international concern and, as a result, poses risk of both climate changes and government policy in which governments are introducing climate change legislation and treaties that could result in increased costs, and therefore, could decrease profitability of the Corporation's operations. The Canadian government has established a number of policy measures in response to concerns relating to climate change. The impacts of these measures will most likely be to increase costs for fossil fuels, electricity and transportation; restrict industrial emission levels; impose added costs for emissions in excess of permitted levels; and increase costs for monitoring and reporting. Compliance with these initiatives could have a material adverse effect on the Corporation's results of operations. The Corporation's current regulatory risks associated with climate change mainly fall under its obligations under the Québec carbon market trading scheme. Increased public awareness and concern regarding global climate change may result in more legislative and/or regulatory requirements to reduce or mitigate the effects of GHG emission. If the current trend of increasing regulation continues, this may result in the increase of costs of the operations of the Corporation.

In addition, the physical risks of climate change may also have an adverse effect on the operations of the Corporation. Global climate change could exacerbate certain of the threats facing the Corporation's business, including the frequency and severity of weather-related events, resource shortages, changes in rainfall and storm patterns and intensities, forest fires, water shortages and changing temperatures, which can disrupt the Corporation's operations, restrict the Corporation's ability to access its properties, damage its infrastructure or properties, create financial risk to Corporation's business or otherwise have a material adverse effect on its results of operations, financial position or liquidity. These may result in substantial costs to respond during the event, to recover from the event and possibly to modify existing or future infrastructure requirements to prevent recurrence. Climate changes could also disrupt the Corporation's operations by impacting the availability and cost of materials needed for mining operations and could increase insurance and other operating costs.

CRITICAL ELEMENTS LITHIUM CORPORATION


Resource exploration and development is generally speculative in nature. Resource exploration and development is a speculative business involving significant risks which even a combination of careful evaluation, experience and knowledge may not eliminate. Few properties which are explored are ultimately developed into producing mines. There is no assurance that the Rose Lithium-Tantalum Property or any other mineral properties which may be explored by the Corporation may be developed into producing mines.

Metal prices. Even if the Corporation's exploration programs are successful, factors beyond the control of the Corporation may affect marketability of any minerals discovered. Metal prices have historically fluctuated widely and are affected by numerous factors beyond the Corporation's control, including international, economic and political trends, expectations for inflation, currency exchange fluctuations, interest rates, global or regional consumption patterns, speculative activities and worldwide production levels. The effect of these factors cannot accurately be predicted.

Volatility of Share Price and Market Price of the Common Shares. The price of the shares of resource companies tends to be volatile. Fluctuations in the world of metal prices in response to many other elements beyond the control of the Corporation could materially affect the price of the common shares of the Corporation.

There can be no assurance that an active market for the common shares of the Corporation will be sustained after any offering of securities. Securities of companies with smaller capitalizations have experienced substantial volatility in the past, often based on factors unrelated to the financial performance or prospects of the companies involved. These factors include global economic developments and market perceptions of the attractiveness of certain industries. There can be no assurance that continuing fluctuations in price will not occur. If an active market for the common shares of the Corporation does not continue, the liquidity of a purchaser's investment may be limited. If such a market does not develop, purchasers may lose their entire investment in the common shares of the Corporation.

As a result of any of these factors, the market price of the common shares of the Corporation at any given point in time may not accurately reflect the long-term value of the Corporation. Securities class-action litigation often has been brought against companies following periods of volatility in the market price of their securities. The Corporation may in the future be the target of similar litigation. Securities litigation could result in substantial costs and damages, and also divert management's attention and resources.

Dilution. Additional financing needed to continue funding the development and operation of the Corporation may require the issuance of additional securities of the Corporation. The issuance of additional securities and the exercise of Warrants, options and other convertible securities will result in dilution of the equity interests of any persons who are or may become holders of common shares.

Sales by existing shareholders. Sales of a substantial number of common shares in the public market could occur at any time. These sales, or the market perception that the holders of a large number of common shares intend to sell common shares, could reduce the market price of the common shares. If this occurs and continues, it could impair the Corporation's ability to raise additional capital through the sale of securities.

Competition. The mining industry is intensely competitive in all its phases. The Corporation competes with many companies possessing greater financial resources and technical facilities than itself for the acquisition of mineral interests as well as for recruitment and retention of qualified employees.

Environmental and safety regulations. The Corporation operations may be subject to environmental regulations promulgated by government agencies from time to time. Environmental legislation provides for restrictions and prohibitions on spills, releases or emissions of various substances produced in association with certain mining industry operations which would result in environmental pollution. A breach of such legislation may result in the imposition of fines and penalties. In addition, certain types of

CRITICAL ELEMENTS LITHIUM CORPORATION
55


operations require the submission and approval of environmental impact assessments. Environmental legislation is evolving in a manner that means standards are stricter, and enforcement, fines and penalties for non-compliance are more stringent. Environmental assessments of proposed projects carry a heightened degree of responsibility for companies and directors, officers and employees. The cost of compliance with changes in governmental regulations has a potential to reduce the profitability of operations. The Corporation intends to comply fully with all environmental regulations. Such operations and exploration activities are also subject to substantial regulation under applicable laws by governmental agencies. There can be no assurance, however, that such laws and regulations will not have an adverse effect on any mining project which the Corporation might undertake.

Failure to comply with applicable laws, regulations, and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in mining operations and mineral exploration and development may be required to compensate those suffering loss or damage by reason of mining or other exploration and/or development activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations and, in particular, environmental laws. Amendments to current laws, regulations and permits governing operations and activities of mining companies, or more stringent implementation thereof, could have a material adverse impact on the Corporation and cause increases in capital expenditures or production costs or reduction in levels of production at producing properties or require abandonment or delays in development of new mining properties.

Environmental liabilities. Exploration activities may also have environmental impacts and may cause environmental liabilities. In any such events, the Corporation may be required to remediate these properties and the costs of such work could have an adverse effect upon the Corporation and the value of its shares.

The Corporation will be required to obtain permits or maintain them in good standing and comply with various other government regulations and there could be significant adverse consequences to the Corporation arising from not obtaining such permits or not complying with such government regulations.

The current and future operations of the Corporation may require obtaining permits or maintaining them in good standing from various governmental authorities and will be governed by laws and regulations governing prospecting, development, mining, production, export, taxes, labour standards, occupational health, waste disposal, land use, environmental protections, mine safety and other matters. There is no assurance that the Corporation will be able to obtain all necessary permits or maintain them in good standing and approvals that may be required to undertake exploration activity or commence construction or operation of lithium extraction facilities on the Corporation's properties or any other properties the Corporation may acquire in the future. To the extent such approvals are required and not obtained, the Corporation may be curtailed or prohibited from commencing or continuing with mining operations, or proceeding with any future exploration or development of the Corporation's properties.

Costs of environmental remediation. Planned expenditures may differ from the actual expenditures required. It is not possible to determine the exact amount that will be required to complete remediation activities, and the amount that the Corporation is required to spend could be materially different than current estimates. Environmental bonds or other forms of financial assurance represent only a portion of the total amount of money that will be spent on remediation over the life of a mine's operation. Although the Corporation includes estimated remediation costs in its mining plans, it may be necessary to revise the planned expenditures and the operating plan for the Corporation's properties in order to fund required remediation activities.

Stage of development. Based on the Technical Report (as such term is defined below), the Corporation has determined that one of its mineral properties, the Rose Lithium-Tantalum Property, contains economically recoverable ore reserves. As at May 31, 2025, the Corporation considered that the Rose Lithium-Tantalum Property was still at the exploration stage, as all the financing needed to start the

CRITICAL ELEMENTS LITHIUM CORPORATION
56


construction and development phase of the project had not yet been secured.

Uninsured hazards

Hazards such as unusual geological conditions are involved in exploring for and developing mineral deposits. The Corporation may become subject to liability for pollution or other hazards which cannot be insured against or against which the Corporation may elect not to insure because of the high cost of premiums or for other reasons. The payment of any such liability could result in the loss of Corporation assets or the Corporation's insolvency.

Future financing

Completion of future programs may require additional financing, which may dilute the interests of existing shareholders. The Corporation has been successful in the past in raising financing, however it requires significant additional financing in the near and long-term and there is uncertainty as to the ability to raise such financing. Specifically, in order to move forward on its mining Rose Lithium-Tantalum Property, the Corporation will have to raise additional funds. If management is unable to obtain new funding, the Corporation may be unable to continue its operations, and amounts realized for assets may be less than amounts reflected in these financial statements.

Canada Revenue Agency

No assurance can be made that Canada Revenue Agency will agree with the Corporation's characterization of expenditures as Canadian exploration expenses or Canadian development expenses or the eligibility of such expenses as Canadian exploration expenses under the Income Tax Act (Canada).

Public Corporation Obligations

As a publicly listed corporate entity, the Corporation is subject to evolving rules and regulations promulgated by a number of governmental and self-regulated organizations, including the Canadian Securities Administrators, the TSXV, the OTCQX International, the Frankfurt Exchange, and the International Accounting Standards Board, which govern corporate governance and public disclosure regulations. These rules and regulations continue to evolve in scope and complexity creating many new requirements, which increase compliance costs and the risk of noncompliance. The Corporation's efforts to comply with these rules and obligations could result in increased general and administration expenses and a diversion of management time and attention from financing, development, operations and, eventually, revenue-generating activities.

Lithium Demand

Lithium is considered an industrial mineral and the sales prices for the different lithium compounds are not public. Lithium is not a traded commodity like base and precious metals. Sales agreements are negotiated on an individual and private basis with each different end-user. Therefore, it is possible that the sales prices used in the Technical Report will be different than the actual prices at which the Corporation is able to sell its lithium compounds. In addition, there are a limited number of producers of lithium compounds and it is possible that these existing producers will try to prevent newcomers from entering the chain of supply by increasing their production capacity and lowering sales prices. Factors such as foreign currency fluctuation, supply and demand, industrial disruption and actual lithium market sale prices could have an adverse impact on operating costs and stock market prices and on the Corporation's ability to fund its activities. In each case, the economics of the Rose Lithium-Tantalum Property could be materially adversely affected, even to the point of being rendered uneconomic.

Changes in technology

Lithium carbonate and hydroxide are currently key materials used in batteries, including those used in electric vehicles. However, the technology pertaining to batteries, electric vehicles and energy creation and storage is changing rapidly and there is no assurance that lithium will continue to be used to the same degree it is used now, or that it will be used at all. Any decline in the use of lithium in batteries or technologies utilizing such batteries may result in a material and adverse effect on the Corporation's prospects for development of the Rose Lithium-Tantalum Property.

Potential impact of U.S. trade policy

The U.S. government has and continues to make significant changes in U.S. trade policy and has taken certain actions that could negatively impact international trade, including imposing tariffs. The implementation and continuance of new tariffs and retaliatory measures is uncertain. To the extent continued, any such tariffs and/or retaliatory measures may have an adverse effect on the Corporation. Tariffs could have an impact on trade flows, investor sentiment and monetary policy decisions, leading to greater fluctuations in the CAD/USD exchange rate and the

CRITICAL ELEMENTS LITHIUM CORPORATION
57


Corporation's ability to raise funds to finance its operations. In addition, tariffs could also have an impact on the capital expenditure required to develop and build a mine for the Rose Lithium-Tantalum Project.

CRITICAL ELEMENTS LITHIUM CORPORATION
58