CRITICAL ELEMENTS LITHIUM CORPORATION
(an exploration company)
MANAGEMENT DISCUSSION AND ANALYSIS
For the six-month period ended February 29, 2020 (Second quarter)
This management discussion and analysis ("MD&A") of Critical Elements Lithium Corporation ("Critical Elements" or the "Company") complies with Rule 51-102A of the Canadian Securities Administrators regarding continuous disclosure.
The MD&A is a narrative explanation, through the eyes of the management of Critical Elements, of how the Company performed during the six-month period ended February 29, 2020, and of the Company financial condition and future prospects. This discussion and analysis complements the unaudited condensed interim financial statements for the six-month period ended February 29, 2020 but does not form part of them.
The condensed interim financial statements have been prepared by the Company's management in accordance with International Financial Reporting Standards ("IFRS").
All figures are in Canadian dollars unless otherwise stated. Additional information relating to the Company can be found on SEDAR at www.sedar.com. The shares of Critical Elements are listed on the TSX Venture Exchange under the symbol CRE, on the American Over-The-Counter QX stock exchange (OTCQX) under the symbol CFECF and on the Frankfurt Exchange under the symbol F12.
DATE
The MD&A was prepared on the basis of information available as at April 9, 2020.
CAUTION REGARDING FORWARD-LOOKING STATEMENTS
This document contains forward-looking statements that reflect the Company's current expectations regarding future events. To the extent that any statements in this document contain information that is not historical, the statements are essentially forward-looking and are often identified by words such as "anticipate", "expect", "estimate", "intend", "project", "plan" and "believe". Forward-looking statements involve risks, uncertainties, and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. There are many factors that could cause such differences, particularly: volatility and sensitivity to market metal prices; impact of change in foreign currency exchange rates and interest rates; imprecision in reserve estimates; environmental risks including increased regulatory burdens; unexpected geological conditions; adverse mining conditions; changes in government regulations and policies, including laws and policies; failure to obtain the necessary permits and approvals from government authorities; and other development and operating risks.
While the Company believes that the assumptions underlying in the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which only apply as of the date of this document. The Company disclaims any intention or obligation to update or revise any forwardlooking statement, whether or not it should be revised because of new information, future events or otherwise, unless required to do so by the applicable securities laws.
NATURE OF ACTIVITIES
Critical Elements Lithium Corporation is incorporated under the Canada Business Corporations Act. The Company is involved in the acquisition, exploration and development of mining properties. The Company is active in Canada.
HIGHLIGHTS
- In October 2019, the Company announced that Primero Group ("Primero") has successfully completed the first phase of its Early Contractor Involvement ("ECI") agreement. Primero has provided a Guaranteed Maximum Price ("GMP") for the engineering, procurement and construction ("EPC") of the Rose Lithium-Tantalum project ("Project") on a lump sum turnkey basis that is in line with the Project's feasibility study published November 29, 2017.
- In December 2019, the Company provided Québec's Ministère de l'Environnement et de la Lutte contre les changements climatiques and the Canadian Environmental Assessment Agency with requested information.
- In March 2020, Eric Zaunscherb joined the Board of Directors of the Company as an independent director.
- The Company continues to work closely with its financial advisor, Canaccord Genuity Corp. ("Canaccord"), to evaluate ongoing interest from global strategic partners that seek to accelerate the Rose Lithium-Tantalum project to production. Discussions with multiple potential partners are advancing and our goal is to finalize a transaction by the end of the fiscal year. Progress is being made on delivering commitments totaling $341 million for a financing package to fund construction.
OVERALL PERFORMANCE
ROSE LITHIUM-TANTALUM – LITHIUM, TANTALUM PROJECT
Property Description
The Rose Lithium-Tantalum property is located in northern Québec's administrative region, on the territory of Eeyou Istchee James Bay. It is located on Category III land, on the Traditional Lands of the Eastmain Community, approximately 40 km north of the Cree village of Nemaska. The latter is located approximately 300 km north-west of Chibougamau.
The Rose Lithium-Tantalum property is accessible by road via the Route du Nord, usable all year round from Chibougamau. The mine site can also be reached by Matagami, via Route 109 and Route du Nord. Figure below shows the regional location of the project. The project is located 80 km south of Goldcorp's Éléonore gold mine and 45 km north-west of Nemaska's Whabouchi lithium project and 20 km south of Hydro Québec's Eastmain 1 hydroelectricity generating plant. The Nemiscau airport services the regions air travel needs. The Rose Lithium-Tantalum property site is located 50 km by road from the Nemiscau airport.
The Rose Lithium-Tantalum property comprises 473 claims spread over a 24,654 ha area. Geologically, the Rose Lithium-Tantalum property is located at the north-east end of the Archean Lake Superior Province of the Canadian Shield.

Rose Lithium-Tantalum Property Location
In April 2017, the Company announced that it had successfully completed its pilot plant trials. The program confirmed the suitability and robustness of the beneficiation plant design. The outstanding results yielded lithium concentrate grades of up to 6.56% and recoveries of up to 83.4%. Results obtained in pilot plant testing demonstrate very good understanding of the processing of the mineralized material, and the commercial plant should generate results similar to the locked cycle tests with the optimized equipment.
Locked cycle tests returned outstanding results, with a lithium concentrate grade of 6.65% Li2O and recoveries of up to 89.7%. Tantalite recoveries were 48.1% for Rose and 64.4% for Rose South, respectively, with grades of 1.44% and 2.39% Ta2O5, respectively. The trials also included testing of low iron content mineralized material suitable for higher-value Glass and Ceramics applications (Spodumene Tech Grade).
In July 2017, has announced that its environmental impact study ("EIS") for the Rose Lithium-Tantalum Project was officially submitted to the Environmental and Social Impact Review Committee ("COMEX") and the Canadian Environmental Assessment Agency ("CEAA"). Submission of the EIS, which was developed by WSP, is an important step in the process of obtaining authorization for the project. The EIS was submitted to COMEX in accordance with Chapter II of the Quebec Environment Quality Act and to the CEAA in accordance with the Canadian Environmental Assessment Act.
On November 27, 2017, the Company proceeds to the filing on SEDAR of a National Instrument ("NI") 43-101 technical report representing the qualifying report for the feasibility study of the Rose Lithium-Tantalum. Highlights are as follows:
-
Average annual production of 186,327 tonnes of chemical grade lithium concentrate
-
Average annual production of 50,205 tonnes of technical grade lithium concentrate
-
Average annual production of 429 tonnes of tantalum concentrate
-
Expected life of mine of 17 years
-
Average operating costs of $66.56 per tonne milled, $458 (US$344) per tonne of concentrate (all concentrate production combined)
-
Estimated initial capital cost $341.2 million before working capital
-
100% equity basis for project
-
Average gross margin 63.6%
-
After-tax NPV of $726 million (at 8% discount rate), after-tax IRR of 34.9% and price assumption of US$1,500 per tonne technical grade lithium concentrate, US$750 per tonne chemical grade lithium concentrate, US$130 per kg tantalum pentoxide
-
Anticipated construction time to start of production of 21 months
The completion of the feasibility on the spodumene plant is the first step to enter the market and establish the Company as a high quality lithium supplier. The low-risk approach is characterised by simple openpit mining and conventional lithium processing technologies.
The feasibility is based on a conventional truck and shovel open pit operation and a conventional milling process to produce technical and chemical grade spodumene concentrates and a tantalite concentrate.
The mine is planned to excavate a total of 26.8M tonnes ore grading an average of 0.85% Li2O and 133 ppm Ta2O5 after dilution. The mill will process 1.61M tonnes of ore per year to produce an annual average of 236,532 tonnes of technical and chemical grade spodumene concentrates and 429 tonnes of tantalite concentrate. The ore is contained in several parallel and continuous low dipping pegmatite veins outcropping on surface. The ore zones are open at depth and a future underground operation is possible.
Over the life of mine, the open pit will excavate a total of 182.4M tonnes of waste rock and 11.0 M tonnes of overburden. The average strip ratio is 7.2 tonnes of stripping per tonne of ore.
Table 1: Rose Key FS Results
| ltem | Units | Value | |
|---|---|---|---|
| Production | |||
| Project life (from start of construction to closure) | years | 19 | |
| Mine life | years | 17 | |
| Total mill feed tonnage | M t | 26.8 | |
| Average mill feed grade | |||
| Li 2 O | % $Li2O$ | 0.85 | |
| $Ta_2O_5$ | ppm $Ta_2O_5$ | 133 | |
| Lithium Concentrate Production | |||
| % of Production, Chemical Grade | $\frac{0}{0}$ | 75 | |
| % of Production, Technical Grade | $\frac{0}{0}$ | 25 | |
| Mill recoveries | |||
| Li 2 O, Chemical Grade | % | 90 | |
| Li 2 O, Technical Grade | % | 87 | |
| Ta2O5 | % | 40 | |
| Payable | |||
| 5% Li 2 O Concentrate, Chemical Grade | t | 3,070,000 | |
| 6% Li 2 O Concentrate, Technical Grade | t | 827,000 | |
| $Ta2O5$ contained in concentrate | kg | 1,431,000 | |
| Commodity Prices | |||
| 5% Li 2 O Concentrate, Chemical Grade FOB port | US$/t conc. | 750 | |
| 6% Li 2 O Concentrate, Technical Grade FOB port | US$/t conc. | 1,500 | |
| $Ta2O5$ contained in concentrate FOB mine site | US$/kg contained | 130 | |
| Exchange rate | 1 US$: 1.33 CAN$ | ||
| 0.75 US$: 1 CAN$ | |||
| Project Costs | CA$ | US$ | |
| Average Mining Cost | $/t milled | 30.69 | 23.02 |
| Average Milling Cost | $/t milled | 16.14 | 12.11 |
| Average General & Administrative Cost | $/t milled | 12.15 | 9.12 |
| Average Concentrate Transport Costs | $/t milled | 7.57 | 5.68 |
| Project Economics | CA$ | US$ | |
| Gross Revenue | $M | 4,973 | 3,729 |
| Total Selling Cost Estimate | $M | 152 | 114 |
| Total Operating Cost Estimate | $Μ | 1.785 | 1.339 |
| Total Sustaining Capital Cost Estimate | $Μ | 127 | 95 |
| Total Capital Cost Estimate | $Μ | 341 | 256 |
| Duties and Taxes | $M | 1,000 | 750 |
| Pre-Tax Cash Flow | $Μ | 2,567 | 1,926 |
| After-Tax Cash Flow | $Μ | 1,5671,175 | |
| Effective tax rate | 39% | ||
| Discount Rate | 8% | ||
| Pre-Tax Net Present Value @ 8% | $Μ | 1,257 | 943 |
| Pre-Tax Internal Rate of Return | 48.2% | ||
| Pre-Tax Payback Period | years | 2.3 | |
| After-Tax Net Present Value @ 8% | $M | 726 | 545 |
| After-Tax Internal Rate of Return | 34.9% | ||
| After-Tax payback period | years | 2.8 |
Reserve Estimate
A Mineral Reserve Estimate for 17 mineralized zones was prepared during this study. The estimation assumed the production of a chemical grade spodumene concentrate with a price of 15.66 US$ per kg Li2O and a tantalite concentrate with a price of 130 US$ per Ta2O5. The recoveries were fixed at 85% and 64% for Li and Ta respectively. The grade-recovery curve used for resource estimate, which became available after the mineral reserves were evaluated, was verified and found to have little influence on the reserve estimate. The production of a higher value technical grade spodumene concentrate was not assumed in the reserve estimate.
Based on compilation status, metal price parameters, and metallurgical recovery inputs, the effective date of the estimate is August 4, 2017.
The estimate was prepared in accordance with CIM's standards and guidelines for reporting mineral resources and reserves.
Table 1 displays the results of the Mineral Reserve Estimate for the Rose Project at the $29.70 NSR per tonne cut-off for the open-pit scenario.
| . | ||||||
|---|---|---|---|---|---|---|
| Tonnage | NSR | Li 2 Oea | Li 2 O | $Ta_2O_5$ | ||
| Category | (Mt) | ($) | (%) | (%) | (ppm) | |
| Probable | 26.8 | 148.99 | 0.96 | 0.85 | 133 | |
| Total | 26.8 | 148.99 | 0.96 | 0.85 | 133 |
| Table 1 – Mineral Reserve Estimate | ||||
|---|---|---|---|---|
| ------------------------------------ | -- | -- | -- | -- |
The Independent and Qualified Person for the Mineral Reserve Estimate, as defined by NI 43-101, is Patrick Frenette, P.Eng, M.Sc.A, of InnovExplo Inc. The effective date of the estimate is August 4, 2017.
- The model includes 17 mineralized zones.
- Calculations used metric units (metres, tonnes and ppm).
- The number of metric tons was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects. Rounding followed the recommendations in NI 43-101.
- InnovExplo is not aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect the Mineral Reserve Estimate.
Resource Estimate
InnovExplo updated the mineral resource estimate from the 2011 PEA for 23 mineralized zones. The mineral resource was updated on a block value basis using current pricing and cost parameters.
The effective date of the estimate is August 29, 2017, based on compilation status, metal price parameters, and metallurgical recovery inputs.
Given the density of the processed data, the search ellipse criteria, the drill hole density and the specific interpolation parameters, InnovExplo is of the opinion that the current mineral resource estimate can be classified as Indicated and Inferred resources. The estimate was prepared in accordance with CIM's standards and guidelines for reporting mineral resources and reserves.
Table 2 displays the results of the Mineral Resource Estimate for the Rose Project using $30 NSR per tonne cut-off for the open-pit mine and $110 NSR cut-off for the underground mine.
| Tonnage | NSR | Li 2 O eq | Li 2 O | $Ta_2O_5$ | |||
|---|---|---|---|---|---|---|---|
| Category | (Mt) | ($) | $(%)$ | $(%)$ | (ppm) | ||
| Indicated | Pit-constrained | 30.0 | 161 | 1.04 | 0.93 | 150 | |
| Underground | 1.9 | 159 | 1.02 | 0.94 | 114 | ||
| Total Indicated | 31.9 | 161 | 1.04 | 0.93 | 148 | ||
| Inferred | Pit-constrained | 2.0 | 137 | 0.90 | 0.79 | 153 | |
| Underground | 0.8 | 149 | 0.96 | 0.88 | 126 | ||
| Total Inferred | 2.8 | 141 | 0.92 | 0.82 | 145 |
The Independent and Qualified Person for the Mineral Resource Estimate, as defined by NI 43-101, is Pierre-Luc Richard, P.Geo. M.Sc., of InnovExplo Inc. The effective date of the estimate is August 29, 2017.
These Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability.
-
The model includes 23 mineralized zones.
-
Results are presented in situ and undiluted.
-
Sensitivity was assessed using cut-off NSR values for $5-10 increments from $20 to $150. The mineral resource is reported at a cut-off of $30 NSR for the open-pit and of $110 NSR for the underground potential based on market conditions (metal price, exchange rate and production cost).
-
A range of densities was used on a per-zone basis based on statistical analysis of all available data.
-
A minimum true thickness of 2.0 metres was applied, using the grade of the adjacent material when assayed or a value of zero when not assayed.
-
High grade capping was done on raw assay data based on the statistical analyses of individual mineralized zones.
-
Compositing was done on drill hole intercepts falling within mineralized zones (composite lengths vary from 1.5 m to 3 m in order to distribute the tails adequately).
-
Resources were evaluated from drill holes using a 2-pass OK interpolation method in a block model (block size = 5 m x 5 m x 5 m).
-
The inferred category is only defined within the areas where blocks were interpolated during pass 1 or pass 2 where continuity is sufficient to avoid isolated blocks being interpolated by only one drill hole. The indicated category is only defined by blocks interpolated by a minimum of two drill holes in areas where the maximum distance to the closest drill hole composite is less than 40 metres for blocks interpolated in pass 1.
-
The number of metric tons was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects. Rounding followed the recommendations in NI 43-101.
-
InnovExplo is not aware of any known environmental, permitting, legal, title-related, taxation, sociopolitical, marketing or other relevant issue that could materially affect the Mineral Resource Estimate.
Feasibility Study
The parameters used for the feasibility study are the following:
- Open pit mining rate of 1,610,000 tpy
- Spodumene process plant with a 4,900 tpd nominal capacity
Mining Operation
The mineralization is hosted within outcropping pegmatite dykes subparallel to surface. The ore body is relatively flat, close to surface and comprised of north oriented stacked lenses. Mineralization recognized to date on the Rose property includes rare element of Lithium-Cesium-Tantalum or LCT-type pegmatites and molybdenum occurrences.
A conventional truck and shovel open-pit approach was considered to mine the Rose Lithium-Tantalum Project's Probable Mineral Reserves. The dimensions of the engineered pit design are approximately 1,620m long x 900m wide x 200m deep.
The life of mine plan (LOM) proposes to mine 26.8 Mt of ore, 182.4 Mt of waste, and 11.0 Mt of overburden for a total of 220.2 Mt of material. The average stripping ratio is 7.2 tonnes of stripping per tonne of ore. The nominal production rate is estimated at 4,600 tonnes per day and 350 operating days per year.
The mining operation production rate is set to approximately 15 Mt of material per year. An open pit mining schedule was planned and resulted in a mine life of 17 years.
Contract mining will be used for the removal of the overburden while Critical Elements will undertake the mining of all hard rock material with its own equipment fleet and operators,
The main production fleet will consist of one (1) backhoe excavator, one (1) electric front shovel, one (1) wheel loader, seven (7) haul trucks (65t), seven (7) haul trucks (135t), two (2) rotary drills, one (1) DTH drill, two (2) bulldozers, one (1) wheel dozer, two (2) graders, and two (2) water trucks.
The Rose Lithium-Tantalum project pit was designed with a 10m single benching arrangement. A 57° inter-ramp angle and an overall pit slope angle of 55° were utilized for the ultimate pit design. A berm width of 7.0m corresponding to the recommended overall slope angle was used. The pit slopes in overburden have a face ratio of 2.5:1 with a 10m berm width.
The main in-pit haulage ramp is designed at 30.9m wide to allow a double-lane traffic, except for the last benches at the pit bottom that are designed at 20.4m wide for single lane traffic. A 2m drainage ditch is included to allow for water drainage and pipe installation. The maximum gradient of the inner curvature of all ramp segments is 10%.

Figure 2 – Rose Lithium-Tantalum Pit Plan View
Figure 3 – Rose Lithium-Tantalum Pit Side View Looking West

Mineral Processing
A standard froth flotation process will be utilized to produce technical grade and chemical grade lithium concentrates and a tantalum concentrate. The mineral process plant will consist of crushing, beneficiation, and dewatering areas. The technical grade lithium concentrate will grade 6.0% Li2O while the chemical grade lithium concentrate will grade 5.0% Li2O. The tantalum concentrate will grade 20% Ta2O5.
The beneficiation process includes crushing, grinding, magnetic separation and flotation. The crushing circuit will consist of a jaw crusher and two (secondary and tertiary) cone crushers, and screens. The crushed ore will have a P80 of 13mm and will be stockpiled in a 9,200 tonnes capacity dome; this is sufficient for approximately two days of mill operation. The grinding circuit will consist of a ball mill operating in a closed circuit and a two-stage cyclone cluster. The tantalum will first be recovered at a grade of 2.0% Ta2O5 by high intensity magnetic separation then upgraded further to 20.0% Ta2O5 by gravity separation. The tantalum concentrate will then be thickened, vacuum filtered, dried to 1% moisture and bagged, ready for shipping. The lithium flotation circuit will remove slimes, separate mica, and purify the lithium to the required grade. The spodumene concentrate will then be thickened, vacuum filtered, dried to 1% moisture, and stored in 1500 tonne silo from where it can be bulk loaded into trucks. The tailings will be thickened, vacuum filtered to 15% moisture, and trucked to the waste rock / tailings piles where it will be dry stacked.
The spodumene plant will operate 24 hours per day, seven (7) days per week, and 52 weeks per year. The process plant was designed with an operating availability of 90%. The crushing circuit was designed using an operating availability of 50%. The concentrator capacity has been established at a nominal throughput rate of 4 900 dry tonnes per day. The plant has a capacity of 1,610,000 per year.
The process plant flowsheet developed by Bumigeme Inc. is presented in Figure 4.

Figure 4: Rose Lithium-Tantalum Process Flowsheet
Metallurgy
Bench scale metallurgical testing was performed at ACME Metallurgical Limited in Vancouver in 2011. The results from these tests were used for the PEA study. Three composites; the Rose (main structure), the Rose Sud-Est (Southeast structure) and Tantalum (secondary structure with higher tantalum and lower lithium content) were subjected to various metallurgical tests.
SGS Canada Inc. in Lakefield conducted tests from 2013 to 2015 to improve lithium and tantalum recoveries. In 2015 SGS Canada Inc. developed a conceptual flowsheet based on a series of bench scale tests on various samples from the Rose deposit. The proposed flowsheet is comprised of conventional three-stage crushing and single stage grinding followed by magnetic separation for the recovery of tantalum, mica flotation, and spodumene flotation. This flowsheet was the basis of the process plant design.
SGS Canada also conducted a pilot plant program in early 2017 on two samples from the Rose project (Rose and Rose South). The main objective of the pilot plant program was to generate spodumene concentrate for testing in a lithium carbonate pilot plant which was conducted by Outotec in Germany and Finland. Secondary objectives were to prove metallurgical performance on a continuous pilot scale and to generate metallurgical and operating data for further studies. The spodumene pilot plant demonstrated the robustness of the design process.
The feasibility study assumes 87.3% and 90% recovery for technical and chemical grade lithium concentrates respectively and 40% recovery for the tantalum concentrate.
Process water will be recycled releasing minimal amounts to the equalization pond and final effluent treatment plant.

Bulk sampling for pilot plant work
Environmental and Social Impact Assessment
Baseline environmental studies were initiated in the spring 2011. In 2016, various studies were undertaken in order to update the 2011 data and to obtain the baseline information that is required to assess the project's impacts within the Environmental and Social Impact Assessment ("ESIA") of the Rose mine Project. In total, eleven different sectorial studies were completed documenting the following components:
- Hydrology
- Surface Water and Sediments
- Terrestrial fauna
- Aquatic fauna
- Artificial light at night
- Landscape
- Environmental Site Assessment Phase I
- Vegetation
- Greenhouse gas
- Noise (including modelling)
- Archeology
- Air quality (including modelling)
The baseline study was completed and the ESIA was submitted to the Canadian Environmental Assessment Agency (CEAA) and the Ministère du Développement durable, de l'Environnement, et de la Lutte contre les changements climatiques (MDDELCC) of the Québec Province on July 28th, 2017. The ESIA included preliminary information regarding Hydrogeology and will be updated when modelling is completed.
Critical Elements has been working since the beginning with the Eastmain Community, on whose lands the Project lies. The Company continue to maintain good relations with the Grand Council of the Cree and with the neighbouring Nation of Nemaska. Consultations have been ongoing and are planned throughout the life of the Project.
The Company continues to engage with both the federal and provincial governments regarding clarifications related to the Environmental and Social Impact Assessment.
Infrastructure
The project infrastructure includes site main services and haulage roads, explosive and detonator storage, a spodumene processing plant, a pit equipment maintenance facility, a warehouse, diesel and gasoline storage, LNG storage and distribution, ore stockpile pad, waste rock and dry tailings stockpile, overburden stockpile, main electrical substation and distribution, fresh and potable water supply, sewage, surface water management, final effluent treatment, communication system, gate house, and an administrative building. A lithium carbonation plant is not included in the feasibility study, but additional space is provided on the industrial pad and services are planned for future installation.
The mine site layout is shown in figure 5.


Waste rock and tailings samples were analysed at the SGS Canada's laboratory in Lakefield and both were found to be non-acid generating. The dry tailings and the waste rock will be stored in the same facility which has sufficient capacity for the life of mine. Rain and melt water will be collected in ditches and pumped to the water treatment plant.
The ore pad will have a 3.9M tonne capacity where low grade material may be stored.
The industrial pad has an area of 296,000 m2 and will contain the process plant, the maintenance facility, warehouse, administration building, diesel and gasoline storage tanks, LNG storage and distribution, and all associated services. LNG will be used for buildings heating and for the drying of the lithium and tantalum concentrates. The LNG facility will be in place for the kiln of a lithium carbonate plant if required, necessitating the addition of only one additional reservoir.
The hydrology study has suggested that water inflow to the open pit is to be expected. In order to maximize pit slopes, water wells will be constructed around the pit periphery to lower the water table below the pit floor. One of these wells will be used to supply the mine site with fresh water. Water from the other wells will be directed directly to the final effluent.
Impacted water from the waste rock / dry tailings pad, the open pit, the industrial pad, and roads will be collected in an equalization pond and treated before being released as final effluent.
The mine site will have a 2.7 km main access road from the Eastmain 1 road to the industrial pad. Including the service roads, the site will total 15.8 km of roads.
Electricity will be provided by Hydro-Québec. A 315 kV electrical transport line (L3176), owned by Hydro-Québec, runs North-South over the eastern side of the Rose Property. It runs over the planned open pit. The portion running over the open pit will be rerouted to allow open pit operation. Critical Elements and Hydro-Québec have signed an agreement to conduct a technical study for the supply of electricity to the mine and the rerouting of the power line. In a previous study Hydro-Québec provided costs for preparation work in supplying electrical power and for the rerouting of the power line which is to be incurred by the mine. These costs were incorporated in the FS. The schedule of the power line relocation fits with Critical Elements construction schedule such that electrical power will be available from the main grid in time for the mill commissioning and start-up. The 315kV power line reroute will total 4.2 km.
The power demand for the project has been estimated at about 13,486 kW (15,615 kVA) and a reserve of up to 20 MVA has been accepted by Hydro-Québec. Two 15 MW transformers will operate at the same time to feed the site and the processing plant. The transformers will feed the 25 kV mine site electrical network. Power lines are necessary to feed the processing plant, the industrial pad, the final water treatment plant, the open pit and wells, the pumps at the waste rock / dry tailings water collecting ponds, and the explosives and detonator storage facilities. A total of 15.5 km of power lines are planned.

Power line at Rose Lithium-Tantalum site
Capital Costs
The capital and operating costs were estimated in Canadian dollars. An economic analysis was conducted with a discounted cash-flow before and after tax. The initial capital cost is estimated at CA$341.2M including all infrastructures described earlier with a 10% contingency. The sustaining capital is estimated at CA$126.8M over the life of mine.
The total payable products are estimated at 3,070,006 tonnes of chemical grade Li2O concentrate, 827,196 tonnes of technical grade Li2O concentrate, and 7,157 tonnes of Ta2O5 concentrate.
| Initial | Sustaining | |||
|---|---|---|---|---|
| Item | InitialCapital | SustainingCapital | Capital | Capital |
| M CA$ | M CA$ | M US$ | M US$ | |
| Total Capital Estimate | 341.2 | 126.8 | 255.9 | 95.1 |
Table 3 – Initial Capital and Sustaining Capital Costs
Operating Costs
The operating costs are estimated at $66.56 per tonne of ore processed which include:
| - | Mining | $30.69 per tonne processed |
|---|---|---|
| - | Processing | $16.14 per tonne processed |
| - | G&A | $12.15 per tonne processed |
| - | Concentrate transportation | $ 7.57 per tonne processed |
The operating costs are estimated at $458/tonne (US$344/tonne) of concentrate as summarized in table 4.
| Item | $CAS/t$ Li 2 Oconcentrate | US$/t $Li2O$concentrate |
|---|---|---|
| Mining | 211 | 158 |
| Processing | 111 | 83 |
| General and Administration | 84 | 63 |
| Transportation Concentrate | 52 | 39 |
| Total Operating Costs | 458 | 344 |
| lSG&A | 26 | 20 |
| Royalties | 13 | 10 |
| Total Operating Costs (w. SG&A and Royalties) | 497 | 373 |
| Less: Tantalite Credit | 48 | 36 |
| Total Operating Costs (after tantalite credit) | 449 | 337 |
Energy unit costs are $0.05 per kWh for electricity, $0.95 per litre for diesel, and $0.546 per m3 for LNG.
Project Economics
The mine will process 1,610,000 tonnes ore per year grading an average of 0.85% Li2O and 133 gpt Ta2O5 over a period of 17 years. The price assumptions are US$750 per tonne and US$1,500 per tonne of chemical grade and technical grade lithium concentrates respectively (FOB port) and US$130 per kg Ta2O5 contained in the tantalum concentrate (FOB mine site). The pre-tax and after-tax NPV at various discount rates are presented in table 5.
| Discount | Pre-Tax | After-Tax | Pre-Tax | After-Tax |
|---|---|---|---|---|
| Rate | M CA$ | M CAS | MUSS | MUSS |
| $0%$NPV @ | 2.567 | 1.567 | 1.926 | 1,175 |
| 5%$NPV$ @ | 1.620 | 960 | 1.215 | 720 |
| 8%$NPV$ @ | 1.257 | 726 | 943 | 545 |
| $NPV @ 10%$ | 1.070 | 605 | 802 | 454 |
| @ 12% | 914 | 504 | 686 | 378 |
Table 5 – Pre-Tax and After-Tax NPV
The after tax internal rate of return is 34.9%.
Sensitivity Analysis
The sensitivity of the NPV to exchange rate and chemical grade lithium concentrate price is presented in table 6.
Table 6 – After-Tax NPV Sensitivity to exchange rate and chemical grade lithium concentrate
| After-Tax NPV @ 8% Discount Rate - M CA$ | |||||
|---|---|---|---|---|---|
| Exchange Rate | Li 2 O Price - Chemical Grade | ||||
| USD/CAD | 720 US$/t | 810 US$/t | Base Case | 990 US$/t | 1080 US$/t |
| 0.70 | 798M CA$ | 923M CA$ | 840M CA$ | 1,172M CA$ | 1,296M CA$ |
| Base Case | 687M CA$ | 805M CA$ | 726M CA$ | 1,038M CA$ | 1,154M CA$ |
| 0.80 | 590M CA$ | 701M CA$ | 627M CA$ | 920M CA$ | 1,030M CA$ |
Figures 6 and 7 present the sensitivity the NPV at 8% discount rate and IRR to prices, Li2O recovery, exchange rate, operating costs, and capital cost. The economics are most sensitive to Li2O price, exchange rate, and Li recovery.

Figure 6 – Sensitivity on After-Tax NPV 8%


Lithium Demand Outlook
The future growth of the lithium market will be dominated by a growing Lithium Battery industry, mainly driven by electric cars, but also further by energy storage applications and other power tools (e-scooter, e-bikes, wireless devices in general). The growth rate is widely accepted of being beyond 20% up to 2030 and growing further, whereas in 2025 there is market consensus for a requirement of about 900,000 to 1 Million mt of Lithium carbonate equivalents. With declining costs of now approaching 100 USD per KWh for Lithium Ion Battery cells, they are also becoming attractive for use in private installations combined with increasing use of photovoltaic roof-top electricity generation ("PV").
In Germany a new regulation demands that for all PV projects exceeding 1MW power generation an energy storage system has to be installed by 2025. This is in order to avoid peak energy stressing the electricity distribution systems, a phenomenon which already pushes European systems to their limits during the summer months and increasingly so with the ongoing addition of new PV systems, be they commercial or private.
The German Automobile Manufacturers Association considers an electric vehicle penetration rate of 15% to 25% being possible by 2025. The lower range for market penetration of 15% corresponds to some 15 million cars or if we assume a market of 100 million cars by 2025 and an average of 30 kg of lithium carbonate equivalent ("LCE") needed for the battery 450,000 MT of LCEs required for this segment alone.
Canaccord, amongst others, assumes that the overall share of electric vehicles will climb to over 50% of all Li-ion batteries installed, i.e. being the driver of the expanding lithium market. The absolute growth numbers from Canaccord's forecast are higher than previous assumptions, however, in line of some forecasts from original equipment manufacturers (OEMs).
The current growth assumptions will if they materialize, lead to a lithium demand requirement of approximately, 900,000 mt to 1 Million mt of LCE. This is an additional 7,000,000t of LCE required from 2019 till 2025 or the equivalent of approximatly 1,400,000t per year of LCE.


Figure 8: Lithium Ion Battery Installed Shares of Application
Source: Canaccord Genuity Research (Battery Materials Update, report June 2017)
Lithium Price Outlook
In 2017, off take agreements for spodumene CG with a Lithium oxide content between 5.0 and 6.0% have been executed, whereby 120,000t of 5.5% spodumene concentrate has been contracted at US$830/t FOB. Pricing mechanisms have been linked to Lithium Carbonate TG prices for China. Every additional 0.1% of Li2O content will garner a premium of US$15/t, enabling prices between 750 US$/mt and 905 US$/mt for spodumene CG 5.0 and 6.0. Also, suppliers who are able to provide a higher quality spodumene CG yielding lower conversion cost will also be able to achieve higher prices. In 2019 prices for CG Spodumene and Lithium carbonate TG have softened as Chineses converters have failed to meet battery grade specifications, which caused an oversupply of Lithium Carbonate TG. However, prices for Battery Grade Lithium carbonate and Lithium hydroxide on a long-term contractual basis have remained stable over the last three years.
The market for spodumene TG is a specialty chemicals market, which addresses the specific needs for customers in the glass and ceramic industry. Historically, prices have been reflecting the higher value of iron free spodumene like in Lithium carbonate and specific properties of the crystalline material. Therefore, pricing for spodumene TG is directly linked to the Lithium oxide content in Lithium carbonate.
Works done following the feasiblity study
In February 2018, the Company signed an agreement with the Cree Nation of Eastmain and Niskamoon Corporation for the implementation of the Eastmain River Lake Sturgeon Spawning Ground Enhancement Project located just above Conglomerate Bridge on the James Bay Highway, 113 km from the mouth of the Eastmain river.
In October 2018, the Company announced the results of it's pilot plant program recently completed at the Outotec Research Center, successfully converting spodumene concentrate from the Rose Lithium-Tantalum Project into battery grade lithium hydroxide using a thermal leaching process. These results provide Critical Elements the flexibility, in conjunction with lithium carbonate and spodumene production, to meet all needs of cathode, battery and electric vehicle producers.
The pilot plant conversion process from spodumene concentrate to lithium hydroxide demonstrated strong results with extraction rates of 93%. This extraction rate surpasses the worldwide average of between 70 to 75% in what is accepted as an industry standard. In addition, the pilot plant produced battery grade lithium hydroxide with 99% purity.
A summary of the recommended ECI approach is included below:
- ECI Phase I Guaranteed Maximum Price ("GMP"):
- o Review and assimilate all of the existing design and data
- o Stress test and optimize the design through reviews, specific value engineering and trade-off studies
- o Reconfirm quantities and pricing
- o Initiate selected engineering deliverables to achieve nominally 25% engineering definition
- o Formulate a GMP for the process plant and associated process supporting infrastructure
- o Submit a proposal and schedule to progress to the next phase
In July 2019, the Cree Nation of Eastmain, the Grand Council of the Crees (Eeyou Istchee), the Cree Nation Government and the Company have signed an impact and benefit agreement, referred to as the Pikhuutaau Agreement, concerning the development and operation of the Rose Lithium-Tantalum Project in Eeyou Istchee.
Work done during the period
Evaluation and Exploration expenses of $1,196,654 were incurred during the period.
In October 2019, the Company announced that Primero has successfully completed the first phase of its ECI agreement. Primero has provided a GMP for the EPC of the Project on a lump sum turnkey basis that is in line with the Project's feasibility study published November 29, 2017.
In December 2019, the Company provided Québec's Ministère de l'Environnement et de la Lutte contre les changements climatiques and the Canadian Environmental Assessment Agency with requested information.
The Company continues to work closely with its financial advisor, Canaccord, to evaluate ongoing interest from global strategic partners that seek to accelerate the Rose Lithium-Tantalum project to production. Discussions with multiple potential partners are advancing and our goal is to finalize a transaction in order to finance and start construction of the project. Progress is being made on delivering commitments totaling $341 million for a financing package to fund construction.
ARQUES – LITHIUM, RARE RARTH, NIOBIUM AND TANTALUM PROJECT
Property Description
The Arques property is composed of one block totalling 123 claims covering an area of 6,148 hectares and a distance of some 18 kilometres in a SW-NE direction. It is contiguous to the Lemare property on its southeast border. The property is traversed in a NE direction by a Hydro-Québec power line and a permanent gravel road that heads north to the Eastmain River and beyond to the La Grande River area. Secondary roads branching off from these also provide access to the property.
The Lac des Montagnes volcano-sedimentary formation runs just inside the southeast border of the Arques property. The primary observed geology is mainly composed of orthogneisses made up of metamorphosed felsic intrusives. In the winter of 2011, a major alkaline intrusion, the Arques Complex, was identified by diamond drilling.
The Arques Alkaline Complex shows similar characteristics to other deposits known for Rare Earth Elements (REE), Niobium (Nb) and Tantalum (Ta) mineralization.
The Arques project offers strong lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Arques property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.
Work done during the period
No exploration work was carried out on the property during the period.
Management however pursue its research to find a partner to continue exploration activities or to find a potential buyer.
BOURIER – LITHIUM COPPER, ZINC, GOLD AND SILVER PROJECT
Property Description
The Bourier property is composed of one block totaling 203 claims covering an area of 10,252 hectares for some 30 kilometres in length. It is located just along the east side of the new Rupert hydroelectric complex.
The Lac des Montagnes volcano-sedimentary formation crosses the Bourier property in a NE direction. It is composed of paragneiss, amphibolites and granitic intrusions. To the north of the Lac des Montagnes Formation, mainly orthogneiss formed of metamorphosed granite has been observed, while the south area of this formation is composed mainly of paragneiss, also intruded by granites.
In the Bourier Lake area, what has been identified as an exhalative massive sulphide horizon in felsic rocks was discovered during fieldwork conducted north of Bourier Lake in the summers of 2010 and 2011. Soil samples taken over an 8-km strike length of this horizon returned anomalous values for Ni, Cu, Zn and Pb. Some channel samples and other grab samples returned anomalous values for Au, As, Ni and Cu. This exhalative horizon in felsic rocks is now known to extend more than 25 km over the property.
The Bourier project offers strong lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Bourier property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.
Work done during the period
No exploration work was carried out on the property during the period.
Management however pursues its research to find a partner to continue exploration activities or to find a potential buyer.
CAUMONT – LITHIUM, COPPER, NICKEL, PGE AND GOLD PROJECT
Property Description
The Caumont property is made of four non-adjacent claim blocks totalling 94 claims spread over 50.37 kilometres in the eastern part of the Lac des Montagnes volcano-sedimentary formation. These blocks are identified as Nemiscau Lake, Kename, Caumont West and Caumont East. A Hydro-Quebec power line crosses the southern part of the Nemiscau Lake block in a NW/SE direction. This block can easily be accessed by road up to Lac Nemiscau, located close to the west boundary of the block, and then by boat. The Kename block is located East of Lac Kanamakuskacik and South West of Lac de la Sicotière. It can also be accessed by road. The Caumont West block can be accessed by plane, landing on Lac Caumont, or directly by helicopter. The Caumont East block can be accessed by helicopter.
The four blocks forming the property are located in the eastern part of the Lac des Montagnes volcanosedimentary formation. The formation is locally composed of amphibolite quartz-rich paragneiss, biotite and sillimanite-bearing schist, pegmatite, basalt and ultramafic intrusives.
The property is currently recognized for its magmatic nickel (Ni), copper (Cu) and platinum group elements (PGE) potential. Geophysical surveys show the signature and extent of ultramafic intrusions and iron formations, with some of them confirmed by historic geological reports. In addition, some areas of the property show potential for gold mineralization associated with shear zone:
- Associated with the Tent showing, aplitic dykes overlapping the mafic and ultramafic rocks show gold potential. The best values were 4.29% Cu, 4.34 g/t Au, 16.65 g/t Ag and 1.74 g/t Pd. Mineralization could be due to remobilization of the host rock mineralization.
- 100 metres east of the Tent showing, grab sample L943057, collected in a muscovite-rich metasediment with 15% arsenopyrite and quartz veins, returned 1.6 g/t Au.
- 10 meters from this sample, grab sample L943077, collected in a metasediment with 20% garnet porphyry, 5% arsenopyrite and 5% pyrite, returned 0.219 g/t Au.
- At the west end of the Caumont West block, a metasediment with mineral segregation (alternating silicified bands with chloritic bands) with traces of sulphides was sampled. Grab samples L943046 and L943418 returned 0.239 g/t and 0.167 g/t Au, respectively.
The Caumont project offers strong lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Caumont property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.
Work done during the period
No exploration work was carried out on the property during the period.
Management however pursues its research to find a partner to continue exploration activities or to find a potential buyer.
DUMULON – LITHIUM, ZINC, LEAD AND GOLD PROJECT
Property Description
The Dumulon property consists of 36 contiguous cells covering a total area of 1,929 hectares. The project is located 20 km south of the Nemiscau airport and can be accessed by helicopter.
The property is located in the central part of the Lac des Montagnes volcano-sedimentary formation. The geology covered by the property is mainly composed of paragneiss with local granitic intrusions. South of Indian Lake, discontinuous lenses of metabasalts and amphibolites were mapped. Strong EM anomalies are associated with plurikilometric magnetic bands oriented NW70°.
The property is currently known for its SEDEX-type deposits and disseminated and replacement gold deposits potential. All conductive anomalies appear to be caused by a graphitic shear zone mineralized in pyrite and pyrrhotite. The Dumulon showing is associated with a carbonate dyke, 60 cm wide, embedded in an outcrop of metasediments. The sphalerite and galena mineralization returned four grab samples with values of between 1.2 and 4.6% Zn, associated with Pb levels between 0.4 and 3.0%. In addition, three grab samples returned gold values of 0.19 g/t, 0.25 g/t and 0.29 g/t Au.
The Dumulon project offers strong lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Dumulon property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.
Work done during the period
No exploration work was carried out on the property during the period.
Management however pursues its research to find a partner to continue exploration activities or to find a potential buyer.
DUVAL – LITHIUM, GOLD, COPPER, NICKEL AND PGE PROJECT
Property Description
The Duval property is composed of two blocks totaling 46 claims covering a total area of 2,458.92 hectares and covers a distance of about 12 kilometres along a SW-NE axis. The Duval main block is contiguous to the Valiquette main block to the northeast. It lies about two kilometres south of the Route du Nord and is served by a Hydro Quebec power line and a gravel road, which cross the southern half of the block in a southeasterly direction. The Duval main block can be accessed by the road leading to Lac des Montagnes and then by boat. An old winter road along the SE shore of Lac des Montagnes has been refurbished and can be used for winter drilling on the main block.
The property is located in the middle part of the Lac des Montagnes volcano-sedimentary formation. In the vicinity of the Duval block, the formation is about 8 km wide and is oriented NE. It is locally composed of amphibolite quartz-rich paragneiss, biotite and sillimanite-bearing schist, pegmatite, basalt and ultramafic intrusives. Geophysical surveys show the signature and extent of ultramafic intrusions and iron formations, with some of them confirmed by historical drilling.
As the Duval property is located in the same geological environment as the Valiquette property, it is currently recognized for its magmatic nickel (Ni), copper (Cu) and platinum group elements (PGE) potential.
The Duval project offers strong lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Duval property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing
Work done during the period
No exploration work was carried out on the property during the period.
Management however pursues its research to find a partner to continue exploration activities or to find a potential buyer.
LEMARE – GOLD, COPPER, NICKEL, PGE AND LITHIUM PROJECT
Property Description
The Lemare property is composed of one block totaling 147 claims covering an area of 6890.47 hectares for a length of over 20 kilometres in a SW-NE direction. It is contiguous to the Nisk property on its northwest border. Secondary roads running from a Hydro-Québec power line and permanent gravel roads that run along its northwest boundary provide access all through the property.
The Lac des Montagnes volcano-sedimentary formation crosses the Lemare property in a NE direction. It is composed of paragneiss (gneiss formed of metamorphosed sediment), amphibolites and granitic intrusives. The north part of the Lac des Montagnes formation is mainly composed by orthogneisses intruded by granites, while the south is composed principally of paragneisses, also intruded by felsic to intermediate intrusives.
Several areas of the property show potential for gold mineralization. There is substantial evidence of hydrothermal activity, such as the many silicified and oxidized corridors of mineralization associated with pyrite and pyrrhotite, the presence of quartz-tourmaline veins and the arsenopyrite and tourmaline mineralization hosted in shear zones. The showings of the property are summarized below:
- The Lac de la Chlorite showing is hosted in a metabasalt with 10 to 15% arsenopyrite and returned gold values of 1.645 g/t, 0.726 g/t and 0.532 g/t.
- The Lac de la Sillimanite showing, having previously returned 4.7 g/t Au (Raymond, 2009), was resampled, and three grab samples returned 0.877 g/t, 0.368 g/t and 0.125 g/t Au.
- On target NI-8, quartz-tourmaline veins returned values of 0.33 and 0.23 g/t Au.
- SE of target NI-1, an outcrop of metasediment with 5% pyrite as returned 0.15 g/t Au. Two boulders in the area returned grades of 0.17 g/t and 0.09 g/t Au.
- To the east of Post Albanel, at the Ancre showing in the Lac Voirdye area, a grab sample in a mineralized metabasalt with 1% pyrite returned 0.53 g/t Au, 1.55 g/t Ag and 0.12% Cu.
The potential for nickel-copper-PGE mineralization is confirmed by the presence of the Nisk-1 deposit nearby. Several magnetic anomalies are present on the property; these have not been drill tested.
The GRAAB showing, a spodumene pegmatite with an apparent thickness of 5 to 14 metres by 200 metres, has been identified. A total of 43 samples were collected along 62 metres of channels. Eleven of these samples showed a Li2O content superior to 2%. This discovery proves that new lithium pegmatites could still be discovered on the Lemare property.
Lepidico Ltd. carried out two drilling programs on the Lemare project within the scope of an option agreement that expired on July 27, 2018.
The best results included:
- 41.5 m at 1.71% Li2O, including 15 m at 2.18% Li2O and 3 m at 3.6% Li2O in Hole LE-16-14
- 21 m at 2.65% Li2O in Hole LE-16-13
- 18.85 m at 1.35% Li2O, including 8.4 m at 2.26% Li2O in Hole LE-16-07
- 23 m at 1.61% Li2O, including 10.5 m at 2.51% Li2O in Hole LE-16-03.
Work done during the period
No exploration work was carried out on the property during the period.
Management however pursues its research to find a partner to continue exploration activities or to find a potential buyer.
NISK – LITHIUM, COPPER, NICKEL, PGE AND GOLD PROJECT
Property Description
The Nisk property is composed of one block totaling 100 claims covering an area of 5,113.95 hectares and a length of over 20 kilometres. The Route du Nord from Chibougamau runs inside the south border of the property. The property is also traversed in a NE direction by a Hydro-Québec power line and a road that heads north to the Eastmain River and beyond to the La Grande River area.
The Lac des Montagnes volcano-sedimentary formation crosses the property in a NE direction. The geology covered by the property is mainly composed of biotite, sillimanite, staurotide and garnet-bearing gneisses and granites, pegmatites, amphibolites and ultramafic intrusive rocks. Geophysical surveys show the signature and extent of ultramafic intrusions, some of which have been historically confirmed by drilling. The north part of the Lac des Montagnes formation is mainly composed by orthogneisses intruded by granites, while the south is composed principally of paragneisses, also intruded by granites.
The property is currently known for its magmatic nickel-copper sulphide deposits associated with ultramafic intrusion potential. It notably hosts the Nisk-1 Ni-Cu-PGE deposit.
Nisk-1 Ni-Cu-PGE deposit
The Nisk-1 deposit is located at UTM coordinates 459,950 mE / 5,728,500 mN. It is hosted in an elongated body of serpentinized ultramafic rocks that intrude the Lac des Montagnes paragneiss and amphibolite sequence. The ultramafic rock intrusion is a sill bordered by paragneisses and amphibolites. Quite similar on either side of the ultramafic sill, they still can be subdivided into a lower paragneiss sequence ("LPS") to the NW of the sill (stratigraphically older) and an upper paragneiss sequence ("UPS") to the SE of the sill (stratigraphically younger).
The ultramafic sill is not a single intrusion. At least two distinct lithological units can be identified. The first, a grey serpentinized peridotite with magnetite veinlets, does not contain any sulphide minerals. The second is a black serpentinized peridotite with chrysotile veinlets. The Ni-Cu-Co-Fe sulphide mineralization is invariably associated with this black serpentinite.
In summary and on average, the sequence intersected by drilling, (striking N164°E with a 50° to 70° plunge to the SE) in the ultramafic body is as follows: (i) 35 meters of unmineralized grey serpentinite; (ii) 4 meters of unmineralized black serpentinite; (iii) 12 meters of massive to disseminated sulphides in black serpentinite; and (iv) 27 meters of unmineralized black serpentinite, sometimes alternating with the grey serpentinite, also unmineralized.
The Nisk-1 deposit is the only mineralized zone with estimated resources on the property. This resource calculation NI43-101 as been performed in 2009 by Pierre Trudel, PH.D., P. Eng. from RSW Inc. The resource stands as follows:
- Measured resource: 1,255,000 tonnes at 1.09% Ni; 0.56% Cu; 0.07% Co; 1.11 g/t Pd and 0.20 g/t Pt;
- Indicated resource: 783,000 tonnes at 1.00% Ni; 0.53% Cu; 0.06% Co; 0.91 g/t Pd and 0.29 g/t Pt;
- Inferred resource: 1,053,000 tonnes at 0.81% Ni; 0.32% Cu; 0.06% Co; 1.06 g/t Pd and 0.50 g/t Pt.
The Nisk project offers strong lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Nisk property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.
Work done during the priod
No exploration work was carried out on the property during the priod.
Management however pursues its research to find a partner to continue exploration activities.
VALIQUETTE – LITHIUM, COPPER, NICKEL, PGE AND GOLD PROJECT
Property Description
The Valiquette Property is composed of one block totaling 104 claims covering an area of 5,563.07 hectares. It is measuring about 20 kilometers in a SE-NW direction and is contiguous South West to the Duval main block. The property can be accessed by a Hydro-Quebec gravel road up to the Lac des Montagnes, and then by boat. An old winter road along the SE shore of Lac des Montagnes can be used for works.
The property is located in the middle part of the Lac des Montagnes volcano-sedimentary formation. In the vicinity of the Duval block the formation width is about 8 km and its orientation NE. It is locally composed of amphibolite quartz-rich paragneiss, biotite and sillimanite-bearing schist, pegmatite, basalt and ultramafic intrusives. Geophysical surveys show the signature and extent of ultramafic intrusions and iron formations, with some of them confirmed by historical drilling.
The property is currently recognized for its magmatic nickel (Ni), copper (Cu) and platinum group elements (PGE) potential and host the Valiquette showing. The Valiquette showing is associated with a peridotite intrusions at the contact of the volcanogenic sediment of the Lac des Montagne formation. Historical results of surface sampling returned up to 1.75% Ni and 1.42% Cu (grab samples) and the best intersections returned from the 2011 drilling campaign are 2.66% Ni and 0.71% Cu over 3.2 meters, 0.78% Ni and 0.47% Cu over 4.8 meters, 1.15% Ni and 0.39% Cu over 8.3 meters and 1.47% Ni and 0.26% Cu over 2.5 meters.
The Valiquette project offers strong lithium potential in a well-established area. The lithium pegmatites tend to occur in swarms in the volcano-sedimentary units. The Valiquette property covers a large part of the regional volcano-sedimentary unit, a favourable unit that hosts Nemaska Lithium's Wabouchi deposit and the Lemarre showing.
Work done during the period
No exploration work was carried out on the property during the period.
Management however pursues its research to find a partner to continue exploration activities or to find a potential buyer.
BLOC 1 – LITHIUM, NICKEL AND COPPER PROJECT
Property Description
The Bloc 1 Property is composed of one block totaling 72 claims covering an area of 3,846.95 hectares. It is measuring about 13 kilometers in a SW-NE direction and is contiguous South West to the Nisk-South main block. It is wholly-owned by the Company.
Work done during the period
No exploration work was carried out on the property during the period.
Management however pursues its research to find a partner to continue exploration activities or to find a potential buyer.
BLOC 2 TO 6 – LITHIUM, NICKEL AND COPPER PROJECT
Property Description
The Bloc 2 to 6 Property is composed of one block totaling 8 claims covering an area of 427.82 hectares. The property Bloc 2 to 6 is located in the east, southeast of the Duval main block. It is wholly-owned by the Company.
Work done during the period
No exploration work was carried out on the property during the period.
Management however pursues its research to find a partner to continue exploration activities or to find a potential buyer.
BLOC 7 – LITHIUM, NICKEL AND COPPER PROJECT
Property Description
The Bloc 7 Property is composed of one block totaling 54 claims covering an area of 2,890.54 hectares. It is measuring about 7 kilometers in a SW-NE direction and is contiguous to the Valiquette, Dumoulon and Caumont Est main blocks. It is located southwest of Valiquette block, north of Dumoulon block and east of Caumont Est block. It is wholly-owned by the Company.
Work done during the period
No exploration work was carried out on the property during the period.
Management however pursues its research to find a partner to continue exploration activities or to find a potential buyer.
Person In Charge of Technical Disclosure
Jean-Sebastien Lavallee (OGQ #773), geologist, shareholder, Chairman and Chief Executive Officer of the Company and a Qualified Person under NI 43-101 on standards of disclosure for mineral projects, has written and approved the technical content of this MD&A for the properties.
RESULTS OF OPERATIONS
Critical Elements anticipates that, for the foreseeable future, quarterly results of operations will primarily be impacted by several factors, including the timing of exploration and the efforts and timing of expenditures related to the development of the Company. Due to fluctuations in these factors, the Company believes that the period-to-period comparisons of operating results are not a good indication of its future performance.
The comments below provide an analysis of the operating results for the six-month period ended February 29, 2020. The selected financial information shown below is taken from the unaudited condensed interim financial statements for each of the six-month periods indicated.
| February 29 (6 months) | ||||
|---|---|---|---|---|
| 2020 | 2019 | |||
| Interest income and other revenues | $ | 50,351 | $ | 52,246 |
| General administrative expenses | $ | 125,067 | S | 169,052 |
| Salaries and fringe benefits | $ | 466,021 | S | 605,725 |
| Registration, listing fees and shareholders' information | $ | 29,157 | S | 56,696 |
| Professionnal and consultant fees | $ | 183,072 | $ | 209,914 |
| Share-based compensation | $ | 25,713 | S | 158,804 |
| Depreciation of fixed assets | $ | 1,520 | S | 1,803 |
| Depreciation of right-of-use assets | $ | 25,584 | $ | |
| Decrease in fair value of the marketable securities | $ | 73,174 | $ | 92,628 |
| Foreign exchange loss | 745 | $ | 4,257 | |
| Total comprehensive loss for the period | 879,702 | $1,246,633 | ||
| Cash & cash equivalents | s | 782,996 | $3,050,795 | |
Interest Income and other revenues
Interest income and other revenues for the six-month period ended February 29, 2020, amounted to $50,351 (2019- $52,246) and consisted of interest income, sublease income, gain on disposal of investment and amounts for administrative services rebilled out to other companies.
General Administrative Expenses
General administrative expenses for the six-month period ended February 29, 2020, consisted mainly of occupancy expenses, travel expenses, promotional activities, office expenses and the Company's claim renewal expenses. The decrease of $43,985 from the previous period was mainly due to the impact of applying IFRS 16, a decrease in travel expenses offset by an increase of Company's claim renewal expenses.
Salaries and Fringe Benefits
Salaries and benefits for the six-month period ended February 29, 2020, amounted to $466,021 (2019 - $605,725). This variation is due to changes in the number of employees from the previous period.
Registration, Listing Fees and Shareholder Information
Registration, listing fees and shareholder information expenses for the six-month period ended February 29, 2020, consisted mainly of expenditures of a legal and regulatory nature incurred to comply with the requirements of the securities commission. A $27,539 decrease resulted from a decrease in exchange, disclosure and shareholders' information expenses and, in regulatory type expenses.
Professional and Consultant Fees
Professional and consulting fees for the six-month period ended February 29, 2020, consisted primarily of expenses of a legal and accounting nature, as well as audit, business development and management expenses. The $26,842 decrease compared to the previous period was due to lower investor relations expenses and legal expenses, offset by higher business development expenses and consulting fees.
Stock-Based Compensation
Share-based payments and compensation for the six-month period ended February 29, 2020 represented the recognition of the charge for a tranche of 200,000 options granted to consultants. A compensation expense of $25,713 calculated using the Black-Scholes option pricing model was allocated during that period in relation to the stock options granted.
Change in the fair value of the marketable securities
The change in the value of marketable securities is related to fluctuations in the prices of securities held on the TSX Venture Exchange and the Australian Stock Exchange, in the case of the common shares of Lepidico Ltd. During the six-month period ended February 29, 2020, the Company has disposed of 8,014,939 Lepidico Ltd's shares for proceeds of $21,349.
The comments below provide an analysis of the operating results for the three-month period ended February 29, 2020. The selected financial information shown below is taken from the unaudited condensed interim financial statements for each of the three-month periods indicated.
| February 29 (3 months) | ||||
|---|---|---|---|---|
| 2020 | 2019 | |||
| Interest income and other revenues | $ | 23,419 | S | 23,129 |
| General administrative expenses | $ | 34,692 | S | 67,547 |
| Salaries and fringe benefits | $ | 230,931 | $ | 286,288 |
| Registration, listing fees and shareholders' information | s | 19,007 | $ | 29,449 |
| Professionnal and consultant fees | $ | 94,503 | $ | 104,209 |
| Share-based compensation | $ | 19,729 | $ | 9,760 |
| Depreciation of fixed assets | $ | 760 | S | 924 |
| Depreciation of right-of-use assets | $ | 12,792 | $ | |
| Decrease (Increase) in fair value of the marketable securities | $ | 13,397 | S | (50, 084) |
| Foreign exchange (gain) loss | (9) | $ | 2,575 | |
| Total comprehensive loss for the period | 402,383 | 427,539 | ||
| Cash & cash equivalents | s | 782,996 | S | 3,050,795 |
Interest Income and other revenues
Interest income and other revenues for the three-month period ended February 29, 2020, amounted to $23,419 (2019 - $23,129) and consisted of interest income, sublease income, gain on disposal of investment and amounts for administrative services rebilled out to other companies.
General Administrative Expenses
General administrative expenses for the three-month period ended February 29, 2020, consisted mainly of occupancy expenses, travel expenses, promotional activities, office expenses and the Company's claim renewal expenses. The decrease of $32,855 from the previous period was mainly due to the impact of applying IFRS 16 and a decrease in travel expenses.
Salaries and Fringe Benefits
Salaries and benefits for the three-month period ended February 29, 2020, amounted to $230,931 (2019 - $286,288). This variation is due to changes in the number of employees from the previous period.
Registration, Listing Fees and Shareholder Information
Registration, listing fees and shareholder information expenses for the three-month period ended February 29, 2020, consisted mainly of expenditures of a legal and regulatory nature incurred to comply with the requirements of the securities commission. A $10,442 decrease resulted from a decrease in exchange and disclosure expenses, offset by an increase in regulatory type expenses.
Professional and Consultant Fees
Professional and consulting fees for the three-month period ended February 29, 2020, consisted primarily of expenses of a legal and accounting nature, as well as audit, business development and management expenses. The $9,706 decrease compared to the previous period was due to lower investor relations expenses and legal expenses, offset by higher business development expenses and consulting fees.
Stock-Based Compensation
Share-based payments and compensation for the three-month period ended February 29, 2020 represented the recognition of the charge for a tranche of 150,000 options granted to consultants. A compensation expense of $19,729 calculated using the Black-Scholes option pricing model was allocated during that period in relation to the stock options granted.
Change in the fair value of the marketable securities
The change in the value of marketable securities is related to fluctuations in the prices of securities held on the TSX Venture Exchange and the Australian Stock Exchange, in the case of the common shares of Lepidico Ltd. During the three-month period ended February 29, 2020, the Company has disposed of 6,514,939 Lepidico Ltd's shares for proceeds of $10,170.
The selected financial information below was taken from Critical Elements' unaudited financial statements for each of the following quarters:
| $000s of $ | Feb. 29 | Nov. 30 | August 31 | May 31 | Feb. 28 | Nov. 30 | August 31 | May 31 |
|---|---|---|---|---|---|---|---|---|
| except for share data | 2020 | 2019 | 2019 | 2019 | 2019 | 2018 | 2018 | 2018 |
| Revenues | 23 | 27 | 31 | 18 | 23 | 29 | 24 | |
| Net loss | 403 | 477 | 532 | 579 | 427 | 819 | 1.869 | 1.108 |
| Basic and diluted | ||||||||
| net loss (net profit) per share $ | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.01 | 0.01 | (0.01) |
This table does not include the 2018 reclassifications relating to the application of IFRS 9. See Note 4 to the audited financial statements as at November 2019, 2019.
LIQUIDITY AND CAPITAL RESOURCES
Cash and cash equivalents as at February 29, 2020, totalled $782,996, compared to $3,050,795 as at February 28, 2019. It is management's intention to search further capital funding in the form of equity or debts to support current and future exploration and evaluation assets development.
| Financing sources table | ||||||
|---|---|---|---|---|---|---|
| Date | Evne. | Financings | Amount | General description of the use of proceeds | ||
| May 2018 | Bought deal privateplacement | Common shares | The net proceed of the financing was used to:$7,000,000 Fund the general administrative expenses, investingactivities and other working capital needs |
For the next year, the Company has budgeted $650,000 for administrative expenses. The Company has been successful in the past in raising financing; however, it requires significant additional financing in the near and long-term and there is uncertainty as to the ability to raise such financing. Advanced exploration of some of the mineral properties would require substantially more financial resources. There is no assurance that such financing will be available when required, or under terms that are favourable to Critical Elements. The Company may also select to advance the exploration and development of exploration and evaluation assets through joint ventures. Management is currently considering opportunities for further financing.
| February 29 (6 months) | |||
|---|---|---|---|
| 2020 | 2019 | ||
| Operating activities | (622, 606) | $(1,438,489) | |
| Financing activities | (22.835)s | $1,328,475 | |
| Investing activities | (551,795) | $(1, 164, 304) | |
| Cash & cash equivalents variation | $(1,197,236) | $(1,274,318) | |
| Cash & cash equivalents | 782.996 | $3,050,795 |
During the six-month period ended February 29, 2020 funds used for operating activities were spent primarily on improving operations and promotion of the Company.
During the six-month period ended February 29, 2020, financing activities consisted of capitalized lease obligation reimbursements resulting from the application of IFRS 16.
During the six-month period ended February 29, 2020, investment activities consisted primarily of exploration to develop the Rose Lithium-Tantalum. The Company also disposed of marketable securities of Lepidico Ltd. during the period.
CONTRACTUAL OBLIGATIONS AND OFF-BALANCE-SHEET ARRANGEMENTS
| PROPERTY | ROYALTY | DESCRIPTION | |||
|---|---|---|---|---|---|
| Name | Percentage | ||||
| Jean-Sébastien Lavallée | 37.5% | ||||
| Rose Lithium-Tantalum | Jean-Raymond Lavallée | 37.5% | 2% NSR of which 1% may be purchased for anamount of $1,000,000 | ||
| Fiducie familiale St-Georges | 25% | ||||
| Alain Champagne | 100% | 1.4% NSR on some claims | |||
| Arques | Golden Goose | 100% | 2% NSR on some claims of which 1% may bepurchased for an amount of $1,000,000 | ||
| Bourier | Alain Champagne | 100% | 1,4 % NSR on some claims | ||
| Golden Goose | 100% | 2% NSR on some claims of which 1% may bepurchased for an amount of $1,000,000 | |||
| Jean-Sébastien Lavallée | 50% | 1% NSR | |||
| Jean-Raymond Lavallée | 50% | ||||
| Caumont | Victor Cantore | 100% | 1.5% NSR on some claims of which 1% may bepurchased for an amount of $1,000,000 | ||
| Affinage Tectonic | 100% | 1% NSR on some claims that may be purchasedfor an amount of $1,000,000 | |||
| Jean-Sébastien Lavallée | 50% | 1% NSR | |||
| Duval | Jean-Raymond Lavallée | 50% | |||
| Golden Goose | 100% | 2% NSR on some claims of which 1% may bepurchased for an amount of $1,000,000 | |||
| Jean-Sébastien Lavallée | 50% | 1% NSR | |||
| Jean-Raymond Lavallée | 50% | ||||
| Lemare | Alain Champagne | 100% | 1,4% NSR sur certains claims | ||
| Golden Goose | 100% | 2% NSR on some claims of which 1% may bepurchased for an amount of $1,000,000 | |||
| Jean-Sébastien Lavallée | 50% | 1% NSR | |||
| Jean-Raymond Lavallée | 50% | ||||
| Nisk | Alain Champagne | 100% | 1,4 % NSR on some claims | ||
| Golden Goose | 100% | 2% NSR on some claims of which 1% may bepurchased for an amount of $1,000,000 | |||
| Jean-Sébastien Lavallée | 50% | 1% NSR | |||
| Valiquette | Jean-Raymond Lavallée | 50% | |||
| Golden Goose | 100% | 2% NSR on some claims of which 1% may bepurchased for an amount of $1,000,000 |
RELATED-PARTY TRANSACTIONS
Transactions with Key Executives and Directors
During the six-month period ended February 29, 2020 the Company incurred development expenses of $62,066 (2019 - $96,195) with Consul-Teck Exploration Minière Inc., a company of which the Chief Executive Officer is a shareholder. An amount of $92,815 was payable as at February 29, 2020 (2019 – $2,666).
The Company's chief executive officer and a director own a 1% NSR on some of the claims of the Caumont, Duval, Lemare, Nisk and Valiquette properties and 2% NSR on some of the claims of the Rose Lithium-Tantalum property.
These transactions are in the normal course of operations and are measured at the exchange amount, which is the amount of consideration established and agreed by the related parties.
The following table reflects the remuneration of key management and directors of the Corporation's:
| February 29,2020 | February 29,2019 | |
|---|---|---|
| $ | $ | |
| Salaries and fringe benefits | 440,219 | 605,725 |
| Compensation and share-based payments | - | 96,283 |
| 440,219 | 702,008 |
SUBSEQUENT EVENT
Since February 29, 2020, the outbreak of the novel strain of coronavirus, specifically identified as "COVID-19", has resulted in governments worldwide enacting emergency measures to combat the spread of the virus. These measures, which include the implementation of travel bans, temporary restriction on all non-essential business, self-imposed quarantine periods and social distancing, have caused material disruption to businesses globally resulting in an economic slowdown. Global equity markets have experienced significant volatility and weakness. Governments and central banks have reacted with significant monetary and fiscal interventions designed to stabilize economic conditions. The duration and impact of the COVID-19 outbreak is unknown at this time, as is the efficacy of the government and central bank interventions.
The Company is continuing non site activities to further the Company's objectives during this uncertain and rapidly evolving time and to follow the recommendations of Quebec Government and Health Canada/Sante Quebec. It is not possible to reliably estimate the length and severity of these developments and the impact on the financial results and condition of the Company and its operating in future periods. However, we anticipate that due to market uncertainty the Company may be restricted in its ability to raise additional funding.
In March 2020, the Company granted 325,000 share purchase options to consultants. Each share purchase option allows its holder to acquire a common share for $0.40 per share for a period of two years.
In March 2020, the Company granted 200,000 share purchase options to a new director. Each share purchase option allows its holder to acquire a common share for $0.24 per share for a period of five years.
CERTIFICATION OF INTERIM FILINGS
The Chief Executive Officer and Chief Financial Officer have signed the official basic certificates for venture issuers as required by Regulation 52-109 respecting certification of disclosure in issuers' annual and interim filings, confirming the review, absence of untrue or misleading information and fair presentation of the interim documents filed.
The Chief Executive Officer and Chief Financial Officer have confirmed that they have reviewed the interim financial statements and the interim MD&A (collectively referred to as the "interim filings") of the Company for the six-month period ended February 29, 2020.
The Chief Executive Officer and Chief Financial Officer have confirmed that, based on their knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings
The Chief Executive Officer and Chief Financial Officer have confirmed that, based on their knowledge, having exercised reasonable diligence, the interim financial statements together with the other financial information included in the interim filings fairly present in all material respects the financial condition, results of operations and cash flows of the issuer, as of the date and for the periods presented in the interim filings for these periods.
| February 29 | ||||||
|---|---|---|---|---|---|---|
| 2020 | 2019 | |||||
| Balance, beginning of period | $24,057,958 | $21,003,210 | ||||
| Add: | ||||||
| Increase of mining properties | 56,100 | |||||
| Community consultations | 43,363 | |||||
| Environmental study | 431,385 | 353,749 | ||||
| Development allowance | 325,693 | 335,560 | ||||
| Finance expenses | 396,213 | 185,470 | ||||
| 1,252,754 | 874,779 | |||||
| Balance, end of period | $25,310,712 | 21,877,989 |
| $1$ CD 1 GM $y$ $\sim$ | |||
|---|---|---|---|
| 2020 | 2019 | 2018 | |
| Statements of Comprehensive Income | |||
| Professional and consultant fees | 183.072S | 209.914S | 333,249S |
| Salaries and fringe benefits | 466,021 | 605.725S | 668,427S |
| General administrative expenses | 125,067S | 265,503S | 146,502S |
| Stock-based compensation | $25,713 | S158.804 | 2,042,716S |
| February 29 | |||
| 2020 | 2019 | 2018 | |
| Statements of Financial Position | |||
| Exploration and evaluation assets | $25,310,712 | $21,877,989 | 19,849,669S |
| Long-term debt | 4,667,336 | $ 3.743.228 | 3,599,025S |
| Lease liabilities | s181,326 | S- | S۰ |
| Accrued interest on long-term debt | 1,597,767 | 1.057.767S | 517.767S |
The following selected financial information is derived from the Company's unaudited financial statements.
| Common shares outstanding: | 158,828,368 | |
|---|---|---|
| Options outstanding: | 7,775,000 | |
| Average exercise price of: | $0.66 | |
| Number | Exercise | |
| Expiry | of shares | price |
| $ | ||
| 2020 | 1,200,000 | Between 0.18 and 0.79 |
| 2021 | 3,900,000 | Between 0.50 and 0.56 |
| 2022 | 475,000 | Between 0.35 and 0.40 |
| 2023 | 1,950,000 | Between 0.52 and 1.25 |
| 2024 | 50,000 | 0.52 |
| 2025 | 200,000 | 0.24 |
| 7,775,000 | ||
| Brokers and intermediaries options: | 420,000 | |
| Average exercise price of: | $1.00 | |
| Number | Exercise | |
| Expiry | of shares | price |
| $ | ||
| 2020 | 420,000 | 1.00 |
| 420,000 | ||
| Warrants outstanding: | 3,500,000 | |
| Average exercise price of: | $1.25 | |
| Number | Exercise | |
| Expiry | of shares | price |
| $ | ||
| 2020 | 3,500,000 | 1.25 |
| 3,500,000 |
CRITICAL ACCOUNTING ESTIMATES AND JUDGMENTS
Estimates and assumptions are continually evaluated and are based on historical experience and other factors, including expectations of future events that are believed to be reasonable under the circumstances. The determination of estimates require the exercise of judgment based on various assumptions and other factors such as historical experience and current and expected economic conditions. Actual results could differ from those estimates.
Critical judgments in applying the Company's accounting policies are detailed in the Annual Financial Statements, filed on SEDAR (www.sedar.com).
NEW ACCOUNTING POLICIES ADOPTED
The following standards and amendments to existing standards have been adopted by the Company on September 1, 2019:
IFRS 16, Leases
The Company adopted IFRS 16, which replaces IAS 17, for its annual period beginning September 1, 2019 using the modified retrospective approach whereby no restatement of comparative periods is required. All other leases were classified as operating leases. IFRS 16 requires lessees to recognize right-of-use assets, representing its right to use the underlying asset, and lease liabilities, representing its obligation to make payments. Right-of-use assets are initially measured at cost, comprises of the initial measurement of the corresponding lease liabilities, lease payments made on or before the commencement date and any initial direct costs incurred, less any lease incentives received. They are subsequently depreciated on a straight-line basis and reduced by impairment losses, if any. If it is reasonably certain that the Company will exercise the purchase options, the underlying asset is depreciated on the basis of its estimated useful life. Right-of-use assets may also be adjusted to reflect the re-measurement of related lease liabilities. Lease liabilities are initially measured at the present value of the remaining lease payments, discounted using the interest rate implicit in the lease or, if that rate cannot be daily determined, the Corporation's incremental borrowing rate. The lease payments include fixed payments less any lease incentives receivable, variable lease payments that depend on an index and the exercise price of a purchase option reasonably certain to be exercised. Subsequently, the lease liability is measured at amortized cost using the effective interest method and adjusted for interest and lease payments.
Impact on transition to IFRS 16 - Leases
Upon adoption of IFRS 16, right-of-use assets and lease liabilities for these assets previously classified as finance leases are recognize in accordance with the requirements of IFRS 16 starting September 1, 2019.
On transition, the Company elected to measure the right-of-use assets at an amount equal to the lease liabilities (subject to certain adjustments) for leases classified as operating leases under IAS 17. As a result, the Company recorded lease liabilities of $251,576 and right-of-use assets of $251,576, including leases previously recognized as finance leases under IAS 17. As permitted by IFRS 16, the Company elected not to recognize lease liabilities and right-of-use assets for short-term leases (lease term of 12 months of less) and leases of low-value assets.
IFRIC 23, Uncertainty over Income Tax Treatments
On June 7, 2017, the IASB issued IFRIC Interpretation 23 Uncertainty over Income Tax Treatments.
The Interpretation provides guidance on the accounting for current and deferred tax liabilities and assets in circumstances in which there is uncertainty over income tax treatments.
The Interpretation was applicable for annual periods beginning on or after September 1, 2019. Earlier application was permitted.
The Interpretation requires the Company to:
- contemplate whether uncertain tax treatments should be considered separately, or together as a group, based on which approach provides better predictions of the resolution;
- reflect an uncertainty in the amount of income tax payable (recoverable) if it is probable that it will pay (or recover) an amount for the uncertainty; and
- Measure a tax uncertainty based on the most likely amount or expected value depending on whichever method better predicts the amount payable (recoverable).
The Company adopted the Interpretation in its financial statements for the period that began on September 1, 2019, and concluded that there was no impact on its financial statements upon its adoption.
FINANCIAL INSTRUMENTS
Financial instruments are measured on initial recognition at fair value, plus, in the case of financial instruments other than those classified as fair value through profit or loss ("FVPL"), directly attributable transaction costs. Financial instruments are recognized when the Company becomes party to the contracts that give rise to them and are classified as amortized cost, FVPL or fair value through other comprehensive income, as appropriate
A description of financial instruments and their fair value is included in the Financial Statements filed on SEDAR (www.sedar.com).
RISKS AND UNCERTAINTIES
Critical Elements is subject to a variety of risks, some of which are described below. If any of the following risks occur, the Company's business, results of operations or financial condition could be adversely affected in a material manner.
Exploration and mining risks. The business of exploration for minerals and mining involves a high degree of risk. Few properties that are explored are ultimately developed into producing mines. Unusual or unexpected formations, formation pressures, fires, power outages, labour disruptions, flooding, caveins, landslides and the inability to obtain suitable or adequate machinery, equipment or labour are other risks involved in the conduct of exploration programs. The Company from time to time increases its internal exploration and operating expertise with due advice from consultants and others as required. The economics of developing gold and other mineral properties is affected by many factors, including the cost of operations, variation of the grade of ore mined and fluctuations in the price of any minerals produced. There are no underground or surface plants or equipment on the Company's mineral properties, nor any known bodies of commercial ore. Programs conducted on the Company's mineral property would be an exploratory search for ore.
Titles to property. While the Company has diligently investigated title to the various properties in which it has an interest, and to the best of its knowledge, title to those properties are in good standing, this should not be construed as a guarantee of title. The properties may be subject to prior unregistered agreements or transfer, or native or government land claims, and title may be affected by undetected defects.
Permits and licenses. The Company's operations may require licenses and permits from various governmental authorities. There can be no assurance that the Company will be able to obtain all necessary licenses and permits that may be required to carry out exploration, development and mining operations at its projects.
Metal prices. Even if the Company's exploration programs are successful, factors beyond the control of the Company may affect marketability of any minerals discovered. Metal prices have historically fluctuated widely and are affected by numerous factors beyond the Company's control, including international, economic and political trends, expectations for inflation, currency exchange fluctuations, interest rates, global or regional consumption patterns, speculative activities and worldwide production levels. The effect of these factors cannot accurately be predicted.
Competition. The mining industry is intensely competitive in all its phases. The Company competes with many companies possessing greater financial resources and technical facilities than itself for the acquisition of mineral interests as well as for recruitment and retention of qualified employees.
Environmental regulations. The Company's operations are subject to environmental regulations promulgated by government agencies from time to time. Environmental legislation provides for restrictions and prohibitions of spills, release or emission of various substances produced in association with certain mining industry operations, such as seepage from tailing disposal areas, which could result in environmental pollution. A breach of such legislation may result in imposition of fines and penalties. In addition, certain types of operations require submissions to and approval of environmental impact assessments. Environmental legislation is evolving in a manner which means stricter standards, and enforcement, fines and penalties for non-compliance are more stringent. Environmental assessments of proposed projects carry a heightened degree of responsibility for companies and directors, officers and employees. The cost of compliance with changes in governmental regulations has a potential to reduce the profitability of operations. The Company intends to fully comply with all environmental regulations.
Conflicts of interest. Certain directors or proposed directors of the Company are also directors, officers or shareholders of other companies that are similarly engaged in the business of acquiring, developing and exploiting natural resource properties. Such associations may give rise to conflicts of interest from time to time. The directors of the Company are required by law to act honestly and in good faith with a view to the best interests of the Company and to disclose any interest which they may have in any project or opportunity of the Company. If a conflict of interest arises at a meeting of the board of directors, any director in a conflict will disclose his interest and abstain from voting on such matter. In determining whether or not the Company will participate in any project or opportunity, the directors will primarily consider the degree of risk to which the Company may be exposed and its financial position at that time.
Stage of development. Based on the NI 43-101-compliant feasibility study dated November 27, 2017, the Company has determined that one of its mineral properties, the Rose lithium-tantalum property, contains economically recoverable ore reserves. As at February 29, 2020, the Company considered that the Rose lithium-tantalum property was still at the exploration stage, as all the financing needed to start the construction and development phase of the project had not yet been secured. The Company does not have a history of revenue or return on investment, and there can be no assurance that it will generate revenue, operate at a profit, or yield return on investment in the future.
Industry conditions. Mining and milling operations are subject to government regulations. Operations may be affected in varying degrees by government regulations such as restrictions on production, price controls, tax increases, expropriation of property, pollution controls or changes in conditions under which minerals may be mined, milled or marketed. The marketability of minerals may be affected by numerous factors beyond the control of the Company, such as government regulations. The effect of these factors cannot be accurately determined.
Uninsured hazards. Hazards such as unusual geological conditions are involved in exploring for and developing mineral deposits. The Company may become subject to liability for pollution or other hazards which cannot be insured against or against which the Company may elect not to insure because of the high cost of premiums or for other reasons. The payment of any such liability could result in the loss of Company assets or the Company's insolvency.
Future financing. Completion of future programs may require additional financing, which may dilute the interests of existing shareholders. The Company has been successful in the past in raising financing, however it requires significant additional financing in the near and long-term and there is uncertainty as to the ability to raise such financing. Specifically, in order to move forward on its mining project Rose lithium-tantalum, the Company will have to raise additional funds. If management is unable to obtain new funding, the Company may be unable to continue its operations, and amounts realized for assets may be less than amounts reflected in these financial statements.
Key employees. Management of the Company rests on a few key officers and members of the board of directors, the loss of any of whom could have a detrimental effect on its operations.
Canada Revenue Agency. No assurance can be made that Canada Revenue Agency will agree with the Company's characterization of expenditures as Canadian exploration expenses or Canadian development expenses or the eligibility of such expenses as Canadian exploration expenses under the Income Tax Act (Canada).