Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CORAZON MINING LIMITED Regulatory Filings 2018

Oct 10, 2018

64747_rns_2018-10-10_1c6a50ab-dd2d-4d18-91e6-0387cc5325e9.pdf

Regulatory Filings

Open in viewer

Opens in your device viewer

==> picture [594 x 96] intentionally omitted <==

----- Start of picture text -----

ASX ANNOUNCEMENT 11 OCTOBER 2018
----- End of picture text -----

MAJOR RESOURCE UPGRADE

FOR LYNN LAKE NICKEL SULPHIDE PROJECT

First inclusion of Cobalt and a 35% increase in

Nickel & Copper metal

  • New, upgraded JORC Mineral Resource Estimate for the Lynn Lake Nickel-Copper-Cobalt Project (Canada) of;

  • 15.3Mt @ 0.72% Ni, 0.34% Cu, 0.034% Co (Indicated & Inferred, 0.5%Ni cut-off)

  • Total contained metal of 110,300t Ni, 51,400t Cu, 5,200t Co

  • New Resource Estimate represents more than a 60% increase in total tonnes and a 35% improvement in nickel and copper metal from previous 2015 Resource Estimate

  • Cobalt included in Lynn Lake Resource Estimate for the first time, adding significant value

  • Includes an internal high-grade Resource Estimate of;

  • 5.2Mt @ 1.00% Ni, 0.41% Cu, 0.044% Co (Indicated & Inferred, 0.7%Ni cut-off)

  • Resource upgrade from only five deposits at the Lynn Lake Project – 11 other deposits yet to be assessed, providing significant further Resource upgrade potential

  • New Resource plus positive results from ongoing metallurgical work expected to deliver major benefits to mining and development studies – planned to be completed early 2019

Corazon Mining Limited (ASX: CZN) ( Corazon or Company ) is pleased to announce its new, upgraded Mineral Resource Estimate ( Resource Estimate ) for the Lynn Lake Nickel-Copper-Cobalt Sulphide Project ( Lynn Lake or Mining Centre ) in Canada.

Lynn Lake was mined for 24 years before closure in 1976 and remains one of Canada’s most prolific nickel sulphide mining centres. The newly upgrade Resource incorporates the EL, N, O and P deposits, as well as the recently discovered Disco deposit.

The Resource Estimate includes:

  • 15.3Mt @ 0.72% Ni, 0.34% Cu, 0.034% Co (Indicated and Inferred, at a 0.5%Ni cut-off), for total contained metal of 110,400t Ni, 51,400t Cu, 5,200t Co

  • The upgraded Resource also includes a high-grade Resource Estimate of 5.2Mt @ 1.00% Ni, 0.41% Cu, 0.044% Co (Indicated & Inferred, 0.7%Ni cut-off).

Full details of the new Resource Estimate are provided in Tables 1, 2 and 3, included within.

The new Resource Estimate represents more than a 60% increase in total tonnes and a 35% increase in nickel and copper metal, in comparison to the previous JORC Mineral Resource Estimate of 2015

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

1

==> picture [594 x 96] intentionally omitted <==

(ASX announcement, 16 April 2015). Furthermore, cobalt has been included in the new Resource Estimate (historically excluded), adding significant value.

The Mineral Resource Estimate was completed in accordance with the guidelines of the JORC Code (2012 edition). The estimation is of a very high quality and is well supported by drilling and historical mining data. It is anticipated that very little additional verification drilling and sampling will be required to upgrade the majority of the defined tonnages in the Resource to the higher Measured JORC category.

This resource provides an excellent foundation upon which to base mining and development studies. These studies are expected to be undertaken subsequent to detailed metallurgical testwork, which is currently in progress and scheduled for completion by the end of this year.

Managing Director, Mr. Brett Smith stated; “ this Resource represents a huge improvement in quality from the previous work and, along with the first modern metallurgical testwork which is currently underway, will give us a very clear indication of Lynn Lake’s value and what is needed for the redevelopment of the Mining Centre .”

Lynn Lake Mining Centre – New Mineral Resource Estimation

Corazon engaged independent resource consultants HGMC to provide a new Mineral Resource estimation for several deposits within the Lynn Lake Mining Centre. This estimation is summarised in Table 1, below, with further details provided in Tables 2 and 3, appended to this announcement.

JORC
Category
Base Cut
Ni %
Tonnes Ni % Cu % Co % Tonnes Tonnes Tonnes
Ni Cu Co
Indicated 0.5 12,899,000 0.7 0.33 0.034 89,700 42,900 4,400
Inferred 0.5 2,403,000 0.86 0.35 0.034 20,600 8,500 800
Total 0.5 15,302,000 0.72 0.34 0.034 110,300 51,400 5,200
JORC
Category
Base Cut
Ni%
Tonnes Ni % Cu % Co % Tonnes
Ni Cu Co
Indicated 0.7 4,280,000 0.93 0.4 0.044 39,800 16,900 1,900
Inferred 0.7 903,000 1.33 0.47 0.043 12,100 4,300 400
Total 0.7 5,183,000 1.00 0.41 0.044 51,900 21,200 2,300

Table 1 : Lynn Lake Indicated and Inferred Mineral Resource Estimate – October 2018

The estimation has focused on the EL, N, O, P and Disco deposits (Figures 1 to 3) within the Mining Centre. Table 2 presents a breakdown of the Resource Estimate on a deposit basis. The EL, N, O and P deposits are proximal to each other, located in the southern part of the mine area, and have been subjected to historical mining and development. The Disco deposit was discovered in 2008, well after mine closure in 1976.

Lynn Lake hosts an additional 11 deposits, as well as numerous occurrences of drill-defined mineralisation, that have yet to be considered for resource studies. These areas support the potential for further upgrades to Lynn Lakes Mineral Resource.

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

2

==> picture [594 x 96] intentionally omitted <==

The Lynn Lake deposits provide the opportunity for mining using large tonnage, low cost methods. The historical mined grades at the A Plug were approximately 0.86% Ni and 0.44% Cu; with the higher-grade EL Plug being mined at 2.50% Ni and 1.15% Cu. The new Resource Estimate grades are consistent with this tenor of mineralisation.

Lynn Lake Mining Centre – Metallurgical Testwork Underway

The commencement of metallurgical testwork for the Lynn Lake mineralisation represents an important step in Corazon’s development pathway for Lynn Lake.

The processing technology previously used at Lynn Lake for the extraction of nickel, copper and cobalt metals was developed in the 1950’s and 1960’s, and detailed testwork has not been completed on Lynn Lake mineralisation since mine closure.

Modern advances in processing technologies are expected to provide substantial benefits with respect to metal recoveries and product quality, which may in turn deliver significant reductions in both operating and capital costs associated with any future development of Lynn Lake.

Testwork will focus on ore characterisation, flotation and product definition for down-stream processing and is designed to provide key data for future mining and development studies for the possible re-commencement of mining at Lynn Lake. The study is being managed by internationally recognised metallurgical consultants, METS Engineering, and is expected to be completed over approximately three to four months. Milestone results will be released to the market as they become available.

About Corazon

Corazon Mining Limited (ASX:CZN) is an Australian resource company with projects in Australia and Canada.

In Canada, Corazon has pulled together the entire historical Lynn Lake Nickel Copper Cobalt Mining Centre within the province of Manitoba. It is the first time this project has been under the control of one company since mine closure in 1976.

Lynn Lake presents Corazon with a major development opportunity that is becoming increasingly prospective as a result of recent increases in the value of both nickel and cobalt metals.

In Australia, Corazon has recently acquired the Mt Gilmore Cobalt Copper Gold Sulphide Project located in New South Wales. The Mt Gilmore Project hosts the Cobalt Ridge Deposit, which is a unique high-grade cobalt-dominant sulphide deposit.

Mt Gilmore is a newly recognised, regionally substantive hydrothermal system with extensive cobalt, copper and gold anomalism. The Company has recently completed definition drilling at the Cobalt Ridge deposit and is currently identifying new areas prospective for additional Cobalt Ridge lookalike deposits.

Both Lynn Lake and Mt Gilmore place Corazon in a great position to take advantage of the growing demand for commodities critically required for the booming rechargeable battery sector.

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

3

==> picture [594 x 96] intentionally omitted <==

==> picture [313 x 378] intentionally omitted <==

Figure 1: Plan - Geological Interpretation of A Plug and EL Plug

==> picture [436 x 247] intentionally omitted <==

Figure 2: Section - Geological Interpretation of A Plug and EL Plug with Historical Workings (After Sherritt Gordon Mines Ltd – 1972)

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

4

==> picture [594 x 96] intentionally omitted <==

==> picture [396 x 502] intentionally omitted <==

Figure 3: 3D View – N, O and P Deposit Outlines - with Historical Workings and Drilling

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

5

==> picture [594 x 96] intentionally omitted <==

Summary of Additional Information Required in Accordance with ASX Listing Rule 5.8.1

Geology and Geological Interpretation

The geological interpretations utilised for the new resource estimates were based on wellestablished geological models of ore genesis, geological history and structural deformation which has been described in general project reporting, including a thorough detailed report produced by government geologist Pinsent (1980), plus various academic papers. These geological models were developed and continuously improved upon during exploration and mining throughout the 1960s and 1970s. The models and mineralisation interpretation work assisted in the successful mining of some the deposits over a +30 year period. Subsequent research has generally upheld the integrity of the models. HGMC has used this modelling as the underlying basis to develop updated 3D mineralisation models used for current resource estimation and reporting.

The nickel-copper-cobalt deposits of Lynn Lake are concentrations of sulphides occurring within two intrusive plugs of mafic to ultramafic igneous rocks, derived from a large intermediate to ultramafic igneous pluton that has been intruded into metavolcanic strata. Classification of the magmatic origins of the main rock types is of the tholeiitic affinity. The mineralisation in both the A- Plug area containing the N, O and P deposits and the El-Plug typically occur within structurally controlled vertical to subvertical pipe intrusions of remobilised peridotite and amphibolite. These pipes typically display four types of mineralisation broadly grouped as massive sulphide, disseminated sulphides, cemented breccia sulphides and stockworks of sulphide stringers.

The bulk of the mineralisation occurs in multiple discrete pipe shaped lodes, characteristically containing disseminated sulphide-bearing anhydrous norite and/or plutonic breccia mineralisation found at the pipe interface with the gabbro host rock. Most of the pipes occur within the larger A Plug complex containing the N, O and P deposits and several other economically significant pipes are identified in the EL Plug area. The pipes can be described as extensive, although the highest grade mineralisation may be localised. The sulphides, locally segregated into discrete silicate enriched mineralised fluids, either within the source magma chamber, or in transit to the plug, forming “high-grade” sulphide pipes and lenses within mineralisation pipes or within the host rock. A history of the geological events of the Lynn Lake deposits is outlined by Pinsent (1980).

Drilling Techniques

The majority of the data utilised for the new resource estimates is historic underground diamond drill data from the mining and exploration undertaken by Sherritt between 1945 and 1976. The majority of the data has been manually input from the original paper copies. A total of 390 drill holes from the EL-Plug area, 3,434 underground drill-holes for the combined N, O and P deposit area had their collar positions, surveys, assays, lithologies and other pertinent information captured. The relatively small Disco area has a total of 106 drill holes available within the newly developed resource model area.

Corazon has undertaken a series of diamond drill programs into the EL Plug since acquiring the Lynn Lake Project in 2009. The diamond drilling was undertaken from surface using B20 skid mounted diesel/hydraulic diamond rigs contracted from Bodnar and Prospector drilling NQ2 sized wireline core.

Sampling and Sub-sampling

Sampling is understood to have been predominantly whole core or partial core and is considered representative of the material drilled. Inspection of the remaining historic ore indicates that it was all cut in half to provide assay samples, with the method used for the majority of samples being

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

6

==> picture [594 x 96] intentionally omitted <==

manual cleaving of core with a hammer and chisel, which was a standard practice at the time. Due to the very large number of samples taken, the method appears to have been adequate and representative. Justification of the approach follows the observation that the sulfidic igneous rocks comprising the mineralisation are generally solid and competent (not too brittle or friable), providing a relatively clean break under sharp impact. The modern core from the Corazon drill-programs has been cut and sampled using an electric rotary diamond saw blade disc.

Details of much of the sample preparation technique of the historic diamond drill samples are not available and downstream drill sample preparation details are not well recorded.

Details of quality control (QA/QC) procedures of the historic data are not available. It is likely that only limited quality control procedures were adopted. Corazon has used modern standards and blanks to monitor sample quality.

The sample size as taken from the diamond core diameter in use at Lynn Lake is considered appropriate for the mineralisation type and style.

Sample Analysis Method

Much of the details of the nature and quality of the assaying and laboratory procedures used for the historic data are not available. During the period of mine operation it is understood that the drill sample preparation and analysis was predominantly completed on site at the Sherritt mill complex.

The small amount of recent verification drilling work by Corazon centred around the EL-Plug deposit complies with current industry best practice standards.

Details of the quality control procedures of the historic data are not available, therefore determination of the acceptable level of accuracy and precision is subject to the judgement of the Competent Person. Contingent in this assessment is the fact that a very large amount of drilling and a very large number of samples have been collected form the majority of the project areas, particularly the N, O and P deposits and also the smaller EL-Plug area.

Excellent verification of significant intersections has been obtained through the successful mining of the EL-Plug and N, O and P deposit areas, leaving little doubt that diamond drill intersections are genuine and reliable. Significant geological reports and scientific papers have been written by Sherritt Gordon Mines (previous mine operator), academic and government geologists about the deposits. Reviews of data by number of different companies including information derived from personal communication with geological consultants familiar with the Project, along with additional recently drilled confirmation drill hole data, have confirmed the reliability of sampling and assaying as it pertains to the existing established geological interpretations.

No use of twinned holes has been made in the resource estimation; however, a large amount of high density development drilling has given a high level of confidence to mineralisation geometry and grade distribution interpretations.

For the historic data, documentation of the procedures used to compile the primary logging, and sampling information followed by the entry of the analytical data are not available. Previous data verification exercises have been undertaken by previous Qualified Persons and documented in detailed NI-43-101 standard technical reports. This work included: an internal validation from the original drill hole logs and the drill hole database on 186 (5%) of the 3,709 drill holes in the total database on collar co-ordinates, end of hole depth, down-the-hole survey measurements, ‘from’ and ‘to’ depth measurements of geology and assay sampling intervals. In addition, lithological unit and nickel and copper percentages that were compiled from hand written drill logs were also reviewed. A core review was undertaken on 23 historic drill holes to confirm the historical logging and identify any discrepancies from the logging.

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

7

==> picture [594 x 96] intentionally omitted <==

A 10 sample check assay program was completed on historical half split core during the 2015 site visit. The sampling was from two mineralised drill holes from the N orebody and was sent to ALS Chemex laboratory in Toronto. Overall results from this sampling showed a decrease of 13% nickel and 22% copper, comparing assay results over the same intervals from historical drill hole data.

HGMC consider that this very small sample set is not large enough to draw any firm useful conclusions. The core was oxidised which is known to have some impact on the grade of similar mineralisation similarly tested at other deposits.

No adjustments to assay data has been made in any of the current resource estimations.

Estimation Methodology

Resource estimation was carried out based on the main analytical elements Nickel (Ni%) and Copper (Cu%) and included parallel regression calculation estimation for a Cobalt (Cu%) item. The new resource estimation was based on a new series of block models constructed by HGMC for the EL-Plug, Disco, N, O and P deposit areas.

The new modelling work for the N, O and P areas was based on earlier resource estimation work carried out by independent consultants (Wardrop) undertook a comprehensive block modelling and mineral resource estimation study of the N, O and G Zones of the Lynn Lake Project in 2005, which was documented in an NI 43-101 report (Carter 2005). This mineral resource formed the basis of the 2009 estimate by Wardrop (McCracken 2010) which re-reported the majority of the Carter report. No additional drilling was added for this estimate, which probably used exactly the same modelling methodology, software and input data.

No previous modelling or resource estimation work has been carried out on the Disco area. The EL-Plug area was most recently modelled in 2015 by Ravensgate and has now been revisited by HGMC. This was considered necessary as a major survey grid update program was carried out by Corazon in late 2017 which consolidated drilling data-set available for the EL-Plug deposit and the Lynn Lake Project generally.

For statistical analysis HGMC composited the drill hole assay data for each deposit area into uniform 2 metre composite lengths for consistency. [This compares to the 3.04 metre (10 feet) down hole lengths for example used by Wardrop previously for the N and O deposits]. Summary tables of the composite statistics for each of the five areas were interrogated top review overall population distribution. Assays and resulting composites below the detection limit, identified as “SNR” or “Not Sampled” in the drill hole database were recorded as ‘null’ grades values of “-1” in the composited dataset in each deposit database. A few assays recorded as trace were assigned where necessary a grade of 0.0% for Ni and Cu.

Histograms and probability plots were also generated to provide a comparison of composite grades within the various Area sub-domains within each interpreted deposit area mineralisation wire-frame solids. Some obvious inflections are evident in many probability plots, indicating data probably contains a number of grade populations, and also indicates that, due to minor wireframe construction precision difficulties, a small proportion of low-grade composites (and mineralisation) is captured within the wireframes. All of these histogram and probability plots were viewed by HGMC and were found to support the geological interpretation. The general lack of extreme outliers meant that heavy grade cutting or limiting was not warranted.

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

8

==> picture [594 x 96] intentionally omitted <==

Further semi-variogram based spatial distribution analysis of nickel and copper were used to determine parameters for geostatistical grade interpolation parameters into the block model. Resource modelling and variography was undertaken using MineSight software and was completed for the main Ni and Cu reporting grade items in the EL-Plug, Disco and the N, O and P areas. Downhole variograms were used to determine the short range local nugget and sill values for each zone and longer range ‘between-hole’ variograms were preliminary modelled to assess appropriate distances that may be applied to interpolation search ellipsoids.

Grade interpolation was completed using the ordinary kriging estimation method. Ordinary kriging was considered geostatistically appropriate for carrying out grade estimation given the overall the spatial distribution characteristics and the low coefficient of variation observations. Ordinary Kriging is a commonly used interpolation technique for base metal deposits such as the ones under consideration at the Project area.

The interpolation process was carried out using a primary search and a secondary search ellipsoid in one calculation pass for each defined sub-area of the mineralisation domains and were adjusted for mineralisation zone orientation. Typical search ellipsoid dimensions used for each of the deposit areas was as follows: 100 metres (X) x 50 metres (Y) x 50 metres (Z). Anisotropic weighting using the designated local search ellipsoids was applied to all interpolation

Resource Classification

The Resource model uses a classification scheme at EL-Plug, Disco and the N, O and P Areas used the same standard approach and was based upon additional block model estimation parameters. These included Kriging Variance, number of composites in search ellipsoid, and the composite distance to block centroid. These inputs were used to derive relative confidence levels or ‘quality of estimate index’ (QLTY item) within the block model) which has a range of 1 to 3, where QLTY = 1, 2 or 3 represents high, medium or low confidence respectively.

QLTY=1

  • Drill spacing of 15 metres x 20 metres or less.

  • Composites – Ni item parameters only used as basis for classification.

  • Search ellipsoid distances 0-20m.

  • Composite numbers 15 or greater.

  • Kriging Variance 0 - 0.4. (EL-Plug), 0 - 0.01 (Disco) and 0 - 0.025 (N, O, & P Zones).

QLTY=2

  • Drill spacing of nominally 20 metres x 40 metres to 40 metres x 40 metres (depending on deposit and variography results).

  • Composites – Ni item parameters only used as basis for classification.

  • Search ellipsoid distances 20 metres -50 metres .

  • Composite numbers 10-15.

  • Kriging Variance 0.4-0.6 (EL-Plug), 0.01 - 0.015 (Disco) and 0.025-0.05 (N, O, & P Zones).

QLTY=3

  • Drill spacing out to or greater than 80 metres x 80 metres (depending on deposit and variography results).

  • Composites – Ni item parameters only used as basis for classification.

  • Search ellipsoid distances 50 metres -100 metres or greater distances.

  • Composite numbers 0 to 10.

  • Kriging Variance 0.6 or greater (EL-Plug), 0.015 or greater (Disco) and 0.05 or greater (N, O, & P Zones).

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

9

==> picture [594 x 96] intentionally omitted <==

The QLTY item parameter values have been further ‘condensed’ into an RCAT assignment item describing the confidence of the localized resource base in the block model. Preliminary Resource Classification Item coding was carried out as – (RCAT) Values 1-3 – (Nominally ‘Measured’, ‘Indicated’ and ‘Inferred’ [1, 2 or 3]. For EL-Plug the QLTY=1 and QLTY=2 material is designated as Indicated Resources (RCAT=2) with the remaining QLTY = 3 material reporting as Inferred Resources. (RCAT=3).

At the Disco Zone all material has been designated as an Inferred Resource owing to the relatively low drilling and sampling density present.

At the N, O and P areas all QLTY=1 and QLTY=2 material was designated Indicated Resources (RCAT=2) with the remaining QLTY = 3 material being designated as Inferred Resources. (RCAT=3).

Cut-off Grade

For EL-Plug, Disco, N, O and P Areas the three-dimensional wireframe models of mineralisation were based on a nominal Nickel lower cut-off of 0.2-0.3% Ni. HGMC has used a default 0.5% Ni lower cut-off for reporting Mineral Resources from the final block models. Additional resource tables are also presented using a 0.7% lower cut-off level to reflect likely future appropriate underground economic cut-off levels. The estimated contained cobalt has not influenced any mineralisation delineation decisions or the final resource reporting lower cut-offs at this stage of project development since more drilling ands sampling work is required to accurately characterise the cobalt distributions within each deposit area.

Mining and Metallurgical Methods and Parameters and other modifying factors

Future mining or mineral extraction at the EL-Plug deposit area deposit is anticipated to be initially open pit mining (as remnant mineralisation is still present close to topographic surface) followed by further underground mining.

Similarly at the Disco area, mining of the deposit due to its close proximity to topographic surface (~30m) is anticipated to be initially open pit.

For the N, O and P Areas all future mining or mineral extraction from these deposits due to their depth and access will be mined using underground mining methods only.

Underground mining methods will probably be very similar to the methods employed during the previous historic mining phases. No other assumptions on mining methodology have been made.

At the EL-Plug, Disco, N, O and P areas it is noted that historic mining, milling and processing of ore from the various deposit areas has been well recorded and it is not expected that any major metallurgical recover concerns will be encountered at such a mature project.

HGMC understands Corazon is planning more detailed test work in the future with the aim of identifying and optimising the best processing route for the production of nickel concentrate as well as recover ancillary elements such as copper and cobalt.

Any operational impacts on the environment in the vicinity of the EL-Plug, Disco, N, O and P Areas is likely to be small owing to these areas already having been cleared for mining and underground operation have little surface impact also. HGMC has not made any assessment regarding waste rock or tailings disposal. It is expected the uses of standardised rock waste dumps and tailing dams of modern design could be utilised without any significant impact on the local environment.

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

10

==> picture [594 x 96] intentionally omitted <==

Deposit Base Cut
Ni%
Tonnes Ni(%) Cu(%) Co(%) Tonnes Tonnes Tonnes
Ni Cu Co
EL Plug 0.50 1,745,000 0.76 0.28 0.023 13,300 4,800 400
O Deposit 0.50 5,165,000 0.68 0.31 0.027 35,300 16,300 1,400
N Deposit 0.50 5,793,000 0.69 0.36 0.044 39,700 20,900 2,600
P Deposit 0.50 196,000 0.71 0.47 0.028 1,400 900 0
Disco 0.50 0 0.00 0.00 0.000 0 0 0
TOTAL INDICATED 12,899,000 0.70 0.33 0.034 89,700 42,900 4,400
Tonnes Tonnes Tonnes
Ni Cu Co
9,600 3,100 300
5,700 2,700 200
4,600 2,300 300
200 100 0
500 300 0
20,600 8,500 800
Total IND + INF (0.5% Ni) 15,302,000 0.72 0.34 0.034 110,300 51,400 5,200

Table 2 : Lynn Lake Indicated and Inferred Mineral Resource Estimate – October 2018 – Defined on the basis of Deposits.

ENDS

For further information visit www.corazon.com.au or contact:

Brett Smith

James Moses

Managing Director Media & Investor Relations Corazon Mining Limited Mandate Corporate P: +61 (8) 6142 6366 M: +61 (0) 420 991 574 E: [email protected] E: [email protected]

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

11

==> picture [594 x 96] intentionally omitted <==

Competent Persons Statement :

The information in this report that relates to Mineral Resources for the EL, Disco, ‘N’, ‘O ’and ‘P’ deposits contained within the Lynn Lake Nickel Project is based on information compiled by Mr Stephen Hyland who is a Fellow of the Australasian Institute of Mining and Metallurgy and who has provided expert guidance on resource modelling and resource estimation. Mr Hyland is a Principal Consultant Geologist at HGMC consultants and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hyland consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

The information in this report that relates to Exploration Results and Targets is based on information compiled by Mr. Brett Smith, B.Sc Hons (Geol), Member AusIMM, Member AIG and an employee of Corazon Mining Limited. Mr. Smith has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Smith consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Forward Looking Statements

This announcement contains certain statements that may constitute “forward looking statement”. Such statements are only predictions and are subject to inherent risks and uncertainties, which could cause actual values, results, performance achievements to differ materially from those expressed, implied or projected in any forward looking statements.

Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forward-looking statements. These statements include, but are not limited to statements regarding future production, resources or reserves and exploration results. All such statements are subject to certain risks and uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that could cause actual results to differ materially from those expressed in, or implied or projected by, the forward-looking information and statements. These risks and uncertainties include, but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii) the potential for delays in exploration or development activities or the completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of development or construction activities, and (vi) other risks and uncertainties related to the Company’s prospects, properties and business strategy. Our audience is cautioned not to place undue reliance on these forward-looking statements that speak only as of the date hereof, and we do not undertake any obligation to revise and disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.

The Company believes that it has a reasonable basis for making the forward-looking Statements in the announcement based on the information contained in this and previous ASX announcements.

The Company is not aware of any new information or data that materially affects the information included in this ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions and technical parameters underpinning the exploration results in this release continue to apply and have not materially changed.

Level 1, 329 Hay St, Subiaco, W.A. 6008 | PO Box 8187, Subiaco East, W.A. 6008 | +61 (8) 6142 6366 | info@corazon,com.au | www.corazon.com.au | ASX: CZN

12

TABLE 3 Checklist of Assessment and Reporting Criteria - JORC Code, 2012 Edition – 11[th] October 2018 Lynn Lake Nickel Copper Cobalt Sulphide Project – Canada.

Section 1 - Sampling Techniques and Data

Lynn Lake Nickel Copper Cobalt Sulphide Project – Canada. Lynn Lake Nickel Copper Cobalt Sulphide Project – Canada. Lynn Lake Nickel Copper Cobalt Sulphide Project – Canada.
Section 1 - Sampling Techniques and Data
Criteria Explanation Comment
Sampling
techniques
Nature and quality of sampling. The Lynn Lake Project’s (Lynn LakeorProject) mineral resources reported have been defined entirely from
diamond drilling. Surface exploration drilling by Corazon Mining Limited (CorazonorCompany) into the EL Plug
deposit has confirmed historic diamond drilling. The N, O and P deposits have been defined entirely from historic
diamond drilling mainly undertaken from underground during mining operations, which extended from 1946 to
1976 (year of mine shutdown). The Disco zone has undergone limited drilling from surface. HGMC understands all
drilling information as has been made available has been used to define the remaining resources for the EL-Plug,
Disco and the N, O and P deposit areas. Significant knowledge of the deposits has been gained through studying
mine geology records and maps.
Measures taken to ensure sample
representivity and the appropriate
calibration of any measurement tools or
systems used.
Details of the sample preparation, analyses and security of the historic (pre-1976) data were not all discoverable
by independent consultants Wardrop during their investigations (2005 – 2010) and some aspects are not known.
Either the procedures were never documented, or the relevant documentation has been lost. During the period of
mine operation it is understood that the drill samples preparation and analysis was completed on site at the
Sherritt mill complex. The large volume of drilling data available lends considerable support towards the reliability
of the Project data presented.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
The historic nature of the majority of the data used to estimate the mineral resources is the most important
element having material impact to the public report. The various specific issues stemming from the historic nature
of the data are described specifically in the appropriate sections of this Table 2 Commentary, and more
expansively in HGMC’s technical report on the mineral resource estimate.
Drilling
techniques
Drill type and details. The majority of the data used has been historic underground diamond drill data derived from Sherritt mining and
exploration undertaken between 1945 and 1976. The majority of the data has been manually input from the
original paper copies. A total of 390 drill holes from the EL-Plug area, 3,434 underground drill-holes for the
combined N, O and P deposit area had their collar positions, surveys, assays, lithologies and other pertinent
information captured. The relatively small Disco area has a total of 106 drill holes available within the newly
developed resource model area.
Corazon has undertaken a series of diamond drill programs into the EL Plug since acquiring the Project in 2009.
The diamond drilling was undertaken from surface using B20 skid mounted diesel/hydraulic diamond rigs
contracted from Bodnar and Prospector drilling NQ2 sized wireline core.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Details of all the recording and assessing core and chip sample recoveries of the historic data are not available.

Page 1 of 24

Section 1 - Sampling Techniques and Data
Criteria Explanation Comment
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Details of all the measures taken to maximise sample recovery and ensure representative nature of historic
samples are not available.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Details and procedures relating to the sample recovery of all the historic drilling are not available.
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Core logging records for the historic data are generally available as hand written records which have been
subsequently scanned and input into a digital database used to guide the geological interpretation. Geotechnical
logs are not available and therefore not used to support structural impacts on the mineral distribution or the
resource estimate. A long history of mining within various deposits with the Lynn Lake Project area has provided
sufficient information towards the integrity of the interpretation of mineralisation.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
Core logging records for the historic data are generally quantitative in nature. Limited core photography is
available.
The total length and percentage of the
relevant intersections logged.
Details of the total length and percentage of logging of the historic data are not available. Recent drilling by
Corazon includes this information and was used for some validation of drilling records from historic drilling and
sampling.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
Inspection of the remaining historic ore indicates that it was all cut in half to provide assay samples, with the
method used for the majority of samples being manual cleaving of core with a hammer and chisel, which was a
standard practice at the time of Sherritt’s mine operations. Due to the very large number of samples taken, the
method appears to have been adequate. Justification of the approach follows the observation that the sulfidic
igneous rocks comprising the mineralisation are generally solid and tough but not brittle, providing a relatively
clean break under sharp impact. The modern core from the Corazon drill-programs has been cut and sampled
using an electric rotary diamond saw blade disc.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
_sampled wet or dry. _
Not applicable as only diamond core sampling has been used in the resource.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Details of the sample preparation technique of the historic diamond drill samples are not available. Modern drill
sample preparation details are variable and have been provided by the Companies operating the project and
commercial laboratories.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Details of the quality control procedures of the historic data are not available. It is likely that only limited quality
control procedures were adopted. Corazon have used modern standards and blanks to monitor sample quality.

Page 2 of 24

Section 1 - Sampling Techniques and Data
Criteria Explanation Comment
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Comprehensive details of the quality control procedures of the historic data are not available. Sampling has been
predominantly whole core or partial core and is considered representative of the material drilled.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
The sample size is considered appropriate for the mineralisation type and style.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Details of the nature and quality of the assaying and laboratory procedures used for the historic data are not
available. During the period of mine operation it is understood that the drill samples’ preparation and analysis
was completed on site at the Sherritt mill complex. Recent work by Corazon complies with current industry best
practice standards.
For geophysical tools, the parameters
used in determining the analysis.
Geophysical surveys have been undertaken during exploration on the Lynn Lake Project, but the results are not
immediately relevant to the mineral resource estimates at the local scale.
Nature of quality control procedures
adopted and whether acceptable levels
of accuracy and precision have been
established.
Details of the quality control procedures of the historic data are not available, therefore determination of the
acceptable level of accuracy and precision is subject to the judgement of the Competent Person. Contingent in
this assessment is the fact that a very large amount of drilling and a large number of samples were collected from
the majority of the Project areas, particularly the N, O and P deposits and the EL-Plug.
Verification
of sampling
and assaying
The verification of significant
intersections by independent or
alternative company personnel.
Excellent verification of significant intersections has been obtained through the successful mining of the EL-Plug
and N, O and P deposit areas, leaving little doubt that diamond drill intersections are genuine and reliable.
Significant geological reports and scientific papers have been written by Sherritt Gordon (previous operator of the
mine), academic and government geologists about the deposits. Reviews of data by number of different companies
including information derived personal communication with geological consultants familiar with the Lynn Lake
Project along with additional recently drilled confirmation drill holes have confirmed the existing geological
interpretations.
The use of twinned holes. No use of twinned holes has been made in the resource estimation but a large amount of high density development
drilling has given a high level of confidence to mineralisation geometry and grade distribution interpretations.
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
For the historic data, documentation of primary data and data entry procedures are not available. Previous data
verification exercises have been undertaken by previous Qualified Persons and documented in detailed NI-43-101
standard technical reports. This work included: an internal validation from the original drill hole logs and the drill
hole database on 186 (5%) of the 3,709 drill holes in the total database on collar co-ordinates, end of hole depth,
down-the-hole survey measurements, ‘from’ and ‘to’ depth measurements of geology and assay sampling intervals,
lithological unit and nickel and copper percentages that were compiled from hand written drill logs. A core review
was undertaken on 23 historic drill holes to confirm the historical logging and identify any discrepancies from the
loggingto a visual review. A ten-sample check assay program was completed on historical half split core duringthe

Page 3 of 24

Section 1 - Sampling Techniques and Data
Criteria Explanation Comment
2015 site visit. The sampling was from two mineralised drill holes from the N orebody and was sent to ALS Chemex
laboratory in Toronto. Overall results from this sampling showed a decrease of 13% nickel and 22% copper,
comparing assay results over the same intervals from historical drill hole data.
HGMC consider that the sample set is not large enough to draw any firm useful conclusions. The core was oxidised
which is known to have some impact on the grade of similar mineralisation similarly tested at other deposits.
Discuss any adjustment to assay data. No adjustment to assay data has been made in the resource estimation.
Location of
data points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Details of the original collar and downhole survey methods for the historic data are not available. It is assumed
they were made by qualified mine surveyors. The majority of drilling data from the database plots in the right
proximity with respect to the known positions and extents of the mine development infrastructure (predominantly
underground).
The recent Corazon surface diamond holes were routinely surveyed upon completion by a Reflex Maxibore II tool
from collar to end of hole.
Specification of the grid system used. All the historic holes were surveyed in the local mine grid. For the EL Plug, Disco, and the N, O, and P areas, the
historic hole surveys were converted from the local grid to modern DGPS NAD83 and UTM co-ordinates by Corazon.
Checks on the local grid transformation were made by picking up the main shaft collar (surveyed originally in the
SGML imperial local grid) and comparing with Mines Department engineering plans of the EL Mine infrastructure.
Previous interrogation of the differences between modern DGPS NAD83 co-ordinates as available from the historic
imperial SGML co-ordinates used for infrastructure design were found to be +/-0.50 metres, which demonstrates
sufficient confidence in the historic survey data for use in ongoing resource development studies.
Quality and adequacy of topographic
control.
The topography at the project area is relatively flat and featureless, with the exception of the collapsed stopes
and open pits remnant from historic mining. The topography DTM surface utilised incorporated surface drill collar
elevation data and was combined with pit survey DTM surfaced data was sourced from historic survey information.
It is considered to be of high quality and accuracy.
Data spacing
and
distribution
Data
spacing
for
reporting
of
Exploration Results.
The Project’s nickel-copper deposits were drilled systematically from the main underground levels of 800, 950
(12th level of A mine), 14th Diesel Haulage, 2000 and 3000 feet levels with horizontal drill holes spaced laterally
every 121.9 metres (400 feet) out to or near the contact between the intrusive plug and the metavolcanics or
metasediments. Unless large amounts of consistent mineralisation were intersected in these horizontal drill holes
no additional drilling was conducted by Sherritt. When considerable lengths of mineralisation and grade were
intersected, drilling was generally conducted systematically on 15.2 metres (50 feet) and then 7.6 metres (25 feet)
intervals and designated an ‘alpha’ orebody or zone identification. Historic information indicates that the majority
of drilling was carried out from underground using either EX or BM diameter core drilling equipment.
Corazon diamond drilling into the EL Plug was undertaken from surface and fanned out from available drill sites
around the current open pit (which is now a lake) to target the resource area on a nominal 50 metre x 25 metres
grid. Drilling was undertaken from four different orientations to best define the intrusive pipes limits.

Page 4 of 24

Section 1 - Sampling Techniques and Data

Section 1 - Sampling Techniques and Data Section 1 - Sampling Techniques and Data Section 1 - Sampling Techniques and Data
Criteria Explanation Comment
Whether
the
data
spacing
and
distribution is sufficient to establish the
degree
of
geological
and
grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
The Competent Persons have determined that the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s). Formal reporting classification weighted with respect to relative levels of drilling density has been
applied to the EL Plug, Disco and N, O, P deposits. The same classification approach has been consistently applied
to each of the deposit areas.
Whether sample compositing has been
applied.
For the EL Plug, Disco, and the N, O and P Area deposits, all available assay data has been composited into uniform
length 2.0 metre downhole composites. This length was chosen following a series or spatial distribution reviews of
domain coded composites to observe effects on overall reported Ni and Cu average grades and associated
coefficients of variation (CV).
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
Because underground access was available for drilling, drill holes fans were able to be designed to adequately test
the deposits largely without bias from drill hole orientation. It is noted that the deeper deposit areas tended to
have higher angle drill intersections into the generally vertically orientated mineralised zones, however, the
estimation method utilised has helped mitigate any unwanted stationarity biases in the estimates.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
At EL Plug: Drilling was undertaken from four different orientations to best define the intrusive pipes limits. Drill
core was not orientated, as historic development and stoping is considered to have already confirmed the attitude
of the pipe and the main contacts are easily identifiable and universally sub-vertical. The intersections are at a
fairly low angle but the range of orientations has reduced the potential bias of this effect.
At Disco, the drilling angle is also at a relatively high angle with respect to the interpreted steeply dipping plug
style mineralisation also. The lower drilling density in this area consequently has necessarily lowered the
classification of reported resources to the Inferred category only.
For the N, O and P areas there had been comprehensive underground development access which has allowed for
the establishment of a large number of drilling locations for drill hole ‘fans’ to be drilled throughout most of the
known deposit area in order to firmly establish the interpreted mineralisation geometry.
Sample
security
The measures taken to ensure sample
security.
Details of the sample security measures of the historic data are not available, however, being a company owned
mining operation this is unlikely to have been an issue. Sample security measures undertaken by Corazon were
subject to rigorous storage and transport procedures both to and from the assay laboratory with no loss of samples
or data. HGMC’s review of the Corazon processes found them to be in line with industry best practice procedures
and acceptable for the acquisition of data to be used for the purposes of resource estimation.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
For the historic data, no record of any historic audits or reviews of sampling techniques and data is available.
Subsequent workers have validated the majority of this data as far as it is known. Detailed descriptions of data
sources have been previously documented and also recently reviewed and updated at the end of 2017.

Page 5 of 24

Section 2 - Reporting of Exploration Results
Criteria Explanation Comment
Mineral
tenement and
land tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as
joint
ventures,
partnerships,
overriding
royalties,
native
title
interests, historical sites, wilderness or
national
park
and
environmental
settings.
The areas covered by this Mineral Resource Estimation pertain to two agreements in which Corazon has 100%
beneficial equity in the ground. These agreements are titled the Dunlop Agreement (which includes the EL
Deposit) and the Victory Agreement (which cover the N, O, P and Disco Deposits).
The tenure includes multiple Mineral Claims, Mineral Leases and Mining Claims, as defined by the Provincial
Government of Manitoba. All claims are currently in good standing.
Much of the exploration ground at Lynn Lake and the satellite EL Mine (EL Deposit) is covered by the Dunlop
agreement.
In this agreement, Corazon has the option to acquire 100% of the Project by meeting certain conditions. This
agreement was originally announced within a Company ASX announcement dated 18 May 2010, with the most
recent amendments to this agreement presented in a Company ASX announcement dated 29 July 2015.
The main mining centre (including the N, O, P and Disco deposits) are cover by an agreement between Victory
Nickel Inc and Corazon, which was announced on 1 April 2015. This agreement saw Corazon acquire 100% equity in
the tenure, with expenditure commitments of $3.5M to be complete by 19 December 2020.
Corazon works closely with First Nation groups and several government organizations responsible for mining and
the environment. Work Permits are currently in place for the Fraser Lake Complex within the Project area and
covers activities such as ground geophysics and land-based drilling.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
The Project tenements are understood by HGMC to be in good standing and with no impediment to obtaining a
licence to operate in the area. Mining and processing has previously been undertaken. A number of agreements
have been signed between Corazon and previous/current owners of the property which require certain payments
and royalties to be paid to other companies, which would need to be satisfied to undertake mining operations.
Exploration
done by other
parties
Acknowledgment
and
appraisal
of
exploration by other parties.
1941
Austin McVeigh located the discovery outcrop.
1945-1946
Sherritt Gordon (Sherritt) staked 353 claims and conducted exploration
1948-1950
Sherritt began sinking the A shaft. This, along with geophysical exploration and drilling increased
the resource to 14 million tons averaging 1.22% nickel and 0.62% copper (1)
1953-1976
Sherritt operated the Lynn Lake Nickel Mine from 1953-1976. During this time they
discovered/developed additional zones and commissioned the Farley Shaft in 1961. The mine
produced over 22 million tons of ore at a grade of 1.023% Ni and 0.535% copper (1)
1988-1989
Lynn Gold Resources Inc., owned by Hayes Resources Inc., conducted an assessment of Sherritt’s
stated historic reserve of 19.3 million tons grading 0.61% nickel and 0.32% copper (1).
1993-2005
Black Hawk Mining Inc. used the Property mill from 1993-2000 to process ore from the Farley
Lake open pit gold mine, approximately 36 km east of Lynn Lake. The gold tailings were pumped
into the B pit and then into open stopes of the abandoned underground workings.

Page 6 of 24

Section 2 - Reporting of Exploration Results
Criteria Explanation Comment
2005-2008
Independent Nickel conducted the following exploration activities on the A Plug area: re-
established the historic mine grid at 1000 foot intervals, line-cutting of 41.75 total line
kilometres, an electromagnetic ground survey, a ground magnetometer survey, borehole EM
surveys, an induced polarisation survey, drilled 87 boreholes totalling >28,000m.
2007
Independent Nickel filed a Preliminary Economic Assessment and a Pre-Feasibility Study on
the A Plug area. Both studies are available on SEDAR.
2009-2014
Prophecy Resources Inc. entered into an agreement with Victory Nickel Inc. to acquire the A Plug
area. Prophecy subsequently withdrew from this agreement.
2009-2015
Corazon Mining Limited acquired an option over the EL Plug area from Dunlop and carried out
an updated resource estimate for the EL-Plug deposit during 2015.
2014-2015
Corazon Mining Limited acquired the A Plug area from Victory Nickel Inc.
Geology Deposit type, geological setting and
style of mineralisation.
The nickel, copper and cobalt deposits of Lynn Lake are concentrations of sulphides occurring within intrusive
plugs mafic to ultramafic igneous rocks. These host rocks are derived from a large intermediate to ultramafic
igneous pluton that has been intruded into Wasekwan Group metavolcanic strata. Classification of the magmatic
origin is of the tholeiitic affinity. The mineralisation in both plugs typically occurs within structurally controlled
vertical to subvertical pipe intrusions of remobilised peridotite and amphibolite, displaying four types of
mineralisation: massive sulphide, disseminated sulphides, cemented breccia sulphides and stockworks of sulphide
stringers. The nickel and copper mineralisation of the Lynn Lake plugs consists primarily of pyrrhotite, pentlandite
and chalcopyrite with minor amounts of pyrite and trace of sphalerite, magnetite and ilmenite. Cobalt
distribution appears coincident to nickel. Disseminated sulphides consist of interstitial and fine-grained sulphides
that are distributed in a homogenous structureless nature. Plutonic breccia material occurs at the contact of the
mineralised intrusive pipe and the barren gabbro country rock displaying sub-rounded xenoliths of either diorite or
gabbro.
There has been a significant amount of structural deformation to the deposits. Although the strongest spatial
association of mineralisation is occurring in ultramafic to mafic intrusive rocks, there is also a strong spatial
association of mineralisation with areas of faulting or intense fracturing. Higher grade mineralisation occurs in
areas of intensely fractured or brecciated mafic intrusive rock and ore minerals are found in all types of material
within the fracture zone, including late acid dykes. Faulting within the basic plugs is believed to be related to the
regional north-south faults, which resulted from a thrust from the west.
Drill hole
Information
The drill hole data relating to the resource estimates reviewed in this study are all previously reported results. No
new drilling has taken place since 2015. Ongoing studies for these prospect areas are focused on the metallurgical
characteristics of the mineralisation and development of updated process technologies.
Drill hole collar, geology and assay data for each prospect area investigated in this study are provided in the main
current Corazon Drill Hole database.
Data Most drill hole samples have been collected over 1 metre or 2 metre down-hole intervals. Assay compositing

Page 7 of 24

Section 2 - Reporting of Exploration Results
Criteria Explanation Comment
aggregation
methods
completed for each deposit in preparation for statistical analysis and grade estimation was conducted using
length weighted averaging of the input assay data by corresponding sample lengths.
No metal equivalent calculations have been used in this assessment.
Relationship
between
mineralisatio
n widths and
intercept
lengths
The mineralisation at the various Lynn lake Project nickel deposit areas have a strong global sub-vertical
orientation. Where possible, previous Lynn Lake developers have used multiple drilling orientations for all
exploration drill holes in order to focus on the predominantly vertically oriented nickel – copper mineralisation.
All vertical drill holes drilled from surface tend to intersect the mineralisation at relatively high angles in
consideration of the vertical orientation of mineralisation. Allowance has been made to ensure down-hole widths
and true widths for vertical and steeply dipping holes are accurately represented.
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
Diagrams used in this report were either supplied by Corazon or generated by HGMC and in some cases reproduced
from diagrams used in previous reports on the deposits.
Balanced
reporting
Not applicable to this report. All data, assumptions and resource estimated have previously been
reported.
Other
substantive
exploration
data
Other exploration data, if meaningful
and material, should be reported.
Not applicable for reports on Mineral Resources.
Refer to commentary in Section 3 of this table.
Further Work The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Not applicable to this report.
Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information
is
not
commercially
sensitive.
Infill additional verification drilling of all areas including EL-Plug and particularly the Disco zone is warranted
before decisions are made with respect to future mine planning. Additional drilling in all areas including the N, O
and P deposit areas will add value towards to allowing higher confidence resource classification levels to be
reported.

Page 8 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
Database
integrity
Measures taken to ensure that data has
not been corrupted by, for example,
transcription or keying errors, between
its initial collection and its use for
Mineral Resource estimation purposes.
The majority of the data used has been historic underground diamond drill data from the mining and
exploration undertaken by Sherritt between 1945 and 1976. The majority of the database consists of this
historic data which has been manually input from the original paper copies of drill logs, survey sheets and assay
sheets and digitised from hand drafted cross sections and mine plans by the independent consultancy Wardrop
in 2005 and by Corazon. A total of 3,709 drill holes had their collar positions, surveys, assays, lithologies and
other pertinent information manually entered into an Access database. Approximately 3,900 historic drill holes
remain to be digitised; however, these drill holes are from deposits which are not included in this mineral
resource estimate. In addition, a total of 395 drawings of sections and plans were scanned from historic data
and subsequently digitised.
More recent drilling (2005-2009) has been added to the Access database by previous owners (Independent
Nickel and Victory) although the details of this have been poorly described in their reports. Corazon have
added 16 diamond drill holes to the database, all from drilling into the EL Plug deposit. These holes were used
to help validate previous historically derived data. Corazon also retrieved 19 historic AX/BN diamond holes
which were added to the drilling database for inclusion in resource modelling and estimation.
Data validation procedures used. N, O and P Deposit Areas:
A validation study on the historical logging which comprised re-logging the remaining half core from 23 historic
diamond drill holes was conducted during a site visit by Cater (2005). The review found that the geology of the
inspected core was consistent with the original geological logging, except for in hole U5622 drilled on the P
orebody, where within the gabbro, amphibolite and quartz-hornblende-diorite units were inconsistent with the
drill log. Sampling intervals matched the assay sampling intervals from the drill log in all cases.
A very limited sample check assay program was completed on historical half split core. The sampling was from
two mineralised drill holes from the N orebody and was sent to ALS Chemex laboratory in Toronto. Overall
results from this sampling showed a decrease of 13% nickel and 22% copper, comparing assay results over the
same intervals from historical drill hole data.
Disco Area:The resource estimate carried out for the Disco zone by HGMC used the
106 available drill holes, which helped confirm some of the preliminary historical mineralisation zone
interpretations.
EL Plug:The resource estimate carried out for EL-Plug by HGMC followed previous validation of the historic
drill holes where the 16 holes drilled by Corazon were used to help validate previous historically derived data.
Corazon also retrieved 19 historic AX/BN diamond holes, which were also added to the drilling database for
inclusion in resource modelling and estimation.

Page 9 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
Site visits Comment on any site visits undertaken by
the Competent Person and the outcome of
those visits.
If no site visits have been undertaken
indicate why this is the case.
The Independent Qualified Person, Mr Stephen Hyland of HGMC (formerly of Ravensgate), visited the Lynn Lake
township and Project in March 5th2015. The visit included:

Visit to historic Mine Site Areas including A-Plug, N, O and P areas as well as the EL Plug area.

Visits to the exploration drill sites and the old EL Plug Pit and associated outcrop exposures.

Visit to the rehabilitated old A-Plug Tails Dam areas. Review of geological setting of the deposit
and some surrounding areas.

Inspection of available drill-core and some of the laboratory equipment used for sample
preparation and bulk density measurements of samples.
From the site visit, no significant concerns relating to previous historic reporting against current status of the
Project were identified.
Geological
interpretation
Confidence in (or conversely, the
uncertainty of) the geological
interpretation of the mineral deposit.
The geological interpretations utilised for this resource estimate were based on well-established geological
models of ore genesis, geological history and structural deformation which has been described in general
Project reporting, including a thorough detailed report produced by government geologist Pinsent (1980), plus
various academic papers. These geological models were developed and continuously improved upon during
exploration and mining throughout the 1960s and 1970s. The models and mineralisation interpretation work
assisted in the successful mining of some the deposits over a +30 year period. Subsequent research has
generally upheld the integrity of the models. HGMC has used this modelling basis to develop updated 3D
mineralisation models used for current resource estimation and reporting.
The nickel-copper-cobalt deposits of Lynn Lake are concentrations of sulphides occurring within two intrusive
plugs of mafic to ultramafic igneous rocks, derived from a large intermediate to ultramafic igneous pluton that
has been intruded into metavolcanic strata. Classification of the magmatic origins of the main rock types is of
the tholeiitic affinity. The mineralisation in both the A-Plug and the El-Plug areas typically occurs within
structurally controlled vertical to subvertical pipe intrusions of remobilised peridotite and amphibolite,
displaying four types of mineralisation. These are broadly grouped as massive sulphide, disseminated sulphides,
cemented breccia sulphides and stockworks of sulphide stringers. The bulk of the mineralisation occurs in
discrete pipe shaped lodes, characteristically containing disseminated sulphide-bearing anhydrous norite
and/or plutonic breccia ore found at the pipe interface with the gabbro host rock. Many ore pipes occur within
the larger A Plug complex and several economically significant pipes are identified in the EL Plug. The pipes
are extensive, though the mineralisation may be localised. The sulphides, locally segregated into a discrete
silicate enriched ore fluids, either within the source magma chamber, or in transit to the plug, forming “high-
grade” sulphide pipes and lenses within ore pipes or within the host rock. A history of the geological events of
the Lynn Lake deposits is outlined by Pinsent (1980).
Nature of the data used and of any
assumptions made.
The majority of the data used for modelling the EL-Plug and N, O and P areas has been from the available
comprehensivehistoric underground diamond drill data acquiredfromthemining and explorationundertaken

Page 10 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
by Sherritt between 1945 and 1976. Some assumptions have been made about the veracity of all this data
because little record of the methods of drilling, logging, sampling, assaying and QAQC were written down or
preserved. Independent consultancy Wardrop compiled and reviewed this data and determined it suitable for
resource estimation purposes. HGMC concurs with this opinion and also noted that the sheer volume of drilling
data available, particularly for the N, O and P areas lends support to the continuity and integrity of the data-
sets. HGMC have made some allowances for modifying factors as it relates to data quality and has reduced
classification confidences where necessary of some resources from previously reported Measured resources to
to JORC Indicated or inferred. The main uncertainties considered relate to possible inaccuracies of sample
locations (dues to aspect line no down-hole surveys) and possible analytical grade inaccuracies caused by
unquantified sampling problems such as sample loss or contamination.
The effect, if any, of alternative
estimation interpretations on Mineral
Resource estimation
Very low risk, as alternative estimation interpretations are unlikely to be valid. The mineralisation in both the
A-Plug area including the well drilled N, O and P areas as well as the EL-plug typically occurs within structurally
controlled vertical to subvertical pipe intrusions. The deposit models used and interpreted and remobilised
peridotite and amphibolite, displaying four types of mineralisation: massive sulphide, disseminated sulphides,
cemented breccia sulphides and stockworks of sulphide stringers further confine the interpretation of
mineralisation zone geometry and grade distributions. Sherritt’s successful mining operation which ran for +30
years were based on the underlying understanding and interpretation of geology provided further confirmation
that other interpretations are not likely to be valid. The early interpretation models differ little from those
independently derived mineralisation zone modelling developed independently by HGMC. The continuity in
geometry and grade of the mineralisation between drill holes has been absolutely confirmed through successful
underground drifting and stoping of the majority of the deposits discovered in the Lynn Lake field.
The use of geology in guiding and
controlling Mineral Resource estimation.
There are significant geological controls on the geometry and grade continuity of the mineralisation and
geological interpretation involves taking these controls into account. Sulphide mineralisation only occurs in
certain well-established rock types in patterns predictable through ore genesis models and geological logging
and mapping. Structural offset of deposits by late faulting has been clearly established and documented
through underground mapping and diamond drilling interpretation.
The factors affecting continuity both of
grade and geology.
The main mineralised zones occur in the western half of the A Plug associated with more mafic to ultramafic
rock types of gabbro, amphibolite and peridotite in three main centres within the pluton as follows:

A, C, Upper D, Lower D, E and J zones at the north end of A Plug situated around the A shaft area;

B, F, K and B-K zones that lie west of the Farley shaft in the middle of the A Plug;

The near surface Disco Area

O, N and P zones at the south end of the A Plug;

The EL deposit lies in the centre of EL Plug.
Significant structural controls on the geology of the mineralisation have been defined:
All the orezones appearto be affected by somefaulting.TheLynn Lakefault orGriffithsheardefines the

Page 11 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
southern contact of the A Plug and the O fault disrupts and offsets the O and N zones. These two major reverse
faults strike northwest and dip moderately to the northeast. The reverse movement on the O fault has caused
sections of the O and N zones to be thrusted southwest over the Wasekwan Group country rock below the 3,500
foot level. The Lynn Lake fault with a similar sense of movement has moved the weakly mineralised portions of
the O and N to the southwest over the Wasekwan. The mineralised portions of the N and O zone lie between
the two faults from the 1,600 and 3,500 foot levels. If the known weakly mineralised M zone, which lies at
surface, is the thrusted hangingwall equivalent of the N zone the offset of the faulting is on the order of 500 to
600 metres. The O zone pipe thrusted hanging wall extension has not been located or the footwall truncated
portion of the Lower O zone.
Dimensions The extent and variability of the Mineral
Resource expressed as length (along strike
or otherwise), plan width, and depth
below surface to the upper and lower
limits of the Mineral Resource.
EL-Plug:The main upper EL-Plug zone is vertically orientated and extends from topographic surface down to a
depth of approximately 480 metres. The deepest EL-Plug mineralisation zone extends for approximately 340
metres starting at approximately 560 metres below the topographic surface. The upper EL-Plug zone is
approximately 120 metres in diameter. Similarly the lower EL-Plug zone is approximately 50 metres in diameter
Disco Zone :The Disco zone is also sub-vertically oriented extending from approximately 30 metres from
topographic surface and extends down for approximately 220 metres. The approximate diameter of the Disco
zone is 30-35 metres.
N Zone:The N zone is interpreted to be the faulted disrupted counterpart of the M zone once being a single
mineralised pipe. This pipe extends from the O fault at 4,500 feet below surface to the subsurface outcrop of
the M zone. The mineralisation therefore lies above and below the Lynn Lake fault (300°/50°NE). The N zone
mineralisation is located adjacent to the A Plug contact and the country rock Wasekwan volcanics at about
1,100 metres south of the Farley Shaft. Mineralisation extends from the Lynn Lake Fault on the 1,600 foot level
to the O fault at approximately 1,400 metres from surface. The majority of the mineralisation is disseminated
sulphides. It consists of several lenses within a pipe of mineralised amphibolite to gabbro that has been cut by
a large peridotite body and numerous thrust faults (030°/30°NW). The faulting has displaced these blocks
successively higher to the southeast. The Lynn Lake fault overlies, and the O fault underlies, the N zone
mineralisation. The upper and lower 1,730 shear separate the upper and lower N zones. The uppermost part of
the N mineralised pipe is located approximately 420 metres from topographic surface. It is crudely sub-circular
in shape on the order of 250 metres to 300 metres in diameter and extends for approximately 720 metres to
maximum interpreted depth.
O Zone:The O zone is located 750 metres from the Farley Shaft, hosted in mineralised amphibolite that
intruded the A Plug gabbro. The O zone extends from the O fault on the 3,550 foot level to the Lynn Lake fault
on the 1,600 foot level. Extensive faulting on the Dyke shear has displaced the O zone into upper and lower
portions. The complex Dyke shear that trends north-south and dips 40° to the west has separated the Upper

Page 12 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
and Lower by approximately 90 to 100 metres. The upper O zone pipe has been structurally juxtaposed by a
number of reverse faults from 1,900 to 2,400 foot level. These reverse faults are probably curved splays from
the underlying Dyke shear that trends north-south and dips off to the west. The mineralised lenses of the upper
O zone consists of disseminated, sulphide breccia and veins of massive sulphides in a sub-circular nature. The
lower O zone that lies below the complicated Dyke shear consists mainly of disseminated sulphide material
hosted in amphibolite. The uppermost part of the O mineralised pipe is located approximately 430 metres from
topographic surface. The lower O zone is sub-circular to irregular in shape and plunges steeply to the southeast
and has an approximate length of 200 metres and approximately 150 metres across. The pipe is cut out by the
O fault on the 3,550 foot level and the total depth extent is roughly 900 metres with the base at approximately
1400 metres from topographic surface.
P Zone:The P Zone is located approximately 50 metres north of the O Zone and is also sub-vertically oriented
with the uppermost part located approximately 760 metres from topographic surface. The total depth extent
of the P Zone is approximately 240 metres and has an approximate diameter of 60 metres.
Estimation and
modelling
techniques:-
A Plug deposits
N zone
O zone
P zone
+
Disco Area
+
+ EL-Plug Area
The nature and appropriateness of the
estimation technique(s) applied and key
assumptions, including treatment of
extreme grade values, domaining,
interpolation parameters and maximum
distance of extrapolation from data
points. If a computer assisted estimation
method was chosen include a description
of computer software and parameters
used.
Independent consultants Wardrop undertook a comprehensive block modelling and mineral resource estimation
study of the N, O and G Zones of the Lynn Lake Nickel Project in 2005, which was documented in an NI 43-101
report on the Project (Carter 2005). This mineral resource formed the basis of the 2009 estimate by Waldrop
(McCracken 2010) which re-reported the majority of the Carter report. No additional drilling was added for
this estimate which probably used exactly the same modelling methodology, software and input data.
HGMC has remodelled the N, O and P zones based upon the earlier Wardrop modelling work. The Disco area has
not had any previous modelling or resource estimation work carried out. The EL-Plug area was most recently
modelled in 2015 by Ravensgate and has now been revisited by HGMC due to a major survey grid consolidation
carried out in late 2017 for the drilling data-set available for the Lynn Lake Project.
For statistical analysis HGMC composited the drill hole assay data into uniform 2 metre composite lengths for,
El-Plug, Disco and the N, O and P areas for consistency. [This compares to the 3.04 metre (10 feet) down hole
lengths used by Wardrop previously]. Summary tables of the composite statistics for each of the five areas
were investigated. Assays below the detection limit, identified as “SNR” or “Not Sampled” in the drill hole
database were recorded as ‘nul’ grades values of “-1” in thye composited dataset in the database. Assays
recorded as trace were assigned a grade of 0.0% for Ni and Cu.
Histograms and probability plots were created to provide a comparison of composite grades within the various
interpreted solids for each zone. Several inflections are evident in many probability plots indicating data
probably contains a number of grade populations, probably indicating a proportion of low-grade material within
the wireframes. All of these histogram and probability plots were viewed by HGMC and found to support the
geological interpretation. The lack of extreme outliers meant that grade cutting or trimming was not
necessary.
Spatial analysis of thegrade distribution of nickel and copper were used to determineparameters for

Page 13 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
geostatistical grade interpolation into the block model. Resource modelling and variography was undertaken
using MineSight software and was completed for Ni and Cu grade items in the EL-Plug, Disco and the N, O and P
areas. Downhole variograms were used to determine the short range local nugget and sill values for each zone.
Grade interpolation was completed using the ordinary kriging estimation method. Ordinary kriging was
considered geostatistically appropriate for carrying out grade estimation given the overall the spatial
distribution characteristics and coefficient of variation observations for the base metal deposit areas under
consideration at Lynn Lake.
The interpolation process was carried out using a primary search and a secondary search ellipsoid in one pass
for each defined sub-Area domains of each of the mineralized zones. Typical search ellipsoid dimensions used
for each of the deposit areas was as follows: 100 metres (X) x 50 metres (Y) x 50 metres (Z).
The availability of check estimates,
previous estimates and/or mine
production records and whether the
Mineral Resource estimate takes
appropriate account of such data.
From 1953 to 1976 a significant mining and mineral processing operation was undertaken by Sherritt. Over this
24 year period, approximately 22.2 million tons (20.1Mt) of sulphide ores were mined and processed at an
average grade of 1.023% Ni and 0.535% Cu. The production was primarily from underground operations in the A
Plug area with a smaller proportion of high-grade production extracted from the EL Plug area. The mines closed
in 1976 with a substantial nickel-copper resource remaining in-situ and partially developed. However,
production records are not sufficiently detailed that the resources for individual zones of mineralisation now
modelled or updated can be reconciled directly against production records as they exist.
The assumptions made regarding recovery
of by-products.
It is assumed that copper will be recovered along with the nickel. Cobalt occurs in the ore in an approximate
30 to 1 ratio to nickel grade. Cobalt was recovered into the nickel concentrate during historic mining and
processing. Low grade cobalt (due to its high current market price) was estimated into the various block
models. Due to limited assay data specifically for cobalt in most areas the cobalt grade has been estimated
based on the reliable Ni-Co correlations as observed, particularly from the EL-Plug area where the correlation
coefficient of Ni vs Co was determined to be 0.91 which is interpreted as very reliable.
Estimation of deleterious elements or
other non-grade variables of economic
significance (eg sulphur for acid mine
drainage characterisation).
The majority of the samples have only been assayed for nickel and copper, with a small number of samples
from more recent drilling analysed for a full suite of elements. It is noted that whilst a full analytical suite for
all deposits is not available the Lynn Lake deposits have nevertheless been successfully processed through a
mills which commenced operation some 50 years ago. There can be little doubt that a modern mill would
successfully handle the majority of deleterious elements in the mineralisation. The mineralisation is very
sulphide rich, so acid drainage issues will necessarily need to be dealt with in any mine environmental
planning.
In the case of block model interpolation,
the block size in relation to the average
sample spacing and the search employed.
As is typical with underground drilling patterns, drill hole spacing is quite variable across the deposits
especially in the vertical direction. The majority of the drilling in the underground developed areas is tightly
spaced at either 7.62 metre or 15.24 metre lateral intervals. Only the Lower N area below elevation 3,000 feet
has used wider spaced at 30.48 metre intervals. Mineralisation targets that have been drilled from surface
drilling tend to be least well drilled, although still more than adequate in most places for deposit modelling
and resource estimationpurposes In conjunction with the down-hole composite length of 2m beingused HGMC

Page 14 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
has chosen a standard block size for a all areas of 5 metres (E) x 5 metres (N) x 5 metres (RL) in order to
accommodate the locally complex mineralisation geometries particularly as defined by the closely spaced
drilling. This block size is small, however, it is an acceptable compromise between volume variance effect
minimization and better local scale mineralisation zone definition. Models with smaller block sizes are
inherently more useful for use in detailed mine planning studies.
Any assumptions behind modelling of
selective mining units.
No detailed assumptions have been made with regard to modelling of selective mining units, except for future
mining, which is expected to use similar underground mining methods to those used historically. The block
sizes utilised are expected to be in line with the general mining method assumptions including the use of
standardised stope extraction.
Any assumptions about correlation
between variables.
There is a good correlation between nickel grades and cobalt grades observed at EL-Plug with a correlation
coefficient of 0.91 observed for the main mineralized zone. It is assumed from a global perspective that a
similar correlation level is present in most of the deposit areas. The correlation of Ni vs Cu for EL-Plug is
significantly less strongly correlated with a correlation coefficient of just 0.66 observed reflecting the different
deposition environments for nickel and copper.
Description of how the geological
interpretation was used to control the
resource estimates.
Three-dimensional wireframe models of mineralisation were developed for each of the EL-Plug, Disco, N, O and
P zones based on a Nickel nominal lower cut-off grade of greater than 0.2-0.3% Ni. The zones of
mineralisation interpreted for each area were generally contiguous, except where affected by interpreted
block faulting. A minimum thickness criterion for sulphide mineralisation of approximately 4 metres was used
in the development of the solids. Both sectional and plan interpretations were digitised MineSight software,
and these interpretations were linked and triangulated to build three-dimensional solid wireframes (solid)
models. The wireframe solids were validated and then used to constrain the limits of block model cells.
Historic mining has been undertaken in the EL-Plug and the N, O and P zones. For the El-Plug HGMC utilised the
historic stope and open pit survey information to construct depletion zone solids used to eliminate this
previously mines material from the remaining resource estimations. Similarly, for the N and O zones, the
volumes of rock material mined out through historic stoping and drift development were previously defined by
Wardop, which, HGMC has adopted for depletion of the resource base in the mined out area. HGMC assume
that this stope volume information was derived from the scanned historic mine plans and cross sections. For
the P area specifically, HGMC has had to roughly estimate an indicative stope location and volume based on the
understood production records for this area. It is assumed the stoping was carried out in the area of best
mineralisation and therefore has deplete some of the better (higher grade) resources. HGMC has taken this
conservative stance as a consequence of no actual underground survey volume information being available for
the P Area and recognise this is an area requiring additional future verification and validation work. Given the
long life and professional nature of the historic mining operation at Lynn Lake, a fair degree of confidence can
be attached to the accuracy of the drafting of these plans and the survey work which determined the locations
of the workings. However, no verification of the accuracy of the historic mine plans has as yet been attempted.
Discussion of basis for using or not using
grade cutting or capping.
Some non-assayed intervals are present in the database. These have been interpreted as non-mineralised

Page 15 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
intervals and assigned zero grade for the purposes of block grade estimation. In situations where non-
mineralised intervals are included within broader mineralised intervals these non-mineralised intervals were
incorporated into the interpreted solids.
The process of validation, the checking
process used, the comparison of model
data to drill hole data, and use of
reconciliation data if available.
Validation for all five of the deposit block models constructed by HGMC in the following order of completion -
EL-Plug, Disco and the N, O, and the P area. Validation was carried out graphically and statistically to ensure
that the block model grades accurately represent the input drill hole data. A number of methods were
employed to validate the block model including: global mean comparison; visual comparison; trend plot
comparison. The global mean comparison between drill composite grades and model grades within each of the
mineralised zone wireframes shows that, globally, the estimates validate well within all well-informed domains
for both deposits. Cross sections were viewed on-screen and showed a good comparison between the drill hole
data and the block model grades. A volume comparison between the volume of the block model cells within
each mineralised zone and the volume of the corresponding wireframe. The results of volume checking were,
as in previous models, within acceptable limits.
For the El-Plug area the wireframe volumes for each area domain were compared to those developed for the
2015 modelling program where it was observed that some drill-hole survey changes necessitate a small update
of mineralisation zone interpretation with a coincident small reduction in defined resource volume.
From interrogation and comparisons of block model grades with composite grades for each of the modelled
deposit it was observed that there is a reasonable correlation between the values. No significant discrepancies
were apparent from the sections and plans reviewed. In some outlying portions of the model, larger
discrepancies are reflected as a result of lower drill density. There is a degree of smoothing apparent from the
ordinary kriging, which reflects the data density to a great extent.
Estimation and
modelling
techniques:-
EL Plug
EL deposit
The nature and appropriateness of the
estimation technique(s) applied and key
assumptions, including treatment of
extreme grade values, domaining,
interpolation parameters and maximum
distance of extrapolation from data
points. If a computer assisted estimation
method was chosen include a description
of computer software and parameters
used.
The well established interpretation of the Lynn Lake deposits clearly describes them as concentrations of
sulphides occurring within two intrusive plugs of mafic to ultramafic igneous rocks (refer “Geological
Interpretation” commentary above). The interpreted nickel-copper mineralisation distribution is based on a
nominal minimum of 0.2% Ni cut-off which has been used to interpret and construct wireframes of
mineralisation within the EL-Plug, Disco, N, O and P Areas.
Interpolation estimates were carried out using MineSight® software.
Block sizes for the EL-Plug, Disco, N, O and P areas models based on drill spacing and deposit geometry are as
follows:

5 metres x 5 metres x 5 metres (all deposits)

(Uniform Block Size – No Sub-Blocks)
These have been allocated ZONE code numbers for modelling use and have been designated at EL-Plug as
ZON1=1 (low grade) and ZON2=1 (high grade) zones. For all other deposits (Disco, N, O and P) a single zone
code designation has been used (ZONE1=1) for all zones coded into the block models.
All models used zone codes with an associated block percentage sub-division (1% precision) to maintain
accurate volume reporting.‘Low grade’nickel domains were coded using items ZON1 and a corresponding

Page 16 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
ZON1%. Similarly the high grade nickel domains within the EL-Plug deposit were coded using a ZON2 item with
a corresponding ZON2% block proportion coding item.
Grade estimation using ordinary kriging was completed for main reportable element items; NIKR1 for Ni% and
CUKR1 for Cu%. Cobalt grades were calculated from regression calculations based on the interpolated nickel
grades and written to the COKR1 block item. The option to generate and report a Nickel Equivalent item NIEQ1
based on the NIKR1, CUKR1 and COKR1 items was not pursued at this time due to the rapidly changing metal
price market which could lead to some reporting complications.
A grade / cut-off distance restriction regime utilised during interpolation to limit the influence of very high,
usually set at approximately the 99thpercentile level or slightly higher depending on ZONE and AREA domain
designation. The associated distance of outlier restriction for the various deposit zones was also variable and
was usually set at approximately two down-hole variogram ranges or approximately 2 block lengths for all
mineralisation zone constrained composites. The effect of the grade / distance restriction regime as applied to
composite grade outliers is to limit how far very high grades can be interpolated into model blocks, particularly
those parts of the resource model with relatively low levels of drilling density.
Grade continuity for each ZONE was measured using geostatistical techniques. Directional variograms were
modelled using traditional and co-variance transformation variograms. Nugget values for all elements were
observed to range from moderate through to high depending on zone designation. Estimation search ellipsoids
were also defined according to the local geometry orientation as defined by an additional AREA domain code.
The availability of check estimates,
previous estimates and/or mine
production records and whether the
Mineral Resource estimate takes
appropriate account of such data.
Previous economic mining activity has taken place within the EL-Plug, N, O and P Areas. A comparison review
of the resource estimate for EL-Plug carried out to compare the 2015 estimate with the 2018 estimates. A small
reduction in the overall resource has resulted from a more accurate interpretation of some of the
mineralisation zones being carried out. No detailed review or direct comparison of any previous resource
estimates has been carried out due to data acquisition difficulties and given the time elapsed or due to
differences in reporting detail available including differing reporting lower cut-offs grades making it difficult to
compare previous historic estimates.
Corazon had previously reported an “interim” Inferred Mineral Resource for EL-Plug according to the the JORC
2004 Code using a 0.6% Nickel (Ni%) lower cut-off was of 1.8Mt at 0.8%Ni, 0.4%Cu and 0.02%Co (ASX
Announcement dated 13 October, 2010).
In 2015, the resources for the EL deposit was re-estimated for JORC 2012 and the previously reported Canadian
NI43-101 resources were converted to JORC 2012 (ASX Announcement dated 16 April 2015). The global
Indicated and Inferred Resource Estimate was stated as 9.4Mt at 0.88% Ni and 0.4% Cu. Cobalt was not
reported. Deposits included in this estimation were the EL, N, O and G.
The assumptions made regarding recovery
of by-products.
Mining and mineral processing of mineralised material from the EL-Plug, Disco and the N, O, and P area
deposits is expected to primarily produce nickel concentrate with associated ancillary elements copper and
cobalt that may be recoverable excess or saleable by-products.

Page 17 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
Estimation of deleterious elements or
other non-grade variables of economic
significance (e.g. sulphur for acid mine
drainage characterisation).
No significant deleterious toxic metal elements have been identified or reported to date. Historically some
problems have been observed with high sulphur materials resulting in unwanted acid mine drainage. Corazon is
aware of these particular concerns.
In the case of block model interpolation,
the block size in relation to the average
sample spacing and the search employed.
EL Plug:Drilling of the deeper zones of the EL Plug from surface has resulted in high angle intersections of the
deposit and broader drill spacing.
Disco Area:Drilling of the deeper zones of the Disco Zone from surface has also resulted in high angle
intersections of the deposit and broader drill spacing. The relatively low number of drill-holes available for this
area has informed HGMC’s decision to report Inferred resource from this area only.
N, O and P Areas:Drilling into each of these zones, particularly N, and O from numerous locations along
underground development drives has resulted in a large number of both low and high angle intersections of the
deposit with quite close drill spacing.
Any assumptions behind modelling of
selective mining units.
EL Plug:Given the scale of the EL-Plug Deposit, the block size used by HGMC for block model construction 5 m
x 5 m x 5 m (X,Y,Z) is a reasonable selective mining unit (SMU) allowing for good modelling resolution. The
relatively high drilling density present in much of the shallower and near surface mineralisation (10 m x 10 m)
also allows for a smaller higher resolution block size to be considered.
Disco Area:The block size used by HGMC for block model construction at Disco of 5 m x 5 m x 5 m (X,Y,Z) is an
appropriate SMU given the scale of the Disco deposit and it’s closer proximity to topographic surface.
N, O and P Areas:The block size used for the N, O and P zones was also 5 m x 5 m x 5 m (X,Y,Z). Again this is
considered by HGMC to be a reasonable SMU given the scale of the deposits concerned allowing for good
modelling resolution. The relatively high drilling density present in much of the shallower and near surface
mineralisation also allows for a smaller higher resolution block size to be considered.
Any assumptions about correlation
between variables.
EL Plug:The primary element nickel is strongly correlated with ancillary elements cobalt and, to a lesser
extent, copper. Mining production will be aimed at maximising nickel recovery and therefore recovering most
of the cobalt and copper. There are a few minor locations identified where relatively high copper and cobalt
grades occur in conjunction with very low inherent nickel grades.
Disco Area:The primary element nickel is correlated with ancillary elements copper. As was observed for EL-
Plug, there are a few minor locations identified where relatively high copper and cobalt grades occur in
conjunction with very low inherent nickel grades. For the purposes of cobalt grade assignment in the block
model, cobalt was estimated using the regression calculation as was derived from the EL-Plug Ni vs Co
correlation analysis
N, O and P Areas:The primary element Nickel is correlated with ancillary elements copper. There are
numerous locations observed where high Copper grades occur in conjunction with very low inherent Nickel
grades. For the purposes of Cobalt grade assignment in the block model and given no Cobalt analyses were
availableformthis areas the block model Cobaltitemwas estimated using theregressioncalculationas was

Page 18 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
derived from the EL-Plug Ni vs Co correlation analysis.
Description of how the geological
interpretation was used to control the
resource estimates.
EL Plug, Disco, N, O and P Areas:The major lithology types interpreted and modelled to date have been used
to guide the mineralisation wire-frames used to code the block model. In addition, at least one known
interpreted fault zone has been shown to cut or off-set mineralisation, and this has been incorporated in the
block modelling where possible
Discussion of basis for using or not using
grade cutting or capping.
EL Plug, Disco, N, O and P Areas:Statistical analysis showed the populations in the main mineralisation
domains in each deposit to generally have low to moderate coefficients of variation levels. Therefore, a
moderated grade / cut off and associated distance restriction regime was applied during kriging interpolation
individually on a zone by zone basis. The distance restriction threshold was applied at approximately the 99th
percentile level. It should be noted that composite grades were not cut prior to use in kriging interpolation,
but their area of influence was significantly restricted.
The process of validation, the checking
process used, the comparison of model
data to drill hole data, and use of
reconciliation data if available.
Model validation was carried out graphically and statistically for all block model areas to ensure that the block
model grades accurately represent the input drill hole data. A number of methods were employed to validate
the block model including:

Global mean comparison;

Visual comparison, and

Bench trend plot comparison.
The global mean comparison between drill composite grades and model grades within each of the mineralised
zone wireframes for the Ni item shows that globally the estimates compare favourably within all the well
drilled parts of the main mineralised domains. Some localised bench variations are observed with the bench
trend plots. These areas of variation are due to the locally inherent bench variability and non-stationarity of
the Ni composite data.
Cross sections were viewed on-screen and showed a good comparison between the drill hole data and the block
model grades. A volume comparison between the volume of the block model cells within each mineralised zone
and the volume of the corresponding wireframe was carried out to ensure coding methods were within
acceptable limits.
Moisture Whether the tonnages are estimated on a
dry basis or with natural moisture, and
the method of determination of the
moisture content.
The tonnages are estimated on a dry basis.
Cut-off
parameters
The basis of the adopted cut-off grade(s)
or quality parameters applied.
EL-Plug, Disco, N, O and P Areas:Three-dimensional wireframe models of mineralisation were developed for
EL-Plug, Disco and the N, O and P zones based on a nominal Nickel lower cut-off of 0.2-0.3% Ni. HGMC has
used a default 0.5% Ni lower cut-off for reporting Mineral Resources as well as at the 0.7% lower cut-off level to
reflect likely future appropriate underground economic cur-off levels.

Page 19 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
Mining factors
or assumptions
Assumptions made regarding possible
mining methods, minimum mining
dimensions and internal (or, if applicable,
external) mining dilution.
EL Plug:Future mining or mineral extraction at the EL-Plug deposit area deposit is anticipated to be initially
open pit mining followed by further underground mining.
Disco Area:Future mining or mineral extraction at the Disco deposit area deposit due to its close proximity to
topographic surface (~30m) is anticipated to be initially mined from open pit.
N, O and P Areas:Future mining or mineral extraction at the N, O and P area deposit due to their depth and
access will be mined using underground mining methods only.
Underground mining methods will probably be very similar to the methods employed during the previous
historic mining phases. No other assumptions on mining methodology have been made.
Metallurgical
factors or
assumptions
The basis for assumptions or predictions
regarding metallurgical amenability.
EL-Plug, Disco, N, O and P Areas:Historic mining, milling and processing of ore from the various deposit areas
has been well recorded and it is not expected that any major metallurgical recovery concerns will be
encountered at such a mature Project.
HGMC understands Corazon is planning more detailed test work in the future with the aim of identifying and
optimising the best processing route for the production of nickel concentrate, as well as recovering ancillary
elements such as copper and cobalt.
Environmental
factors or
assumptions
Assumptions made regarding possible
waste and process residue disposal
options.
EL-Plug, Disco, N, O and P Areas:HGMC has not made any assessment regarding waste rock or tailings
disposal. It is expected the uses of standardised rock waste dumps and tailing dams of modern design could be
utilised without any significant impact on the local environment.
Bulk density Whether assumed or determined. If
assumed, the basis for the assumptions. If
determined, the method used, whether
wet or dry, the frequency of the
measurements, the nature, size and
representativeness of the samples.
The bulk density for bulk material must
have been measured by methods that
adequately account for void spaces (vugs,
porosity, etc), moisture and differences
between rock and alteration zones within
the deposit.Discuss assumptions for bulk
density estimates used in the evaluation
process of the different materials.
Disco, N, O and P Areas:The available database for these deposits does not include any bulk density core
measurement data, nor does it contain any tonnage factor statistics from historic production. Neither historic
mine nor recent explorers have acquired or formally recorded Archimedes data, despite the very significant
amount of drill core available.
Tonnage factors were derived from Ni and Cu grades using trendline formulas, graphing iron (Fe) and insolubles
(Insol) against Ni grades on assayed intervals for each zone and orebody. Strong relationships were identified
between assayed Ni values and percentages of Fe and Insol. These correlations were then used to estimate
tonnage factors for each individual zone based on trendline formulas, sample assay data and chemical formulas
of chalcopyrite, pentlandite and pyrrhotite. Certain assumptions were used in order to determine the tonnage
factor:

Amount of total Fe is derived from pyrrhotite, pentlandite and chalcoyprite.

Cu is derived entirely from chalcopyrite

Ni is derived entirely from pentlandite

Insolubles specific gravity assumed as 2.85

Page 20 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
EL Plug:The bulk density information utilised by HGMC was derived from data contained within the Corazon
drilling database. Approximately 240 bulk density measurements were carried out using the Archimedes
Method on 120 linear metres of diamond core acquired as part of the Corazon drilling programs.
HGMC’s opinion is that this is a reasonable number of physically measured bulk density measurements, in
conjunction with associated assay analytical data for nickel and sulphur, to reliably describe mineralisation
bulk density characteristics.
HGMC elected to use the available nickel versus bulk density correlation analysis with an observed correlation
coefficient confirmation derived at 0.907 which was slightly better than that observed for nickel for sulphur.
The bulk average densities assigned at EL-Plug were 3.15 tonnes per cubic metre within the ‘low grade’
mineralization zones and 3.50 tonnes per cubic metre within the ‘high grade’ zones.
At the Disco zone the average bulk density assigned was 3.10 tonnes per cubic metre for the total
mineralization zone.
The average bulk densities for N, O Zones were 3.10 tonnes per cubic metre and for the P zone the average
bulk density assigned was 3.11, tonnes per cubic metre.
Classification The basis for the classification of the
Mineral Resources into varying confidence
categories. Whether appropriate account
has been taken of all relevant factors (ie
relative confidence in tonnage/grade
estimations, reliability of input data,
confidence in continuity of geology and
metal values, quality, quantity and
distribution of the data). Whether the
result appropriately reflects the
Competent Person’s view of the deposit.
EL Plug, Disco, N, O and P Areas:
Estimation parameters including kriging variance, number of composites informing the interpolated block and
distance of block centroid from nearest drill hole were considered during the classification process. These
parameters were condensed into a quality of estimate (QLTY) item which was used as a starting basis for
decisions relating to resource classification and further re-condensing of the QLTY parameter into a RCAT
(Resource Category) item summary.
The Resource model uses a classification scheme at EL-Plug, Disco and the N, O and P Areas used the same
standard approach and was based upon additional block model estimation parameters. These included Kriging
Variance, number of composites in search ellipsoid, and the composite distance to block centroid. These inputs
were used to derive relative confidence levels or ‘quality of estimate index’ (QLTY item) within the block
model) which has a range of 1 to 3, where QLTY = 1, 2 or 3 represents high, medium or low confidence
respectively.
QLTY=1

Drill spacing of 15 metres x 20 metres or less.

Composites – Ni item parameters only used as basis for classification.

Search ellipsoid distances 0-20m.

Composite numbers 15 or greater.

Page 21 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment

Kriging Variance 0 - 0.4. (EL-Plug), 0 - 0.01 (Disco) and 0 - 0.025 (N, O, & P Zones).
QLTY=2

Drill spacing of nominally 20 metres x 40 metres to 40 metres x 40 metres (depending on deposit and
variography results).

Composites – Ni item parameters only used as basis for classification.

Search ellipsoid distances 20 metres -50 metres .

Composite numbers 10-15.

Kriging Variance 0.4-0.6 (EL-Plug), 0.01 - 0.015 (Disco) and 0.025-0.05 (N, O, & P Zones).
QLTY=3

Drill spacing out to or greater than 80 metres x 80 metres (depending on deposit and variography
results).

Composites – Ni item parameters only used as basis for classification.

Search ellipsoid distances 50 metres -100 metres or greater distances.

Composite numbers 0 to 10.

Kriging Variance 0.6 or greater (EL-Plug), 0.015 or greater (Disco) and 0.05 or greater (N, O, & P
Zones).
The QLTY item parameter values have been further ‘condensed’ into an RCAT assignment item describing the
confidence of the localized resource base in the block model. Preliminary Resource Classification Item coding
was carried out as – (RCAT) Values 1-3 – (Nominally ‘Measured’, ‘Indicated’ and ‘Inferred’ [1, 2 or 3]. For EL-
Plug the QLTY=1 and QLTY=2 material is designated as Indicated Resources (RCAT=2) with the remaining QLTY
= 3 material reporting as Inferred Resources. (RCAT=3).
At the Disco Zone all material has been designated as an Inferred Resource owing to the relatively low drilling
and sampling density present.
At the N, O and P areas all QLTY=1 and QLTY=2 material was designated Indicated Resources (RCAT=2) with the
remaining QLTY = 3 material being designated as Inferred Resources. (RCAT=3).

Page 22 of 24

Section 3 - Estimation and Reporting of Mineral Resources

Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment
Audits or
reviews
The results of any audits or reviews of
Mineral Resource estimates.
EL Plug, Disco, N, O and P Areas:
HGMC have undertaken a review of the previous mineral resource estimates for the N, O and P deposits areas.
The review has not been to the depth of a full audit of the previous estimates nor of the database which
supports the estimates. HGMC notes that the capture of the historic data and the previous resource estimates
of the N, and O deposits were made by consultant geologists employed by a fully independent geological
consultancy. HGMC utilised this previous block modelling and resource estimation work as the basis for
generating new mineralisation wireframes including the associated cut-off and block model interpolation
parameters which have resulted in new updated reported mineral resource estimates for theses deposits.
EL Plug:
HGMC has re-estimated the mineral resources for the EL deposit using MineSight®software. HGMC’s resource
estimates for the Lynn Lake deposits have not been externally audited or reviewed.
Discussion of
relative
accuracy/
confidence
Where appropriate a statement of the
relative accuracy and confidence level in
the Mineral Resource estimate using an
approach or procedure deemed
appropriate by the Competent Person.
The statement should specify whether it
relates to global or local estimates, and,
if local, state the relevant tonnages,
which should be relevant to technical and
economic evaluation. These statements of
relative accuracy and confidence of the
estimate should be compared with
production data, where available.
HGMC considers the most important factors on relative accuracy and confidence level in the Mineral Resource
estimates to be:

Adequate levels of drilling and sample density;

Precise drilling and sampling technique;

Regular checking of assay data quality;

Adequate survey control for drill holes and sample points;

Reliable estimation and allowance for variability of specific gravity;

Consistent and accurate logging of drill hole data;

Precise definition and modelling of mineralisation zones with reference to geology;

Thorough reviews of deposit statistics;

Realistic application of grade cut-offs and area of influence restrictions;

Page 23 of 24

Section 3 - Estimation and Reporting of Mineral Resources
Criteria Explanation Comment

Correct application of interpolation techniques;

Thorough analysis of all modelling parameters and the results derived; and

The minimisation of all assumptions where possible.
These factors have helped ensure resources as reported from the EL-Plug, Disco, N, O and P area
lock models are robust estimates of nickel, copper and cobalt resources.

Page 24 of 24