CORAZON MINING LIMITED Capital/Financing Update 2024

Oct 6, 2024

64747_rns_2024-10-06_5f59961d-dabf-4464-9023-ed23237a9d71.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 65] intentionally omitted <==

----- Start of picture text -----

ASX ANNOUNCEMENT
7 [th] October 2024
----- End of picture text -----

Multiple geophysical conductors identified at high-grade zinc-copper-gold-silver

project in Canada

Emerging large-scale critical and precious metals exploration opportunity revealed at Lynn Lake’s MacBride Project

==> picture [410 x 10] intentionally omitted <==

Key Highlights

ASX: CZN ABN: 87112 898 825

REGISTERED OFFICE

Level 3, 33 Ord St, West Perth, WA 6005

PO Box 8187 Subiaco East WA 6008

T : +61 8 6166 6361 E : [email protected] www.corazon.com.au

==> picture [10 x 10] intentionally omitted <==

  • Processing of aerial geophysical data has identified nine priority targets at the MacBride Project, located in Canada’s Lynn Lake district

==> picture [10 x 10] intentionally omitted <==

  • The electromagnetic conductors are located along a seven kilometre stratigraphic horizon and provide a compelling exploration opportunity

==> picture [9 x 9] intentionally omitted <==

  • One conductor is coincident with the high-grade MacBride zinc-copper-goldsilver deposit defined by drilling over a strike of +400 metres and to a depth of +300 metres

==> picture [9 x 10] intentionally omitted <==

  • Eight other similar priority conductors defined but are yet to be drill tested

==> picture [9 x 10] intentionally omitted <==

  • Multiple other conductive bodies defined on trend; plus numerous mapped copper mineralisation occurrences indicated within historical plans from previous exploration

==> picture [10 x 9] intentionally omitted <==

  • Corazon is focused on expediting this Critical Metals exploration opportunity at the MacBride Project and current work includes:

==> picture [10 x 10] intentionally omitted <==

  • Geological and resource modelling of drilling at the priority MacBride deposit

==> picture [10 x 10] intentionally omitted <==

  • Digital capture of regional historical exploration data

==> picture [10 x 10] intentionally omitted <==

  • Fast-tracking drilling of defined priority conductors

==> picture [10 x 10] intentionally omitted <==

  • Assessment and ranking of Corazon’s copper-zinc-gold deposits in the Lynn Lake region and prioritising exploration work programs

==> picture [411 x 10] intentionally omitted <==

Corazon Mining Limited (ASX: CZN) (Corazon or Company) is pleased to announce initial stage exploration results from the MacBride base and precious metals project (MacBride) nearby the Company’s 100% owned Lynn Lake Nickel-Copper-Cobalt Sulphide Project (Lynn Lake or Project) in the province of Manitoba, Canada.

==> picture [97 x 97] intentionally omitted <==

Corazon has processed data from an aerial VTEM (versatile time domain electromagnetic) survey completed in 2008, identifying multiple electromagnetic (EM) conductive bodies (Figure 1). The quantity and distribution of these anomalies suggest the MacBride Project has the potential to deliver a cluster of zinc-copper-gold-silver volcanogenic massive sulphide (VMS) deposits, similar to the drill-defined MacBride deposit.

==> picture [384 x 9] intentionally omitted <==

1

ASX Announcement | MacBride Conductors Defined 7th October 2024

==> picture [384 x 9] intentionally omitted <==

==> picture [125 x 29] intentionally omitted <==

Corazon Managing Director Mr Brett Smith states – “ We believe the MacBride Project has the potential to be a substantial stand-alone exploration play in the Lynn Lake district. Our data processing has generated multiple geophysical conductors, with nine high-priority targets identified and modelled. One of these is coincident with the outcropping drill-defined MacBride zinc-copper-gold-silver deposit. The other targets, which are yet to be drilled, are near-surface and generally as large if not bigger than the MacBride deposit conductor, providing multiple high quality exploration targets which are an immediate priority for Corazon.”

Next Steps

The MacBride Project has become a major focus for Corazon’s Lynn Lake region exploration activities. Planning is underway for work programs that will enable drilling of the priority conductors as soon as possible. The relatively elevated terrain of the MacBride Project can be explored throughout most of the year.

The Company plans to undertake ground electromagnetic (EM) surveys to better locate and define the conductive bodies defined by the aerial VTEM survey. The results of this work are aimed at confirming initial priority drill targets. Ground EM surveys have the capacity to test deeper than VTEM, and better define the size and orientation of conductors for drilling.

The Company will continue to update the market on its exploration activities as they progress.

==> picture [418 x 143] intentionally omitted <==

==> picture [418 x 143] intentionally omitted <==

==> picture [418 x 143] intentionally omitted <==

Figure 1 - Interpreted Geology overlain on a greyscale image of VTEM magnetics (tilt-derivative), with VTEM conductors and the surface projections of modelled plates for the priority conductor. Refer to Figure 2 for location of image. Datum NAD 1983 UTM Zone 14N. Geology modified from the Manitoba Geological Survey’s 1:50,000 Mapsheet – Fraser Lake (64B13, GP87-3-3) 1993.

==> picture [384 x 9] intentionally omitted <==

2

www.corazon.com.au

ASX Announcement | MacBride Conductors Defined 7th October 2024

==> picture [384 x 9] intentionally omitted <==

==> picture [125 x 29] intentionally omitted <==

MacBride Project Summary

The MacBride Project is one of three new areas Corazon has announced the intention to acquire. Details of this acquisition are provided in the ASX announcement dated 13 June 2024. The Company can complete this acquisition by paying C$153,600 to the private owner of the projects, before the 13 December 2024.

The MacBride Project is located within the Lynn Lake region of Manitoba, Canada (Figure 3). The region has a history of mining and exploration for magmatic nickel sulphide, volcanogenic zinc-copper-gold massive sulphide (VMS) and orogenic gold, dating back to the late 1940’s. The main historical mining operations have included the Lynn Lake nickel-sulphide mining centre (100% owned by Corazon), the Fox Lake copper-zinc mine and the MacLellan-Gordon gold deposits.

VMS deposits typically exist as stratiform lenses of polymetallic sulphide mineralisation occurring in clusters (indicative of a “camp”). World-class VMS camps are well established within the province of Manitoba, including the Flin Flon – Snow Lake region, immediately south of the Lynn Lake greenstone belt.

Outcropping copper-zinc-gold-silver sulphide mineralisation was discovered at MacBride in the mid-1950’s, with drilling campaigns completed through to the early-1990’s. To date, historical data has identified 41 holes drilled in the vicinity of the MacBride deposit, with 29 of these holes defining the high-grade mineralisation.

Drilling has tested the deposit over a strike of approximately 400 metres, to a depth of about 300 metres. Corazon is in the process of validating this historical work, with the intention of using the information to complete geological and resource modelling. An interpretive cross-section through the MacBride deposit is provided in Figure 2.

Historical mapping has identified numerous copper mineralisation occurrences within the MacBride Project. Corazon is in the process of digitally capturing this exploration data, for inclusion in the target generation process.

VTEM Survey Modelling

An airborne VTEM geophysical survey completed by Western Areas NL (ASX:WSA) in 2008 is the only modern exploration work undertaken at the MacBride Project. Corazon has acquired the raw data for this geophysical survey and engaged independent consultant St Pierre Geoconsultant Inc (St Pierre) to interrogate and generate geophysical targets for ongoing exploration.

The VTEM survey identifies numerous conductive bodies (Figure 1), predominantly located along a seven kilometre stratigraphic horizon within the MacBride Project. St Pierre completed a quantitative assessment and ranking of all conductors, with nine priority anomalies highlighted. Maxwell Geophysical Modelling software was used to further interrogate the data and design “plates” that best characterise the orientation and dimensions of the conductive bodies (Table 1).

The first step in this assessment was to model the VTEM EM response for the existing drill-defined MacBride deposit, for comparison against the other conductive bodies. The modelling of the outcropping MacBride deposit VTEM conductor produced a high CT [(1)] (Conductivity Thickness) plate of 410 siemens, with a strike length of 150 metres, a depth extent of at least 400 metres. The conductor may continue deeper, however the VTEM system is limited in its capacity to be effective at such depths.

It should be noted that the modelled 150 metre strike of the MacBride conductor plate is significantly less than the drill defined mineralisation of 400 metres.

Evidence from the historical drilling indicates that the sulphide mineralisation at MacBride includes sphalerite (zinc), chalcopyrite (copper) and the iron sulphides pyrite and pyrrhotite. Since sphalerite is one of the rare metallic sulphides that is both non-conductive and non-magnetic, the EM response at MacBride is attributed to the other metallic sulphides. Should the conductive metallic sulphides be reduced in quantity, a sphalerite dominant VMS mineralisation would display substantially less conductivity. For this reason, prioritising conductors based on CT values alone may not be appropriate.

In addition to the MacBride deposit EM anomaly, St Pierre identified three other areas of interest, which contain eight significant bedrock conductors (Figure 1, Table 1). Of these target areas, top priority is given to MacBride North (plates 4A to 4D in Table 1 and Figure 1) as it has the greatest size potential and combination of low and high CT

==> picture [384 x 9] intentionally omitted <==

3

www.corazon.com.au Reference (1) - In electromagnetic geophysics, CT refers to the product of the electrical conductivity of a material and its thickness. The CT measurement helps geophysicists understand the distribution of conductive materials at various depths.

ASX Announcement | MacBride Conductors Defined 7th October 2024

==> picture [384 x 9] intentionally omitted <==

==> picture [125 x 29] intentionally omitted <==

values (30 to 276 siemens).

Second priority is given to MacBride Southeast due to the size potential of plates 2A and 2B, even though the CT values range from low to low-to-moderate (39-73 siemens). The high CT Plate 3 (260 siemens) is small, but its structural connectivity to plates 2A and 2B make it an inclusive target.

The third priority is given to MacBride South (plate 1) due to its smaller size potential even though it has a high CT value (282-631 siemens). The location of this target is consistent with the stratigraphic horizon occupied by MacBride and MacBride North.

Table 1 – MacBride Project – modelled conductor plate dimensions. Refer to Figure 1 for Plate locations.

Conductor Plate ID Conductivity
(CT)
Strike -
Horizontal
(m)
Depth -
Vertical
(m)
Depth to
Top of Plate
(m)
MacBride Deposit V High 150 400 Surface
MacBride-1 V High 213 34 126
MacBride-2A Low-Mod 361 58 178
MacBride-2B Low 106 207 152
MacBride-3 High 34 32 88
MacBride-4A Low 126 392 100
MacBride-4B Low 117 463 47
MacBride-4C High 450 26 118
MacBride-4D Low 731 99 25

==> picture [328 x 165] intentionally omitted <==

==> picture [328 x 164] intentionally omitted <==

Figure 2 – MacBride Deposit representative drill hole cross-section. Local grid coordinates have yet to be transformed to a real-world coordinate grid system. “DDH” denotes Diamond Drill Hole, followed by the hole ID. Taken from Corazon ASX announcement dated 13 June 2024.

==> picture [384 x 9] intentionally omitted <==

4

www.corazon.com.au

ASX Announcement | MacBride Conductors Defined 7th October 2024

==> picture [384 x 9] intentionally omitted <==

==> picture [125 x 29] intentionally omitted <==

==> picture [362 x 653] intentionally omitted <==

Figure 3 – Location of the MacBride Project and the area tested by the VTEM geophysical survey (2008) shown in Figure 1.

==> picture [384 x 9] intentionally omitted <==

5

www.corazon.com.au

ASX Announcement | MacBride Conductors Defined 7th October 2024

==> picture [384 x 9] intentionally omitted <==

==> picture [125 x 29] intentionally omitted <==

==> picture [449 x 32] intentionally omitted <==

==> picture [449 x 31] intentionally omitted <==

==> picture [449 x 32] intentionally omitted <==

==> picture [449 x 32] intentionally omitted <==

==> picture [449 x 32] intentionally omitted <==

==> picture [449 x 32] intentionally omitted <==

==> picture [449 x 32] intentionally omitted <==

==> picture [449 x 32] intentionally omitted <==

==> picture [449 x 32] intentionally omitted <==

==> picture [449 x 31] intentionally omitted <==

Figure 4 – Lynn Lake Project Location Map

Other Company Activities

Lynn Lake – Manitoba Canada

Mining and metallurgical testwork programs are continuing for the historical Lynn Lake Mining Centre. Excellent results returned to date, from a number of processing technologies, has led to an extension of the metallurgical testwork program (ASX announcement 23 August 2023). The current phase of studies is anticipated to be completed in Q4 2024. Following this work, a fully optimised and scheduled mine plan will be generated for assessment.

The goal of the current mining and metallurgical studies is to define the value of a potential Lynn Lake nickel-coppercobalt mining opportunity and set a pathway through to production.

Nickel, copper and cobalt are Critical Metals of growing interest in Canada and the United States of America. With the growing dominance of nickel products from Chinese-backed Indonesian mining operations, north American battery and automobile manufacturers may struggle to secure nickel sources that qualify for benefits of Inflation Reduction Act tax credits. As such, generating sources of domestic supply have assumed high importance.

Mt Gilmore - NSW

A new, high-priority porphyry copper-gold target has been defined at the Mt Gilmore Project’s May Queen prospect. This target is a significant anomaly with a strike length of ~2 kilometres, possessing mineral chemistry analogous with known giant porphyry copper-gold deposits in NSW, Australia (ASX announcements 2 April and 5 April 2024).

Corazon has completed a maiden drill program at the May Queen prospect, with drilling intersecting favourable lithologies, alteration and copper mineralisation (ASX announcement 2 October 2024).

Miriam - WA

Corazon has divested an 85% interest in the lithium and industrial minerals rights for the Miriam Project in Western Australia, to Future Battery Minerals Limited (FBM) (ASX announcement 25 March 2024 and 24 May 2024).

The transaction delivered initial cash and FBM shares to Corazon, with performance rights allowing the Company to

==> picture [384 x 9] intentionally omitted <==

6

www.corazon.com.au

ASX Announcement | MacBride Conductors Defined 7th October 2024

==> picture [384 x 9] intentionally omitted <==

==> picture [125 x 29] intentionally omitted <==

participate in any future upside from FBM’s exploration or development success at the combined Miriam and Kangaroo Hills lithium projects.

Corazon will retain 100% of the base and precious metal rights at Miriam and be free-carried on the lithium exploration costs (with 15% ownership) until completion of a positive definitive feasibility study.

This announcement has been authorised on behalf of Corazon Mining Limited by Managing Director, Mr. Brett Smith.

For further information visit www.corazon.com.au or contact:

Brett Smith James Moses Managing Director Media & Investor Relations Corazon Mining Limited Mandate Corporate P: +61 (08) 6166 6361 M: +61 (0) 420 991 574 E: [email protected] E: [email protected]

Competent Persons Statement :

The information in this report that relates to Exploration Results and Targets is based on information compiled by Mr. Brett Smith, B.Sc Hons (Geol), Member AusIMM, Member AIG and an employee of Corazon Mining Limited. Mr. Smith has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Smith consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Canadian geologist Dr Larry Hulbert has been engaged by Corazon as an expert in magmatic Ni-Cu-PGE mineralization and volcanogenic massive suphide (VMS) deposits. Dr Hulbert has extensive knowledge of the Lynn Lake district and over 40 years’ experience in both Ni-Cu-PGM and VMS exploration and research. During his early years with Sherrit-Gordon Dr Hulbert worked in exploration on the Fox and Ruttan Cu-Zn deposit mine properties. During his twenty-three years as a research scientist with the Mineral Deposit Research Group, Geological Survey of Canada, his research overlapped with the VMS working group and witnessed the development of some of the most important VMS metallogenic models in current use today. Dr Hulbert would qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.

Processing, auditing and interpretation of the 2008 VTEM geophysical survey has been completed by the Company’s consultant geophysicist and ‘expert’, Martin St-Pierre (P. Geophysicist) from St-Pierre Geoconsultant Inc., based in British Colombia, Canada. Mr St-Pierre has consulted for numerous mining companies and has extensive experience in the exploration for VMS deposits. Mr St-Pierre consents to the release of this geophysical interpretation as it appears within this announcement.

References for Previously Reported Results

The information in this release that relates to Exploration Results and Targets for the Lynn Lake Project is based on information previously disclosed in the following Company ASX announcements and public documents as referenced.

The ASX Announcements are available on the Company’s website (www.corazon.com.au) and the ASX website (www.asx.com.au) under the Company’s ticker code ‘CZN’.

The Company confirms that it is not aware of any new information or data that materially affects the information included in these referenced documents, and that all material assumptions and technical parameters underpinning the referenced documents continue to apply and have not materially changed. With respect to Corazon’s ASX announcements, the Company confirms that the form and context in which the Competent Persons’ findings are presented, are not materially modified from the original announcement.

==> picture [384 x 9] intentionally omitted <==

7

www.corazon.com.au

ASX Announcement | MacBride Conductors Defined 7th October 2024

==> picture [384 x 9] intentionally omitted <==

==> picture [125 x 29] intentionally omitted <==

Forward Looking Statements

This announcement contains certain statements that may constitute “forward looking statement”. Such statements are only predictions and are subject to inherent risks and uncertainties, which could cause actual values, results, performance achievements to differ materially from those expressed, implied or projected in any forward looking statements.

Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forward-looking statements. These statements include, but are not limited to statements regarding future production, resources or reserves and exploration results. All such statements are subject to certain risks and uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii) the potential for delays in exploration or development activities or the completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of development or construction activities, and (vi) other risks and uncertainties related to the Company’s prospects, properties and business strategy. Our audience is cautioned not to place undue reliance on these forward-looking statements that speak only as of the date hereof, and we do not undertake any obligation to revise and disseminate forwardlooking statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.

The Company believes that it has a reasonable basis for making the forward-looking Statements in the announcement based on the information contained in this and previous ASX announcements.

The Company is not aware of any new information or data that materially affects the information included in this ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions and technical parameters underpinning the exploration results in this release continue to apply and have not materially changed.

==> picture [384 x 9] intentionally omitted <==

8

www.corazon.com.au

Table 2: Checklist of Assessment and Reporting Criteria

7[th] October 2024

Aerial VTEM (Versatile Time Domain Electromagnetic) Survey MacBride Project – Lynn Lake, Canada.

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling Nature and quality of sampling (eg cut channels, random An aerial VTEM geophysical survey, completed in 2008, has be
techniques chips, or specific specialised industry standard processed, with priority conductors defined and modelled.
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
The sampling information (methodology) for this survey is provided within this
table.
not be taken as limiting the broad meaning of sampling. The original VTEM survey was completed for Western Areas NL (ASX:WSA)
by consultancy Geotech Ltd.
Auditing, processing and modelling of the VTEM by Corazon Mining Limited
(Corazon) was completed by Canadian geophysical consultant Martin St-Pierre
(P. Geophysicist), from St-Pierre Geoconsultant Inc., based in British
Colombia, Canada.
Include reference to measures taken to ensure sample The geophysical survey was flown in a grid pattern over the survey area,
representivity and the appropriate calibration of any approximately perpendicular to the drill defined mineralisation at the MacBride
measurement tools or systems used. Deposit.
Geophysical data acquisition has been carried out using industry standard
practices that are appropriate for the style of mineralisation being tested and
ensures accuracies are preserved.
Aspects of the determination of mineralisation that are The geophysical survey method does not identify mineralisation. It is a test of
Material to the Public Report. certain geophysical characteristics for the near regolith and lithologies, of the
area surveyed.
In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling VTEM is a widely used geophysical process within the mineral exploration
was used to obtain 1 m samples from which 3 kg was industry. Processing of the survey data was completed using industry standard
pulverised to produce a 30 g charge for fire assay’). In other geophysical software, including Geosoft. The final priority plates were modelled
cases more explanation may be required, such as where using the Maxwell Geophysical Modelling Software.
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg submarine

1

Table 2: Checklist of Assessment and Reporting Criteria

7[th] October 2024

Aerial VTEM (Versatile Time Domain Electromagnetic) Survey MacBride Project – Lynn Lake, Canada.

Criteria JORC Code explanation Commentary
nodules) may warrant disclosure of detailed information
Drilling Drill type (eg core, reverse circulation, open-hole hammer, No new drilling information is provided within this report.
techniques rotary air blast, auger, Bangka, sonic, etc) and details (eg
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
Drill sample Method of recording and assessing core and chip sample No new drilling information is provided within this report.
recovery recoveries and results assessed.
Measures taken to maximise sample recovery and ensure No new drilling information is provided within this report.
representative nature of the samples.
Whether a relationship exists between sample recovery and No new drilling information is provided within this report.
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Logging Whether core and chip samples have been geologically and No new drilling information is provided within this report.
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core No new drilling information is provided within this report.
(or costean, channel, etc) photography.
The total length and percentage of the relevant intersections
No new drilling information is provided within this report.
logged.
Sub- If core, whether cut or sawn and whether quarter, half or all No new drilling information is provided within this report.
sampling core taken.
techniques
and sample
preparation

2

Table 2: Checklist of Assessment and Reporting Criteria

7[th] October 2024

Aerial VTEM (Versatile Time Domain Electromagnetic) Survey MacBride Project – Lynn Lake, Canada.

Criteria JORC Code explanation Commentary
If non-core, whether riffled, tube sampled, rotary split, etc No new drilling information is provided within this report.
and whether sampled wet or dry.
For all sample types, the nature, quality and No new drilling information is provided within this report.
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling No new drilling information is provided within this report.
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is No new drilling information is provided within this report.
representative of the in situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of No new drilling information is provided within this report.
the material being sampled.
Quality of The nature, quality and appropriateness of the assaying and
No new drilling or assay/sampling information is provided within this report.
assay data laboratory procedures used and whether the technique is .
and considered partial or total.
laboratory
tests
For geophysical tools, spectrometers, handheld XRF The electromagnetic system was a Geotech Time Domain EM (VTEM) system.
instruments, etc, the parameters used in determining the Receiver and transmitter coils are concentric and Z-direction oriented. The
analysis including instrument make and model, reading loops were towed at a mean distance of 35 meters below the aircraft.
times, calibrations factors applied and their derivation, etc. The magnetic sensor utilized for the survey was a Geometrics optically
pumped caesium vapour magnetic field sensor, mounted in a separated bird,
13 metres below the helicopter. The sensitivity of the magnetic sensor is 0.02
nanoTesla (nT) at a sampling interval of 0.1 seconds. The magnetometer
sends the measured magnetic field strength as nanoTeslas to the data
acquisition system via the RS-232 port.

3

Table 2: Checklist of Assessment and Reporting Criteria

7[th] October 2024

Aerial VTEM (Versatile Time Domain Electromagnetic) Survey MacBride Project – Lynn Lake, Canada.

Criteria JORC Code explanation Commentary
A combined magnetometer/GPS base station was utilized on this project. A
Geometrics Caesium vapour magnetometer was used as a magnetic sensor
with a sensitivity of 0.001 nT. The base station was recording the magnetic
field together with the GPS time at 1 Hz on a base station computer.
The base station magnetometer sensor was installed at Leaf Rapids airport,
away from noise sources such as electric transmission lines and moving
ferrous objects such as motorized vehicles. The exact geographic position of
the base station was 54o36’36”N and 97o45’45”W. At the end of each survey
day the base station data was backed-up to the data processing computer.
Nature of quality control procedures adopted (eg standards, In-field data processing involved quality control and compilation of data
blanks, duplicates, external laboratory checks) and whether collected during the acquisition stage, using an in-field processing centre.
acceptable levels of accuracy (ie lack of bias) and precision
have been established.
Preliminary and final data processing by Geotech Ltd included generation of
digital data and map products for reconciliation.
Verification The verification of significant intersections by either Numerous conductive features have been identified by the VTEM survey. From
of sampling independent or alternative company personnel. these, nine priority conductors were defined and modelled using the Maxwell
and Geophysical Modelling Software. One of these priority conductors is coincident
assaying with the drill-defined MacBride sulphide deposit. The other geophysical
conductors have not been drill tested.
The use of twinned holes. No new drilling or assay/sampling information is provided within this report.
Documentation of primary data, data entry procedures, data Raw geophysical data, as provided by Geotech Ltd in 2008, has been used for
verification, data storage (physical and electronic) protocols.
this analysis and modelling. Geotech Ltd provided Western Areas NL with a
survey report, detailing the survey specifications and methodology.

4

Table 2: Checklist of Assessment and Reporting Criteria

7[th] October 2024

Aerial VTEM (Versatile Time Domain Electromagnetic) Survey MacBride Project – Lynn Lake, Canada.

Criteria JORC Code explanation Commentary
Discuss any adjustment to assay data. There has been no adjustment to the raw or contractor provided data, as
supplied by Geotech Ltd in 2008.
Current geophysical modelling software utilised by St-Pierre Geoconsultant Inc
for this recent work, is considered superior to the software available in 2008.
Location of Accuracy and quality of surveys used to locate drill holes Location control for the VTEM survey included a GPS navigation system and a
data points (collar and down-hole surveys), trenches, mine workings radar altimeter. Navigation was assisted by a GPS receiver and data
and other locations used in Mineral Resource estimation. acquisition system, which reports GPS co-ordinates as latitude/longitude and
directs the pilot over a pre-programmed survey grid. The operator was
responsible for monitoring of the system integrity. The operator also
maintained a detailed flight log during the survey, tracking the times of the flight
as well as any unusual geophysical or topographic feature.
The data recording rates of the data acquisition was 0.1 second for
electromagnetics and magnetometer, 0.2 second for altimeter and GPS. This
translates to a geophysical reading about every 2 meters along flight track.
In-field data processing involved quality control and compilation of data
collected during the acquisition stage, using an in-field processing centre.
Preliminary and final data processing by Geotech Ltd included generation of
digital data and map products for reconciliation.
Specification of the grid system used. The flight path, recorded by the acquisition program as WGS 84
latitude/longitude, was converted into the UTM coordinate system (UTM Zone
14N) in Oasis Montaj.
The navigation system used was a Geotech PC based unit consisting of a
NovAtel’s CDGPS (Canada-Wide Differential Global Positioning System
Correction Service) enabled OEM4-G2-3151W GPS receiver, The Geotech
navigate software, a full screen display with controls in front of the pilot to
direct the flight and a NovAtel GPS antenna mounted on the helicopter tail. As
manyas 11 GPS and two CDGPS satellites maybe monitored at anyone time.

5

Table 2: Checklist of Assessment and Reporting Criteria

7[th] October 2024

Aerial VTEM (Versatile Time Domain Electromagnetic) Survey MacBride Project – Lynn Lake, Canada.

Criteria JORC Code explanation Commentary
The positional accuracy or circular error probability (CEP) is 1.8 m, with
CDGPS active, it is 1.0 m. The co-ordinates of the block were set-up prior to
the survey and the information was fed into the airborne navigation system.
Quality and adequacy of topographic control. Where possible, the helicopter maintained a mean terrain clearance of 77
meters, which translates into an average height of 42 meters above ground for
the bird-mounted VTEM system and 64 meters for the magnetic sensor.
The survey was flown using contractors Eurocopter Aerospatiale helicopters,
utilising an Astar B2 helicopter.
Data spacing
Data spacing for reporting of Exploration Results.
The survey block was flown at a 100-metre traverse line spacing with a flight
and direction of N 91° E, while the tie lines were flown perpendicular to the traverse
distribution lines at a spacing of 950 metres in the direction of N 1° E.
Whether the data spacing and distribution is sufficient to The spacing of the grid of 100m used for the survey is consider appropriate for
establish the degree of geological and grade continuity the style of mineralisation being explored for. The MacBride sulphide deposit is
appropriate for the Mineral Resource and Ore Reserve defined over a strike of 400 metres and is adequately tested and defined by
estimation procedure(s) and classifications applied. this survey.
Whether sample compositing has been applied. Not applicable for this method of exploration.
Orientation Whether the orientation of sampling achieves unbiased The Flight Lines are perpendicular to the trend of the MacBride deposit and to
of data in sampling of possible structures and the extent to which this the stratigraphic trends in that area.
relation to
geological
structure
is known, considering the deposit type. The stratigraphy swings to the northwest in the norther part of the survey area,
however the survey still provides good coverage.
No bias appears to have been generated by the survey grid orientation.
If the relationship between the drilling orientation and the No drilling information is provided within this report. Issues of possible bias with
orientation of key mineralised structures is considered to respect to the orientation of thegeophysicalgrid,isprovided above.

6

Table 2: Checklist of Assessment and Reporting Criteria

7[th] October 2024

Aerial VTEM (Versatile Time Domain Electromagnetic) Survey MacBride Project – Lynn Lake, Canada.

Criteria JORC Code explanation Commentary
have introduced a sampling bias, this should be assessed
and reported if material.
Sample The measures taken to ensure sample security. Geotech Ltd were responsible for the data supplied to Western Areas NL.
security
Audits or The results of any audits or reviews of sampling techniques In-field data processing involved quality control and compilation of data
reviews and data. collected during the acquisition stage, using an in-field processing centre.
Preliminary and final data processing by Geotech Ltd included generation of
digital data and map products for reconciliation.
Corazon’s consultant St-Pierre Geoconsultant Inc audited the contractor
supplied data, prior to processing. No issues were highlighted.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral Type, reference name/number, location and ownership Corazon Mining Limited is in the process of acquiring the MacBride Project
tenement and including agreements or material issues with third parties (ASX announcement 13 June 2024). Details of the claims are provided within
land tenure such as joint ventures, partnerships, overriding royalties, that announcement.
status native title interests, historical sites, wilderness or national
park and environmental settings.
All claims are currently in the name of Corazon’s 100% owned Manitoba
subsidiary “5918139 Minitoba Inc.”. This acquisition can be finalised by
payment by Corazon, to the vendor of the project (P. Dunlop), by 13th
December 2024.
Once acquisition is completed, Mr PC Dunlop will retain a 2% Net Smelter
Royalty (NSR) over the ground, with the Company having right to purchase
up to 1% of the NSR for C$500k per 0.5%.
Corazon Mining works closely with First Nation groups and several government
organizations responsible for mining and the environment. While the MacBride
claim area is outside of anyFirst Nation designatedgrounds,it is the

7

Table 2: Checklist of Assessment and Reporting Criteria

7[th] October 2024

Aerial VTEM (Versatile Time Domain Electromagnetic) Survey MacBride Project – Lynn Lake, Canada.

Criteria JORC Code explanation Commentary
Company’s intention to work with the nearest group, being the Marcel Colomb
Fist Nation from the Lynn Lake area.
The security of the tenure held at the time of reporting along The tenure includes multiple Mineral Claims as defined by the Provincial
with any known impediments to obtaining a licence to Government of Manitoba. All claims are currently in good standing.
operate in the area. Work Permits will be sort in due course.
Exploration Acknowledgment and appraisal of exploration by other Exploration within these areas stretches back to the mid-1940’s. Historical
done by other parties. reports that record the historical exploration exist from the late 1950’s.
parties Sulphide mineralisation was discovered at MacBride in the mid-1950’s, with
drilling campaigns completed through to the early-1990’s. Past drilling identifies
consistent zinc and copper mineralisation over a strike of approximately 400
metres and to a depth of approximately 300 metres below surface.
Detailed assessment of this historical work is currently underway. Historical
Assessment Reports referencing drilling includes:-

Sherritt Gordon Mines 1958. Assessment Report # 91293 and 94186.

Sherritt Gordon Mines 1986, 1987. Assessment Report # 71726 and
94186.

Knobby Lake Mines Ltd. 1971, Assessment Report # 94198.

DuPont of Canada Exploration 1975 Assessment Report # 94186.
Australian company Western Areas NL held these projects for a short time in
2007-2008, and completed the VTEM geophysical survey reported on within.

8

Table 2: Checklist of Assessment and Reporting Criteria

7[th] October 2024

Aerial VTEM (Versatile Time Domain Electromagnetic) Survey MacBride Project – Lynn Lake, Canada.

Criteria JORC Code explanation Commentary
Geology Deposit type, geological setting and style of mineralisation. The deposit type reported on within this document is volcanogenic massive
sulphide (VMS) deposits. These are zinc and copper dominant, with lesser
amounts of silver and gold.
The Lynn Lake Greenstone Belt also hosts magmatic nickel-copper-cobalt
sulphide deposits (associated within mafic/ultramafic intrusives) and orogenic
gold deposits.
Drill hole A summary of all information material to the understanding No new drilling information is provided within this report.
Information of the exploration results including a tabulation of the
following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis No new drilling information is provided within this report.
that the information is not Material and this exclusion does
not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
Data In reporting Exploration Results, weighting averaging No new drilling information is provided within this report.
aggregation techniques, maximum and/or minimum grade truncations
methods (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of No new drilling information is provided within this report.
high grade results and longer lengths of low grade results,
theprocedure used for such aggregation should be stated

9

Table 2: Checklist of Assessment and Reporting Criteria

7[th] October 2024

Aerial VTEM (Versatile Time Domain Electromagnetic) Survey MacBride Project – Lynn Lake, Canada.

Criteria JORC Code explanation Commentary
and some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal equivalent Metal equivalent values are not reported.
values should be clearly stated.
Relationship These relationships are particularly important in the No new drilling or assay information is provided within this report.
between reporting of Exploration Results.
mineralisation
widths and
intercept
lengths
If the geometry of the mineralisation with respect to the drill No new drilling or assay information is provided within this report.
hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are No new drilling or assay information is provided within this report.
reported, there should be a clear statement to this effect (eg
‘down hole length, true width not known’).
Diagrams Appropriate maps and sections (with scales) and tabulations
Appropriate diagrams have been included in the announcement. No new
of intercepts should be included for any significant discovery
drilling information is provided within this report.
being reported. These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views.
Balanced Where comprehensive reporting of all Exploration Results is No new drilling or assay information is provided within this report.
reporting not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
Other Other exploration data, if meaningful and material, should be
Analogous examples for VMS deposits within Manitoba are numerous.
substantive reported including (but not limited to): geological Geological studies by the Manitoba Geological Survey have established the
observations; geophysical survey results; geochemical similarities between the Lynn Lake Greenstone Belt(that hosts the MacBride

10

7[th] October 2024

Table 2: Checklist of Assessment and Reporting Criteria

Aerial VTEM (Versatile Time Domain Electromagnetic) Survey MacBride Project – Lynn Lake, Canada.

Criteria JORC Code explanation Commentary
exploration survey results; bulk samples – size and method of deposit) and the world-class VMS terranes within the Flin Flon Greenstone Belt
data treatment; metallurgical test results; bulk density, (FFGSB), 250km to the south of Lynn Lake. The two greenstone belts are the
groundwater, geotechnical and rock characteristics; same age, with similar arc stratigraphy and deformational history.
potential deleterious or contaminating substances.
The FFGSB has a 100-year mining history and hosts approximately 30
developed VMS deposits containing close to 180 Mt of sulphide mineralisation.
(Reference:Field Trip Guidebook FT-A2 / Open File OF2013-3. 22-24 May, 2013. Table
1. Volcanological and structural setting of Paleoproterozoic VMS and Gold deposits at
Snow Lake, Manitoba. And incorporating the more recent discovery of the 1901 deposit,
as stated within the report titled “NI 43-101 Technical Report, Lalor and Snow Lake
Operations, Manitoba, Canada”, dated March 29 2021. Hudbay Minerals Inc.)
Further work The nature and scale of planned further work (eg tests for The current phase of exploration at the MacBride Project is focussed on
lateral extensions or depth extensions or large-scale step- enabling drilling of priority VTEM conductors as soon as practicable.
out drilling). While it may be possible to complete drilling of targets defined by the aerial
VTEM survey, best practice dictates ground electromagnetic surveys are
required to better define the conductive bodies.
Corazon is currently completing work program applications for approval by the
Manitoba Provincial Government.
Diagrams clearly highlighting the areas of possible All relevant diagrams have been presented in this report.
extensions, including the main geological interpretations and
future drilling areas, provided this information is not
commercially sensitive.

11