ASX ANNOUNCEMENT 29 July 2025

JUNE 2025 QUARTERLY REPORT

Constellation Resources Limited (“Constellation” or “Company”) is pleased to provide its Quarterly Report for the period ended 30 June 2025. The Company’s focus is on its projects in Western Australia and evaluating new opportunities in the resources sector.

HIGHLIGHTS

NATURAL HYDROGEN PROJECTS

  • Constellation’s total natural hydrogen (“NatH2”) project area is a sizeable 87,602km[2] via nine Special Prospecting Authorities with an Acreage Option (“SPA-AO”) over the Edmund-Collier, Yerrida and Ashburton Basins.

  • The SPA-AOs are intersected by the Goldfields Gas Pipeline and are in close proximity to a number of major consumers, including iron ore mines who are investigating pathways for onsite green steel production.

  • Reprocessing and interpretation of a historical Geoscience Australia seismic line 10GA-CP2, indicates the organic rich Blue Billy and Discovery Formations, extend across the Edmund-Collier Basin and may be capable of generating largescale NatH2, given the source rock and thermal maturity analysis completed.

  • Total Organic Carbon (“TOC”) results from eleven diamond holes demonstrated strong values across the entire Edmund Collier basin including a maximum average of 5.24% (results over 2% are considered good to excellent for potential NatH2 production).

  • Edmund-Collier represents a first-of-its-kind opportunity in Western Australia to explore for NatH2 across a large, 300km east–west and 40km north–south , underexplored basin, with no prior deep drilling to date .

  • The Company continues to collaborate with the CSIRO to advance prospectivity studies for NatH2 and helium across its projects in Western Australia.

ULARRING COPPER GOLD PROJECT

  • This region is known to host several major deposits that are intrusion related, such as the Boddington Copper-Gold mine and Caravel Minerals Ltd’s Caravel Copper Project (a porphyry hosted Cu-Mo-Ag-Au deposit).

  • Ularring includes a well-developed copper-gold (“Cu-Au”) horizon identified at the Centre Forest Prospect, interpreted to be hosted within a prospective regional shear corridor that follows the margins of an intrusion.

  • Sampling programs identified a strong geochemical 1.3km x 0.45km Au-Cu soil anomaly (“Chatham”), that has had no systematic on-ground exploration or drilling and is located over the regionally important Meenar Shear.

  • Chatham exhibits maximum values of 78ppb Au and 1,126ppm Cu with associated silver, tellurium and tungsten which are the suite of coincident elements consistent with known Cu-Au drill intersections at Ularring.

  • Chatham overlies the northern edge of a bullseye, late time Versatile Time Domain Electromagnetic (“VTEM”) anomaly that was identified from a historical survey and may indicate a conductive sulphide rich unit below and prospective drill target.

CORPORATE

  • Subsequent to quarter end, the Company announced its non-renounceable pro-rata entitlements offer closed raising gross proceeds of approximately $1.1 million. The Directors reserve the right to issue the remaining shortfall within three (3) months after the closing date.

For further information, please contact:

Peter Woodman

Peter Muccilli

Managing Director Technical Director Tel: +61 8 9322 6322 Tel: +61 8 9322 6322

Level 9, 28 The Esplanade PERTH WA 6000 tel +61 8 9322 6322 fax +61 8 9322 6558 email [email protected] constellationresources.com.au

ABN 57 153 144 211

29 July 2025

==> picture [472 x 590] intentionally omitted <==

Figure 1: Constellation SPA-AO application locations.

Page 2 of 10

constellationresources.com.au

29 July 2025

EXPLORATION FOR NATURALLY OCCURRING HYDROGEN IN WESTERN AUSTRALIA

The Company’s natural hydrogen projects expand over a total area of 87,602km[2] in Western Australia across the Edmund-Collier, Yerrida and Ashburton Basins (Figure 1), intersecting and/or in proximity to the Goldfields gas transmission pipeline which offers a potential solution to market should a discovery occur. In response to increasing gas prices and domestic supply constrictions, the Western Australian Government in 2024 passed legislation that enables the inclusion of hydrogen into existing gas pipelines.

Global hydrogen demand is expected to grow fivefold by 2050. Current hydrogen consumption is mainly sourced from grey hydrogen (produced by natural gas) and the search for and uses of a zero-carbon source of hydrogen is gathering momentum worldwide. Constellation considers that it has selected the most prospective large-scale basin opportunities for hydrogen, helium and associated gases that will give it a first mover advantage in the search for natural hydrogen in Western Australia.

SEISMIC REPROCESSING AND INTERPRETATIONS

During the quarter, the Company completed reprocessing and interpretation of a historical Geoscience Australia Seismic line 10GA-CP2. Seismic surveys which are used extensively by exploration companies, are considered the most effective geophysical tool to map subsurface geology (>1km). The seismic line was acquired in 2010 and transects both the entire Edmund-Collier Basin and the Company’s project area.

The Edmund Collier Basin reaches a maximum depth ~ 4.2km within the Wanna Syncline and overlays the Ashburton and Gascoyne Provinces basement units. The focus of the reprocessing was on optimising the resolution in the top four kilometres of the seismic section and the high-resolution imagery obtained has greatly enhanced the geological detail that can be extrapolated along the section. The resultant cross section interpretation along the seismic line indicates the organic rich Blue Billy and Discovery Formations (the thickness of which also appears to increase significantly to 700m, within the Wanna Syncline) extend across the Edmund Collier Basin and may be capable of generating large-scale natural hydrogen, given the source rock and thermal maturity analysis completed to date.

The Godfrey and Talga Faults are both deep regional scale faults that are interpreted to extend from the basement to surface. The fault locations provide attractive target zones for surface soil gas sampling to test for potential surface gas seepage.

The geological interpretation from the reprocessed seismic and CSIRO and laboratory results, indicate all elements that are needed to establish a viable NatH2 system (Figure 2). These elements include a variety of source rocks, migration pathways, reservoirs, seals and potential traps.

==> picture [495 x 190] intentionally omitted <==

Figure 2: Edmund Collier Conceptual Hydrogen System Against Reprocessed Seismic Image.

The generation of NatH2 can be from a variety of sources within the Company’s project area. The main sources for NatH2 being considered are:

  1. the basement (via radiolysis, which may also generate helium); and

  2. organic shales (via thermogenesis) which enhance the exploration potential for the Project.

Page 3 of 10

constellationresources.com.au

29 July 2025

THERMOGENIC HYDROGEN ASSESSMENT – EDMUND-COLLIER NATURAL HYDROGEN

During the quarter, the Company received Total Organic Carbon (“TOC”) results from eleven diamond holes that were publicly available from several of the deeper mineral exploration holes within the Edmund-Collier Basin. TOC values are an important measurement to confirm the richness of organic content within a geological formation with results over 2% considered good to excellent for potential NatH2 production.

Analysis by Core Laboratories of selected core samples taken over regular intervals from organic-rich shales units have returned highly encouraging TOC values over large widths, including:

  • 17BBDD002: TOC values ranging from 0.91% to 10.10% (average 3.59%) from eleven core samples over a 339m down hole interval through the Blue Billy Formation (127m-466m).

  • E044/0051: TOC values ranging from 1.40% to 4.76% (average 3.08%) from five core samples over a 159m down hole interval through the Blue Billy Formation (60m-219m).

  • DD97BC14: TOC values ranging from 3.06% to 7.75% (average 5.76%) from four core samples over a 59m down hole interval through the Discovery Formation (62m-121m).

  • DDH2: TOC values ranging from 0.92% to 8.40% (average 5.24%) from five core samples over a 141m down hole interval through the Discovery Formation (0-186m).

  • DDH3: TOC values ranging from 2.06% to 7.56% (average 4.17%) from eight core samples over a 74m down hole interval through the Discovery Formation (0-115m).

  • DH13: TOC values ranging from 2.15% to 4.29% (average 2.81%) from five core samples over a 57m down hole interval through the Discovery Formation (0-78m).

  • ISBD2: TOC values ranging from 0.49% to 5.17% (average 2.33%) from eleven core samples over a 193m down hole interval through the Discovery or Kiangi Creek Formation (0-291m).

The importance of investigating the organic rich units within the Edmund-Collier is that a body of research and case examples demonstrates that during continued burial and increasing temperature, the remaining degraded (i.e post oil and natural gas production) organic matter and pyrobitumens can produce hydrogen, through metagenic and metamorphic processes until graphite is ultimately formed (Figure 3; Hanson and Hanson, 2023).

Optimal hydrogen generation from organic rich rocks is predicted at ~250°C to 500°C, which equates potentially to at least the minimum temperature that organic-rich shales have reached in the deepest parts of the Wanna Syncline (now at present-day ~4km depth). The collective research works invokes a hydrogen generation window that develops within a sedimentary basin where organic-rich formations have been heated beyond 250°C and presents a potential new frontier for natural hydrogen

exploration.

There has been no deep drilling in the Wanna Syncline which is a large-scale basinal feature within the Edmund–Collier Basins, extending in excess of 300km east-west and 40km north-south.

CSIRO test work remains ongoing to analyse the composition of trapped gases within any fluid inclusions and/or the gases liberated from fluid inclusions from crushed core samples. If hydrogen and associated gases are detected, it could indicate the likely origin and processes to produce these generated gases.

POROSITY MEASUREMENTS – EDMUND-COLLIER NATURAL HYDROGEN

During the quarter, an initial batch of 63 core plugs were also sent to Core Laboratories for porosity measurements. The holes selected were the same publicly available diamond holes that were laid out for the TOC and thermal maturity sampling and analysis. Encouraging conventional porosity values were returned from various sedimentary formations, although values were highly heterogeneous; Blue Billy (<0.1% – 13.24%), Discovery Formation (<0.1% – 13.24%), Kiangi Creek Formation (0,1%32.23%), Irregully/ Gooragoora Formations (<0.1% – 10.91%). Additional, sampling and analysis are required to better understand porosity distribution within these formations.

Page 4 of 10

constellationresources.com.au

29 July 2025

==> picture [324 x 319] intentionally omitted <==

Figure 3: Hydrogen generation model (Hanson & Hanson, 2023) with interpreted Edmund-Collier Maturation Window Plotted.

==> picture [443 x 310] intentionally omitted <==

Figure 4: Edmund-Collier Basin outcropping organic-rich shale units and drill hole sample locations.

Page 5 of 10

constellationresources.com.au

29 July 2025

STAKEHOLDER ENGAGEMENT AND SOIL GAS SAMPLING

The Company is continuing engagement meetings with relevant stakeholders (native title groups, pastoral stations, other tenement holders etc) regarding its proposed activities on the SPA-AOs and aims to commence ground activities for one of the SPA-AOs for the Edmund-Collier area upon finalisation of all stakeholder engagements and other conditions i.e Department of Mines, Petroleum and Exploration (DMPE) requirements. The regional soil gas sampling program is planned to progress in a staged manner as the remaining SPA-AOs submission conditions are satisfied and approvals given. The Company has submitted its Environmental Plan, one of the final requirements prior to conducting on-ground activities, to DMPE for approval.

The Company’s key focus is on high potential targets in the early stages of the soil gas sampling program and as such, intends to refine sampling locations based on receipt of the results from its collaboration with the CSIRO.

==> picture [482 x 323] intentionally omitted <==

Figure 5: Edmund-Collier Basin STP- SPA-0116-19;131-133 Application Locations.

The proposed exploration work programs in the current application areas draw on the ideologies behind ‘first-mover advantage’ — where the largest discoveries in an unexplored field for either metals or petroleum are usually shallow and found early in the field’s history.

One of the Company’s underlying technical assumptions are the largest and most viable hydrogen and helium gas accumulations are likely to leak through to the surface. Thus, the identification of anomalous gas seeps or ‘invisible gossans’ at the surface could be one of the low-cost mechanisms to quickly confirm the prospectivity of the basins. The identification of gas seeps can be achieved by taking regular readings alongside an existing track using a small diameter hole that is drilled by a handheld drill. The probe is lowered down the resultant hole and connected to a sophisticated handheld gas detectors where a range of gases can be analysed (hydrogen, methane, carbon dioxide and hydrogen sulphide. Any anomalous surface gas seepage will be immediately apparent as direct field gas readings are given in real time. These gases could also be a proxy for helium. Helium can only be reliably measured by laboratories. If any areas of gas anomalism are detected, a gas sample will be collected and sent away for confirmatory analysis.

Page 6 of 10

constellationresources.com.au

29 July 2025

ULARRING COPPER GOLD PROJECT

The Ularring Copper Gold Project, consisting of tenements E70/4686, E70/4901 and newly granted E70/6671 (cumulatively 222km[2] ) is located 100km northeast of Perth (Figure 7). Ularring is situated within the Archaean Yilgarn Craton and borders the Southwest and Youanmi Terranes. Historical drill results and geology indicates a highly prospective Intrusion related Cu-Au system for Ularring, a system style that can generate large scale deposits. The region is known to host several major deposits that are intrusion related, such as the Boddington Copper-Gold mine (11Moz Au and 1Mt of copper produced, hosted in a sheared Intrusive related setting) and Caravel Minerals Limited’s (ASX: CVV) Caravel Copper Project (a porphyry hosted Cu-MoAg-Au deposit containing 3Mt Cu, 61Kt Mo, 895koz Au and 46Moz Ag in Mineral Resource).

Ularring represents an exciting opportunity to explore for Cu-Au zones regionally along the targeted shear corridor (24km of strike), where minimal exploration (if any) has been undertaken. Historical results generated Cu-Au-Bi-Mo-W soil anomalies utilising a variety of sampling methods (soil and auger sampling) and various analytical techniques which are located along strike of Centre Forest and on separate trends.

CHATHAM GEOCHEMICAL ANOMALY

During the quarter, the Company’s maiden Ultrafine+[TM] soil program identified Chatham, a strong geochemical 1.3km x 0.45km gold copper soil anomaly that is located over the regionally important Meenar Shear. Chatham was identified from a 436 sample program with a density achieved on a notional 100m x 80m grid pattern. Chatham exhibits maximum values of 78ppb Au and 1,126ppm Cu with associated silver, tellurium, tungsten and platinum group elements (Figure 6). The suite of coincident elements is typical when compared to the Au-Cu drillhole intersections achieved elsewhere within Ularring.

==> picture [430 x 284] intentionally omitted <==

Figure 6: The larger Chatham Ultrafine+[TM] gold in soil anomaly and a smaller anomaly to the south draped over TMI Aeromagnetic image. Note these anomalies are over the prospective Meenar Shear corridor that hosts a number of copper – gold prospects along its strike.

Chatham sits within an open field and is best developed on a slight topographic rise of residual soils (no outcrop) at its western most point. The soil anomaly appears to migrate down slope and then to the northeast along a minor drainage channel.

Below the Chatham anomaly, a bullseye - late time VTEM anomaly has also been identified from a historical survey. The electromagnetic anomaly at Chatham could indicate a conductive sulphide rich unit below and potentially a prospective target. Additionally, Chatham is located at the intersection of the prospective Meenar Shear Corridor with an interpreted folded limb of ultramafics, mafics and banded iron formations based on aeromagnetic interpretations. Further infill soil programs are required to optimise a proposed shallow reconnaissance drill program.

Page 7 of 10

constellationresources.com.au

29 July 2025

==> picture [434 x 381] intentionally omitted <==

Figure 7: Ularring Project Location.

CORPORATE

Capital Position

On 8 July 2025, the Company announced the results of its non-renounceable entitlement offer (“Entitlement Offer”). The Company received applications for 9,021,887 Shares at an issue price of $0.12 each under the Entitlement Offer raising $1.1 million. Accordingly, the remaining shortfall (“Remaining Shortfall”) from the Entitlement Offer is 11,991,046 Shares totalling approximately $1.4 million. The Directors reserve the right to issue the Remaining Shortfall within three (3) months after the closing date.

As at the date of this report, the Company has the following securities on issue:

Security Type Number
Fully Paid Ordinary Shares 72,061,112
Unlisted options exercisable at $0.12 to $0.25 each, expiring 31 March 2027 – 31 March 2029 7,775,000

Business Development

Several other opportunities have been reviewed during the quarter, and the Company will continue in its efforts to identify and acquire suitable new business opportunities in the resources sector, both domestically and overseas. However, no agreements have been reached or licences granted and the Directors are not able to assess the likelihood or timing of a successful acquisition or grant of any opportunities.

Page 8 of 10

constellationresources.com.au

29 July 2025

COMPETENT PERSONS STATEMENT

The information in this report that relates to Exploration Results is extracted from the following ASX announcements:

  • Seismic Results Reveal Large Scale Hydrogen Potential; ” – dated 3 July 2025;

  • Chatham Gold Target at Ularring Project ” – dated 24 June 2025;

  • Thermogenic Hydrogen Potential Confirmed at Edmund-Collier ” – dated 19 May 2025;

  • IP Survey Defines Copper Gold Target at Ularring ” – dated 18 March 2025;

  • December 2024 Quarterly Report ” – dated 31 January 2025; and

  • “Acquisition of Ularring Coper Gold Project” – dated 12 September 2024.

These announcements are available to view at the Company’s website on www.constellationresources.com.au. The information in the original ASX Announcements that related to Exploration Results was based on, and fairly represents information compiled by Peter Muccilli, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Muccilli is a Technical Director of Constellation Resources Limited and a holder of shares and options in Constellation Resources Limited. Mr Muccilli has sufficient experience that is relevant to the styles of mineralisation and types of deposit under consideration, and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The Company confirms that it is not aware of any information or data that materially affects the information included in the original market announcements. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.

FORWARD LOOKING STATEMENTS

Statements regarding plans with respect to Constellation’s project are forward-looking statements. There can be no assurance that the Company’s plans for development of its projects will proceed as currently expected. These forward-looking statements are based on the Company’s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of the Company, which could cause actual results to differ materially from such statements. The Company makes no undertaking to subsequently update or revise the forwardlooking statements made in this announcement, to reflect the circumstances or events after the date of that announcement.

This announcement has been authorised for release by the Company’s Managing Director, Peter Woodman.

References:

  • Global Energy Perspective 2023 – McKinsey ” - https://www.mckinsey.com/industries/oil-gas/our-insights/global-energy-perspective-2023-hydrogen-outlook

Production details are sourced and summarised from https://www.newmont.com/.

McCuaig, T.C., Behn, M., Stein, H., Hagemann, S.G., McNaughton, N.J., Cassidy, K.F., Champion, D. and Wyborn, L., 2001 - The Boddington gold mine: A new style of Archaean Au-Cu deposit.

Caravel Minerals Limited ASX release “2023 Mineral Resource Update – Caravel Copper Project“ dated 13 November 2023.

Hanson J and Hanson H, 2023, Hydrogen’s organic genesis: Unconventional Resources, V4.

Page 9 of 10

constellationresources.com.au

29 July 2025

Appendix 1: Disclosures in accordance with ASX Listing Rule 5.3

Summary of Mining Tenements

As at 30 June 2025, the Company has an interest in the following projects:

Project Name Permit Number Percentage Interest Status
Ularring Project, Western Australia
E70/4686
100%
Granted
E70/4901
100%
Granted
E70/6671
100%
Granted
Fraser Range, Western Australia
E63/1281
70%
Granted
E28/2403
70%
Granted
E63/1695
70%
Application
E28/2738
100%
Granted
E28/2957
100%
Granted

During the quarter, there were no changes to the Company’s interest in projects.

Application Identifier **Type ** Size(km2) Location
STP-SPA-0116 SPA-AO(ConditionallyGranted) 9,419 Edmund-Collier Basin
STP-SPA-0117 SPA-AO(ConditionallyGranted) 9,465 Edmund-Collier Basin
STP-SPA-0118 SPA-AO(ConditionallyGranted) 9,357 Edmund-Collier Basin
STP-SPA-0119 SPA-AO(ConditionallyGranted) 9,047 Edmund-Collier Basin
STP-SPA-0120 SPA-AO(ConditionallyGranted) 8,918 Yerrida Basin
STP-SPA-0121 SPA-AO(ConditionallyGranted) 9,176 Yerrida Basin
STP-SPA-0131 SPA-AO(ConditionallyGranted) 9,778 Ashburton Basin
STP-SPA-0132 SPA-AO(ConditionallyGranted) 9,672 Ashburton Basin
STP-SPA-0133 SPA-AO(ConditionallyGranted) 11,980 Ashburton Basin

Summary of Mining Exploration Activities Expenditure

Activity Amount($A’000)
Consultants – Geophysical,Geological,Field Team,Other (88)
Drilling (198)
Sample Analysis (33)
Field Equipment,Supplies,Vehicle Hire,Accommodation,Travel,Other (54)
Tenement Maintenance,Rents,Rates and Application Fees (19)
Stakeholder Engagement (30)
Total as reported in Appendix 5B (422)

There were no mining or production activities and expenses incurred during the quarter ended 30 June 2025.

Related Party Payments

During the quarter ended 30 June 2025, the Company made payments of $199,000 to related parties and their associates. These payments relate to existing remuneration arrangements (executive salaries, director fees and superannuation of $147,000) and provision of a serviced office ($52,000).

Page 10 of 10

constellationresources.com.au

Rule 5.5

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Name of entity

CONSTELLATION RESOURCES LIMITED ABN Quarter ended (“current quarter”) 57 153 144 211 30 June 2025

Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other – Business development costs
1.9
Net cash from / (used in) operating
activities
-
(422)
-
-
(147)
(78)
-
4
-
-
-
-
-
(1,194)
-
-
(562)
(354)
-
54
-
-
-
(18)
(643) (2,074)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
-
-
(21)
-
-
-
-
(22)
(21)
-
-
-

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 1

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
2.2
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
(21) (43)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (Proceeds received in advance for
issue of equity securities)
3.10
Net cash from / (used in) financing
activities
-
-
-
(2)
-
-
-
-
160
-
-
-
(5)
-
-
-
-
160
158 155
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
837
(643)
(21)
158
2,293
(2,074)
(43)
155

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 2

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
- -
331 331
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
166
165
-
-
6
831
-
-
331 837
6.
Payments to related parties of the entity and their
associates
6.
Payments to related parties of the entity and their
associates
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
199
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
199
-
7.
7.1
7.2
7.3
7.4
7.5
7.6
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
Loan facilities
-
-
Credit standby arrangements
-
-
Other (please specify)
-
-
Total financing facilities
-
-
Unused financing facilities available at quarter end
-
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
- -
- -
- -
- -

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 3

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

8. Estimated cash available for future operating activities $A’000
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
Net cash from / (used in) operating activities (item 1.9)
(643)
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
-
Total relevant outgoings (item 8.1 + item 8.2)
(643)
Cash and cash equivalents at quarter end (item 4.6)
331
Unused finance facilities available at quarter end (item 7.5)
-
Total available funding (item 8.4 + item 8.5)
331
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.5
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
(643)
-
(643)
331
-
331
Answer: No. The Company’s June 2025 quarter cashflows include expenditure relating to
the completed diamond drilling program at the Company’s Ularring Project.
Accordingly, exploration costs are expected to reduce in the present and coming
quarters.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Yes, on 8 July 2025, the Company announced the results of its non-renounceable
entitlement offer (“Entitlement Offer”). The Company received applications for
9,021,887 Shares at an issue price of $0.12 each under the Entitlement Offer raising
$1.1 million. Accordingly, the remaining shortfall (“Remaining Shortfall”) from the
Entitlement Offer is 11,991,046 Shares totalling approximately $1.4 million. The
Directors reserve the right to issue the Remaining Shortfall within three (3) months
after the closing date.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, on 8 July 2025, the Company announced the results of its non-renounceable
entitlement offer (“Entitlement Offer”). The Company received applications for
9,021,887 Shares at an issue price of $0.12 each under the Entitlement Offer
raising $1.1 million. Accordingly, the remaining shortfall (“Remaining Shortfall”) from
the Entitlement Offer is 11,991,046 Shares totalling approximately $1.4 million. The
Directors reserve the right to issue the Remaining Shortfall within three (3) months
after the closing date.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 4

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

  • 2 This statement gives a true and fair view of the matters disclosed.

Date: 29 July 2025

Authorised by: Company Secretary

(Name of body or officer authorising release – see note 4)

Notes

  1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.

  2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

  3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

  4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [ name of board committeeAudit and Risk Committee ]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”.

  5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations , the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 5