ASX QUARTERLY REPORT
FOR PERIOD ENDED 31[ST] DECEMBER 2017
HIGHLIGHTS: MT THIRSTY COBALT PROJECT:
-
Mt Thirsty Scoping Study returns outstanding financial metrics (base case NPV A$290M) for simple atmospheric SO2 flowsheet over 21-year mine life.
-
Planning underway for 2018 PFS to test additional flowsheet options with the potential to significantly increase metal recovery and further improve the project economics.
MT THIRSTY COBALT PROJECT (50% Conico: 50% Barra – Joint Venture )
The Mt Thirsty Cobalt Project is located 20km north-northwest of Norseman, Western Australia. Conico Ltd (ASX: CNJ) is the Joint Venture manager.
The Project contains the Mt Thirsty Cobalt-Nickel (Co-Ni) Oxide Deposit that has the potential to emerge as a significant cobalt producer. Further information can be found at www.mtthirstycobalt.com . In addition to the Co-Ni Oxide Deposit, the Project also hosts nickel sulphide (Ni-S) mineralisation.
Demand for cobalt looks very encouraging as the world becomes more dependent on rechargeable power sources for portable electronics and electric vehicles. However, the battery industry is also competing with demand for cobalt from producers of superalloys, aircraft turbines and chemical industries.
Demand is likely to escalate exponentially with battery production, however supply is uncertain as over 60% of global supply comes from the politically unstable African countries such the Democratic Republic of Congo, Central African Republic and Zambia.
With potential supply constraints and surging demand, many commentators see pricing pressure as a likely eventuality.
The undeveloped Mt Thirsty Cobalt Project has a significant JORC (2004) compliant resource with a potential to have a long mine life. The Project is close to all necessary infrastructure (rail, road, power, water, and sea port) and, being in a mining orientated state, has the potential to attract a variety of interested parties including end users of cobalt.
The great advantage of Mt Thirsty compared to other potential cobalt operations is the nature of the resource, being a flat lying, continuous and thick deposit starting from near surface to around 70 metres below surface. Due to intense oxidation, the deposit is very soft, fine grained and low in silica.
The Joint Venture partners are working collaboratively to exploit this joint opportunity and remain confident Mt Thirsty has the potential to become a major supplier to the burgeoning battery supply chain.
Level 15, 197 St George’s Terrace, Perth, Western Australia 6000 Telephone: (08) 9282 5889 Facsimile: (08) 9282 5866 Website: www.conico.com.au
1
Report for December Quarter 2017
==> picture [124 x 22] intentionally omitted <==
==> picture [393 x 294] intentionally omitted <==
Figure 1: Mt Thirsty Project Location
ACTIVITIES
Scoping Study
The Mt Thirsty Scoping Study (Study) was released during the quarter (refer to ASX Release dated 5th October 2017). The Study confirmed the Mt Thirsty JV’s view that the Mt Thirsty Cobalt Project represents a long mine life, low capital and low operating cost mining opportunity.
The base case employs an atmospheric agitated leaching process, using Sulphur dioxide (SO2) as the preferred reagent, to extract 73% of the cobalt metal and 21.5% of the nickel. Approximately 6,000t of a mixed sulphide product will be produced each year from 1.5Mtpa of feed.
For a modest capital outlay of $A212M (including A$34M contingency), with an operating cost of A$43/t of feed, metal pricing of US$72,000/t for cobalt and US$15,500/t for nickel, and a foreign exchange rate of 0.74 USD/AUD, the base case delivers a very healthy NPV of A$290M.
The Mt Thirsty JV is now planning the Pre-Feasibility Study (PFS) for the project. The PFS will test several additional flow sheet options, all of which have the potential to significantly increase metal recovery and further improve the project economics.
Since completion of the scoping study the cobalt price has risen over one third from around $US60,000 per tonne to around $US80,000/tonne. Forecast future increases in the cobalt price would obviously have a positive impact on project economics.
Research & Development Claim
During the quarter, an R&D claim for Mt Thirsty metallurgical process development work was prepared for the year ended 30 June 2017 and lodged with AusIndustry. Assuming it is successful $41,656 should be returned to Conico from the ATO.
2
Report for December Quarter 2017
==> picture [124 x 22] intentionally omitted <==
Corporate
Since the beginning of the December quarter a total of $A285,000 has been raised through the exercise of 9.5 million unlisted options.
==> picture [101 x 51] intentionally omitted <==
Guy T Le Page Director
Disclaimer
The interpretations and conclusions reached in this report are based on current geological theory and the best evidence available to the authors at the time of writing. It is the nature of all scientific conclusions that they are founded on an assessment of probabilities and, however high these probabilities might be, they make no claim for complete certainty. Any economic decisions that might be taken on the basis of interpretations or conclusions contained in this report will therefore carry an element of risk.
Competent Persons Statement
The information in the 2011 report relating to the Mt Thirsty Mineral Resource Update is based on information compiled by Alan Miller, who at the time was a full time employee of Golder Associates Pty Ltd and a member of the Australasian Institute of Mining and Metallurgy. Alan Miller has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves prepared by the Joint Ore Resources Committee, the Australian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and the Mineral Council of Australia.” Alan Miller consented to the inclusion in the 2011 report of the matters based on this information in the form and context in which it appears.
The information in this quarterly report that relates to Exploration Targets and Exploration Results is based on and fairly represents information compiled by Michael J Glasson and Robert N Smith, Competent Persons who are members of the Australian Institute of Geoscientists.
Mr Glasson and Mr Smith are employees of Tasman Resources Ltd and in this capacity act as part time consultants to Conico Ltd. Mr Glasson and Mr Smith hold shares in Conico Ltd.
Mr Glasson and Mr Smith have sufficient experience which is relevant to the style of mineralisation and type of the deposits under consideration and to the activity being undertaking to qualify as Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Glasson and Mr Smith consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.
3
Report for December Quarter 2017
==> picture [124 x 22] intentionally omitted <==
Mt Thirsty Project Summary
The Mt Thirsty Cobalt – Nickel - Manganese oxide project covering an area of 11.5km2 is located 20km north-northwest of Norseman in the southern goldfields of Western Australia, a well-endowed nickel terrain (see Figure 1). Conico Ltd through its wholly owned subsidiary Meteore Metals Pty Ltd owns 50% of the project in joint venture with Barra Resources Limited. The Mt Thirsty deposit has the potential to emerge as a significant cobalt supplier.
The project hosts the Mt Thirsty Cobalt Oxide Deposit (Table 2) which has the potential to emerge as a significant cobalt supplier. Refer also Cross Section through Mt Thirsty deposit, Figure 5 below.
Table 2: Mt Thirsty Cobalt Oxide Deposit Mineral Resource Summary (0.06% Co cut off)
| Mineral Resource Category | Tonnes | Cobalt(Co) (%) | Nickel(Ni) (%) | Manganese(Mn) (%) |
|---|---|---|---|---|
| Indicated | 16,600,000 | 0.14 | 0.60 | 0.98 |
| Inferred | 15,340,000 | 0.11 | 0.51 | 0.73 |
| Total Mineral Resource | 31,940,000 | 0.13 | 0.55 | 0.86 |
(This resource information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported, refer ASX Announcement 8th March 2011: “Resource Upgrade”, available to view on www.conico.com.au ).
Extensive metallurgical testwork in recent years has indicated that high recoveries of cobalt can be achieved via agitated, low temperature, atmospheric leaching using cheaper and more efficient sulphur dioxide (SO2) as the main leaching agent resulting in a more practical and economic leaching method by specifically targeting cobalt only.
A low temperature, low reagent consumption agitated atmospheric leaching process flowsheet has been developed with greater than 70% cobalt and 20% nickel recoveries. A recent positive scoping study has justified further work to progress to a pre-feasibility stage.
The Mt Thirsty Cobalt Oxide Deposit currently represents an excellent long-term, low cost, cobalt production opportunity.
As well as the Co-Ni oxide resource, the Mt Thirsty joint venture tenements have potential for nickel sulphide mineralisation at greater depths within the same ultramafic sequence which hosts the near surface oxide deposit.
Intersections of nickel sulphides up to 6m down hole at 3.4% Ni were made by the joint venture in 2010 within E63/373 (refer ASX announcement 19th May 2010: “High Grades Intersected at Mt Thirsty”, available to view on www.conico.com.au ).
For more details on the Mt Thirsty Cobalt Project, shareholders and investors are encouraged to visit the Project website at www.mtthirstycobalt.com .
Interests in Mining Tenements
| Tenements | Location | Interest held at end of quarter |
Acquired during the quarter |
Disposed during the quarter |
|---|---|---|---|---|
| E63/1267 | WA | 50% | ||
| R63/4 | WA | 50% | ||
| EL63/1790 | WA | 50% | ||
| P63/2045 | WA | 50% |
4
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
Conico Ltd ABN Quarter ended (“current quarter”) 49 119 057 457 31 December 2017
| Consolidated statement of cash flows | Current quarter $A’000 |
Year to date (6 months) $A’000 |
|---|---|---|
| 1. Cash flows from operating activities 1.1 Receipts from customers 1.2 Payments for (a) exploration & evaluation (b) development (c) production (d) staff costs (e) administration and corporate costs 1.3 Dividends received (see note 3) 1.4 Interest received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Research and development refunds 1.8 Other (provide details if material) 1.9 Net cash from / (used in) operating activities |
- (32) - - (40) (117) - - - - - - |
- (137) - - (80) (203) - - - - - - |
| (189) | (420) | |
| 2. Cash flows from investing activities 2.1 Payments to acquire: (a) property, plant and equipment (b) tenements (see item 10) (c) investments (d) other non-current assets |
- - - - |
- - - - |
- See chapter 19 for defined terms
1 September 2016
Page 1
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
| Consolidated statement of cash flows | Current quarter $A’000 |
Year to date (6 months) $A’000 |
|---|---|---|
| 2.2 Proceeds from the disposal of: (a) property, plant and equipment (b) tenements (see item 10) (c) investments (d) other non-current assets 2.3 Cash flows from loans to other entities 2.4 Dividends received (see note 3) 2.5 Other (provide details if material) 2.6 Net cash from / (used in) investing activities |
- - - - - - - |
- - - - - - - |
| - | - | |
| 3. Cash flows from financing activities 3.1 Proceeds from issues of shares 3.2 Proceeds from issue of convertible notes 3.3 Proceeds from exercise of share options 3.4 Transaction costs related to issues of shares, convertible notes or options 3.5 Proceeds from borrowings 3.6 Repayment of borrowings 3.7 Transaction costs related to loans and borrowings 3.8 Dividends paid 3.9 Other (provide details if material) 3.10 Net cash from / (used in) financing activities |
- - 60 - - - - - - |
- - 150 - - - - - - |
| 60 | 150 | |
| 4. Net increase / (decrease) in cash and cash equivalents for the period 4.1 Cash and cash equivalents at beginning of period 4.2 Net cash from / (used in) operating activities (item 1.9 above) 4.3 Net cash from / (used in) investing activities (item 2.6 above) 4.4 Net cash from / (used in) financing activities (item 3.10 above) 4.5 Effect of movement in exchange rates on cash held 4.6 Cash and cash equivalents at end of period |
325 (189) - 60 - |
466 (420) - 150 - |
| 196 | 196 |
- See chapter 19 for defined terms 1 September 2016
Page 2
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
| 5. Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts |
Current quarter $A’000 |
Previous quarter $A’000 |
|---|---|---|
| 5.1 Bank balances 5.2 Call deposits 5.3 Bank overdrafts 5.4 Other (provide details) 5.5 Cash and cash equivalents at end of quarter (should equal item 4.6 above) |
196 - - - |
325 - - - |
| 196 | 325 |
| 6. | Payments to directors of the entity and their associates | Current quarter |
|---|---|---|
| $A'000 | ||
| 6.1 | Aggregate amount of payments to these parties included in item 1.2 | 118 |
| 6.2 | Aggregate amount of cash flow from loans to these parties included | - |
| in item 2.3 | ||
| 6.3 | Include below any explanation necessary to understand the transactions included in | |
| items 6.1 and 6.2 |
Director fees and superannuation were paid and expenses were reimbursed during the quarter.
Management Fees, as per agreement, were paid during the quarter to a company of which Mr GH Solomon and Mr DH Solomon are directors.
Corporate advisory fees paid to RM Corporate Finance Pty Ltd, a company of which Mr GT Le Page and Mr J Richardson have an interest.
| 7. Payments to related entities of the entity and their associates 7.1 Aggregate amount of payments to these parties included in item 1.2 7.2 Aggregate amount of cash flow from loans to these parties included in item 2.3 |
Current quarter $A'000 |
|---|---|
| - | |
| - |
-
7.3 Include below any explanation necessary to understand the transactions included in items 7.1 and 7.2
-
See chapter 19 for defined terms 1 September 2016
Page 3
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
| 8. Financing facilities available Add notes as necessary for an understanding of the position Total facility amount at quarter end $A’000 Amount drawn at quarter end $A’000 8.1 Loan facilities - - 8.2 Credit standby arrangements - - 8.3 Other (please specify) - - 8.4 Include below a description of each facility above, including the lender, interest rate and whether it is secured or unsecured. If any additional facilities have been entered into or are proposed to be entered into after quarter end, include details of those facilities as well. |
Total facility amount at quarter end $A’000 |
Amount drawn at quarter end $A’000 |
|
|---|---|---|---|
| - | - | ||
| - | - | ||
| - | - | ||
| - |
| 9. Estimated cash outflows for next quarter |
$A’000 |
|---|---|
| 9.1 Exploration and evaluation 9.2 Development 9.3 Production 9.4 Staff costs 9.5 Administration and corporate costs 9.6 Other (provide details if material) 9.7 Total estimated cash outflows |
40 - - - 120 - |
| 160 |
Note – On 15 January 2018, 7,500,000 unlisted 3c options were exercised raising $225,000.
| 10. Changes in tenements (items 2.1(b) and 2.2(b) above) |
Tenement reference and location |
Nature of interest |
Interest at beginning of quarter |
Interest at end of quarter |
|---|---|---|---|---|
| 10.1 Interests in mining tenements and petroleum tenements lapsed, relinquished or reduced |
||||
| 10.2 Interests in mining tenements and petroleum tenements acquired or increased |
- See chapter 19 for defined terms 1 September 2016
Page 4
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Compliance statement
-
1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
-
2 This statement gives a true and fair view of the matters disclosed.
Sign here:
==> picture [67 x 40] intentionally omitted <==
Date: 30 January 2018
Company secretary
Print name: Aaron Gates
Notes
-
The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.
-
If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
-
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.
-
See chapter 19 for defined terms 1 September 2016
Page 5