POSITIVE MT THIRSTY PFS TO PROVIDE ‘FIRST WORLD’ SECURITY OF COBALT SUPPLY
HIGHLIGHTS
ASX ANNOUNCEMENT
20[th] February 2020
BARRA RESOURCES LIMITED
A.B.N. 76 093 396 859 Corporate Details:
ASX Code: BAR Market Cap: $11.3M @ 1.9c Cash: $1,180,000 (Dec 31)
Issued Capital:
596.5M Ordinary Shares 38M Options
Substantial Shareholders:
FMR Investments 14.0% Mineral Resources Ltd 9.6%
DIRECTORS
MD & CEO: Sean Gregory Chairman: Gary Berrell Non-Exec: Jon Young Non-Exec: Grant Mooney
PROJECTS
Mt Thirsty Co-Ni (50%) Coolgardie Au (100%)
CONTACT DETAILS
www.barraresources.com.au [email protected]
Ground Floor, 6 Thelma St West Perth, WA 6005 T: (08) 9481 3911
-
Mt Thirsty now assumes the mantle of Australia’s most advanced genuine cobalt project with a completed Pre-Feasibility Study (PFS)
-
Nickel is a useful by-product with a cobalt-nickel value split of 71%-29%
-
• Hydrometallurgical process is at atmospheric pressure and 70-90ºC utilising sulphur dioxide (SO2) as the main reagent
-
Project scaled up to 1.8 Mdtpa feed rate
-
19.1kt of cobalt and 24.8kt of nickel as a Mixed Sulphide Product (MSP) will be produced over a 12 year mine life
-
Maiden JORC 2012 Probable Ore Reserve of 18.8 Mdt at 0.13% cobalt and 0.54% nickel estimated for the project
-
Additional 1.8Mdt (<10%) of Inferred Mineral Resources scheduled. There is a low level of confidence associated with inferred mineral resources and there is no certainty that further exploration will result in the determination of indicated mineral resources or that the production target itself will be realised.
-
Positive economics returned with a pre-tax NPV of A$44.4M (A$25.7M post-tax)
-
Capital Expenditure of A$371M including 10% indirects, 9% growth, 4% owner’s costs, and 10% contingency
-
All in Sustaining Costs of US$35,400/t contained cobalt
-
Cobalt price forecast to rise by all surveyed investment banks as demand for electric vehicle batteries continues to grow and other cobalt supply growth options limited
-
The Mt Thirsty Joint Venture (MTJV) has identified the highest value development path to be a farm-in from a large global firm, eager to secure a guaranteed sustainable source of cobalt
-
The direct project expenditure for the MTJV now reverts to a minimum while the partnering strategy is pursued as planned
-
The MTJV is now re-engaging with several major Australian and international mining, trading and refining firms who have all identified a high quality PFS as their minimum investment criteria
Barra’s Managing Director and CEO and MTJV PFS Manager Sean Gregory commented: “This study is the culmination of 18 months’ work by the MTJV. I am confident that the PFS has been completed to a very high standard by global engineering houses that will stand up to the most detailed scrutiny from potential project partners. We are now looking forward to engaging with these large global firms who are eager to secure a guaranteed sustainable source of cobalt for electric vehicle batteries.”
==> picture [126 x 82] intentionally omitted <==
==> picture [230 x 39] intentionally omitted <==
Mt Thirsty Cobalt Nickel Project Pre-Feasibility Study Executive Summary
February 2020 Mt Thirsty Joint Venture
Revision: 2 Date: 20/02/2020
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
CONTENTS
| CONTENTS | CONTENTS | CONTENTS |
|---|---|---|
| CONTENTS ....................................................................................................................................................... 2 | ||
| 1. | Introduction ............................................................................................................................................... 4 | |
| 2. | Tenure ........................................................................................................................................................ 4 | |
| 3. | Geology ..................................................................................................................................................... 6 | |
| 3.1 | Regional Geology .............................................................................................................................. 6 | |
| 3.2 | Exploration History ............................................................................................................................. 6 | |
| 3.3 | Deposit Geology ................................................................................................................................ 7 | |
| 3.4 | PFS Metallurgical Sample Drilling ..................................................................................................... 8 | |
| 4. | Mineral Resources.................................................................................................................................. 10 | |
| 4.1 | Density and Moisture Determination ............................................................................................... 10 | |
| 4.2 | Domaining ........................................................................................................................................ 10 | |
| 4.3 | Grade Estimation ............................................................................................................................. 10 | |
| 4.4 | Classification Criteria ....................................................................................................................... 10 | |
| 4.5 | Mineral Resource estimates ............................................................................................................ 11 | |
| 5. | Hydrogeology ......................................................................................................................................... 11 | |
| 6. | Metallurgy ................................................................................................................................................ 12 | |
| 6.1 | Mineralogy ....................................................................................................................................... 12 | |
| 6.2 | Test work ......................................................................................................................................... 12 | |
| 6.2.1 | Beneficiation ................................................................................................................................ 12 | |
| 6.2.2 | Leach Optimisation ...................................................................................................................... 13 | |
| 6.2.3 | Leach Variability........................................................................................................................... 13 | |
| 6.2.4 | Bulk Leaches ............................................................................................................................... 13 | |
| 6.2.5 | Limestone Characterisation ......................................................................................................... 14 | |
| 6.2.6 | Primary Neutralisation ................................................................................................................. 14 | |
| 6.2.7 | Continuous Counter-current Decantation (CCD) ......................................................................... 14 | |
| 6.2.8 | Secondary Neutralisation ............................................................................................................. 14 | |
| 6.2.9 | Mixed Sulphide Product (MSP) Precipitation ............................................................................... 14 | |
| 6.2.10 Future Testwork ....................................................................................................................... 15 |
||
| 6.3 | Metal Recovery Regressions ........................................................................................................... 15 | |
| 7. | Mining ...................................................................................................................................................... 17 | |
| 7.1 | Mining Method ................................................................................................................................. 17 | |
| 7.2 | Pit Designs ....................................................................................................................................... 17 | |
| 7.3 | Mine Schedule ................................................................................................................................. 20 | |
| 7.4 | Mining Equipment ............................................................................................................................ 23 | |
| 7.5 | Site Layout ....................................................................................................................................... 23 |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 2 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| 8. Ore Reserves .......................................................................................................................................... 25 |
|---|
| 8.1 Material Assumptions ...................................................................................................................... 25 |
| 8.2 Criteria for Classification .................................................................................................................. 25 |
| 8.3 Mining Method ................................................................................................................................. 25 |
| 8.4 Processing Method .......................................................................................................................... 25 |
| 8.5 Cut-Off Grades ................................................................................................................................ 26 |
| 8.6 Reserve Estimation Methodology .................................................................................................... 26 |
| 8.7 Material Modifying Factors ............................................................................................................... 26 |
| 8.8 Ore Reserve Statement ................................................................................................................... 26 |
| 9. Processing .............................................................................................................................................. 26 |
| 10. Infrastructure .......................................................................................................................................... 28 |
| 10.1 Regional Infrastructure .................................................................................................................... 28 |
| 10.2 Power and Steam ............................................................................................................................ 28 |
| 10.3 Water Infrastructure ......................................................................................................................... 29 |
| 10.4 Workforce Strategy, Accommodation and Flights ........................................................................... 29 |
| 10.5 Product Transport ............................................................................................................................ 29 |
| 11. Tailings .................................................................................................................................................... 30 |
| 12. Environment and Approvals ................................................................................................................. 31 |
| 13. Capital Cost Estimate ............................................................................................................................ 31 |
| 14. Operating Cost Estimate ....................................................................................................................... 32 |
| 15. Marketing ................................................................................................................................................. 34 |
| 16. Financial Analysis .................................................................................................................................. 36 |
| 17. Risk .......................................................................................................................................................... 37 |
| 18. Value Optimisation Opportunities ........................................................................................................ 38 |
| 18.1 Inclusion of a Manganese Product .................................................................................................. 38 |
| 18.2 Addition of a Cobalt Sulphate and Nickel Sulphate circuit .............................................................. 38 |
| 19. Next Steps ............................................................................................................................................... 38 |
| 20. Competent Persons’ Statement ............................................................................................................ 39 |
| 21. JORC Table 1 .......................................................................................................................................... 39 |
| 21.1 Section 1 Sampling Techniques and Data ...................................................................................... 39 |
| 21.2 Section 2 Reporting of Exploration Results ..................................................................................... 42 |
| 21.3 Section 3 Estimation and Reporting of Mineral Resources ............................................................. 44 |
| 21.4 Section 4 Estimation and Reporting of Ore Reserves ..................................................................... 47 |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 3 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
1. INTRODUCTION
The Mt Thirsty Co-Ni Project (Project) is located about 16 km NW of Norseman in the Eastern Goldfields of Western Australia (Figure 1). The Project is being developed by the Mt Thirsty Joint Venture (MTJV) which is an unincorporated 50/50 joint venture between ASX listed companies Barra Resources Limited and Conico Limited. There are two deposits on the tenements, Mt Thirsty Main and Mt Thirsty North.
==> picture [397 x 402] intentionally omitted <==
Figure 1 – Project Location
2. TENURE
The Project comprises four adjacent granted exploration tenements covering an area of approximately 1,768 hectares (~17.7km[2] ). All tenements are located on Unallocated Crown Land and wholly within the Ngadju Native Title Claim which was determined and registered in 2014. Tenement details are displayed in Table 1 below and their locations are shown in Figure 2.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 4 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
Table 1 - Mt Thirsty Project tenement details
| Tenement | Granted | Expiry | Area (ha) | Annual | Purpose |
|---|---|---|---|---|---|
| Commitment | |||||
| R63/04 | 1/07/2016 | 30/06/2019 | 571 | $0 | To be replaced by M(A)63/670 |
| E63/1267 | 28/04/2010 | 27/04/2020 |
582 | $50,000 | To be replaced by M(A)63/699 |
| E63/1790 | 23/02/2017 | 22/02/2022 |
582 | $15,000 | To be covered by G(A)63/9 |
| P63/2045 | 16/02/2017 | 15/02/2021 |
33 | $2,000 | To be covered by G(A)63/9 |
| L63/80 | 14/08/2019 | 13/08/2040 |
595 | Western palaeochannel water | |
| search | |||||
| L63/81 | 14/08/2019 | 13/08/2040 |
178 | Lake Cowan water search | |
| L(A)63/91 | 181 | Northern access route | |||
| L(A)63/92 | 331 | Southern access route | |||
| Total | 3,053 | $67,000 | * (A) = Application |
==> picture [303 x 334] intentionally omitted <==
Figure 2 - Mt Thirsty Cobalt-Nickel Project, tenement location map
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 5 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
3. GEOLOGY
3.1 Regional Geology
The Project is underlain by the Archaean Mt Kirk Formation which outcrops at the southern end of the Norseman-Wiluna greenstone belt (Figure 3). The Mt Kirk Formation comprises a metamorphosed sequence of sediments, peridotite, pyroxenite, gabbro and mafic-felsic volcanic rocks which are intruded by granite and pegmatite dykes on its western side and in faulted contact with the Woolyeenyer Formation on its eastern side. Drilling by the MTJV indicates the pegmatite dykes in the local area are relatively flat lying.
==> picture [393 x 292] intentionally omitted <==
Figure 3 - Location of Mt Thirsty tenements showing regional geology
3.2 Exploration History
The Mt Thirsty area was explored for nickel sulphide mineralisation in the late nineteen sixties and early seventies by Anaconda, Union Miniere and CRA. Although no significant nickel sulphide discoveries were made during that time, limonitic cobalt/nickel mineralisation was encountered but not followed up. In the 1990’s Resolute-Samantha discovered high grade cobalt-nickel mineralisation in the oxidised profile derived from intense weathering of the peridotite rocks.
The Mt Thirsty Cobalt-Nickel Deposit has been progressively delineated by a series of drilling campaigns from 1996-2018 including 696 Air Core (AC) holes, 14 Reverse Circulation (RC) holes, 21 Rotary Air Blast (RAB) holes, and 7 Sonic Core (SC) holes for a total of 31,827 m. Drill hole spacing at 50m x 40m on the eastern side and 50m x 80m on the western side of the Main deposit is sufficiently close for the style of mineralisation and to allow for a Mineral Resource Estimation (MRE).
In 2015 a small deposit of similar style to the Mt Thirsty Main Deposit was discovered approximately 3km to the north (Mt Thirsty North). This deposit was defined by 47 air core holes for 1,705 m on a 40m x 100m grid spacing.
AC and RC drill hole cuttings were collected using a cyclone and subsequently reduced in volume with a sampling tube (for some pre-2009 drilling), riffle or rotary splitter. The cyclone was cleaned between each three-metre rod and every metre for wet samples and riffle splitters were cleaned as required. Water injection
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 6 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
was kept to a minimum. Over 90% of the holes were sampled at regular 1m intervals. Half-core samples collected from SC drilling was also at regular 1m intervals.
All samples were crushed, pulverised, and analysed for Co, Ni, Mn, Zn, Mg, Al & Fe using a four-acid digestion technique and analysed using Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES) at Bureau Veritas’ Kalassay laboratory in Kalgoorlie, Western Australia. These procedures are appropriate for the elements and style of mineralisation and the analysis is considered total.
A comparison of the analytical results from twin, AC, RC and SC holes was completed. Differences are noted between the various drilling types and are most likely due to sample size and short-scale geological variability inherent in laterite deposits. The bulk of the drilling is AC which, based on population statistics, is slightly conservative compared to RC and SC drilling results.
The quality assurance data associated with the drilling also proved to be suitable for an MRE.
3.3 Deposit Geology
The Mt Thirsty Cobalt-Nickel Deposit has formed within intensely weathered ultramafic peridotite orthocumulate rocks overlain by a Tertiary laterite capping. The host peridotite is sandwiched between a sediment–ultramafic-basalt sequence to the west and a pyroxenite unit to the east. The pyroxenite unit is interpreted to form the base of the Mt Thirsty Sill.
Deep chemical weathering and supergene enrichment processes associated with high rainfall in the Tertiary period have produced a relatively flat lying supergene blanket style deposit within the weathered profile beneath a ferruginous laterite cap. The laterite cap is up to 15m thick but has been partly or completely eroded on the eastern side of the deposit forming several half mesas with steep slopes on their eastern sides and gentle slopes to the west. Oxidation of the peridotite extends down to almost 100m below surface in some places where weathering processes have been focused down fractures.
The deposit is enriched in cobalt, nickel and manganese. The manganese and cobalt contents are particularly high compared to most nickel laterite deposits located in Western Australia. Most of the cobalt and some of the nickel is contained in the secondary manganese oxide mineral asbolane. Most of the nickel however is contained in goethite and some also occurs in silicate minerals in the lower saprolite horizon.
==> picture [452 x 262] intentionally omitted <==
Figure 4 - Cross Sections through the Mt Thirsty Cobalt-Nickel Deposit showing weathering profile and outlines of cobalt and nickel mineralisation
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 7 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
3.4 PFS Metallurgical Sample Drilling
Two drilling programs (Figure 5) were carried out to source metallurgical samples for use in the PFS. A sixhole RC program (MTRC036 to 041) was completed in November 2016 and a further three AC holes (MTAC 798, 799 & 801) were drilled in August 2018.
Test work during the Scoping Study was completed on a Master Composite made up from the 2016 RC drill samples (Figure 5, Table 2). The Master Composite comprised a blend of approximately half upper saprolite domain (upper) and half lower saprolite domain (lower) at cobalt and nickel grades representative of the most important early years of the mine plan.
Over the entire Mineral Resource, the upper domain accounts for 13% and the lower domain accounts for 87% of the available tonnes. As part of this PFS, composites for the upper and lower domains at grades representative of the early years in the mine plan were also blended from the same RC samples from 2016.
Additionally, the three AC drill holes drilled in August 2018 to collect fresh samples for beneficiation test work (Table 2) were also blended into upper and lower composites, although at cobalt and nickel grades representative of the overall Mineral Resource averages for those domains.
==> picture [304 x 341] intentionally omitted <==
Figure 5 - Location of holes drilled for 2016 (RC, green) and 2018 (AC, red) metallurgical samples (grid AGD84, Z51)
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 8 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
Table 2 - Drill holes used in the sample composites. All holes are vertical. Grid AGD84 Zone 51.
| Hole ID | Date Drilled | Easting | Northing | RL (m) |
Depth (m) |
Composite Intervals (m) |
|---|---|---|---|---|---|---|
| MTRC036 | 20/11/2016 | 372162 | 6447455 | 378 | 54 | 18-42 |
| MTRC037 | 19/11/2016 | 372244 | 6447455 | 376 | 30 | 13-30 |
| MTRC038 | 19/11/2016 | 372349 | 6447457 | 369 | 35 | 14-28 |
| MTRC039 | 20/11/2016 | 371956 | 6447000 | 382 | 40 | 14-34 |
| MTRC040 | 20/11/2016 | 372115 | 6447001 | 393 | 40 | 30-36 |
| MTRC041 | 20/11/2016 | 372295 | 6446999 | 381 | 35 | 23-32 |
| MTAC798 | 14/08/18 | 372300 | 6447251 | 377 | 30 | 3-5 |
| 8-10 | ||||||
| 16-26 | ||||||
| MTAC799 | 14/08/18 | 372121 | 6446846 | 392 | 60 | 35-48 |
| 54-56 | ||||||
| MTAC801 | 14/08/18 | 371754 | 6447056 | 375 | 35 | 23-34 |
==> picture [481 x 361] intentionally omitted <==
Figure 6 - Sample collection at Mt Thirsty, August 2018
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 9 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
4. MINERAL RESOURCES
4.1 Density and Moisture Determination
Representative core sticks were collected from 2008 Sonic Core (SC) drilling. SC is a relatively expensive method that is considered to be best practice for representative sampling without core losses for deposits like Mt Thirsty. In 2008, the core sticks were measured for wet density as presented (i.e. including in-situ moisture).
In 2018, the MTJV recovered 156 of these core sticks from storage and had them remeasured for dry density. After excluding outliers, 142 samples were analysed in detail. The difference between wet density and dry density is the in-situ moisture. Average densities and moisture contents were applied to each domain in the Mineral Resource independently.
4.2 Domaining
MTJV geologists manually interpreted a surface to define the upper- and lower- saprolite domains in 2018, however further sub-domaining was not possible from visual inspection of the cross sections. Golder Associates Pty Ltd (Golder) have been able to automatically group data into like domains using a multi-element statistical technique called K-means Clustering followed by wireframing into 3D shapes using Leapfrog software to produce a geological domain model. The two dominant domains which account for 99% of the resource (manganese enriched Goethitic Saprolite and Nontronite Saprolite) agree very closely with the upperand lower-saprolite domains that were manually interpreted and formed the basis for selecting samples for metallurgical testing.
4.3 Grade Estimation
Grade estimates by ordinary kriging were constrained in each of these domains and the high-grade samples were constrained to only influence local blocks.
The 2019 resource model contains some smoothing (averaging) across ore-waste boundaries. By comparing to the 2011 model it can be quantified as approximately 10% dilution. Golder have advised that this is reasonable for the style of deposit and proposed mining methods. When using the 2019 model for mining studies, Golder have recommended not applying any further dilution other than that which might be caused when aggregating blocks to various mining bench heights.
4.4 Classification Criteria
The classification of the Mineral Resource is more sophisticated than drill hole spacing alone, which in this case is considered adequate for both Indicated and Inferred Mineral Resources. In the case of the Mt Thirsty Mineral Resource, it is the improved confidence in the quality of the data on two fronts that has allowed the classification to be improved,
Firstly, the statistical comparison of different drilling methods confirmed their suitability for use in an Indicated Mineral Resource. As such, no additional drilling was specifically completed to facilitate the upgrade from the previous JORC 2004 Inferred and Indicated Mineral Resource to the current JORC 2012 Mineral Resource which is now mostly (90%) classified as Indicated.
Secondly, the knowledge of direct physical measurements of wet densities, dry densities and in-situ moisture contents for a large number of samples across all geological domains is a key determinant in achieving higher levels of confidence and therefore the higher resource categories in the application of the JORC code. The Indicated portion of the Mineral Resource is in the core of the Mt Thirsty Main deposit. Around the margins of the deposit, a buffer has been assumed such that 10% of the Mineral Resource is Inferred, consistent with the lower confidence in these areas. An area in the south east of the deposit where RAB drilling is prominent has also been classified as Inferred due to the lower confidence associated with this drilling and sampling method.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 10 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
4.5 Mineral Resource estimates
Table 3 - 2019 Mineral Resource estimates (all grades reported on a dry basis)
| Mineral Resource | Cut- off (Co%) |
Wet Tonnes (Mt) |
Moisture (% wet t) |
Dry Tonnes (Mt) |
Co (%) |
Ni (%) |
Mn (%) |
Fe (%) |
|---|---|---|---|---|---|---|---|---|
| Mt Thirsty Main Indicated | 0.06 | 31.2 | 27% | 22.8 | 0.121 | 0.53 |
0.79 |
21.3 |
| Mt Thirsty Main Inferred | 0.06 | 3.5 | 27% | 2.5 | 0.103 | 0.45 |
0.66 |
19.1 |
| Mt Thirsty Main Sub Total |
0.06 | 34.7 | 27% | 25.4 | 0.119 | 0.52 |
0.77 |
21.1 |
| Mt Thirsty North Inferred | 0.06 | 2.0 | 27% | 1.5 | 0.092 | 0.55 |
0.48 |
19.4 |
| Total | 0.06 | 36.7 | 27% | 26.9 | 0.117 | 0.52 |
0.76 |
20.9 |
Refer to ASX Announcement 9/9/2019 for full details of the Mineral Resource.
The Mineral Resource is reported above 0.06% cobalt (Table 3). This cut-off is consistent with previous Mineral Resource estimates and the 2017 Scoping Study. The cut-off grade has been confirmed by the Ore Reserve declared as part of this PFS. It is assumed that all cobalt and nickel mineralisation above this cobalt grade will have reasonable prospects for eventual economic extraction.
5. HYDROGEOLOGY
The MTJV engaged Golder to undertake a hydrogeological desktop study to determine likely groundwater sources capable of supplying the required process water to the Project. The study highlighted three target areas for drill testing.
Most groundwater in the area is expected to be saline to hypersaline except for small supplies in a few locations yet to be demonstrated. Golder estimate the water could be anywhere between 2 times and 10 times seawater. Scoping Study test work identified that the saline water is helpful in settling the ore. All PFS metallurgical test work has been conducted with synthetic water made up to 4 times seawater with sodium chloride salt.
The two main groundwater supply targets outlined by the study are the trunk palaeochannel aquifers inferred to exist beneath Lake Cowan 15km to the south-east and in a salt lake area 30-40 km to the north-west of the Project.
The third groundwater supply target are weathered and fractured bedrock deposits located within the Project area along an identified photo-lineament and includes at least one of the high ground water flow drill sites previously identified during MTJV mineral exploration drilling. This target may yield smaller quantities of higher quality water.
The PFS has assumed a water supply of 1.8 GLpa of hyper saline (4 times seawater) from the paleochannel aquifers for process water supplemented by 0.2 GLpa of saline water (1 times seawater) to be treated by reverse osmosis for the potable and demineralised water requirements for the Project.
A $170,000 investigative drilling program has been prepared with program of work approvals in place. This will form a key part of future studies on the Project.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 11 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
6. METALLURGY
6.1 Mineralogy
QEMSCAN, XRD analysis, Electron Microprobe, SEM Analysis, and photomicrographs have all been completed on the Mt Thirsty Ore.
One specific observation from the QEMSCAN analysis that is relevant to the leaching optimisation is that 62% of the cobalt is present in the manganese mineral (asbolane) which is readily leached with SO2 (Figure 7 - QEMSCAN elemental deportment for Cobalt and Nickel). The remainder of the cobalt and most of the nickel is in the harder to leach iron oxide mineral (goethite). Lower nickel extractions are explained by 44% of the nickel being in the silicate mineral (chlorite) which is not leached by the methods studied. Two separate reactions are used to target the asbolane and the goethite. The Scoping Study results align with successfully leaching the asbolane and only a small proportion of the goethite. This knowledge of two separate reactions enabled the PFS to:
-
Leach the asbolane as rapidly and efficiently as possible; and
-
Target the secondary nickel and cobalt mineralisation in goethite with minimal iron dissolution.
==> picture [100 x 259] intentionally omitted <==
==> picture [97 x 259] intentionally omitted <==
==> picture [264 x 119] intentionally omitted <==
Figure 7 - QEMSCAN elemental deportment for Cobalt and Nickel
6.2 Test work
6.2.1 Beneficiation
Beneficiation was evaluated as it had the potential to reduce the capital costs by allowing the size of the hydrometallurgical circuit to be reduced to account for the lower volume of leach feed and the higher percentage solids that can be pumped with a coarser beneficiated leach feed. The beneficiation concentrate was also expected to be richer in the target asbolane mineral that hosts the leachable cobalt. The beneficiation tail was also expected to contain more cobalt in fines, dominantly goethite, which is less easily leached.
The beneficiation testing successfully concentrated the asbolane mineral into the coarse fraction with approximately half of the feed mass recovered to concentrate. Cobalt grades variably increased to as high as 0.33% in the concentrate with nickel in concentrate reducing slightly below feed grades which is consistent
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 12 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
with the understanding of the mineralogy that has the cobalt concentrated in the asbolane and the nickel dispersed though the fines, especially in the goethite.
The beneficiation concentrates exhibited improved leach extraction of the cobalt to that of the Master Composite representing the first five years of production (refer Section 3.4) and other lower domain composites. Beneficiation did not improve the leaching extraction of cobalt for the upper domain. Nickel leach extractions were significantly higher for the beneficiation concentrates compared to the whole of ore leaches.
When the overall recovery for beneficiation and leaching are considered, the beneficiation case delivers significantly lower overall recoveries when compared to whole of ore leaching.
Economic modelling of the two options was completed internally by the MTJV.
It was concluded that in all cases the whole of ore leach case delivered higher relative financial returns. Even running sensitives on possible best-case beneficiation recoveries and leaching performance could not achieve materially higher NPVs than the whole of ore leach.
As well as the relative financial performance of the two options, the MTJV also considered other non-financial criteria around the risk of selecting the beneficiation option.
The MTJV therefore confidently selected the whole of ore leach case for the front-end go-forward flowsheet for the Project.
6.2.2 Leach Optimisation
The recognition of two key leaching reactions in the SO2 and O2 leach has been instrumental in achieving higher extractions compared to those achieved in the 2017 Scoping Study. The first reaction is a reductive leach targeting the cobalt and nickel in the asbolane mineral. The second reaction is an acidic leach targeting the nickel and cobalt in the goethite mineral.
The acidic leach conditions have been achieved without the need for the addition of expensive supplemental acid. A by-product of the first reaction is the leaching of manganese, which is rejected in the downstream mixed cobalt-nickel sulphide precipitation. For the second reaction, iron is leached as a by-product, which does create a cost to remove this in the downstream process. Some earlier tests did achieve higher nickel extractions of up to 37% but there was a significant penalty of increased iron in solution which requires removal. Consequently, the bulk leaches have targeted the optimum economic balance between cobalt and nickel extraction extent balanced against operating costs associated with iron leaching and then subsequent removal.
6.2.3 Leach Variability
Seventeen variability leach tests were conducted early during the PFS.
Initial variability leaches were conducted as SO2 leaches open to air in the top of the leach vessel prior to the discovery of the importance of accurate control of SO2 and oxygen concentrations and the differentiation of the initial fast reductive leach for the asbolane followed by the slower oxidative/acidic leach of the goethite. As such the initial leach tests underestimated the achievable cobalt extractions.
The variability leaches typically ran past the economic optimum iron extraction point of about 5 g/L. Additional iron leached beyond this point requires downstream oxidation and precipitation with limestone. As such they overestimated the practicably achievable nickel extractions.
Adjustments were therefore applied as discussed under Metal Recovery Regressions below.
6.2.4 Bulk Leaches
Seven bulk leaches (approximately 20kg of dry sample at 40% solids; i.e. 50kg wet) have been completed. The bulk leaches are in addition to the 17 variability leaches, 24 optimisation leaches, 8 beneficiation leaches completed during the PFS, and 15 SO2 leaches in the scoping study, bringing the total number of SO2 leaches completed to 71, giving confidence in the final leaching method proposed for the study.
The bulk leach results are shown in Table 4 below.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 13 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
Table 4 - Bulk Leach Results
| Bulk Leach |
Test ID |
Co extraction (%) |
Ni extraction (%) |
Fe in sol’n (g/l) |
|---|---|---|---|---|
| 1 | HY7334 | 85.43 | 30.45 | 11.7 |
| 2 | HY7460 | 82.52 | 27.38 | 1.3 |
| 3 | HY7556 | 83.36 | 26.57 | 2.2 |
| 4 | HY8147 | 83.74 | 36.85 | 13.0 |
| 5 | HY8190 | 85.78 | 35.30 | 8.1 |
| 6 | HY8189 (lower grade) |
68.61 | 20.46 | 3.0 |
| 7 | HY8369 | 85.35 | 30.05 | 7.4 |
Bulk Leaches 1-4 and 6 were completed on the Master Composite (0.18% Co) derived from 2016 RC drilling using pure SO2 and O2 gas, to allow the conditions to be accurately optimised.
Bulk Leaches 5 and 7 were conducted on the Master Composite (0.18% Co) using dilute SO2 gas as intended to be used in Mt Thirsty operations. They delivered the highest cobalt and nickel extractions for a given iron extraction to date.
Bulk Leach 6 was on a lower grade composite (0.12% Co) derived from 2018 AC drilling that performed as expected (using pure SO2 and O2 gas) based on the variability leaches as plotted on Figure 8.
6.2.5 Limestone Characterisation
Limestone samples from Triple M Transport’s Esperance limestone quarry were analysed for chemistry and neutralisation capacity. The samples were then used in the neutralisation tests.
6.2.6 Primary Neutralisation
Primary neutralisation (PN) tests were completed on the slurries from the first three bulk leach tests. These results showed that iron (III), aluminium, and silicon can be precipitated at this stage of the process with minimal losses in payable metals.
6.2.7 Continuous Counter-current Decantation (CCD)
Due to the bench-scale nature of the test work no CCD testing was performed. To prepare a suitable solution for downstream testing, PN slurry from bulk leach three was subjected to solids filtration, washing and solution dilution to simulate CCD washing with a 98% recovery of cobalt and nickel.
A sample of PN slurry was used for vendor thickening testwork to establish flocculant addition rates and achievable underflow densities.
Assumed losses in the CCD will remain at 2% for both payable metals, as per the 2017 scoping study. The CCD loss estimate can only be refined with continuous piloting, which will be part of forward work plan post PFS.
6.2.8 Secondary Neutralisation
Secondary neutralisation was also completed with minimal co-precipitation of cobalt and nickel. This stream is recycled to the leach for dissolution of payable metals, with any net loss included as part of the 2% CCD losses. As with the CCD, piloting testwork will refine these preliminary results.
6.2.9 Mixed Sulphide Product (MSP) Precipitation
Five sighter tests were completed on one litre solutions at 70°C. Sodium hydrosulfide (NaHS) addition was set at 107-125% of the stoichiometric requirement and sodium hydroxide (NaOH) addition was used to control pH
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 14 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
to a setpoint. The pH was increased gradually from 3.2 in the first test to 3.8 in the fifth test. Cobalt precipitation increased from 75.7% to 94.5% and nickel precipitation increased from 91.7% to 99.4% from the first to the fifth sighter test.
A bulk MSP test was then run using a 15-litre sample from the secondary neutralisation test with conditions of 70°C and pH 3.8. NaHS was added in excess at 164% of the stoichiometric requirement to ensure the target precipitation was achieved. Both cobalt and nickel precipitation exceeded 99.8%, demonstrating that minimal losses are achievable in mixed sulphide precipitation.
This is an improvement on previous assumptions for nickel losses during mixed sulphide precipitation, which have been revised downwards for the previously assumed 2% to the now demonstrated 1%.
Cobalt losses during mixed sulphide precipitation will remain as previously assumed at 2%.
6.2.10 Future Testwork
A future testwork program will be required to provide data for the plant and tailings facility design and reduce uncertainty around reagent consumptions and plant performance. Some key items are:
-
Comminution testwork for ore feed and limestone grinding circuit requirements;
-
Leach tests to optimise SO2 and O2 requirements for various feed compositions, opportunity to reduce operating costs further;
-
Integrated pilot plant to demonstrate flowsheet performance, optimise MSP and manganese circuit conditions, and provide vendor samples for thickener and filtration testwork;
-
Neutralised tailings production for tailings storage facility testwork.
6.3 Metal Recovery Regressions
Detailed multi-variate statistical analysis of the variability leaches considered correlations between metal extraction and feed grade. This was considered by geological domain and in a multi-element setting. However, it was determined that more complicated methods did not significantly improve correlations. It was concluded that the most diagnostic variable of leach extraction for both nickel and cobalt was the natural logarithm of cobalt feed grade. For cobalt and nickel, the regression has a correlation coefficient (r[2] ) of 78% (Figure 9). A very high extraction outlier was removed from the nickel dataset improving the correlation coefficient to 88%.
The PFS regressions are adjusted to match Bulk Leach 7 which while it wasn’t the highest extraction achieved, it did represent the culmination of the PFS test work program, including the optimisation of SO2/O2 concentrations through the leach and is a realistic representation of what is thought to be achievable in a production environment. The cobalt extraction in Bulk Leach 7 was 7% higher than that predicted by the regression of the variability leach dataset. A positive 7% adjustment was therefore added to the regression for cobalt.
Similarly, the variability leaches for nickel extractions were also adjusted. Bulk Leach 7 stopped at the optimum iron extraction level, at which point there was lower nickel extraction than predicted by the variability regression. As such, the nickel extraction regressions were adjusted by negative 9%.
Checks were also applied so that no extraction could fall outside of a range of 0 to 100% for cobalt or 0 to 53% for nickel, being the maximum result achieved in the test work.
Finally, adjustments to the extraction regressions were made to get to the final recoveries after downstream losses. CCD losses are assumed as 2% for both cobalt and nickel and MSP losses are 2% for cobalt and 1% for nickel.
The metal recovery regressions are applied on a block-by-block basis within the mine planning software. The average cobalt and nickel recoveries over the life of mine are 74.3% and 22.3% respectively.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 15 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
==> picture [409 x 314] intentionally omitted <==
Figure 8 - Cobalt Recovery Regression
==> picture [411 x 310] intentionally omitted <==
Figure 9 – Nickel Recovery Regression
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 16 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
7. MINING
Snowden Mining Industry Consultants Pty Ltd (Snowden) completed the mine planning for the Mt Thirsty Cobalt Nickel PFS, under the supervision of Mr Frank Blanchfield, Competent Person for the Ore Reserve.
7.1 Mining Method
The mining method is considered as conventional load and haul using off road trucks and excavators with significant free dig areas to the saprock. Pits up to 90 m deep may be possible depending on economic ore extraction. Pits were designed with an overall slope of 35 degrees and batters will vary between 30 and 55 degrees with berms at least every 10m. The ore will be mined in 5 x 2m flitches plus heave to accommodate selective mining and minimise ore dilution. Waste can be mined on benches up to 10m high.
Moisture contents within the saprolite are approximately 26% to 30%, hence the in-situ material is probably close to 100% saturation. This is likely to result in piezometric pressures within the horizon that may influence pit slope stability. However, the permeability of the material is likely to be very low, therefore it is anticipated that flows from the material into any bore or excavation will be negligible.
Drill and blast in the upper laterite layer outside the ore will utilise conventional drill rigs supplied by a mining service contractor.
7.2 Pit Designs
Snowden completed pit optimisation for both deposits (Mt Thirsty Main and Mt Thirsty North) using Whittle 4X software. A list of the parameters used is provided in Table 5.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 17 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
Table 5 - Pit optimisation parameters
| Parameter | Value | Comments |
|---|---|---|
| Modifying Factors | ||
| Considered to be included in | ||
| Dilution | 0% | resource model with large blocks |
| (10 mE x 25 mN x 2 mRL). | ||
| Ore loss | 2% | Nominal allocation. |
| Overall slope angles | 30° (25° near lease boundary) |
Geotechnical assumptions and WA regulations for abandonment bunds. |
| Based on test work, downstream | ||
| Process recovery – cobalt | As illustrated in Figure 8 | losses and scale-up factors |
| provided by Wood | ||
| Based on test work, downstream | ||
| Process recovery – nickel | As illustrated in Figure 9 | losses and scale-up factors |
| provided by Wood | ||
| Payability – cobalt | 80% | Marketing report by NC Chem |
| Payability – nickel | 85% | Marketing report by NC Chem |
| COSTS | ||
| Mining cost | $4.96/t rock* | Based on mining contractor quotation. |
| Fixed Component and Variable | ||
| Processing / administration | by Mn grade and payable metal | Estimate provided by Wood |
| in product | ||
| Royalty – Ni / Co | 5.32% of payable metal value | Incorporates state royalty, native title and Coastrange royalties |
| Commodity Prices | ||
| Cobalt | US$61,000/t | Marketing report by NC Chem |
| Nickel | US$16,500/t* | Marketing report by NC Chem |
| Exchange rate | 0.67 AUD/USD | Marketing report by NC Chem |
*Mining Cost averaged $4.76/dmt once scheduled in detail and Nickel price revised upwards to US$17,850/t in financial model based on marketing advice.
Pits were designed based on the revenue factor ‘1’ pit shells for both Mt Thirsty Main and Mt Thirsty North. Mt Thirsty Main was designed in 14 stages, with Mt Thirsty North having a single stage.
Trafficking will not be an issue on saprock benches; however, haul roads and ramps on wet saprolite will need sheeting with competent sub-base material. This could be laterite material from the hard cap.
The Mt Thirsty Main pit is split into stages. Figure 10 shows the stage numbering for the main pit. Mt Thirsty North consists of a single stage.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 18 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
==> picture [483 x 567] intentionally omitted <==
Figure 10 - Mt Thirsty Main Pit Stages
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 19 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
7.3 Mine Schedule
The physicals used in the schedule are shown in Table 6.
Table 6 - Life of mine plan physicals
| Classification | Mass (Mt) | Co (%) | Ni (%) | Mn (%) | ||||
|---|---|---|---|---|---|---|---|---|
| Mt Thirsty | ||||||||
| Probable Ore Reserve | 18.8 | 0.126 | 0.54 | 0.80 | ||||
| Inferred Resources | 1.0 | 0.128 | 0.52 | 0.87 | ||||
| Inferred % | 5 | |||||||
| Waste | 46.5 | Strip ratio = 2.4 | w:o | |||||
| Mt Thirsty North | ||||||||
| Inferred Resources | 0.8 | 0.094 | 0.53 | 0.47 | ||||
| Inferred % | 100 | |||||||
| Waste | 2.0 | Strip ratio = 2.5 | w:o | |||||
| Project Total | ||||||||
| Probable Ore Reserve | 18.8 | 0.126 | 0.54 | 0.80 | ||||
| Inferred Resources | 1.8 | 0.112 | 0.53 | 0.69 | ||||
| Inferred % | 9 | |||||||
| Waste | Strip ratio = 2.4 | w:o |
A portion of the Production Target uses Inferred Mineral Resources and there is a low level of confidence associated with the Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the Production Target itself will be realised.
Quarterly scheduling was completed for the life of mine in Snowden’s Evaluator schedule optimisation software. The schedule used 2 m vertical mining increments in the 15 design stages. Focus was placed on maximising revenue as early as possible by targeting the highest grades areas of the deposit. Constraints were placed on ore process throughput of 1.8 Mtpa with a limit to the Mn grade of 1.3%. A one-year ramp-up profile was applied.
Figure 11 demonstrates that the majority of the Inferred Resources are processed at the end of the mine life. The schedule is able to maximise grade in early periods, which accompanies higher recoveries during this time (Figure 12). The total mining rate of 8 Mtpa (dry) is required for the first five years of production, including a one-year pre-production period.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 20 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
==> picture [503 x 258] intentionally omitted <==
Figure 11 - Process throughput schedule by resource classification
==> picture [503 x 257] intentionally omitted <==
Figure 12 - Process input grade and overall recovery schedule
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 21 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
==> picture [503 x 258] intentionally omitted <==
Figure 13 - Total mining movement schedule
An annual summary of the mine schedule is provided in Table 7.
Table 7 - Life of mine schedule summary
| Year | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Item | Total | -1 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| Total waste (kt) |
48,612 |
7,325 | 5,908 | 5,770 | 5,452 | 4,855 | 4,388 | 3,556 | 3,717 | 3,142 | 2,264 | 1,972 | 264 | - |
| Total ore (kt) |
20,627 | 125 | 1,992 | 2,230 | 2,434 | 2,738 | 2,564 | 2,091 | 1,561 | 1,842 | 1,375 | 891 | 784 | - |
| Mined cobalt (%) |
0.12 | 0.21 | 0.18 | 0.15 | 0.13 | 0.12 | 0.12 | 0.12 | 0.11 | 0.10 | 0.10 | 0.10 | 0.10 | - |
| Mined nickel(%) |
0.54 | 0.52 | 0.55 | 0.60 | 0.57 | 0.54 | 0.53 | 0.52 | 0.52 | 0.53 | 0.50 | 0.50 | 0.54 | - |
| Mined | ||||||||||||||
| manganese | 0.79 |
1.46 | 1.26 | 1.04 | 0.90 | 0.80 | 0.75 | 0.61 | 0.68 | 0.58 | 0.57 | 0.51 | 0.46 | - |
| (%) | ||||||||||||||
| Stripratio | 2.4 | 58.4 | 3.0 | 2.6 | 2.2 | 1.8 | 1.7 | 1.7 | 2.4 | 1.7 | 1.6 | 2.2 | 0.3 | - |
| Stockpile size (kt) |
125 | 587 | 1,017 | 1,651 | 2,589 | 3,353 | 3,644 | 3,405 | 3,448 | 3,022 | 2,113 | 1,097 | 33 | |
| Processed (kt) |
20,594 |
- | 1,530 | 1,800 | 1,800 | 1,800 | 1,800 | 1,800 | 1,800 | 1,800 | 1,800 | 1,800 | 1,800 | 1,064 |
| Processed cobalt (%) |
0.12 |
- | 0.20 | 0.19 | 0.15 | 0.14 | 0.14 | 0.12 | 0.10 | 0.10 | 0.09 | 0.09 | 0.09 | 0.08 |
| Processed nickel (%) |
0.54 |
- | 0.55 | 0.61 | 0.58 | 0.55 | 0.56 | 0.53 | 0.55 | 0.54 | 0.51 | 0.50 | 0.52 | 0.48 |
| Processed | ||||||||||||||
| manganese | 0.79 |
- | 1.28 | 1.30 | 1.08 | 0.93 | 0.84 | 0.64 | 0.66 | 0.58 | 0.56 | 0.53 | 0.52 | 0.57 |
| (%) | ||||||||||||||
| Inferred | ||||||||||||||
| feed proportion |
9% | - | 5% | 4% | 5% | 6% | 5% | 0% | 2% | 8% | 4% | 10% | 37% | 21% |
| (%) | ||||||||||||||
| Cobalt | ||||||||||||||
| recovered | 19,007 | - | 2,345 | 2,843 | 2,135 | 1,911 | 1,884 | 1,636 | 1,271 | 1,296 | 1,114 | 1,051 | 1,021 | 501 |
| (kt) |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 22 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| Year | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Item | Total | -1 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| Nickel | ||||||||||||||
| recovered | 24,845 | - | 2,249 | 3,154 | 2,689 | 2,397 | 2,466 | 2,179 | 1,930 | 1,911 | 1,695 | 1,668 | 1,691 | 816 |
| (kt) | ||||||||||||||
| Cobalt | ||||||||||||||
| recovery | 74 | - | 78 | 84 | 79 | 77 | 76 | 74 | 69 | 70 | 67 | 65 | 65 | 61 |
| (%) | ||||||||||||||
| Nickel | ||||||||||||||
| recovery | 22 | - | 27 | 29 | 26 | 24 | 25 | 23 | 20 | 20 | 19 | 18 | 18 | 16 |
| (%) |
7.4 Mining Equipment
Open pit excavations and site construction work will be carried out by contractors. It is envisaged that the mining contractor will operate and maintain equipment under a schedule of rates style contract.
MACA Ltd and Hamptons Transport Pty Ltd both costed the Mt Thirsty Project Mine Plan.
The peak equipment list selected by MACA was as follows:
-
3 Leibherr 9200 200t excavators
-
1 Komatsu PC1250 120t excavator
-
18 Komatsu HD1500 150t trucks
-
4 Komatsu HD785 90t trucks
-
1 Komatsu WA600 Front End Loader
-
3 Caterpillar 16M Graders
-
3 Caterpillar D10 Dozers
-
3 Komatsu HD785 90t water trucks
-
2 Scania Service Trucks
-
3 Atlas Copco D65 Drills
7.5 Site Layout
Figure 14 shows the overall site mining layout.
The ROM, low-grade stockpile and waste dumps are placed to the west of the deposit. There is some opportunity to place waste in-pit later in the mine life to reduce haulage costs, and some waste is allocated to the construction of the TSF.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 23 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
==> picture [381 x 508] intentionally omitted <==
Figure 14 - Site Layout
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 24 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
8. ORE RESERVES
The below information is provided as a summary of information required for ASX Listing Rule 5.9.1.
8.1 Material Assumptions
The material economic assumptions in the PFS are as shown in Table 8 below:
Table 8 - Material economic assumptions for the Ore Reserve and PFS
| Input | Assumption |
|---|---|
| Cobalt Price | US$61,000/t |
| Nickel Price | US$17,850/t |
| Cobalt Payable | 80% |
| Nickel Payable | 85% |
| Forex (AUD:USD) | 0.67 |
| Royalties (WA State Government, previous tenement vendor, and | 5.32% |
| Native Title (yet to be finalised)) | |
| Discount Rate (Pre-Tax Real) | 8% |
| Australian Corporate Tax Rate | 30% |
8.2 Criteria for Classification
Ore Reserves have been classified as Probable Ore Reserves based on the input Indicated Mineral Resources that produced a positive NPV result when scheduled and costed in detail with all modifying factors taken into account.
The Ore Reserve was calculated using a schedule that considered only the Indicated Mineral Resources and assigned zero value to the Inferred Mineral Resources. This schedule still delivered a positive NPV. The PFS is based on a schedule that also includes Inferred Mineral Resources that are restricted to a maximum of 10% for any quarterly period in the first 10 years of operations.
8.3 Mining Method
The mining method will be by conventional open pit methods on 10m benches. Laterite (approximately 13% of mined rock) will be drilled and blasted. All other rock is expected to be free dig. The ore will be dug on 2m flitches and no blasting is necessary in the ore. No dilution was added as the resource model was considered pre-diluted. Ore loss was assumed at 2%.
8.4 Processing Method
The ore feed will pass through a static grizzly into a mineral sizer, prior to wet scrubbing in an open circuit SAG mill and then closed circuit grinding in a ball mill to meet a -53um leach feed specification. The ball mill cyclone overflow is thickened to 40% solids (in hypersaline process water) and leached at 70-90ºC at atmospheric pressure using SO2 and air. Sulphur will be imported and burnt in air to make sulphur dioxide that will be diluted with compressed air and sparged into the leach tanks at varying concentrations. The leached slurry will be primary neutralised with limestone and treated by counter current decantation before secondary neutralisation using limestone. The cobalt and nickel in the neutralised solution is recovered by mixed sulphide precipitation using NaHS and NaOH prior to filtering and product bagging. Manganese precipitation using sulphur dioxide and tailings neutralisation with limestone and lime complete the process.
Recovery factors for cobalt and nickel vary by cobalt head grade and the regressions are shown in Figure 8
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 25 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
and Figure 9.
8.5 Cut-Off Grades
The cut-off grade is determined on a block-by-block basis by Snowden’s scheduling software after application of all revenue and cost assumptions, including reagent consumption that varies by manganese grade. It is approximately aligned with the nominal 0.06% cobalt cut-off used in the Mineral Resource Estimate.
8.6 Reserve Estimation Methodology
Ore Reserves, in accordance with JORC (2012) were estimated by reporting the Indicated Resource blocks within the pit designs that return a positive margin after comparing the revenue per block with the combined processing, admin and royalty costs. This varies depending on the Co, Ni and Mn grades. As Mt Thirsty North is entirely Inferred Resources it is not included in the Ore Reserve estimate. A total Probable Ore Reserve of 18.8 Mdt grading 0.126% Co, 0.54% Ni and 0.80% Mn is reported (Table 9). Full details of the Modifying Factors are reported in JORC Table 1. Although the financial model reported for this study included Inferred Resources, Snowden completed checks to ensure that the Project would provide a positive post-tax NPV with only Ore Reserves contributing to revenue.
8.7 Material Modifying Factors
There are not expected to be any impediments to finalising the land access and approvals for the Project. The tenements are in good standing and mining leases and miscellaneous licences have been applied for. The Project sits within the determined Ngadju Native Title claim and negotiations with the traditional Owners are well advanced.
Environmental Surveys have been completed with no rare plants or animals identified. The approvals pathway for the Project has been identified and will be managed by the WA mines department (DMIRS).
The Modifying factors that were used in the pit optimisation were also used for Ore Reserve estimate.
8.8 Ore Reserve Statement
The PFS now enables the Maiden JORC 2012 Probable Ore Reserve to be estimated for the Project as shown in Table 9 below:
Table 9 - Mt Thirsty Ore Reserve estimate
| Mineral | Cut-off | Wet | Moisture | Dry | Co | Ni | Mn | Fe |
|---|---|---|---|---|---|---|---|---|
| Resource | (Co%) | Tonnes | (% wet t) | Tonnes | (%) | (%) | (%) | (%) |
| (Mwt) | (Mdt) | |||||||
| Mt Thirsty Probable |
Approx. 0.07% Co (Variable) |
25.9 | 27% | 18.8 | 0.126 | 0.54 | 0.80 | 21.6 |
9. PROCESSING
The flowsheet for the PFS is ostensibly unchanged from that proposed during the scoping study other than being increased in scale from 1.5 Mdtpa to 1.8 Mdtpa (dry) feed rate or 2.3Mwtpa (wet) to bring revenue forward and maximise the NPV of the Project. The basic process steps and PFS processing plant layout are shown in Figure 17, Figure 15 and Figure 17.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 26 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
==> picture [476 x 227] intentionally omitted <==
Figure 15 - Schematic Process Flowsheet for Mt Thirsty
==> picture [480 x 324] intentionally omitted <==
Figure 16 - Detailed Mt Thirsty Flowsheet
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 27 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
==> picture [481 x 271] intentionally omitted <==
Figure 17 - 3D isometric of the Mt Thirsty processing plant showing generalised process flow (numbered labels)
The ramp up curve for the Project is shown in Table 10. It is aligned with the Type 1 McNaulty curves expected for properly planned and executed developments.
Table 10 - Mt Thirsty Ramp Up Curve
| % Design | Q1 | Q2 | Q3 | Q4 |
|---|---|---|---|---|
| Tonnes | 65% | 80% | 95% | 100% |
| Recovery | 75% | 90% | 95% | 100% |
| Product | 49% | 72% | 90% | 100% |
10. INFRASTRUCTURE
10.1 Regional Infrastructure
The Project is fortunate to be located only 16km north-west of Norseman and only 4km from the CoolgardieEsperance Highway (part of the Trans-Australia Highway 1) (Figure 1). This infrastructure corridor includes road, rail, gas, water, fibre optic infrastructure, some of which will be useful to the Project.
10.2 Power and Steam
The power estimate for the Project is based on a build own operate solution to provide power. The Project will have a total installed power of 21.2 MW, drawing 12.4 MW at any one time. The power solution proposed is a combined diesel-solar power station. The power cost is a competitive 20.6 c/kwh.
Waste heat boilers will be utilised on both the sulphur dioxide plant and diesel generators to produce steam to heat the processing tanks.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 28 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
10.3 Water Infrastructure
Bore fields will be established to obtain 1.8 GLpa of hypersaline water (assumed 4 times seawater) from paleochannels 16km from the Project. A local bore field to obtain 0.2GLpa of saline water from fractured rock aquifers (assumed 1 times seawater) will also be established.
10.4 Workforce Strategy, Accommodation and Flights
The Project workforce comprising around 300 construction workers at peak, up to 186 miners, 95 plant and administration workers will be a combination of fly-in fly-out, drive-in drive-out, and residential workers. At this stage it is assumed that the contract mining personnel and construction work force will primarily be Fly In Fly Out (FIFO) and the plant operators and administration workers will be Drive in Drive Out (DIDO) from nearby towns gold fields towns including Kalgoorlie and Esperance. Permanent FIFO workers will work on a roster of 14 days on 7 days off while DIDO and residential workers will work a 5/2/4/3 roster for day shift roles. DIDO shift workers will work a roster of 4 days on, 4 days off, 4 nights on, 4 nights off.
Preliminary discussions with the shire of Norseman have indicated a very strong preference to see a new accommodation village established in town, leveraging existing town infrastructure such as the workers mess, swimming pool, gymnasium and other community infrastructure within the town. A quotation for an all-in accommodation rate has been received from a 3[rd] party commercial camp operator also advancing discussions with the shire of Norseman.
10.5 Product Transport
The Project is expected to produce 9,530 dry tonnes per annum of MSP at the process design criteria specifications. Initially in the early years with higher grade ore feed, more product will be produced and in the later years with lower grade ore feed, less product will be produced (Figure 18). The product will be dried by filters on site to about 50% moisture and packaged in bulka bags, then loaded into sea-containers for ease of freight. The sea-containers can then be trucked to Australian end-users or exported via any one of several container ports in Western Australia. Due to the high value of the product per tonne, the cost and distance of freight is not a major consideration.
==> picture [441 x 267] intentionally omitted <==
Figure 18 - MSP Production and Composition
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 29 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
11. TAILINGS
Golder Associates prepared a preliminary design of a tailings storage facility (TSF).
The proposed Mt Thirsty TSF is envisaged to be developed as a single storage cell and provide storage for approximately 21.6Mm[3] of tailings up to a maximum height of about 35m above natural ground level. At the planned tailings production rate of ~2 Mtpa and an average in-situ dry density of 1.0t/m[3] , the TSF is designed to provide storage for roughly 11 years of production. The deposited tailings will have a maximum surface area of approximately 1.1Mm[2] .
Tailings will be pumped to the TSF as slurry at a solids concentration of around 40% solids by mass and are expected to achieve a beach slope of 0.5%. Discharge into the TSF will take place through multiple spigots, spaced at about 200m centres, from around the TSF perimeter and from the decant access wall/ wing walls as required to manage the supernatant pond.
The supernatant pond will be located towards the centre of the TSF and around the pump-off decant system from where supernatant water will be returned to the process water pond for reuse in the process plant as needed. A decant causeway will provide access to a floating pontoon with barge pump which will be used to manage surface water from both normal and exceptional storm events. During normal operating conditions, the aim would be to maintain the size of the supernatant pond at approximately 10% of the TSF surface area.
The embankments will be constructed primarily using mine waste fill. Low permeability clay will be used as secondary embankment construction material to construct low permeability zones along the upstream slopes of the TSF embankments. The interface between coarse mine waste fill and the clay zone will be constructed from selected fine mine waste fill to provide a filter zone that will protect the facility from piping erosion. The floor of the TSF will be lined by ripping and compacting the in situ clayey materials. A foundation cut-off keyway has been provided to further limit the quality of seepage through the embankment and foundation.
As raising of the perimeter embankment will be done on an ongoing basis, construction verification will occur in the form of regular construction completion reports. As-constructed reports summarising the work completed in accordance with the embankment staging plan and compliance milestones should be submitted on a regular basis to the regulator (DMIRS). The aim of these reports is to document compliance of the construction process with the design specifications and requirements, but also to gain approval from the regulator to continue the tailings deposition. The construction summary reports (with as-built drawings) will be prepared and submitted in accordance with the DMIRS Code of Practice.
The total capital cost estimate to construct the proposed TSF impoundment is approximately AU$27.1M (excluding harvesting of trees, clearing and grubbing, topsoil stripping, mechanical works and ancillary roadworks). This equates to approximately AU$2.60 per dry tonne of future tailings generated by the Mt Thirsty Mine over ~11years of production. The total capital cost estimate associated with the first year of operation (starter embankment) is about AU$9.5M (excluding site preparation, earthworks carried out by the mine fleet, piping, pumps and ancillary roads).
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 30 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
12. ENVIRONMENT AND APPROVALS
A reconnaissance flora and fauna survey was conducted by Spectrum Ecology at Mt Thirsty in spring 2018. The survey did not identify any rare plants or animals. Plants listed as priority flora were however identified and Malleefowl are known in the area. As such, a targeted flora and Mallee Fowl search was conducted over the tenements in spring 2019. No evidence of Malleefowl were found. Seven priority flora species were recorded.
Other environmental factors such as subterranean fauna, landforms, terrestrial environmental quality, inland waters, air quality and social surroundings are not considered to be materially impacted by the Project as assessed by Talis Environmental Consultants.
The likely approvals pathway for the Project will be:
-
Native Vegetation Clearing Permit, Works Approval and Environmental Licence under the Environmental Protection Act 1986
-
Licences to Construct Wells and Take Water under the Rights in Water and Irrigation Act 1914; and
-
Mining Proposal under the Mining Act 1978 .
These approvals should be able to be completed within 6 months.
All closure costs have been allowed for in the PFS. Allowance for rehabilitation of waste rock landforms and haul roads has been built into the load and haul rates in the operating cost estimate quotation from the mining contractor. For final infrastructure decommissioning, Wood have advised that the value of salvageable items of plant will net out the disposal cost of unsalvageable items and rehabilitation of the plant site.
13. CAPITAL COST ESTIMATE
The capital cost estimate for Mt Thirsty Cobalt – Nickel Project has an accuracy level of +/-25% and includes a 10% contingency on direct and indirect costs (Table 11).
The estimate includes costs for processing plant, supporting infrastructure including road upgrades, tailings compound, workshops, laboratory and administration offices.
The estimate, with a base date of 1st Qtr 2020 is supported by competitive budget pricing obtained from the market for contractor rates, major equipment and turnkey vendor packages. The balance of the estimate is factored as per AACE International and Wood internal guidelines. Mining and the associated mine support infrastructure are excluded from the capital estimate below and will be supplied as part of the mining contract.
For the purposes of the PFS, the costs for a Build, Own Operate (BOO) Power Station have been included in the operating cost estimate for the provision of site power.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 31 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
Table 11 - Mt Thirsty PFS Capital Expenditure Estimate
| Estimated Cost (A$M) | ||
|---|---|---|
| Direct Costs | ||
| Site Preparation | $3.2 | |
| Processing Plant | $213.1 | |
| Plant Infrastructure | $20.4 | |
| Area Infrastructure | $6.5 | |
| Miscellaneous | $8.5 | |
| First Fill and Spares | $7.0 | |
| Tailings Establishment | $8.2 | |
| Total Direct Costs | $266.9 | |
| Indirect Costs | ||
| Construction Facilities | $2.6 | |
| EPCM and PCM | $28.1 | |
| Total Indirect Costs | $30.6 | |
| Growth Allowance | 9% | $27.6 |
| Contingency | 10% | $32.5 |
| Owner’s Costs | 4% | $13.0 |
| Total Capital Expenditure | $370.7 |
An amount of 1% of direct capital expenditure was added as an allowance for sustaining capital each year.
14. OPERATING COST ESTIMATE
The estimated average operating cost for the Project is estimated on the following basis:
-
Process plant design criteria and mass balance for the first four years of plant operation
-
Process plant mechanical equipment and electrical load list
-
Labour costs from salary benchmark data and in-house data
-
Vendor data/allowances for consumables
-
Mining – MACA Ltd, Hampton Transport Services Pty Ltd quotations
-
Lab - SGS Australia Pty Ltd, Bureau Veritas Pty Ltd quotations
-
Tailings Lifts – Golder Associates Pty Ltd
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 32 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
-
Camp – Tulla Group Pty Ltd, Civeo Corporation quotations
-
Diesel – Caltex Australia Petroleum Pty Ltd quotation
-
Reagents: supplier quotations, sulphur price supplied by MTJV analysis
-
Power – Pacific Energy (KPS) quotation
-
Freight – in house data
The average operating cost to produce 9,500 dry tonnes per annum of MSP concentrate is estimated at $12,212 per tonne of concentrate. See Table 12 - Mt Thirsty PFS Operating Cost Estimate for the operating cost breakdown.
Table 12 - Mt Thirsty PFS Operating Cost Estimate
| At Process Design Criteria Grades A$M pa |
$/dry feed tonne |
|---|---|
| Mining (including Diesel, Labour and On-costs) 28.8 |
15.99 |
| Grade Control 1.2 |
0.67 |
| Tailings Lifts 1.6 |
0.91 |
| Process Plant | |
| Labour 13.8 |
7.69 |
| Power 20.2 |
11.20 |
| MSP transport* 0.8 |
0.42 |
| Miscellaneous (Lab, Accommodation, Vehicles, etc.) 5.5 |
3.07 |
| Maintenance Materials 6.3 |
3.51 |
| Consumables 1.0 |
0.54 |
| General & Administration 0.9 |
0.48 |
| Reagents & Grinding Media* 37.5 |
20.84 |
| Total 117.6* |
65.32 |
- Note that Reagents & Grinding Media and MSP transport costs vary block-by-block in the mine plan and year-by-year in the financial model based on the manganese grade and product tonnes. Over the life of mine reagent and grinding media costs average $15.48/dmt feed and total operating costs average $59.86/dmt feed due to lower manganese grades in later years. A breakdown of operating costs over the life of mine is shown in Figure 19.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 33 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
==> picture [362 x 220] intentionally omitted <==
Figure 19 - Life of Mine Operating Cost Breakdown
15. MARKETING
The market assessment for the Project was prepared for the MTJV by Mr David Morgan, Principal of NC Chem Pty Ltd. Mr Morgan has been a successful senior marketer for nickel and cobalt metals, their associated intermediates, and specialty chemicals for more than 25 years. He has worked in Australia, London and Singapore for Queensland Nickel and BHP before working more recently as a consultant in the nickel and cobalt industry. He has specific experience buying and selling nickel and cobalt based intermediates and developing and marketing of nickel and cobalt precursor materials to Li-ion battery industry.
There are already many detailed reports and forecasts reviewing the future nickel and cobalt demand as a result of the impact of Li-ion battery and Electric Vehicle (EV) markets. This report assumes a base case where the EV market will grow from less than 2 million units in 2018 to 13million units by 2025 and the dominant cathode material used in EV’s will be 811 NCM by 2022. This will result in the demand for primary cobalt for EVs increasing 10x by 2025 to 115 ktpa and demand for primary nickel for EVs increasing 4x to 520 kt. This report uses the consensus price forecasts by market players collated by Consensus Economics Inc. and Citi Research Report on EV Metals, to determine future prices for nickel and cobalt for the period 2022 to 2029.
For cobalt price the consensus trend is for a steady increase over the next few years, from the current spot level of US$16.50/lb (US$36,000/t), to an average of around US$21/lb (US$46,000/mt) by 2022 (nominal basis). The increase in the price has been influenced by the recent news that Glencore has placed its Mutanda operation (25 ktpa Co or 20% of total market) on care and maintenance. This brings forward the date when the cobalt supply-demand balance would go into deficit to 2020/21. For the period 2022-2029, analysts reported in Consensus Economics predict a wide range of prices from US$16-35/lb (US$35,500–77,000/t). The predicted price range for cobalt metal for the purposes of this report will be US$20–35/lb (US$44,000– 77,000/t), giving an average price estimate of US$27.50/lb (US$61,000/t) for the period 2022 to 2029.
For nickel, the average (or consensus) in the shorter term is for the nickel price to gradually increase from current levels (US$5.90/lb / US$13,000/t) to approx. US$7.30/lb (US$16,100/t) by 2022 (nominal basis). The increase in price will be influenced by the increasing demand for class 1 nickel by the growing Li-ion battery demand and offset by the relatively low cost of production of class 2 Nickel Pig Iron (NPI) in Indonesia for stainless steel. For the period 2022-2029, analysts reported in Consensus Economics predict LME Cash price for nickel in the range of US$7.00-8.90/lb (US$15,420-19,620/t) with the mean ranging from US$7.25-8.30/lb (US$16,000-18,400/mt).The predicted price range for LME nickel price for the purposes of this report will be US$7.25–8.15/lb (16,100–19,600/t), giving an average price estimate of US$8.10/lb (US$17,850/t) for period 2022 to 2029.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 34 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
The Project has selected Mixed Sulphide Product (MSP) intermediate product as the preferred final product. The product contains 50:50 ratio of nickel to cobalt and is in the form of wet filter cake. Apart from the different Ni to Co ratio, this product is in a similar form to other impure nickel and cobalt intermediates already produced and refined into nickel and cobalt metals / chemicals. The average annual production rate of MSP product is forecast to contain 2,750 mtpa Ni & 2,350 mtpa Co. This represents about 0.1% of current nickel market and 2% of current cobalt market.
The current trade of impure Ni & Co containing intermediates most like the Mt Thirsty MSP are other MSP products (usually containing a lower ratio of Co) and Mixed Hydroxide Product (MHP). These products are currently sold to many different refineries around the world, particularly in China for the production of nickel sulphate (NiSO4) and cobalt sulphate (CoSO4) used to make precursor materials for the Li-ion battery cathode material.
The demand for NiSO4 for the Li-ion battery is expected to grow 2-3x by 2022 from the current level requiring approx. 90 ktpa of primary nickel. Currently approx. 15% of NiSO4 is produced from refined nickel metal and as a result the average premium for NiSO4 is about US$1,500/mt Ni above the London Metal Exchange (LME) nickel price. The use of nickel metal and the resulting premium for NiSO4 is forecast to continue in the future due to shortage of other available feedstocks. Nickel based intermediates are a preferred feedstock for production of NiSO4 compared to using nickel metal. Use of class 1 metal as feedstock for production of NiSO4 has the highest relative cost and therefore the payables for intermediate feedstocks are likely to rise as NiSO4 demand further increases.
Taking into account the premium for NiSO4, the equivalent reference price for suitable feedstocks for NiSO4 production can be considered to be US$1,500/mt higher than the forecast LME price of US$16,975/mt. This should allow higher payables for nickel-based intermediates. On this basis, it could be expected that the %Ni payable may be up to 85% by 2022.
The demand for cobalt won’t grow as fast as the demand for NiSO4 in absolute terms due to the lower percentage of cobalt in cathode material for Li-ion battery for the EV applications but will increase to from 12kt in 2018 to 115 kt in 2025.
Cobalt is predominantly mined and refined as a by-product of copper and nickel operations. The cobalt market is relatively small (115 ktpa vs 2.5 million tpa for Ni) and hence is different to the nickel market. Over 70% of cobalt is produced as a by-product of copper and processed into intermediates in DRC in central Africa. The biggest intermediate product produced is crude cobalt hydroxide containing no nickel. The majority of this material is exported to China where it is refined into cobalt chemicals and a small amount of cobalt metal. The main chemical product produced is cobalt sulphate used in the production of cathode materials for the Li-ion battery. The other source of cobalt is from nickel based intermediate products in the form of MHP and MSP, but the quantities and amount traded in the market is much smaller.
The pricing of the cobalt component of nickel-cobalt intermediates will be increasingly influenced by the pricing / % payable of the crude cobalt hydroxide product predominantly sold to China. The cost to process the cobalt contained in the crude cobalt hydroxide is not directly related to metals prices and is somewhat a fixed price. In a deficit or balanced market (as forecast post 2022) with associated higher cobalt prices it would be expected that the % payable for cobalt to be higher and to be more related to the refining cost. At a cobalt price (FMB SG low Co price) of US$27.50/lb (US$61,000 /mt) the % payable could be as high as 85%.
The Mt Thirsty MSP is different to other MSP and MHP products in that it contains 50:50 ratio of Ni to Co compared to MHP / MSP produced from laterite ore containing 12:1 ratio of Ni to Co. It has higher levels of iron (Fe) and zinc (Zn) compared to other main nickel and cobalt intermediates (MSP, MHP & Crude Cobalt Hydroxide) but it is not envisaged this will be major issue with the marketing of the Mt Thirsty MSP.
In the future (post 2022) the most interested customers for Mt Thirsty MSP will be targeting to produce Nickel and Cobalt sulphate for the Li-ion battery industry. It is predicted the cobalt market will be in balance or a deficit and % payable for cobalt is likely to be higher than current levels and similar to nickel payable.
In the period 2022 to 2029 expect the following market conditions:
- Strong demand for NiSO4 & CoSO4 from the Li-ion battery / EV applications;
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 35 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
-
NiSO4 continue to be selling for a premium above the LME Ni price;
-
Balanced to deficit market for both nickel & cobalt;
-
Ni & Co containing intermediates will be the preferred raw material for production of Li-ion battery chemicals for EVs in particular NiSO4 and CoSO4;
-
Many refineries capable of treating Mt Thirsty MSP and with the higher Fe & Zn levels
-
Forecast average price nickel (US$16,975 /mt Ni) and cobalt (US$27.50/lb or US$61,000/mt) prices
Based on these forecasts, the estimate of % payables are 85% for nickel and 80% for cobalt contained in the Mt Thirsty MSP product.
Given the strong forecast growth of Li-ion batteries for EV’s and the resultant demand for NiSO4 and CoSO4, all producers of these chemicals will be looking for secure cost-effective supply of raw materials. By 2022 many of the existing sources of nickel and cobalt will consumed and producers of these products will be looking for new sources. The potential customers for MSP will include traditional existing customers for Ni & Co containing MSP, refineries processing MHP and cobalt based refineries. In addition, likely to see the big players further up the supply chain (Li-ion battery manufacturers and EV OEM’s) getting involved in sourcing Ni & Co containing raw materials.
The obvious target market for Mt Thirsty MSP will be producers of NiSO4 and CoSO4 for the Li-ion battery manufacturers. Whether the focus should be on the largest market China or the other markets with large EV OEM companies like Japan, Korea, Europe or USA will depend on the view of the success of Chinese owned HPAL projects in Indonesia. If successful, these projects could provide increased competition in the Chinese market for intermediates containing nickel and cobalt in the same time period (post 2022).
The marketing strategy for the MSP is very much related to investment in the Project and therefore needs to be investigated and addressed together. At this stage in the Project it is probably most important for potential investors to know there are plenty of refineries capable of refining this MSP into battery related chemicals.
16. FINANCIAL ANALYSIS
A financial model for the Project has been built based on the mine schedule reported in quarterly increments. The input assumptions are as tabulated in Table 8 - Material economic assumptions for the Ore Reserve and PFS.
==> picture [408 x 246] intentionally omitted <==
Figure 20 - Mt Thirsty NPV Sensitivity
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 36 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
An analysis of operating costs over the life of mine was also completed (Table 13). The All-In Sustaining Cost (AISC) is approximately aligned with the current depressed cobalt spot price.
Table 13 - Operating Cost Analysis
| US$/t cobalt metal in | |
|---|---|
| product (LOM) | |
| C1 Cash Costs | $55,500 |
| Nickel Credits | $24,700 |
| Royalties | $4,600 |
| All-In Sustaining Costs | $35,400 |
| Depreciation | $16,300 |
| C3 Costs | $51,600 |
The financial analysis returned the following results:
-
Life of Mine Revenue after Royalties $1,848M (71% from Cobalt and 29% from Nickel)
-
Life of Mine Operating Costs $1,233M
-
Life of Mine Cumulative Cash Flow $213M
-
Pre Tax NPV $44.4M
-
Post Tax NPV $25.7M
17. RISK
Risks and opportunities have been drawn from the various sections of the prefeasibility study (PFS) and collated. The risk register context was developed in consultation with stakeholders focusing on the following key focus areas:
-
Health, safety and environmental (HSE) including organisational management, human resources and industrial relations
-
External to operations including regulatory, approvals and community relations
-
Technical including process, technology, scope of work, schedule and estimates
-
Execution including engineering, procurement, construction, commissioning, ramp-up and operation
-
Opportunities.
The final risk register comprised 81 risks identified with two very high residual risks remaining after mitigation actions were applied. Both risks are classified under the external, regulatory or approvals and community relations focus area and relate to the potential of low commodity prices on the Project economics as well as the difficulty in the current market with funding projects.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 37 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
18. VALUE OPTIMISATION OPPORTUNITIES
18.1 Inclusion of a Manganese Product
The leaching process to be employed at Mt Thirsty is very effective at leaching the manganese in the ore. More than 120,000 tonnes of manganese will be leached over the life of the mine. The base case flowsheet has this manganese being precipitated as an oxide to go to tails and allow the process water to be recycled. There remains an opportunity to make a product from this manganese either as an oxide, or higher value carbonate or sulphate products. Test-work is underway to investigate this opportunity as a potential value add to the base case PFS.
18.2 Addition of a Cobalt Sulphate and Nickel Sulphate circuit
The MTJV has selected a product strategy to produce and intermediate product to realise 80-85% payability on metal prices. This will keep the on-site operation relatively simple and also leave some value available for likely Project partners who may wish to take the next value adding processing step elsewhere in Western Australia or overseas.
However, many other nickel-cobalt projects within Australia have elected to include Nickel and Cobalt Sulphate plants in their base case. This remains as a future value adding initiative for the Project.
19. NEXT STEPS
The Mt Thirsty Joint Venture (MTJV) has identified the highest value development path to be a farm-in from a large global firm, eager to secure a guaranteed sustainable source of cobalt.
The direct Project expenditure for the MTJV now reverts to a minimum while the partnering strategy is pursued as planned.
The MTJV is now re-engaging with several major Australian and international mining, trading and refining firms who have all identified a high quality PFS as their minimum investment criteria.
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 38 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
20. COMPETENT PERSONS’ STATEMENT
Table 14 - Competent Persons for the Mt Thirsty Cobalt Nickel Project
| Discipline | JORC Section | Competent | Employer | Professional |
|---|---|---|---|---|
| Person | Membership | |||
| Geology | Exploration Results | Michael J | Tasman Resources Ltd; | MAIG |
| and Mineral | Glasson | Consultant to MTJV; holds | ||
| Resources | shares in Conico Ltd | |||
| Resource | Mineral Resources | David Reid | Golder Associates Pty Ltd | MAusIMM |
| Estimation | ||||
| Metallurgy | Exploration Results | Peter Nofal | AMEC Foster Wheeler Pty | FAusIMM |
| and Ore Reserves | Ltd trading as Wood | |||
| Mining | Ore Reserves | Frank | Snowden Mining Industry | FAusIMM |
| Blanchfield | Consultants Pty Ltd |
The information in this report that relates to Exploration Results, Mineral Resources and Ore Reserves for the Mt Thirsty Cobalt-Nickel Project is based on and fairly represents information compiled by the Competent Persons listed in Table 14. The Competent Persons have sufficient relevant experience to the style of mineralisation and type of deposits under consideration and to the activity for which they are undertaking to qualify as a Competent Person as defined in the JORC Code (2012 Edition). For new information, the Competent Persons consent to the inclusion in the report of the matters based on their information in the form and context in which it appears. Previously announced information is cross referenced to the original announcements. In these cases, the company is not aware of any new information or data that materially affects the information presented and that the material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified from the original market announcements.
21. JORC TABLE 1
21.1 Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| Sampling techniques | • | 1m samples were split and collected at the drill rig. |
| Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad |
• |
The remainder of the drill cuttings were immediately bagged and sealed in airtight bags to minimise drying and agglomeration of the clays. These samples were later used for compositing and metallurgical test-work. |
| meaning of sampling. | • | The split samples were then dried and pulverised and a |
| Include reference to measures taken to ensure sample representivity and the appropriate calibration of any |
40gm sub sample analysed for Co, Ni, Mn, Zn, Mg, Al & Fe using a four-acid digest with an ICP OES finish. |
|
| measurement tools or systems used. | ||
| Aspects of the determination of mineralisation that are Material | ||
| to the Public Report. | ||
| In cases where ‘industry standard’ work has been done this | ||
| would be relatively simple (eg ‘reverse circulation drilling was | ||
| used to obtain 1 m samples from which 3 kg was pulverised to | ||
| produce a 30 g charge for fire assay’). In other cases more | ||
| explanation may be required, such as where there is coarse | ||
| _gold that has inherent sampling problems. Unusual _ |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 39 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| commodities or mineralisation types (eg submarine nodules) | ||
| may warrant disclosure of detailed information. | ||
| Drilling techniques | • | RC drilling was completed with a 165mm face sampling |
| Drill type (eg core, reverse circulation, open-hole hammer, | hammer. | |
| rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face- sampling bit or other type, whether core is oriented and if so, by what method, etc). |
• | AC Drilling was completed with a 102mm blade bit. The cuttings are lifted to the surface up the inner tube of the drill bit in the same manner as RC drilling. |
| • | All drilling was above the water table and there was no | |
| water injectionused. | ||
| Drill sample recovery | • | Sample recovery was generally excellent in dry powdery |
| Method of recording and assessing core and chip sample | clay which hosts the upper portion of the mineralisation. | |
| recoveries and results assessed. | Any intervals with obvious poorer sample recovery were | |
| Measures taken to maximise sample recovery and ensure representative nature of the samples. |
recorded in the logs. These were mostly in greenish puggy clay sections beneath the oxidised zone in the lower portion of the deposit. |
|
| Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material. |
• | The cyclone was cleaned between each six-metre rod (RC) and three-metre rod (AC) and every metre for wet samples; riffle splitters were cleaned as required. There is no |
| obvious relationship between grade and sample recovery. | ||
| Most of the material drilled is strongly weathered, soft and | ||
| fine grained. No significant sample bias is expected to have | ||
| occurred due to preferential loss of fine/coarsematerial. | ||
| Logging | • | Logging is conducted in detail at the drill site by the site |
| Whether core and chip samples have been geologically and | geologist, who routinely records weathering, lithology, | |
| geotechnically logged to a level of detail to support appropriate | alteration, mineralisation, or any other relevant features. It | |
| Mineral Resource estimation, mining studies and metallurgical | is considered to be logged at a level of detail to support | |
| studies. | appropriate Mineral Resource estimation and mining | |
| Whether logging is qualitative or quantitative in nature. Core | studies. | |
| (or costean, channel, etc) photography. | • | All holes were logged in the field by MTJV geologists who |
| The total length and percentage of the relevant intersections | have a long association and familiarity with the deposit. | |
| logged. | • | Logging is qualitative in nature. |
| • | The entirelengthofeach holewasloggedin 1m intervals. | |
| Sub-sampling techniques and sample preparation | • | All RC drill chips were split with a rotary splitter. The |
| If core, whether cut or sawn and whether quarter, half or all | remaining sample was bagged and placed on the ground. | |
| core taken. | ||
| • | Sample preparation followed industry standard practice of | |
| If non-core, whether riffled, tube sampled, rotary split, etc and | drying, coarse crushing to -6mm, before pulverising to 90% | |
| whether sampled wet or dry. | passing 75 micron. | |
| For all sample types, the nature, quality and appropriateness of the sample preparation technique. |
• | To meet QAQC requirements duplicates were placed at irregular intervals in the sample stream, usually one or two |
| Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples. |
duplicates per drill hole (approximately every 20-40m). For the RC drilling certified blanks (OREAS 24P) were placed in the sample stream at the rate of 1 in 100, at each |
|
| Measures taken to ensure that the sampling is representative | hundredth sample. Additionally, two different certified | |
| of the in situ material collected, including for instance results | standards were used in the sample stream (OREAS 72A | |
| for field duplicate/second-half sampling. | and OREAS 162) at the rate of 2 standards per 100 | |
| Whether sample sizes are appropriate to the grain size of the material being sampled. |
samples. These were placed at the 25th and 75th number of every hundred samples. |
|
| • | The Co values in the blank samples were higher than the | |
| provided values however they are below 80 ppm; | ||
| comparatively low compared to the estimated resource | ||
| values and therefore within acceptable ranges for blank | ||
| samples. Overall there were only a small number of outliers | ||
| in the duplicates collected and therefore the duplicate | ||
| results are also considered satisfactory. | ||
| • | Material being sampled is generally fine grained, and a 2- | |
| 3kg samplefromeach metreis considered adequate. | ||
| Quality of assay data and laboratory tests | • | Samples were crushed and pulverised, and analysed for |
| The nature, quality and appropriateness of the assaying and | Co, Ni, Mn, Zn, Mg, Al & Fe using a four-acid digest with an | |
| laboratory procedures used and whether the technique is | ICP OES finish(method AD02-ICP)byBureau Veritas’ |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 40 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| considered partial or total. | Perth laboratory. These procedures are considered | |
| For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the |
appropriate for the elements and style of mineralisation. Analysis is considered total. |
|
| analysis including instrument make and model, reading times, | • | No geophysical tools have been used. |
| calibrations factors applied and their derivation, etc. | • | The internal laboratory QAQC procedures included |
| Nature of quality control procedures adopted (eg standards, | analysing its own suite of internal standards and blanks | |
| blanks, duplicates, external laboratory checks) and whether | within every sample batch and also adding sample | |
| acceptable levels of accuracy (ie lack of bias) and precision | duplicates. | |
| have been established. | ||
| Verification of sampling and assaying | • | Significant intersections are determined by company |
| The verification of significant intersections by either | personnel and checked internally. | |
| independent or alternative company personnel. | • | A limited number of twinned RC holes and AC holes |
| The use of twinned holes. | twinned by Sonic Core (SC) holes have been drilled. 5 of | |
| Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. |
the 6 RC holes and the 3 AC metallurgical holes are twins of previous AC holes. Analysis of paired data representing AC and SC samples with proximity of approximately 5 m or |
|
| Discuss any adjustment to assay data. | less has given at least preliminary indications that some AC samples are yielding higher Co and Mn values than |
|
| corresponding samples derived from SC. Population | ||
| statistics however show the reverse and AC statistics are | ||
| slightly lower grade on average than RC and SC. | ||
| • | Individual sample numbers are generated and matched on | |
| site with down hole depths. Sample numbers are then used | ||
| to match assays when received from the laboratory. | ||
| Verification of data is managed and checked by company | ||
| personnel with extensive experience. All data is stored | ||
| electronically, with industry standard systems and backups. | ||
| • | Dataisnot subject to any adjustments. | |
| Location of data points | • | Collar locations were determined by handheld GPS and are |
| Accuracy and quality of surveys used to locate drill holes | accurate to approximately +/- 3m. | |
| (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. |
• | The grid system used is AGD84; AMG Zone 51 to match a |
| previously established grid. A DTM and 2.5m spaced | ||
| Specification of the grid system used. | topographic contours have been prepared from ortho- | |
| Quality and adequacy of topographic control. | photomaps and hole RLs are measured from these. This topographic control is considered quite adequate for the |
|
| current purposes. | ||
| Data spacing and distribution | • | All holes were sampled and assayed in 1m intervals and no |
| Data spacing for reporting of Exploration Results. | other compositing has been applied during sample | |
| Whether the data spacing and distribution is sufficient to | collection and assay laboratory preparation. | |
| establish the degree of geological and grade continuity | ||
| appropriate for the Mineral Resource and Ore Reserve | ||
| estimation procedure(s) and classifications applied. | ||
| Whether sample compositing has been applied. | ||
| Orientation of data in relation to geological structure | • | The mineralisation is mostly contained within a flat lying |
| Whether the orientation of sampling achieves unbiased | weathering blanket and vertical holes achieve unbiased | |
| sampling of possible structures and the extent to which this is | sampling in most cases. | |
| known, considering the deposit type. | • | The mineralisation is mostly contained within a flat lying |
| If the relationship between the drilling orientation and the | weathering blanket and vertical holes achieve unbiased | |
| orientation of key mineralised structures is considered to have | sampling in most cases. | |
| introduced a sampling bias, this should be assessed and | ||
| reported if material. | ||
| Sample security | • | Samples were either taken directly from the drill site to the |
| The measures taken to ensure sample security. | laboratory in Kalgoorlie or delivered to a dedicated cartage | |
| contractor in Norseman by company employees and or | ||
| contractors. | ||
| Audits or reviews | ||
| • | No audits or reviews were carried out for this metallurgical | |
| The results of any audits or reviews of sampling techniques | drilling asitisnot consideredwarranted at this stage. |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 41 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation | Commentary |
|---|---|
| and data. |
21.2 Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
| JORC Code explanation Commentary |
JORC Code explanation Commentary |
JORC Code explanation Commentary |
JORC Code explanation Commentary |
JORC Code explanation Commentary |
JORC Code explanation Commentary |
JORC Code explanation Commentary |
JORC Code explanation Commentary |
|---|---|---|---|---|---|---|---|
| Mineral tenement and land tenure status Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area. • • • |
The exploration results relate to the Mt Thirsty Project, located approximately 16km north west of Norseman, Western Australia. The tenements are owned 50:50 (Mt Thirsty Joint Venture, MTJV) by Conico Ltd (through its subsidiary Meteore Metals Pty Ltd) and Barra Resources Ltd. The Project includes Retention Licence R63/4, Exploration Licences E63/1267, and E63/1790 and Prospecting Licence P63/2045. Mining Lease applications have been lodged over R63/4 and E63/1267 and a General Purpose Lease application over E63/1790 and P63/2045. The exploration results referred to in this announcement are located on R63/4. A NSR royalty is payable to a third party on any production from R63/4. The tenements lie within the Ngadju native title claim (WC99/002), and agreements between the claimants and the tenement holders are designed to protect Aboriginal heritage sites and facilitate access. There are no historical or wilderness sites or national parks or known environmental settings that affect the Mt Thirsty Project although the Project area is located within the Great Western Woodlands. Meteore/Barra have secured tenure over the Project area and there are no known impediments to obtaining a licence to operate in the area. |
||||||
| Exploration done by other parties Acknowledgment and appraisal of exploration by other parties. • |
The Mt Thirsty area was explored for nickel sulphide mineralisation in the late sixties and early seventies by Anaconda, Union Miniere, CRA, WMC/CNGC and others. Although no significant sulphide discoveries were made during that time, limonitic nickel/cobalt mineralisation was encountered but not followed up. In the 1990’s Resolute-Samantha discovered high grade cobalt mineralisation in the oxidised profile above an orthocumulate peridotite. This oxide mineralisation is the subject of this announcement. |
||||||
| Geology Deposit type, geological setting and style of mineralisation. • |
The Mt Thirsty Cobalt deposit mineralisation has developed as a result of weathering of ultramafic (peridotite) rocks located at the southern end of the Archaean Norseman - Wiluna greenstone belt. Most of the Co and some of the Ni mineralisation is associated with manganese oxides which have formed in the weathering profile. |
||||||
| Drill hole Information A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes: easting and northing of the drill hole collar elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar dip and azimuth of the hole down hole length and interception depth hole length. If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case. • • • |
Test work during the scoping study was completed on a Master Composite made up from Reverse Circulation (RC) drill samples from six holes collected in November 2016 (refer ASX Quarterly Report for December Quarter 2016). The Master Composite was made up of a blend of approximately half upper saprolite domain (upper) and half lower saprolite domain (lower) at grades representative of the most important early years of the mine plan. Over the entire Mineral Resource, the upper domain accounts for 13% and the lower domain accounts for 87% of the available tonnes. As part of this PFS, composites for the upper and lower domains at grades representative of the early years in the mine plan have been blended from these same RC samples from 2016. Additionally, three Air Core (AC) drill holes were drilled in August 2018 to collect fresh samples for beneficiation test work. These samples were also blended into upper and lower composites, although at grades representative of the overall Mineral Resource averages for those domains. Hole ID Date Drilled Easting Northing RL (m) Depth (m) Composite Intervals (m) MTRC036 20/11/2016 372162 6447455 378 54 18-42 MTRC037 19/11/2016 372244 6447455 376 30 13-30 MTRC038 19/11/2016 372349 6447457 369 35 14-28 MTRC039 20/11/2016 371956 6447000 382 40 14-34 MTRC040 20/11/2016 372115 6447001 393 40 30-36 MTRC041 20/11/2016 372295 6446999 381 35 23-32 MTAC798 14/08/18 372300 6447251 377 30 3-5 8-10 16-26 MTAC799 14/08/18 372121 6446846 392 60 35-48 |
||||||
| Hole ID | Date Drilled | Easting | Northing | RL (m) |
Depth (m) |
Composite Intervals (m) |
|
| MTRC036 | 20/11/2016 | 372162 | 6447455 | 378 | 54 | 18-42 | |
| MTRC037 | 19/11/2016 | 372244 | 6447455 | 376 | 30 | 13-30 | |
| MTRC038 | 19/11/2016 | 372349 | 6447457 | 369 | 35 | 14-28 | |
| MTRC039 | 20/11/2016 | 371956 | 6447000 | 382 | 40 | 14-34 | |
| MTRC040 | 20/11/2016 | 372115 | 6447001 | 393 | 40 | 30-36 | |
| MTRC041 | 20/11/2016 | 372295 | 6446999 | 381 | 35 | 23-32 | |
| MTAC798 | 14/08/18 | 372300 | 6447251 | 377 | 30 | 3-5 8-10 16-26 |
|
| MTAC799 | 14/08/18 | 372121 | 6446846 | 392 | 60 | 35-48 |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 42 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation Commentary |
JORC Code explanation Commentary |
||||||
|---|---|---|---|---|---|---|---|
| Table – | 54-56 | ||||||
| MTAC801 | 14/08/18 | 371754 | 6447056 | 375 | 35 | 23-34 | |
| Data aggregation methods In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated. Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail. The assumptions used for any reporting of metal equivalent values should be clearly stated. • • |
Not applicable. No equivalent values are used. |
||||||
| Relationship between mineralisation widths and intercept lengths These relationships are particularly important in the reporting of Exploration Results. If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported. If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg ‘down hole length, true width not known’). • |
As the mineralised envelope is generally flat lying and nearly all holes were drilled vertically; down hole width is mostly considered to be true width. |
||||||
| Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. • |
All diagrams contained in this document are generated from spatial data displayed in industry standard mining and GIS packages. |
||||||
| Balanced reporting Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results. • |
Not applicable. | ||||||
| Other substantive exploration data Other exploration data, if meaningful and material, should be reported • |
Metallurgical testwork has included Beneficiation, Leach Optimisation, Leach Variability, Bulk Leaches, Limestone Characterisation, Primary Neutralisation, Secondary Neutralisation, MSP Precipitation. The test work was all completed at ALS |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 43 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| including (but not limited to): |
Balcatta laboratory under the supervision of Process Engineers from Amec Foster | |
| geological observations; geophysical | Wheeler Pty Ltd (Wood) | |
| survey results; geochemical survey | ||
| results; bulk samples – size and | ||
| method of treatment; metallurgical | ||
| test results; bulk density, |
||
| groundwater, geotechnical and rock | ||
| characteristics; potential deleterious | ||
| or contaminating substances. | ||
| Further work | • | A PFS has been completed at Mt Thirsty |
| The nature and scale of planned | ||
| further work (eg tests for lateral | ||
| extensions or depth extensions or | ||
| large-scale step-out drilling). | ||
| Diagrams clearly highlighting the | ||
| areas of possible extensions, |
||
| including the main geological |
||
| interpretations and future drilling | ||
| areas, provided this information is | ||
| not commercially sensitive. |
21.3 Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in the preceding sections also apply to this section.)
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| Database Integrity | • | An extract from the MTJV’s master AcQuire database |
| Measures taken to ensure that data has not been corrupted by, for | was provided to Golder for this study. | |
| example, transcription or keying errors, between its initial collection | • | On loading the database for modelling, Golder performed |
| and its use for Mineral Resource estimation purposes. | data checks including the verification of: | |
| Data validation procedures used. | • | Collar depth with final sample depth. |
| • | Collar RLs with topographic data where possible. | |
| • | Any overlapping intervals or gaps in the downhole data. | |
| • | Grid survey problems. | |
| • | Duplicate drill hole numbers and coordinates. | |
| • | Duplicate geological and assay intervals. | |
| • | Nominal surveys vs. precise surveys. | |
| Site Visits | • | Golder did not visit site for this resource update. |
| Comment on any site visits undertaken by the Competent Person | • | Mr M Glasson has visited the site on numerous occasions |
| and the outcome of those visits. | in his role as consultant geologist including oversight of | |
| If no site visits have been undertaken indicate why this is the case. | recent drilling programmes. | |
| Geological Interpretation | • | A mineralisation interpretation for the Mt Thirsty Cobalt |
| Confidence in (or conversely, the uncertainty of) the geological interpretation of the mineral deposit. |
deposit was completed by MTJV personnel on hardcopy cross-sections and used to validate 3D computer modelling. |
|
| Nature of the data used and of any assumptions made. | • | Sample data analysed using K-means Clustering to group |
| The effect, if any, of alternative interpretations on Mineral Resource estimation. The use of geology in guiding and controlling Mineral |
data into like domains. This is checked against dominant logging codes. |
|
| Resource estimation. | • | K-means Clustering results are loaded into Leapfrog |
| The factors affecting continuity both of grade and geology. | geological modelling software. Interpretation is in section | |
| then wireframed into 3D shapes using Leapfrog’s in-built | ||
| modelling tools. |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 44 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| Dimensions | • | The deposit has a strike length of approximately 2.5 km |
| The extent and variability of the Mineral Resource expressed as length (along strike or otherwise), plan width, and depth below surface to the upper and lower limits of the Mineral Resource. |
and a maximum plan width of about 900m. The portion held by the MTJV is the southern 1.8 km of strike length contained within R63/4. |
|
| • | The Mineral Resources Estimates have been constrained | |
| by tenement boundaries. | ||
| Estimation and Modelling Techniques | • | The block dimensions for the Mt Thirsty Cobalt deposit |
| The nature and appropriateness of the estimation technique(s) applied and key assumptions, including treatment of extreme grade |
were determined on the basis of drilling density, and mining assumptions. |
|
| values, domaining, interpolation parameters, and maximum distance | • |
Grade estimation was completed using Ordinary Kriging |
| of extrapolation from data points. If a computer assisted estimation | (OK) in Golder proprietary software. Grades were | |
| method was chosen include a description of computer software and | estimated for Co, Ni, Mn, Fe, Mg, Zn, and Al using 1 m | |
| parameters used. | composites. Grade estimation was completed in three | |
| The availability of check estimates, previous estimates and/or mine | passes. | |
| production records and whether the Mineral Resource estimate | • | The regolith horizons were estimated using hard |
| takes appropriate account of such data. | boundaries for all variables. | |
| The assumptions made regarding recovery of by products. | • | Grade estimates were made to the parent block volume |
| Estimation of deleterious elements or other non grade variables of | of 10 × 25 × 2 m. No sub-celling is used. | |
| economic significance (e.g. sulfur for acid mine drainage characterisation). |
• | Top cuts or spatial constraints were applied to Ni, Co, Mn, Fe, Mg, and Al to limit extrapolation of high-grade |
| In the case of block model interpolation, the block size in relation to | samples. | |
| the average sample spacing and the search employed. | ||
| Any assumptions behind modelling of selective mining units. | ||
| Any assumptions about correlation between variables. | ||
| Description of how the geological interpretation was used to control | ||
| the resource estimates. | ||
| Discussion of basis for using or not using grade cutting or capping. | ||
| The process of validation, the checking process used, the | ||
| comparison of model data to drill hole data, and use of reconciliation | ||
| data if available. | ||
| Moisture | • | The wet tonnages were estimated using wet bulk density. |
| Whether the tonnages are estimated on a dry basis or with natural | • | The dry tonnages were estimated using dry bulk density. |
| moisture, and the method of determination of the moisture content. | ||
| • | All grades are reported on a dry % basis. | |
| • | Moisture determinations were completed on 142 samples | |
| and averages assigned to all blocks by regolith horizon. | ||
| Cut-off Parameters | • | Mineral Resources are reported at 0.06% Co cut-off |
| The basis of the adopted cut-off grade(s) or quality parameters | grade. | |
| applied. | • | The Mineral Resource is reported above 0.06% cobalt. |
| This cut-off is consistent with previous Mineral Resource | ||
| estimates and the 2017 Scoping Study. The cut-off grade | ||
| has been confirmed by recent preliminary financial | ||
| modelling. It is assumed that all cobalt and nickel | ||
| mineralisation above this cobalt grade will have | ||
| reasonable prospects for eventual economic extraction. | ||
| Mining Factors or Assumptions | • | This Mineral Resource statement assumes mining by |
| Assumptions made regarding possible mining methods, minimum | conventional shallow open pit techniques. | |
| mining dimensions and internal (or, if applicable, external) mining | ||
| dilution. | ||
| It is always necessary as part of the process of determining | ||
| reasonable prospects for eventual economic extraction to consider | ||
| potential mining methods, but the assumptions made regarding | ||
| mining methods and parameters when estimating Mineral | ||
| Resources may not always be rigorous. Where this is the case, this |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 45 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| should be reported with an explanation of the basis of the mining | ||
| assumptions made. | ||
| Metallurgical Factors or Assumptions | • | PFS level metallurgical test work programmes have been |
| The basis for assumptions or predictions regarding metallurgical amenability. It is always necessary as part of the process of determining reasonable prospects for eventual economic extraction to consider potential metallurgical methods, but the assumptions |
completed. These studies have demonstrated the potential for economic Co and Ni extraction using atmospheric leaching to produce a Ni-Co mixed sulphide product. |
|
| regarding metallurgical treatment processes and parameters made | ||
| when reporting Mineral Resources may not always be rigorous. | ||
| Where this is the case, this should be reported with an explanation | ||
| of the basis of the metallurgical assumptions made. | ||
| Environmental Factors or Assumptions | • | Golder is not aware of any environmental issues that |
| Assumptions made regarding possible waste and process residue disposal options. It is always necessary as part of the process of |
would affect the eventual economic extraction of the deposit. |
|
| determining reasonable prospects for eventual economic extraction | • | Spring environmental surveys were completed during |
| to consider the potential environmental impacts of the mining and | 2018 and 2019. No rare flora or fauna were observed. | |
| processing operation. While at this stage the determination of | ||
| potential environmental impacts, particularly for a greenfields | ||
| project, may not always be well advanced, the status of early | ||
| consideration of these potential environmental impacts should be | ||
| reported. Where these aspects have not been considered this | ||
| should be reported with an explanation of the environmental | ||
| assumptions made. | ||
| Sampling techniques | • | 1m samples were split and collected at the drill rig. |
| Nature and quality of sampling (eg cut channels, random chips, or | • | The remainder of the drill cuttings were immediately |
| specific specialised industry standard measurement tools | bagged and sealed in air-tight bags to minimise drying | |
| appropriate to the minerals under investigation, such as down hole | and agglomeration of the clays. These samples were | |
| gamma sondes, or handheld XRF instruments, etc). These | later used for compositing and metallurgical test-work. | |
| examples should not be taken as limiting the broad meaning of sampling. Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement |
• | The split samples were then dried and pulverised and a 40gm sub sample analysed for Co, Ni, Mn, Zn, Mg, Al & Fe using a four-acid digest with an ICP OES finish. |
| tools or systems used. | ||
| Aspects of the determination of mineralisation that are Material to | ||
| the Public Report. | ||
| In cases where ‘industry standard’ work has been done this would | ||
| be relatively simple (eg ‘reverse circulation drilling was used to | ||
| obtain 1 m samples from which 3 kg was pulverised to produce a 30 | ||
| g charge for fire assay’). In other cases more explanation may be | ||
| required, such as where there is coarse gold that has inherent | ||
| sampling problems. Unusual commodities or mineralisation types | ||
| (eg submarine nodules) may warrant disclosure of detailed | ||
| information. | ||
| Drilling techniques | • | RC drilling was completed with a 165mm face sampling |
| Drill type (eg core, reverse circulation, open-hole hammer, rotary air | hammer. | |
| blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple | • | AC Drilling was completed with a 102mm blade bit. The |
| or standard tube, depth of diamond tails, face-sampling bit or other | cuttings are lifted to the surface up the inner tube of the | |
| type, whether core is oriented and if so, by what method, etc). | drill bit in the same manner as RC drilling. | |
| • | All drilling was above the water table and there was no | |
| water injection used. |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 46 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
21.4 Section 4 Estimation and Reporting of Ore Reserves
(Criteria listed in the preceding sections also apply to this section.)
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| Mineral Resource estimate for conversion to Ore Reserves | • | Mineral resources for the Mt Thirsty deposit were estimated |
| Description of the Mineral Resource estimate used as a basis for the conversion to an Ore Reserve. |
and reported by Golder Associates Pty Ltd. in September 2019. A cut-off grade of 0.06% Co was used for assessing the Co and Ni Mineral Resource and no cut-off grade for Ni |
|
| Clear statement as to whether the Mineral Resources are | was used for the Mineral Resources | |
| reported additional to, or inclusive of, the Ore Reserves. | • | Mineral Resources are Inclusive of Ore Reserves |
| Site Visits | • | The Competent Persons Visited Site as follows: |
| Comment on any site visits undertaken by the Competent Person | • | Mr M Glasson has visited the site on numerous occasions |
| and the outcome of those visits. | in his role as consultant geologist including oversight of | |
| If no site visits have been undertaken indicate why this is the | recent drilling programmes. | |
| case. | • | Mr David Reid (Mineral Resources) has not visited site, |
| however has extensive experience with similar nickel- | ||
| cobalt laterite deposits in WA. | ||
| • | Mr Peter Nofal (Metallurgy) has not visited site, however | |
| has extensive experience with similar nickel-cobalt laterite | ||
| deposits in WA. | ||
| • | Mr Frank Blanchfield (Mining) visited site in October 2019 | |
| Study status | • | Pre-Feasibility Study reported in February 2020. |
| The type and level of study undertaken to enable Mineral | ||
| Resources to be converted to Ore Reserves. | ||
| The Code requires that a study to at least Pre-Feasibility Study | ||
| level has been undertaken to convert Mineral Resources to Ore | ||
| Reserves. Such studies will have been carried out and will have | ||
| determined a mine plan that is technically achievable and | ||
| economically viable, and that material Modifying Factors have | ||
| been considered. | ||
| Cut-off parameters | • | A marginal cut-off grade was calculated for each block |
| The basis of the cut-off grade(s) or quality parameters applied. | using values for: | |
| • | Mining Cost of $4.96/dt rock. | |
| • | Ore loss 2%, Dilution 0% (considered to be already | |
| accounted for in resource model). | ||
| • | Processing and Administration cost based on a fixed | |
| component and a variable component based on Mn grade | ||
| and payable metal in product. | ||
| • | Mill throughput per annum of 1.8 Mdtpa | |
| • | Cobalt price of US$61,000/t and 80% payability | |
| • | Nickel price of US$16,500/t and 85% payability | |
| • | Exchange rate of 0.67 AUD:USD | |
| • | Vendor, State Government and Native TItle Royalties of | |
| 5.32% of FOB revenue. | ||
| • | Metallurgical recovery by application of regressions, | |
| averaging 74% for cobalt and 22% for Nickel over the life | ||
| of mine. | ||
| • | The average cut-off was approximately 0.07% Cobalt | |
| Mining factors or assumptions | • | Snowden Mining Industry Consultants (Snowden) |
| The method and assumptions used as reported in the Pre- Feasibility or Feasibility Study to convert the Mineral Resource to |
completed a mining prefeasibility study for the Mt Thirsty Project in February 2020. |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 47 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| an Ore Reserve (i.e. either by application of appropriate factors | • | An evaluation using pit optimisation to produce an |
| by optimisation or by preliminary or detailed design). | economic mining shell followed by detailed pit design was | |
| The choice, nature and appropriateness of the selected mining method(s) and other mining parameters including associated design issues such as pre-strip, access, etc. |
used to convert the Mineral Resource to an Ore Reserve. A mine layout was planned for mining of staged designs for mine development. Mine equipment requirements were determined by contractors, who provided pricing using the |
|
| The assumptions made regarding geotechnical parameters (eg | Snowden mine production schedule as a basis. | |
| pit slopes, stope sizes, etc), grade control and pre-production drilling. |
• | The resource model used is named ‘mtt_201906export.csv” for Mt Thirsty and generated by |
| The major assumptions made and Mineral Resource model used for pit and stope optimisation (if appropriate). |
Golder in June 2019. Zero dilution was applied as the block models were not sub-celled and modelled to a 10 mX by 25 mY by 2 mRL block size. At this block size, the model was |
|
| The mining dilution factors used. | considered to be diluted as mining will be more selective | |
| The mining recovery factors used. | than this. A 2% ore loss was applied. | |
| Any minimum mining widths used. | • | For grade control, samples will be taken from blasthole cutting. For those areas that do not require drill and blast, |
| The manner in which Inferred Mineral Resources are utilised in | a ditch-witch style machine will be used to rip lines across | |
| mining studies and the sensitivity of the outcome to their | the mining floor for sampling. A fully specified XRF and ICP | |
| inclusion. | laboratory will be available on site. | |
| The infrastructure requirements of the selected mining methods | • | The minimum Mining width subject to modified mining |
| procedures in basal pits is 20m. | ||
| • | No in pit Inferred Resources were used to quantify Ore | |
| Reserves. Inferred Resources are however included at up | ||
| to 10% in any quarter in the first 10 years of the PFS mine | ||
| plan and up to 30% thereafter. | ||
| • | The deposits will be mined as open pits sequenced in | |
| mining stages and mined using semi-selective methods | ||
| using conventional load and haul. Blasting will only be done | ||
| in the ferro hard cap (about 13% of the rock mined) and no | ||
| ore will be blasted. This will minimise ore dilution. | ||
| • | Golder Associates completed a desktop hydrogeology | |
| study in 2018. The study identified target for process water | ||
| abstraction in nearby paleochannels and local fractured | ||
| rock aquifers. The mine is entirely above the water table. | ||
| The shallow resource holes are reported to be dry. Alluvial | ||
| and colluvial deposits near the orebody may contain minor | ||
| amounts of water. | ||
| • | Moisture contents within the saprolite are 26-30%, hence | |
| the in-situ material is probably close to 100% saturation. | ||
| This is likely to result in piezometric pressures within the | ||
| horizon that may influence pit slope stability. However, the | ||
| permeability of the material is likely to be very low hence it | ||
| is anticipated that flows from the material into any bore or | ||
| excavation will be negligible. | ||
| • | For geotechnical and wall stability, overall slope angles | |
| (OSA) will vary with height: | ||
| • | for deeper sections of saprolite (up to 70 m) the | |
| recommended maximum OSA is 30° | ||
| • | in shallower sections (less than 30 m) the recommended | |
| maximum OSA is 40° | ||
| • | in saprock the maximum inter-ramp angle (IRA) can be | |
| increased to 45° | ||
| • | Saprolite will be free-dig material, but more competent | |
| saprock sections may need ripping, possibly some paddock | ||
| blasting. | ||
| • | Trafficking will not be an issue on saprock benches, | |
| however haul roads and ramps on wet saprolite will need | ||
| sheeting with competent sub-base material. |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 48 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| Metallurgical factors or assumptions | • | The metallurgical process proposed is hydrometallurgical |
| The metallurgical process proposed and the appropriateness of that process to the style of mineralisation. |
leaching at atmospheric pressure using sulphur dioxide as the main reagent. |
|
| Whether the metallurgical process is well-tested technology or novel in nature. • The nature, amount and representativeness of metallurgical test work undertaken, the nature of the metallurgical |
• | Leaching using sulphur dioxide at atmospheric pressure is applied elsewhere including at the Boleo operation in Mexico. |
| domaining applied and the corresponding metallurgical recovery | • | Individual unit processes are all standard well-tested |
| factors applied. • Any assumptions or allowances made for | technology. | |
| deleterious elements. | ||
| The existence of any bulk sample or pilot scale test work and the degree to which such samples are considered representative of the orebody as a whole. |
• | The metallurgical test work was conducted on composites of representative samples collected by RC and AC drilling and blended into a ‘Master Composite’ representative of the early years of mining. |
| For minerals that are defined by a specification, has the ore reserve estimation been based on the appropriate mineralogy to meet the specifications? |
• | Variability testwork was also conducted on samples of a range of head grades. Theses test results were then used to construct metallurgical regressions that were also |
| adjusted to match the performance of larger bulk leaches. | ||
| Metallurgical recoveries were applied on a block-by-clock | ||
| basis within the mine plan. | ||
| Environmental | • | A reconnaissance flora and fauna survey was conducted |
| The status of studies of potential environmental impacts of the mining and processing operation. Details of waste rock characterisation and the consideration of potential sites, status of design options considered and, where applicable, the status of approvals for process residue storage and waste dumps should be reported. |
by Spectrum Ecology at Mt Thirsty in spring 2018. The survey did not identify any rare plants or animals. Plants listed as priority flora were however identified and Malleefowl are known in the area. As such, a targeted flora and Mallee Fowl search was conducted over the tenements in spring 2019. No evidence of Malleefowl were found. Seven priority flora species were recorded. |
|
| • | Other environmental factors such as subterranean fauna, | |
| landforms, terrestrial environmental quality, inland waters, | ||
| air quality and social surroundings are not considered to be | ||
| materially impacted by the Project as assessed by Talis | ||
| Environmental Consultants. | ||
| • | The likely approvals pathway for the Project will be: | |
| • | Native Vegetation Clearing Permit, Works Approval and | |
| Environmental Licence under the Environmental Protection | ||
| Act 1986 | ||
| • | Licences to Construct Wells and Take Water under the | |
| Rights in Water and Irrigation Act 1914; and | ||
| • | Mining Proposal under the Mining Act 1978. | |
| • | These approvals should be able to be completed within 6 | |
| months. | ||
| Infrastructure | • | Mt Thirsty is located 16km north west from the town of |
| The existence of appropriate infrastructure: availability of land for plant development, power, water, transportation (particularly for |
Norseman and 4km west of the Coolgardie-Esperance Highway, parallel to which is rail, gas, water, and fibre optic. |
|
| bulk commodities), labour, accommodation; or the ease with | • | Power will be generated on site using a combined solar – |
| which the infrastructure can be provided, or accessed. | diesel power station | |
| • | Hypersaline water will be source from paleochannels to the | |
| west and east of the Project. Drilling is required to | ||
| demonstrate the quality and quantity of the water source. | ||
| • | Saline water will also be sourced from local fractured rock | |
| aquifers. | ||
| • | The MTJV is enthusiastic about working the the Shire of | |
| Dundas and 3rdparty mining village providers to locate | ||
| accommodation for the Project within Norseman, |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 49 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation | Commentary |
|---|---|
| • Sulphur will be imported through the Port of Esperance. While existing facilities exist, commercial negotiations have not commenced. • The product will be containerised and can be exported from any one of many container ports within Western Australia. |
|
| Costs The derivation of, or assumptions made, regarding projected capital costs in the study. The methodology used to estimate operating costs. Allowances made for the content of deleterious elements. The source of exchange rates used in the study. Derivation of transportation charges. The basis for forecasting or source of treatment and refining charges, penalties for failure to meet specification, etc. The allowances made for royalties payable, both Government and private. |
• Capital Costs and Operating Costs have been estimated by Amec Foster Wheeler Pty Ltd (Wood) with reference to multiple vendor quotes. • Mining costs were estimated based on quote received from two mining contractors. • A market assessment of the Mt Thirty MSP Product was completed by NC Chem Pty Ltd and the metal playabilities estimated include consideration of deleterious elements. • Exchange rates used are the spot AUD:USD exchange rate of 0.67. • As the MSP is a high value product, the cost of freight is not significant. An allowance has been included based on in- house data. • Royalties of 5.32% have been allowed for including the WA State Government Royalty, a royalty due to a previous tenement owner, and a royalty for the Traditional Owners (negotiations in progress). |
| Revenue factors The derivation of, or assumptions made regarding revenue factors including head grade, metal or commodity price(s) exchange rates, transportation and treatment charges, penalties, net smelter returns, etc. The derivation of assumptions made of metal or commodity price(s), for the principal metals, minerals and co-products. |
• The study is based on the following macroeconomics assumptions: • Cobalt Price US$61,000/t • Nickel Price US$17,850/t • Cobalt Payable 80% • Nickel Payable 85%; all as recommended by NC Chem Pty Ltd • Forex (AUD:USD) 0.67; the February 2020 spot price. • |
| Market assessment The demand, supply and stock situation for the particular commodity, consumption trends and factors likely to affect supply and demand into the future. A customer and competitor analysis along with the identification of likely market windows for the product. Price and volume forecasts and the basis for these forecasts. For industrial minerals the customer specification, testing and acceptance requirements prior to a supply contract. |
• The Mt Thirsty Project has selected Mixed Sulphide Product (MSP) intermediate product as the preferred final product. The product contains 50:50 ratio of nickel to cobalt and is in the form of wet filter cake. Apart from the different Ni to Co ratio, this product is in a similar form to other impure nickel and cobalt intermediates already produced and refined into nickel and cobalt metals / chemicals. The average annual production rate of MSP product is forecast to contain 2,750 mtpa Ni & 2,350 mtpa Co. This represents about 0.1% of current nickel market and 2% of current cobalt market. • An assessment of multiple broker forecasts and supply and demand trends was completed by NC Chem Pty Ltd who selected a price of US$61,000/t for cobalt and US$17,850 for nickel. • NC Chem Pty Ltd considered the MSP product specification and market trends and advised 80% payability for cobalt and 85% payability for nickel. |
| Economic The inputs to the economic analysis to produce the net present value (NPV) in the study, the source and confidence of these economic inputs including estimated inflation, discount rate, etc. • NPV ranges and sensitivity to variations in the significant |
• Financial modelling was completed by the MTJV, Snowden is reliant on the metal price projections advised by NC Chem Pty Ltd. Snowden is not expert in the forecasting of metal prices, and other than to draw attention to the sensitivity of the Project to these projections, is not able to |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 50 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| assumptions and inputs | comment on the risk that these projections will change over | |
| time. | ||
| • | The discount rate is 8% Pre Tax Real. | |
| • | The Ore Reserve only (treats Inferred Mineral Resources | |
| as waste) NPV is A$14.0M (Pre-Tax) and A$1.5M (Post- | ||
| Tax). In this case the All In Sustaining Cost is A$35,800/t | ||
| cobalt. | ||
| • | The key financial metrics and sensitivities for the Project | |
| are: | ||
| • | Pre Tax NPV A$44.4M | |
| • | Post Tax NPV A$25.7M | |
| • | All In Sustaining Costs US$35,400/t cobalt | |
| Social | • | A Native Title Agreement is presently being negotiated with |
| The status of agreements with key stakeholders and matters | the Ngadju Traditional Owners | |
| leading to social licence to operate. | • | Consultation has been undertaken with key local |
| stakeholders including indigenous groups, neighbouring | ||
| exploration companies, government agencies including the | ||
| Office of the Environmental Protection Authority and the | ||
| Shire of Norseman. | ||
| • | The workforce will be approximately half fly in / fly out of | |
| Perth and half residential / drive in drive out from Norseman | ||
| and surrounding towns including Kalgoorlie and |
||
| Esperance. | ||
| • | Environmental monitoring and reporting required for the | |
| site will include the following: | ||
| • | Annual Environmental Report | |
| • | Reporting under the site Groundwater Licence(s); and | |
| • | Reporting under the site Works Approval and Licence. | |
| Other | • | Risks and opportunities have been drawn from the various |
| To the extent relevant, the impact of the following on the project and/or on the estimation and classification of the Ore Reserves: |
sections of the prefeasibility study (PFS) and collated. The risk register context was developed in consultation with stakeholders focusing on the following key focus areas: |
|
| Any identified material naturally occurring risks. | • | Health, safety and environmental (HSE) including |
| The status of material legal agreements and marketing arrangements. |
organisational management, human resources and industrial relations |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study
Page 51 of 52
==> picture [89 x 58] intentionally omitted <==
==> picture [150 x 26] intentionally omitted <==
| JORC Code explanation | Commentary | Commentary |
|---|---|---|
| The status of governmental agreements and approvals critical to | • | External to operations including regulatory, approvals and |
| the viability of the project, such as mineral tenement status, and | community relations | |
| government and statutory approvals. There must be reasonable grounds to expect that all necessary Government approvals will be received within the timeframes anticipated in the Pre- |
• | Technical including process, technology, scope of work, schedule and estimates |
| Feasibility or Feasibility study. Highlight and discuss the materiality of any unresolved matter that is dependent on a third party on which extraction of the reserve is contingent. |
• | Execution including engineering, procurement, construction, commissioning, ramp-up and operation |
| • | The final risk register comprised 81 risks identified with two | |
| very high residual risks remaining after mitigation actions | ||
| were applied. Both risks are classified under the external, | ||
| regulatory or approvals and community relations focus area | ||
| and relate to the potential of low commodity prices on the | ||
| Project economics as well as the difficulty in the current | ||
| market with funding projects. There were also 18 risks with | ||
| a high residual risk 43 with a medium residual risk and 18 | ||
| with a low residual risk. | ||
| • | Advice from Talis Environmental Consultants Pty Ltd is that | |
| there are no impediments expected to prevent the | ||
| necessary approvals under the_Mining Act 1978_and the | ||
| Environmental Protection Act 1986. | ||
| • | A Native Title Agreement is presently being negotiated for | |
| the project. A suitable agreement in line with the PFS | ||
| assumptions is expected to be reached. | ||
| Classification | • | Mt Thirsty Ore Reserves are estimated using the guidelines |
| The basis for the classification of the Ore Reserves into varying | of the JORC Code 2012. | |
| confidence categories. | • | In pit Indicated Mineral Resources were used as the basis |
| Whether the result appropriately reflects the Competent Person’s view of the deposit. |
of Probable Ore Reserve and the Competent Person's view is that this is reasonable. |
|
| The proportion of Probable Ore Reserves that have been derived | • | There are no Proved Ore Reserves. |
| from Measured Mineral Resources (if any). | ||
| Audits or reviews | • | There have been no external audits of the Ore Reserve |
| The results of any audits or reviews of Ore Reserve estimates. | estimate | |
| • | The mining study was reviewed internally by Snowden. | |
| Discussion of relative accuracy/ confidence | • | The capital cost estimates in this study relating to mining, |
| Where appropriate a statement of the relative accuracy and confidence level in the Ore Reserve estimate using an approach or procedure deemed appropriate by the Competent Person. For |
processing and cost performance are underpinned by a comprehensive PFS which has an assessed accuracy of +25% and -25% at the 90% confidence range. |
|
| example, the application of statistical or geostatistical procedures | ||
| to quantify the relative accuracy of the reserve within stated | ||
| confidence limits, or, if such an approach is not deemed | ||
| appropriate, a qualitative discussion of the factors which could | ||
| affect the relative accuracy and confidence of the estimate. | ||
| The statement should specify whether it relates to global or local | ||
| estimates, and, if local, state the relevant tonnages, which should | ||
| be relevant to technical and economic evaluation. |
||
| Documentation should include assumptions made and the | ||
| procedures used. | ||
| Accuracy and confidence discussions should extend to specific | ||
| discussions of any applied Modifying Factors that may have a | ||
| material impact on Ore Reserve viability, or for which there are | ||
| remaining areas of uncertainty at the current study stage. | ||
| It is recognised that this may not be possible or appropriate in all | ||
| circumstances. These statements of relative accuracy and | ||
| confidence of the estimate should be compared with production | ||
| data, where available. |
Mt Thirsty Joint Venture | February 2020 – Mt Thirsty Pre-Feasibility Study