Galilee Basin Drilling Update – Albany 1 Well
- ➢ Well at 2470 metres - about to run and cement casing just above target Sandstone
➢ Total depth prognosed to be approximately 2775 metres
Comet Ridge Limited (ASX:COI) is pleased provide an update on the drilling operations ongoing at the vertical Albany 1 conventional appraisal well in the Galilee Basin. At 0600 hrs this morning, the 8-1/2” intermediate hole section had been drilled through to the base of the Jericho Formation, just above the target Lake Galilee Sandstone reservoir, at 2470 metres. The drill-string is currently being pulled out of the hole, in preparation for running and cementing of the 7” casing from surface all the way to the current depth of the well (see Figure 1). Following this, the final 6-1/8” hole section will be drilled through the sandstone reservoir with nitrogen as planned.
==> picture [360 x 335] intentionally omitted <==
Figure 1 – Albany 1 basic well design
Comet Ridge Limited T: +61 7 3221 3661 E: [email protected] 283 Elizabeth St, Brisbane, Qld, ABN 47 106 092 577 F: +61 7 3221 3668 W: www.cometridge.com.au GPO Box 798, Brisbane, Qld, 4001
Comet Ridge Limited
The total depth (TD) of the well is prognosed to be approximately 2775 metres. Figure 2 below details the position of the Albany 1 well in the Galilee Basin and also the position of the well on the structure (inset).
==> picture [481 x 306] intentionally omitted <==
Figure 2 – Galilee Basin location and Albany structure (inset)
==> picture [117 x 34] intentionally omitted <==
Stephen Rodgers Company Secretary Comet Ridge Limited
For further information please contact: Tor McCaul Managing Director [email protected] +61 7 3221 3661
COMET RIDGE LIMITED – OVERVIEW
Comet Ridge Limited has a 40% interest in the Mahalo Coal Seam Gas (CSG) project located in ATP 1191 in Queensland’s Bowen Basin. The Company is currently acting as agent for the Exploration Operator to manage work in the block. The Company also holds a 70% effective interest (consequent on the successful Farm-in of Vintage Energy Limited) in the Albany conventional gas project and 100% in the Gunn CSG project in the Galilee Basin (ATP 743, ATP 744 and ATP 1015). The Company also has CSG equity of 29.55%, 59.09% and 68.42% respectively in PEL 6, PEL 427 and PEL 428 in the Gunnedah Basin in New South Wales. Gas resources have been certified by independent professional certifiers at several projects, and gas reserves were certified in 2014 and expanded in 2015 and 2018 for the Mahalo project. The Company is listed on the Australian Securities Exchange (ASX Code: COI) and is based in Brisbane. The Board and Management are experienced in establishing and developing energy projects. Comet Ridge’s early entry into well-located exploration areas, has allowed shareholders to gain substantial leverage into the considerable upside value potential associated with exploration success.
Comet Ridge Limited T: +61 7 3221 3661 E: [email protected] 283 Elizabeth St, Brisbane, Qld, ABN 47 106 092 577 F: +61 7 3221 3668 W: www.cometridge.com.au GPO Box 798, Brisbane, Qld, 4001
Comet Ridge Limited
2 of 2