AI assistant
COMET RIDGE LIMITED — Capital/Financing Update 2012
Dec 19, 2012
64686_rns_2012-12-19_65f1b481-76cf-43c7-bf26-79c1945737f5.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [596 x 119] intentionally omitted <==
20 December 2012
Mahalo Pilot Wells Successfully Completed
Four previously drilled Mahalo wells now successfully completed for production
Wells ready to be connected following surface facility installation
Coal seam gas explorer Comet Ridge Limited (ASX:COI) is pleased to announce that the four Mahalo pilot wells have been completed for production at the Mahalo block in ATP 337P, north of Rolleston in the Bowen Basin, central Queensland. This work follows the successful drilling of these wells in July this year.
The Mahalo field is located approximately 260 km west of Gladstone.
These completion operations included the installation of tubing, a downhole pump and pressure monitoring equipment in each of the wells. The service rig has now been stacked in the area to undertake further completion operations on other wells in the Mahalo block early in the New Year.
The completion of the Mahalo wells is a key step in constructing the Mahalo pilot scheme, with the intention of achieving reserves certification in 2013.
==> picture [399 x 324] intentionally omitted <==
Comet Ridge Limited T: +61 7 3221 3661 E: [email protected] 283 Elizabeth St, Brisbane, Qld, 4000 Australia ABN 47 106 092 577 F: +61 7 3221 3668 W: www.cometridge.com.au GPO Box 798, Brisbane, Qld, 4001 Australia
ASX CODE: COI
Comet Ridge Limited
Comet Ridge has a 35% interest in ATP 337P Mahalo, having divested a 5% interest in the asset in late 2011. Under the terms of that divestment, Stanwell Corporation Limited will fund Comet Ridge’s future expenditure at ATP 337P Mahalo up to $8 million. Stanwell Corporation has an option to purchase Comet Ridge’s equity in the Mahalo block, based on 2P reserves booked, under an agreement initially announced in September 2011.
Equity participants in ATP 337P Mahalo are Comet Ridge Mahalo Pty Ltd 35%, Stanwell Corporation Limited 5% (with an option to increase), Australia Pacific LNG Pty Ltd 30% and Santos QNT Pty Ltd 30%.
==> picture [139 x 42] intentionally omitted <==
Stephen Rodgers Company Secretary Comet Ridge Limited
For further information please contact:
Tor McCaul Managing Director Comet Ridge Limited [email protected] +61 7 3221 3661
Media: Dianne Monopoli Principal Consultant Three Plus [email protected] +61 7 3503 5700
2 of 3
COMET RIDGE LIMITED - OVERVIEW
Comet Ridge Limited has significant Coal Seam Gas (CSG) projects in key regions of Queensland, northern New South Wales and New Zealand, as well as oil and gas interests in the United States. Gas resources have been certified, by independent professional certifiers, at four projects. The company is listed on the Australian Securities Exchange (ASX Code: COI) and is based in Brisbane. The Board and Management are experienced in establishing and developing energy projects.
Corporate Strategy
Comet Ridge has gained early entry into well-located exploration areas, allowing shareholders to gain substantial leverage into the upside value potential associated with exploration success.
Comet Ridge conducts CSG exploration and appraisal, with the aim of maturing exploration acreage from Gas Resources into Proven and Probable Gas Reserves. This process initially involves drilling wells in order to certify Prospective and Contingent Resources and then through further appraisal via Pilot Projects, with the intention of progressing into certified Reserves.
Where possible, Comet Ridge takes high equity positions in its large exploration permits, including a 100% interest in both its Galilee Basin and New Zealand assets. Comet Ridge has 35% equity in the ATP 337P Mahalo block in the Bowen Basin, and announced on 21 June 2012 that it has signed an agreement to increase its equity to 22.5%, 50% and 60% respectively in PEL 6, PEL 427 and PEL 428 in the Gunnedah Basin in New South Wales. This transaction is subject to government and joint venture consent to transfer.
Work Programme
Comet Ridge has an active exploration and appraisal work program for CSG projects in Queensland, northern New South Wales and New Zealand. Drilling for the first Pilot Project for ATP 337P Mahalo was undertaken in July 2012, with additional exploration and appraisal work planned for the Galilee Basin and Mahalo in 2012 and 2013.
==> picture [443 x 138] intentionally omitted <==
Comet Ridge Limited T: +61 7 3221 3661 E: [email protected] 283 Elizabeth St, Brisbane, Qld, 4000 Australia ABN 47 106 092 577 F: +61 7 3221 3668 W: www.cometridge.com.au GPO Box 798, Brisbane, Qld, 4001 Australia
ASX CODE: COI
Comet Ridge Limited