ASX RELEASE 26[th] April 2021
ASX Code: COD
Significant New Drilling Results Strengthen and Extend CopperCobalt Mineralisation at Emmie Bluff
New assays of up to 4.71% copper equivalent demonstrate potential to extend high-grade zones within the Exploration Target while also extending the overall mineralised footprint
Highlights
-
Final assay results received from Phase 2 of the Emmie Bluff drill programme
-
Drilling continues both to validate the Emmie Bluff Exploration Target[1] and extend the mineralised envelope to the north-east
-
Continuing the pattern seen in previous drilling, every hole drilled within the defined Exploration Target area has encountered significant copper-cobalt mineralisation
-
New intercept of 3m @ 4.71% CuEq[2] demonstrates potential to extend high-grade pods in the core of the Exploration Target
-
Phase 3, the final stage of drilling required to deliver a maiden JORC Mineral Resource, on track to commence in early May 2021
Coda Minerals Limited (ASX:COD, “Coda” or “the Company”) is pleased to report the final round of assay results from its two-phase, 17-hole diamond drill programme at the Emmie Bluff prospect, part of the Elizabeth Creek Project located in the Olympic Copper Province in South Australia (see Figure 1).
Emmie Bluff is an advanced shale-hosted Cu-Co-Ag prospect which forms part of Coda’s extensive portfolio of copper assets in this highly prospective region. Coda is the operator and majority owner of the Elizabeth Creek Project, holding a 70% interest alongside Torrens Mining (ASX: TRN) with 30%.
The most recent round of assays includes some of the highest-grade intercepts encountered at Emmie Bluff to date. The best assays from the most recent round include:
DD21EB0012: 2.24m[3] @ 3.19% CuEq (1.82% Cu, 1,139ppm Co and 24 g/t Ag) DD21EB0013: 3m @ 4.71% CuEq (2.85% Cu, 1,545ppm Co and 27 g/t Ag) DD21EB0014: 2.13m @ 3.53% CuEq (2.08% Cu, 1,212ppm Co and 28 g/t Ag)
1 The information related to the Emmie Bluff Exploration Target is extracted from the report entitled “Confirmation Statements JORC” created on 26[th] October 2020 and is available to view on https://www.codaminerals.com/wpcontent/uploads/2020/10/20201026_Coda_ASX-ANN_Confirmation-Statements-JORC.pdf The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement
2 Cu Eq = Cu % + (Co ppm*0.0012). Please see Coda Announcement “Appendix to the Annual Report 2020 – Mineral Resource and Ore Reserve Statement”, released 31/07/2020, available at https://www.codaminerals.com/wpcontent/uploads/2020/08/Coda_Announcement_Resource-and-Reserve-statement-2020_Typeset.pdf for derivation.
3 Hole Penetrated mineralised stratum at a dip of approximately 67°. True width of mineralisation is approximately 2.06m.
6 Altona Street E: [email protected] West Perth Western Australia, 6005 ABN 49 625 763 957
==> picture [77 x 78] intentionally omitted <==
==> picture [595 x 83] intentionally omitted <==
`
The Cu-Co sulphide mineralisation at Emmie Bluff typically occurs on both the upper and lower contacts of the host Tapley Hill Formation black shale. The new assay results, from holes DD21EB0012, DD21EB0013 and DD21EB00014, include the following significant intercepts at a 0.5% copper equivalent (CuEq) cut-off (Table 1, below):
Table 1 – All mineralised intersections from holes DD21EB0008 and DD21EB0009, 0.5% CuEq cut-off.
| 0.5% CuEq Cut Off | |
|---|---|
| DD21EB0012 | 2.24m4@ 3.19% CuEq (1.82% Cu, 1,139ppm Co and 24 g/t Ag) from 497.11m. |
| DD21EB0012 | 0.83m4@ 0.64% CuEq (0.41% Cu, 195ppm Co and 7 g/t Ag) from 499.94m. |
| DD21EB0012 | 0.75m4@ 1.08% CuEq (0.5% Cu, 488ppm Co and 5 g/t Ag) from 501.08m. |
| DD21EB0013 | 3m @ 4.71% CuEq (2.85% Cu, 1,545ppm Co and 27 g/t Ag) from 400.47m. |
| DD21EB0013 | 2.31m @ 0.63% CuEq (0.48% Cu, 124ppm Co and 2985g/t Ag) from 441.3m. |
| DD21EB0014 | 2.13m @ 3.53% CuEq (2.08% Cu, 1,212ppm Co and 28 g/t Ag) from 445.25m. |
These new assays, together with previously announced results[6] , continue to strongly validate the Emmie Bluff Exploration Target and support the Company’s goal of completing a maiden JORC 2012 Mineral Resource Estimate for the deposit in Q3 2021.
The Emmie Bluff Exploration Target comprises 46 to 77 million tonnes at an estimated grade of between 0.5 and 2.3% CuEq (see Table 4 and its accompanying notes). The Exploration Target area stretches over 4.5 square kilometres and to date, every hole drilled within the defined Exploration Target area has encountered mineralisation. The Company notes that the potential grade and tonnage is conceptual in nature and there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
The Company is encouraged by results to date and is currently pursuing an aggressive exploration programme aimed at delivering a JORC 2012 Compliant Mineral Resource Estimate in Q3 2021.
Work continues to evaluate the potential for extensions to the mineralisation, especially to the south-east, where historical drilling has identified the presence of Tapley Hill Formation shale. Coda has commissioned a study into the structural geology of Emmie Bluff, which may assist in targeting future drilling in this area.
Coda CEO Chris Stevens said: “ The consistent drilling results generated within the Exploration Target area have further reinforced our confidence in the scale and robustness of the mineralisation at Emmie Bluff. In particular, the strong results from hole DD21EB0012 confirm the potential both to extend the mineralised envelope beyond the bounds of the Exploration Target and show the potential for excellent grades in these extensions.
“With our final assays now received, our focus is firmly on our third phase of drilling, which will commence next month – paving the way for a maiden Inferred Mineral Resource Estimate by late next quarter.”
4 Hole penetrated mineralised stratum at approximately 67°. True widths of intercepts are approximately 2.06m, 0.76m and 0.69m.
5 Results reported as per lab analysis. Assay result has been highlighted by QA/QC procedures and has been identified for reassay. See Table 1 for full details.
6 Please see previous announcement “Retraction and Re-release of Release “Assay Results Confirm Huge Lateral Extent of Emmie Bluff Copper-Cobalt Mineralisation” and “Latest Assay Results Confirm Extent, Grade and Continuity of Copper-Cobalt Mineralisation at Emmie Bluff”, released to the market on 12 March 2021 and 22 March 2021 respectively. Announcements available at https://www.codaminerals.com/wpcontent/uploads/2021/03/20210312_Coda_ASX-ANN_RETRACTION-AND-RE-RELEASE_Assay-Results-Confirm-Huge-Lateral-Extent-of-Emmie-Bluff.pdf and https://www.codaminerals.com/wp-content/uploads/2021/03/20210322_Coda_ASX-ANN_Emmie-Bluff-Assays-Further-Validate-ExplorationTarget_RELEASE.pdf.
==> picture [78 x 78] intentionally omitted <==
6 Altona Street West Perth Western Australia, 6005
ABN 49 625 763 957
==> picture [595 x 83] intentionally omitted <==
`
Previously Announced Results
Drill-holes previously announced to the market are summarised as Table 2, below. Collar locations are provided in Figure 2.
Table 2 – Summarised results from recent drilling at Emmie Bluff.
| HoleID | Collar Location | Results |
|---|---|---|
| Upper Lode | ||
| DD20EB0001 | Outside Exploration Target | Not Assayed |
| DD20EB0002 | Outside Exploration Target | No Significant Results |
| DD20EB0003 | Outside Exploration Target | Not Assayed |
| DD20EB0004 | Within Exploration Target | 1.75m from 405.9 @ 1.48% CuEq (1.45% Cu, 24ppm Co and 43.81g/t Ag) |
| DD20EB0004 | Within Exploration Target | 2.05m from 408.95 @ 4.09% CuEq (1.76% Cu, 1,936ppm Co and 16.89g/t Ag) |
| DD20EB0005 | Within Exploration Target | 1.5m from 351.9 @ 0.7% CuEq (0.68% Cu, 15ppm Co and 17.17g/t Ag) |
| DD20EB0006 | Outside Exploration Target | Not Assayed |
| DD20EB0007 | Within Exploration Target | 3.49m from 454.2 @ 2.22% CuEq (1.47% Cu, 620ppm Co and 17.45g/t Ag) |
| DD21EB0008 | Within Exploration Target | 1.83m from 419.96m @ 1.74% CuEq (1% Cu, 615ppm Co, 10.3g/t Ag). |
| DD21EB0008 | Within Exploration Target | 0.38m from 423.18m @ 0.69% CuEq (0.39% Cu, 245ppm Co, 8.8g/t Ag). |
| DD21EB0009 | Within Exploration Target | 3.77m from 440.63m @ 2.1% CuEq (1.16% Cu, 784ppm Co, 13.8g/t Ag). |
| DD21EB0009 | Within Exploration Target | 1.02m from 444.74m @ 1.26% CuEq (0.91% Cu, 302ppm Co, 6.9g/t Ag). |
| DD21EB0010 | Outside Exploration Target | Not Assayed |
| DD21EB0011 | Outside Exploration Target | Not Assayed |
| DD21EB0012 | Outside Exploration Target | 2.24m7from 497.11m @ 3.19% CuEq (1.82% Cu, 1,139ppm Co and 24 g/t Ag). |
| DD21EB0012 | Outside Exploration Target | 0.83m6499.94m @ 0.64% CuEq (0.41% Cu, 195ppm Co and 7 g/t Ag) from. |
| DD21EB0012 | Outside Exploration Target | 0.75m6from 501.08m @ 1.08% CuEq (0.5% Cu, 488ppm Co and 5 g/t Ag). |
| DD21EB0013 | Within Exploration Target | 3m from 400.47m @ 4.71% CuEq (2.85% Cu, 1,545ppm Co and 27 g/t Ag). |
| DD21EB0014 | Within Exploration Target | 2.13m from 445.25m @ 3.53% CuEq (2.08% Cu, 1,212ppm Co and 28 g/t Ag). |
| Lower Lode | ||
| DD20EB0004 | Within Exploration Target | 1.51m from 434.34 @ 1.83% CuEq (1.62% Cu, 179ppm Co and 11.88g/t Ag) |
| DD20EB0005 | Within Exploration Target | 1.28m from 364.85 @ 0.9% CuEq (0.71% Cu, 156ppm Co and 5.87g/t Ag) |
| DD21EB0008 | Within Exploration Target | 0.37m from 437.35 @ 0.68% CuEq (0.49% Cu, 145ppm Co, 4.6g/t Ag). |
| DD21EB0009 | Within Exploration Target | 0.39m from 446.61m @ 0.85% CuEq (0.54% Cu, 259ppm Co, 2.4g/t Ag). |
| DD21EB0009 | Within Exploration Target | 0.44m @ 2.63% CuEq (0.92% Cu, 1420ppm Co, 2.6g/t Ag) from 447.77m. |
| DD21EB0013 | Within Exploration Target | 2.31m from 441.3m @ 0.63% CuEq (0.48% Cu, 124ppm Co and 298 g/t Ag). |
7 Hole penetrated mineralised stratum at approximately 67°. True widths of intercepts are approximately 2.06m, 0.76m and 0.69m.
==> picture [78 x 78] intentionally omitted <==
6 Altona Street West Perth Western Australia, 6005
ABN 49 625 763 957
==> picture [595 x 83] intentionally omitted <==
`
==> picture [358 x 434] intentionally omitted <==
Figure 1 The Elizabeth Creek Copper-Cobalt Project in South Australia
==> picture [78 x 78] intentionally omitted <==
6 Altona Street West Perth Western Australia, 6005
ABN 49 625 763 957
==> picture [595 x 83] intentionally omitted <==
`
==> picture [426 x 598] intentionally omitted <==
----- Start of picture text -----
`
----- End of picture text -----
Figure 2 – Emmie Bluff Exploration Target with drill-holes completed to date.
==> picture [78 x 78] intentionally omitted <==
6 Altona Street West Perth Western Australia, 6005
ABN 49 625 763 957
==> picture [842 x 84] intentionally omitted <==
`
==> picture [793 x 284] intentionally omitted <==
Figure 3 – Implicit model of Tapley Hill Formation at Emmie Bluff showing new and historical mineralised holes at the northern end of the Emmie Bluff Exploration Target (Approx. 6,557,400mN). Eastern and western extent are estimated only: drilling has not closed off the deposit in either direction at this northing.
6 Altona Street E: [email protected] West Perth Western Australia, 6005 ABN 49 625 763 957
==> picture [78 x 78] intentionally omitted <==
==> picture [842 x 84] intentionally omitted <==
`
==> picture [692 x 308] intentionally omitted <==
Figure 4 – Implicit model of Tapley Hill Formation at Emmie Bluff showing new and historical mineralised holes in the approximate centre of the Emmie Bluff Exploration Target (Approx. 6,556,150mN).
6 Altona Street West Perth Western Australia, 6005
==> picture [78 x 78] intentionally omitted <==
ABN 49 625 763 957
==> picture [595 x 83] intentionally omitted <==
The Emmie Bluff Exploration Target
The Emmie Bluff Exploration Target was first defined in 2019, and most recently updated in 2020.[8] It consists of two layers of laterally extensive copper-cobalt-silver mineralisation at the upper and lower contacts of the Tapley Hill Formation black shale, with a combined tonnage of 46 to 77 million tonnes and an estimated grade of between 0.5 and 2.3% CuEq . The Company notes that the potential grade and tonnage is conceptual in nature and there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
Table 3 Emmie Bluff Exploration Target.
| Mineralisation Area | Layer Thickness (m) |
Volume **(m3) ** |
Tonnage Range (Mt) |
Cu Range (%) |
Co Range (%) |
Ag Range (%) |
Cu Eq. Range9(%) |
|---|---|---|---|---|---|---|---|
| Tapley Hill Formation Upper Layer |
1.7 - 6.1 | 14,271,000 | 28.7 – 47.8 | 0.9 - 1.6 | 0.04 - 0.06 | 11 – 19 | 1.4 – 2.3 |
| Tapley Hill Formation Lower Layer |
0.8 - 4.7 | 8,642,000 | 17.4 – 29.0 | 0.3 - 0.6 | 0.02 - 0.03 | 5 – 18 | 0.5 – 0.9 |
| Total | 0.8 - 6.1 | 22,913,000 | 46.1 – 76.8 | 0.3 - 1.6 | 0.02 - 0.06 | 5 - 19 | 0.5 – 2.3 |
This announcement has been authorised for release by the Board of Coda Minerals Ltd For more information, please contact:
Further Information:
Investors:
Chris Stevens Chief Executive Officer [email protected]
Media:
Nicholas Read Read Corporate [email protected]
8 Please see ASX Announcement “Confirmation Statements (JORC)” (Confirmation of Exploration Target & Mineral Resource and Ore Reserve Statement) , released to the ASX on 23[rd] October 2020, for full details and Competent Person’s Statement.
==> picture [78 x 78] intentionally omitted <==
E: [email protected] ABN 49 625 763 957
6 Altona Street West Perth Western Australia, 6005
==> picture [595 x 83] intentionally omitted <==
About Coda Minerals
Coda Minerals (ASX: COD) is a minerals exploration company focused on the discovery, and development of base metals, precious metals, and battery minerals.
Coda is primed to unlock the value of its highly prospective Elizabeth Creek Copper Project, which is located in the heart of the Olympic Copper, Province Australia’s most productive copper belt.
The Elizabeth Creek Copper Project covers 739 km[2] is centred 100km south of BHP’s Olympic Dam mine 15km from BHP’s Oak Dam West Project and 50 km west of OZ Minerals’ Carrapateena copper-gold project. The project includes JORC 2012compliant Indicated Mineral Resources at the Windabout and MG14 deposits, which together host a combined 159,000 tonnes of contained copper and 9,500 tonnes of contained cobalt. The project also includes Coda’s Emmie Bluff prospect, which has a JORC compliant Zambian-style copper-cobalt Exploration Target, and strong IOCG potential.
Coda is the majority owner of the Elizabeth Creek Copper Project and operator of the Farm-in and Joint Venture with Torrens Mining (ASX: TRN), which currently owns 30% of the project. Coda holds the rights and interests to earn up to 75% interest in the project under the farm-in agreement with Torrens and anticipates completing its Farm-in expenditure commitment of a total project expenditure of $ 8.62 million by Q2 2021.
Coda has a dual strategy for success at Elizabeth Creek. Firstly, it is working to further define and extend known Zambianstyle copper-cobalt resources across multiple prospects, including Emmie Bluff, Powerline, MG14 North and Hannibal. Secondly, it is planning to systematically explore, define and where appropriate, drill-test copper-gold IOCG targets. Existing IOCG targets at Elizabeth Creek include Elaine, Elizabeth North, Chianti and also Emmie Bluff Deeps, which was recently redefined through extensive geophysical work.
The company listed on the ASX in October 2020 after a successful, heavily oversubscribed IPO which is funding an aggressive exploration campaign across the Elizabeth Creek project tenure.
Confirmatory Statement
The information related to the Emmie Bluff Exploration Target is extracted from the report entitled “Confirmation Statements JORC” created on 26[th] October 2020 and is available to view on https://www.codaminerals.com/wpcontent/uploads/2020/10/20201026_Coda_ASX-ANN_Confirmation-Statements-JORC.pdf The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of the MG14 and Windabout Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
Forward Looking Statements
This announcement contains ‘forward-looking information’ that is based on the Company’s expectations, estimates and projections as of the date on which the statements were made. This forward-looking information includes, among other things, statements with respect to the Company’s business strategy, plans, development, objectives, performance, outlook, growth, cash flow, projections, targets and expectations, mineral reserves and resources, results of exploration and related expenses. Generally, this forward-looking information can be identified by the use of forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘potential’, ‘likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar expressions. Persons reading this announcement are cautioned that such statements are only predictions, and that the Company’s actual future results or performance may be
==> picture [78 x 78] intentionally omitted <==
6 Altona Street E: [email protected] West Perth Western Australia, 6005 ABN 49 625 763 957
==> picture [595 x 83] intentionally omitted <==
materially different. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information.
Competent Person’s Statement
The information in this report which relates to exploration results is based on information compiled by Mr. Matthew Weber, who is an employee of the company. Mr Weber is a Member of the Australasian Institute of Mining and Metallurgy and has sufficient relevant experience to the style of mineralisation and type of deposit under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Weber consents to the inclusion in this report of the matters based on the information compiled by him, in the form and context in which it appears.
==> picture [78 x 78] intentionally omitted <==
6 Altona Street West Perth Western Australia, 6005
ABN 49 625 763 957
==> picture [595 x 83] intentionally omitted <==
Appendix 1: Core Photos
DD21EB0012
==> picture [506 x 183] intentionally omitted <==
==> picture [506 x 364] intentionally omitted <==
Figure 5 Core photos showing the transition from Whyalla Sandstone to Tapley Hill Formation and into Pandurra Formation, encompassing the mineralised intersections in hole DD21EB0012. Mineralisation is closely tied to the presence of reducing black shale and negatively correlated with lower carbon sands beds, which are easily discriminated.
==> picture [78 x 78] intentionally omitted <==
6 Altona Street West Perth Western Australia, 6005
ABN 49 625 763 957
==> picture [595 x 83] intentionally omitted <==
DD21EB0013
==> picture [506 x 182] intentionally omitted <==
==> picture [506 x 181] intentionally omitted <==
Figure 6 Core photos showing the upper contact of the Tapley Hill Formation in hole DD21EB0013. Miineralisation is fine grained and largely non-visual at this scale.
==> picture [78 x 78] intentionally omitted <==
6 Altona Street West Perth Western Australia, 6005
ABN 49 625 763 957
==> picture [595 x 83] intentionally omitted <==
==> picture [506 x 177] intentionally omitted <==
==> picture [506 x 179] intentionally omitted <==
Figure 7 Core photos showing the mineralised lower contact between Taply Hill Fm shale and Pandurra Fm in hole DD21EB0013.
==> picture [78 x 78] intentionally omitted <==
6 Altona Street West Perth Western Australia, 6005
ABN 49 625 763 957
==> picture [595 x 83] intentionally omitted <==
DD21EB0014
==> picture [506 x 374] intentionally omitted <==
Figure 8 Core photos showing the mineralised upper Tapley Hill Fm shale contact with Whyalal Sandstone in hole DD21EB0014. This hole is located near the eastern edge of the shale body; as the Tapley thins out to the east, mineralisation is anticipated to become more intense.
==> picture [78 x 78] intentionally omitted <==
6 Altona Street West Perth Western Australia, 6005
ABN 49 625 763 957
==> picture [595 x 83] intentionally omitted <==
Appendix 2: Detailed Technical Information and JORC Table 1
Table 4 Completed and ongoing drillholes at Emmie Bluff at the time of publication.
| HoleID | Phase | Easting | Northing | EOH(RC) | Dip | Azi | EOH(DD) | Comments |
|---|---|---|---|---|---|---|---|---|
| DD20EB0001 | 1 | 708140 | 6553048 | 212.7 | -80 | 270 | 490.08 | Results released |
| DD20EB0002 | 1 | 708025 | 6554312 | 251.3 | -80 | 280 | 512.85 | Results released |
| DD20EB0003 | 1 | 707260 | 6554861 | 251.4 | -90 | 273 | 456.77 | Results released |
| DD20EB0004 | 1 | 705461 | 6555872 | - | -80 | 90 | 456.8 | Results released |
| DD20EB0005 | 1 | 704128 | 6557375 | 155.7 | -75 | 90 | 390.9 | Results released |
| DD20EB0006 | 1 | 705158 | 6555872 | 220.5 | -80 | 90 | 414 | Results released |
| DD20EB0007 | 1 | 706583 | 6556580 | 218.7 | -80 | 270 | 479.4 | Results released |
| DD21EB0008 | 1 | 706331 | 6556140 | 218.7 | -88 | 90 | 460 | Results released |
| DD21EB0009 | 2 | 706602 | 6555859 | 218.7 | -88 | 270 | 471.8 | Results released |
| DD21EB0010 | 2 | 705715 | 6555250 | 218.7 | -75 | 90 | 390.7 | Results released |
| DD21EB0011 | 2 | 705937 | 6555248 | 218.7 | -85 | 90 | 432.8 | Results released |
| DD21EB0012 | 2 | 706651 | 6557401 | 219.6 | -60 | 270 | 519.5 | Results released |
| DD21EB0013 | 2 | 705408 | 6556132 | 218.7 | -80 | 90 | 453.3 | Results released |
| DD21EB0014 | 2 | 706490 | 6556220 | 218.7 | -80 | 90 | 468.4 | Results released |
| DD21EB0015 | 2 | 707014 | 6556335 | 218.7 | -85 | 90 | 465.84 | Results released |
| DD21EB0016 | 2 | 708480 | 6555353 | 218.7 | -85 | 90 | 501.9 | Results released |
| DD21EB0017 | 2 | 708210 | 6554280 | 302.7 | -75 | 180 | 475 | Results released |
Table 5 Referenced Historic Completed and ongoing drillholes at Emmie Bluff
| HoleID | Easting | Northing | Dip | Azi | EOH |
|---|---|---|---|---|---|
| IHAD2 | 705450 | 6557500 | -90 | 0 | 1158.8 |
| IHAD5 | 705119 | 6557882 | -90 | 0 | 1152.8 |
| IHAD6 | 704806 | 6558260 | -90 | 0 | 1116.7 |
| IHAD7 | 704430 | 6557930 | -90 | 0 | 465.9 |
| MGD 1 | 706687.9 | 6554811 | -90 | 0 | 435.66 |
| MGD 55 | 704100 | 6555500 | -90 | 0 | 1107.3 |
| MGD 57 | 705350 | 6556700 | -90 | 0 | 1242.9 |
| PEB 64 | 704838.9 | 6555982 | -90 | 0 | 401 |
| SAE 12 | 705879 | 6555682 | -90 | 0 | 446.3 |
| SAE 13 | 706969 | 6556872 | -90 | 0 | 477.6 |
| SAE 14 | 705429 | 6558162 | -90 | 0 | 498.44 |
| SAE 15 | 704459 | 6556812 | -90 | 0 | 400.81 |
| SAE 16 | 705929 | 6554722 | -90 | 0 | 357.8 |
| SAE 17 | 706519 | 6555292 | -90 | 0 | 435.2 |
| SAE 18 | 706439 | 6555362 | -90 | 0 | 426.7 |
| SAE 19 | 706579 | 6555512 | -90 | 0 | 429.7 |
| SAE 20 | 706309 | 6555212 | -90 | 0 | 417.85 |
| SAE 21 | 705799 | 6556302 | -90 | 0 | 452.3 |
| SAE 22 | 705279 | 6556962 | -90 | 0 | 435.6 |
| SAE 3 | 704379 | 6555352 | -90 | 0 | 1221 |
| SAE 4 | 704179 | 6556172 | -90 | 0 | 1172.5 |
| SAE 5 | 706029 | 6557322 | -90 | 0 | 914.4 |
| SAE 6 | 705029 | 6556222 | -90 | 0 | 1200 |
| DD18EB0001 | 706110 | 6555382 | -90 | 0 | 441.88 |
| DD19EB0001 | 706378 | 6555681 | -60 | 90 | 467.5 |
| DD18EB0002 | 706122 | 6555939 | -90 | 0 | 444.04 |
| DD19EB0002a | 705792 | 6556452 | -90 | 0 | 456.9 |
==> picture [78 x 78] intentionally omitted <==
6 Altona Street West Perth Western Australia, 6005
ABN 49 625 763 957
==> picture [842 x 84] intentionally omitted <==
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
| Criteria | JORC | Code explanation | Commentary | Commentary |
|---|---|---|---|---|
| Sampling | • | Nature and quality of sampling (eg cut channels, | • | RC precollars of varying depths were drilled before drilling technique switched |
| techniques | random chips, or specific specialised industry | over to HQ drill core. | ||
| standard measurement tools appropriate to the | • | Core was logged in the field and rough metal content was measured at regular | ||
| minerals under investigation, such as down hole | intervals with a portable XRF device. XRF measurement intervals varied | |||
| gamma sondes, or handheld XRF instruments, | depending on lithology, from 10m in suspected unmineralised strata to 10cm | |||
| etc). These examples should not be taken as | in areas of suspected mineralisation. | |||
| limiting the broad meaning of sampling. | • | Sampling intervals were selected by field geologist based on logging and XRF | ||
| • | Include reference to measures taken to ensure | results. | ||
| sample representivity and the appropriate | • | Understanding of the mineralising system based on historical drilling and the | ||
| calibration of any measurement tools or systems | XRF results allowed large parts of the holes to remain unsampled. Typically, | |||
| used. | sampling as restricted to the Tapley Hill Formation shale, and the material | |||
| • | Aspects of the determination of mineralisation | immediately above and below its upper and lower contacts. | ||
| that are Material to the Public Report. | ||||
| • | In cases where ‘industry standard’ work has been | |||
| done this would be relatively simple (eg ‘reverse | ||||
| circulation drilling was used to obtain 1 m samples | ||||
| from which 3 kg was pulverised to produce a 30 g | ||||
| charge for fire assay’). In other cases more | ||||
| explanation may be required, such as where there | ||||
| is coarse gold that has inherent sampling | ||||
| problems. Unusual commodities or mineralisation | ||||
| types (eg submarine nodules) may warrant | ||||
| disclosure of detailed information. |
6 Altona Street E: [email protected] West Perth Western Australia, 6005 ABN 49 625 763 957
==> picture [78 x 78] intentionally omitted <==
==> picture [842 x 84] intentionally omitted <==
| Criteria | JORC | Code explanation | Commentary | Commentary | |
|---|---|---|---|---|---|
| Drilling | • | Drill type (eg core, reverse circulation, open-hole | • | All drill holes excluding holes DD20EB0004 and DD21EB0017 were drilled with | |
| techniques | hammer, rotary air blast, auger, Bangka, sonic, | RC precollars to approximately 150 – 250m, followed by HQ standard tube | |||
| etc) and details (eg core diameter, triple or | diamond tails to a maximum depth of between 400 and 519.5m. | ||||
| standard tube, depth of diamond tails, face- | • | DD20EB0004 was drilled as diamond from surface, commencing as PQ until | |||
| sampling bit or other type, whether core is | 50.9m, then changing over to HQ diamond for the remainder of the hole. | ||||
| oriented and if so, by what method, etc). | • | DD21EB0017 was drilled RC from surface to 302.7m, then changing over to NQ | |||
| diamond for the remainder of the hole. | |||||
| • | Core was oriented by Ezymark core orientation tool. | ||||
| Drill | sample | • |
Method of recording and assessing core and chip | • | RC precollars are not believed to be relevant to the mineralising system at |
| recovery | sample recoveries and results assessed. | Emmie Bluff and were not assessed for recovery. | |||
| • | Measures taken to maximise sample recovery and | • | Recovery of diamond tails was consistently excellent, with minimal core loss. | ||
| ensure representative nature of the samples. | • | No relationship is believed to exist between sample recovery and grade. | |||
| • | Whether a relationship exists between sample | ||||
| recovery and grade and whether sample bias may | |||||
| have occurred due to preferential loss/gain of | |||||
| fine/coarse material. | |||||
| Logging | • | Whether core and chip samples have been | • | Basic stratigraphic logging has been carried out by appropriately trained and | |
| geologically and geotechnically logged to a level of | experienced field geologists on RC precollars. | ||||
| detail to support appropriate Mineral Resource | • | Detailed qualitative geological logging has been carried out by appropriately | |||
| estimation, mining studies and metallurgical | trained and experienced field geologists on all diamond core. Quantitative | ||||
| studies. | logging by means of portable XRF has been undertaken on an as needed basis | ||||
| • | Whether logging is qualitative or quantitative in | in areas of prospectivity, typically utilising a 0.5m interval with interval | |||
| nature. Core (or costean, channel, etc) |
reduction down to 0.2, 0.1 or 0.05m in areas of known prospectivity (i.e. the | ||||
| photography. | upper and lower contacts of the Tapley Hill Fm shale) or where coarser analysis | ||||
| • | The total length and percentage of the relevant | revealed geochemical anomalism. | |||
| intersections logged. |
6 Altona Street West Perth Western Australia, 6005
==> picture [78 x 78] intentionally omitted <==
ABN 49 625 763 957
==> picture [842 x 84] intentionally omitted <==
| • | Sample intervals were defined by field geologists based on portable XRF results | Sample intervals were defined by field geologists based on portable XRF results | Sample intervals were defined by field geologists based on portable XRF results | |
|---|---|---|---|---|
| and detailed geological logging. | ||||
| • | Core was then transported by road to Adelaide where the core was cut | by | ||
| means of an Almonte core saw (where competent enough to do so) or by brick | ||||
| saw, where it was not. | ||||
| • | In the batch of samples discussed primarily in this announcement, a total of | |||
| 125 samples were taken, including field duplicates and standards, which were | ||||
| inserted at a 1:20 and 1:10 ratio respectively (10 standards, 7 field duplicates), | ||||
| leaving a total of 108 samples. | ||||
| • | Core was cut on a sample-by sample-basis according to need in the following | |||
| manner: | ||||
oWhere a field duplicate was notrequired:¼ core for assay, ¼ core for |
||||
| retention by Coda on site for future review, ½ core for future | ||||
| metallurgical work (currently being held in cold storage). | ||||
oWhere a field duplicatewasrequired:¼ core for assay, ¼ core for |
||||
| duplicate assay, ¼ core for retention by Coda on site for future review, | ||||
| ¼ core for future metallurgical work (currently being held in cold | ||||
| storage). | ||||
| • | Samples varied in width from 0.21 to 1.25m, with an average of 0.64m per | |||
| sample. Mineralised samples (i.e. CuEq>0.5) varied in width from 0.25 | to | |||
| 0.72.m, with an average of 0.40m per sample. Full details regarding the CuEq | ||||
| calculation can be found in the body of the document. | ||||
| • | Field duplicates were taken based on sample numbers ensuring random | |||
| selection of mineralised and unmineralized material: | ||||
| Hole | ID SampleID From To Interval Cu Co Ag |
|||
| DD21EB0012 D20A0299 496.3 496.66 0.36 32 8 <0.2 |
||||
| DD21EB0012 D20A0301 496.3 496.66 0.36 100 10 <0.2 |
||||
| DD21EB0012 D20A0319 502.17 502.47 0.3 48 19 0.4 |
||||
| DD21EB0012 D20A0321 502.17 502.47 0.3 111 19 0.4 |
-
Sub-sampling • If core, whether cut or sawn and whether quarter, • Sample intervals were defined by field geologists based on portable XRF results techniques half or all core taken. and detailed geological logging. and sample • If non-core, whether riffled, tube sampled, rotary • Core was then transported by road to Adelaide where the core was cut by preparation split, etc and whether sampled wet or dry. means of an Almonte core saw (where competent enough to do so) or by brick • For all sample types, the nature, quality and saw, where it was not. appropriateness of the sample preparation • In the batch of samples discussed primarily in this announcement, a total of technique. 125 samples were taken, including field duplicates and standards, which were
-
• Quality control procedures adopted for all subinserted at a 1:20 and 1:10 ratio respectively (10 standards, 7 field duplicates), sampling stages to maximise representivity of leaving a total of 108 samples. samples. • Core was cut on a sample-by sample-basis according to need in the following
-
• Measures taken to ensure that the sampling is manner: representative of the in situ material collected,
oWhere a field duplicate was not required: ¼ core for assay, ¼ core for including for instance results for field retention by Coda on site for future review, ½ core for future duplicate/second-half sampling. metallurgical work (currently being held in cold storage). -
• Whether sample sizes are appropriate to the grain
oWhere a field duplicate was required: ¼ core for assay, ¼ core for size of the material being sampled. duplicate assay, ¼ core for retention by Coda on site for future review,
==> picture [78 x 78] intentionally omitted <==
6 Altona Street E: [email protected] West Perth Western Australia, 6005 ABN 49 625 763 957
==> picture [842 x 84] intentionally omitted <==
| Criteria JORC Code explanation Commentary |
Criteria JORC Code explanation Commentary |
|||||||
|---|---|---|---|---|---|---|---|---|
| DD21EB0013 D20A0339 DD21EB0013 D20A0341 DD21EB0013 D20A0359 DD21EB0013 D20A0361 DD21EB0013 D20A0379 DD21EB0013 D20A0381 DD21EB0014 D20A0399 DD21EB0014 D20A0401 DD21EB0014 D20A0419 DD21EB0014 D20A0421 All results in ppm |
DD21EB0013 | D20A0339 | 403.47 | 404 | 0.53 0.53 |
1620 1960 |
113 121 |
8.4 8.4 |
| DD21EB0013 | D20A0341 | 403.47 | 404 | |||||
| DD21EB0013 | D20A0359 | 420.11 | 421 | 0.89 0.9 |
141 139 |
27 23 |
2.4 2.4 |
|
| DD21EB0013 | D20A0361 | 420.1 | 421 | |||||
| DD21EB0013 | D20A0379 | 437 | 438 | 1 1 |
58 82 |
55 52 |
4.4 4 |
|
| DD21EB0013 | D20A0381 | 437 | 438 | |||||
| DD21EB0014 | D20A0399 | 445.97 | 446.27 | 0.3 0.3 |
32200 30400 |
1700 1590 |
71.6 68.2 |
|
| DD21EB0014 | D20A0401 | 445.97 | 446.27 | |||||
| DD21EB0014 | D20A0419 | 455.56 | 455.86 | 0.3 0.3 |
120 226 |
16 16 |
<0.2 <0.2 |
|
| DD21EB0014 | D20A0421 | 455.56 | 455.86 | |||||
6 Altona Street E: [email protected] West Perth Western Australia, 6005 ABN 49 625 763 957
==> picture [78 x 78] intentionally omitted <==
==> picture [842 x 84] intentionally omitted <==
| Criteria JORC Code explanation |
Commentary | Commentary | Commentary | Commentary | Commentary | Commentary |
|---|---|---|---|---|---|---|
| Quality of assay data and laboratory tests • The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. • For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc. • Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established. |
• Assays were undertaken by Bureau Veritas in Adelaide SA. • Quartered core was crushed, split and pulverised before being digested with a mixture of nitric, perchloric and hydrofluoric acids. This digest approximates a total digest in most samples. • Al, Ca, Fe, Mg, Mn and S were determined by ICP-AES, Ag, As, Bi, Ce, Co, Cu, La, Ni, Pb, Th, Y, Zn, Zr.were determined by ICP-MS. • These techniques were determined in consultation with the assay laboratory and are considered appropriate for the deposit type. • Field duplicates and standards were inserted at a 1:20 and 1:10 ratio respectively (10 standards, 7 field duplicates over 125 total samples). • Average absolute error for target elements was 635 ppm (Cu), 0.10 ppm (Ag) and 45 ppm (Co). See below: Cu % Cu % Ag ppm Ag ppm Co ppm Co ppm Measured Expected Measured Expected Measured Expected 0.38% 0.41% 1 1.1 111 119 0.38% 0.41% 1 1.1 112 119 0.37% 0.41% 1 1.1 110 119 0.38% 0.41% 1.2 1.1 120 119 0.38% 0.41% 1.2 1.1 121 119 0.75% 0.77% 3.4 3.5 612 660 3.13% 3.20% 3 3.02 2520 2445 3.35% 3.20% 3 3.02 2360 2445 3.13% 3.20% 3 3.02 2320 2445 3.16% 3.20% 2.8 3.02 2360 2445 3.33% 3.20% 3 3.02 2320 2445 3.37% 3.20% 2.8 3.02 2450 2445 3.22% 3.20% 2.8 3.02 2450 2445 ~~•~~ |
|||||
| Cu % | Cu % | Ag ppm | Ag ppm | Co ppm | Co ppm | |
| Measured | Expected | Measured | Expected | Measured | Expected | |
| 0.38% | 0.41% | 1 | 1.1 | 111 | 119 | |
| 0.38% | 0.41% | 1 | 1.1 | 112 | 119 | |
| 0.37% | 0.41% | 1 | 1.1 | 110 | 119 | |
| 0.38% | 0.41% | 1.2 | 1.1 | 120 | 119 | |
| 0.38% | 0.41% | 1.2 | 1.1 | 121 | 119 | |
| 0.75% | 0.77% | 3.4 | 3.5 | 612 | 660 | |
| 3.13% | 3.20% | 3 | 3.02 | 2520 | 2445 | |
| 3.35% | 3.20% | 3 | 3.02 | 2360 | 2445 | |
| 3.13% | 3.20% | 3 | 3.02 | 2320 | 2445 | |
| 3.16% | 3.20% | 2.8 | 3.02 | 2360 | 2445 | |
| 3.33% | 3.20% | 3 | 3.02 | 2320 | 2445 | |
| 3.37% | 3.20% | 2.8 | 3.02 | 2450 | 2445 | |
| 3.22% ~~•~~ |
3.20% | 2.8 | 3.02 | 2450 | 2445 |
6 Altona Street West Perth Western Australia, 6005
==> picture [78 x 78] intentionally omitted <==
ABN 49 625 763 957
==> picture [842 x 84] intentionally omitted <==
| Criteria | JORC | Code explanation | Commentary | Commentary | |
|---|---|---|---|---|---|
| Verification | of | • | The verification of significant intersections by | • | Significant intersections have been verified against geological logging, portable |
| sampling and | either independent or alternative company | XRF results, and distributed to field geologists for further review. | |||
| assaying | personnel. | • | No adjustments have been made to assay data except to composite for | ||
| • | The use of twinned holes. | simplicity in this release. | |||
| • | Documentation of primary data, data entry | • | No twin holes have been undertaken at this prospect. | ||
| procedures, data verification, data storage | • | Unusually high Ag assays were identified in these results and noted in this | |||
| (physical and electronic) protocols. | release. These results will be investigated for accuracy via umpire assays. Coda | ||||
| • | Discuss any adjustment to assay data. | does not believe that the potential inaccuracy materially impacts the overall | |||
| release nor the economic potential of the Emmie Bluff prospect as a whole. | |||||
| • | If umpire assays determine the result to be inaccurate, Coda will inform the | ||||
| market. | |||||
| Location | of | • | Accuracy and quality of surveys used to locate drill | • | Drill collar locations (including RL) have been located using handheld GPS, MGA |
| data points | holes (collar and down-hole surveys), trenches, | 94 Zone 53. | |||
| mine workings and other locations used in Mineral | • | Precise location of drillholes will be determined by an independent surveyor at | |||
| Resource estimation. | the completion of the overall drill programme (expected March 2021). | ||||
| • | Specification of the grid system used. | ||||
| • | Quality and adequacy of topographic control. |
6 Altona Street West Perth Western Australia, 6005
==> picture [78 x 78] intentionally omitted <==
ABN 49 625 763 957
==> picture [842 x 84] intentionally omitted <==
| Criteria | Criteria | JORC | Code explanation | Commentary | Commentary |
|---|---|---|---|---|---|
| Data | spacing |
• | Data spacing for reporting of Exploration Results. | • | Drillholes are irregularly spaced, with a mean distance of 537m to their |
| and | • | Whether the data spacing and distribution is | nearest neighbour, a minimum nearest neighbour distance of 193m | ||
| distribution | sufficient to establish the degree of geological and | (DD20EB0002 – DD21EB0017) and a maximum of 1,759m (DD20EB0005 – | |||
| grade continuity appropriate for the Mineral | DD21EB0013). | ||||
| Resource and Ore Reserve estimation |
• | If nearby historic holes are included, the mean distance to their nearest | |||
| procedure(s) and classifications applied. | neighbour falls to 433m, with an unchanged minimum and a new maximum | ||||
| • | Whether sample compositing has been applied. | of 1,356m (DD21EB0017 – MGD 42). | |||
| • | Holes DD21EB0013 and DD21EB0014 are 1,093m apart on a rough E/W axis. | ||||
| Hole DD21EB0012 is approximately 1,191m NNE of hole DD21EB0014. | |||||
| • | Physical compositing has not been applied to samples. | ||||
| • | Coda does not believe that the results reported in this release are sufficient to | ||||
| estimate a Mineral Resource and has not attempted to do so. | |||||
| Orientation of | • | Whether the orientation of sampling achieves | • | Due to drilling conditions, drillholes at Emmie Bluff are difficult to keep straight | |
| data | in relation | unbiased sampling of possible structures and the | and tend to dip towards -90 degrees as they increase in depth, regardless of | ||
| to | geological | extent to which this is known, considering the | starting dip. This makes orienting of core difficult and largely ineffective at the | ||
| structure | deposit type. | prospect. | |||
| • | If the relationship between the drilling orientation | • | The main mineralised stratum (Tapley Hill Fm shale) is relatively flat lying | ||
| and the orientation of key mineralised structures | throughout the prospect area based on previously announced seismic results | ||||
| is considered to have introduced a sampling bias, | and historical drilling. As such, the near-vertical intersects reported in holes | ||||
| this should be assessed and reported if material. | DD21EB0013 and DD21EB0014 are believed to be broadly representative of | ||||
| true width and are not believed to introduce any meaningful sampling bias. | |||||
| • | DD21EB0012 penetrated the mineralised stratum at an angle of approximately | ||||
| 67 degrees. The true width of the mineralised intersections are noted in | |||||
| footnotes in the body of the release. | |||||
| Sample | • | The measures taken to ensure sample security. | • | Samples were taken by representatives of Coda Minerals or Challenger | |
| security | Geological Services from the field to a core cutting facility in Adelaide, and then | ||||
| on to the assay lab. No third party other than Challenger Geological Services | |||||
| had access to the samples between the field and the assay lab. |
==> picture [78 x 78] intentionally omitted <==
6 Altona Street West Perth Western Australia, 6005 ABN 49 625 763 957
==> picture [842 x 84] intentionally omitted <==
| Criteria | JORC | Code explanation | Commentary | Commentary | |
|---|---|---|---|---|---|
| Audits | or | • |
The results of any audits or reviews of sampling | • |
No audits, umpire assays or reviews were undertaken beyond standard QA/QC |
| reviews | techniques and data. | procedures. |
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
| Criteria | JORC | Code explanation | Commentary | Commentary | |
|---|---|---|---|---|---|
| Mineral | • | Type, reference name/number, location and | • | All drilling took place on EL 6265. | |
| tenement and | ownership including agreements or material issues | • | EL 6265 is owned in a 70:30 relationship by Coda Minerals Ltd and Terrace | ||
| land | tenure | with third parties such as joint ventures, | Mining Ltd. | ||
| status | partnerships, overriding royalties, native title | • | Coda Minerals is currently free-carrying Terrace until a total of 8.62 million | ||
| interests, historical sites, wilderness or national | dollars is spent, at which point an unincorporated joint venture will be formed | ||||
| park and environmental settings. | to manage the tenure. | ||||
| • | The security of the tenure held at the time of | • | The tenure is in good standing and is considered secure at the time of this | ||
| reporting along with any known impediments to | release. No other impediments are known at this time. | ||||
| obtaining a licence to operate in the area. | |||||
| Exploration | • | Acknowledgment and appraisal of exploration by | • | Historical exploration of the Emmie Bluff prospect has been undertaken by | |
| done by other | other parties. | (among others) Mt Isa Mines, Gunson Resources, Torrens Mining and | |||
| parties | Gindalbie Metals (Coda’s predecessor company). | ||||
| • | With the exception of data from Gindalbie Metals, all historical results used to | ||||
| guide Coda’s exploration has been obtained from the Geological Survey of | |||||
| South Australia via the South Australian Resources Information Gateway | |||||
| (SARIG). |
6 Altona Street West Perth Western Australia, 6005
==> picture [78 x 78] intentionally omitted <==
ABN 49 625 763 957
==> picture [842 x 84] intentionally omitted <==
| Criteria | JORC | Code explanation | Commentary | Commentary | |
|---|---|---|---|---|---|
| Geology | • | Deposit type, geological setting and style of | • | The Elizabeth Creek project sits in the Stuart Shelf within the broader Olympic | |
| mineralisation. | Copper Province in South Australia. Specifically, mineralisation is hosted in the | ||||
| dolomitic shales and dolarenites of the Neoproterozoic Tapley Hill Formation. | |||||
| This formation unconformably overlies the Meso/Palaeoproterozoic Pandurra | |||||
| Formation due to local uplifting associated with the Pernatty Upwarp. This | |||||
| unconformity, as well as structures associated with the Pernatty Upwarp, | |||||
| represent the most likely fluid flow pathways associated with the | |||||
| emplacement of metal bearing sulphides. | |||||
| • | Emmie Bluff mineralisation closely resembles mineralisation in the MG14 and | ||||
| Windabout resources found approximately 40 kilometres to the south, also | |||||
| within the broader Elizabeth Creek tenure. It is considered to fall within the | |||||
| broad “Zambian-style” family of sediment hosted copper deposits. | |||||
| Drill | hole | • |
A summary of all information material to the | • | See Table 4 and Table 5 in body of announcement. |
| Information | understanding of the exploration results including | ||||
| a tabulation of the following information for all | |||||
| Material drill holes: | |||||
oeasting and northing of the drill hole collar |
|||||
oelevation or RL (Reduced Level – elevation |
|||||
| above sea level in metres) of the drill hole | |||||
| collar | |||||
odip and azimuth of the hole |
|||||
odown hole length and interception depth |
|||||
ohole length. |
|||||
| • | If the exclusion of this information is justified on | ||||
| the basis that the information is not Material and | |||||
| this exclusion does not detract from the | |||||
| understanding of the report, the Competent | |||||
| Person should clearly explain why this is the case. |
6 Altona Street E: [email protected] West Perth Western Australia, 6005 ABN 49 625 763 957
==> picture [78 x 78] intentionally omitted <==
==> picture [842 x 84] intentionally omitted <==
| Criteria JORC Code explanation Commentary |
Criteria JORC Code explanation Commentary |
|---|---|
| Data aggregation methods • In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated. • Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail. • The assumptions used for any reporting of metal equivalent values should be clearly stated. • • • |
Cut Off grade for reporting assays is 0.5% CuEq calculated as per Footnote 1 in the main body of the announcement. Due to the narrow nature of the mineralised intercepts, Coda believes that selective mining of high grade bands is likely impractical and would be misleading. All intersects have been reported as length weighted averages, in line with how they would most likely be eventually extracted. Typical example is included below: DD20EB00013:3m from 400.47m @ 4.71% CuEq (2.85% Cu, 1,545ppm Co and 27 g/t Ag). From To Length Cu ppm Co ppm Ag ppm CuEq% 400.47 400.72 0.25 10700 137 10 1.23% 400.72 401.11 0.39 48300 3470 45.2 8.99% 401.11 401.51 0.4 42000 1280 45.2 5.74% 401.51 401.96 0.45 48500 3300 47 8.81% 401.96 402.37 0.41 24500 1480 17.6 4.23% 402.37 402.75 0.38 18600 1010 15.6 3.07% 402.75 403.07 0.32 17700 648 15.2 2.55% 403.07 403.47 0.4 6630 134 12.8 0.82% |
| DD20EB00013:3m from 400.47m @ 4.71% CuEq (2.85% Cu, 1,545ppm Co and 27 g/t Ag). |
|
| From To Length Cu ppm Co ppm Ag ppm CuEq% |
|
| 400.47 400.72 0.25 10700 137 10 1.23% 400.72 401.11 0.39 48300 3470 45.2 8.99% 401.11 401.51 0.4 42000 1280 45.2 5.74% 401.51 401.96 0.45 48500 3300 47 8.81% 401.96 402.37 0.41 24500 1480 17.6 4.23% 402.37 402.75 0.38 18600 1010 15.6 3.07% 402.75 403.07 0.32 17700 648 15.2 2.55% 403.07 403.47 0.4 6630 134 12.8 0.82% |
|
| Relationship between mineralisation widths and intercept lengths • These relationships are particularly important in the reporting of Exploration Results. • If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported. • If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg ‘down hole length, true width not known’). • • |
Due to drilling conditions, drillholes at Emmie Bluff are difficult to keep straight and tend to dip towards -90 degrees as they increase in depth, regardless of starting dip. The main mineralised stratum (Tapley Hill Fm shale) is relatively flat lying throughout the prospect area based on previously announced seismic results and historical drilling. As such, the near-vertical intersects reported are believed to be broadly representative of true width, except where otherwise noted (i.e. hole DD21EB0012). |
==> picture [78 x 78] intentionally omitted <==
6 Altona Street E: [email protected] West Perth Western Australia, 6005 ABN 49 625 763 957
==> picture [842 x 84] intentionally omitted <==
| Criteria | JORC | Code explanation | Commentary | Commentary |
|---|---|---|---|---|
| Diagrams | • | Appropriate maps and sections (with scales) and | • | See map, sections and tables in main body of announcement. |
| tabulations of intercepts should be included for | ||||
| any significant discovery being reported These | ||||
| should include, but not be limited to a plan view of | ||||
| drill hole collar locations and appropriate sectional | ||||
| views. | ||||
| Balanced | • | Where comprehensive reporting of all Exploration | • | All assays > 0.5% CuEq reported in this announcement. Intersects not |
| reporting | Results is not practicable, representative reporting | specifically reported on in this announcement can be assumed to be <0.5% | ||
| of both low and high grades and/or widths should | CuEq. | |||
| be practiced to avoid misleading reporting of | ||||
| Exploration Results. | ||||
| Other | • | Other exploration data, if meaningful and material, | • | No other substantive exploration results are considered relevant to this |
| substantive | should be reported including (but not limited to): | release. | ||
| exploration | geological observations; geophysical survey |
• | The information regarding the Exploration Target referred to in this | |
| data | results; geochemical survey results; bulk samples – | announcement is extracted from the report entitled Confirmation of | ||
| size and method of treatment; metallurgical test | Exploration Target and Mineral Resource and Ore Reserve Statement, created | |||
| results; bulk density, groundwater, geotechnical | on 23 October 2020 and is available to view on |
|||
| and rock characteristics; potential deleterious or | https://www.asx.com.au/asxpdf/20201026/pdf/44p31fmg5k2579.pdf. The |
|||
| contaminating substances. | company confirms that it is not aware of any new information or data that | |||
| materially affects the information included in the original market | ||||
| announcement and that all material assumptions and technical parameters | ||||
| underpinning the estimates in the relevant market announcement continue to | ||||
| apply and have not materially changed. The company confirms that the form | ||||
| and context in which the Competent Person’s findings are presented have not | ||||
| been materially modified from the original market announcement. |
6 Altona Street E: [email protected] West Perth Western Australia, 6005 ABN 49 625 763 957
==> picture [78 x 78] intentionally omitted <==
==> picture [842 x 84] intentionally omitted <==
-
Criteria JORC Code explanation Commentary Further work • The nature and scale of planned further work (eg • Coda has appointed a resource geologist to assess the existing drilling and tests for lateral extensions or depth extensions or geophysical dataset. The objective of this work is to identify necessary drill large-scale step-out drilling). holes required to define a JORC 2012 compliant Inferred Mineral Resource.
-
• Diagrams clearly highlighting the areas of possible Coda anticipates that this will involve the drilling of at least 12 additional extensions, including the main geological diamond drillholes within or at the fringes of the existing known mineralised interpretations and future drilling areas, provided envelope, which it expects to complete in the second or third quarter of 2021. this information is not commercially sensitive.
==> picture [197 x 281] intentionally omitted <==
Figure 9: Map showing the current interpretation of known Tapley Hill Fm shale (red outline), the current Exploration Target outline (black and white outline) and drilling at the prospect (red, green and grey circles). Areas of proposed additional infill drilling are outlined in pink. Areas of possible extension/expansion are outlined in blue
6 Altona Street West Perth Western Australia, 6005
==> picture [78 x 78] intentionally omitted <==
ABN 49 625 763 957