ASX Announcement

Aus Tin Mining Limited (ASX:ANW)

10 May 2019

Shallow High‐grade Nickel Intersections at Mt Cobalt

Highlights:

  • Recent diamond drilling results highlight:

  • high‐grade nickel intersections up to 1.6%Ni near surface at Mt Cobalt;

  • Existence of shear‐zones north of previous drilling extends target zone to 500m long x 25m wide and open at depth.

  • Elevated silver assays (average 116 g/t over 13m) reported for sludge samples.

The Directors of Aus Tin Mining Limited (the Company ) are pleased to provide the following update in relation to the Company’s Mt Cobalt cobalt‐nickel project.

In April 2019 the Company completed a program of five diamond drill holes for a total 153.6m to test potential extensions of mineralisation below and along strike from historic workings at Mt Cobalt. Assays results have now been obtained and are summarised in Table 1. Sampling was selective over the length of the holes reflecting intervals of poor core recovery (HQ) due to the extremely broken ground. Additional results are provided in Table 2 and Appendix 1.

Table 1 – Summary Analytical Results for Diamond Drilling

Hole # Significant Ni intersections
COB033 0.4m @ 1.19% Ni, 149ppm Co from 11.6m
COB034 0.9m @ 1.62% Ni, 125ppm Co from 16.4m
0.4m @ 0.97% Ni, 222ppm Co from 13.1m &
0.4m @ 1.02% Ni, 155ppm Co from 13.6m
COB035 1.0m @ 1.10% Ni, 152ppm Co from 16m
0.5m @ 1.14% Ni, 229ppm Co from 40.2m &
0.2m @ 1.10% Ni, 285ppm Co from 44.8m

Results from this most recent drilling confirm the occurrence of high‐grade nickel at relatively shallow depths in a new zone north of where previous drilling has been conducted (Figure 1). The recent drilling also confirmed the existence of shear zones north and west of where previous drilling has been conducted, the shear zone having previously been found to host high‐grade cobalt‐manganese oxide, asbolite. Notwithstanding an absence of the elevated cobalt or manganese assays in this latest program, previous drilling in 2016 and 2018 did indicate not all shear zone was mineralised with asbolite, and the Company will continue to explore this northern extension in due course.

Aus Tin Mining Limited Level 27, 111 Eagle Street, Brisbane, Qld 4000 (GPO Box 5261) Phone: 07 3303 0611, Fax: 07‐3303 0681, Website: www.austinmining.com.au

==> picture [477 x 673] intentionally omitted <==

Figure 1 – Geological interpretation of Mt Cobalt

Aus Tin Mining Limited Level 27, 111 Eagle Street, Brisbane, Qld 4000 (GPO Box 5261) Phone: 07 3303 0611, Fax: 07‐3303 0681, Website: www.austinmining.com.au

As previously announced[1] the shear zones observed in the latest drilling program support the previous interpretation of a possible continuation of the shear zone in a north west direction and possible extension of the target zone. In 2018[2] a 350m target zone was defined by a combination of target lithology mapping, surface mineralisation, soil geochemistry, drilling and the extent of historic workings, over a sinusoidal folded and sheared zone in the host serpentinite. As illustrated in Figure 1, this latest drilling extended the target zone by a further 150m, to a total 500m long x 25m wide and open at depth. The Company will focus the next phase of exploration at Mt Cobalt to further field reconnaissance and mapping for shear zones west of the target zone in order to develop further drill targets.

Following problems with lower core recovery in the 2018 programs[3] this latest program employed HQ triple tube diamond drilling but recovery was lower than desired in areas of broken ground associated with the shear zone. Again sludge samples were collected for selected intervals and notable was a high silver assay averaging 116 g/t over a 13m interval from surface (COB034). In the 2018 program a sludge sample from the southern end of the target zone returned a silver grade of 247 g/t over 43m from surface and any potential connection between the two results are being examined. The Company will also examine the results against the high‐grade copper‐silver Silver Valley prospect located two kilometers south‐east of Mt Cobalt where historic drilling results have included 21m @ 1.0%Cu, 99g/t Ag including 1.5m @ 6.2%Cu, 582 g/t Ag[4] .

==> picture [161 x 30] intentionally omitted <==

On behalf of the Board KM Schlobohm Company Secretary

Email: [email protected]

Electronic copies and more information are available on the Company website: www.austinmining.com.au

Company Twitter account: @AusTin_Mining

For further information contact:

Mr. Peter Williams Karl Schlobohm CEO, Aus Tin Mining Limited Company Secretary, Aus Tin Mining Limited Ph: 07 3303 0611 Ph: 07 3303 0680

1 Refer ASX Announcement dated 27th March 2019

2 Refer ASX Announcement dated 16 February 2018

3 Refer ASX Announcement dated 23rd January 2018

4 Refer ASX Announcement dated 29th March 2011

Aus Tin Mining Limited Level 27, 111 Eagle Street, Brisbane, Qld 4000 (GPO Box 5261) Phone: 07 3303 0611, Fax: 07‐3303 0681, Website: www.austinmining.com.au

Forward Looking Statement

This announcement may contain certain statements and projections provided by or on behalf of Aus Tin Mining Limited (Aus Tin Mining) with respect to the anticipated future undertakings. These forward‐looking statements reflect various assumptions by or on behalf of Aus Tin Mining. Accordingly, these statements are subject to significant business, economic and competitive uncertainties and contingencies associated with exploration and/or mining which may be beyond the control of Aus Tin Mining which could cause actual results or trends to differ materially, including but not limited to price fluctuations, exploration results, reserve and resource estimation, environmental risks, physical risks, legislative and regulatory changes, political risks, project delay or advancement, ability to meet funding requirements, factors relating to property title, native title and aboriginal heritage issues, dependence on key personnel, share price volatility, approvals and cost estimates. Accordingly, there can be no assurance that such statements and projections will be realised. Aus Tin Mining makes no representations as to the accuracy or completeness of any such statement of projections or that any forecasts will be achieved.

Additionally, Aus Tin Mining makes no representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under statute or otherwise) is or will be accepted by Aus Tin Mining or by any of their respective officers, directors, shareholders, partners, employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or matters (express or implied) arising out of, contained in or derived from this presentation or any omission from this presentation or of any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing this presentation, Aus Tin Mining undertakes no obligation to provide any additional or updated information whether as a result of new information, future events or results or otherwise.

Nothing in this material should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a basis to invest in Aus Tin Mining Limited .

COMPETENT PERSON STATEMENT

The information in this presentation that relates to Exploration Targets and Exploration Results is based on information compiled by Mr Nicholas Mather B.Sc (Hons) Geol., who is a Member of The Australian Institute of Mining and Metallurgy. Mr Mather is employed by Samuel Capital Pty Ltd, which provides certain consultancy services including the provision of Mr Mather as a Director of Aus Tin Mining. Mr Mather has more than five years experience which is relevant to the style of mineralisation and type of deposit being reported and to the activity, which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves’ (the JORC Code). This public report is issued with the prior written consent of the Competent Person(s) as to the form and context in which it appears.

Table 2 – Summary Results for Diamond Drilling

mgE mgN RL DIP AZ_MAG EOH
(m)
From To Interval
(m)
Co
(ppm)
Ni (%)
427617 7102461 516 60 350 20.3 11.6 12.0 0.4 149 1.19
427617 7102467 516 70 71 26.5 16.4 17.5 0.9 125 1.62
Sludge Sample 0 13.0 13
427622 7102490 492 60 115 56.5 13.1 13.5 0.4 222 0.97
13.6 14.0 0.4 155 1.02
16.0 17.0 1.0 152 1.10
40.2 40.7 0.5 229 1.145
44.8 45.0 0.2 285 1.10
427545 7102435 480 60 118 17.8 Hole abandoned due to poor co
zone
427545 7102435 480 70 118 32.5

Aus Tin Mining Limited Level 27, 111 Eagle Street, Brisbane, Qld 4000 (GPO Box 5261) Phone: 07 3303 0611, Fax: 07‐3303 0681, Website: www.austinmining.com.au

Appendix 1 ‐ JORC Code, 2012 Edition – Table 1

1.1 Section 1 Sampling Techniques and Data

Criteria JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of
sampling.
Sub surface samples were collected as drill core from
diamond drilling (HQ).
A total of 5 DD drill holes were completed for a total of
153.6m and 1 hole abandoned at 18m due to loss of
circulation. The reported results are for 4 holes totalling
137.6m.
Drill holes were oriented to intersect the interpreted strike of
the targeted shear zone trend. Dip angles ranging from 60
and 70 degrees from horizontal to maximise drill distance to
test intersections of the shear while taking topography of the
site into consideration.
Samples submitted for assay typically weighed 1‐3kg
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be
required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Samples were collected from halved cut core and where the
core was intact. Where core was too soft to be cut with a
power saw the core was halved by cutting with a sharp knife.
Intervals with broken core had the sample debris divided into
halves and the half core sample collected by spoon.
Samples for geochemical analysis were selectively collected
at intervals of varying thickness over mineralised zones not
greater than 1.5m or less than 0.2m in competent core. Over
intervals of core loss and broken ground samples intervals
were no greater than 2.5m. 3 samples were taken from as
sludge samples at the drill collar due to no core in
unconsolidated ground. Zones not sampled reflected zones
of either poor core recovery or lithology not representing
exploration target zone.
A total of 83 samples were collected with sample weights
typically 1‐3kg.
Samples were packaged at site and delivered to ALS labs in
Brisbane to be assayed using Nitric aqua regia digestion
followed by ICP AES finish (ALS ME‐ICP41). Samples assaying
above 1% Ni and 100ppm Ag were reassayed using aqua regia
method ALS NE‐OG46.
Drilling
techniques
Drill type (eg core, reverse circulation, open‐hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard tube,
depth of diamond tails, face‐sampling bit or other type,
whether core is oriented and if so, by what method,
etc).
Diamond drilling comprised:
HQ diamond drilling.
Hole depths range from 17‐56.5m
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
HQ core samples were visually checked and recorded for
recovery, moisture and contamination.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
The drill holes were drilled using polymers and muds to limit
core loss in argillic zones and where cutting return was lost
swelling polymers were mixed with the mud to restore mud
and cutting return to the surface
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Sample recoveries were high within the mineralised zones in
competent ground and low in zones of unconsolidated
ground. No significant bias is expected.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Drill core was geologically logged and the level of
understanding of these variables increases with the
maturity of the prospect.

Aus Tin Mining Limited Level 27, 111 Eagle Street, Brisbane, Qld 4000 (GPO Box 5261) Phone: 07 3303 0611, Fax: 07‐3303 0681, Website: www.austinmining.com.au

Criteria JORC Code explanation
Commentary
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
All drill holes were geologically logged for the entirety of the
holes with the following observations recorded:
Lithology, texture, colour, mineralogy, alteration,
weathering and other relevant features of the samples.
Mineralised zones were identified from observation of
mineralogy and lithological characteristics.
All logged information was initially logged on to field notes
and then later entered digitally into a MS database (Excel).
Core from each hole for the entirety of the hole was
collected into core trays, with intervals and core loss
recorded on drillers blocks, numbered and photographed as
a representation of the hole. The core trays are stored in a
designated building for future reference.
The total length and percentage of the relevant
intersections logged.
All drillholes were geologically logged in full where core
recovery allowed.
Sub‐sampling
techniques
and sample
preparation
If non‐core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
80 samples were from drill core.
3 samples were sludge samples taken from the drill collar.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Sample preparation follows industry best practice standards
and is conducted by internationally recognised laboratories.
Quality control procedures adopted for all sub‐sampling
stages to maximise representivity of samples
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field duplicate/second‐
half sampling.
Regular cleaning of sampling equipment was undertaken to
prevent contamination.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
Sample sizes are considered appropriate for the rock type,
style of mineralisation, the thickness and consistency of the
intersections, the sampling methodology and percent value
assay ranges for the primary elements.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
Assay and laboratory procedures have been selected
following a review of techniques provided by internationally
certified laboratories.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
None used
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (ie
lack of bias) and precision have been established.
Appropriate analytical method using Nitric aqua regia
digestion with ICP‐AES finish (ME_ICP41 and OG46) and fire
assay with ICP‐AES finish (PGM‐ICP23)
Assaying was carried out by ALS, an accredited laboratory.
No duplicates or standards were submitted
Verification
of sampling
and assaying
The verification of significant intersections by either
independent or alternative company personnel.
The drill logs were prepared by the site supervising
geologist and have subsequently reviewed by the
Company’s senior geologist.
The use of twinned holes.
No twinned holes were undertaken

Aus Tin Mining Limited Level 27, 111 Eagle Street, Brisbane, Qld 4000 (GPO Box 5261) Phone: 07 3303 0611, Fax: 07‐3303 0681, Website: www.austinmining.com.au

Criteria JORC Code explanation
Commentary
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
All field data is manually collected and noted on field sheets
then later entered into excel spreadsheets.
Hard copies are stored within a local office and electronic
data is stored on the Brisbane server.
All electronic data is routinely backed up.
Discuss any adjustment to assay data.
None required
Location of
data points
Accuracy and quality of surveys used to locate drill
holes (collar and down‐hole surveys), trenches, mine
workings and other locations used in Mineral Resource
estimation.
All drill holes are initially located using a hand held GPS
Upon completion of drill hole, collars are again checked
with two hand held GPS with a 3m lateral accuracy.
Specification of the grid system used.
The grid system used is MGA_GDA94 Zone56.
Quality and adequacy of topographic control.
The accuracy is adequate for collection of initial data on the
zone of mineralisation
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Due to the steep terrain, drill spacing was largely dependent
on accessible sites.
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and classifications
applied.
The purpose of the drilling was to target mineralisation of a
shear zone inferred from previous drilling and geophysics
and is not intended to be used for JORC resource calculation
purposes.
_Whether_sample compositing has been applied.
Some assaying samples were collected by compositing half
core up to 2.5m within zones of little visible mineralisation.
The composite samples to be resampled at 1m intervals as
quarter core at a later date if the results from the composite
samples were considered significant based on grade.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
Drill holes were oriented perpendicular to the interpreted
strike of the targeted shear zone trend at dip angles to
optimally intersect the mineralisation zones and with strike
to establish depth of mineralisation.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
The drill holes oriented perpendicular to the interpreted
strike of mineralisation, are regarded has having no bias
sampling bias.
Sample
security
The measures taken to ensure sample security.
Company geologist supervises all sampling and subsequent
storage in the field. The samples are delivered to ALS
Brisbane by either company management or recognized
freight service.
Sample submission forms are submitted both electronically
and with the samples.
Upon receipt of samples, ALS delivers by email to the
Company’s CEO confirmation of arrival of samples.

Aus Tin Mining Limited Level 27, 111 Eagle Street, Brisbane, Qld 4000 (GPO Box 5261) Phone: 07 3303 0611, Fax: 07‐3303 0681, Website: www.austinmining.com.au

Criteria JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park
and environmental settings.
Mt Cobalt is located wholly within Exploration Permit 19366
approximately 40km West of Gympie and is 100% held by AusTin
Mining.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
All granted tenements are in good standing and there are no
impediments to operating in the area.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by
other parties.
Reference made to results previously reported by the Company
Geology Deposit type, geological setting and style of
mineralisation.
The Mt Cobalt project is part of a larger Nickel mineralisation
province.
The prospect setting is a structurally controlled nickel/cobalt
mineralising system hosted in Carboniferous Serpentinite rocks of
the Wandilla Province.
The mineralisation is associated with an almost North/South
master shear that deeps steeply to the West. The cobalt‐
Manganese enriched mineralisation is a result of the weathering
of a polymetallic lode system.
The principle ore minerals identified at the Mt Cobalt prospect
include, Asbolite and garnierite.
Asbolite occurs as bluish black dendrites and fracture coatings
throughout the laterite profile.
The footwall of the fault consists of a talcose Garnierite zone
hosting irregular veins of Nickel/Cobalt Manganese oxide
(Asbolite). On the hangwall, a silicate rich assemblage hosts the
main portion of Asbolite being the greater source of the
mineralisation.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all
Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.
Refer to the body of this report for significant intercepts
pertaining to this announcement.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (eg cutting of high grades) and cut‐off
Results are reported for individual and averaged intervals

Aus Tin Mining Limited Level 27, 111 Eagle Street, Brisbane, Qld 4000 (GPO Box 5261) Phone: 07 3303 0611, Fax: 07‐3303 0681, Website: www.austinmining.com.au

Criteria JORC Code explanation Commentary
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship These relationships are particularly important in the Drill holes were orientated to intersect the mineralised shear
between reporting of Exploration Results. at the perpendicular.
mineralisation If the geometry of the mineralisation with respect to The general orientation of the drill holes is considered
widths and the drill hole angle is known, its nature should be suitable.
intercept reported.
lengths If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
_effect(eg ‘down hole length, true width not known’). _
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Balanced Where comprehensive reporting of all Exploration Results are reported for grades greater than 0.1%Co and
reporting Results is not practicable, representative reporting of
0.5%Ni
both low and high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
Other Other exploration data, if meaningful and material, Limited preliminary metallurgical test work has been
substantive should be reported including (but not limited to): undertaken and a review of extraction options evaluated.
exploration geological observations; geophysical survey results;
data geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
Further work The nature and scale of planned further work (eg Details of further work are yet to be determined
tests for lateral extensions or depth extensions or
large‐scale step‐out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.