Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CHEM Management Reports 2023

Nov 24, 2023

51839_rns_2023-11-24_77ec1c6c-7fba-4a8b-989c-e501c39bcaa0.pdf

Management Reports

Open in viewer

Opens in your device viewer

==> picture [117 x 30] intentionally omitted <==

CHEM Company Brief by Ellen Kuo Vice Chairperson

1

==> picture [117 x 30] intentionally omitted <==

==> picture [411 x 59] intentionally omitted <==

Recognized in Achievement of Carbon Emission Reduction & Revenue Generation.

CO2 Emission Reduction Effectiveness + Robust Growth in Stock Performance

Proven Competitiveness in the Same Industry (+188% among others)

==> picture [117 x 30] intentionally omitted <==

Focus

1. ISO37001 integrated with anti-bribery for corporate governance.

2. Welding in Automation , including CO2 Welding in South Plant and Arc Brazing in Linkuo Plant for Competitiveness in Cost Efficiency in Materials & Labor

3. Automation in Manufacturing Application and Quality for meeting the demands for Cost Efficiency and Streamlining in future growing business.

4. Cooperative Education in Practice in 2023: 1Q24 to be on board with 40 new members to join as infusing new energy from talents.

5. TCFD Carbon Emission Check : Scope 1 & 2 to be covered by IT Team for automatic calculation, targeting efficient carbon emission reduction.

6. Plants & Inventory to Build for increased work efficiency in Chiyi Plants, 1700 Taiwanese ping, expected to increase 15% to 20% in production efficiency. 7. R&D Focus for hydrogen business with BOL (Build, Operate, Localize) Strategy

5

==> picture [117 x 30] intentionally omitted <==

Business

CHEM

2022

NT$2.96b

NT$11.56b NT$4.03b

Revenue

●Green Energy

■ Solar Energy

■ Hydrogen Energy Storage, Micro Grid ■ Power Supply & Equipment

68■ Power Supply & Equipment ●Service ■ Parking Management ■ 19● ■ Urban Renovation Projects ■ System Integration 13■ Precision Machining

■ Maintenance Management

● Engineering & Others

■ Urban Renovation Projects

6

==> picture [117 x 30] intentionally omitted <==

==> picture [183 x 27] intentionally omitted <==

Occupational Aerospace Safety & Health

Quality System

Governance

AS-9100 Rev D NADCAP GE S1000 Audit

ISO14001 ISO 45001 TOSHMS

TAF ISO27001 CNS ISO37001 ISO9001

==> picture [87 x 39] intentionally omitted <==

==> picture [87 x 54] intentionally omitted <==

==> picture [85 x 130] intentionally omitted <==

==> picture [78 x 135] intentionally omitted <==

==> picture [79 x 135] intentionally omitted <==

==> picture [56 x 83] intentionally omitted <==

==> picture [71 x 65] intentionally omitted <==

==> picture [86 x 141] intentionally omitted <==

==> picture [91 x 127] intentionally omitted <==

: to be introduced in 2023Q4

7

==> picture [117 x 30] intentionally omitted <==

==> picture [49 x 26] intentionally omitted <==

==> picture [307 x 234] intentionally omitted <==

==> picture [264 x 202] intentionally omitted <==

==> picture [266 x 36] intentionally omitted <==

8

==> picture [117 x 30] intentionally omitted <==

==> picture [49 x 26] intentionally omitted <==

==> picture [406 x 248] intentionally omitted <==

Da Lin345KV GIS Lon Qi 345KV GIL

9

==> picture [117 x 30] intentionally omitted <==

==> picture [49 x 26] intentionally omitted <==

Chong Liao 345KV GCS Nanke 345KV GIL

10

==> picture [117 x 30] intentionally omitted <==

Tai-Power Power Grid Resilience Program

*台電10年電網強韌案

621.2Billion to inject by Tai-power for the year 2022 to 2031

==> picture [106 x 66] intentionally omitted <==

----- Start of picture text -----

Power Grid +
Renewable Energy
----- End of picture text -----

==> picture [106 x 66] intentionally omitted <==

----- Start of picture text -----

Power Grid +
Expansion &
Renewal
----- End of picture text -----

==> picture [106 x 66] intentionally omitted <==

----- Start of picture text -----

Power Storage
----- End of picture text -----

==> picture [106 x 66] intentionally omitted <==

----- Start of picture text -----

Renewable Energy
Generation
----- End of picture text -----

==> picture [106 x 66] intentionally omitted <==

----- Start of picture text -----

Power Distribution
& Arrangement
----- End of picture text -----

==> picture [106 x 66] intentionally omitted <==

----- Start of picture text -----

Facilities &
Engineering
----- End of picture text -----

Bud et b TaiPower in Plannin g y g 2022 2023 2024 2025 2026 2027 26.51 164% 240% 300% 297% 292% billion

==> picture [234 x 129] intentionally omitted <==

11

==> picture [117 x 30] intentionally omitted <==

==> picture [173 x 32] intentionally omitted <==

  • TaiPower – New Plants & Engineering

、 、 Project Dong161 Project Da1161 Project Da2345 Estimated NTD16 Billion*

  • Phase 3-1 Off-Grid Wind Power Substation & Engineering Estimated NTD 8.5 billion

  • Power Storage Engineering Projects –

  • Estimated NTD 8billion

  • Taipower – Power Distribution & Substation Engineering Projects Estimated NTD 2 billion

  • Phase 3-2 Off-Grid Wind Power, Grids on Land & Substation

  • Solar Power Projects and EPC

  • Renewable Energy in Substation and Grids Engineering

  • Private Power Storage at Sites, Substations, Grids and Engineering

==> picture [17 x 28] intentionally omitted <==

==> picture [18 x 21] intentionally omitted <==

12

facilities included

==> picture [117 x 30] intentionally omitted <==

==> picture [100 x 27] intentionally omitted <==

Needs in Energy Slow Down & Needs in Electricity Go

==> picture [591 x 342] intentionally omitted <==

13

==> picture [117 x 30] intentionally omitted <==

==> picture [577 x 33] intentionally omitted <==

Emission & Offset For Targeting Zero Carbon Emission

14

==> picture [117 x 30] intentionally omitted <==

==> picture [173 x 27] intentionally omitted <==

Tree Valley Tech Park, Tainan

==> picture [469 x 320] intentionally omitted <==

----- Start of picture text -----






----- End of picture text -----

Business Scope

  • Chamber – Welding & Machining for Gen. 10.5

  • • Display & Equipment – Parts Machining

  • • Large Parts & Measurement in Precision

  • Ultra-Sonic Testing & Measurement

  • Welding & Erosion in Testing

==> picture [117 x 30] intentionally omitted <==

==> picture [597 x 33] intentionally omitted <==

==> picture [634 x 300] intentionally omitted <==

----- Start of picture text -----

Before After

----- End of picture text -----

  • Gen. 10.5 & Gen. 8.5 OLED Display

  • Commonly seen in Tablets and/or PC application

  • Human Resources Recruiting in Progress for Business Growth

16

==> picture [117 x 30] intentionally omitted <==

==> picture [275 x 33] intentionally omitted <==

Methanol-Based H2 Generation for Engine Carbon Removal

==> picture [157 x 98] intentionally omitted <==

==> picture [157 x 137] intentionally omitted <==

==> picture [157 x 137] intentionally omitted <==

==> picture [45 x 24] intentionally omitted <==

==> picture [94 x 40] intentionally omitted <==

==> picture [16 x 20] intentionally omitted <==

==> picture [21 x 17] intentionally omitted <==

==> picture [131 x 23] intentionally omitted <==

----- Start of picture text -----

ME2H
----- End of picture text -----

ME2 Stack & Power Module

  • H2 Fuel Cell

  • H2 Stake and Power Module

  • H2-based Light Vehicles

H2 Refueling Station Solution / Plug-in and Produce

  • Micro-Grid

==> picture [156 x 22] intentionally omitted <==

----- Start of picture text -----

Light Vehicles
----- End of picture text -----

==> picture [151 x 154] intentionally omitted <==

----- Start of picture text -----

Refueling Station &
Engineering Solution
----- End of picture text -----

==> picture [151 x 133] intentionally omitted <==

==> picture [151 x 22] intentionally omitted <==

----- Start of picture text -----

Micro-Grid Solution
----- End of picture text -----

17

==> picture [117 x 30] intentionally omitted <==

==> picture [443 x 33] intentionally omitted <==

==> picture [287 x 52] intentionally omitted <==

==> picture [287 x 257] intentionally omitted <==

==> picture [347 x 46] intentionally omitted <==

----- Start of picture text -----

The Turning Point is NOW
Tech & Application for 2026-2030
----- End of picture text -----

Industry

  • Complete up, mid, and down-stream in supply

  • Certification to the Products & Components

  • Targeting Proven Achievement with International Partners

Government: Taiwan for 10Trillian & the Potentials

  • Speed up for h2 policies & development, h2 for international market and demands

  • Subsidies, incentives, tax benefits, utilities in needs, POC plans to implementation

Academics & Research

  • Continued efforts in research for critical tech and patents,

  • Focused on turn-key and/or deployment

==> picture [117 x 30] intentionally omitted <==

==> picture [580 x 27] intentionally omitted <==

#Completed Supply Chain in Taiwan #Over 100M units for Global Market

==> picture [662 x 386] intentionally omitted <==

----- Start of picture text -----

Over 100M units for Global Market
公車
Bus
乘用車
Passenger Vehicle
特殊用途
special purpose
摩托車
Motorbike
貨車
Cargo
輕型機車 微型貨運
Moped Micro Delivery
充氫服務 Refuel
Service
Dimension (OAL size)
19
Power
----- End of picture text -----

19

==> picture [117 x 30] intentionally omitted <==

20

==> picture [117 x 30] intentionally omitted <==

Go-to Choices for Leisure & Outdoor fun Excellent for Delivery Logistics

21

==> picture [117 x 30] intentionally omitted <==

==> picture [375 x 71] intentionally omitted <==

==> picture [462 x 253] intentionally omitted <==

CHEM as the World First for H 2 in 2-4 Wheelers

Hydrogen in Compression with h2 Exchange Station for Last Mile Delivery Purpose

Perfect fit for Carbon Reduction & Emission Checks in Sustainability Purpose

==> picture [117 x 30] intentionally omitted <==

- H2 Generation in Container 100kg/day

One reformer generates 5kW, and using 12 units for one 100kgContainer means one container is ready for 60kW Power Output.

==> picture [366 x 189] intentionally omitted <==

----- Start of picture text -----

Power Panel
H2 generating Module4
350L Buffer
Tank
20-Meter
dehydrator
Control System 200LFuel Tank
----- End of picture text -----*

==> picture [338 x 145] intentionally omitted <==

----- Start of picture text -----

Control Panel
----- End of picture text -----

==> picture [117 x 30] intentionally omitted <==

- Mobility in Fuel Refueling

Methanol Reforming for h2 Generation in Containers

  • No Danger with Excessive Amount in H2 Storage

  • Methanol for Instant Conversion

  • Safe in Highly-Populated City Area

  • Safe in Storage & Deliver

  • Cost-Friendly in Transferring

  • 20M-Container type - 100kg/Day,

  • Expected to↑200 kg/Day in Production

24

==> picture [117 x 30] intentionally omitted <==

Lon -Term Outlook for H Business g 2

==> picture [597 x 303] intentionally omitted <==

----- Start of picture text -----

CPC Corporation for Hydrogen Refueling Station,
Multiple Choices Available.
- -
Hydrogen Refueling Vehicles and Battery Based ones
are the focus.
H
2
-
Hydrogen Based Vehicles are on the spot for
deployment in 2030, especially in city bus & vehicles
use by public sectors.
FC and Storage Demonstration are drawing attention
at International Exhibitions & Trade Fairs.
----- End of picture text -----

25

==> picture [117 x 30] intentionally omitted <==

Hwa-Ya Plant for H Tech 2

ISO 9001+TUV Production & FC Pilot Run Based BOL Build, Operate & Localize Licensing +Turn Key Localizing for Manufacturing

==> picture [123 x 82] intentionally omitted <==

==> picture [138 x 85] intentionally omitted <==

==> picture [117 x 30] intentionally omitted <==

Strate ies & Business Ma in g pp g

  • Hylect Holding / Black Pearl Investments

  • the Project Zenith

  • KWN Investment Company – to license or JV

  • To build FC Production Line

  • Tricycle Project

  • Operation & Demonstration Ongoing in Maharashtra

  • Merge & Projects in Startups ITRI supported

  • Alliance - local bus company for low-carbon emission -

  • in transportation eco systemLin-Yuen H2 Hub in Kaohsiung

27