Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CHEM Annual Report 2021

Dec 22, 2021

51839_rns_2021-12-22_bf7a76bb-da86-4cc6-82a7-a833bff06d30.pdf

Annual Report

Open in viewer

Opens in your device viewer

This English translation is prepared in accordance with the Chinese version and is for reference purposes only. If any inconsistency appears between the Chinese original and the English version, the Chinese version shall prevail.

Company Overview

  • Established in 1956
  • Group Capital: 4.77 billion
  • Group Revenue: 20 billion/yr
  • Power Equipment, Engineering and Energy Management
  • TSE: Code 1513, listed since 1994
  • Headquarter: Linkou, Taiwan
  • ISO 9001/9002/14001/AS 9100

Financial Highlights

Fiscal
Year
Dividends
(TWD)
Profitability 2020 2019 2018
2005 1.5
2006 1.4 ROE 16.57% 8.28% 7.42%
2007 1.4
2008 0.88 ROA 6.47% 3.67% 3.56%
2009 1.0
2010 1.0 GPM 21.35% 16.69% 15.87%
2011 1.0 OPM 11.18% 5.29% 4.75%
2012 1.0
2013 0.8 (cash dividends)
1.25 (cash capital reduction)
Profit Margin 10.08% 5.16% 4.59%
2014 1.2 2021 Q1-Q3
2015 1.0 Consolidated Revenue
2016 1.0 NTD 12.86b, EPS 2.87
2017 1.0
2018 1.0 Numbers, Vision and Mission.
2019 1.2
2020 2.2

Financial Highlights

Parent Company, 2017-2021

Operating
Income
Net
Income
EPS 17.6b
2017 9,225,672 488,165 1.19 13.6b
2018 10,119,536 544,837 1.33
2019 9,745,724 635,299 1.55
2020 17,609,224 1,527,368 3.59
2021
Jan-Sep
13,614,498 1,673,181 2.87 '17
'18
'19
'20
'21(Jan-Sep)
\$NT, In thousand
Operating Income
\$NT, billion

Organizational Changes

for Green Energy Business

B= \$NT, billion

2021 Nov.

Heavy
Power
Power
Metering
Power
Engineering
Operating
Mechanism
Contracted
To deliver
16.27b Contracted
To deliver
274m Contracted
To deliver
4.09b Contracted
To deliver
109m
Payment Collected
100% / ready to
finalize
24,640,826 Contracted to
Deliver
FY2020*
150,253,163 J101 Project 1,901,015 Contracted to
Deliver
FY2020*
111,206,070
Estimated from
Project Execution
16,247,871,641 Accumulated in
Sales 2021
319,971,753 J102Project 4,007,222,878 Accumulated in
Sales 2021
110,465,428
Accumulated 281,431,516 Accumulated in
Contracted Value
2021
196,066,663 J103Project 90,145,143 Accumulated in
Contracted Value
2021
112,143,010

in Total 20.8 Billion

2020 2021 2022
Estimated but not closing at 5.81b 7.26b 7.01b
Contracted to Deliver % 100% 94% 58% FY = Financial Year
B = Billion
To be Contracted % 0% 6% 42% M = Million

Engineering, Procurement & Construction

23 Full Turnkey Substations

design, engineering, procurement, constructing, installing & test for all civil & electrical projects included

Achievement & Milestones

  • Hydroelectric power plant in Ku-Kuan and Chin-Shan
  • Total of 71 Sets of Wind Energy Generator installation with 99.46 MW
  • 11 Sets Wind Energy Generator installation with 33MW in Penghu (off island)

Golden Quality Medal Award by "Public Construction Commission"

The 5th annual award (2004) The 7th annual award (2006) The 8th annual award (2007) The 9th annual award (2008) The 11th annual award (2010) The 12th annual award (2011) The 15th Premium (2015) The 16th Excellence (2016) The 17th Premium (2017) The 17th Excellence (2017) The 19th Excellence (2019) The 20th Excellence (2020) Special Contribution Award (2020)

Spin-Off Plan for PV business (SPVs)

Tainan Project in Chi-ku Site - Bird View

H2 Generating Technology

Milestones

Please refer to Chinese version for details of Tech Roadmap & Product Scope.

项目 铅酸电池 燃料电池
使用成本 10年内:22万(含空调/报废2次等) 10年内: 20万(无需空调等)
应急效率 2-3小时 大于60小时(可在线添加燃料)
企业效益 应急通信用户100人扩大到100万以上
社会成本 安装方便/安全/环保/应急情况不争抢油料

13 Please refer to Chinese version for details of deployment, alliances and core strength.

H2 Dispenser for Carbon Removal - Application

H2 -Driven Forklift Total Solution

Distributed Refueling Station in Containers

Micro-Grid Solution

Household Use

Community Use Commercial Use

SMG-05-075 • PGM-45-72 PGS-100-144 /PGS-300-288

Light FC Vehicle – Commercial Use

Food Delivery Service or Logistic Service to be changed into FC light vehicles using

Island Mode Micro-Grid – DJY Island

Green energy for Island Mode Micro-Grid, the DJY Isle Project – Turn-Key Solution

The maximum penetration rate of solar power increased from 32% up to 92.8% and had won APEC 2017 ESCI-KSP Smart Grid–Silver Award – Dongjiyu.

Estimated >1 billion people are still in need of power supply in ASEAN countries. This solution serves as the key tech for the market demand.

Hybrid Mode Micro-Grid – Community in S.A.

Naledi Trust Community, Kroonstad, Free State Location : Naledi Trust Community, Kroonstad, Free State, South Africa from Aug. 2014 till now

  • Unaffected from weather, 24/7 uninterrupted power supply
  • Technical feasibility proven, commercial requirement identified
  • Smart-Generation, Smart-Storage, Smart-Dispatching 20

Strategic Alliance

For FUEL CELL & Hydrogen Business in June 2017

Strategic Alliance

Spin-Off Plan for H2 Business

DDH Parking Mngmt + COP

Maintenance & Operating Service

Maintenance & Operation

For Solar Energy Projects

CHENG-HSIN Engineering & Services

Maintenance
&
Operating
Wha
Dun
Building
Management
Service
CHENG-HSIN
Engineering
& Services
Actual
Revenue
2020
412m 80m 748m
Operating
Budget
2021
305m 70m 735m

M= \$NT, Million

CNC Group

CNC Group

Chamber

Vertical Multi-Tasking Turning Center ( 5 Axis) ( Mazak e-1550 V/10)

CNC Five-face machining center

Capability Status for Manufacturing

Process Technique Assessment Major Customer
CHEM
China
Welding Carbon Steel
Stainless Steel
Aluminum Alloy
中微
UCT
Machining Machining All Approved AKT
Polishing Jitterbug
Raceway polishing
F Fiti
Surface
Treatment
Chemical Cleaning/
Anodize/Electro Polish
理想
CHEM
Linko
Welding Carbon Steel
Stainless Steel
Aluminum Alloy
Approved
U-stamp. UT. .
AMAT Semi
ULVAC
Machining Machining Approved
AS9100. Nadcap.
S200. S1000. GT193
AIDC
AEF
EGAT
Polishing Jitterbug
Raceway polishing
Approved
AMAT
EBARA
CHEM
Tainan
Welding Carbon Steel
Stainless Steel
Aluminum Alloy
Approved
AMAT
UT. .
AMAT
ULVAC
Machining Machining Approved
Polishing Jitterbug
Raceway polishing
Approved
AMAT

Urban Renovation Projects

Center of Taipei City Area – Dunwha S. Rd. & Civic Blvd. Center of Taipei City Area – Sanchong Site (In Progress)