2 December 2021

New mineralised intrusion discovered at Julimar

New zone of shallow high-grade mineralisation intersected directly south of the ~6.5km long Hartog airborne EM anomaly, outside of the Gonneville Intrusion

==> picture [493 x 25] intentionally omitted <==

----- Start of picture text -----

[Highlights ]
----- End of picture text -----

  • « New shallow high-grade PGE-Ni-Cu-Co sulphide discovery made on Chalice-owned farmland within the 100%-owned Julimar Project, ~70km NE of Perth, WA:

  • « High-grade (>0.6% NiEq) sulphide mineralisation intersected in a newly identified ultramafic intrusive unit to the west of Gonneville (separated by ~70m of metasediments):

    • « 3m @ 2.0g/t Pd , 0.3g/t Pt, 0.6% Ni, 0.5% Cu, 0.05% Co ( ~1.7% NiEq[1] ) from 68m (JRC392);

    • « 2m @ 1.8g/t Pd , 0.2g/t Pt, 0.6% Ni, 0.5% Cu, 0.06% Co ( ~1.9% NiEq ) from 139.2m (JD211);

  • « New zone has no EM response but is located immediately south of the ~6.5km long Hartog Airborne EM (AEM) anomaly – further upgrading the prospectivity of that target and again highlighting the potential for further ‘blind’ discoveries .

  • « New zone already visually identified in holes drilled down-dip and along strike to the south (assays pending).

  • « Ongoing step-out drilling outside the Gonneville Resource has extended multiple high-grade (>0.6% NiEq) zones, including:

  • « 23.3m @ 2.8g/t Pd, 0.7g/t Pt, 1.0g/t Au , 0.2% Ni, 1.5% Cu , 0.02% Co (~ 2.7% NiEq ) from 582m (JD142);

  • « 7.1m @ 2.3g/t Pd, 0.9g/t Pt, 0.3% Ni, 0.9% Cu , 0.02% Co (~ 2.0% NiEq ) from 513m (JD157);

  • « 4.4m @ 4.5g/t Pd, 2.2g/t Pt, 0.6% Ni, 0.2% Cu, 0.03% Co (~ 3.0% NiEq ) from 523m (JD157);

  • « 8.2m @ 2.2g/t Pd, 1.1g/t Pt, 1.1g/t Au, 0.1% Ni, 0.1% Cu, 0.01% Co (~ 1.6% NiEq ) from 455m (JD162); and,

  • « 5.0m @ 3.3g/t Pd, 0.8g/t Pt, 0.2g/t Au, 0.3% Ni, 0.7% Cu, 0.02% Co (~ 2.2% NiEq ) from 157m (JD167).

  • «

  • Step-out drilling is continuing on farmland, focused on extending the high-grade Resource .

  • « 40m spaced infill drilling within the shallow (<250m deep) Inferred part of the Gonneville Resource continues to deliver results in line with the Resource model (refer to Appendix).

  • « Conservation Management Plan (CMP) for initial drilling at the Hartog-Baudin targets is finalised and under consideration by the WA State Government – approval expected shortly .

  • « The Scoping Study for an initial mine development at Gonneville is progressing on schedule .

1 Nickel Equivalent (%) = Ni (%) + 0.37xPd (g/t) + 0.24xPt (g/t) + 0.25xAu (g/t) + 0.65xCu (%) + 3.24xCo (%)

Registered Office ABN 47 116 648 956

==> picture [10 x 9] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

Level 3, 46 Colin Street West Perth, Western Australia PO Box 428, West Perth 6005

[email protected] www.chalicemining.com

@chalicemining chalice-mining

T: +61 8 9322 3960

Overview

Chalice Mining Limited (“Chalice” or “the Company”, ASX: CHN | OTCQB: CGMLF) is pleased to report a significant new discovery at its 100%-owned Julimar Nickel-Copper-Platinum Group Element (PGE) Project , located ~70km north-east of Perth in Western Australia.

Step-out drilling at the north-western limit of the Gonneville deposit has intersected a new shallow zone of high-grade sulphide mineralisation. The mineralisation occurs within a newly identified narrow ultramafic unit located approximately 70m above the hanging wall contact between the Gonneville Intrusion and the surrounding meta-sediments.

This discovery is considered significant because the new zone is located immediately south of the ~6.5km long Hartog AEM anomaly (within the Julimar State Forest). In addition, it confirms that there are other mineralised intrusions in the area that have no EM response. As such, it is interpreted that the Hartog AEM anomaly may stem from the northern extension of this mineralised zone, which in turn may represent the very southern extent of an entirely new intrusion (Hartog).

Chalice’s Conservation Management Plan for initial drilling at the Hartog-Baudin Targets within the Julimar State Forest (Stage 2 CMP) has been finalised and is currently under consideration by the WA State Government. Approval is expected shortly, which will allow the first ever drilling across ~10km of strike length of the Julimar Complex.

While CMP approval is awaited, Chalice has been continuing step-out and infill drilling at the Gonneville deposit with six rigs. A total of 225 diamond drill holes and 460 RC drill holes (including RC pre-collars with diamond tails) for ~180,000m have been completed to date at the Project.

New assay results have been received for 129 holes, which were not included in the Gonneville maiden Mineral Resource Estimate (Resource) of 330Mt @ 0.94g/t Pd+Pt+Au (3E), 0.16% Ni, 0.10% Cu, 0.016% Co (refer to ASX Announcement on 9 November 2021). Assay results are pending for a further 66 completed drill holes, with lab turnaround times currently averaging approximately four weeks.

New assay results have been received for drilling targeting:

  • « The eastern (footwall) and western (hanging wall) contacts between the Gonneville Intrusion and surrounding meta-sediments;

  • « Infill and down-dip extensions to the high-grade G1-G9 zones;

  • « Infill of the shallow Inferred sections of the Gonneville Resource; and,

  • « The non-magnetic pyroxenite and leucogabbro-rich north-western part of the Gonneville Intrusion.

Chalice Managing Director and Chief Executive Officer, Alex Dorsch, said: “Extensional drilling in an area previously considered to consist only of metasediments has intersected a tantalising new shallow zone of sulphide mineralisation, which is interpreted to be the potential southern extent of a new Hartog zone. The moderate nickel, copper and cobalt grades observed are considered particularly encouraging.

“We believe that the new ultramafic unit intersected is very unlikely to be Gonneville, given that it is separated by ~70m of metasediments and appears to be highly deformed and geochemically different. The new discovery has once again upgraded the prospectivity of the >6.5km long Hartog target immediately north of the new intersections.

“After lengthy consultation with the WA State Government, we believe our low-impact approach to initial drilling in the State Forest is close to being approved. We have received positive feedback on our approach to minimising disturbance and we are eagerly awaiting final approvals for drilling to commence at this exciting new frontier.”

==> picture [77 x 114] intentionally omitted <==

----- Start of picture text -----

2
----- End of picture text -----

2 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Technical overview

New mineralised ultramafic unit discovered

The new zone of sulphide mineralisation to the north-west of the Gonneville Intrusion was initially recognised in visual logging as a narrow zone of matrix to semi-massive pyrrhotite-pentlanditechalcopyrite mineralisation, hosted within a strongly sheared ultramafic intrusion approximately 70m above the hanging wall contact of the Gonneville Intrusion (Figure 1 and Figure 3).

==> picture [495 x 176] intentionally omitted <==

Figure 1. Matrix to semi-massive sulphide mineralisation in JD211.

The new zone has so far been intersected in five wide-spaced holes, based on initial visual logging. Assays have been received for two of these holes, with significant high-grade (>0.6% NiEq) results including:

  • « 3m @ 2.0g/t Pd , 0.3g/t Pt, 0.6% Ni, 0.5% Cu, 0.05% Co (~ 2.0% NiEq ) from 68m (JRC392);

  • « 2m @ 1.8g/t Pd , 0.2g/t Pt, 0.6% Ni, 0.5% Cu, 0.06% Co (~ 1.9% NiEq ) from 139.2m (JD211);

The ultramafic unit appears to widen towards the north where it is trending towards the ~6.5km long Hartog AEM anomaly (Figure 2).

It is currently interpreted to be a separate intrusion which overlies the Gonneville Intrusion in sequence. However, the ultramafic unit intersected to date is relatively thin and strongly sheared and therefore a definitive conclusion is not yet possible. Mineralisation is not associated with significant zones of deformation / shearing within Gonneville.

The new discovery further increases the prospectivity of the Hartog target within the Julimar State Forest immediately north. Further step-out drilling is continuing targeting the new zone on private farmland.

==> picture [77 x 114] intentionally omitted <==

----- Start of picture text -----

3
----- End of picture text -----

3 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [730 x 448] intentionally omitted <==

Figure 2. Gonneville north and Hartog south Plan View – drilling results and Resource pit crest over ch15 Airborne EM.

==> picture [109 x 21] intentionally omitted <==

----- Start of picture text -----

4
----- End of picture text -----

4 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [607 x 450] intentionally omitted <==

Figure 3. Gonneville cross section 6,513,600mN +/- 30m.

==> picture [109 x 21] intentionally omitted <==

----- Start of picture text -----

5
----- End of picture text -----

5 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Gonneville step-out drilling results

Drilling outside the Gonneville Resource pit shell (9 Nov 2021) continues to intersect broad intervals of sulphide mineralisation and continues to extend the high-grade zones (Figure 4).

Significant new high-grade (>0.6% NiEq) results include:

  • « 23.3m @ 2.8g/t Pd , 0.7g/t Pt, 1.0g/t Au , 0.2% Ni, 1.5% Cu , 0.02% Co (~ 2.7% NiEq ) from 582m (JD142);

  • « 7.1m @ 2.3g/t Pd, 0.9g/t Pt, 0.3% Ni, 0.9% Cu , 0.02% Co (~ 2.0% NiEq ) from 513m (JD157);

  • « 4.4m @ 4.5g/t Pd, 2.2g/t Pt, 0.6% Ni, 0.2% Cu, 0.03% Co (~ 3.0% NiEq ) from 523m (JD157);

  • « 8.2m @ 2.2g/t Pd, 1.1g/t Pt, 1.1g/t Au, 0.1% Ni, 0.1% Cu, 0.01% Co (~ 1.6% NiEq ) from 455m (JD162);

  • « 12.9m @ 1.2g/t Pd , 0.3g/t Pt, 0.3% Ni, 0.3% Cu , 0.02% Co (~ 1.1% NiEq ) from 355m (JD172);

  • « 5.0m @ 3.3g/t Pd, 0.8g/t Pt, 0.2g/t Au, 0.3% Ni, 0.7% Cu, 0.02% Co (~ 2.2% NiEq ) from 157m (JD167); « 8m @ 2.0g/t Pd, 0.5g/t Pt , 0.3% Ni, 0.3% Cu, 0.03% Co (~ 1.5% NiEq ) from 223m (JRC423); and,

  • « 8m @ 1.4g/t Pd , 0.4g/t Pt, 0.4g/t Au , 0.2% Ni, 0.3% Cu, 0.02% Co (~ 1.1% NiEq ) from 107m (JRC403).

==> picture [77 x 114] intentionally omitted <==

----- Start of picture text -----

6
----- End of picture text -----

6 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [727 x 361] intentionally omitted <==

Figure 4. Gonneville 3D View (looking east-north-east) – drilling results, Resource blocks (>0.8% NiEq only) and pit shell.

==> picture [77 x 115] intentionally omitted <==

----- Start of picture text -----

7
----- End of picture text -----

7 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Infill drilling results

Infill drilling within the Gonneville Resource pit shell (9 Nov 2021) has continued to deliver results in line with expectations. Refer to Appendix A for a full listing of results (infill and extensional).

Recent results indicate that the high-grade G2 zone continues further to the north at depth than previously interpreted. Additional drilling is required in the northern part of Gonneville, as high-grade extensions have the potential to deepen the Resource pit shell in this area.

Forward plan

Chalice’s Julimar Project strategy is to concurrently advance studies for an initial mining development on private farmland and to define the full extent of mineralisation along the >26km long Julimar Complex.

Ongoing and planned activities at Julimar include:

  • « Step-out drilling (farmland) – Step-out diamond drilling on a nominal ~80m spacing is expected to continue until ~Q1 2022, subject to results. Step-out drilling is targeting the extension of highgrade (>0.6 NiEq) zones.

  • « Infill drilling (farmland) – The northern portion of the Gonneville Resource is currently classified as Inferred and additional infill drilling is targeting conversion of the shallow (<250m deep) portion into the higher-confidence Indicated category.

  • « Reconnaissance drilling at the Torres-Jansz and Baudin targets at the northern end of the Julimar Complex – First-pass AC drilling on private farmland will commence in the coming weeks.

  • « Geotechnical, metallurgical, hydrogeological and infrastructure drilling (Gonneville) – AC/RC/diamond drilling to support studies for Gonneville will commence once resource drilling is complete and will continue through Q1 2022.

  • « Metallurgical testwork (Gonneville) – ongoing testwork is now focused on optimisation of disseminated sulphide performance and continuing leach testwork on oxide composites. Investigation into further bulk concentrate enrichment alternatives has commenced for the disseminated sulphide mineralisation as part of the recent $2.9M grant from the Australian Government’s Co-operative Research Centre Projects (CRC-P) Program. Initial waste rock and tailings characterisation testwork continues.

  • « Studies (Gonneville) – Work is underway to support studies for the project, which will assess potential mine development scenarios for the Gonneville Deposit. The Company anticipates that a Scoping Study for the initial stage of development at Gonneville will be completed in Q2 2022.

  • « Low-impact reconnaissance drilling at the Hartog-Baudin Targets within the Julimar State Forest – First-pass low-impact drilling utilising small track-mounted diamond rigs is planned to commence immediately upon obtaining access and permitting approvals, which is expected shortly. A total of ~70 drill sites are planned across the ~10km strike length, with the ability to drill multiple angled holes at each site. No mechanised vegetation clearance is required to complete this first pass of drilling.

Authorised for release by the Disclosure Committee of the Company.

For further information please visit www.chalicemining.com or contact:

==> picture [77 x 114] intentionally omitted <==

----- Start of picture text -----

8
----- End of picture text -----

8 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Corporate Enquiries

Media Enquiries

Follow our communications

Alex Dorsch Nicholas Read LinkedIn: chalice-mining Managing Director & CEO Principal and Managing Director Twitter: @chalicemining Chalice Mining Limited Read Corporate Investor Relations +61 8 9322 3960 +61 8 9388 1474 [email protected] [email protected]

About the Julimar Nickel-Copper-PGE Project

The 100%-owned Julimar Nickel-Copper-PGE Project is located ~70km north-east of Perth in Western Australia and is surrounded by world-class infrastructure. The Project was staked in early 2018 as part of Chalice’s global search for high-potential nickel sulphide exploration opportunities.

Chalice discovered the Gonneville deposit in the very first drill hole at the project in March 2020, intersecting shallow high-grade PGE-nickel-copper-cobalt-gold sulphide mineralisation. Gonneville is located on private farmland at the southern end of the interpreted >26km long Julimar Complex.

In November 2021, Chalice defined a tier-1 scale, pit-constrained maiden Mineral Resource Estimate (Resource) for Gonneville – 330Mt @ 0.94g/t Pd+Pt+Au (3E), 0.16% Ni, 0.10% Cu, 0.016% Co (~0.58% NiEq or ~1.6g/t PdEq)[2] . The maiden Resource confirmed Gonneville is the largest nickel sulphide discovery worldwide since 2000[3] , and the largest PGE discovery in Australian history – demonstrating the potential for Julimar to become a strategic, long-life ‘green metals’ asset.

The Resource includes a significant high-grade sulphide component, affording the project significant optionality in development and the potential to materially enhance project economics in the initial years of operations.

The Gonneville Resource is interpreted to cover just ~7% of the interpreted Julimar Complex strike length. As such the project is considered highly prospective for further orthomagmatic Ni-Cu-PGE discoveries.

The significant Julimar discovery has defined the new West Yilgarn Ni-Cu-PGE Province, an almost entirely unexplored mineral province which is interpreted to extend for ~1,200km along the western margin of the Yilgarn Craton. Chalice holds an unrivalled >8,000km[2] land position in this exciting new area and is leveraging its competitive ‘first mover’ advantage.

2 Refer to full Mineral Resource Statement in Appendix B 3 Source: S&P Global Market Intelligence, Capital IQ

==> picture [109 x 22] intentionally omitted <==

----- Start of picture text -----

9
----- End of picture text -----

9 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 609] intentionally omitted <==

Figure 5. Julimar Complex, Gonneville deposit, Project tenure and nearby infrastructure.

10 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Competent Persons and Qualifying Persons Statement

The information in this announcement that relates to Exploration Results in relation to the Julimar Nickel-Copper-PGE Project is based on and fairly represents information and supporting documentation compiled by Mr. Bruce Kendall BSc (Hons), a Competent Person, who is a Member of the Australian Institute of Geoscientists. Mr. Kendall is a full-time employee of the Company as General Manager – Development and has sufficient experience that is relevant to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves, and is a Qualified Person under National Instrument 43-101 – ‘Standards of Disclosure for Mineral Projects’. The Qualified Person has verified the data disclosed in this release, including sampling, analytical and test data underlying the information contained in this release. Mr Kendall consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

The Information in this announcement that relates to Mineral Resources has been extracted from the ASX announcement titled “Tier 1 Scale Maiden Mineral Resource at Julimar” dated 9 November 2021 This announcement is available to view on the Company’s website at www.chalicemining.com.

The Company confirms that it is not aware of any new information or data that materially affects the information included in the original announcement and that all material assumptions and technical parameters underpinning the estimates in the original release continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person and Qualified Person’s findings are presented have not been materially modified from the relevant original market announcement. Refer to Annexure B for further information on the Mineral Resource Estimate.

Forward Looking Statements

This announcement may contain forward-looking information, including forward looking information within the meaning of Canadian securities legislation and forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, forwardlooking statements). These forward-looking statements are made as of the date of this report and Chalice Mining Limited (the Company) does not intend, and does not assume any obligation, to update these forward-looking statements.

Forward-looking statements relate to future events or future performance and reflect Company management’s expectations or beliefs regarding future events and include, but are not limited to: the impact of the discovery on the Julimar Project’s capital payback; the Company’s strategy; the estimated timing of drilling in the Julimar State Forest; the Company’s intended activities at the Julimar Project; and the success of future mining operations.

In certain cases, forward-looking statements can be identified by the use of words such as, “anticipates”, “considered”, “expected”, “highly”, “interpreted”, “likely”, “may”, “plan” or “planned”, “potential”, “prospectivity”, “will” or variations of such words and phrases or statements that certain actions, events or results may, could, would, might or will be taken, occur or be achieved or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.

Such factors may include, among others, risks related to actual results of current or planned exploration activities; whether geophysical and geochemical anomalies are related to economic mineralisation or some other feature; obtaining appropriate access to undertake additional ground disturbing exploration work on EM anomalies located in the Julimar State Forrest; the results from testing EM anomalies; results of planned metallurgical test work Including results from other zones not tested yet, scaling up to commercial operations; changes in project parameters as plans continue

11 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

to be refined; changes in exploration programs and budgets based upon the results of exploration, changes in commodity prices; economic conditions; grade or recovery rates; political and social risks, accidents, labour disputes and other risks of the mining industry; delays or difficulty in obtaining governmental approvals, necessary licences, permits or financing to undertake future mining development activities; changes to the regulatory framework within which Chalice operates or may in the future; movements in the share price of investments and the timing and proceeds realised on future disposals of investments, the impact of the COVID 19 pandemic as well as those factors detailed from time to time in the Company’s interim and annual financial statements, all of which are filed and available for review on SEDAR at sedar.com, ASX at asx.com.au and OTC Markets at otcmarkets.com.

Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

12 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Appendix A Drilling and assay data

Table 1. Significant new drill intersections (Oxide: >0.3g/t Pd, >1g/t Pd. Sulphide: >0.4% NiEq, >0.6% NiEq).

From To Interval Pd Pt Au Ni Cu Co
Hole ID (m) (m) (m) (g/t) (g/t) (g/t) (%) (%) (%) Geology Type
JD133 33.0 61.0 28.0 0.80 0.14 0.01 0.15 0.10 0.01 Sulphide Infill
Incl 41.0 43.6 2.6 1.86 0.14 0.02 0.21 0.33 0.02 Sulphide Infill
and 45.7 51.0 5.3 0.85 0.18 0.01 0.17 0.06 0.02 Sulphide Infill
and 55.0 61.0 6.0 1.11 0.21 0.01 0.16 0.07 0.02 Sulphide Infill
JD133 72.0 132.0 60.0 0.66 0.14 <0.01 0.17 0.07 0.02 Sulphide Infill
Incl 74.5 77.3 2.8 1.04 0.18 0.01 0.19 0.07 0.02 Sulphide Infill
and 98.0 101.0 3.0 0.77 0.17 0.01 0.20 0.08 0.02 Sulphide Infill
and 106.0 110.8 4.8 0.75 0.15 <0.01 0.18 0.17 0.02 Sulphide Infill
and 114.0 116.0 2.0 0.80 0.16 <0.01 0.20 0.07 0.02 Sulphide Infill
and 120.0 132.0 12.0 0.82 0.18 <0.01 0.19 0.06 0.02 Sulphide Infill
JD133 172.4 177.0 4.6 0.43 0.08 <0.01 0.18 0.01 0.02 Sulphide Infill
JD133 199.9 211.0 11.1 0.61 0.11 <0.01 0.14 0.04 0.01 Sulphide Infill
JD133 218.0 233.0 15.0 0.56 0.14 <0.01 0.11 0.06 0.01 Sulphide Infill
JD133 242.0 250.5 8.5 0.48 0.11 <0.01 0.17 0.04 0.01 Sulphide Infill
JD133 320.4 322.5 2.1 0.77 0.21 0.01 0.21 0.08 0.02 Sulphide Infill
JD133 343.0 348.8 5.8 0.65 0.14 0.04 0.14 0.11 0.01 Sulphide Infill
JD133 353.0 362.0 9.0 1.79 0.26 0.01 0.18 0.05 0.02 Sulphide Infill
Incl 353.0 355.8 2.7 4.83 0.65 0.02 0.26 0.12 0.03 Sulphide Infill
JD134 32.8 49.0 16.3 0.54 0.10 0.01 0.14 0.06 0.01 Sulphide Infill
Incl 37.0 39.0 2.0 0.74 0.15 0.01 0.24 0.10 0.02 Sulphide Infill
JD134 61.0 66.0 5.0 0.64 0.13 0.01 0.16 0.03 0.02 Sulphide Infill
JD134 77.0 120.0 43.0 0.59 0.13 0.01 0.18 0.06 0.02 Sulphide Infill
Incl 78.9 82.0 3.1 0.81 0.17 0.01 0.15 0.13 0.02 Sulphide Infill
and 115.4 120.0 4.7 1.52 0.36 0.02 0.31 0.26 0.02 Sulphide Infill
JD134 126.0 148.0 22.0 0.52 0.11 <0.01 0.13 0.06 0.01 Sulphide Infill
Incl 126.0 128.0 2.0 0.96 0.19 <0.01 0.17 0.08 0.02 Sulphide Infill
JD134 228.1 250.2 22.1 0.57 0.12 0.01 0.15 0.07 0.02 Sulphide Infill
JD134 276.0 281.6 5.6 0.39 0.09 <0.01 0.15 0.08 0.02 Sulphide Infill
JD134 331.0 333.7 2.7 1.44 0.23 0.01 0.22 0.30 0.02 Sulphide Infill
JD134 348.0 354.0 6.0 0.55 0.10 0.01 0.16 0.02 0.01 Sulphide Infill
JD134 381.0 385.0 4.0 0.70 0.10 0.01 0.15 <0.01 0.01 Sulphide Infill
JD134 389.7 411.6 21.9 0.50 0.11 0.01 0.17 0.06 0.01 Sulphide Infill
Incl 389.7 394.0 4.3 0.58 0.15 0.03 0.17 0.25 0.02 Sulphide Infill
JD134 418.0 427.0 9.0 0.88 0.13 0.01 0.23 0.08 0.02 Sulphide Infill
JD134 433.0 446.0 13.0 1.39 0.19 0.02 0.31 0.58 0.03 Sulphide Infill
Incl 440.0 445.2 5.2 2.70 0.30 0.04 0.53 1.36 0.05 Sulphide Infill
JD135 16.5 37.0 20.5 0.96 0.21 0.01 0.18 0.08 0.02 Oxide Infill
Incl 25.0 34.0 9.0 1.23 0.28 0.01 0.17 0.10 0.02 Oxide Infill

13 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 695] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|JD135|61.0|87.0|26.0|0.60|0.12|0.01|0.16|0.04|0.02|Sulphide|Infill|
|JD136|44.0|127.7|83.7|0.62|0.15|0.03|0.17|0.08|0.02|Sulphide|Infill|
|Incl|49.0|56.0|7.0|1.03|0.34|0.02|0.24|0.06|0.03|Sulphide|Infill|
|and|63.0|65.0|2.0|0.51|0.12|0.04|0.15|0.40|0.02|Sulphide|Infill|
|and|73.0|79.0|6.0|0.65|0.14|0.02|0.19|0.12|0.02|Sulphide|Infill|
|and|87.0|89.0|2.0|1.39|0.51|0.03|0.20|0.05|0.02|Sulphide|Infill|
|and|107.0|110.0|3.0|1.00|0.21|0.04|0.19|0.11|0.02|Sulphide|Infill|
|JD137|54.6|60.0|5.4|1.06|0.34|0.02|0.16|0.25|0.01|Sulphide|Infill|
|JD137|79.5|96.5|17.0|0.59|0.12|0.01|0.14|0.09|0.01|Sulphide|Infill|
|Incl|90.0|96.5|6.5|1.00|0.19|0.01|0.17|0.07|0.02|Sulphide|Infill|
|JD137|124.0|189.0|65.0|0.75|0.14|<0.01|0.19|0.11|0.02|Sulphide|Infill|
|Incl|136.0|149.0|13.0|0.77|0.15|<0.01|0.17|0.08|0.02|Sulphide|Infill|
|and|153.0|163.8|10.8|1.21|0.23|0.01|0.33|0.28|0.02|Sulphide|Infill|
|and|171.0|182.0|11.0|0.78|0.15|<0.01|0.18|0.12|0.02|Sulphide|Infill|
|JD137|251.0|257.0|6.0|0.58|0.11|<0.01|0.14|0.05|0.02|Sulphide|Infill|
|JD137|278.0|282.0|4.0|0.57|0.12|0.01|0.17|0.05|0.02|Sulphide|Infill|
|JD137|373.6|381.0|7.4|3.19|0.60|0.04|0.27|0.17|0.02|Sulphide|Infill|
|JD137|390.0|403.0|13.0|0.47|0.10|0.01|0.17|0.01|0.02|Sulphide|Infill|
|JD137|405.9|418.0|12.1|0.50|0.11|0.01|0.21|0.06|0.02|Sulphide|Infill|
|JD137|430.0|451.0|21.0|0.54|0.10|0.01|0.15|0.06|0.01|Sulphide|Infill|
|JD137|458.2|516.0|57.8|0.91|0.17|0.16|0.15|0.28|0.01|Sulphide|Infill|
|Incl|458.2|460.4|2.2|1.29|0.16|0.06|0.19|0.19|0.02|Sulphide|Infill|
|and|490.0|492.0|2.0|2.60|0.40|0.18|0.11|0.09|0.01|Sulphide|Infill|
|and|495.3|498.0|2.8|1.58|0.30|0.28|0.13|1.71|0.02|Sulphide|Infill|
|and|501.0|511.6|10.7|2.06|0.32|0.62|0.18|0.79|0.01|Sulphide|Infill|
|JD137|526.0|552.8|26.8|2.00|0.55|0.33|0.18|0.91|0.02|Sulphide|Infill|
|Incl|526.0|533.5|7.5|3.05|1.27|0.61|0.23|2.25|0.02|Sulphide|Infill|
|and|538.0|552.8|14.8|1.91|0.34|0.28|0.17|0.48|0.02|Sulphide|Infill|
|JD138|5.0|29.4|24.4|1.11|0.31|0.01|0.10|0.09|0.03|Oxide|Infill|
|Incl|7.1|22.8|15.7|1.48|0.43|0.01|0.11|0.11|0.05|Oxide|Infill|
|JD138|35.7|47.0|11.3|0.63|0.12|0.01|0.15|0.08|0.01|Sulphide|Infill|
|Incl|35.7|38.0|2.3|1.05|0.18|0.02|0.15|0.07|0.01|Sulphide|Infill|
|JD138|60.9|185.0|124.2|0.74|0.18|0.04|0.16|0.13|0.02|Sulphide|Infill|
|Incl|72.0|75.0|3.0|0.80|0.33|0.01|0.13|0.07|0.01|Sulphide|Infill|
|and|85.0|90.0|5.0|0.97|0.29|0.02|0.17|0.15|0.02|Sulphide|Infill|
|and|97.0|100.0|3.0|0.96|0.49|0.16|0.19|0.31|0.02|Sulphide|Infill|
|and|143.0|176.0|33.0|0.92|0.20|0.06|0.18|0.17|0.02|Sulphide|Infill|
|and|182.0|184.0|2.0|1.43|0.27|0.07|0.20|0.11|0.02|Sulphide|Ext|
|JD138|197.0|199.0|2.0|0.06|<0.01|2.29|0.01|0.19|0.01|Sulphide|Ext|
|JD139|19.0|40.0|21.0|0.91|0.20|0.01|0.21|0.09|0.03|Oxide|Infill|
|Incl|19.0|23.1|4.1|1.15|0.29|0.01|0.28|0.12|0.09|Oxide|Infill|

----- End of picture text -----

14 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|and|29.9|37.2|7.3|1.25|0.29|0.02|0.19|0.11|0.02|Oxide|Infill|
|JD139|40.0|60.0|20.0|0.49|0.10|0.01|0.16|0.05|0.01|Sulphide|Infill|
|Incl|40.0|43.1|3.1|1.08|0.20|0.01|0.23|0.05|0.02|Sulphide|Infill|
|JD139|69.0|78.0|9.0|0.41|0.07|0.01|0.15|0.05|0.02|Sulphide|Infill|
|JD139|85.0|96.0|11.0|0.56|0.16|0.02|0.16|0.07|0.02|Sulphide|Infill|
|JD139|101.0|125.0|24.0|0.66|0.12|0.02|0.15|0.06|0.01|Sulphide|Infill|
|Incl|120.0|123.0|3.0|0.90|0.16|0.02|0.18|0.07|0.02|Sulphide|Infill|
|JD139|132.0|139.0|7.0|0.44|0.11|0.01|0.14|0.05|0.01|Sulphide|Infill|
|JD139|144.3|184.0|39.7|0.71|0.14|0.03|0.16|0.08|0.02|Sulphide|Infill|
|Incl|149.0|151.0|2.0|0.79|0.13|0.03|0.19|0.15|0.02|Sulphide|Infill|
|and|162.6|169.0|6.5|1.17|0.24|0.02|0.18|0.08|0.02|Sulphide|Infill|
|and|175.0|182.0|7.0|0.86|0.20|0.02|0.16|0.09|0.02|Sulphide|Ext|
|JD140|7.0|25.5|18.5|0.77|0.05|<0.01|0.04|0.04|0.01|Oxide|Infill|
|Incl|14.2|20.5|6.4|1.05|0.06|0.01|0.04|0.06|0.01|Oxide|Infill|
|JD141|34.1|56.0|21.9|0.55|0.11|0.04|0.16|0.10|0.02|Sulphide|Infill|
|Incl|35.0|44.0|9.0|0.75|0.14|0.08|0.18|0.17|0.02|Sulphide|Infill|
|JD141|68.0|97.0|29.0|0.45|0.09|<0.01|0.17|0.04|0.02|Sulphide|Infill|
|Incl|84.0|86.0|2.0|0.91|0.18|<0.01|0.22|0.03|0.02|Sulphide|Infill|
|JD141|103.0|122.0|19.0|0.62|0.11|<0.01|0.15|0.06|0.02|Sulphide|Infill|
|Incl|104.0|110.0|6.0|0.92|0.16|0.01|0.16|0.07|0.02|Sulphide|Infill|
|JD141|127.0|169.0|42.0|0.66|0.15|0.01|0.18|0.08|0.02|Sulphide|Infill|
|Incl|152.1|158.0|5.9|0.79|0.15|0.02|0.19|0.08|0.02|Sulphide|Infill|
|JD141|174.0|195.0|21.0|0.73|0.15|0.04|0.19|0.14|0.02|Sulphide|Infill|
|Incl|190.0|194.0|4.0|1.72|0.31|0.12|0.39|0.26|0.04|Sulphide|Infill|
|JD141|201.0|216.0|15.0|0.74|0.18|0.02|0.20|0.18|0.03|Sulphide|Infill|
|Incl|206.0|211.0|5.0|1.66|0.42|0.03|0.36|0.26|0.05|Sulphide|Infill|
|JD141|226.0|235.0|9.0|0.98|0.28|0.01|0.16|0.07|0.02|Sulphide|Infill|
|Incl|230.0|233.0|3.0|2.13|0.65|0.03|0.32|0.18|0.03|Sulphide|Infill|
|JD141|241.0|271.0|30.0|0.86|0.19|0.01|0.18|0.06|0.02|Sulphide|Infill|
|Incl|242.0|253.0|11.0|1.26|0.28|0.01|0.18|0.08|0.02|Sulphide|Infill|
|JD141|283.0|295.0|12.0|1.04|0.26|0.01|0.26|0.13|0.02|Sulphide|Infill|
|Incl|283.0|287.0|4.0|2.11|0.58|0.02|0.46|0.35|0.03|Sulphide|Infill|
|JD141|324.0|361.0|37.0|0.67|0.13|0.01|0.18|0.05|0.02|Sulphide|Infill|
|Incl|325.0|330.0|5.0|0.75|0.15|0.01|0.20|0.06|0.02|Sulphide|Infill|
|and|331.0|333.0|2.0|0.80|0.15|0.01|0.20|0.03|0.02|Sulphide|Infill|
|and|339.0|347.0|8.0|0.88|0.16|0.01|0.21|0.08|0.02|Sulphide|Infill|
|JD142|63.2|78.8|15.6|0.44|0.09|0.01|0.13|0.11|0.02|Sulphide|Infill|
|JD142|142.0|226.0|84.0|0.62|0.12|0.01|0.17|0.07|0.02|Sulphide|Infill|
|Incl|149.0|161.0|12.0|1.19|0.27|0.01|0.23|0.18|0.02|Sulphide|Infill|
|and|214.0|218.0|4.0|0.75|0.06|0.01|0.20|0.11|0.02|Sulphide|Infill|
|JD142|230.5|243.0|12.5|0.83|0.16|<0.01|0.17|0.08|0.02|Sulphide|Infill|

----- End of picture text -----

15 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|Incl|234.0|242.0|8.0|0.88|0.17|0.01|0.17|0.12|0.02|Sulphide|Infill|
|JD142|321.3|346.5|25.2|0.65|0.13|0.02|0.13|0.04|0.02|Sulphide|Infill|
|Incl|322.0|324.0|2.0|0.98|0.19|0.01|0.13|0.04|0.02|Sulphide|Infill|
|JD142|418.1|480.7|62.6|0.62|0.13|0.02|0.17|0.05|0.02|Sulphide|Infill|
|Incl|438.0|440.0|2.0|1.28|0.32|0.01|0.17|0.05|0.02|Sulphide|Infill|
|and|444.0|449.0|5.0|0.75|0.16|0.03|0.19|0.08|0.02|Sulphide|Infill|
|and|465.0|468.0|3.0|0.80|0.16|0.09|0.18|0.04|0.02|Sulphide|Infill|
|JD142|515.1|531.8|16.6|0.40|0.10|0.01|0.16|0.04|0.01|Sulphide|Ext|
|JD142|533.0|564.0|31.0|0.49|0.18|0.03|0.17|0.07|0.01|Sulphide|Ext|
|Incl|537.0|539.0|2.0|0.73|0.44|0.05|0.22|0.33|0.02|Sulphide|Ext|
|and|543.0|546.0|3.0|0.63|0.56|0.03|0.17|0.07|0.01|Sulphide|Ext|
|and|560.0|562.0|2.0|0.85|0.15|0.04|0.26|0.12|0.02|Sulphide|Ext|
|JD142|569.3|605.3|36.0|2.06|0.50|0.68|0.20|0.98|0.02|Sulphide|Ext|
|Incl|574.0|576.0|2.0|2.18|0.10|0.44|0.17|0.12|0.01|Sulphide|Ext|
|and|582.0|605.3|23.3|2.81|0.71|0.97|0.23|1.46|0.02|Sulphide|Ext|
|JD143|66.3|77.0|10.7|0.72|0.17|0.01|0.16|0.08|0.02|Sulphide|Infill|
|Incl|66.3|70.0|3.7|0.91|0.23|0.01|0.19|0.11|0.02|Sulphide|Infill|
|JD143|83.0|104.0|21.0|0.80|0.17|0.01|0.17|0.04|0.02|Sulphide|Infill|
|Incl|83.0|88.0|5.0|0.79|0.14|0.01|0.18|0.10|0.02|Sulphide|Infill|
|and|91.4|102.0|10.6|0.94|0.21|0.01|0.18|0.02|0.01|Sulphide|Infill|
|JD143|136.0|220.0|84.0|0.72|0.14|0.05|0.14|0.11|0.02|Sulphide|Infill|
|Incl|149.0|152.0|3.0|1.66|0.31|0.06|0.28|0.22|0.03|Sulphide|Infill|
|and|160.0|166.0|6.0|1.42|0.20|0.15|0.21|0.23|0.02|Sulphide|Infill|
|and|169.0|172.0|3.0|0.99|0.12|0.32|0.14|0.26|0.01|Sulphide|Infill|
|and|181.0|189.0|8.0|0.88|0.16|0.04|0.16|0.12|0.02|Sulphide|Infill|
|and|193.0|196.0|3.0|0.91|0.36|0.01|0.12|0.05|0.01|Sulphide|Infill|
|JD144|15.0|24.8|9.8|0.97|0.24|0.02|0.16|0.06|0.01|Oxide|Infill|
|Incl|16.1|23.0|6.9|1.14|0.25|0.02|0.19|0.07|0.01|Oxide|Infill|
|JD144|42.0|51.0|9.0|0.53|0.09|<0.01|0.16|0.04|0.02|Oxide|Infill|
|JD144|60.0|121.0|61.0|0.56|0.13|0.02|0.15|0.06|0.02|Sulphide|Infill|
|Incl|96.0|99.0|3.0|0.99|0.33|0.06|0.20|0.08|0.02|Sulphide|Infill|
|and|105.0|108.0|3.0|0.87|0.27|0.03|0.19|0.18|0.02|Sulphide|Infill|
|JD145|55.0|60.0|5.0|0.56|0.11|0.02|0.16|0.09|0.02|Sulphide|Infill|
|JD145|67.0|77.0|10.0|0.58|0.17|0.01|0.15|0.06|0.02|Sulphide|Infill|
|Incl|73.0|75.0|2.0|1.02|0.41|0.03|0.18|0.19|0.02|Sulphide|Infill|
|JD145|91.0|158.0|67.0|0.63|0.13|0.01|0.16|0.05|0.01|Sulphide|Infill|
|Incl|102.0|105.0|3.0|1.11|0.26|0.05|0.21|0.15|0.02|Sulphide|Infill|
|and|111.0|119.0|8.0|1.42|0.27|0.02|0.20|0.10|0.02|Sulphide|Infill|
|and|135.0|137.0|2.0|1.12|0.24|0.01|0.15|0.02|0.02|Sulphide|Infill|
|JD145|238.4|263.0|24.7|0.77|0.16|0.01|0.16|0.07|0.02|Sulphide|Infill|
|Incl|238.4|241.0|2.7|0.95|0.18|0.01|0.17|0.04|0.02|Sulphide|Infill|

----- End of picture text -----

16 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|and|248.0|254.1|6.1|1.15|0.24|0.01|0.21|0.10|0.02|Sulphide|Infill|
|JD145|269.0|305.2|36.2|0.78|0.16|0.01|0.12|0.08|0.01|Sulphide|Infill|
|Incl|273.0|277.7|4.7|0.85|0.15|0.01|0.16|0.11|0.02|Sulphide|Infill|
|and|281.0|289.0|8.0|0.96|0.20|0.01|0.12|0.08|0.01|Sulphide|Infill|
|and|293.0|297.0|4.0|0.95|0.18|0.01|0.14|0.14|0.02|Sulphide|Infill|
|JD145|341.0|351.9|10.9|1.79|0.25|0.03|0.41|0.21|0.03|Sulphide|Infill|
|Incl|342.0|344.0|2.0|1.00|0.21|0.01|0.24|0.15|0.02|Sulphide|Infill|
|and|347.0|351.9|4.9|3.20|0.41|0.05|0.70|0.40|0.05|Sulphide|Infill|
|JD145|358.0|377.0|19.0|1.35|0.38|0.03|0.28|0.11|0.02|Sulphide|Infill|
|Incl|362.0|370.9|8.9|2.16|0.67|0.05|0.43|0.20|0.03|Sulphide|Infill|
|JD145|400.0|414.0|14.0|0.49|0.10|0.01|0.15|0.05|0.01|Sulphide|Infill|
|JD145|422.0|447.8|25.8|0.46|0.10|0.02|0.18|0.06|0.02|Sulphide|Infill|
|JD146|25.0|43.0|18.0|0.68|0.16|0.01|0.21|0.05|0.03|Oxide|Infill|
|Incl|25.0|30.0|5.0|1.09|0.28|0.01|0.25|0.05|0.04|Oxide|Infill|
|JD146|49.0|57.6|8.6|1.36|0.27|0.01|0.24|0.07|0.02|Oxide|Infill|
|Incl|53.0|57.0|4.0|2.36|0.45|0.02|0.28|0.13|0.03|Oxide|Infill|
|JD146|57.6|70.0|12.4|0.70|0.14|0.01|0.16|0.04|0.02|Sulphide|Infill|
|Incl|63.0|66.0|3.0|0.93|0.18|0.01|0.17|0.10|0.02|Sulphide|Infill|
|JD146|78.0|83.0|5.0|1.08|0.16|0.02|0.20|0.06|0.02|Sulphide|Infill|
|Incl|79.0|81.8|2.8|1.46|0.20|0.02|0.25|0.06|0.02|Sulphide|Infill|
|JD147|13.3|49.8|36.5|1.10|0.25|0.02|0.24|0.06|0.04|Oxide|Infill|
|Incl|13.3|29.4|16.1|1.21|0.28|0.02|0.27|0.09|0.06|Oxide|Infill|
|and|44.8|47.0|2.2|4.91|1.13|0.08|0.68|0.09|0.07|Oxide|Infill|
|JD150|0.6|5.7|5.1|0.72|0.05|<0.01|0.02|0.04|<0.01|Oxide|Infill|
|JD150|20.0|37.0|17.0|1.14|0.23|0.07|0.15|0.10|0.01|Oxide|Infill|
|Incl|21.0|27.8|6.8|1.38|0.31|0.08|0.18|0.15|0.02|Oxide|Infill|
|and|32.0|37.0|5.0|1.29|0.25|0.08|0.16|0.06|0.02|Oxide|Infill|
|JD150|37.0|59.0|22.0|0.72|0.13|0.01|0.17|0.06|0.02|Sulphide|Infill|
|Incl|37.0|42.0|5.0|1.43|0.26|0.03|0.22|0.04|0.02|Sulphide|Infill|
|JD150|70.0|135.0|65.0|0.55|0.12|0.01|0.15|0.06|0.01|Sulphide|Infill|
|Incl|106.6|109.0|2.4|0.65|0.14|0.01|0.18|0.17|0.02|Sulphide|Infill|
|and|114.0|116.0|2.0|0.93|0.18|0.01|0.19|0.03|0.02|Sulphide|Infill|
|and|132.0|134.5|2.5|0.67|0.13|0.01|0.18|0.18|0.02|Sulphide|Infill|
|JD150|139.0|154.5|15.5|0.51|0.12|0.01|0.16|0.06|0.01|Sulphide|Infill|
|JD150|168.0|173.0|5.0|0.40|0.12|0.01|0.15|0.10|0.01|Sulphide|Infill|
|JD150|187.6|194.0|6.4|0.59|0.08|0.02|0.14|0.09|0.01|Sulphide|Infill|
|JD150|221.0|254.0|33.0|1.31|0.27|0.02|0.21|0.10|0.02|Sulphide|Infill|
|Incl|221.0|229.0|8.0|3.54|0.74|0.06|0.37|0.19|0.03|Sulphide|Infill|
|and|236.0|239.0|3.0|0.78|0.16|0.02|0.20|0.05|0.02|Sulphide|Infill|
|and|244.0|246.0|2.0|1.11|0.20|0.02|0.23|0.56|0.02|Sulphide|Infill|
|JD150|277.7|308.8|31.1|0.57|0.15|0.01|0.18|0.06|0.01|Sulphide|Infill|

----- End of picture text -----

17 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|Incl|277.7|280.0|2.3|1.27|0.24|0.06|0.41|0.47|0.03|Sulphide|Infill|
|JD150|328.0|345.5|17.5|0.50|0.10|0.01|0.18|0.04|0.02|Sulphide|Infill|
|JD153|13.5|23.0|9.5|1.07|0.27|0.01|0.14|0.10|0.02|Oxide|Infill|
|Incl|14.9|21.0|6.1|1.24|0.33|0.01|0.14|0.11|0.02|Oxide|Infill|
|JD153|27.0|68.5|41.5|0.60|0.13|0.02|0.15|0.05|0.01|Sulphide|Infill|
|Incl|51.0|54.0|3.0|1.16|0.22|0.01|0.15|0.06|0.01|Sulphide|Infill|
|and|65.0|68.5|3.5|1.02|0.25|0.11|0.13|0.08|0.01|Sulphide|Infill|
|JD156|58.4|66.0|7.6|0.49|0.11|0.01|0.15|0.08|0.02|Sulphide|Infill|
|JD156|76.0|169.0|93.0|0.61|0.13|0.01|0.15|0.06|0.02|Sulphide|Infill|
|Incl|77.0|81.0|4.0|0.87|0.19|0.01|0.16|0.07|0.02|Sulphide|Infill|
|and|96.0|103.0|7.0|0.94|0.19|0.01|0.18|0.14|0.02|Sulphide|Infill|
|and|122.0|125.0|3.0|0.82|0.17|0.01|0.21|0.07|0.02|Sulphide|Infill|
|and|135.0|142.0|7.0|0.91|0.23|0.01|0.18|0.08|0.02|Sulphide|Infill|
|and|154.0|157.0|3.0|1.20|0.26|<0.01|0.15|0.08|0.01|Sulphide|Infill|
|JD156|174.0|179.0|5.0|0.57|0.11|<0.01|0.16|0.02|0.01|Sulphide|Infill|
|JD156|242.2|249.3|7.1|0.43|0.08|0.01|0.23|0.02|0.02|Sulphide|Infill|
|JD156|285.0|293.0|8.0|0.54|0.11|0.01|0.14|0.07|0.01|Sulphide|Infill|
|JD156|334.0|346.5|12.5|0.37|0.08|0.01|0.15|0.06|0.02|Sulphide|Infill|
|JD156|379.0|403.9|24.9|0.49|0.11|0.02|0.13|0.04|0.01|Sulphide|Infill|
|JD156|416.0|421.4|5.4|0.56|0.12|0.03|0.17|0.03|0.01|Sulphide|Infill|
|JD157|196.0|253.0|57.0|0.67|0.13|0.01|0.16|0.07|0.02|Sulphide|Infill|
|Incl|206.2|213.5|7.3|1.18|0.15|0.02|0.33|0.15|0.03|Sulphide|Infill|
|and|239.0|242.0|3.0|0.87|0.16|<0.01|0.18|0.09|0.02|Sulphide|Infill|
|and|250.0|253.0|3.0|1.10|0.19|0.01|0.17|0.08|0.02|Sulphide|Infill|
|JD157|264.0|290.0|26.0|0.84|0.17|0.02|0.16|0.10|0.02|Sulphide|Ext|
|Incl|270.0|281.0|11.0|1.14|0.24|0.02|0.17|0.15|0.02|Sulphide|Ext|
|and|286.0|288.0|2.0|0.89|0.17|0.01|0.20|0.07|0.02|Sulphide|Infill|
|JD157|295.0|317.2|22.2|0.49|0.12|0.01|0.15|0.05|0.01|Sulphide|Ext|
|JD157|324.0|351.0|27.0|0.78|0.12|0.01|0.22|0.18|0.03|Sulphide|Ext|
|Incl|324.0|328.0|4.0|1.31|0.27|0.01|0.16|0.21|0.02|Sulphide|Ext|
|JD157|357.1|362.3|5.2|0.50|0.13|0.01|0.13|0.07|0.01|Sulphide|Ext|
|JD157|363.8|368.4|4.7|0.54|0.11|0.01|0.12|0.07|0.01|Sulphide|Ext|
|JD157|371.0|391.8|20.8|0.43|0.09|0.01|0.12|0.10|0.01|Sulphide|Ext|
|JD157|405.2|444.0|38.8|0.43|0.09|0.01|0.14|0.07|0.02|Sulphide|Ext|
|JD157|450.0|454.0|4.0|0.34|0.08|0.01|0.14|0.19|0.02|Sulphide|Ext|
|JD157|464.0|489.0|25.0|0.66|0.13|0.01|0.21|0.05|0.02|Sulphide|Ext|
|JD157|509.4|535.0|25.6|1.85|0.72|0.02|0.26|0.33|0.02|Sulphide|Ext|
|Incl|513.0|520.1|7.1|2.32|0.92|0.04|0.27|0.90|0.02|Sulphide|Ext|
|and|523.0|527.4|4.4|4.49|2.22|0.05|0.57|0.23|0.03|Sulphide|Ext|
|JD157|539.4|573.5|34.1|0.62|0.12|0.02|0.18|0.05|0.02|Sulphide|Ext|
|Incl|553.0|561.0|8.0|0.80|0.14|0.02|0.22|0.09|0.02|Sulphide|Ext|

----- End of picture text -----

18 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|JD157|631.9|674.0|42.1|0.47|0.12|0.01|0.16|0.05|0.01|Sulphide|Ext|
|JD157|679.0|686.0|7.0|0.61|0.14|0.08|0.16|0.16|0.02|Sulphide|Ext|
|Incl|680.0|684.6|4.6|0.63|0.13|0.12|0.20|0.18|0.02|Sulphide|Ext|
|JD158|10.0|25.0|15.0|0.69|0.31|0.02|0.11|0.12|0.08|Oxide|Infill|
|JD158|35.1|79.0|43.9|0.57|0.12|0.01|0.15|0.05|0.02|Sulphide|Infill|
|Incl|69.2|72.0|2.8|1.03|0.21|0.01|0.16|0.04|0.02|Sulphide|Infill|
|JD158|85.0|146.0|61.0|0.64|0.14|0.01|0.14|0.05|0.01|Sulphide|Infill|
|Incl|96.0|98.0|2.0|0.77|0.15|0.01|0.19|0.05|0.02|Sulphide|Infill|
|and|138.0|141.0|3.0|0.97|0.20|0.01|0.16|0.07|0.02|Sulphide|Infill|
|JD158|153.0|167.0|14.0|0.50|0.11|<0.01|0.15|0.04|0.01|Sulphide|Infill|
|JD158|209.0|242.0|33.0|1.87|0.35|0.05|0.25|0.14|0.02|Sulphide|Infill|
|Incl|213.0|236.0|23.0|2.49|0.46|0.07|0.29|0.19|0.02|Sulphide|Infill|
|JD158|252.0|261.0|9.0|0.51|0.09|0.01|0.16|0.07|0.01|Sulphide|Infill|
|JD159|9.0|21.0|12.0|0.88|0.27|0.01|0.07|0.13|0.04|Oxide|Infill|
|Incl|16.3|20.5|4.2|1.27|0.52|0.01|0.11|0.18|0.09|Oxide|Infill|
|JD159|24.0|36.0|12.0|0.46|0.10|0.01|0.17|0.08|0.02|Sulphide|Infill|
|JD159|47.0|58.2|11.2|0.48|0.10|0.01|0.14|0.06|0.01|Sulphide|Infill|
|Incl|50.0|53.0|3.0|0.81|0.17|0.01|0.17|0.05|0.02|Sulphide|Infill|
|JD159|62.3|111.7|49.4|0.61|0.14|0.02|0.15|0.09|0.01|Sulphide|Infill|
|Incl|69.0|72.4|3.4|0.89|0.19|0.02|0.17|0.13|0.02|Sulphide|Infill|
|and|90.5|97.0|6.6|1.02|0.22|0.05|0.19|0.11|0.02|Sulphide|Infill|
|and|101.5|108.0|6.5|1.03|0.20|0.04|0.17|0.22|0.02|Sulphide|Infill|
|JD159|174.1|189.0|14.9|0.67|0.14|<0.01|0.16|0.04|0.02|Sulphide|Infill|
|Incl|186.0|189.0|3.0|0.88|0.21|0.01|0.17|0.11|0.02|Sulphide|Infill|
|JD159|200.4|256.0|55.6|0.63|0.13|<0.01|0.14|0.05|0.01|Sulphide|Infill|
|Incl|202.0|208.0|6.0|1.07|0.27|<0.01|0.16|0.03|0.01|Sulphide|Infill|
|and|252.0|256.0|4.0|0.88|0.15|0.01|0.16|0.06|0.02|Sulphide|Infill|
|JD159|267.0|275.0|8.0|0.82|0.15|0.01|0.15|0.08|0.02|Sulphide|Infill|
|Incl|273.0|275.0|2.0|1.70|0.21|0.02|0.21|0.11|0.02|Sulphide|Infill|
|JD159|281.0|380.8|99.8|0.86|0.14|0.01|0.22|0.09|0.02|Sulphide|Infill|
|Incl|284.3|290.0|5.6|0.84|0.18|0.02|0.18|0.09|0.02|Sulphide|Infill|
|and|299.3|307.0|7.7|1.06|0.15|0.01|0.22|0.06|0.02|Sulphide|Infill|
|and|313.0|315.0|2.0|0.93|0.12|0.01|0.24|0.07|0.02|Sulphide|Infill|
|and|319.0|326.1|7.1|1.19|0.27|0.02|0.17|0.08|0.01|Sulphide|Infill|
|and|334.0|336.0|2.0|2.45|0.43|0.01|0.49|0.24|0.04|Sulphide|Infill|
|and|338.4|342.0|3.7|4.90|0.29|0.05|1.49|0.84|0.09|Sulphide|Infill|
|and|358.1|360.2|2.1|4.14|0.38|0.02|0.48|0.14|0.03|Sulphide|Infill|
|JD160|8.0|25.1|17.1|1.56|0.47|0.01|0.16|0.17|0.13|Oxide|Infill|
|Incl|9.0|24.0|15.0|1.71|0.52|0.02|0.16|0.19|0.15|Oxide|Infill|
|JD160|30.0|35.2|5.2|0.54|0.12|0.01|0.14|0.09|0.02|Sulphide|Infill|
|JD160|40.0|139.2|99.2|0.59|0.13|0.02|0.15|0.09|0.02|Sulphide|Infill|

----- End of picture text -----

19 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|Incl|51.0|53.0|2.0|0.62|0.15|0.10|0.15|0.21|0.02|Sulphide|Infill|
|and|94.0|105.0|11.0|0.72|0.17|0.02|0.19|0.14|0.02|Sulphide|Infill|
|and|115.0|128.0|13.0|0.91|0.20|0.01|0.17|0.12|0.02|Sulphide|Infill|
|JD161|39.0|80.0|41.0|0.59|0.12|0.02|0.15|0.08|0.02|Sulphide|Infill|
|Incl|65.0|70.0|5.0|0.91|0.17|0.02|0.23|0.09|0.02|Sulphide|Infill|
|and|75.0|79.0|4.0|0.78|0.15|0.08|0.16|0.26|0.02|Sulphide|Infill|
|JD161|90.2|236.0|145.8|0.97|0.24|0.10|0.14|0.08|0.01|Sulphide|Infill|
|Incl|116.0|122.0|6.0|1.07|0.38|0.05|0.14|0.09|0.02|Sulphide|Infill|
|and|126.0|138.0|12.0|1.02|0.26|0.04|0.16|0.05|0.01|Sulphide|Infill|
|and|157.0|161.0|4.0|0.87|0.21|0.12|0.15|0.06|0.01|Sulphide|Infill|
|and|166.0|175.0|9.0|1.09|0.29|0.22|0.15|0.12|0.01|Sulphide|Infill|
|and|180.0|188.0|8.0|1.72|0.39|0.22|0.16|0.10|0.01|Sulphide|Infill|
|and|200.0|205.0|5.0|3.90|1.20|0.11|0.13|0.05|0.01|Sulphide|Infill|
|and|209.0|223.0|14.0|1.43|0.15|0.31|0.14|0.24|0.01|Sulphide|Ext|
|and|233.0|235.0|2.0|5.63|2.26|0.31|0.20|0.13|0.02|Sulphide|Ext|
|JD162|6.8|17.0|10.2|1.02|0.46|0.01|0.14|0.16|0.10|Oxide|Infill|
|Incl|7.0|14.7|7.7|1.10|0.51|0.01|0.13|0.16|0.11|Oxide|Infill|
|JD162|32.1|135.2|103.1|0.96|0.20|0.01|0.18|0.09|0.02|Sulphide|Infill|
|Incl|32.1|37.0|4.9|0.78|0.16|0.01|0.17|0.09|0.02|Sulphide|Infill|
|and|66.0|76.9|10.9|0.96|0.20|0.01|0.19|0.08|0.02|Sulphide|Infill|
|and|96.0|101.0|5.0|0.67|0.15|0.01|0.20|0.11|0.02|Sulphide|Infill|
|and|107.3|115.0|7.8|4.27|0.84|0.07|0.37|0.31|0.03|Sulphide|Infill|
|JD162|145.0|157.0|12.0|0.46|0.10|<0.01|0.17|0.04|0.02|Sulphide|Infill|
|JD162|170.6|179.0|8.4|4.19|0.88|0.03|0.70|0.43|0.05|Sulphide|Infill|
|Incl|170.6|177.7|7.1|4.86|1.02|0.03|0.80|0.50|0.05|Sulphide|Infill|
|JD162|200.0|249.8|49.8|0.68|0.15|0.02|0.19|0.03|0.02|Sulphide|Infill|
|Incl|200.0|202.4|2.4|4.54|0.80|0.06|0.89|0.24|0.06|Sulphide|Infill|
|JD162|293.3|301.0|7.7|0.46|0.09|<0.01|0.16|0.02|0.01|Sulphide|Infill|
|JD162|306.0|364.0|58.0|0.87|0.11|0.18|0.16|0.08|0.01|Sulphide|Infill|
|Incl|350.0|353.0|3.0|1.88|0.17|0.16|0.15|0.48|0.02|Sulphide|Infill|
|and|357.0|364.0|7.0|3.20|0.09|1.26|0.16|0.21|0.02|Sulphide|Infill|
|JD162|371.0|429.2|58.2|0.72|0.21|0.09|0.16|0.18|0.01|Sulphide|Infill|
|Incl|379.0|382.7|3.7|0.39|0.09|0.15|0.17|0.30|0.02|Sulphide|Infill|
|and|392.0|412.3|20.3|1.06|0.25|0.16|0.19|0.34|0.02|Sulphide|Infill|
|and|417.3|421.5|4.2|1.34|0.34|0.03|0.21|0.20|0.02|Sulphide|Infill|
|and|427.0|429.2|2.2|0.78|0.26|0.01|0.18|0.16|0.02|Sulphide|Infill|
|JD162|436.8|441.0|4.2|0.61|0.13|0.02|0.18|0.12|0.02|Sulphide|Infill|
|Incl|436.8|439.0|2.2|0.64|0.12|0.02|0.22|0.14|0.02|Sulphide|Infill|
|JD162|447.0|466.1|19.1|1.16|0.52|0.47|0.11|0.12|0.01|Sulphide|Ext|
|Incl|455.0|463.2|8.2|2.20|1.13|1.07|0.10|0.12|0.01|Sulphide|Ext|
|JD163|68.6|83.0|14.4|0.51|0.11|0.02|0.15|0.05|0.02|Sulphide|Infill|

----- End of picture text -----

20 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 695] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|JD166|234.0|238.0|4.0|0.36|0.87|0.01|0.03|0.02|0.01|Sulphide|Ext|
|JD166|243.0|248.0|5.0|0.58|0.48|0.12|0.06|0.10|0.01|Sulphide|Ext|
|JD166|325.0|339.0|14.0|0.89|0.19|<0.01|0.17|0.09|0.02|Sulphide|Ext|
|Incl|330.0|339.0|9.0|0.96|0.20|<0.01|0.17|0.11|0.02|Sulphide|Ext|
|JD167|10.5|19.4|8.9|1.20|0.33|0.03|0.14|0.12|0.06|Oxide|Infill|
|Incl|13.0|19.4|6.4|1.44|0.42|0.03|0.17|0.15|0.07|Oxide|Infill|
|JD167|24.5|37.6|13.1|0.75|0.22|<0.01|0.18|0.06|0.02|Oxide|Infill|
|JD167|137.0|174.0|37.0|0.90|0.20|0.06|0.16|0.14|0.02|Sulphide|Ext|
|Incl|157.0|162.0|5.0|3.29|0.77|0.23|0.27|0.67|0.02|Sulphide|Ext|
|JD168|13.0|26.0|13.0|0.77|0.27|0.01|0.11|0.09|0.05|Oxide|Infill|
|Incl|14.0|16.0|2.0|1.00|0.42|<0.01|0.05|0.10|0.08|Oxide|Infill|
|JD168|38.0|44.0|6.0|0.51|0.12|0.02|0.13|0.06|0.01|Oxide|Infill|
|JD168|49.0|55.4|6.4|0.57|0.14|0.02|0.15|0.04|0.01|Oxide|Infill|
|JD168|91.0|95.0|4.0|0.45|0.08|0.01|0.17|0.02|0.02|Sulphide|Infill|
|JD168|110.0|121.5|11.5|0.50|0.09|<0.01|0.15|0.01|0.01|Sulphide|Infill|
|JD168|123.3|133.0|9.8|0.41|0.09|0.01|0.16|0.05|0.02|Sulphide|Infill|
|JD168|137.7|185.0|47.4|0.64|0.13|0.01|0.14|0.05|0.01|Sulphide|Infill|
|Incl|137.7|140.0|2.4|0.85|0.17|0.01|0.17|0.06|0.02|Sulphide|Infill|
|and|168.0|170.0|2.0|0.80|0.17|0.01|0.18|0.13|0.02|Sulphide|Infill|
|JD168|190.0|194.0|4.0|0.47|0.11|<0.01|0.16|0.04|0.02|Sulphide|Infill|
|JD168|201.0|215.0|14.0|0.51|0.11|0.01|0.13|0.06|0.01|Sulphide|Infill|
|JD168|243.8|249.0|5.2|0.45|0.11|0.02|0.14|0.08|0.02|Sulphide|Infill|
|JD168|262.0|268.0|6.0|0.51|0.10|0.01|0.15|0.08|0.02|Sulphide|Infill|
|JD168|275.0|293.0|18.0|0.58|0.13|0.01|0.16|0.03|0.01|Sulphide|Infill|
|Incl|289.4|293.0|3.6|0.84|0.17|0.01|0.19|0.03|0.01|Sulphide|Infill|
|JD168|298.4|321.0|22.7|0.97|0.15|0.02|0.26|0.16|0.02|Sulphide|Infill|
|Incl|308.1|312.0|3.9|3.08|0.30|0.02|0.94|0.33|0.06|Sulphide|Infill|
|and|317.0|321.0|4.0|0.80|0.16|0.05|0.13|0.38|0.01|Sulphide|Infill|
|JD168|326.4|346.3|19.9|0.61|0.12|0.01|0.16|0.13|0.01|Sulphide|Infill|
|Incl|333.0|336.5|3.5|1.02|0.19|0.01|0.27|0.28|0.02|Sulphide|Infill|
|JD170|97.0|120.0|23.0|0.75|0.16|<0.01|0.17|0.09|0.02|Sulphide|Infill|
|Incl|103.2|120.0|16.9|0.79|0.17|<0.01|0.17|0.10|0.02|Sulphide|Infill|
|JD170|172.0|206.0|34.0|0.56|0.13|<0.01|0.16|0.05|0.01|Sulphide|Infill|
|JD170|275.0|282.0|7.0|0.58|0.12|0.03|0.13|0.03|0.01|Sulphide|Infill|
|JD170|294.0|300.0|6.0|1.01|0.27|0.06|0.21|0.34|0.02|Sulphide|Infill|
|Incl|295.0|300.0|5.0|1.13|0.31|0.07|0.23|0.39|0.03|Sulphide|Infill|
|JD170|304.8|307.0|2.2|1.63|0.23|0.02|0.57|0.61|0.07|Sulphide|Infill|
|JD170|328.0|341.0|13.0|0.47|0.11|0.01|0.17|0.02|0.02|Sulphide|Infill|
|JD171|9.0|36.0|27.0|1.47|0.50|0.13|0.17|0.19|0.03|Oxide|Infill|
|Incl|10.0|33.8|23.8|1.61|0.54|0.13|0.18|0.20|0.04|Oxide|Infill|
|JD171|41.0|45.4|4.4|1.86|0.27|0.10|0.16|0.07|0.01|Oxide|Infill|

----- End of picture text -----

21 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 695] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|JD171|45.4|73.8|28.4|1.00|0.22|0.09|0.14|0.06|0.01|Sulphide|Infill|
|Incl|45.4|48.0|2.6|4.87|0.92|0.38|0.13|0.10|0.02|Sulphide|Infill|
|and|59.0|63.0|4.0|0.96|0.22|0.04|0.13|0.08|0.01|Sulphide|Infill|
|and|71.0|73.0|2.0|1.14|0.31|0.10|0.16|0.12|0.01|Sulphide|Infill|
|JD171|83.9|133.7|49.9|0.89|0.22|0.12|0.16|0.12|0.01|Sulphide|Infill|
|Incl|90.0|101.0|11.0|0.87|0.28|0.04|0.16|0.06|0.01|Sulphide|Infill|
|and|108.0|122.0|14.0|1.40|0.31|0.06|0.20|0.12|0.01|Sulphide|Infill|
|JD171|146.4|154.0|7.6|0.51|0.17|0.12|0.13|0.12|0.01|Sulphide|Infill|
|JD172|80.6|172.0|91.4|0.58|0.14|0.02|0.14|0.11|0.02|Sulphide|Infill|
|Incl|105.0|107.5|2.5|0.58|0.13|0.02|0.24|0.31|0.03|Sulphide|Infill|
|and|111.0|115.0|4.0|0.89|0.27|0.03|0.16|0.15|0.02|Sulphide|Infill|
|and|137.0|150.9|13.9|0.97|0.20|0.02|0.16|0.16|0.02|Sulphide|Infill|
|JD172|207.9|212.9|5.1|0.57|0.12|<0.01|0.16|0.07|0.02|Sulphide|Infill|
|JD172|269.0|276.0|7.0|0.39|0.08|<0.01|0.15|0.06|0.02|Sulphide|Infill|
|JD172|280.0|384.0|104.0|0.70|0.16|0.01|0.17|0.08|0.02|Sulphide|Ext|
|Incl|301.9|305.0|3.1|0.83|0.17|<0.01|0.20|0.04|0.02|Sulphide|Infill|
|and|332.0|334.0|2.0|0.98|0.19|<0.01|0.18|0.03|0.02|Sulphide|Ext|
|and|355.0|367.9|12.9|1.24|0.33|0.02|0.29|0.31|0.02|Sulphide|Ext|
|and|381.4|384.0|2.6|1.73|0.40|0.06|0.13|0.17|0.01|Sulphide|Ext|
|JD172|409.0|474.2|65.2|0.74|0.19|0.05|0.13|0.07|0.01|Sulphide|Ext|
|Incl|422.0|426.0|4.0|0.64|0.10|0.09|0.18|0.15|0.02|Sulphide|Ext|
|and|442.0|465.7|23.7|1.12|0.32|0.04|0.12|0.07|0.01|Sulphide|Ext|
|and|468.0|470.0|2.0|1.48|0.46|0.19|0.11|0.04|0.01|Sulphide|Ext|
|JD173|4.0|42.0|38.0|1.60|0.44|0.10|0.17|0.11|0.02|Oxide|Infill|
|Incl|5.0|39.0|34.0|1.71|0.47|0.11|0.17|0.12|0.02|Oxide|Infill|
|JD173|43.0|77.0|34.0|0.82|0.20|0.03|0.18|0.06|0.01|Sulphide|Infill|
|Incl|43.0|50.0|7.0|1.47|0.33|0.04|0.19|0.07|0.02|Sulphide|Infill|
|and|72.0|76.0|4.0|0.90|0.29|0.04|0.16|0.13|0.01|Sulphide|Infill|
|JD173|91.0|94.4|3.4|1.23|0.19|0.04|0.18|0.06|0.02|Sulphide|Infill|
|JD173|99.8|112.0|12.3|0.77|0.45|0.04|0.16|0.05|0.01|Sulphide|Infill|
|Incl|99.8|102.0|2.3|2.34|0.73|0.06|0.34|0.07|0.03|Sulphide|Infill|
|JD173|120.0|125.0|5.0|0.81|0.24|0.04|0.09|0.05|0.01|Sulphide|Infill|
|JD174|7.0|39.0|32.0|1.37|0.39|0.04|0.20|0.16|0.03|Oxide|Infill|
|Incl|9.0|26.5|17.5|2.04|0.59|0.03|0.20|0.22|0.05|Oxide|Infill|
|and|29.0|31.0|2.0|1.14|0.20|0.10|0.24|0.09|0.02|Oxide|Infill|
|JD174|39.0|59.0|20.0|0.53|0.14|0.01|0.14|0.05|0.01|Sulphide|Infill|
|JD174|63.4|113.3|49.9|0.70|0.16|0.04|0.17|0.13|0.01|Sulphide|Infill|
|Incl|67.0|72.0|5.0|0.86|0.26|0.06|0.16|0.15|0.01|Sulphide|Infill|
|and|89.0|94.0|5.0|0.74|0.16|0.05|0.17|0.15|0.01|Sulphide|Infill|
|and|97.0|113.3|16.3|0.92|0.20|0.04|0.19|0.16|0.02|Sulphide|Infill|
|JD175|9.0|25.0|16.0|0.74|0.04|0.01|0.04|0.06|<0.01|Oxide|Infill|

----- End of picture text -----

22 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|Incl|11.0|16.8|5.8|1.10|0.05|0.02|0.05|0.08|<0.01|Oxide|Infill|
|JD175|80.7|101.6|20.9|0.69|0.16|0.04|0.15|0.14|0.01|Sulphide|Infill|
|Incl|85.0|89.0|4.0|0.76|0.18|0.04|0.17|0.25|0.02|Sulphide|Infill|
|and|92.0|99.0|7.0|0.87|0.19|0.04|0.16|0.11|0.01|Sulphide|Infill|
|JD176|8.4|22.0|13.6|1.04|0.27|0.01|0.09|0.10|0.03|Oxide|Infill|
|Incl|14.0|19.7|5.7|1.54|0.39|0.01|0.13|0.16|0.06|Oxide|Infill|
|JD176|22.0|32.0|10.0|0.70|0.14|0.02|0.15|0.10|0.02|Sulphide|Infill|
|Incl|23.0|25.0|2.0|0.86|0.17|0.04|0.16|0.14|0.02|Sulphide|Infill|
|and|30.0|32.0|2.0|0.99|0.19|0.02|0.18|0.10|0.02|Sulphide|Infill|
|JD176|37.0|54.0|17.0|0.50|0.12|0.01|0.14|0.04|0.01|Sulphide|Infill|
|JD176|63.0|72.8|9.8|1.03|0.20|0.02|0.17|0.05|0.02|Sulphide|Infill|
|Incl|64.0|72.8|8.8|1.07|0.21|0.02|0.17|0.05|0.02|Sulphide|Infill|
|JD176|142.0|204.0|62.0|0.71|0.13|0.01|0.18|0.11|0.02|Sulphide|Infill|
|Incl|151.3|157.0|5.7|0.76|0.15|0.01|0.20|0.05|0.02|Sulphide|Infill|
|and|165.0|167.0|2.0|1.12|0.21|0.01|0.22|0.07|0.02|Sulphide|Infill|
|and|187.0|196.0|9.0|0.83|0.15|<0.01|0.21|0.07|0.02|Sulphide|Infill|
|JD176|212.0|275.0|63.0|0.57|0.11|0.01|0.15|0.05|0.02|Sulphide|Infill|
|Incl|220.0|224.0|4.0|1.09|0.20|0.01|0.15|0.08|0.01|Sulphide|Infill|
|and|260.0|263.0|3.0|0.83|0.17|0.01|0.17|0.08|0.02|Sulphide|Infill|
|JD176|281.0|302.9|21.9|0.66|0.13|0.02|0.22|0.23|0.02|Sulphide|Infill|
|Incl|281.0|285.0|4.0|0.93|0.06|0.06|0.25|0.98|0.02|Sulphide|Infill|
|JD176|309.0|360.0|51.0|0.58|0.12|0.01|0.16|0.08|0.01|Sulphide|Infill|
|Incl|336.0|339.0|3.0|0.86|0.22|0.01|0.18|0.11|0.02|Sulphide|Infill|
|and|356.0|360.0|4.0|0.62|0.03|0.02|0.18|0.57|0.02|Sulphide|Infill|
|JD176|370.0|386.0|16.0|0.49|0.11|0.01|0.16|0.13|0.01|Sulphide|Infill|
|JD177|9.0|17.0|8.0|1.30|0.39|0.01|0.15|0.10|0.07|Oxide|Infill|
|JD177|21.2|27.0|5.8|1.16|0.25|0.02|0.27|0.14|0.02|Oxide|Infill|
|Incl|22.0|24.0|2.0|2.56|0.20|0.01|0.29|0.14|0.02|Oxide|Infill|
|JD179|277.4|282.0|4.6|0.72|0.17|<0.01|0.18|0.07|0.02|Sulphide|Ext|
|Incl|277.4|280.0|2.6|0.92|0.18|<0.01|0.22|0.05|0.02|Sulphide|Ext|
|JD180|5.0|15.2|10.2|1.57|0.35|0.01|0.19|0.28|0.09|Oxide|Infill|
|Incl|6.9|15.2|8.3|1.89|0.32|0.02|0.23|0.29|0.12|Oxide|Infill|
|JD180|22.0|36.6|14.6|0.60|0.16|0.01|0.16|0.09|0.02|Oxide|Infill|
|JD180|36.6|44.9|8.4|1.67|2.64|0.01|0.50|0.43|0.03|Sulphide|Infill|
|Incl|42.5|44.9|2.5|4.62|8.79|0.03|1.40|1.21|0.07|Sulphide|Infill|
|JD180|53.0|64.0|11.0|1.87|0.44|0.02|1.22|0.25|0.06|Sulphide|Infill|
|Incl|53.0|59.9|6.9|2.48|0.70|0.02|1.92|0.36|0.09|Sulphide|Infill|
|JD180|97.9|112.9|15.0|2.50|0.67|0.02|0.37|0.15|0.03|Sulphide|Infill|
|Incl|97.9|101.0|3.1|2.73|0.63|0.03|0.30|0.26|0.03|Sulphide|Infill|
|and|104.0|112.9|8.9|3.14|0.86|0.02|0.47|0.17|0.03|Sulphide|Infill|
|JD180|156.6|170.0|13.4|1.43|0.25|0.01|0.27|0.11|0.03|Sulphide|Infill|

----- End of picture text -----

23 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|Incl|156.6|160.8|4.2|3.33|0.55|0.01|0.48|0.20|0.04|Sulphide|Infill|
|and|164.0|169.0|5.0|0.73|0.15|0.01|0.21|0.09|0.02|Sulphide|Infill|
|JD180|182.0|188.6|6.6|0.45|0.15|0.01|0.14|0.03|0.01|Sulphide|Infill|
|JD181|375.1|400.0|24.9|0.48|0.12|<0.01|0.17|0.07|0.02|Sulphide|Ext|
|Incl|385.6|391.0|5.4|0.83|0.21|<0.01|0.22|0.17|0.02|Sulphide|Ext|
|JD181|405.0|409.2|4.2|0.70|0.16|0.01|0.17|0.03|0.02|Sulphide|Ext|
|JD181|415.0|434.0|19.0|0.61|0.13|0.01|0.17|0.10|0.02|Sulphide|Ext|
|Incl|424.0|428.0|4.0|1.12|0.19|0.01|0.20|0.25|0.02|Sulphide|Ext|
|JD181|445.0|489.5|44.5|0.78|0.15|0.04|0.19|0.25|0.02|Sulphide|Ext|
|Incl|445.0|470.0|25.0|0.88|0.17|0.02|0.21|0.23|0.02|Sulphide|Ext|
|and|473.0|479.0|6.0|0.63|0.12|0.04|0.19|0.32|0.02|Sulphide|Ext|
|and|483.0|489.5|6.5|0.83|0.17|0.12|0.15|0.49|0.01|Sulphide|Ext|
|JD181|495.8|507.2|11.4|0.87|0.14|0.29|0.12|0.35|0.01|Sulphide|Ext|
|Incl|499.0|507.2|8.2|1.09|0.18|0.36|0.13|0.43|0.01|Sulphide|Ext|
|JD211|139.2|141.2|2.0|1.79|0.23|0.01|0.63|0.49|0.06|Sulphide|Ext|
|JRC028D|264.0|270.3|6.3|2.18|0.60|0.10|0.13|0.04|0.01|Sulphide|Ext|
|JRC028D|280.9|283.1|2.2|3.93|2.88|1.41|0.12|0.11|0.01|Sulphide|Ext|
|JRC087D|271.1|277.0|5.9|0.45|0.24|0.02|0.15|0.06|0.01|Sulphide|Ext|
|JRC087D|294.0|305.9|11.9|1.22|0.45|0.03|0.15|0.04|0.01|Sulphide|Ext|
|Incl|296.0|298.0|2.0|1.10|0.20|0.02|0.20|0.08|0.02|Sulphide|Ext|
|JRC087D|327.6|330.0|2.4|2.57|1.57|0.17|0.08|0.04|0.01|Sulphide|Ext|
|JRC109D|251.0|273.0|22.0|1.08|0.29|0.03|0.14|0.05|0.01|Sulphide|Infill|
|JRC109D|281.0|293.0|12.0|0.45|0.11|0.04|0.14|0.08|0.01|Sulphide|Infill|
|JRC209D|264.4|283.0|18.6|1.00|0.27|0.03|0.14|0.05|0.01|Sulphide|Infill|
|Incl|267.0|272.0|5.0|1.64|0.42|0.03|0.14|0.04|0.01|Sulphide|Infill|
|JRC209D|288.0|302.0|14.0|0.60|0.12|0.07|0.12|0.07|0.01|Sulphide|Infill|
|Incl|294.0|296.0|2.0|0.97|0.18|0.25|0.15|0.21|0.01|Sulphide|Infill|
|JRC272D|356.0|396.6|40.6|0.91|0.22|0.09|0.17|0.14|0.02|Sulphide|Ext|
|JRC272D|406.0|435.3|29.3|0.44|0.12|0.02|0.13|0.05|0.01|Sulphide|Ext|
|JRC274D|182.0|186.0|4.0|0.46|0.09|0.01|0.13|0.08|0.02|Sulphide|Infill|
|JRC274D|192.0|222.0|30.0|0.70|0.15|0.01|0.12|0.06|0.01|Sulphide|Infill|
|JRC274D|227.0|260.0|33.0|0.51|0.12|0.01|0.15|0.11|0.01|Sulphide|Infill|
|JRC274D|264.1|268.0|4.0|3.60|0.73|0.03|0.81|0.43|0.06|Sulphide|Infill|
|JRC274D|289.2|297.0|7.8|0.80|0.15|0.01|0.31|0.12|0.02|Sulphide|Infill|
|JRC274D|303.0|308.0|5.0|0.71|0.13|0.02|0.14|0.17|0.01|Sulphide|Infill|
|Incl|304.0|306.2|2.2|0.84|0.16|0.03|0.18|0.27|0.01|Sulphide|Infill|
|JRC274D|324.0|330.0|6.0|0.50|0.10|<0.01|0.16|0.08|0.02|Sulphide|Infill|
|JRC274D|335.0|359.0|24.0|0.46|0.10|0.01|0.14|0.09|0.02|Sulphide|Infill|
|JRC274D|365.5|378.0|12.5|0.61|0.13|0.04|0.11|0.15|0.01|Sulphide|Infill|
|Incl|369.0|373.0|4.0|1.23|0.25|0.09|0.15|0.28|0.01|Sulphide|Infill|
|JRC274D|384.0|400.0|16.0|0.59|0.12|0.01|0.17|0.03|0.01|Sulphide|Infill|

----- End of picture text -----

24 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|JRC274D|408.0|418.1|10.1|0.58|0.11|0.03|0.18|0.11|0.02|Sulphide|Infill|
|JRC274D|425.0|433.0|8.0|0.48|0.11|0.01|0.15|0.03|0.01|Sulphide|Infill|
|JRC274D|453.6|458.0|4.4|0.45|0.10|0.01|0.19|0.06|0.02|Sulphide|Infill|
|JRC274D|497.3|521.0|23.7|0.58|0.11|0.02|0.13|0.07|0.01|Sulphide|Ext|
|Incl|516.0|519.0|3.0|1.72|0.18|0.04|0.15|0.04|0.02|Sulphide|Ext|
|JRC345D|272.0|305.0|33.0|0.90|0.21|0.03|0.20|0.08|0.02|Sulphide|Infill|
|Incl|295.0|298.0|3.0|1.02|0.15|0.02|0.17|0.05|0.02|Sulphide|Infill|
|JRC345D|324.8|365.0|40.2|0.62|0.12|0.02|0.16|0.08|0.02|Sulphide|Ext|
|Incl|349.0|352.0|3.0|0.84|0.14|0.01|0.20|0.12|0.02|Sulphide|Ext|
|and|358.0|360.0|2.0|1.80|0.34|0.05|0.18|0.08|0.02|Sulphide|Ext|
|JRC366|135.0|141.0|6.0|1.11|0.56|0.05|0.16|0.10|0.01|Sulphide|Ext|
|JRC367|185.0|195.0|10.0|0.72|0.29|0.03|0.08|0.02|0.01|Sulphide|Ext|
|JRC367|210.0|216.0|6.0|0.84|0.29|0.03|0.15|0.14|0.02|Sulphide|Ext|
|Incl|211.0|216.0|5.0|0.89|0.31|0.03|0.15|0.15|0.02|Sulphide|Ext|
|JRC368|206.0|225.0|19.0|0.40|0.89|0.04|0.04|0.05|0.01|Sulphide|Ext|
|Incl|214.0|216.0|2.0|1.40|3.76|0.05|0.04|0.02|0.01|Sulphide|Ext|
|JRC368|237.0|239.0|2.0|2.57|0.92|0.06|0.27|0.11|0.02|Sulphide|Ext|
|JRC368|249.0|251.0|2.0|1.80|0.49|0.08|0.19|0.10|0.02|Sulphide|Ext|
|JRC372|35.0|37.0|2.0|5.45|0.94|0.02|0.24|0.23|0.02|Oxide|Infill|
|JRC372|43.0|115.0|72.0|0.72|0.15|0.01|0.17|0.06|0.02|Sulphide|Infill|
|Incl|44.0|48.0|4.0|1.13|0.16|0.01|0.31|0.09|0.02|Sulphide|Infill|
|and|90.0|93.0|3.0|5.07|1.17|0.03|0.39|0.17|0.03|Sulphide|Infill|
|and|112.0|115.0|3.0|1.07|0.24|0.02|0.21|0.07|0.02|Sulphide|Infill|
|JRC372|123.0|146.0|23.0|0.69|0.16|0.02|0.17|0.08|0.02|Sulphide|Infill|
|Incl|136.0|142.0|6.0|1.20|0.31|0.04|0.20|0.17|0.02|Sulphide|Infill|
|JRC372|155.0|182.0|27.0|0.73|0.14|0.01|0.14|0.05|0.02|Sulphide|Infill|
|Incl|164.0|166.0|2.0|1.25|0.29|0.01|0.17|0.10|0.02|Sulphide|Infill|
|and|175.0|178.0|3.0|1.60|0.24|0.03|0.19|0.05|0.02|Sulphide|Infill|
|JRC374|14.0|38.0|24.0|0.85|0.17|<0.01|0.12|0.07|0.04|Oxide|Infill|
|Incl|17.0|26.0|9.0|1.37|0.25|0.01|0.10|0.12|0.08|Oxide|Infill|
|JRC374|41.0|48.0|7.0|0.51|0.12|<0.01|0.14|0.02|0.01|Sulphide|Infill|
|JRC374|58.0|95.0|37.0|0.96|0.33|<0.01|0.22|0.08|0.02|Sulphide|Infill|
|Incl|67.0|76.0|9.0|2.11|0.94|0.01|0.41|0.17|0.03|Sulphide|Infill|
|and|86.0|88.0|2.0|1.02|0.25|<0.01|0.19|0.07|0.02|Sulphide|Infill|
|JRC374|107.0|138.0|31.0|0.77|0.12|<0.01|0.18|0.04|0.02|Sulphide|Infill|
|Incl|126.0|128.0|2.0|4.42|0.41|0.01|0.35|0.09|0.03|Sulphide|Infill|
|JRC374|189.0|273.0|84.0|0.82|0.16|0.06|0.15|0.11|0.01|Sulphide|Infill|
|Incl|189.0|191.0|2.0|0.92|0.19|0.03|0.18|0.09|0.02|Sulphide|Infill|
|and|195.0|205.0|10.0|1.46|0.20|0.03|0.15|0.08|0.01|Sulphide|Infill|
|and|209.0|212.0|3.0|1.13|0.57|0.02|0.14|0.08|0.02|Sulphide|Infill|
|and|222.0|230.0|8.0|1.31|0.17|0.02|0.13|0.09|0.01|Sulphide|Infill|

----- End of picture text -----

25 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|and|233.0|235.0|2.0|1.00|0.22|0.01|0.16|0.10|0.02|Sulphide|Infill|
|and|243.0|264.0|21.0|0.72|0.13|0.16|0.17|0.18|0.01|Sulphide|Infill|
|JRC376|19.0|27.0|8.0|0.67|0.14|0.02|0.10|0.05|0.01|Oxide|Infill|
|Incl|20.0|22.0|2.0|0.93|0.19|0.06|0.08|0.10|0.01|Oxide|Infill|
|JRC376|36.0|77.0|41.0|0.71|0.16|<0.01|0.18|0.10|0.02|Sulphide|Infill|
|Incl|44.0|51.0|7.0|0.94|0.19|<0.01|0.25|0.10|0.02|Sulphide|Infill|
|and|55.0|64.0|9.0|0.92|0.27|<0.01|0.19|0.26|0.02|Sulphide|Infill|
|and|68.0|72.0|4.0|1.03|0.16|<0.01|0.18|0.04|0.02|Sulphide|Infill|
|JRC376|82.0|88.0|6.0|0.63|0.14|<0.01|0.21|0.11|0.02|Sulphide|Infill|
|Incl|83.0|85.0|2.0|0.78|0.17|<0.01|0.33|0.13|0.04|Sulphide|Infill|
|JRC377|138.0|152.0|14.0|0.71|0.17|0.01|0.22|0.20|0.02|Sulphide|Infill|
|Incl|143.0|152.0|9.0|0.84|0.21|0.01|0.25|0.28|0.02|Sulphide|Infill|
|JRC377|160.0|173.0|13.0|0.62|0.12|0.01|0.17|0.04|0.01|Sulphide|Infill|
|JRC380|58.0|75.0|17.0|0.70|0.18|<0.01|0.18|0.05|0.02|Sulphide|Infill|
|Incl|58.0|61.0|3.0|0.83|0.18|0.01|0.23|0.10|0.02|Sulphide|Infill|
|and|67.0|69.0|2.0|1.06|0.18|0.01|0.22|0.01|0.02|Sulphide|Infill|
|and|73.0|75.0|2.0|1.02|0.24|0.01|0.22|0.10|0.02|Sulphide|Infill|
|JRC380|107.0|148.0|41.0|0.64|0.13|<0.01|0.19|0.04|0.02|Sulphide|Infill|
|Incl|109.0|111.0|2.0|1.13|0.16|0.01|0.40|<0.01|0.03|Sulphide|Infill|
|and|124.0|126.0|2.0|0.98|0.17|<0.01|0.30|0.16|0.03|Sulphide|Infill|
|and|130.0|132.0|2.0|1.37|0.40|0.01|0.30|0.12|0.03|Sulphide|Infill|
|JRC380|153.0|192.0|39.0|0.50|0.12|<0.01|0.17|0.05|0.02|Sulphide|Infill|
|Incl|187.0|191.0|4.0|0.66|0.20|<0.01|0.23|0.05|0.02|Sulphide|Infill|
|JRC380|214.0|229.0|15.0|0.76|0.21|<0.01|0.20|0.07|0.02|Sulphide|Infill|
|Incl|214.0|217.0|3.0|1.46|0.42|0.01|0.40|0.15|0.03|Sulphide|Infill|
|JRC380|236.0|329.0|93.0|0.89|0.18|0.10|0.16|0.09|0.02|Sulphide|Infill|
|Incl|236.0|242.0|6.0|1.65|0.37|0.01|0.23|0.09|0.02|Sulphide|Infill|
|and|246.0|253.0|7.0|0.91|0.24|<0.01|0.23|0.07|0.02|Sulphide|Infill|
|and|282.0|292.0|10.0|1.86|0.33|0.07|0.19|0.25|0.02|Sulphide|Infill|
|and|312.0|329.0|17.0|0.90|0.16|0.49|0.14|0.13|0.01|Sulphide|Infill|
|JRC383|54.0|63.0|9.0|0.82|0.22|0.01|0.15|0.07|0.01|Oxide|Infill|
|Incl|58.0|62.0|4.0|1.07|0.25|0.01|0.17|0.09|0.01|Oxide|Infill|
|JRC383|63.0|94.0|31.0|0.76|0.15|0.01|0.19|0.07|0.02|Sulphide|Infill|
|Incl|63.0|72.0|9.0|1.17|0.24|0.01|0.24|0.20|0.03|Sulphide|Infill|
|JRC383|99.0|109.0|10.0|1.60|0.45|0.01|0.47|0.09|0.06|Sulphide|Infill|
|Incl|99.0|107.0|8.0|1.85|0.52|0.01|0.56|0.11|0.07|Sulphide|Infill|
|JRC383|165.0|187.0|22.0|0.75|0.23|<0.01|0.28|0.09|0.02|Sulphide|Infill|
|Incl|180.0|187.0|7.0|1.43|0.52|0.01|0.53|0.18|0.04|Sulphide|Infill|
|JRC383|215.0|298.0|83.0|0.87|0.18|0.04|0.16|0.08|0.02|Sulphide|Infill|
|Incl|219.0|221.0|2.0|1.19|0.28|0.04|0.13|0.16|0.01|Sulphide|Infill|
|and|227.0|244.0|17.0|1.09|0.27|0.01|0.20|0.09|0.02|Sulphide|Infill|

----- End of picture text -----

26 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|and|251.0|256.0|5.0|2.34|0.41|0.04|0.39|0.14|0.03|Sulphide|Infill|
|and|262.0|264.0|2.0|0.66|0.14|0.04|0.15|0.18|0.02|Sulphide|Infill|
|and|287.0|294.0|7.0|1.95|0.34|0.23|0.16|0.08|0.01|Sulphide|Infill|
|JRC384|6.0|11.0|5.0|0.68|0.06|0.06|0.04|0.10|<0.01|Oxide|Ext|
|Incl|7.0|9.0|2.0|0.96|0.06|0.08|0.03|0.09|<0.01|Oxide|Ext|
|JRC388|17.0|24.0|7.0|1.02|0.35|0.01|0.10|0.14|0.08|Oxide|Infill|
|Incl|18.0|22.0|4.0|1.18|0.46|0.01|0.11|0.16|0.09|Oxide|Infill|
|JRC388|29.0|34.0|5.0|0.92|0.17|0.01|0.21|0.28|0.02|Oxide|Infill|
|JRC388|48.0|60.0|12.0|0.58|0.12|<0.01|0.19|0.11|0.02|Oxide|Infill|
|JRC388|60.0|81.0|21.0|0.50|0.10|<0.01|0.15|0.03|0.01|Sulphide|Infill|
|JRC388|86.0|112.0|26.0|0.53|0.11|<0.01|0.14|0.05|0.01|Sulphide|Infill|
|Incl|99.0|104.0|5.0|0.76|0.17|<0.01|0.17|0.08|0.02|Sulphide|Infill|
|JRC388|150.0|170.0|20.0|0.48|0.10|0.01|0.15|0.08|0.02|Sulphide|Infill|
|Incl|152.0|154.0|2.0|0.64|0.13|0.01|0.18|0.22|0.02|Sulphide|Infill|
|JRC388|187.0|204.0|17.0|0.64|0.12|0.01|0.15|0.04|0.02|Sulphide|Infill|
|JRC388|216.0|278.0|62.0|0.56|0.13|0.06|0.15|0.10|0.01|Sulphide|Ext|
|Incl|217.0|219.0|2.0|1.39|0.42|0.05|0.16|0.14|0.02|Sulphide|Infill|
|and|273.0|276.0|3.0|0.85|0.18|0.02|0.15|0.08|0.01|Sulphide|Ext|
|JRC389|137.0|141.0|4.0|0.60|0.13|0.02|0.13|0.06|0.01|Sulphide|Infill|
|JRC389|202.0|236.0|34.0|0.46|0.08|0.01|0.17|0.08|0.02|Sulphide|Ext|
|Incl|219.0|221.0|2.0|0.83|0.11|0.01|0.29|0.13|0.03|Sulphide|Ext|
|JRC390|117.0|125.0|8.0|0.53|0.23|0.02|0.09|0.07|0.01|Sulphide|Ext|
|JRC391|11.0|15.0|4.0|0.66|0.13|0.01|0.08|0.07|0.01|Oxide|Infill|
|JRC391|27.0|35.0|8.0|0.69|0.14|0.01|0.21|0.13|0.02|Sulphide|Infill|
|Incl|28.0|31.0|3.0|0.85|0.17|0.01|0.28|0.17|0.03|Sulphide|Infill|
|JRC391|46.0|55.0|9.0|0.85|0.15|0.01|0.28|0.11|0.03|Sulphide|Infill|
|Incl|48.0|52.0|4.0|1.23|0.20|0.02|0.42|0.17|0.04|Sulphide|Infill|
|JRC391|82.0|120.0|38.0|0.71|0.16|0.01|0.14|0.08|0.01|Sulphide|Infill|
|Incl|84.0|87.0|3.0|1.63|0.33|0.04|0.18|0.15|0.02|Sulphide|Infill|
|and|104.0|116.0|12.0|0.91|0.20|0.01|0.17|0.08|0.02|Sulphide|Infill|
|JRC391|134.0|151.0|17.0|0.73|0.15|<0.01|0.14|0.05|0.01|Sulphide|Infill|
|Incl|136.0|142.0|6.0|1.21|0.21|<0.01|0.19|0.07|0.02|Sulphide|Infill|
|JRC391|157.0|189.0|32.0|0.52|0.10|<0.01|0.16|0.09|0.02|Sulphide|Ext|
|Incl|170.0|174.0|4.0|1.00|0.18|<0.01|0.21|0.06|0.02|Sulphide|Ext|
|and|180.0|182.0|2.0|0.53|0.14|0.01|0.21|0.19|0.02|Sulphide|Ext|
|JRC392|68.0|72.0|4.0|1.66|0.22|0.01|0.52|0.44|0.04|Sulphide|Ext|
|Incl|68.0|71.0|3.0|2.04|0.26|0.01|0.63|0.54|0.05|Sulphide|Ext|
|JRC393|10.0|28.0|18.0|0.92|0.22|0.02|0.08|0.10|0.01|Oxide|Infill|
|Incl|11.0|16.0|5.0|1.44|0.19|0.04|0.07|0.13|0.01|Oxide|Infill|
|and|19.0|21.0|2.0|1.09|0.36|0.02|0.07|0.06|0.02|Oxide|Infill|
|JRC393|28.0|58.0|30.0|0.62|0.17|0.01|0.16|0.12|0.02|Sulphide|Infill|

----- End of picture text -----

27 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 695] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|Incl|35.0|45.0|10.0|0.84|0.29|0.02|0.22|0.21|0.03|Sulphide|Infill|
|and|49.0|51.0|2.0|0.92|0.13|0.01|0.29|0.17|0.03|Sulphide|Infill|
|JRC393|64.0|76.0|12.0|0.47|0.09|0.01|0.15|0.08|0.02|Sulphide|Infill|
|JRC393|88.0|136.0|48.0|0.60|0.12|<0.01|0.17|0.07|0.02|Sulphide|Infill|
|Incl|91.0|93.0|2.0|0.83|0.12|<0.01|0.40|0.17|0.05|Sulphide|Infill|
|JRC395|86.0|100.0|14.0|0.47|0.09|<0.01|0.17|0.07|0.02|Sulphide|Infill|
|Incl|96.0|98.0|2.0|0.56|0.12|<0.01|0.21|0.18|0.02|Sulphide|Infill|
|JRC395|191.0|208.0|17.0|0.58|0.12|0.01|0.13|0.08|0.01|Sulphide|Infill|
|Incl|198.0|203.0|5.0|0.82|0.16|0.01|0.17|0.14|0.02|Sulphide|Infill|
|JRC396|14.0|32.0|18.0|0.95|0.18|0.01|0.10|0.14|0.01|Oxide|Infill|
|Incl|15.0|18.0|3.0|1.69|0.25|0.01|0.08|0.20|0.01|Oxide|Infill|
|and|23.0|26.0|3.0|1.58|0.41|0.01|0.14|0.18|0.02|Oxide|Infill|
|JRC396|34.0|60.0|26.0|0.70|0.14|<0.01|0.19|0.10|0.02|Sulphide|Infill|
|Incl|34.0|38.0|4.0|1.73|0.36|0.01|0.38|0.25|0.04|Sulphide|Infill|
|and|41.0|43.0|2.0|0.86|0.16|<0.01|0.19|0.14|0.02|Sulphide|Infill|
|JRC396|69.0|114.0|45.0|0.64|0.12|0.01|0.16|0.08|0.02|Sulphide|Infill|
|Incl|70.0|74.0|4.0|0.89|0.17|0.01|0.16|0.08|0.02|Sulphide|Infill|
|and|87.0|90.0|3.0|0.89|0.19|0.01|0.14|0.07|0.01|Sulphide|Infill|
|and|91.0|95.0|4.0|0.83|0.16|0.01|0.17|0.06|0.02|Sulphide|Infill|
|and|98.0|100.0|2.0|0.44|0.06|0.01|0.23|0.20|0.03|Sulphide|Infill|
|JRC397|20.0|32.0|12.0|0.81|0.20|<0.01|0.16|0.16|0.02|Oxide|Infill|
|Incl|23.0|27.0|4.0|1.01|0.31|0.01|0.18|0.19|0.02|Oxide|Infill|
|JRC399|9.0|36.0|27.0|0.66|0.24|0.03|0.20|0.19|0.03|Oxide|Infill|
|JRC399|46.0|85.0|39.0|0.66|0.19|<0.01|0.19|0.09|0.02|Sulphide|Infill|
|Incl|65.0|67.0|2.0|1.01|0.14|0.01|0.44|0.19|0.04|Sulphide|Infill|
|and|70.0|72.0|2.0|1.05|0.68|0.01|0.33|0.51|0.02|Sulphide|Infill|
|JRC399|182.0|186.0|4.0|0.93|0.22|0.02|0.15|0.03|0.01|Sulphide|Ext|
|Incl|183.0|185.0|2.0|1.08|0.29|0.02|0.14|0.03|0.01|Sulphide|Ext|
|JRC399|191.0|205.0|14.0|0.99|0.30|0.03|0.14|0.07|0.01|Sulphide|Ext|
|Incl|192.0|195.0|3.0|1.17|0.74|0.02|0.13|0.07|0.02|Sulphide|Ext|
|and|201.0|204.0|3.0|2.00|0.40|0.06|0.18|0.11|0.02|Sulphide|Ext|
|JRC400|131.0|133.0|2.0|0.65|0.16|0.01|0.18|0.17|0.02|Sulphide|Ext|
|JRC400|212.0|214.0|2.0|1.18|0.48|0.06|0.16|0.11|0.01|Sulphide|Ext|
|JRC400|219.0|230.0|11.0|0.91|0.41|0.06|0.10|0.10|0.01|Sulphide|Ext|
|Incl|223.0|225.0|2.0|1.65|0.70|0.08|0.16|0.11|0.01|Sulphide|Ext|
|and|228.0|230.0|2.0|1.34|0.49|0.06|0.16|0.14|0.02|Sulphide|Ext|
|JRC402|4.0|27.0|23.0|0.69|0.18|0.02|0.08|0.08|0.03|Oxide|Infill|
|Incl|10.0|14.0|4.0|1.28|0.38|0.04|0.11|0.14|0.10|Oxide|Infill|
|JRC402|27.0|33.0|6.0|0.94|0.17|0.01|0.20|0.30|0.02|Sulphide|Infill|
|JRC403|9.0|26.0|17.0|1.65|0.51|0.02|0.17|0.24|0.07|Oxide|Infill|
|Incl|10.0|26.0|16.0|1.70|0.49|0.02|0.17|0.25|0.07|Oxide|Infill|

----- End of picture text -----

28 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|JRC403|38.0|59.0|21.0|0.68|0.14|0.01|0.15|0.11|0.02|Sulphide|Infill|
|Incl|38.0|43.0|5.0|0.96|0.16|0.01|0.18|0.13|0.02|Sulphide|Infill|
|and|53.0|57.0|4.0|0.92|0.21|<0.01|0.17|0.05|0.02|Sulphide|Infill|
|JRC403|82.0|93.0|11.0|0.43|0.09|0.01|0.16|0.04|0.02|Sulphide|Infill|
|JRC403|101.0|125.0|24.0|0.74|0.19|0.13|0.15|0.13|0.02|Sulphide|Ext|
|Incl|107.0|115.0|8.0|1.40|0.39|0.36|0.16|0.31|0.02|Sulphide|Infill|
|JRC405|6.0|14.0|8.0|0.66|0.11|0.01|0.04|0.10|0.02|Oxide|Infill|
|JRC410|6.0|22.0|16.0|1.73|0.62|0.07|0.19|0.26|0.08|Oxide|Infill|
|Incl|7.0|22.0|15.0|1.81|0.65|0.07|0.20|0.27|0.09|Oxide|Infill|
|JRC410|22.0|51.0|29.0|0.74|0.14|<0.01|0.16|0.06|0.02|Sulphide|Infill|
|Incl|22.0|29.0|7.0|1.10|0.22|0.01|0.18|0.09|0.02|Sulphide|Infill|
|and|41.0|44.0|3.0|1.31|0.23|0.01|0.23|0.14|0.02|Sulphide|Infill|
|JRC410|103.0|111.0|8.0|0.69|0.15|0.03|0.14|0.07|0.01|Sulphide|Ext|
|JRC412|14.0|46.0|32.0|1.65|0.63|0.03|0.19|0.15|0.05|Oxide|Infill|
|Incl|17.0|27.0|10.0|1.65|0.52|0.01|0.19|0.18|0.11|Oxide|Infill|
|and|31.0|41.0|10.0|3.02|1.33|0.07|0.30|0.22|0.02|Oxide|Infill|
|JRC412|48.0|70.0|22.0|0.38|0.08|0.02|0.16|0.07|0.01|Sulphide|Infill|
|JRC412|161.0|165.0|4.0|0.03|<0.01|0.22|0.11|0.30|0.03|Sulphide|Infill|
|JRC413|9.0|17.0|8.0|2.01|1.00|0.01|0.13|0.21|0.19|Oxide|Infill|
|Incl|10.0|17.0|7.0|2.19|1.12|0.01|0.14|0.23|0.22|Oxide|Infill|
|JRC414|9.0|25.0|16.0|1.12|0.26|0.02|0.23|0.16|0.02|Oxide|Infill|
|Incl|12.0|24.0|12.0|1.29|0.29|0.02|0.24|0.18|0.02|Oxide|Infill|
|JRC415|6.0|22.0|16.0|1.33|0.50|0.11|0.17|0.27|0.07|Oxide|Infill|
|Incl|7.0|21.0|14.0|1.41|0.51|0.11|0.18|0.29|0.07|Oxide|Infill|
|JRC415|22.0|74.0|52.0|0.90|0.19|0.01|0.16|0.07|0.02|Sulphide|Infill|
|Incl|22.0|26.0|4.0|0.85|0.20|0.04|0.15|0.15|0.02|Sulphide|Infill|
|and|34.0|54.0|20.0|1.33|0.26|<0.01|0.19|0.08|0.02|Sulphide|Infill|
|JRC416|8.0|24.0|16.0|1.62|0.57|0.02|0.15|0.18|0.04|Oxide|Infill|
|Incl|10.0|24.0|14.0|1.77|0.60|0.02|0.17|0.19|0.05|Oxide|Infill|
|JRC416|24.0|57.0|33.0|0.63|0.13|<0.01|0.15|0.08|0.02|Sulphide|Infill|
|Incl|41.0|50.0|9.0|0.80|0.18|<0.01|0.19|0.12|0.02|Sulphide|Infill|
|JRC416|139.0|152.0|13.0|0.75|0.16|0.01|0.16|0.05|0.02|Sulphide|Ext|
|Incl|139.0|145.0|6.0|0.90|0.19|0.01|0.16|0.05|0.02|Sulphide|Ext|
|JRC417|9.0|23.0|14.0|0.58|0.21|0.02|0.09|0.14|0.04|Oxide|Infill|
|JRC417|30.0|66.0|36.0|0.65|0.14|0.01|0.15|0.08|0.02|Sulphide|Infill|
|Incl|38.0|49.0|11.0|0.76|0.18|0.01|0.16|0.11|0.02|Sulphide|Infill|
|JRC418|9.0|29.0|20.0|0.74|0.17|0.05|0.14|0.18|0.02|Oxide|Infill|
|Incl|16.0|19.0|3.0|1.04|0.25|0.04|0.19|0.26|0.05|Oxide|Infill|
|JRC418|29.0|60.0|31.0|0.69|0.16|0.04|0.12|0.13|0.01|Sulphide|Infill|
|Incl|41.0|53.0|12.0|0.76|0.17|0.08|0.13|0.17|0.01|Sulphide|Infill|
|JRC419|87.0|200.0|113.0|0.70|0.14|0.02|0.16|0.09|0.02|Sulphide|Infill|

----- End of picture text -----

29 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 695] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|Incl|127.0|140.0|13.0|1.08|0.22|0.01|0.17|0.10|0.02|Sulphide|Infill|
|and|143.0|146.0|3.0|1.05|0.26|0.01|0.19|0.09|0.02|Sulphide|Infill|
|and|164.0|173.0|9.0|0.70|0.12|0.01|0.27|0.15|0.04|Sulphide|Infill|
|and|195.0|197.0|2.0|1.09|0.32|0.05|0.26|0.11|0.02|Sulphide|Ext|
|JRC420|63.0|74.0|11.0|0.75|0.19|0.01|0.16|0.12|0.02|Sulphide|Infill|
|Incl|67.0|74.0|7.0|0.89|0.22|0.01|0.16|0.13|0.02|Sulphide|Infill|
|JRC420|102.0|246.0|144.0|0.61|0.14|0.01|0.15|0.09|0.01|Sulphide|Infill|
|Incl|121.0|123.0|2.0|0.95|0.19|0.01|0.14|0.11|0.01|Sulphide|Infill|
|and|133.0|137.0|4.0|0.74|0.17|0.02|0.14|0.17|0.01|Sulphide|Infill|
|and|162.0|166.0|4.0|0.62|0.12|<0.01|0.18|0.18|0.02|Sulphide|Infill|
|and|168.0|174.0|6.0|0.83|0.16|0.01|0.15|0.12|0.01|Sulphide|Infill|
|and|236.0|239.0|3.0|1.54|0.36|0.05|0.20|0.09|0.02|Sulphide|Ext|
|JRC421|11.0|37.0|26.0|1.30|0.37|0.04|0.15|0.15|0.03|Oxide|Infill|
|Incl|11.0|30.0|19.0|1.55|0.45|0.03|0.14|0.17|0.04|Oxide|Infill|
|JRC421|46.0|147.0|101.0|0.76|0.16|0.04|0.15|0.08|0.01|Sulphide|Infill|
|Incl|60.0|68.0|8.0|1.70|0.26|0.05|0.16|0.11|0.01|Sulphide|Infill|
|and|71.0|76.0|5.0|0.98|0.11|0.07|0.18|0.16|0.02|Sulphide|Infill|
|and|88.0|93.0|5.0|1.30|0.11|0.06|0.18|0.15|0.02|Sulphide|Infill|
|and|125.0|131.0|6.0|1.46|0.50|0.02|0.17|0.05|0.01|Sulphide|Infill|
|JRC422|25.0|36.0|11.0|0.67|0.18|0.01|0.14|0.15|0.02|Oxide|Infill|
|JRC422|47.0|57.0|10.0|0.54|0.13|0.01|0.12|0.09|0.01|Sulphide|Infill|
|JRC422|68.0|140.0|72.0|0.78|0.19|0.01|0.17|0.14|0.02|Sulphide|Infill|
|Incl|68.0|88.0|20.0|1.22|0.35|0.01|0.20|0.26|0.02|Sulphide|Infill|
|and|92.0|99.0|7.0|0.86|0.17|0.01|0.17|0.14|0.01|Sulphide|Infill|
|and|122.0|129.0|7.0|0.85|0.16|0.01|0.24|0.15|0.02|Sulphide|Infill|
|JRC423|37.0|53.0|16.0|0.43|0.12|0.01|0.13|0.12|0.02|Sulphide|Infill|
|JRC423|58.0|176.0|118.0|0.71|0.15|0.02|0.14|0.11|0.01|Sulphide|Infill|
|Incl|74.0|76.0|2.0|0.98|0.24|0.02|0.13|0.06|0.01|Sulphide|Infill|
|and|79.0|93.0|14.0|0.92|0.20|0.04|0.13|0.13|0.01|Sulphide|Infill|
|and|97.0|103.0|6.0|0.81|0.17|0.03|0.14|0.13|0.01|Sulphide|Infill|
|and|106.0|128.0|22.0|0.85|0.19|0.03|0.15|0.14|0.01|Sulphide|Infill|
|and|132.0|137.0|5.0|0.91|0.17|0.01|0.16|0.09|0.01|Sulphide|Infill|
|and|155.0|160.0|5.0|1.15|0.19|0.01|0.22|0.17|0.02|Sulphide|Infill|
|JRC423|181.0|192.0|11.0|0.49|0.11|<0.01|0.13|0.07|0.02|Sulphide|Ext|
|JRC423|217.0|235.0|18.0|1.15|0.28|0.01|0.23|0.17|0.02|Sulphide|Ext|
|Incl|223.0|231.0|8.0|1.98|0.49|0.02|0.32|0.31|0.03|Sulphide|Ext|
|JRC423|241.0|249.0|8.0|0.69|0.12|0.01|0.19|0.09|0.02|Sulphide|Ext|
|Incl|245.0|249.0|4.0|0.70|0.12|0.01|0.20|0.15|0.02|Sulphide|Ext|
|JRC423|276.0|280.0|4.0|0.71|0.13|0.10|0.13|0.06|0.01|Sulphide|Ext|
|JRC424|10.0|26.0|16.0|0.73|0.23|0.03|0.10|0.17|0.03|Oxide|Infill|
|Incl|12.0|16.0|4.0|0.95|0.27|0.02|0.09|0.26|0.03|Oxide|Infill|

----- End of picture text -----

30 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 695] intentionally omitted <==

----- Start of picture text -----

|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|From|To|Interval|Pd|Pt|Au|Ni|Cu|Co|
|Hole ID|Geology|Type|
|(m)|(m)|(m)|(g/t)|(g/t)|(g/t)|(%)|(%)|(%)|
|JRC424|26.0|35.0|9.0|0.42|0.10|0.01|0.11|0.10|0.01|Sulphide|Infill|
|JRC424|53.0|139.0|86.0|0.62|0.14|0.01|0.14|0.07|0.01|Sulphide|Infill|
|Incl|56.0|58.0|2.0|1.03|0.24|0.02|0.13|0.08|0.01|Sulphide|Infill|
|and|61.0|65.0|4.0|0.85|0.19|0.02|0.14|0.13|0.01|Sulphide|Infill|
|and|71.0|75.0|4.0|0.85|0.21|0.02|0.14|0.11|0.01|Sulphide|Infill|
|and|106.0|110.0|4.0|0.79|0.19|0.12|0.17|0.16|0.02|Sulphide|Infill|
|and|113.0|115.0|2.0|1.83|0.37|0.01|0.17|0.09|0.02|Sulphide|Infill|
|JRC424|156.0|167.0|11.0|0.49|0.10|<0.01|0.15|0.04|0.01|Sulphide|Ext|
|JRC424|234.0|238.0|4.0|0.61|0.19|0.03|0.11|0.02|0.01|Sulphide|Ext|
|JRC425|14.0|19.0|5.0|1.02|0.19|0.01|0.12|0.07|0.01|Oxide|Infill|
|Incl|14.0|18.0|4.0|1.08|0.20|0.02|0.12|0.08|0.01|Oxide|Infill|
|JRC425|21.0|54.0|33.0|0.63|0.12|<0.01|0.17|0.05|0.01|Sulphide|Infill|
|Incl|26.0|31.0|5.0|0.90|0.16|<0.01|0.21|0.05|0.02|Sulphide|Infill|
|JRC425|112.0|123.0|11.0|0.93|0.21|<0.01|0.16|0.07|0.02|Sulphide|Infill|
|Incl|112.0|116.0|4.0|1.67|0.40|<0.01|0.26|0.12|0.02|Sulphide|Infill|
|JRC425|138.0|150.0|12.0|0.94|0.21|0.01|0.15|0.07|0.01|Sulphide|Infill|
|Incl|144.0|148.0|4.0|1.78|0.44|0.01|0.19|0.07|0.02|Sulphide|Infill|
|JRC425|192.0|281.0|89.0|0.54|0.12|0.02|0.13|0.06|0.01|Sulphide|Ext|
|Incl|260.0|262.0|2.0|1.41|0.24|0.04|0.25|0.22|0.02|Sulphide|Ext|
|JRC427|29.0|47.0|18.0|0.50|0.12|0.03|0.11|0.12|0.01|Sulphide|Infill|
|Incl|38.0|41.0|3.0|0.49|0.11|0.14|0.13|0.44|0.02|Sulphide|Infill|
|JRC427|74.0|102.0|28.0|0.67|0.13|0.01|0.16|0.09|0.02|Sulphide|Infill|
|Incl|74.0|86.0|12.0|0.93|0.18|0.01|0.14|0.10|0.02|Sulphide|Infill|
|and|89.0|91.0|2.0|0.46|0.11|0.01|0.22|0.20|0.03|Sulphide|Infill|
|JRC427|123.0|127.0|4.0|1.83|0.44|<0.01|0.37|0.13|0.03|Sulphide|Infill|
|JRC427|168.0|177.0|9.0|1.45|0.14|<0.01|0.25|0.07|0.02|Sulphide|Infill|
|Incl|168.0|173.0|5.0|2.11|0.17|<0.01|0.29|0.11|0.03|Sulphide|Infill|
|JRC427|205.0|209.0|4.0|0.56|0.11|<0.01|0.19|0.01|0.02|Sulphide|Infill|
|JRC427|235.0|261.0|26.0|0.75|0.15|0.01|0.15|0.07|0.02|Sulphide|Infill|
|Incl|252.0|260.0|8.0|1.01|0.26|0.01|0.17|0.09|0.02|Sulphide|Infill|
|JRC427|266.0|271.0|5.0|0.62|0.12|0.01|0.14|0.06|0.01|Sulphide|Ext|
|JRC428|68.0|71.0|3.0|0.98|0.17|0.01|0.15|0.13|0.02|Sulphide|Infill|
|JRC428|157.0|162.0|5.0|0.56|0.11|<0.01|0.18|0.03|0.01|Sulphide|Infill|
|JRC430|11.0|17.0|6.0|0.63|0.06|0.01|0.03|0.04|<0.01|Oxide|Ext|
|JRC431|164.0|176.0|12.0|1.23|0.26|<0.01|0.27|0.07|0.02|Sulphide|Infill|
|Incl|171.0|176.0|5.0|2.31|0.47|<0.01|0.47|0.07|0.04|Sulphide|Infill|
|JRC431|225.0|229.0|4.0|0.79|0.57|0.01|0.13|0.31|0.01|Sulphide|Infill|
|Incl|226.0|229.0|3.0|0.89|0.60|0.01|0.15|0.34|0.01|Sulphide|Infill|
|JRC432|8.0|14.0|6.0|0.73|0.16|0.02|0.04|0.07|0.07|Oxide|Ext|
|Incl|12.0|14.0|2.0|1.12|0.28|0.04|0.05|0.07|0.10|Oxide|Ext|
|JRC433|15.0|39.0|24.0|0.83|0.18|0.02|0.16|0.11|0.02|Oxide|Infill|

----- End of picture text -----

31 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

From To Interval Pd Pt Au Ni Cu Co
Hole ID (m) (m) (m) (g/t) (g/t) (g/t) (%) (%) (%) Geology Type
Incl 19.0 29.0 10.0 1.19 0.26 0.03 0.18 0.16 0.02 Oxide Infill
JRC433 50.0 123.0 73.0 0.61 0.13 <0.01 0.17 0.06 0.02 Sulphide Infill
Incl 59.0 63.0 4.0 0.74 0.16 0.01 0.27 0.18 0.03 Sulphide Infill
and 69.0 77.0 8.0 1.06 0.23 <0.01 0.19 0.09 0.02 Sulphide Infill
and 86.0 88.0 2.0 1.13 0.19 0.01 0.17 0.12 0.02 Sulphide Infill
JRC433 149.0 175.0 26.0 0.52 0.11 <0.01 0.16 0.06 0.02 Sulphide Infill
JRC433 180.0 207.0 27.0 0.61 0.12 <0.01 0.17 0.04 0.02 Sulphide Infill
Incl 185.0 188.0 3.0 1.00 0.18 <0.01 0.23 0.04 0.02 Sulphide Infill
JRC433 214.0 225.0 11.0 0.48 0.12 <0.01 0.15 0.03 0.01 Sulphide Infill
JRC433 230.0 261.0 31.0 1.10 0.19 0.02 0.15 0.07 0.02 Sulphide Infill
Incl 240.0 254.0 14.0 0.87 0.15 0.01 0.17 0.08 0.02 Sulphide Infill
and 257.0 260.0 3.0 4.47 0.76 0.09 0.16 0.08 0.02 Sulphide Infill
JRC433 277.0 320.0 43.0 0.78 0.15 0.03 0.13 0.11 0.01 Sulphide Infill
Incl 295.0 298.0 3.0 1.21 0.25 0.05 0.09 0.33 0.01 Sulphide Infill
and 301.0 303.0 2.0 2.48 0.13 0.10 0.13 0.21 0.02 Sulphide Infill
and 309.0 315.0 6.0 1.60 0.30 0.05 0.20 0.16 0.02 Sulphide Infill
JRC434 79.0 85.0 6.0 0.38 0.10 0.01 0.16 0.07 0.02 Sulphide Infill
JRC434 102.0 108.0 6.0 0.49 0.12 0.01 0.12 0.09 0.01 Sulphide Infill
JRC434 127.0 151.0 24.0 0.66 0.16 0.01 0.11 0.09 0.01 Sulphide Infill
Incl 136.0 138.0 2.0 1.26 0.35 0.01 0.15 0.10 0.02 Sulphide Infill
and 149.0 151.0 2.0 0.93 0.23 0.01 0.13 0.13 0.01 Sulphide Infill
JRC434 159.0 180.0 21.0 0.78 0.16 0.01 0.13 0.08 0.01 Sulphide Infill
Incl 159.0 166.0 7.0 0.91 0.20 <0.01 0.16 0.11 0.02 Sulphide Infill
and 178.0 180.0 2.0 0.91 0.18 0.01 0.16 0.10 0.02 Sulphide Infill
JRC434 236.0 241.0 5.0 0.63 0.11 <0.01 0.17 0.03 0.01 Sulphide Infill
JRC434 247.0 260.0 13.0 0.66 0.14 <0.01 0.16 0.07 0.02 Sulphide Infill
JRC434 272.0 285.0 13.0 0.47 0.13 <0.01 0.16 0.06 0.02 Sulphide Infill
JRC434 290.0 321.0 31.0 2.11 0.62 0.03 0.54 0.34 0.04 Sulphide Infill
Incl 301.0 316.0 15.0 3.86 1.17 0.04 0.95 0.63 0.06 Sulphide Infill
JRC435 21.0 25.0 4.0 0.66 0.24 0.09 0.14 0.13 0.03 Oxide Infill
JRC435 33.0 37.0 4.0 0.59 0.15 0.02 0.12 0.13 0.01 Oxide Infill
JRC435 37.0 52.0 15.0 0.58 0.15 0.01 0.11 0.10 0.01 Sulphide Infill
Incl 41.0 44.0 3.0 0.76 0.18 0.02 0.14 0.15 0.02 Sulphide Infill
JRC435 56.0 65.0 9.0 0.69 0.15 0.01 0.16 0.06 0.02 Sulphide Infill
Incl 61.0 63.0 2.0 0.94 0.17 0.02 0.16 0.04 0.01 Sulphide Infill

Ext = Intersection outside Resource pit shell. Infill = Intersection within Resource pit shell

32 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Table 2. New drill hole survey data and assaying status.

==> picture [483 x 663] intentionally omitted <==

----- Start of picture text -----

|||||||||||
|---|---|---|---|---|---|---|---|---|---|
|Easting|Northing|RL|Depth|Survey|Azi|Dip|
|Hole ID|Type|Assay status|
|(m)|(m)|(m)|(m)|type|(°)|(°)|
|JD133|Core|424807.1|6512430.7|240.2|390.7|GPS-RTK|93.1|-59.7|Reported|
|JD134|Core|424811.7|6512476.8|242.0|456.7|GPS-RTK|91.7|-58.3|Reported|
|JD135|Core|425643.8|6513073.8|248.9|207.4|GPS-RTK|89.5|-59.1|Reported|
|JD136|Core|425640.1|6512999.8|249.4|243.4|GPS-RTK|89.7|-59.9|Reported|
|JD137|Core|424772.8|6512428.2|239.8|651.5|GPS-RTK|91.5|-59.7|Reported|
|JD138|Core|425631.2|6512917.7|249.2|222.4|GPS-RTK|89.4|-59.0|Reported|
|JD139|Core|425631.3|6512962.6|250.1|249.3|GPS-RTK|91.8|-59.3|Reported|
|JD140|Core|425556.7|6512962.4|254.9|300.4|GPS-RTK|89.9|-59.2|Reported|
|JD141|Core|424942.4|6512559.1|244.2|362.8|GPS-RTK|90.0|-59.6|Reported|
|JD142|Core|424753.2|6512510.0|243.4|642.0|GPS-RTK|90.0|-60.0|Reported|
|JD143|Core|425593.1|6512967.2|253.3|279.4|GPS-RTK|91.0|-66.2|Reported|
|JD144|Core|425629.0|6513034.3|249.8|249.4|GPS-RTK|89.1|-59.4|Reported|
|JD145|Core|424816.9|6512551.3|246.0|447.8|GPS-RTK|89.5|-59.7|Reported|
|JD146|Core|425637.8|6513115.6|248.8|204.4|GPS-RTK|89.3|-60.0|Reported|
|JD147|Core|425669.8|6513089.8|247.4|180.4|GPS-RTK|90.0|-60.0|Reported|
|JD148|Core|425719.0|6513083.7|247.1|120.4|GPS-RTK|89.6|-58.4|Reported - NSA|
|JD149|Core|425759.1|6513080.3|246.6|120.5|GPS-RTK|90.6|-60.1|Reported - NSA|
|JD150|Core|424938.8|6512470.2|239.8|345.5|GPS-RTK|87.2|-60.3|Reported|
|JD151|Core|425755.6|6512989.6|246.3|144.4|GPS-RTK|91.0|-60.5|Reported - NSA|
|JD152|Core|425707.0|6513008.0|247.0|150.3|GPS-RTK|93.7|-58.9|Reported - NSA|
|JD153|Core|425675.8|6512998.6|247.5|177.4|GPS-RTK|96.6|-55.3|Reported|
|JD154|Core|425806.6|6513076.7|245.3|120.5|GPS-RTK|91.9|-60.2|Reported - NSA|
|JD155|Core|425799.7|6512993.3|245.4|120.5|GPS-RTK|89.1|-60.1|Reported - NSA|
|JD156|Core|424811.6|6512505.6|243.4|450.3|GPS-RTK|93.4|-60.2|Reported|
|JD157|Core|424705.4|6512797.2|254.5|776.5|GPS-RTK|89.2|-62.4|Reported|
|JD158|Core|424936.7|6512427.3|237.8|270.6|GPS-RTK|127.4|-59.7|Reported|
|JD159|Core|424848.2|6512520.6|243.1|381.7|GPS-RTK|89.1|-62.0|Reported|
|JD160|Core|425667.8|6512922.1|247.3|174.3|GPS-RTK|89.4|-60.0|Reported|
|JD161|Core|425580.0|6512821.2|249.2|248.4|GPS-RTK|89.4|-60.5|Reported|
|JD162|Core|424936.5|6512395.7|236.4|489.2|GPS-RTK|87.6|-60.7|Reported|
|JD163|Core|425710.7|6512921.1|246.3|147.4|GPS-RTK|89.8|-60.4|Reported|
|JD164|Core|425755.1|6512919.8|245.5|120.4|GPS-RTK|90.9|-60.4|Reported - NSA|
|JD165|Core|425802.9|6512920.4|245.5|120.4|GPS-RTK|90.9|-60.4|Reported - NSA|
|JD166|Core|425086.4|6513519.5|263.2|339.6|GPS-RTK|87.6|-61.0|Reported|
|JD167|Core|425566.5|6513198.5|248.6|240.9|GPS-RTK|88.2|-60.3|Reported|
|JD168|Core|424883.2|6512504.2|241.2|367.8|GPS-RTK|95.5|-60.2|Reported|
|JD169|Core|425785.8|6512858.8|245.6|171.4|GPS-RTK|90.8|-60.0|Reported|
|JD170|Core|424872.9|6512399.6|238.0|352.0|GPS-RTK|89.7|-56.5|Reported|
|JD171|Core|425665.1|6512819.5|247.5|222.4|GPS-RTK|90.2|-60.7|Reported|

----- End of picture text -----

33 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||
|---|---|---|---|---|---|---|---|---|---|
|Easting|Northing|RL|Depth|Survey|Azi|Dip|
|Hole ID|Type|Assay status|
|(m)|(m)|(m)|(m)|type|(°)|(°)|
|JD172|Core|425221.9|6513079.2|262.1|577.0|GPS-RTK|90.6|-56.7|Reported|
|JD173|Core|425683.7|6512784.5|247.9|147.4|GPS-RTK|119.6|-66.7|Reported|
|JD174|Core|425680.9|6512851.0|246.9|180.0|GPS-RTK|91.0|-60.3|Reported|
|JD175|Core|425707.0|6512864.2|246.4|168.4|GPS-RTK|86.6|-60.6|Reported|
|JD176|Core|424863.0|6512472.6|240.4|435.2|GPS-RTK|87.2|-60.1|Reported|
|JD177|Core|425675.9|6513115.8|247.2|144.4|GPS-RTK|89.8|-60.5|Reported|
|JD178|Core|425713.4|6513111.1|247.2|135.4|GPS-RTK|85.1|-60.4|Reported|
|JD179|Core|425080.0|6513031.7|266.0|300.9|GPS-RTK|88.9|-60.2|Reported|
|JD180|Core|424979.5|6512276.2|233.9|236.3|GPS-RTK|92.1|-60.2|Reported|
|JD181|Core|424861.5|6512320.9|235.0|577.3|GPS-RTK|92.5|-69.5|Reported|
|JD211|Core|424800.0|6513585.0|273.6|273.4|GPS-RTK|90.4|-60.7|Reported|
|JRC028D|RC-Core|425298.8|6512517.6|241.8|354.8|GPS-RTK|93.1|-59.3|RC previously reported|
|JRC087D|RC-Core|425257.1|6512507.7|241.9|357.8|GPS-RTK|94.1|-58.6|RC previously reported|
|JRC109D|RC-Core|425318.3|6512706.4|249.3|384.8|GPS-RTK|89.2|-60.5|RC previously reported|
|JRC115D|RC-Core|425396.5|6512701.7|250.9|319.0|GPS-RTK|89.3|-60.8|RC previously reported|
|JRC209D|RC-Core|425257.9|6512562.4|244.1|350.0|GPS-RTK|93.3|-59.7|RC previously reported|
|JRC272D|RC-Core|425327.2|6512997.5|262.6|471.7|GPS-RTK|91.0|-60.1|RC previously reported|
|JRC274D|RC-Core|424982.7|6512652.6|248.5|606.6|GPS-RTK|90.0|-60.3|RC previously reported|
|JRC345D|RC-Core|425407.8|6512998.2|260.2|390.7|GPS-RTK|88.8|-60.4|RC previously reported|
|JRC366|RC|425209.5|6513439.9|259.8|177.0|GPS-RTK|89.3|-60.3|Previously reported|
|JRC367|RC|425131.2|6513441.6|263.3|249.0|GPS-RTK|90.8|-60.4|Previously reported|
|JRC368|RC|425064.4|6513438.8|267.5|255.0|GPS-RTK|89.7|-63.4|Reported|
|JRC369|RC|425043.0|6513590.6|264.7|252.0|GPS-RTK|93.0|-60.7|Reported - NSA|
|JRC370|RC|424982.1|6513444.2|270.3|249.0|GPS-RTK|89.6|-63.6|Reported - NSA|
|JRC371|RC|425007.4|6513591.4|266.6|267.0|GPS-RTK|91.9|-60.3|Reported - NSA|
|JRC372|RC|425513.7|6512959.1|255.4|320.0|GPS-RTK|91.6|-60.5|Reported|
|JRC373|RC|424964.2|6513592.4|268.9|307.0|GPS-RTK|89.8|-60.2|Reported - NSA|
|JRC374|RC|425474.0|6512958.1|256.9|273.0|GPS-RTK|92.5|-60.1|Reported|
|JRC375|RC|425679.4|6513601.9|248.2|153.0|GPS-RTK|90.5|-60.2|Reported - NSA|
|JRC376|RC|425433.2|6512957.2|259.5|225.0|GPS-RTK|92.7|-60.8|Reported|
|JRC377|RC|425397.9|6512955.9|261.0|213.0|GPS-RTK|91.3|-60.6|Reported|
|JRC378|RC|425755.7|6513602.2|247.9|150.0|GPS-RTK|91.5|-60.4|Reported - NSA|
|JRC379|RC|425836.2|6513606.0|247.8|153.0|GPS-RTK|90.2|-59.9|Reported - NSA|
|JRC380|RC|425315.9|6512955.2|263.1|336.0|GPS-RTK|93.2|-59.8|Reported|
|JRC381|RC|425758.6|6512597.4|243.3|120.0|GPS-RTK|88.6|-60.1|Reported|
|JRC382|RC|425797.8|6512598.5|243.8|120.0|GPS-RTK|91.8|-59.7|Reported|
|JRC383|RC|425351.8|6512958.2|262.6|303.0|GPS-RTK|94.3|-59.9|Reported|
|JRC384|RC|425758.5|6512560.1|243.0|120.0|GPS-RTK|89.9|-59.9|Reported|
|JRC385|RC|425797.2|6512559.6|242.9|120.0|GPS-RTK|89.8|-60.0|Reported - NSA|
|JRC386|RC|425915.7|6513607.9|247.0|150.0|GPS-RTK|90.1|-60.2|Reported - NSA|
|JRC387|RC|425990.9|6513609.5|245.6|150.0|GPS-RTK|87.8|-61.1|Reported - NSA|

----- End of picture text -----

34 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

==> picture [483 x 696] intentionally omitted <==

----- Start of picture text -----

|||||||||||
|---|---|---|---|---|---|---|---|---|---|
|Easting|Northing|RL|Depth|Survey|Azi|Dip|
|Hole ID|Type|Assay status|
|(m)|(m)|(m)|(m)|type|(°)|(°)|
|JRC388|RC|425524.0|6513035.3|254.9|315.0|GPS-RTK|91.8|-60.5|Reported|
|JRC389|RC|425452.4|6513553.9|251.2|300.0|GPS-RTK|88.1|-59.7|Reported|
|JRC390|RC|424924.5|6513593.0|269.5|246.0|GPS-RTK|91.8|-59.7|Reported|
|JRC391|RC|425490.6|6513553.6|250.3|250.0|GPS-RTK|89.6|-59.6|Reported|
|JRC392|RC|424869.5|6513597.5|272.1|252.0|GPS-RTK|89.7|-57.5|Reported|
|JRC393|RC|425533.2|6513555.0|249.0|207.0|GPS-RTK|89.5|-59.7|Reported|
|JRC394|RC|424903.0|6513437.6|269.6|204.0|GPS-RTK|88.0|-59.8|Reported|
|JRC395|RC|425482.5|6513034.3|256.4|321.0|GPS-RTK|91.4|-60.4|Reported|
|JRC396|RC|425563.7|6513556.7|248.3|150.0|GPS-RTK|90.5|-59.9|Reported|
|JRC397|RC|425607.9|6513558.1|247.9|150.0|GPS-RTK|88.8|-59.3|Reported|
|JRC398|RC|424890.3|6513376.3|268.4|180.0|GPS-RTK|86.6|-60.5|Reported|
|JRC399|RC|425533.4|6513198.9|250.1|279.0|GPS-RTK|91.2|-60.1|Reported|
|JRC400|RC|424928.9|6513318.7|267.7|250.0|GPS-RTK|89.0|-60.2|Reported|
|JRC401|RC|425843.1|6513110.9|244.0|126.0|GPS-RTK|91.3|-59.9|Reported - NSA|
|JRC402|RC|425566.5|6513198.5|248.6|39.0|GPS-RTK|90.0|-60.0|Reported|
|JRC403|RC|425607.7|6513195.1|248.1|233.0|GPS-RTK|89.6|-59.3|Reported|
|JRC404|RC|425881.4|6513111.9|242.5|120.0|GPS-RTK|89.2|-60.0|Reported - NSA|
|JRC405|RC|425686.8|6513193.5|247.4|152.0|GPS-RTK|90.8|-59.2|Reported|
|JRC406|RC|425920.9|6513107.5|241.1|120.0|GPS-RTK|93.5|-59.5|Reported - NSA|
|JRC407|RC|425958.0|6513109.1|239.0|120.0|GPS-RTK|94.8|-60.1|Reported - NSA|
|JRC408|RC|425650.7|6513196.7|247.4|213.0|GPS-RTK|92.9|-60.2|Reported - NSA|
|JRC409|RC|425999.8|6513114.6|238.4|250.0|GPS-RTK|88.0|-59.6|Reported - NSA|
|JRC410|RC|425604.8|6513350.1|246.1|198.0|GPS-RTK|90.4|-60.6|Reported|
|JRC411|RC|425726.8|6513189.7|248.1|153.0|GPS-RTK|90.9|-59.5|Reported - NSA|
|JRC412|RC|425578.7|6512739.6|249.0|297.0|GPS-RTK|88.5|-59.8|Reported|
|JRC413|RC|425578.5|6512651.8|246.5|17.0|GPS-RTK|90.0|-60.0|Reported|
|JRC414|RC|425609.6|6513278.4|246.0|45.0|GPS-RTK|95.4|-59.6|Reported|
|JRC415|RC|425565.9|6513350.4|246.4|150.0|GPS-RTK|90.2|-59.8|Reported|
|JRC416|RC|425571.0|6513279.0|246.9|250.0|GPS-RTK|89.4|-59.7|Reported|
|JRC417|RC|425526.9|6513276.8|247.9|69.0|GPS-RTK|90.0|-60.0|Reported|
|JRC418|RC|425528.8|6513352.6|247.0|60.0|GPS-RTK|91.7|-60.0|Reported|
|JRC419|RC|425490.9|6513480.3|249.0|282.0|GPS-RTK|91.9|-59.1|Reported|
|JRC420|RC|425452.7|6513475.5|249.7|318.0|GPS-RTK|86.0|-60.2|Reported|
|JRC421|RC|425584.9|6512655.1|246.1|257.0|GPS-RTK|92.6|-59.6|Reported|
|JRC422|RC|425538.4|6513478.6|247.7|222.0|GPS-RTK|87.9|-60.5|Reported|
|JRC423|RC|425448.7|6513276.5|250.9|330.0|GPS-RTK|94.6|-59.6|Reported|
|JRC424|RC|425485.3|6513275.5|249.2|300.0|GPS-RTK|86.8|-59.9|Reported|
|JRC425|RC|425519.3|6513112.8|253.2|300.0|GPS-RTK|91.3|-60.7|Reported|
|JRC426|RC|425921.1|6512858.8|243.4|120.0|GPS-RTK|92.5|-60.3|Reported - NSA|
|JRC427|RC|425396.0|6513113.0|258.2|288.0|GPS-RTK|90.8|-60.5|Reported|
|JRC428|RC|425357.2|6513112.3|260.0|204.0|GPS-RTK|92.4|-60.2|Reported|

----- End of picture text -----

35 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Hole ID Type Easting
(m)
Northing
(m)
RL
(m)
Depth
(m)
Survey
type
Azi
(°)
Dip
(°)
Assay status
JRC429 RC 425998.2 6512859.7 240.5 120.0 GPS-RTK 95.8 -60.2 Reported - NSA
JRC430 RC 425882.6 6512565.3 242.6 120.0 GPS-RTK 85.4 -60.2 Reported
JRC431 RC 425318.0 6513110.7 260.7 240.0 GPS-RTK 90.4 -59.5 Reported
JRC432 RC 425840.4 6512572.0 243.4 120.0 GPS-RTK 101.7 -60.4 Reported
JRC433 RC 425404.1 6513030.7 260.0 327.0 GPS-RTK 91.1 -61.9 Reported
JRC434 RC 425239.6 6513111.1 261.5 323.0 GPS-RTK 87.2 -60.1 Reported
JRC435 RC 425361.5 6513040.9 261.1 183.0 GPS-RTK 87.8 -59.6 Reported

NSA = No significant assay

Metal equivalents

Sulphide drill intersections are quoted using a nickel equivalent (NiEq) cut-off grade. No metal equivalent is used for the oxide domain.

Based on limited metallurgical testwork completed to date for the sulphide domain, it is the Company’s opinion that all the quoted elements included in metal equivalent calculations (palladium, platinum, gold, nickel, copper and cobalt) have a reasonable potential of being recovered and sold.

Metal equivalents for the sulphide domains are calculated according to the formula below:

  • « NiEq (%) = Ni (%) + 0.37 x Pd (g/t) + 0.24 x Pt (g/t) + 0.25 x Au (g/t) + 0.65 x Cu (%) + 3.24 x Co (%);

Metal recoveries used in the metal equivalent calculations are at the lower end of the range for all metals in the sulphide domain based on limited metallurgical testwork (refer to ASX Announcement on 28 September 2021). Metal recoveries used in the metal equivalent calculations are listed below:

  • « Pd – 75%, Pt – 65%, Au – 50%, Ni – 60%, Cu – 80%, Co – 60%. Metal prices used are:

  • « Pd – US$1,700/oz,

  • « Pt – US$1,300/oz,

  • « Au – US$1,700/oz,

  • « Ni – US$18,500/t,

  • « Cu – US$9,000/t,

  • « Co – US$60,000/t.

36 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Appendix B Resource Table

Table 3. Gonneville Maiden Mineral Resource Estimate (JORC Code 2012), 9 November 2021.

Domain
Cut-off
Grade
Category Mass Grade Contained Metal
(Mt) Pd
(g/t)
Pt
(g/t)
Au
(g/t)
Ni
(%)
Cu
(%)
Co
(%)
NiEq
(%)
PdEq
(g/t)
Pd
(Moz)
Pt
(Moz)
Au
(Moz)
Ni
(kt)
Cu
(kt)
Co
(kt)
NiEq
(kt)
PdEq
(Moz)
Oxide
0.9g/t
Pd
Indicated
Inferred 8.8 1.8
0.06
1.9 0.51
0.02
0.52
Subtotal 8.8 1.8
0.06
1.9 0.51
0.02
0.52
Indicated 7.7 0.68
0.16
0.03
0.18
0.11
0.019
0.60
1.6
0.17
0.04
0.01
14
8.1
1.5
46
0.40
Sulphide
0.4%
Inferred 8.0 0.97
0.25
0.03
0.17
0.14
0.029
0.79
2.1
0.25
0.06
0.01
14
11
2.3
63
0.55
(Transitional)
NiEq
Subtotal 16 0.83
0.20
0.03
0.18
0.12
0.024
0.70
1.9
0.42
0.10
0.02
27
19
3.8
110
0.95
Indicated 150 0.74
0.18
0.03
0.16
0.10
0.016
0.61
1.6
3.5
0.82
0.14
240
150
23
890
7.7
Sulphide
0.4%
Inferred 160 0.69
0.16
0.02
0.16
0.10
0.016
0.58
1.6
3.6
0.82
0.12
270
160
26
940
8.2
(Fresh)
NiEq
Subtotal 310 0.72
0.17
0.03
0.16
0.10
0.016
0.59
1.6
7.1
1.6
0.26
510
310
49
1,800
16
Indicated 150 0.74
0.17
0.03
0.17
0.10
0.016
0.61
1.6
3.7
0.86
0.15
250
160
25
930
8.1
All Inferred 180 0.76
0.15
0.03
0.16
0.09
0.016
0.56
1.6
4.4
0.89
0.15
280
170
28
1,000
9.3
Total 330 0.75
0.16
0.03
0.16
0.10
0.016
0.58
1.6
8.1
1.7
0.30
530
330
53
1,900
17

Note some numerical differences may occur due to rounding to 2 significant figures. NiEq (%) = Ni (%) + 0.37 x Pd (g/t) + 0.24 x Pt (g/t) + 0.25 x Au (g/t) + 0.65 x Cu (%) + 3.24 x Co (%). PdEq (g/t) = Pd (g/t) + 0.66 x Pt (g/t) + 0.67 x Au (g/t) + 2.71 x Ni (%) + 1.76 x Cu (%) + 8.78 x Co (%). Includes drill holes drilled up to and including 31 July 2021.

37 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Appendix C JORC Table 1

C-1 Section 1 Sampling Techniques and Data

Criteria JORC Code explanation
Commentary
Nature and quality of sampling (eg. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.

HQ core was quarter cored and NQ2
was half cored with samples taken
over selective intervals ranging from
0.2m to 1.2m (typically 1.0m).

Reverse Circulation (RC) drilling
samples were collected as 1m
samples.

Qualitative care taken when sampling
Include reference to measures taken to
ensure sample representivity and the
diamond drill core to sample the same
half of the drill core.

appropriate calibration of any

For RC, two 1m assay samples were

measurement tools or systems used.
collected as a split from the rig cyclone
using a cone splitter with the same split
consistently sent to the laboratory for
Sampling
techniques

analysis.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’).
In other cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling problems.
Unusual commodities or mineralisation
types (eg. submarine nodules) may
warrant disclosure of detailed information.

Mineralisation is easily recognised by
the presence of sulphides. In diamond
core sample intervals were selected on
a qualitative assessment of sulphide
content

Drilling has been undertaken by
diamond, Reverse Circulation (RC)
techniques.

Diamond drill core is predominantly HQ
Drill type (eg. core, reverse circulation,

size (63.5mm diameter). Limited NQ2

open-hole hammer, rotary air blast,
(47.6mm diameter) drilling has also
Drilling auger, Bangka, sonic, etc) and details
been completed. Triple tube has been

(eg. core diameter, triple or standard
used from surface until competent
techniques

tube, depth of diamond tails, face-
bedrock and then standard tube

sampling bit or other type, whether core is
thereafter.
oriented and if so, by what method, etc).

Core orientation is by an ACT Reflex
(ACT II RD) tool

RC Drilling uses a face-sampling
hammer drill bit with a diameter of 5.5
inches (140mm).
Method of recording and assessing core
and chip sample recoveries and results
assessed.

Individual recoveries of diamond drill
core samples were assessed
quantitively by comparing measured
core length with expected core length
from drillers mark. Generally core
recoverywas excellent in fresh rock
Drill sample
recovery

38 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

and approaching 100%. Core
recovery in oxide material is often poor
due to sample washing out. Core
recovery in the oxide zone averages
60%

Individual recoveries for RC composite
samples were recorded on a
qualitative basis. Sample weights were
observed to be slightly lower through
transported cover whereas drilling
through bedrock yielded samples with
more consistent weights. Two separate
studies were completed where all the
sample was weighed and compared
with the expected weight. These
indicated that as with the diamond
core, sample recovery in the oxide is
moderate and good in the fresh rock.

With diamond drilling triple tube coring
in the oxide zone is undertaken to
improve sample recovery. This results in
Measures taken to maximise sample

better recoveries but recovery is still
recovery and ensure representative
only moderate to good.
nature of the samples.

Diamond core samples were
consistently taken from the same side
of the core and RC samples were
consistently taken from the same split
on the cyclone.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.

There is no evidence of a sample
recovery and grade relationship in
unweathered material.

All drill holes were logged geologically
Whether core and chip samples have

including, but not limited to;
been geologically and geotechnically
weathering, regolith, lithology,
logged to a level of detail to support
structure, texture, alteration and
appropriate Mineral Resource estimation,
mineralisation. Logging was at an
mining studies and metallurgical studies.
appropriate quantitative standard for
Logging infill drilling and resource estimation.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.

Logging is considered qualitative in
nature.

Diamond drill core is photographed
wet before cutting.
The total length and percentage of the

All holes were geologically logged in
relevant intersections logged.
full.
If core, whether cut or sawn and whether
quarter, half or all core taken.

Diamond core was sawn in half and
one-half quartered and sampled over
0.2-1.2m intervals (mostly 1m).
Sub-sampling

RC assay samples were collected as
techniques

and sample
two 1m splits from the rig cyclone via a

preparation
If non-core, whether riffled, tube sampled,

cone splitter. The cone splitter was
rotary split, etc and whether sampled wet
horizontal to ensure sample
or dry.
representivity. Wet or damp samples
were noted in the sample logging
sheet. A majority of samples were dry.

39 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.

Sample preparation is industry
standard and comprises oven drying,
jaw crushing and pulverising to -75
microns (80% pass).

Field duplicates were collected from
AC, RC and diamond drilling at an
approximate ratio of one in twenty five.
Quality control procedures adopted for

Diamond drill core field duplicates
all sub-sampling stages to maximise
collected as ¼ core.
representivity of samples.

RC Field duplicates were collected
from selected sulphide zones as a
second 1m split directly from the cone
splitter.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.

In the majority of cases the entire hole
has been sampled and assayed.

Duplicate sample results were
compared with the original sample
results and there is no bias observed in
the data.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.

Drill sample sizes are considered
appropriate for the style of
mineralisation sought and the nature of
the drilling program.
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.

Diamond drill core and RC samples
underwent sample preparation and
geochemical analysis by ALS Perth.
Au-Pt-Pd was analysed by 50g fire
assay fusion with an ICP-AES finish (ALS
Method code PGM-ICP24). A 48-
element suite was analysed by ICP-MS
following a four-acid digest (ALS
method code ME-MS61) for holes up to
and including JD023 and JRC122. Later
holes were analysed using four-acid
digest for 34 elements (ALS method
code ME-ICP61) including Ag, Al, As,
Ba, Be, Bi, Ca, Cd, Co, Cr, Cu, Fe, Ga,
K, La, Mg, Mn, Mo, Na, Ni, P, Pb, S, Sb,
Sc, Sr, Th, Ti, Tl, U, V, W, Zn, Zr.
Additional ore-grade analysis was
performed as required for elements
reporting out of range for Ni, Cr, Cu
(ALS method code ME-OG-62) and Pd,
Pt (ALS method code PGM-ICP27).

These techniques are considered total
digests.
Quality of
assay data
and
laboratory
tests
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the

Not applicable as no data from such
analysis including instrument make and
tools or instruments are reported
model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (eg. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie. lack of bias) and precision
have been established.

Certified analytical standards and
blanks were inserted at appropriate
intervals for diamond, and RC drill
samples with an insertion rate of >5%.
Approximately 5% of significant
intercepts were sent for cross
laboratory checks.AllQAQC samples

40 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

display results within acceptable levels
of accuracy and precision.

Significant drill intersections are
checked by the Project Geologist and
The verification of significant intersections

then by the General Manager
by either independent or alternative
Development. Significant intersections
company personnel.
are cross-checked with the logged
geology and drill core after final assays
are received.
The use of twinned holes.

Six sets of twinned holes (RC versus
Diamond) have been drilled to provide
a comparison between
grade/thickness variations over a 5m
separation between drill holes.

Only Palladium assays have been
analysed as part of this twin hole
comparison. Ni and Cu grades are very
low level in the selected holes (~0.1 –
0.2% Ni and <0.1% Cu), so no
meaningful correlation can be
obtained.

Intervals correlate well between holes
although in detail there is variation
between them for higher grade
samples in terms of both location and
grade. However, there is no
discernible grade bias between drill
types.
Verification of
sampling and
assaying

Primary drill data was collected
digitally using OCRIS software before
Documentation of primary data, data
entry procedures, data verification, data
being transferred to the master SQL
database.

storage (physical and electronic)

All procedures including data

protocols.
collection, verification, uploading to
the database etc are captured in
detailed procedures and summarised
in a single document.
Discuss any adjustment to assay data

No adjustments were made to the lab
reported assay data.

Diamond and RC drill hole collar
locations are initially recorded by
Chalice employees using a handheld
Accuracy and quality of surveys used to
GPS with a +/- 3m margin of error and

locate drill holes (collar and down-hole
then picked up with an RTK-DGPS.
surveys), trenches, mine workings and

RTK-DGPS collar pick-ups replace
other locations used in Mineral Resource
handheld GPS collar pick-ups and
Location of estimation.

have +/-20 mm margin of error.
data points
Planned and final hole coordinates are
compared after pick up to ensure that
the original target has been tested.
Specification of the grid system used.

The grid system used for the location of
all drill holes is GDA94 - MGA (Zone 50).
Quality and adequacy of topographic

RLs for reported holes were derived
control.
from RTK-DGPS pick-ups.
Data spacing Data spacing for reporting of Exploration
Results.

Drill hole spacing varies from between
40m x 40 m in the south to 160m x 80m
in the north and west.
and
distribution

41 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Whether the data spacing and

Results from the drilling to date are
distribution is sufficient to establish the
considered sufficient to assume
degree of geological and grade
geological or grade continuity
continuity appropriate for the Mineral
appropriate for Mineral Resource
Resource and Ore Reserve estimation
estimation procedure(s) and
procedure(s) and classifications applied.
classifications.
Whether sample compositing has been
applied.

No compositing undertaken for
diamond drill core or RC samples.

RC and Diamond drill holes were
typically oriented within 15° of
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
orthogonal to the interpreted dip and
strike of the known zone of
mineralisation. However, several holes
were drilled at less optimal azimuths
due to site access constraints or to test
Orientation of
data in

relation to
for alternative mineralisation
orientations.
geological
structure If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.

The orientation of the drilling is not
considered to have introduced
sampling bias.
The measures taken to ensure sample
security.

Samples were collected in polyweave
bags either at the drill rig (RC samples)
or at the core cutting facility (diamond
samples). The polyweave bags have
five samples each and are cable tied.

Filled bags were collected into
palletised bulk bags at the field office
Sample
security

and delivered directly from site to ALS
laboratories in Wangara, Perth by a
Chalice contractor several times
weekly.
The results of any audits or reviews of
sampling techniques and data.

CSA Global conducted a site visit and
review of the sampling techniques In
July 2021.

SRK completed an independent
assurance review of the Chalice
procedures including documentation
and appropriateness of methods
employed.
Audits or
reviews

C-2 Section 2 Reporting of Exploration Results

Criteria JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number,
location and ownership including
agreements or material issues with third
parties such as joint ventures,
partnerships, overriding royalties, native
title interests, historical sites, wilderness
or national park and environmental
settings.

Exploration activities are ongoing over
E70/5118 and 5119 and the tenements
are in good standing. The holder CGM
(WA) Pty Ltd is a wholly owned
subsidiary of Chalice Mining Limited
with no known encumbrances.
The security of the tenure held at the

Current drilling is on private land, all of

time of reportingalongwith anyknown
which is owned by the Company.

42 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Criteria JORC Code explanation Commentary Commentary
impediments to obtaining a licence to E70/5119 partially overlaps ML1SA, a
operate in the area. State Agreement covering Bauxite
mineral rights only.
There is no previous exploration at
Gonneville and only limited
exploration has been completed by
other exploration parties in the vicinity
of the targets identified by Chalice to
date.
Chalice has compiled historical
records dating back to the early
1960’s which indicate only three
genuine explorers in the area, all
primarily targeting Fe-Ti-V
mineralisation.
Over 1971-1972, Garrick Agnew Pty
Ltd undertook reconnaissance
surface sampling over prominent
aeromagnetic anomalies in a search
for ‘Coates deposit style’ vanadium
mineralisation. Surface sampling
methodology is not described in
Exploration done Acknowledgment and appraisal of detail, nor were analytical methods
by other parties exploration by other parties. specified, with samples analysed for
V2O5, Ni, Cu, Cr, Pb and Zn, results of
which are referred to in this
announcement.
Three diamond holes were completed
by Bestbet Pty Ltd targeting Fe-Ti-V
situated approximately 3km NE of
JRC001. No elevated Ni-Cu-PGE
assays were reported.
Bestbet Pty Ltd undertook 27 stream
sediment samples within E70/5119.
Elevated levels of palladium were
noted in the coarse fraction (-
5mm+2mm) are reported in this
release. Finer fraction samples did not
replicate the coarse fraction results.
A local AMAG survey was flown in
1996 by Alcoa using 200m line
spacing which has been used by
Chalice for targeting purposes.
The target deposit type is an
orthomagmatic Ni-Cu-PGE sulphide
deposit, within the Yilgarn Craton. The
Geology Deposit type, geological setting and
style of mineralisation.
style of sulphide mineralisation
intersected consists of massive, matrix,
stringer and disseminated sulphides
typical of metamorphosed and
structurally overprinted
orthomagmatic Ni sulphide deposits.
A summary of all information material to
the understanding of the exploration
Drill hole
Information
results including a tabulation of the
following information for all Material drill
holes:
Provided in body of text.
Easting and northing of the drill hole
collar

43 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Criteria JORC Code explanation
Commentary
Elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
Dip and azimuth of the hole
Down hole length and interception
depth hole length.
If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the

No material information has been
excluded.

Competent Person should clearly
explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg. cutting of high grades)
and cut-off grades are usually Material
and should be stated.

Significant intercepts are reported
using a >0.5g/t Pd length-weighted
cut off for oxide and >0.4% NiEq
length-weighted cut off for sulphide
material. A maximum of 4m internal
dilution has been applied.
Where aggregate intercepts
incorporate short lengths of high-grade
results and longer lengths of low grade
results, the procedure used for such
aggregation should be stated and
some typical examples of such
aggregations should be shown in detail.

Higher grade intervals are reported
using a >0.9g/t Pd length-weighted
cut off for oxide and >0.6% NiEq
length-weighted cut off. A maximum
of 2m internal dilution has been
applied.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.

Metal price assumptions used in the
metal equivalent calculations are:
US$1,700/oz Pd, US$1,300/oz Pt,
US$1,700/oz Au, US$18,500/t Ni,
US$9,000/t Cu, US$60,000/t Co.

No metal equivalent calculation is
reported for the oxide material.

Metallurgical recovery assumptions
used in the metal equivalent
calculation for the sulphide (fresh)
material are: Pd – 75%, Pt – 65%, Au –
50%, Ni – 60%, Cu – 80%, Co - 60%.

Hence for the sulphide material NiEq =
Ni % + 0.37x Pd g/t + 0.24 x Pt g/t +
0.25 x Au g/t + 0.65 x Cu % +3.24 x Co
% and PdEq = Pd g/t + 0.66 x Pt g/t +
0.67 x Au g/t + 2.71 x Ni % + 1.76 x Cu
% + 8.78 x Co %.

The volume of transitional material is
small and considered unlikely to
materially affect the overall metal
equivalent calculation.

RC and Diamond drill holes were
These relationships are particularly
important in the reporting of Exploration
Results.

typically oriented within 15° of
orthogonal to the interpreted dip and
strike of the known zone of
mineralisation. However, several holes
Relationship
between
mineralisation
widths and If the geometry of the mineralisation


were drilled at less optimal azimuths
intercept lengths with respect to the drill hole angle is


due to site access constraints or to
known, its nature should be reported.
test for alternative mineralisation
orientations.

44 Chalice Mining Limited

ASX:CHN OTCQB:CGMLF

Criteria JORC Code explanation
Commentary
If it is not known and only the down
hole lengths are reported, there should
be a clear statement to this effect (eg.
‘down hole length, true width not
known’).

All widths are quoted down-hole. True
widths vary depending on the
orientation of the hole and the
orientation of the mineralisation. For
low grade intercepts (> 0.3g/t Pd) true
width approximates downhole width.
For high grade intercepts (>1g/t Pd)
true width is generally between 80
and 100% of the downhole width.
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
Diagrams
discovery being reported These should

Refer to figures in the body of text.
include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low
and high grades and/or widths should
be practiced to avoid misleading
reporting of Exploration Results.

All holes including those without
significant intercepts have been
reported.
Other exploration data, if meaningful
and material, should be reported
including (but not limited to):
geological observations; geophysical
Other
survey results; geochemical survey
results; bulk samples – size and method
of treatment; metallurgical test results;

Not applicable. All meaningful data
has been included
substantive
exploration data
bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
Further work The nature and scale of planned further
work (eg. tests for lateral Exts or depth
Exts or large-scale step-out drilling).

Diamond and RC drilling will continue
to test high-priority targets including
EM conductors. Further drilling along
strike and down dip may occur at
these and other targets depending
on results.

Scoping study work has commenced
including additional metallurgical
testwork, mining studies, tailings
studies and waste rock
characterisation etc.
Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially

Any potential extensions to
mineralisation are shown in the figures
in the body of the text.

sensitive.

45 Chalice Mining Limited