Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CHALICE MINING LIMITED Capital/Financing Update 2019

Mar 18, 2019

64649_rns_2019-03-18_c66e91b7-e502-404b-b6bb-3f8656edf73d.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

19 March 2019

==> picture [553 x 93] intentionally omitted <==

Reconnaissance drilling at Pyramid Hill Gold Project continues to outline high-priority target areas

==> picture [510 x 12] intentionally omitted <==

Highlights

  • Phase 1 reconnaissance aircore drill programme continuing within the Muckleford Area at the 100% owned Pyramid Hill Gold Project.

  • Several areas of highly anomalous gold and pathfinder elements identified on wide-spaced drill lines, outlining several high-priority zones of interest for immediate follow-up:

  • A highly anomalous arsenic interval (6m at >6,000ppm As) at the East Target , interpreted to lie directly along strike from the 22Moz Bendigo Goldfield; and

  • Numerous anomalous gold and arsenic intervals along a >30km gravity trend at the West Target , corresponding with the eastern margin of a Devonian granite.

  • 19,500m drilled on the Project to date, with assays now received for ~17,430m.

  • Based on the continued success of the initial drilling utilising the highly cost-effective multi-purpose AC/RC rig, the Phase 1 drill programme has been further expanded to ~35,000m .

  • 4,000m Phase 1 reconnaissance aircore drill programme to commence within the Mt William Area (north-east of Kirkland Lake Gold’s >8Moz high-grade Fosterville Gold Mine ) in late March with a second rig.

  • Concurrent drilling at Mt William will open up a second front for gold exploration at Pyramid Hill.

  • Kirkland Lake Gold’s recent mineral reserve upgrade and 2019 production and cost guidance for its Fosterville mine has continued to draw global attention to the region.

  • Chalice positioned well in this exciting region with ~4,500km[2] of Exploration Licences and applications in three districts (Muckleford, Mt William and Percydale), all 100%-owned.

  • Chalice has ability to continue its aggressive exploration programme with a strong cash balance of ~ A$21 million at 31 December 18.

==> picture [510 x 12] intentionally omitted <==

Chalice Gold Mines Limited (“Chalice” or “the Company”) (ASX: CHN | TSX: CXN) is pleased to provide an update on recent results and ongoing exploration activities at its 100%-owned Pyramid Hill Gold Project, located in the world-class Bendigo region of Victoria.

Several new zones of strongly anomalous gold and pathfinder mineralisation have been intersected across wide-spaced reconnaissance aircore (AC) drill lines within the Muckleford Area. These results provide important vectors to potential gold systems and provide immediate targets for follow up in-fill drilling.

Based on the encouraging new results and the cost-effectiveness of the programme in testing a very large area, the initial 15,000m Phase 1 AC drilling programme at Muckleford has been more than doubled in size to 35,000m. This initial programme will continue until early May 2019.

In addition, a second AC drill rig will commence the Company’s maiden 4,000m Phase 1 reconnaissance drill programme within the Mt William Area, located north-east of Kirkland Lake Gold’s (TSX / NYSE: KL | ASX: KLA) >8Moz high-grade Fosterville Gold Mine. This programme is scheduled to begin in late March 2019.

==> picture [594 x 74] intentionally omitted <==

A first-pass reconnaissance soil geochemistry survey has also commenced within the Percydale Area, located north-west of the historic St Arnaud Goldfield. This programme aims to define drill-ready targets by late April 2019.

Commenting on progress at Pyramid Hill, Chalice’s Managing Director, Alex Dorsch, said: “The latest assay results have outlined several areas of strong gold and pathfinder anomalism which justify immediate followup drilling on tighter line spacing. The wide spaced nature of this first phase of drilling, which allows a large (~1,400km[2] ) area to be explored very cost effectively, continues to deliver encouraging results.”

“Importantly, other recent discoveries undercover in this region, like Four Eagles (Catalyst Metals and Hancock Prospecting) and Tandarra (Catalyst Metals and Navarre Minerals), originated from low level anomalous gold and pathfinder values on initial wide-spaced aircore drilling. This gives us confidence that our systematic approach to exploration at Pyramid Hill is the best way to vector towards areas which could ultimately lead to a world-class high-grade gold discovery.”

“In light of the encouraging anomalous intercepts to date, we have more than doubled the size of the initial reconnaissance drilling programme to 35,000m, and will continue drilling through until May.”

“Chalice is in a very favourable position, having the financial resources to aggressively explore in this high grade but underexplored gold province, which continues to capture global attention.”

Muckleford Phase 1 Drilling Update

The Company’s Phase 1 reconnaissance AC drill programme is continuing on its 100% owned tenure (EL6737, EL6661) in the central Muckleford Area, 20-70km north-west of Bendigo (Figure 1).

The AC drill programme has been designed to provide an effective first-pass test of three high priority, large-scale geochemical, geophysical and structural targets (East, West and South) in areas of reduced cover. Drilling has been successful in intersecting the Castlemaine Group basement, which is the host geological unit for all gold deposits and occurrences in the Bendigo Zone.

Drilling has been undertaken on wide-spaced east-west drill lines with the aim to drill and sample at least 30m of basement below Murray Basin and Permian tillite cover. This type of reconnaissance drilling aims to quickly screen large areas and narrow down to priority targets, based on anomalous gold and pathfinder elements within halos commonly surrounding gold deposits in the region.

Drilling to date has achieved this objective, with only a minor proportion of drill holes having failed to penetrate overburden in isolated areas of deep cover (>150m). Areas of deeper cover are expected to be restricted to the north-eastern part of the Muckleford Area, however, cover thickness has been observed to be highly variable in the drilling to date.

To date, a total of 201 drill holes for 19,500m have been completed and assay results have been received for the first 182 holes totalling 17,430m. Several areas of anomalous gold and pathfinder elements have been identified (Figure 2).

At the East Target, drilling has been undertaken on two 4km-spaced lines to test a structural corridor located along and adjacent to the interpreted position of the Sebastian Fault. The east-dipping Sebastian Fault is an important regional structure associated with gold mineralisation at Sebastian and continues to the south and immediately west of the high-grade >22Moz Bendigo Goldfield.

Drill hole PA136 intersected a zone of strongly elevated arsenic (6m @ 6,857ppm As from 94m) through to the bottom-of-hole. Arsenic is considered one of the better gold pathfinders and therefore these results are considered to be a high priority for additional in-fill and deeper drill testing.

Drill hole PA149, drilled 4km north of PA116, intersected 4m @ 0.25g/t Au from 76m at the strongly weathered basement/cover interface. Given that these anomalous drill holes are located along strike from the highgrade >22Moz Bendigo Goldfield, they provide highly encouraging vectors for follow-up drilling.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

2

At the West Target, drilling was designed to test a gold + pathfinder soil geochemical trend coincident with a regionally extensive (>30km) gravity anomaly located adjacent to the interpreted position of the Campbelltown Fault and to the immediate east of a Devonian granite.

Drill hole PA073 intersected 4m @ 0.39g/t Au from 95m, associated with coarse quartz gravels at the base of the Murray Basin cover. This hole is located on section with drill hole PA078, which intersected 4m @ 0.29g/t Au from 52m located at a redox front between oxidised and reduced saprolite clays after Castlemaine Group sediments. Additional 1m sub-sampling has been undertaken over this 4m zone to better understand gold distribution within the strongly weathered sediments.

Drill hole spacing on this drill line currently remains wide (~400m between drill holes) and therefore warrants additional in-fill drilling to further follow-up the anomalous gold in drill holes PA073 and 078 (Figure 3).

Anomalous gold values have also been returned in drill holes PA085 and PA112. In PA085, gold mineralisation (2m @ 0.11g/t Au from 74m) is located at the bottom-of-hole within fine-grained micaceous sandstone and remains open at depth and along strike.

In PA112, gold mineralisation (8m @ 0.11g/t Au from 84m) is located within oxidised clay directly above reduced saprolitic shale. Given both holes are proximal to the Devonian granite margin to the immediate west, and are >30km apart, this provides an immediate priority area for follow-up drilling.

Low-level gold and anomalous pathfinder element levels (As, Sb etc) are important in identifying a geochemical footprint to proximal gold mineralisation. Low-level gold intervals (>0.05g/t Au) and anomalous arsenic (>50 ppm As) represent immediate follow-up drill targets, particularly as the current drill lines are very widely spaced (3-4km) at this initial stage of reconnaissance drill testing.

Based on these encouraging early stage results, as well as previous reported results on the South Target, an additional 15,500m of Phase 1 drilling is planned to better define targets for follow up in-fill drilling.

Muckleford Phase 2 Drilling

At the completion of the Phase 1 reconnaissance drill programme, a second phase of AC/RC drilling is planned to in-fill along strike to a drill line spacing of approximately 0.5 – 1.0km where warranted.

It is anticipated that Phase 2 will commence following the completion of Phase 1 in May 2019, where access and permitting constraints allow.

Mt William Phase 1 Drilling

A 4,000m maiden Phase 1 reconnaissance AC drill programme will be undertaken at the Mt William Area, commencing late March 2019. The drill programme will provide a first-pass shallow test of several recently identified soil geochemical and structural targets located in the southern part of EL6738 (Figure 4).

Four targets in areas of thin cover will be tested as part of this initial Phase 1 reconnaissance drill programme:

South Target: A gold-in-soil geochemical anomaly located directly along strike from a recent drill intersection of 6m @ 4.2 g/t Au reported by Catalyst Metals (ASX: CYL) at their Golden Camel Project.

East Target: A cluster of gold-in-soil geochemical anomalies associated with the interpreted position of the Mt William Fault and associated faults splays along the eastern edge of EL6738.

North Target: A gold-in-soil geochemical trend to the west of a splay fault off the Heathcote Fault.

West Target: A gold-in-soil geochemical anomaly associated with Castlemaine Group sediments under shallow Murray Basin cover along the western part of EL6738.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited

3

ABN 47 116 648 956 ASX : CHN | TSX : CXN

Percydale Soil Sampling

A reconnaissance soil geochemistry survey consisting of approximately 800 samples has commenced within granted EL6805. This tenement lies to the north-west of the historical St Arnaud Goldfield and contains strike extensions of the St Arnaud and Percydale Faults.

Navarre Minerals (ASX: NML) recently reported results from several phases of wide-spaced reconnaissance AC drilling to the south-east of EL6805, with better results including 6m @ 2.5g/t Au from 80m and 4m @ 1.7g/t Au from 32m.

Any anomalous results generated from the soil sampling programme will form the basis for a Phase 1 reconnaissance AC drilling programme.

==> picture [87 x 64] intentionally omitted <==

Alex Dorsch Managing Director

For further information, please contact: Nicholas Read, Principal and Managing Director Alex Dorsch, Managing Director Read Corporate Investor Relations Chalice Gold Mines Limited +61 8 9388 1474 +61 8 9322 3960 [email protected] [email protected]

Follow our communications: LinkedIn: https://au.linkedin.com/company/chalice-gold-mines Twitter: https://twitter.com/chalicegold Facebook: https://www.facebook.com/Chalice-Gold-Mines-323740744933099/

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

4

About the Pyramid Hill Gold Project, Victoria, Australia

The 100%-owned Pyramid Hill Gold Project was staked in 2017 and now covers an area of ~4,500km[2] in the Bendigo region of Victoria. The Project comprises three key districts within the Murray Basin covered North Bendigo and North Stawell Zones: Muckleford, Mt William and Percydale (Figure 1).

The central Muckleford Area extends to the north-west of the world-class >22Moz Bendigo Goldfield. The Mt William Area extends to the north-east of one of the world’s highest-grade gold mines, the >8Moz Fosterville Gold Mine owned by Kirkland Lake Gold (NYSE / TSX: KL | ASX: KLA). The Percydale Area is located north-west of the historical St Arnaud Goldfield within the Stawell Zone.

The ‘Gold Undercover[1] ’ initiative by the Victorian Government estimated a potential ~32Moz (P50) of undiscovered gold beneath Murray Basin cover in the Bendigo Zone, where Chalice holds ~60% of the total ~7,000km[2] prospective area (Figure 5). Chalice is targeting large-scale, high-grade gold deposits, and is currently conducting regional scale greenfield exploration.

In Q2 2018 geochemistry and gravity geophysics programmes commenced, outlining multiple large-scale targets in areas of thin to moderate cover. The first phase of reconnaissance aircore drilling commenced in Q4 2018 within the Muckleford Area.

1 V. Lisitsin, A. Olshina, D.H. Moore & C.E. Willman 2007, Assessment of undiscovered mesozonal orogenic gold endowment under cover in the northern part of the Bendigo Zone, GeoScience Victoria Gold Undercover Report 2, Department of Primary Industries. http://earthresources.efirst.com.au/categories.asp?cID=42

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited

5

ABN 47 116 648 956 ASX : CHN | TSX : CXN

==> picture [511 x 394] intentionally omitted <==

Figure 1 . Pyramid Hill Gold Project location, regional licence holders and gold occurrences.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

6

==> picture [512 x 595] intentionally omitted <==

Figure 2 . Phase 1 drill results from Muckleford Area over 1VD gravity image and soil geochemistry

contours.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

7

==> picture [511 x 339] intentionally omitted <==

Figure 3 . West Target Oblique Cross Section A-B.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

8

==> picture [511 x 589] intentionally omitted <==

Figure 4 . Mt William Phase 1 drill targets and soil geochemistry results over 1VD Magnetic Image.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

9

==> picture [433 x 621] intentionally omitted <==

Figure 5. Regional geology and major gold deposits of central Victoria.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

10

Competent Persons and Qualifying Persons Statement

The information in this announcement that relates to Exploration Results in relation to the Pyramid Hill Gold Project is based on information compiled by Dr. Kevin Frost BSc (Hons), PhD, a Competent Person, who is a Member of the Australian Institute of Geoscientists. Dr. Frost is a full-time employee of the company and has sufficient experience that is relevant to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves, and is a Qualified Person under National Instrument 43-101 – ‘Standards of Disclosure for Mineral Projects’. The Qualified Person has verified the data disclosed in this release, including sampling, analytical and test data underlying the information contained in this release. Dr. Frost consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

Forward Looking Statements

This announcement may contain forward-looking information within the meaning of Canadian securities legislation and forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, forward-looking statements). These forward-looking statements are made as of the date of this report and Chalice Gold Mines Limited (the Company) does not intend, and does not assume any obligation, to update these forward-looking statements.

Forward-looking statements relate to future events or future performance and reflect Company management’s expectations or beliefs regarding future events and include, but are not limited to, the Company’s strategy, the estimation of mineral reserve and mineral resources, the realisation of mineral resource estimates, the likelihood of exploration success at the Company’s projects, the prospectivity of the Company’s exploration projects, the timing of future exploration activities on the Company’s exploration projects, planned expenditures and budgets and the execution thereof, the timing and availability of drill results, potential sites for additional drilling, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage.

In certain cases, forward-looking statements can be identified by the use of words such as “plans”, “planning” “expects” or “does not expect”, “is expected”, “will”, “may”, “could”, “would”, “potential”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, “believes”, “occur” or “be achieved” or variations of such words and phrases or statements that certain actions, events or results may, could, would, might or will be taken, occur or be achieved or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.

Such factors may include, among others, risks related to actual results of current or planned exploration activities; changes in project parameters as plans continue to be refined; changes in exploration programmes based upon the results of exploration; future prices of mineral resources; possible variations in mineral resources or ore reserves, grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; as well as those factors detailed from time to time in the Company’s interim and annual financial statements, all of which are filed and available for review on SEDAR at sedar.com.

Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

11

Appendix 1: Pyramid Hill Gold Project – Significant Drill Intercepts (>0.1g/t Au)

Hole ID From(m) To(m) Interval(m) Gold(g/t)
PA073 95 99 4 0.39
PA078 52 56 4 0.29
PA085 74 76 2 0.11
PA112 84 92 8 0.11
PA115 40 44 4 0.14
PA124 8 12 4 0.10
PA149 76 80 4 0.25

Appendix 2: Pyramid Hill Gold Project – JORC Table 1

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.

Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.

Aspects of the determination of mineralisation
that are Material to the Public Report.

In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.

Aircore (AC) drilling samples were
collected via 2-4m composite samples
from 1m bulk samples using a pvc spear
with each combined composite sample
weighing approximately 3kg.

The composite samples were pulverised
to nominal 85% passing 75 microns
before being analysed .

Qualitative care was taken to ensure
representative sample weights were
consistent when sampling on a metre by
metre basis.
Drilling
techniques

Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter,
triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether
core is oriented and if so, by what method,
etc).

The drilling was completed via an aircore
(AC) drilling technique using both blade
and face sampling hammer drill bits with
a diameter of 102-104mm.
Drill sample
recovery

Method of recording and assessing core and
chip sample recoveries and results assessed.

Measures taken to maximise sample recovery
and ensure representative nature of the
samples.

Whether a relationship exists between sample
recovery and grade and whether sample bias
_may have occurred due to preferential _

Individual recoveries of 1m samples were
recorded on a qualitative basis.
Generally the sample weights were
comparable and any bias considered
negligible.

No relationships have been noticed
between sample grade and recoveries.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

12

Criteria JORC Code explanation Commentary
loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.

The total length and percentage of the
relevant intersections logged.

All drill holes were logged geologically
including but not limited to weathering,
regolith, lithology, structure, texture,
alteration and mineralisation. Logging
was at an appropriate quantitative
standard to support future geological,
engineering and metallurgical studies.

Logging is considered quantitative in
nature.

All holeswere geologicallyloggedin full.
Sub-sampling
techniques
and sample
preparation

If core, whether cut or sawn and whether
quarter, half or all core taken.

If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.

For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.

Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the sampling is
representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.

Whether sample sizes are appropriate to the
grainsize of the material being sampled.

1 metre AC samples were collected in
bulk form from the rig cyclone. 2-4m
composite samples of the 1m samples
were collected using a spear method.
The majority of the samples were dry in
nature.

Field duplicate samples were sent every
20thsample to check for assay
repeatability. Results of duplicate
samples were considered acceptable
and within precision and accuracy limits
for the style of mineralisation.

Sample sizes are considered appropriate
for the style mineralisation sought and
the reconnaissance nature of the drilling
programme.
Quality of
assay data
and laboratory
tests

The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.

For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.

Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.

All samples were sent to ALS prep facility
in Adelaide for sample preparation then
sent to ALS Perth for chemical analysis.

40 elements (including gold) were
analysed using up to a 25g aqua regia
method with an ICPAES and ICPMS finish
depending on the elements (ALS method
code – TL43-MEPKG). Aqua Regia
techniques are not considered total in
nature. Should refractory mineralisation
be encountered this can affect the
nature of the final results.

Chalice has its own internal QAQC
procedure involving the use of certified
reference materials. Standards - 4 per
100 samples, blanks – 1 per 100 samples
and duplicates 4 per 100 samples which
accounts for ~9% of the total submitted
samples.
Verification of
sampling and
assaying

The verification of significant intersections by
either independent or alternative company
personnel.

The use of twinned holes.

Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.

Significant intersections are checked by
the Project Senior Geologist and then by
the General Manager of Exploration.
Significant intersections are cross-
checked with the geology logged and
drill chips collected after final assays are
received.

No twin holes have been drilled for
comparative purposes.The prospect is

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

13

Criteria JORC Code explanation Commentary

still considered to be in an early
exploration stage.
Primary data was collected via hard
copy logging sheets using in house
logging codes. The data is sent to Perth
where the data is validated and entered
into the master database.
No adjustments have been made to the
assay datareceived
Location of
data points

Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic
control.


Hole collar locations have been picked
up by Chalice employees using a
handheld GPS with a +/- 5m error.
The grid system used for the location of
all drill holes is either MGA_GDA94 (Zone
54) or MGA_GDA94 (Zone 55) . A grid
zone boundary transects the project
area
RL data is considered unreliable although
topography around the drill area is
relatively flat and hence should not have
any significant effect on the
interpretationofdata.
Data spacing
and
distribution

Data spacing for reporting of Exploration
Results.

Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.

Whether sample compositing has been
applied.


Nominal drill hole spacing is generally
100-400m between aircore holes.
The current spacing is not considered
sufficient to assume any geological or
grade continuity of the mineralisation
intersected.
No sample compositing has been
applied.
Orientation of
data in
relation to
geological
structure

Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.

If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.

Sampling has been routinely completed
beneath transported cover with no
selective bias to any particular primary
geological domain.
It is unclear at this early stage as to the
orientation of sampling to the orientation
of the mineralisation intersected.
Sample
security

The measures taken to ensure sample security.
Chain of custody is managed by
Chalice. Samples are being stored on site
before being transported by third parties
tothelaboratory.
Audits or
reviews

The results of any audits or reviews of sampling
techniques and data.
No review has been carried out to date.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status

Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.

Drilling was carried out within EL6737
and EL6661. Both licences are wholly
owned by CGM (WA) Pty Ltd, a full
subsidiary of Chalice Gold Mines
Limited with no known
encumbrances.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

14

Criteria JORC Code explanation Commentary

The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
Exploration done
by other parties

Acknowledgment and appraisal of exploration
by other parties.

There has been little exploration
completed by other parties in the
immediate vicinity of the drilling
completed to date. Homestake
Mining completed initial surface
sampling which has been evaluated
and used by Chalice for some
targeting purposes.
Geology
Deposit type, geological setting and style of
mineralisation.

The mineralisation being explored for
is orogenic style similar to that seen
within the Bendigo and Fosterville
gold deposits of the Bendigo Zone.
Gold mineralisation is typically
hosted by quartz veins within in the
Ordovician age Castlemaine Group
sediments.
Drill hole
Information

A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.

If the exclusion of this information is justified on
the basis that the information is not Material
and this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.

See Annexure 1
Data aggregation
methods

In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material
and should be stated.

Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths
of low grade results, the procedure used for
such aggregation should be stated and some
typical examples of such aggregations should
be shown in detail.

The assumptions used for any reporting of metal
equivalent values should be clearly stated.

A weighted average technique has
been applied where necessary to
produce all displayed drill
intersections. No other grade
truncations or cuts have been
applied.

Grade intercepts are reported in full
with no internal grades calculated.

No metal equivalent results are
reported.
Relationship
between
mineralisation
widths and
intercept lengths

These relationships are particularly important in
the reporting of Exploration Results.

If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.

If it is not known and only the down hole
_lengths are reported, there should be a clear _

The drill intersections reported are
not considered true widths. Further
detailed geological analysis and
drilling is required to determine the
geometry of the intersected
mineralisation.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

15

Criteria JORC Code explanation Commentary
statement to this effect (eg ‘down hole length,
true width not known’).
Diagrams
Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.

Refer to figures in the body of text.
Balanced
reporting

Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.

Only significant results above 0.1g/t
Au and 1000ppm As have been
tabulated.
Other substantive
exploration data

Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations;
geophysical survey results; geochemical survey
results; bulk samples – size and method of
treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.

Not Applicable
Further work
The nature and scale of planned further work
(eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not

Follow up drilling will be planned to
better define the mineralised
envelopes and to improve the
understanding of potential
geological controls to mineralisation.

Target Zones as defined on the cross
sections highlight the areas of most
interest for initial further follow-up
exploration.

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

16

Appendix 3 – Pyramid Hill Gold Project AC Drill Hole Details

Hole ID MGA East
z54 (mE)
MGA North
z54 (mN)
MGA East
z55 (mE)
MGA North
z55 (mN)
RL (m) Azimuth
UTM(°)
Dip (°) Depth (m)
PA001 771286 5941589 234801 5941779 147 360 -90 92.5
PA002 771386 5941584 234901 5941781 147 360 -90 99
PA003 771489 5941581 235004 5941784 147 360 -90 63
PA004 771585 5941578 235100 5941787 147 360 -90 99
PA005 771679 5941560 235195 5941775 147 360 -90 78
PA006 771786 5941573 235301 5941795 147 360 -90 72
PA007 771885 5941569 235400 5941797 147 360 -90 74
PA008 771984 5941561 235500 5941795 147 360 -90 79
PA009 772384 5941540 235900 5941799 148 360 -90 96
PA010 772276 5941556 235791 5941808 148 360 -90 99
PA011 772180 5941545 235696 5941791 148 360 -90 99
PA012 772085 5941562 235600 5941802 148 360 -90 96
PA013 772490 5941549 236005 5941815 148 360 -90 99
PA014 772585 5941546 236100 5941818 148 360 -90 90
PA015 772679 5941543 236194 5941820 148 360 -90 76
PA016 772784 5941528 236300 5941812 148 360 -90 84
PA017 772885 5941535 236400 5941825 149 360 -90 90
PA018 772985 5941532 236500 5941829 149 360 -90 84
PA019 773084 5941517 236600 5941820 150 360 -90 81
PA020 773685 5941511 237200 5941851 152 360 -90 89
PA021 766600 5948186 229712 5948071 132 360 -90 51
PA022 767000 5948175 230112 5948085 132 360 -90 57
PA023 767200 5948168 230312 5948090 132 360 -90 63
PA024 766800 5948181 229912 5948078 132 360 -90 60
PA025 766400 5948193 229512 5948065 132 360 -90 44
PA026 766200 5948199 229312 5948059 133 360 -90 46
PA027 766000 5948205 229112 5948052 133 360 -90 48
PA028 765799 5948211 228911 5948046 133 360 -90 45
PA029 765598 5948218 228710 5948040 133 360 -90 78
PA030 765399 5948224 228511 5948034 133 360 -90 66
PA031 765199 5948230 228311 5948027 134 360 -90 60
PA032 764999 5948236 228111 5948021 134 360 -90 75
PA033 764804 5948242 227916 5948015 134 360 -90 78
PA034 765700 5948212 228813 5948041 133 360 -90 63
PA035 765899 5948207 229012 5948048 133 360 -90 67
PA036 772581 5938280 236300 5938558 154 360 -90 51
PA037 772033 5938296 235753 5938540 153 360 -90 78
PA038 771979 5938299 235698 5938539 153 90 -90 84
PA039 771930 5938297 235650 5938534 153 360 -90 66
PA040 766730 5953750 229495 5953632 129 360 -90 88
PA041 765539 5953774 228305 5953582 129 360 -90 62.6

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

17

Hole ID MGA East
z54 (mE)
MGA North
z54 (mN)
MGA East
z55 (mE)
MGA North
z55 (mN)
RL (m) Azimuth
UTM(°)
Dip (°) Depth (m)
PA042 765728 5953756 228495 5953576 129 360 -90 60
PA043 765914 5953754 228681 5953585 129 360 -90 102
PA044 765627 5953770 228393 5953583 129 360 -90 97
PA045 766132 5953776 228897 5953621 129 360 -90 91
PA046 766235 5953749 229001 5953600 129 360 -90 127
PA047 766333 5953761 229098 5953618 129 360 -90 151
PA048 766433 5953739 229200 5953603 129 360 -90 133
PA049 766537 5953741 229303 5953611 128 360 -90 121
PA050 766640 5953731 229407 5953608 128 360 -90 118
PA051 766834 5953739 229600 5953628 128 360 -90 151
PA052 767134 5953727 229900 5953634 128 360 -90 124
PA053 765650 5982101 226656 5981862 104 360 -90 72
PA054 765750 5982098 226756 5981866 104 360 -90 72
PA055 765853 5982100 226858 5981874 104 360 -90 74
PA056 765936 5982099 226941 5981878 104 360 -90 111
PA057 766050 5982093 227055 5981879 103 360 -90 60
PA058 766149 5982091 227154 5981883 103 360 -90 60
PA059 766234 5982088 227239 5981886 104 360 -90 54.5
PA060 766363 5982087 227368 5981893 105 360 -90 102
PA061 766197 5962890 228394 5962722 120 360 -90 84
PA062 766586 5962873 228784 5962729 120 360 -90 66
PA063 766804 5962866 229002 5962735 120 360 -90 78
PA064 766999 5962857 229197 5962739 120 360 -90 66
PA065 767204 5962851 229402 5962745 120 360 -90 85
PA066 767604 5962837 229802 5962756 120 360 -90 127
PA067 766406 5962949 228599 5962794 120 360 -90 66
PA068 767404 5962846 229602 5962753 120 360 -90 103
PA069 768201 5962857 230396 5962813 120 360 -90 175
PA070 767770 5962883 229965 5962812 120 360 -90 151
PA071 769200 5962830 229298 5962744 120 360 -90 163
PA072 767100 5962856 229298 5962744 120 360 -90 115
PA073 762269 5964327 224384 5963912 117 360 -90 103
PA074 762663 5964060 224794 5963670 117 360 -90 100
PA075 762951 5963844 225095 5963472 119 360 -90 114
PA076 763233 5963537 225395 5963183 119 360 -90 110
PA077 763510 5963225 225691 5962889 119 360 -90 86
PA078 763795 5962901 225996 5962583 119 360 -90 76
PA079 764079 5962597 226298 5962297 119 360 -90 113
PA080 764369 5962439 226598 5962158 119 360 -90 73
PA081 764767 5962371 226999 5962115 119 360 -90 107
PA082 765163 5962301 227399 5962070 119 360 -90 100
PA083 765559 5962234 227798 5962027 119 360 -90 112

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

18

Hole ID MGA East
z54 (mE)
MGA North
z54 (mN)
MGA East
z55 (mE)
MGA North
z55 (mN)
RL (m) Azimuth
UTM(°)
Dip (°) Depth (m)
PA084 765950 5985350 226754 5985124 104 360 -90 73
PA085 766050 5985348 226854 5985128 104 360 -90 76
PA086 766150 5985343 226954 5985130 104 360 -90 75
PA087 766250 5985341 227054 5985134 104 360 -90 70
PA088 766350 5985336 227154 5985135 104 360 -90 54
PA089 766450 5985334 227254 5985139 104 360 -90 82
PA090 766670 5985328 227474 5985147 104 360 -90 98
PA091 766850 5985324 227654 5985154 104 360 -90 103
PA092 767100 5985325 227903 5985170 104 360 -90 90
PA093 767250 5985321 228053 5985175 104 360 -90 116
PA094 767450 5985314 228253 5985181 104 360 -90 138
PA095 767649 5985308 228452 5985187 104 360 -90 105
PA096 767751 5985304 228554 5985190 102 360 -90 122
PA097 768349 5985285 229152 5985208 102 360 -90 131
PA098 768044 5985294 228847 5985198 102 360 -90 105
PA099 771900 5988454 232500 5988590 96 360 -90 132
PA100 771642 5992115 232017 5992228 95 360 -90 103
PA101 765399 5958776 227854 5958566 122 70.5 -60 27
PA102 765505 5958758 227961 5958554 122 70.5 -60 78
PA103 765603 5958742 228159 5958551 122 70.5 -60 75
PA104 765703 5958727 228160 5958536 123 70.5 -60 75
PA105 765797 5958710 228255 5958525 123 70.5 -60 78
PA106 765901 5958688 228360 5958509 123 70.5 -60 90
PA107 766003 5958670 228463 5958498 123 70.5 -60 75
PA108 766095 5958655 228556 5958488 123 70.5 -60 72
PA109 766209 5958647 228670 5958487 123 70.5 -60 96
PA110 766324 5958621 228787 5958469 123 70.5 -60 111
PA111 766418 5958602 228882 5958456 124 70.5 -60 100
PA112 766505 5958586 228969 5958445 124 70.5 -60 118
PA113 766605 5958573 229070 5958438 124 70.5 -60 74
PA114 766709 5958551 229175 5958423 124 70.5 -60 100
PA115 766805 5958538 229272 5958416 124 70.5 -60 72
PA116 766898 5958522 229366 5958406 125 70.5 -60 120
PA117 765098 5958794 227552 5958565 123 70.5 -60 108
PA118 765202 5958779 227657 5958556 123 70.5 -60 96
PA119 765302 5958762 227758 5958546 123 70.5 -60 60
PA120 764342 5955205 227021 5954936 137 70.5 -60 98
PA121 764516 5955167 227197 5954909 133 70.5 -60 94
PA122 764621 5955149 227303 5954897 132 70.5 -60 114
PA123 764818 5955109 227502 5954870 130 70.5 -60 77
PA124 764884 5955094 227569 5954859 130 70.5 -60 72
PA125 765111 5955056 227798 5954835 129 70.5 -60 90

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

19

Hole ID MGA East
z54 (mE)
MGA North
z54 (mN)
MGA East
z55 (mE)
MGA North
z55 (mN)
RL (m) Azimuth
UTM(°)
Dip (°) Depth (m)
PA126 765315 5955023 228004 5954815 130 70.5 -60 96
PA127 765513 5954987 228203 5954791 133 70.5 -60 72
PA128 780391 5951002 243300 5951741 129 360 -90 97
PA129 781865 5950974 244773 5951805 131 360 -90 114
PA130 781691 5950967 244600 5951787 131 360 -90 84
PA131 781483 5950975 244391 5951782 131 360 -90 102
PA132 781291 5950977 244200 5951773 131 360 -90 90
PA133 781091 5950987 244000 5951770 130 360 -90 96
PA134 780885 5950991 243799 5951763 129 360 -90 96
PA135 780690 5950998 243599 5951756 129 360 -90 117
PA136 780491 5951002 243400 5951748 129 360 -90 100
PA137 780591 5950996 243500 5951748 129 360 -90 114
PA138 780774 5951036 243680 5951799 129 360 -90 96
PA139 780991 5950985 243900 5951762 129 360 -90 73
PA140 781192 5950982 244101 5951771 129 360 -90 108
PA141 781391 5950977 244300 5951779 129 360 -90 108
PA142 781592 5950970 244501 5951784 129 360 -90 96
PA143 781792 5950972 244700 5951799 129 360 -90 96
PA144 780313 5954910 242979 5955636 129 90 -60 113
PA145 780234 5954912 242900 5955633 129 90 -60 138
PA146 780139 5954918 242805 5955633 129 90 -60 123
PA147 780958 5954955 243620 5955721 129 90 -60 150
PA148 780841 5954959 243503 5955718 129 90 -60 73
PA149 780738 5954962 243400 5955715 129 90 -60 132
PA150 780637 5954965 243299 5955711 129 90 -60 113
PA151 780540 5954966 243202 5955706 129 90 -60 98
PA152 780438 5954970 243100 5955704 129 90 -60 114
PA153 781131 5954947 243793 5955724 129 90 -60 120
PA154 781032 5954950 243694 5955721 129 90 -60 132
PA155 780185 5954917 242851 5955635 129 90 -60 123
PA156 782179 5954929 244840 5955771 129 90 -60 114
PA157 782089 5954926 244750 5955763 129 90 -60 132
PA158 781991 5954959 244650 5955790 129 90 -60 108
PA159 781890 5954956 244550 5955780 129 90 -60 114
PA160 781801 5954950 244461 5955769 129 90 -60 145
PA161 781691 5954948 244351 5955760 129 90 -60 124
PA162 781590 5954974 244249 5955780 129 90 -60 113
PA163 781493 5954971 244152 5955771 129 90 -60 108
PA164 781389 5954951 244050 5955744 129 90 -60 123
PA165 781291 5954949 243952 5955736 129 90 -60 105
PA166 780273 5954912 242939 5955636 129 90 -60 108
PA167 779797 5968792 241600 5969457 129 360 -90 137

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

20

Hole ID MGA East
z54 (mE)
MGA North
z54 (mN)
MGA East
z55 (mE)
MGA North
z55 (mN)
RL (m) Azimuth
UTM(°)
Dip (°) Depth (m)
PA168 765991 5992216 226370 5991980 129 90 -60 126
PA169 766100 5992218 226479 5991988 129 90 -60 112
PA170 766203 5992213 226582 5991988 129 90 -60 102
PA171 766299 5992208 226678 5991990 129 90 -60 102
PA172 766403 5992253 226777 5992041 129 360 -90 97
PA173 766507 5992252 226883 5992045 129 360 -90 90
PA174 766689 5992194 227068 5992001 129 360 -90 132
PA175 766898 5992166 227278 5991986 129 360 -90 112
PA176 767005 5992172 227378 5992000 129 360 -90 132
PA177 767100 5992183 227479 5992015 129 360 -90 108
PA178 767199 5992180 227578 5992018 129 360 -90 96
PA179 766597 5992201 226976 5992002 129 360 -90 107
PA180 767698 5992152 228078 5992020 129 360 -90 83
PA181 765775 5982104 226782 5981873 104 90 -60 105
PA182 772085 5938297 235804 5938544 150 90 -60 139

==> picture [595 x 17] intentionally omitted <==

Chalice Gold Mines Limited ABN 47 116 648 956 ASX : CHN | TSX : CXN

21