Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CHALICE MINING LIMITED Capital/Financing Update 2018

Mar 5, 2018

64649_rns_2018-03-05_9ab7764a-ea0a-4a22-983d-b1499afaf7aa.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement 6 March 2018

Significant new gold intersections at East Cadillac Project, Quebec confirm mineralisation over ~3.5km

Large number of assays still awaited from drilling of high-potential targets

Highlights

  • Significant gold mineralisation intersected at the East Cadillac Gold Project, Quebec, with significant new assays including:

  • 11.6m at 3.32g/t Au from 235.9m down-hole including 1.6m at 18.52 g/t Au from 244.0m (hole ECG-18-21) at Simon West prospect; and

  • 6.5m at 1.77 g/t Au from 157m down-hole (ECG-18-24) at North Contact prospect.

  • Drilling to date has confirmed gold mineralisation along ~3.5km of strike of the Larder Lake – Cadillac Fault in the Simon West area – an extremely encouraging result.

  • An additional drill hole is planned to test the steep westerly plunge of the high-grade mineralisation intersected in ECG-18-21.

  • Significant progress made towards completion of the ~29,000m diamond drill program during the winter field season, with drilling continuing to test a number of high-potential targets.

  • Only ~40% of the 29,000m program assayed so far.

Chalice Gold Mines Limited (“Chalice” or “the Company”) (ASX: CHN) (TSX: CXN) is pleased to advise that it is making excellent progress with the expanded exploration program at its East Cadillac Gold Project, located in the Abitibi gold province in Quebec, Canada, with the receipt of a number of encouraging new assay results confirming and further expanding the potential of the project.

As announced on 16 January 2018, Chalice has increased its planned drilling program at East Cadillac to a planned 29,000m, representing an increase of 21,000m. Drilling activity has increased with four diamond rigs now operating.

Drilling Overview

The current diamond drill program was designed to follow-up on potential extensions to the mineralisation previously intersected at Nordeau and Simon West and to complete an initial assessment of prioritised targets identified from both surface geochemistry and 3D Induced Polarisation surveys undertaken in 2017 (see Figure 1).

The latest assay results have confirmed the presence of significant gold mineralisation at Simon West (ECG-18-21) and the continuation of multiple mineralised zones up to 10m in width (ECG-18-16 and 37) over a strike length of ~3.5km to the west of the Chimo Mine boundary. The mineralisation is typical of the Abitibi region and is seen elsewhere along the Larder Lake – Cadillac Fault structure.

Chalice is also encouraged by results received from drilling on the Northern Contact, located ~1km north and parallel to the Larder Lake – Cadillac Fault, where drill hole ECG-18-24 intersected 6.5m at 1.77 g/t Au from 157m . This result warrants further testing of the Northern Contact (Figure 1).

The area west of the Chimo Mine boundary is subject to an option and earn-in agreement with Monarques Gold Corp. (TSX-V: MQR), where Chalice may earn a 70% interest by spending C$3.1 million and paying option payments totalling

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 1

==> picture [63 x 52] intentionally omitted <==

C$200,000. Chalice is expected to meet its expenditure commitments under this agreement in March 2018. Drilling along the northern contact is subject to the Monarques agreement and also an option and earn-in agreement with Globex Mining Enterprises Inc. (TSX: GMX), where Chalice can earn a 100% interest by spending C$2.5 million and making option payments of C$590,000 (Globex will retain a 3% Gross Metal Royalty).

==> picture [468 x 266] intentionally omitted <==

Figure 1. East Cadillac Gold Project showing progress of diamond drilling (drill-hole numbers prefixed by ECG-18)

The latest significant intercepts are listed below in Table 1 (full listing of intersections can be found in Appendix 1). Assays are continuing to be received from the laboratory, with only ~40% of the planned 29,000m program assayed to date.

Table 1. East Cadillac Gold Project latest significant diamond drilling intercepts.

Prospect Hole From To Interval (m) Grade (g/t)
2km west of Simon West ECG_18_016 38.0 43.8 5.8 1.62
ECG_18_016 incl. 1.0 3.72
ECG_18_016 251.0 261.8 10.8 0.99
ECG_18_016 incl. 1.3 3.11
Simon West ECG_18_018 538.5 544.5 6.0 1.55
ECG_18_018 incl. 2.0 3.18
ECG_18_018 441.0 442.0 1.0 9.00
ECG_18_020 368.5 369.4 0.9 3.44
ECG_18_020 564.3 566.5 2.2 1.47
ECG_18_021 235.9 247.7 11.6 3.32
ECG_18_021 incl. 1.6 18.52
2km west of Simon West ECG_18_037 125.8 138.8 13.0 0.58
ECG_18_037 incl. 7.0 0.74
ECG_18_037 incl. 1.0 1.17
ECG_18_037 153.8 156.5 2.7 1.28
ECG_18_037 incl. 0.7 3.00
ECG_18_037 214.6 220.0 5.4 0.77
ECG_18_037 incl. 1.4 2.44

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 2

==> picture [63 x 52] intentionally omitted <==

Prospect Hole From To Interval (m) Grade (g/t)
Northern Contact ECG_18_024 157.0 163.5 6.5 1.77
ECG_18_024 incl. 3.5 2.10

Simon West Target

At Simon West, drill hole ECG-18-21, which was designed to test the westward extension of the historical deposit, returned a best intercept of 11.6m at 3.32 g/t Au from 235.9m including a higher-grade interval of 1.6m at 18.52 g/t Au from 244.0m (true widths are estimated at 70% of quoted down-hole widths). Assays from the down-dip extension of this zone are pending from drill hole ECG-18-20.

Mineralisation is hosted in sheared and altered mafic volcanic rocks altered to a quartz-biotite+ sericite schist. Visible gold was observed in the interval and the gold is associated with trace to 15% by volume arsenopyrite. Three significantly mineralised zones were intersected in the hole (Figure 2), typical of the multiple parallel mineralised horizons seen at many of the deposits along the Larder Lake – Cadillac Fault.

==> picture [487 x 322] intentionally omitted <==

Figure 2. Simon West cross-section at drill holes ECG-18-20 and ECG-18-21.

The high-grade mineralisation encountered in ECG-18-21 is interpreted to plunge steeply to the west, as seen at the Chimo Mine (Figure 3).

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 3

==> picture [63 x 52] intentionally omitted <==

==> picture [505 x 329] intentionally omitted <==

  • Figure 3. Long section through Chimo Mine – Simon West – Far Simon West, showing steep westerly plunge of mineralisation at the Chimo Gold Mine (owned by Cartier Resources Inc.).

The structures hosting the mineralisation at Simon West and the Chimo Mine have been intersected a further 2km west of Simon West, extending the known mineralisation over ~3.5km of strike, comprised of a number of zones – which is considered to be an extremely encouraging result as it suggests a large scale plumbing system. An additional drill hole is planned to test the steep westerly plunge of high-grade mineralisation intersected in ECG-18-21.

At Far Simon West, drill hole ECG-19-16 intersected two mineralised zones with the deeper zone returning a down-hole intercept of 10.8m at 0.99 g/t Au (Figure 4) and will be followed up with additional drilling.

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 4

==> picture [63 x 52] intentionally omitted <==

==> picture [493 x 328] intentionally omitted <==

Figure 4. Far Simon West cross section – drill hole ECG-18-16.

Northern Contact Target

Chalice is encouraged by the discovery of a new mineralised structure referred to as the Northern Contact, located approximately 1km north and running parallel to the Larder Lake – Cadillac Fault.

Drill-hole ECG18-24 at the Northern Contact, which was designed to test a coincident soil and IP chargeability anomaly, intersected a mineralised structure positioned at the mafic volcanic and sediment contact (Figure 5). This is newly identified mineralised horizon within the project area which requires significant further work.

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 5

==> picture [63 x 52] intentionally omitted <==

==> picture [510 x 343] intentionally omitted <==

Figure 5. Northern Contact cross section – drill hole ECG-18-24

Commenting on the results, Chalice’s Managing Director, Mr Tim Goyder, said: “The intersections at the Simon West and Northern Contact Targets are very encouraging and clearly show that we have identified a potentially large mineralised system at East Cadillac with significant potential notwithstanding we only have results for approximately 40% of the 29,000m program to date.

“Given that it is just 18 months since we first secured an initial interest in the East Cadillac Gold Project, we have made excellent progress and believe that we are now beginning to understand where the focus of the project lies from an exploration perspective. We are looking forward to completing the current 29,000m program and to receiving the remaining assay results.”

==> picture [93 x 48] intentionally omitted <==

TIM GOYDER Managing Director Chalice Gold Mines Limited

For further information, please contact:

Nicholas Read, Principal and Managing Director Read Corporate Investor Relations +61 8 9388 1474

Alex Dorsch, General Manager Corporate Development Chalice Gold Mines Limited +61 8 9322 3960 [email protected]

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 6

==> picture [63 x 52] intentionally omitted <==

About the East Cadillac Gold Project, Quebec, Canada

The East Cadillac Gold Project (“ECG Project”) covers an area of 145km[2] and is located 35km east of the 20Moz Val-d’Or gold camp. With land holdings encompassing a strike length of 16km of the Larder Lake-Cadillac Fault – the most prolifically endowed gold trend in the southern Abitibi – the project is situated amongst some of the region’s most significant mines, and is adjacent to the historical Chimo gold mine (owned by Cartier Resources (TSX: ECR)).

Competent Persons and Qualifying Persons

The information in this report that relates to Exploration Results in relation to the East Cadillac Gold Project is based on information compiled by Dr Kevin Frost BSc (Hons), PhD, who is a Member of the Australian Institute of Geoscientists. Dr Frost is a full-time employee of the company and has sufficient experience in the field of activity being reported to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves, and is a Qualified Person under National Instrument 43-101 – ‘Standards of Disclosure for Mineral Projects’. The Qualified Person has verified the data disclosed in this release, including sampling, analytical and test data underlying the information contained in this release. Dr Frost consents to the release of information in the form and context in which it appears here.

Forward Looking Statements

This document may contain forward-looking information within the meaning of Canadian securities legislation and forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, forward-looking statements). These forward-looking statements are made as of the date of this document and Chalice Gold Mines Limited (the Company) does not intend, and does not assume any obligation, to update these forward-looking statements.

Forward-looking statements relate to future events or future performance and reflect Company management’s expectations or beliefs regarding future events and include, but are not limited to, the estimation of mineral reserve and mineral resources at the East Cadillac Gold Project, the realisation of mineral reserve estimates; the likelihood of exploration success including results of future geophysical surveys, drilling at the East Cadillac Gold Project; the timing and costs of future exploration activities on the Company’s exploration projects; the potential to define future mineral resources and, if successful at any of the Company’s exploration projects, the potential viability of any mineral resource so defined; planned expenditures and budgets and the execution thereof; the timing and availability of drill results; potential sites for additional drilling, that general business and economic conditions will not change in a materially adverse manner; the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage.

In certain cases, forward-looking statements can be identified by the use of words such as plans, planning, expects or does not expect, is expected, will, may, would, potential, budget, scheduled, estimates, forecasts, intends, anticipates or does not anticipate, or believes, occur, or be achieved, or variations of such words and phrases or statements that certain actions, events or results may, could, would, might or will be taken, occur or be achieved or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors may include, among others, risks related to actual results of current exploration activities; changes in exploration programs based upon results of exploration; future prices of mineral resources; possible variations in mineral resources or ore reserves, grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; as well as those factors detailed from time to time in the Company’s interim and annual financial statements, all of which are filed and available for review on SEDAR at sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forwardlooking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 7

==> picture [63 x 52] intentionally omitted <==

APPENDIX 1 – Drill Hole Intercepts

Hole Easting Northing Azi RL Dip From To Interval (m) Grade (g/t)
ECG_17_005 333080 5319992 188.6 354.0 -83.5 66.6 69.6 3.0 0.47
ECG_17_005 333080 5319992 188.6 354.0 -83.5 261.0 265.0 4.0 0.59
ECG_17_005 333080 5319992 188.6 354.0 -83.5 594.3 619.8 25.5 1.08
ECG_17_005 333080 5319992 188.6 354.0 -83.5 incl. 12.9 1.52
ECG_17_005 333080 5319992 188.6 354.0 -83.5 incl. 3.1 4.74
ECG_17_006A 333118 5320149 188.2 363.0 -77.0 488.0 503.3 15.3 0.60
ECG_17_006A 333118 5320149 188.2 363.0 -77.0 497.3 503.3 6.0 1.12
ECG_17_006A 333118 5320149 188.2 363.0 -77.0 501.3 503.3 2.0 2.68
ECG_17_006A 333118 5320149 188.2 363.0 -77.0 812.8 823.0 10.2 2.78
ECG_17_006A 333118 5320149 188.2 363.0 -77.0 incl. 2.5 9.72
ECG_17_006A 333118 5320149 188.2 363.0 -77.0 841.2 844.2 3.0 2.21
ECG_17_007W1 332983 5319997 188.0 355.0 -80.0 77.4 79.4 2.0 1.19
ECG_17_007W1 332983 5319997 188.0 355.0 -80.0 243.1 246.1 3.0 0.70
ECG_17_007W1 332983 5319997 188.0 355.0 -80.0 292.0 293.0 1.0 4.83
ECG_17_007W1 332983 5319997 188.0 355.0 -80.0 480.8 493.1 12.3 0.49
ECG_17_007W1 332983 5319997 188.0 355.0 -80.0 incl. 3.0 0.98
ECG_17_007W1 332983 5319997 188.0 355.0 -80.0 491.2 493.1 1.9 1.24
ECG_17_007W1 332983 5319997 188.0 355.0 -80.0 600.4 603.5 3.1 0.58
ECG_17_007W1 332983 5319997 188.0 355.0 -80.0 607.3 608.3 1.0 3.08
ECG_17_007W1 332983 5319997 188.0 355.0 -80.0 625.4 627.9 2.5 1.69
ECG_17_007W1 332983 5319997 188.0 355.0 -80.0 681.4 683.2 1.8 1.40
ECG_17_007W1 332983 5319997 188.0 355.0 -80.0 690.7 691.4 0.7 7.84
ECG_17_008 333021 5320173 188.0 364.0 -78.0 903.7 910.7 7.0 0.67
ECG_17_008 333021 5320173 188.0 364.0 -78.0 incl. 1.7 1.95
ECG_17_009 333075 5319994 181.0 354.0 -69.0 134.5 136.0 1.5 4.49
ECG_17_009 333075 5319994 181.0 354.0 -69.0 521.4 541.4 20.0 0.93
ECG_17_009 333075 5319994 181.0 354.0 -69.0 incl. 4.8 2.04
ECG_17_009 333075 5319994 181.0 354.0 -69.0 593.3 594.1 0.8 25.80
ECG_18_015 328604 5320317 195.1 338.0 -55.0 51.7 53.6 2.0 0.59
ECG_18_016 328661 5320540 195.2 339.0 -55.0 38.0 43.8 5.8 1.62
ECG_18_016 328661 5320540 195.2 339.0 -55.0 incl. 1.0 3.72
ECG_18_016 328661 5320540 195.2 339.0 -55.0 110.9 113.4 2.5 0.46
ECG_18_016 328661 5320540 195.2 339.0 -55.0 116.7 120.4 3.6 0.49
ECG_18_016 328661 5320540 195.2 339.0 -55.0 125.3 127.8 2.5 0.28
ECG_18_016 328661 5320540 195.2 339.0 -55.0 208.0 210.5 2.5 0.20
ECG_18_016 328661 5320540 195.2 339.0 -55.0 251.0 261.8 10.8 0.99
ECG_18_016 328661 5320540 195.2 339.0 -55.0 incl. 1.3 3.11
ECG_18_018 330817 5320678 180.4 334.0 -60.0 90.0 96.0 6.0 0.18
ECG_18_018 330817 5320678 180.4 334.0 -60.0 105.3 106.7 1.4 0.82
ECG_18_018 330817 5320678 180.4 334.0 -60.0 134.8 138.0 3.2 0.43
ECG_18_018 330817 5320678 180.4 334.0 -60.0 195.0 197.0 2.0 0.30

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 8

==> picture [63 x 52] intentionally omitted <==

Hole Easting Northing Azi RL Dip From To Interval (m) Grade (g/t)
ECG_18_018 330817 5320678 180.4 334.0 -60.0 264.7 267.0 2.3 0.21
ECG_18_018 330817 5320678 180.4 334.0 -60.0 330.0 332.2 2.2 0.68
ECG_18_018 330817 5320678 180.4 334.0 -60.0 346.9 350.0 3.1 0.45
ECG_18_018 330817 5320678 180.4 334.0 -60.0 372.9 373.5 0.6 1.15
ECG_18_018 330817 5320678 180.4 334.0 -60.0 538.5 544.5 6.0 1.55
ECG_18_018 330817 5320678 180.4 334.0 -60.0 incl. 2.0 3.18
ECG_18_018 330817 5320678 334.0 180.4 -60.0 435.4 439.0 3.6 0.31
ECG_18_018 330817 5320678 334.0 180.4 -60.0 441.0 442.0 1.0 9.00
ECG_18_019 330620 5320542 179.9 334.0 -60.0 332.7 333.3 0.6 1.14
ECG_18_019 330620 5320542 179.9 334.0 -60.0 444.0 446.1 2.1 0.72
ECG_18_020 330729 5320634 181.5 334.0 -64.6 143.6 144.6 1.0 0.38
ECG_18_020 330729 5320634 181.5 334.0 -64.6 156.5 167.0 10.5 0.21
ECG_18_020 330729 5320634 181.5 334.0 -64.6 175.9 177.0 1.1 0.84
ECG_18_020 330729 5320634 181.5 334.0 -64.6 293.0 295.2 2.2 0.42
ECG_18_020 330729 5320634 181.5 334.0 -64.6 368.5 369.4 0.9 3.44
ECG_18_020 330729 5320634 181.5 334.0 -64.6 564.3 566.5 2.2 1.47
ECG_18_021 330729 5320457 180.4 335.0 -65.0 235.9 247.7 11.6 3.32
ECG_18_021 330729 5320457 180.4 335.0 -65.0 incl. 1.6 18.52
ECG_18_021 330729 5320457 180.4 335.0 -65.0 312.5 314.1 1.6 0.91
ECG_18_021 330729 5320457 180.4 335.0 -65.0 387.0 389.6 2.6 0.93
ECG_18_024 335191 5320211 190.0 373.0 -55.0 157.0 163.5 6.5 1.77
ECG_18_024 335191 5320211 190.0 373.0 -55.0 incl. 3.5 2.10
ECG_18_025 335157 5320035 190.0 364.0 -55.0 46.2 50.4 4.2 0.14
ECG_18_025 335157 5320035 190.0 364.0 -55.0 67.0 69.6 2.6 0.26
ECG_18_029 334063 5319792 190.4 350.0 -55.0 236.2 237.2 1.0 1.49
ECG_18_030 333397 5319474 190.7 347.0 -55.0 37.6 39.1 1.5 1.43
ECG_18_033 330134 5320602 190.0 334.0 -55.0 115.0 122.1 7.1 0.18
ECG_18_033 330134 5320602 190.0 334.0 -55.0 297.2 298.3 1.1 0.91
ECG_18_034 330182 5320776 190.0 333.0 -55.0 47.0 57.8 10.8 0.18
ECG_18_034 330182 5320776 190.0 333.0 -55.0 61.0 69.5 8.6 0.25
ECG_18_034 330182 5320776 190.0 333.0 -55.0 incl. 1.0 1.09
ECG_18_035 330327 5320934 332.0 191.0 -55.0 289.0 290.0 1.0 0.90
ECG_18_035 330327 5320934 332.0 191.0 -55.0 299.9 301.0 1.1 0.84
ECG_18_037 328903 5321381 195.0 335.0 -55.0 125.8 138.8 13.0 0.58
ECG_18_037 328903 5321381 195.0 335.0 -55.0 incl. 7.0 0.74
ECG_18_037 328903 5321381 195.0 335.0 -55.0 incl. 1.0 1.17
ECG_18_037 328903 5321381 195.0 335.0 -55.0 142.8 147.8 5.0 0.16
ECG_18_037 328903 5321381 195.0 335.0 -55.0 153.8 156.5 2.7 1.28
ECG_18_037 328903 5321381 195.0 335.0 -55.0 incl. 0.7 3.00
ECG_18_037 328903 5321381 195.0 335.0 -55.0 214.6 220.0 5.4 0.77
ECG_18_037 328903 5321381 195.0 335.0 -55.0 incl. 1.4 2.44
ECG_18_038 328850 5321175 195.0 337.0 -55.0 119.0 122.0 3.0 0.63
ECG_18_038 328850 5321175 195.0 337.0 -55.0 incl. 1.0 1.20
ECG_18_038 328850 5321175 195.0 337.0 -55.0 193.1 195.8 2.7 0.19

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 9

==> picture [63 x 52] intentionally omitted <==

Hole Easting Northing Azi RL Dip From To Interval (m) Grade (g/t)
ECG_18_038 328850 5321175 195.0 337.0 -55.0 215.8 216.8 1.0 0.60
ECG_18_038 328850 5321175 195.0 337.0 -55.0 257.5 258.3 0.9 0.54

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 10

==> picture [63 x 52] intentionally omitted <==

APPENDIX 2 – EAST CADILLAC GOLD - JORC TABLE 1 Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling. Include reference to
measures taken to ensure sample representivity and
the appropriate calibration of any measurement
tools or systems used.
Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used
Aspects of the determination of mineralisation that
are Material to the Public Report. In cases where
‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be
required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities
or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Rock core samples collected using a diamond
drill. Core is cut in half using a saw and the
half core is sent to the lab for analysis, with
one half of the core retained in the core box.
For every 20 samples sent to the lab, there is
one standard, one duplicate, and one blank
sample included within those 20. Duplicate
samples are core that has been cut in half,
and then the half core cut in half once again,
so that each duplicate represents one quarter
of the core.
NQ diamond drilling was completed to obtain
core which was cut and sent to ALS Chemex
laboratories for analysis. Gold is analysed
using ALS Chemex’s Au-AA23 method, which
is the analysis of a 30g crushed and
homogenized sample using fire assay and
atomic absorption. Any sample which
registers a value of greater than 10 ppm Au is
run again using the Au-GRA21, which analysis
a 30g crushed and homogenized sample using
fire assay with a gravimetric finish.
Drilling techniques Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
NQ diamond drilling, oriented using the Reflex
Act III tool, and downhole surveys were
collected using both the Reflex EZ-trac and EZ-
gyro tools, depending on the hole. Some holes
have been independently surveyed using a
gyro by an independent contract surveyor.
Drill sample recovery Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Core recovery lengths are measured and
collected for each core run.
Core samples are cut in half using a core saw,
and half of the core is kept in the core box and
stored in a locked and secure storage area in
Val d’Or, QC
There was no significant loss of core during the
drill program. QAQC methods were used to
ensure that there was no lab bias or sample
contamination (QAQC methods and results
included in report)
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
Core was logged with respect to lithology,
alteration, deformation, texture, and
mineralization. Magnetic susceptibility
readings were collected systematically on the
core. All samples collected were also analysed
for pathfinder geochemistry. All of this
information combined will be used in the
interpretation of the geology of the holes.
Logging is a combination of qualitative and
quantitative observation. Wet and dry photos
of all the core were collected
100% of the core was logged.

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 11

==> picture [63 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Sawn core, half-core sent to lab (except in
case of duplicate sampling, where one half of
the core is cut again, with the two quarter-
core samples being sent to the lab)
Samples were prepped using ALS Chemex
PREP-31, “Crush to 70% less than 2mm, riffle
split off 250g, pulverize split to better than
85% passing 75 microns”
Within every subset of 20 samples, there is
one blank, one standard (randomized
selection of OREAS standards) and one
duplicate.
Scrutinizing the QAQC results to ensure that
there is no sample smear or unexplainable
results/anomalies.
Sample sizes are considered appropriate.
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) and precision have been established
Laboratory procedures and assay data have
been carefully selected based on appropriate
techniques for the type of analysis required.
A Terraspec Halo instrument is used to collect
short wave infrared data at approximately 3m
intervals on all core.
Within every subset of 20 samples, there is
one blank, one standard (randomized
selection of OREAS standards) and one
duplicate.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay data.
Not applicable.
Not applicable.
All logging was completed using Geotic logging
software. Completed logs are then exported
and brought into a MS Access database which
is backed up and stored on a server. All hard
copy assay certificates are kept in the
Winnipeg office.
None applied
Location of data
points
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic control.
Drill collar locations were collected using a
handheld GPS unit, which has an accuracy of
roughly +/- 5m.
The grid system used is UTM NAD83 Zone 18
datum
Topographic control is based on a property
scale LiDAR survey

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 12

==> picture [63 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has been applied.
Rock chip and whole rock samples collected
from available outcrops which occur
sporadically in the areas traversed.
Soil samples collected on a 400m x 400m grid
with infill to 200m x 200mNot applicable
Not applicable
Composited assay values are composited
using a simple weighted average method
based on grade and sample length
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Drilling was oriented to achieve as close as
possible to orthogonal intersection of
mineralized zones, and this was achieved with
a relatively high degree of confidence.
The drilling orientation did not introduce any
sampling bias.
Sample security The measures taken to ensure sample security. Samples are delivered directly to the
laboratory by a company representative and
are double bagged with a security tag
attached, and a bag list which is verified by
the lab when processed.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
None completed

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park
and environmental settings.
The East Cadillac Gold Project comprises
agreements with Globex Enterprises Inc,
Monarques
Gold
Corp
and
Khalkos
Exploration Inc, and claims held by Chalice
Gold
Mines
(Quebec)
Inc.
located
approximately 35-40km east of Val-d’Or,
Quebec, Canada.
Chalice Gold Mines (Quebec) Inc has entered
into a binding option and farm-in term sheet
to acquire Globex’s interest in the Nordeau
Gold Project through total option payments of
C$590,000
and
incurring
exploration
expenditures of C$2,500,000 over 4 years.
Chalice shall grant a 3% gross metal royalty to
Globex upon exercising the option.
Claims owned 100% by Globex Enterprises Inc
include title nos. 2437791-2437811; 2437912-
2437915; 2437862-2437873. Claims owned
60% Globex Enterprises Inc - 40% Bateman
Inc. include title nos. 2438798-2438811;
2438935-2438937. The Globex Option
comprises a total 54 claims for 1,499.89Ha.
Chalice Gold Mines (Quebec) Inc has entered
into a binding option and farm-in term sheet
to acquire a 70% interest in Monarques Gold
Corp. Chimo Gold Project through total option
payments
of
C$200,000
and
incurring

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 13

==> picture [63 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
exploration expenditures of C$3,100,000 over
4 years. Chalice shall grant a 1% net smelter
royalty to Monarques upon exercising the
option. A 2% net smelter royalty is held by
third parties (Paul Boyd and Patsy Currie Mills)
on 748Ha of claims held by Monarques.
Claims owned 100% by Monarques include
title nos. 2385084, 2438140-2438211 for a
total of 73 claims for 2,899.81.4Ha.
Chalice Gold Mines (Quebec) Inc has entered
into a binding option and farm-in term sheet
to acquire a 70% interest in the Project by
making total option payments of C$375,000
to
Khalkos
and
funding
exploration
expenditures of C$1.75 million over a period
of
five
years.
Upon
meeting
these
requirements and exercising the option,
Chalice shall then grant a 1% Net Smelter
Royalty (NSR) to Khalkos on the claims on the
basis that all royalties (including pre-existing
royalties) do not exceed 3%. Chalice maintains
a pre-emptive right over the Khalkos royalty.
The Project comprises a total 27 claims for
12.4 km² and includes title Nos.2437916-
2437942.
Claims owned 100% by Chalice Gold Mines
(Quebec) Inc. include title no’s 2434329,
243469-243471,2438058-2438067,2438103-
2438104,
2438130-2438133,2445500-
2445501,
2456677-2456680,
2456713-
2456714,2457365-2457366,
2457890-
2457892,2458268-2458272,
2466091-
2466092,2461488-2461495,2468029-
2468043,2470586,
2471188-
2471200,2472374-2472375,2481223-
2481300,2491522,
2491126,2491239-
2491250, for a total of 170 claims for
8,719.14Ha.
All tenements are in good standing and there
are no known impediments to operating in
the area.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by
other parties.
Exploration commenced in the 1940’s and
numerous companies have carried out
prospecting, geological mapping, trenching
and outcrop sampling and ground
geophysical surveys and drilling.
Multiple programs of diamond drilling were
completed prior to Chalice Gold securing
options with Globex, Richmont and Khalkos
and pegging new claims over adjoining areas.
Geology Deposit type, geological setting and style of
mineralisation.
Gold deposits on the East Cadillac Gold
project are greenstone-hosted gold deposits
that belong to the orogenic class of gold
deposits.
The East Cadillac Gold project contains a
sequence of volcano-sedimentary rocks that is
known as the Trivio structural domain, a
kilometres-wide deformation corridor
interpreted as the eastern extension of the
larder lake – Cadillac tectonic zone.

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 14

==> picture [63 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
Gold mineralization is categorized into two
types of epigenetic gold occurrences:
i) Gold mineralisation in silicified lodes with
disseminated to semi-massive sulphides
(arsenopyrite, pyrrhotite and pyrite) spatially
related to sedimentary banded iron
formations. Secondary quartz veining is
commonly associated with this type of gold
mineralisation.
ii) Structurally controlled gold mineralisation
in altered and sheared zones with quartz or
quartz carbonate veins parallel to the
schistosity and shear zones (most likely to be
found in volcanic units). Associated
disseminated sulphides include arsenopyrite,
pyrite and minor chalcopyrite; graphitic
horizons are common.
Both types of mineralization occur as free
gold associated with sulphide minerals
ranging from 1% to 5% when in quartz veins
to as much as 20% to 50% when in association
with magnetite iron formations.
Drill hole Information A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all
Material drill holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar

dip and azimuth of the hole

down hole length and interception depth

hole length.
A collar table containing all holes drilled to
date and containing all the requested
information is included in the body of this
document.
Data aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
For composited grade intercepts a simple
average of grade intercept over length was
used.
Not applicable
Not applicable
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to
the drill hole angle is known, its nature should be
reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (eg ‘down hole length, true width not known’).
Drilling was oriented to achieve as close as
possible to orthogonal intersection of
mineralized zones, and this was achieved
with a relatively high degree of confidence.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
Cross sections and plan map included

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 15

==> picture [63 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Balanced reporting Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
Included
Other substantive
exploration data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
All meaningful and material data reported
Further work The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Further drilling along strike and down plunge
of multiple targets

Chalice Gold Mines Limited I ABN 47 116 648 956 I Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 I F: +618 9322 5800 I [email protected] I www.chalicegold.com I Page 16