CHALICE MINING LIMITED Capital/Financing Update 2016

Nov 22, 2016

64649_rns_2016-11-22_bd652563-2da5-4305-be7f-da5246678da2.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ABN 47 116 648 956

ASX Announcement

23 November 2016

Chalice secures second Gold Project in Canada’s world-class Abitibi region

Option agreement sees Chalice consolidate 16km of strike along the highly prospective Larder LakeCadillac fault in Quebec, a trend that hosts several multi-million ounce gold deposits

Highlights:

  • Chalice Gold Limited (ASX: CHN; TSX: CXN) has entered into a binding option and farm-in term sheet with Richmont Mines Inc. (TSX: RIC; NYSE: RIC) to acquire a 70% interest in the Chimo Gold Project (“Project”), located in the highly endowed Abitibi region of Quebec, Canada.

  • Chalice may acquire the interest through total option payments of C$200,000 and incurring exploration expenditures of C$3.1M over four years.

  • Chalice shall grant a 1% Net Smelter Royalty to Richmont on claims with no existing royalty.

  • The Project is located adjacent the Nordeau Gold Project, which Chalice also secured recently under an option agreement, allowing it to consolidate a contiguous ~16km strike length along the Larder Lake-Cadillac fault.

  • The Project is adjacent to the former producing Chimo gold mine and lies at the eastern end of the prolific Archaean Abitibi greenstone belt, ~35km east of the >20Moz Val d’Or gold camp.

Chalice Gold Mines Limited (ASX: CHN, TSX: CXN) (“Chalice” or the “Company”) is pleased to announce that it has taken a further step towards consolidating a significant ground position in the Abitibi gold province in Quebec, Canada after entering into a binding option and farm-in term sheet to acquire a 70% interest in the Chimo Gold Project from Richmont Mines Inc. (“Richmont”).

Chalice can earn a 70% interest in the Project by making total option payments of C$200,000 to Richmont and funding exploration expenditures of C$3.1 million over a period of four years (Table 1). Upon meeting these requirements and exercising the option, Chalice shall then grant a 1% Net Smelter Royalty (“NSR”) to Richmont on claims with no pre-existing royalties. Chalice has the right to withdraw without earning an interest in the Project at any time.

Upon completing all obligations under the term sheet and forming a joint venture, the agreement is subject to usual joint venture dilution terms including reverting to a 1.5% NSR (0.5% NSR on certain claims with pre-existing royalties), with a right to buy back 0.5% of the royalty for C$1.0M, upon either party diluting its Project interest to less than 10%.

The term sheet remains subject to satisfactory due diligence, primarily in relation to matters of tenure.

==> picture [521 x 20] intentionally omitted <==

Chalice Gold Mines Limited, Level 2, 1292 Hay Street, West Perth, Western Australia T: +618 9322 3960 F: +618 9322 5800 E: [email protected] www.chalicegold.com

Table 1. Chimo Gold Project option and farm-in commitments

Timing Option Payments Expenditure Commitment
Upon completion of due diligence C$25,000 -
12 months C$50,000 C$700,000
24 months C$50,000 C$700,000
36 months C$65,000 C$700,000
48 Months - C$1,000,000
At completion C$10,000 -
Total C$200,000 C$3,100,000

The Chimo Gold Project, together with the Company’s recently secured Nordeau Gold Project and adjacent claims owned 100% by Chalice, gives Chalice a significant contiguous land position along the Larder Lake-Cadillac fault, and a strategic foothold in the most prolific gold endowment trend in Canada.

The Abitibi region of Canada is a premier gold district hosting multi-million ounce gold deposits that are preferentially sited on well-defined structural breaks, of which the Larder Lake-Cadillac fault hosts approximately 100Moz of gold in past production and current mineral resources (Figure 1).

==> picture [452 x 348] intentionally omitted <==

Figure 1. Location map of Chimo Gold Project in the Abitibi sub-Province of Canada.

The Chimo Gold Project

The Chimo Gold Project is located 35km east of Val d’Or and comprises approximately 2,593Ha of claims in two main blocks along strike to the east and west of the former Chimo gold mine (Figure 2).

Historical exploration in the area in the 1940s led to the discovery of the Chimo mine, as well as the Nordeau West and Nordeau East deposits (located on the Company’s Nordeau Gold project) to the east of the Chimo Gold Project.

2

Louvem Mines Inc. (“Louvem”) acquired the Chimo claims and completed additional work in the late 1970s and 1980s, resulting in the identification of several gold targets throughout the property. Richmont acquired all of the issued and outstanding shares of Louvem not owned by Richmont Mines in 2010 and completed one surface sampling program in 2013 with recommendations for follow-up drill testing of up to eight separate targets.

Exploration work undertaken to date has highlighted targets to the west of the historical Chimo mine including the Simon West target, which is in a similar geological setting as the historical Chimo Mine and the Nordeau West deposits to the east.

No modern surface geochemistry, geological mapping or structural analysis has been completed in the district for decades. The Company will commence a review of historical exploration results and merge the data with the Company’s Nordeau Gold Project to allow an integrated approach to exploration targeting over the Company’s consolidated land position.

==> picture [452 x 335] intentionally omitted <==

Figure 2. Local geology and tenure of the Chimo Gold Project. Existing tenure shown for the Nordeau Gold project and other claims held 100% by Chalice.

Chalice’s Managing Director Tim Goyder said the agreement with Richmont gave the Company a rare opportunity to consolidate a significant contiguous land-holding in a world-class gold district.

The Abitibi is one of the world’s most prolific and well known gold provinces, host to numerous world-class deposits,” he said. “Chalice has now been able to assemble what amounts to a significant strategic position covering a contiguous 16km strike length of the major regional fault system that controls a majority of the known gold mineralization in this region.

3

“By consolidating the Chimo and Nordeau projects, for the first time in decades, we will be able to apply a coordinated and systematic approach to exploration, bringing the latest techniques and methodologies to what is an under-explored area of the Larder Lake-Cadillac Fault.”

“We look forward to commencing an immediate review of the project in anticipation of defining targets for drill testing as soon as possible.”

==> picture [93 x 47] intentionally omitted <==

TIM GOYDER Managing Director Chalice Gold Mines Limited

For further information, please contact:

Tim Goyder, Managing Director Chalice Gold Mines Limited Telephone +618 9322 3960

Competent Persons and Qualifying Persons Statement

The information in this report that relates to Exploration Results in relation to the Chimo Gold project is based on information compiled by Dr. Kevin Frost BSc (Hons), PhD, who is a Member of the Australian Institute of Geoscientists. Dr. Frost is a full-time employee of the company and has sufficient experience in the field of activity being reported to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves, and is a Qualified Person under National Instrument 43-101 – ‘Standards of Disclosure for Mineral Projects’. The Qualified Person has verified the data disclosed in this release, including sampling, analytical and test data underlying the information contained in this release. Dr. Frost consents to the release of information in the form and context in which it appears here.

Forward Looking Statements

This document may contain forward-looking information within the meaning of Canadian securities legislation and forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, forward-looking statements). These forward-looking statements are made as of the date of this document and Chalice Gold Mines Limited (the Company) does not intend, and does not assume any obligation, to update these forward-looking statements.

Forward-looking statements relate to future events or future performance and reflect Company management’s expectations or beliefs regarding future events and include, but are not limited to, the estimation of mineral reserve and mineral resources, the realisation of mineral reserve estimates, the likelihood of exploration success, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage.

In certain cases, forward-looking statements can be identified by the use of words such as plans, expects or does not expect, is expected, will, may would, budget, scheduled, estimates, forecasts, intends, anticipates or does not anticipate, or believes, or variations of such words and phrases or statements that certain actions, events or results may, could, would, might or will be taken, occur or be achieved or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking

4

statements. Such factors may include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of mineral resources; possible variations in mineral resources or ore reserves, grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; as well as those factors detailed from time to time in the Company’s interim and annual financial statements, all of which are filed and available for review on SEDAR at sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.

Accordingly, readers should not place undue reliance on forward-looking statements.

5

Appendix 1 Chimo Gold Project – JORC Table 1.

Section 1: Sampling Techniques and Data

Criteria Explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Not applicable
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used
Not applicable
Aspects of the determination of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information
Not applicable
Drilling techniques Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
No drilling reported
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed
Not applicable
Measures taken to maximise sample
recovery and ensure representative nature of
the samples
Not applicable
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Not applicable
Logging Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Not applicable
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
Not applicable
The total length and percentage of the
relevant intersections logged
Not applicable
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
Not applicable
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
Not applicable

6

Criteria Explanation
Commentary
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Not applicable
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Not applicable
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
Not applicable
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Not applicable
Quality of assay
data and laboratory
tests
The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
No drilling reported
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
Not applicable
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Not applicable
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
Not applicable
Not applicable
Not applicable
Not applicable
Not applicable
Discuss any adjustment to assay data.
Not applicable
Location of data
points
Accuracy and quality of surveys used to
locate drillholes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Not applicable
Specification of the grid system used.
Not applicable
Quality and adequacy of topographic
control.
Not applicable
Data spacing and
distribution
Data spacing for reporting of Exploration
Results.
Not applicable
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Not applicable
Whether sample compositing has been
applied.
Not applicable
Orientation of data
in relation to
geological structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
Not applicable
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
Not applicable

7

Criteria Explanation Commentary
introduced a sampling bias, this should be
assessed and reported if material.
Sample security The measures taken to ensure sample
security.
Not applicable
Audits or reviews The results of any audits or reviews of
sampling techniques and data.
Not applicable

Section 2: Reporting of Exploration Results

Criteria Explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
Current Ownership:
The Chimo Gold Project is located about 35km east of Val-d’Or, Quebec, Canada and comprises claims
owned 100% by Richmont Mines Inc. and other claims owned 100% by Chalice Gold Mines (Quebec)
Inc. Chalice Gold Mines (Quebec) Inc. has entered into a binding option and farm-in term sheet to
acquire a 70% interest in Richmont’s Chimo Gold Project through total option payments of C$200,000
and incurring exploration expenditures of C$3,100,000 over 4 years. Chalice shall grant a 1% net
smelter royalty to Richmont upon exercising the option.
The Chimo Gold Project comprises a total 73 claims for 2,593.43 Ha owned 100% by Richmont Mines
Inc. which include title Nos.2385084, 2438140-2438211.
Claims owned 100% by Chalice Gold Mines (Quebec) Inc. comprise a total of 25 claims for 1,325.4Ha
and include title nos. 2461488-2461495, 2468029-2468043, 2448456 and 2449285.
A 2% net smelter royalty is held by third parties (Chimo Gold Mines, Paul Boyd and Patsy Currie Mills)
on 784Ha of claims held by Richmont Mines Inc..
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
All granted tenements are in good standing and there are no known impediments to operating in the
area.
Exploration done by
other parties
Acknowledgment and appraisal of
exploration by other parties.
Exploration commenced in the 1940’s and numerous companies have carried out prospecting,
geological mapping, trenching and outcrop sampling and ground geophysical surveys.
Previous exploration results have not been verified and the Company is in the process of compiling all
previous exploration data.
Geology Deposit type, geological setting and style of
mineralisation.
Gold deposits in the Abitibi sub Province are greenstone-hosted gold deposits and they can generally
be considered to be a part of the orogenic family of gold deposits.
The Chimo Gold Project contains a sequence of volcano-sedimentary rocks that is known as the Trivio
structural domain, a kilometres-wide deformation corridor interpreted as the eastern extension of
the Larder lake – Cadillac tectonic zone.
Gold mineralisation in the Abitibi sub Province is typically hosted in quartz-carbonate veins and
surrounding alteration zones developed along major fault zones that are traced for many 10’s km
across the Archaean granite-greenstone terrane. The Larder lake- Cadillac fault zone is a typical
crustal-scale fault zone which host many multi-million ounce gold deposits for a total inventory of
approximately 100Moz Au. Gold mineralization is hosted in a wide variety of greenstone belt rock-
types including Banded Iron Formation, mafic volcanics, mafic intrusives, fine to coarse-grained
sedimentary sequences and granitoids. Gold mineralization is specially associated with lithological
contacts between the major rock sequences.
Drill hole Information
A summary of all information material to
the understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:

easting and northing of the drill
hole collar

elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar

dip and azimuth of the hole

down hole length and
interception depth

hole length.
Not applicable

8

Criteria Explanation
Commentary
Data aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
No Exploration Results reported
Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation should
be stated and some typical examples of
such aggregations should be shown in
detail.
Not applicable
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
Not applicable
Relationship
between
mineralisation widths
and intercept lengths
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
Not Applicable
Diagrams Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
Not applicable
Balanced reporting Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
Not applicable
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
The Company has not verified previous exploration data.
Further work The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive
Future work programs are to be considered following the review and compilation of all historic
exploration data.
Figures 1 and 2.