Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CENTAURUS METALS LIMITED Interim / Quarterly Report 2007

Jan 28, 2008

64715_rns_2008-01-28_ca93d604-5f8a-4fb2-8c7d-283ea0ba6f01.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

“Exploring for the Future”

December 2007 Quarterly Report

Highlights

  • Resource definition drilling designed to define the open pittable portion of the Maitland copper deposit was completed during the Quarter. An updated measured and indicated resource will be estimated as soon as all assay results have been received.

  • Initial assays from the resource drilling at Maitland confirm the continuity of high grade mineralisation with better intersections including:

  • 9 metres @ 8.92% copper from 37 metres

  • 18 metres @ 4.14% copper from 68 metres

  • 12 metres @ 6.67% copper from 113 metres.

  • The drilling at Maitland also indicates strong mineralisation is open at depth with 35 metres @ 2.09% copper intersected from 220 metres down hole.

  • The Queensland government has awarded Glengarry’s Percyvale EPM application priority status. This new project area is located approximately 50 kilometres west of Maitland and historic exploration by other companies has recorded high grade gold, base metals, uranium and molybdenum at a number of prospects.

  • Infill soil sampling at Snake Creek in western Queensland has confirmed a number of strong copper-gold anomalies which will be investigated further in early 2008.

  • Access negotiations with the Traditional Owners of the Citadel Project area are largely complete increasing the probability that field work will commence early in the second Quarter of 2008.

  • With financial resources totalling approximately $7,000,000 at Quarter’s end, the Company is well funded and can complete exploration planned for 2008 without requiring additional capital.

Priorities for the March 2008 Quarter

  • At Greenvale

  • Compile all data from resource definition drilling completed at the Maitland copper deposit.

  • Appoint independent consultants to estimate JORC compliant measured and indicated resource for the Maitland deposit.

  • Plan geotechnical and deeper drill testing of the Maitland deposit.

  • Secure drill rig to test Acacia North gold target at the Rum Jungle Project in the Northern Territory.

  • Finalise legal documentation for the Citadel Project in northwest Western Australia and plan Heritage Surveys to be carried out in April 2008.

GLENGARRY RESOURCES LIMITED ABN 40 009 468 099 Telephone: (08) 9322 4929 Facsimile: (08) 9322 5510 PO Box 975, West Perth, WA 6872 - 35 Havelock Street, West Perth, WA 6005 Website: www.glengarry.com.au Email: [email protected]

Glengarry Resources Limited – December 2007 Quarterly Report

Project Activities Report

NORTH QUEENSLAND

Greenvale Project – Resource definition drilling confirms continuity of high grade copper at Maitland .

Resource definition drilling at the Maitland copper deposit was the main exploration activity carried out at the Greenvale Project (Figure 1) during the Quarter. The drilling has confirmed the continuity of mineralisation which remains open at depth. Initial drill testing of the Maitland South interface anomaly was also completed as was additional soil sampling at Copper Creek.

Maitland Copper Deposit

Resource definition drilling designed to define the open pittable portion of the Maitland copper deposit was completed during the Quarter. The drilling comprised 68 reverse circulation percussion (RC) drill holes (MTRC28 – 95) for a total of 8,520 metres drilled on a 20 by 20 metre pattern down to a depth of 150 to 200 metres

below the surface. To date, assays have been received for 24 holes and better copper intersections are listed below.

Hole From
(m)
To
(m)
Interval
(m)*
Cu
%
MTRC34 28
58
Including:
37
46
30
9
3.90
8.92
MTRC35 42
48
Including:
65
70
46
5
1.49
6.12
MTRC36 63
112
Including:
68
86
49
18
2.05
4.14
MTRC40 89
139
Including:
100
110
50
10
1.39
3.00
MTRC51 102
140
Including:
113
125
38
12
2.08
6.67
MTRC52 123 172 49 1.5
MTRC59 220
255
including
235
241
35
6
2.09
4.62
  • 0.5% copper cut off.

==> picture [454 x 103] intentionally omitted <==

==> picture [454 x 104] intentionally omitted <==

==> picture [454 x 103] intentionally omitted <==

Figure 1: Glengarry Resources Limited North Queensland Projects

  • 2 -

Glengarry Resources Limited – December 2007 Quarterly Report

High grade molybdenum (>0.1%) was also intersected in a number of holes with better results tabled below:

Hole From
(m)
To
(m)
Interval
(m)*
Mo
%
MTRC34 29 36 7 0.10
MTRC35 50 56 6 0.39
MTRC51 108 113 5 0.34
MTRC59 182 187 5 0.12
  • 0.05% molybdenum cut off.

Assays received to date and visual estimates from the remaining holes confirm the continuity of high grade copper mineralisation in the main southern shoot which contains the bulk of the potential resource and which remains open at depth (Figures 2 & 3). No assays have yet been received for holes drilled into the smaller northern shoot.

Once all results have been received (due early February 2008), independent consultants will estimate an updated measured and indicated resource. This resource estimation will only include data from drill holes completed by Glengarry Resources since 2005.

Diamond core drilling to provide geotechnical information and to test for deeper, high grade extensions of the mineralisation will be planned once all data from the resource drilling program has been fully assessed.

==> picture [209 x 136] intentionally omitted <==

==> picture [209 x 135] intentionally omitted <==

Figure 2: Maitland Copper Deposit – Drill Section 7889600N

==> picture [453 x 108] intentionally omitted <==

==> picture [453 x 107] intentionally omitted <==

==> picture [453 x 107] intentionally omitted <==

Figure 3: Maitland Prospect - Longitudinal Section showing holes drilled by Glengarry Resources since August 2005.

  • 3 -

Glengarry Resources Limited – December 2007 Quarterly Report

Results for all drill holes completed at Maitland during the latest phase of drilling are tabled in Appendix 1. Unless otherwise stated, mineralisation is hosted by primary sulphides and true widths are estimated to be 60 - 70% of drill hole intersections.

Beacon is managing exploration on the tenements and during the Quarter carried out a review of exploration completed during 2007. A number of gold and base metal prospects have been selected for additional drill testing in 2008. Further details are provided in Beacon’s quarterly report.

Maitland South

Three RC drill holes for a total of 312 metres were drilled to test the copper anomaly defined by shallow RAB drilling approximately 1.3 kilometres south of the Maitland copper deposit. Sheared, mafic amphibolites similar to the lithologies that host the copper mineralisation at Maitland were intersected; however, no significant assay results were recorded. The copper anomaly appears to be caused by a high background associated with the mafic lithologies. No further work is planned.

Copper Creek Prospect

The Copper Creek area is located approximately 44 kilometres south of the Maitland deposit (Figure 1) in the same geological sequence. Stream sampling in the 1980’s defined anomalous copper over a 1 kilometre long strike length and reconnaissance prospecting by Glengarry recorded up to 3.3% copper, 0.32 g/t gold and 19 g/t silver in rock chip samples.

Wide spaced, reconnaissance soil sampling during the September Quarter defined moderately anomalous (>200 ppm) copper values over 1.2 kilometres strike. An additional 65 infill soil samples were collected during the Quarter and results confirm the previously defined anomalous zone. Detailed mapping and prospecting will be completed to determine whether drill testing is warranted.

Lucky Creek Joint Venture

The north eastern Lucky Creek Group tenements at Greenvale (Figure 1) are subject to a Joint Venture Agreement with Beacon Minerals Limited (Beacon). The tenements cover 195 square kilometres and comprise 10% of the Company’s existing tenure in the Greenvale area.

Percyvale Project – New project area prospective for gold, base metals, uranium and molybdenum.

The Percyvale project is located approximately 50 kilometres due west of the Maitland copper deposit (Figure 1) and was applied for in February 2007. Glengarry’s EPM application was one of 4 competing applications lodged simultaneously; however, the Company has now been formally advised by the Queensland government that its application has been given priority status. The application is expected to be granted in the first half of 2008 with fieldwork to commence immediately afterwards.

The Project area is underlain by lithologies belonging to the Proterozoic Einasleigh Metamorphic suite, the same geological sequence that hosts Glengarry’s Maitland copper deposit and Copper Strike’s Chloe base metal deposit (Figure 1).

Previous exploration by other companies has identified a number of prospects where Glengarry plans to carry out further work:

  • Lim Kins – Rock chip sampling has recorded up to 2.4% U3O8 and 0.53% molybdenum suggesting analogies with Ben Lomond and Maureen uranium deposits. There has been no previous drilling.

  • Bernadette – Rock chip sampling by Kidston Goldmines recorded up to 21 g/t gold in rocks considered prospective for bulk tonnage mineralisation. Only limited previous drilling has been carried out.

  • Black Soil Creek – 7 to 12 kilometre long base metal sulphide horizon where limited drilling by BHP intersected up to 6.8 metres @ 1.52% zinc associated with elevated copper, lead and silver. Appears strongly analogous to the Chloe setting.

  • 4 -

Glengarry Resources Limited – December 2007 Quarterly Report

  • Nifty’s – 2 kilometre long horizon where rock chip sampling by Rio in 2005 recorded up to 37% copper and 421 g/t silver. There has been no previous drilling.

Glengarry’s initial field work will include verification of previous exploration results followed by geochemical surveys and geological mapping to define targets for drill follow up as quickly as possible.

WESTERN QUEENSLAND

Snake Creek Project – Infill soil sampling confirms strong copper-gold anomalies.

The Snake Creek Project is located in northwest Queensland approximately 125 kilometres east-southeast of Mt Isa (Figure 4) and on the northern extension of the regionally significant Cloncurry Fault. It is prospective for copper-gold and uranium mineralisation.

During the Quarter, infill soil sampling was completed across three previously defined targets (Figure 5) coincident with the Consternation Trend, a subsidiary structure located 1.5 kilometres west and parallel to the Cloncurry Fault Zone.

Assay results confirm strong copper – gold anomalism and will be used to plan follow up exploration work across the three target areas.

==> picture [344 x 214] intentionally omitted <==

==> picture [344 x 215] intentionally omitted <==

Figure 4: Mt Isa region showing major mineral deposits and Glengarry Projects.

  • 5 -

Glengarry Resources Limited – December 2007 Quarterly Report

==> picture [209 x 133] intentionally omitted <==

==> picture [209 x 133] intentionally omitted <==

Figure 5: Snake Creek Project – Copper/Gold Soil Anomalies on Consternation Trend.

Cannington Project – Discussions commenced with possible joint venture partners.

The Cannington Project tenements are located immediately north and south of BHP Billiton’s 40 - 50 million tonne Cannington silver-lead-zinc mine (Figure 4).

Assay results for an interface sampling program completed last Quarter did not return any significant results.

The Project is still considered prospective for a range of commodities due to its geological setting in the Mt Isa region, proximity to world class metal deposits and extensive shallow cover which precludes the use of conventional surface exploration techniques.

Glengarry has decided to seek a joint venture partner to continue exploration at Cannington and has commenced discussions with a number of companies active in the region.

Mt Guide Joint Venture (Western Queensland) – Summit divests majority interest to base metal focussed explorer

The Mt Guide Joint Venture is located 35 kilometres south of Mt Isa (Figure 4) and covers the southern strike extension of the stratigraphy that hosts the world class Mt Isa, Hilton and George Fisher base metal deposits.

Glengarry has a 10% free carried interest in the JV which until recently was managed by Summit Resources. Late in the Quarter, Summit reached agreement with unlisted UK company MM Mining Plc (MMM) for the farm out of 80% of Summit’s non-uranium interests in the Mt Isa region which includes their equity in the Mt Guide JV.

MMM is currently reviewing and reinterpreting data from the Mt Guide JV and plans to commence field work in April 2008.

NORTHERN TERRITORY

Rum Jungle Project – Acacia North gold target ready for drilling.

Glengarry’s wholly owned Rum Jungle Project covers approximately 140 square kilometres in the Rum Jungle area located 65km south of Darwin in the Northern Territory. The Project is proximal to the historical Rum Jungle uranium mine (3,530 tonnes U3O8) and the Woodcutters lead-zinc mine (~6 Mt @ 12% zinc and 6% lead).

Previous explorers intersected high grade gold mineralisation at Acacia North (up to 6 metres @ 11.3 g/t gold) which is open in all directions. Glengarry has designed a 1,000 metre reverse circulation percussion drill program to test for extensions of the gold mineralisation. Attempts to secure a suitable drill rig to complete the program are continuing.

  • 6 -

Glengarry Resources Limited – December 2007 Quarterly Report

WESTERN AUSTRALIA

Citadel Project (Northwest Western Australia) – Access negotiations largely complete.

The wholly owned Citadel Project covers approximately 1,700 square kilometres in the Paterson geological province and is located 100 kilometres north of the Telfer gold mine. The region contains several world class uranium, gold and copper deposits including Kintyre (36 Kt tonnes U3O8), Telfer (26 M oz gold, 1 Mt copper) and Nifty (1 Mt copper).

The Project comprises 4 Exploration Licences (ELs). Agreement has been reached with the Native Title claimants for the northern ELs and a meeting was held during the Quarter to discuss details of a heritage survey over the proposed work area.

Access negotiations continued with the Martu people who are the Traditional Owners of the southern ELs. Verbal agreement has now been reached on all outstanding issues and documentation is being prepared for execution.

Fieldwork is still scheduled to commence in the second Quarter of 2008. Once access is established to the Project area, Glengarry’s initial work program will comprise approximately 10,000 metres of aircore drilling to test a number of geochemical and geophysical targets defined by previous explorers. The drilling will be designed to collect samples from the prospective bedrock lithologies which are covered by 40 – 60 metres of barren cover.

  • 7 -

Glengarry Resources Limited – December 2007 Quarterly Report

David Richards Managing Director 29th January 2008

Corporate

Kagara Ltd

Major shareholder, Kagara Ltd, purchased an additional 8,599,300 Glengarry shares on the market and now own a total of 56,599,300 shares which represents 19.79% of Glengarry’s total issued capital.

Cash Position and Investments

At the end of December 2007, Glengarry had approximately $5.3 million in cash.

Glengarry investments in other public listed companies are currently valued at approximately $1.5 million.

==> picture [140 x 67] intentionally omitted <==

Declaration

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by David Richards who is a member of the Australian Institute of Geoscientists and Kevin Seymour who is a member of the Australasian Institute of Mining and Metallurgy. David Richards and Kevin Seymour are full time employees of Glengarry Resources Limited. David Richards and Kevin Seymour have sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to qualify as Competent Persons as defined in the 2004 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. David Richards and Kevin Seymour consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.

C O M P A N Y I N F O R M A T I O N C O M P A N Y I N F O R M A T I O N
DIRECTORS MANAGING DIRECTOR
Keith G McKay BSc(Geol Hons), MAusIMM, David R Richards BSc(Geol Hons), MAIG,
MAICD MAICD, MSEG
Chairman
Bill Manning BA, LLB, FAICD
Director
STOCK EXCHANGE LISTING
Glengarry Resources Limited shares are listed on
the Australian Stock Exchange
Shares - Code GGY
PRINCIPAL OFFICE
35 Havelock Street
West Perth WA 6005
Email: [email protected]
(PO Box 975, West Perth WA 6872)
Telephone: (08) 9322 4929
Web Site: www.glengarry.com.au
Facsimile:(08)9322 5510
  • 8 -

Glengarry Resources Limited – December 2007 Quarterly Report

APPENDIX 1 – Maitland Copper Deposit - Summary of Drill Results

Table 1: Significant Copper Drill Intersections (0.5% lower cut)

Hole_ID AMG_East AMG_North Dip **Azimuth ** Depth (m) Copper Intersections(>0.5%) Copper Intersections(>0.5%) Copper Intersections(>0.5%) Copper Intersections(>0.5%)
**From(m) ** **To(m) ** Interval(m) Cu%
07MTRC028 226480 7899680 -59 269.5 60 NSR
07MTRC029 226500 7899680 -60 269.5 90 69 70 1 1.08
07MTRC030 226425 7899642 -89 352 43 0 22 22* 1.32
07MTRC031 226475 7899640 -59 269.5 90 47
52
48
53
1
1
0.85
0.57
07MTRC032 226494 7899640 -59 269.5 112 27
35
77
31
36
79
7
1
2
0.74
0.57
0.80
07MTRC033 226511 7899640 -60 269.5 120 NSR
07MTRC034 226420 7899599 -60 269.5 80 28
Incl.
37
58
46
30
9
3.90
8.92
07MTRC035 226439 7899600 -57 271.5 108 42
Incl.
65
88
70
46
5
1.79
6.12
07MTRC036 226460 7899600 -57 271.5 126 63
Incl.
68
112
86
49
18
2.05
4.14
07MTRC037 226390 7899560 -57 271.5 80 NSR
07MTRC038 226429 7899559 -57 271.5 130 93
Incl.
108
117
110
24
2
1.33
3.53
07MTRC039 226410 7899520 -57 270.5 144 123
136
129
138
6
2
1.71
0.88
07MTRC040 226480 7899600 -60 271.5 169 89
Incl.
100
131
139
110
132
50
10
1
1.39
3.00
7.77
07MTRC041 226500 7899600 -60 271.5 199 92
116
129
144
150
164
112
121
130
145
160
165
20
5
1
1
10
1
0.65
0.75
1.15
0.67
1.72
0.83
07MTRC042 226458 7899739 -60 269.5 70 48 49 1 0.78
07MTRC043 226478 7899739 -60 271.5 90 Assays pending
07MTRC044 226438 7899780 -60 271.5 60
07MTRC045 226457 7899780 -59 269.5 80
07MTRC046 226439 7899824 -60 271.5 48
07MTRC047 226388 7899520 -60 267.5 130
07MTRC048 226444 7899860 -60 271.5 78
07MTRC049 226434 7899520 -60 269.5 181 138
142
148
158
Incl.
161
139
143
151
169
163
1
1
3
11
2
0.73
0.52
1.25
1.89
3.94
07MTRC050 226468 7899900 -70 250.5 90 Assays pending
07MTRC051 226449 7899558 -60 271.5 169 89
102
Incl.
113
90
140
125
1
38
12
1.09
2.08
6.67
07MTRC052 226469 7899557 -60 271.5 199 123
Incl.
130
149
172
132
153
49
2
4
1.5
3.91
3.21
07MTRC053 226455 7899520 -60 272.5 211 Assays pending
07MTRC054 226499 7899898 -57 271 120
07MTRC055 226420 7899480 -60 271.5 253 203 204 1 0.78
  • – Oxide (predominantly malachite) mineralisation, NSR – no significant result

  • 9 -

Glengarry Resources Limited – December 2007 Quarterly Report

Table 1 (cont.): Significant Copper Drill Intersections (0.5% lower cut)

Hole_ID AMG_East AMG_North Dip **Azimuth ** Depth (m) Copper Intersections(>0.5%) Copper Intersections(>0.5%) Copper Intersections(>0.5%) Copper Intersections(>0.5%)
**From(m) ** **To(m) ** Interval(m) Cu%
07MTRC056 226455 7899620 -57 271.5 96 0
12
22
68
3
22
57
84
3
10

35
16
0.56
1.01
1.03
1.07
07MTRC057 226420 7899500 -57 271.5 181 148
Incl.
154
161
158
13
4
1.83
3.48
07MTRC058 226390 7899540 -58 271.5 80 NSR
07MTRC059 226445 7899500 -57 271.5 265 178
186
192
220
Incl.
222
235
180
190
193
255
225
241
2
4
1
35
3
6
0.73
2.38
0.60
2.09
3.77
4.62
07MTRC060 226409 7899540 -57 271.5 109 89 90 1 0.76
07MTRC061 226455 7899760 -60 270.5 70 Assays Pending
07MTRC062 226473 7899760 -60 270.5 90
07MTRC063 226495 7899760 -60 270.5 109
07MTRC064 226478 7899776 -60 272.5 95
07MTRC065 226470 7899798 -60 266.5 80
07MTRC066 226488 7899800 -70 269.5 119
07MTRC067 226439 7899839 -60 270.5 89
07MTRC068 226459 7899820 -60 270 89
07MTRC069 226460 7899820 -75 270 110
07MTRC070 226461 7899820 -90 270 140
07MTRC071 226444 7899878 -60 268.5 70
07MTRC072 226453 7899879 -60 267.5 89
07MTRC073 226486 7899875 -60 272.5 120
07MTRC074 226502 7899880 -60 269.5 149
07MTRC075 226488 7899865 -60 236.5 130
07MTRC076 226479 7899864 -55 239.5 95
07MTRC077 226415 7899861 -90 7.5 100
07MTRC078 226440 7899840 -75 271 90
07MTRC079 226433 7899839 -50 271.5 89
07MTRC080 226475 7899620 -60 271.5 110
07MTRC081 226495 7899620 -60 272.5 130
07MTRC082 226514 7899620 -60 273.5 155
07MTRC083 226399 7899577 -60 269.5 71
07MTRC084 226438 7899480 -65 268.5 335
07MTRC085 226439 7899580 -58 271.5 140
07MTRC086 226490 7899659 -60 270.5 89
07MTRC087 226430 7899538 -58 270 149
07MTRC088 226475 7899540 -55 272 197
07MTRC089 226494 7899541 -57 270.5 250
07MTRC090 226484 7899580 -57 272.5 200
07MTRC091 226504 7899580 -57 272.5 215
07MTRC092 226896 7899321 -60 268.5 47
07MTRC093 226469 7899520 -57 271.5 300
07MTRC094 226500 7899777 -60 270.5 119
07MTRC095 226423 7899875 -60 269.5 100
  • – Oxide (predominantly malachite) mineralisation, NSR – no significant result

  • 10 -

Glengarry Resources Limited – December 2007 Quarterly Report

Table 2: Significant Molybdenum Drill Intersections (0.05% lower cut)

Hole_ID AMG_East AMG_North Dip **Azimuth ** Depth (m) Molybdenum Intersections(>0.05%) Molybdenum Intersections(>0.05%) Molybdenum Intersections(>0.05%) Molybdenum Intersections(>0.05%)
**From (m) ** **To (m) ** Interval (m) Mo%
07MTRC028 226480 7899680 -59 269.5 60 NSR
07MTRC029 226500 7899680 -60 269.5 90 NSR
07MTRC030 226425 7899642 -89 352 43 NSR
07MTRC031 226475 7899640 -59 269.5 90 NSR
07MTRC032 226494 7899640 -59 269.5 112 82 83 1 0.05
07MTRC033 226511 7899640 -60 269.5 120 NSR
07MTRC034 226420 7899599 -60 269.5 80 29 36 7 0.10
07MTRC035 226439 7899600 -57 271.5 108 38 39 1 0.07
50 56 6 0.39
07MTRC036 226460 7899600 -57 271.5 126 NSR
07MTRC037 226390 7899560 -57 271.5 80 NSR
07MTRC038 226429 7899559 -57 271.5 130 90 91 1 0.09
98 101 3 0.11
112 114 2 0.06
07MTRC039 226410 7899520 -57 270.5 144 114 117 3 0.10
07MTRC040 226480 7899600 -60 271.5 169 NSR
07MTRC041 226500 7899600 -60 271.5 199 117 118 1 0.13
07MTRC042 226458 7899739 -60 269.5 70 NSR
07MTRC043 226478 7899739 -60 271.5 90 Assays pending
07MTRC044 226438 7899780 -60 271.5 60
07MTRC045 226457 7899780 -59 269.5 80
07MTRC046 226439 7899824 -60 271.5 48
07MTRC047 226388 7899520 -60 267.5 130
07MTRC048 226444 7899860 -60 271.5 78
07MTRC049 226434 7899520 -60 269.5 181 143 148 5 0.11
07MTRC050 226468 7899900 -70 250.5 90 Assays pending
07MTRC051 226449 7899558 -60 271.5 169 108
Incl.
109
112
110
4
1
0.34
0.75
07MTRC052 226469 7899557 -60 271.5 199 130 133 3 0.14
07MTRC053 226455 7899520 -60 272.5 211 Assays pending
07MTRC054 226499 7899898 -57 271 120
07MTRC055 226420 7899480 -60 271.5 253 211 212 1 0.08
07MTRC056 226455 7899620 -57 271.5 96 57 58 1 0.07
07MTRC057 226420 7899500 -57 271.5 181 NSR
07MTRC058 226390 7899540 -58 271.5 80 NSR
07MTRC059 226445 7899500 -57 271.5 265 168
182
169
187
1
5
0.09
0.12
07MTRC060 226409 7899540 -57 271.5 109 NSR

NSR – No significant result

  • 11 -