Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CENTAURUS METALS LIMITED Capital/Financing Update 2022

Jan 26, 2022

64715_rns_2022-01-26_f791baed-32bb-4b6c-9ae2-94df7f2ea44d.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT AND MEDIA RELEASE

==> picture [124 x 57] intentionally omitted <==

27 January 2022

JAGUAR DRILLING CAPACITY SET TO INCREASE TO 14 RIGS AS LATEST RESULTS HIGHLIGHT EXCEPTIONAL GROWTH OUTLOOK

Resource development and exploration in full swing with nine diamond rigs and one RC rig currently operating on site, and a further four rigs (three diamond and one RC) planned to arrive on site before the end of February

  • Step-out, extensional and in-fill drilling at Jaguar South (JS), Jaguar West (JW) and Onça Preta (OP) continues to deliver strong, consistent results with new assay results including:

  • 40.0m at 1.04% Ni from 74.0m; including 6.5m at 2.04% Ni , from 90.0m and 5.0m at 2.13% Ni from 100.0m in JAG-DD-21-221 (JW)

  • 37.3m at 1.11% Ni , from 134.5m; including 6.0m at 2.44% Ni from 160.5m in JAG-DD-21-216 (JW)

  • 14.0m at 2.07% Ni from 101.0m; including 5.5m at 3.88% Ni from 105.0m in JAG-DD-21-196 (JS)

  • 23.0m at 1.17% Ni from 283.0m, including 8.0m at 2.01% Ni from 298.0m in JAG-DD-21-208 (OP)

  • 14.4m at 1.50% Ni , from 502.6m; including 4.4m at 3.41% Ni from 507.0m in JAG-DD-21-223 (JS)

  • 24.0m at 0.80% Ni , from 73.0m in JAG-DD-21-216 (JW)

  • 14.2m at 0.98% Ni from 388.0m, including 2.7m at 1.93% Ni from 399.5m in JAG-DD-21-219 (OP)

  • 13.0m at 1.02% Ni , from 95.0m JAG-DD-21-204 (JS)

  • 7.1m at 1.46% Ni from 379.9m, including 4.0m at 2.13% Ni from 382.0m in JAG-DD-21-204 (JS)

  • 27.0m at 0.43% Ni from 294.0m in JAG-DD-21-223 (JS)

  • 16.0m at 0.65% Ni , from 53.0m in JAG-DD-21-221 (JW)

  • 5.0m at 1.14% Ni, from 30.0m in JAG-DD-21-224 (JW)

  • 11.5m at 0.74% Ni, from 61.0m in JAG-DD-21-224 (JW)

  • The Jaguar December 2021 Mineral Resource Estimate (MRE), comprising 80.6Mt @ 0.91% Ni for 730,700 tonnes of contained nickel, is one of the largest nickel sulphide resources held by an ASX-listed company and the largest outside of the majors.

  • New visual logs together with multiple strong, late-time (Ch20+) conductor plates identified in down-hole electromagnetic (DHEM) surveys point to the strong likelihood of more high-grade nickel intersections as step-out drilling continues.

  • The Company is well-funded after completing a heavily oversubscribed institutional raise of $75 million.

Centaurus Metals (ASX Code: CTM ) is pleased to advise that resource growth and development drilling at its 100%owned Jaguar Nickel Sulphide Project in the Carajás Mineral Province of northern Brazil continues to deliver outstanding results which will underpin further resource growth ahead of the completion of the Definitive Feasibility Study (DFS) and maiden Ore Reserve estimate due for completion by the end of calendar 2022.

As a result of the continued run of outstanding results and following the recent highly successful $75 million institutional placement, the Company has committed to a further increase in drilling capacity at Jaguar with a total of 14 rigs expected to be operating at the Project by the end of February.

Australian Office Centaurus Metals Limited Level 2, 1 Ord Street West Perth WA 6005 AUSTRALIA

Brazilian Office ASX: CTM Centaurus Brasil Mineração Ltda ACN 009 468 099 Avenida Barão Homem de Melo, 4391 [email protected] Salas 606 e 607 - Estoril T: +61 8 6424 8420 CEP: 30.494.275, Belo Horizonte MG BRAZIL

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Centaurus’ Managing Director, Mr Darren Gordon, said exploration and development drilling was back in full swing at Jaguar following a short break for the festive season, paving the way for another year of strong news-flow from the drill bit.

“It’s great to be back in the field with drilling operations back at full speed. We currently have 10 rigs on site with an additional four rigs being mobilised to site over the next six weeks. The additional rigs will allow us to continue growth orientated step-out and greenfields drilling in parallel with the important resource development drilling that is the priority for the first half of 2022.

“It is good to see the results flow in from holes we completed last year, with step-out drilling at Onça Preta and the Jaguar Deposits continuing to deliver further strong results. With these deposits remaining open at depth, there is still an enormous amount of resource growth potential available to us as we progressively drill deeper to test the newly-defined DHEM conductor plates. Where we identify DHEM conductor plates, we usually intersect economic zones of semi-massive and massive sulphides with high-grade nickel encountered in most holes.

“The recent results from Jaguar West, including 40.0m at 1.04% Ni and 37.3m at 1.11% Ni at the eastern limit of the Deposit, are outstanding in that they are likely to push the planned open pit deeper as well as help underpin an amalgamation of the Jaguar West and Jaguar Central pits, positively impacting strip-ratios.

“We are targeting 90,000m of drilling during 2022 and I look forward to keeping our shareholders updated with the results of our resource development and growth drilling and the progress of the Definitive Feasibility Study which underpins our goal of achieving first production for Jaguar by late 2024.

“Meanwhile, the recently completed $75 million equity raise gives us all the firepower we need to do all of this planned drilling and complete all DFS activities while also leaving us with a strong balance sheet heading into funding discussions planned for the first half of 2023.”

Jaguar South

The Jaguar South Deposit is currently the largest deposit at the Jaguar Project, hosting a MRE of 27.6Mt at 0.93% Ni for more than 257kt of contained nickel , including an Indicated component of 13.9Mt at 1.01% Ni for 140kt of contained nickel . The base of the December 2021 MRE continues to be constrained by the depth of drilling and ongoing step-out drilling continues to confirm that the mineralisation remains open at depth and along the +800m strike in both directions (Figure 1 and Figure 8).

The current base of the deposit has now been extended well below the base of the underground operations identified in the May 2021 Jaguar Project Scoping Study, which was already restricted by the base of the March 2021 MRE. Any new resource tonnes generated by step-out drilling are expected to contribute to the underground operations as part of the DFS.

Ongoing step-out drilling continued below previously defined resource limits to test new DHEM conductors and down-dip extensions of the high-grade mineralisation within the main mineralised zones (Figure 1). New holes such as JAG-DD-21-223 intersected mineralisation more than 100m below the previous deepest drilling, returning 14.4m at 1.50% Ni from 502.6m, including 4.4m at 3.41% Ni (Figure 2).

Highlights of new assay results from drilling at the Jaguar South Deposit include the following down-hole intervals (see Table 1 for complete results and plan map in Figure 8):

Hole JAG-DD-21-196

  • 10.8m at 0.59% Ni , 0.03% Zn, 0.02% Cu and 0.01% Co from 19.3m

  • 6.0m at 0.92% Ni , 0.08% Zn, 0.04% Cu and 0.02% Co from 39.0m

  • 14.0m at 2.07% Ni , 0.01% Zn, 0.21% Cu and 0.05% Co from 101.0m; including

  • 5.5m at 3.88% Ni , 0.01% Zn, 0.29% Cu and 0.09% Co from 105.0m

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Hole JAG-DD-21-204

  • 13.0m at 1.02% Ni , 0.01% Zn, 0.04% Cu and 0.01% Co from 95.0m

  • 4.5m at 1.11% Ni , 0.02% Zn, 0.09% Cu and 0.03% Co from 161.6m

  • 7.1m at 1.46% Ni , 0.01% Zn, 0.04% Cu and 0.03% Co from 379.9m, including

  • 4.0m at 2.13% Ni , 0.01% Zn, 0.05% Cu and 0.05% Co from 382.0m

  • 5.0m at 0.74% Ni , 0.01% Zn, 0.03% Cu and 0.01% Co from 461.4m

Hole JAG-DD-21-223

  • 14.5m at 0.32% Ni , 0.02% Zn, 0.02% Cu and 0.01% Co from 214.5m

  • 27.0m at 0.43% Ni , 0.01% Zn, 0.02% Cu and 0.01% Co from 294.0m; including

  • o 3.0m at 1.01% Ni , 0.01% Zn, 0.03% Cu and 0.02% Co from 303.5m

  • 14.4m at 1.50% Ni, 0.15% Zn, 0.06% Cu and 0.04% Co from 502.6m; including

  • o 4.4m at 3.41% Ni , 0.06% Zn, 0.13% Cu and 0.08% Co from 507.0m

  • 7.9m at 0.40% Ni , 0.05% Zn, 0.03% Cu and 0.01% Co from 549.8m

Figure 1 – The Jaguar South Deposit: Cross-Sections 478300mE (left) and 478390 (right) showing existing drilling, DHEM conductor plates in dark blue and FLEM conductor plates in light blue.

==> picture [236 x 341] intentionally omitted <==

==> picture [236 x 341] intentionally omitted <==

Drilling is now stepping out well below the current resource base, with the deepest intersections approximately 450m below surface.

Importantly, a number of recently defined DHEM conductor plates, which are indicative of semi-massive and massive sulphides, show that the mineralisation extends to at least 600m below surface (Figure 1).

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

& MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 2 – Core photo from drill hole JAG-DD-21-223 (Jaguar South), 507.0m to 511.40m down-hole: Stringer to semi-massive sulphides (metallic bronze/yellow colour) with magnetite (black colour) mineralisation hosted in felsic sub-volcanic.

==> picture [337 x 162] intentionally omitted <==

Drilling on Section 478390mE, one of the easternmost sections at Jaguar South, has intersected more semi-massive to massive nickel sulphides at depth in drill-hole JAG-22-21-233[1] . For photos of the core and visual estimates from hole JAG-22-21-233, see Figure 11 and Table 3. This intersection is over 100m below the previous deepest drilling on that section.

Step-out and extensional drilling at Jaguar South has consistently intersected the mineralised domains in line with the EM conductor plates, current geological model interpretations and the developing structural model. This consistency strongly supports the deeper drilling that is currently underway to identify additional Resource tonnes as well as upgrade existing underground Resources into the higher-confidence Resource categories required for future Ore Reserve Estimation and DFS work.

Jaguar West

The December 2021 MRE update has expanded the Jaguar West Deposit to 7.3Mt at 0.74% Ni for more than 54kt of contained nickel. Recent drilling on the eastern sections of the Jaguar West deposit has intersected a nearsurface high-grade zone (Figure 4). These high-grade intersections, which were not part of the December MRE , are expected to contribute to a grade increase in the Resource at Jaguar West.

Drilling on section 476575mE, which was previously the easternmost section of the Jaguar West pit, intersected thick zones of near surface high-grade nickel sulphide mineralisation including 40.0m at 1.04% Ni from 74m, including 6.5m at 2.04% Ni from 90.0m in JAG-DD-21-221 and 37.3m at 1.11% Ni from 134.5m, including 6.0m at 2.44% Ni from 160.5m in JAG-DD-21-216 (Figure 3).

Importantly, this recent drilling at Jaguar West has been very successful in joining the Resource between the Jaguar West and Jaguar Central deposits which is expected to eventually result in the joining of the planned open pits and to also have a materially positive impact on strip ratios.

These intersections are immediately below the current Scoping Study pit limit (Figure 4) and are expected to push future open pit optimisations significantly deeper. The deposit remains open at depth and step-out drilling is planned to continue to grow the Resource.

1 Visual estimates are uncertain in nature and hence in no way are intended to be a substitute for analytical results. All intervals have been sampled and the analytical results will be reported to the market when the Company receives them. For photos of the core and visual estimates see Figure 11 and Table 3.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

& MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 3 – Core photo from drill hole JAG-DD-21-216 (Jaguar West), 160.5 to 166.5m down-hole: Stringer to semi-massive and massive sulphides (metallic bronze/yellow colour) with magnetite (black colour) mineralisation hosted in felsic sub-volcanic.

==> picture [313 x 184] intentionally omitted <==

Figure 4 – The Jaguar West Deposit: Cross-Sections 476575mE showing existing drilling, DHEM conductor plates in dark blue and FLEM conductor plates in light blue.

==> picture [230 x 331] intentionally omitted <==

Highlights of new assay results from in-fill drilling at the Jaguar West Deposit include the following down-hole intervals (see Table 1 for complete results and plan map in Figure 9):

Hole JAG-DD-21-216

  • 3.3m at 1.23% Ni , 0.66% Zn, 0.05% Cu and 0.03% Co from 66.8m

  • 24.0m at 0.80% Ni , 0.27% Zn, 0.03% Cu and 0.02% Co from 73.0m

  • 37.3m at 1.11% Ni , 0.26% Zn, 0.04% Cu and 0.02% Co from 134.5m; including

  • 11.0m at 1.43% Ni , 0.39% Zn, 0.06% Cu and 0.03% Co from 143.5m; and

  • 6.0m at 2.44% Ni , 0.42% Zn, 0.10% Cu and 0.05% Co from 160.5m

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Hole JAG-DD-21-221

  • 16.0m at 0.65% Ni , 0.31% Zn, 0.02% Cu and 0.02% Co from 53.0m

  • 40.0m at 1.04% Ni , 0.23% Zn, 0.04% Cu and 0.02% Co from 74.0m; including

  • 4.6m at 1.51% Ni , 0.58% Zn, 0.08% Cu and 0.03% Co from 80.0m; and

  • 6.5m at 2.04% Ni , 0.58% Zn, 0.09% Cu and 0.04% Co from 90.0m; and

  • 5.0m at 2.13% Ni , 0.04% Zn, 0.05% Cu and 0.06% Co from 100.0m

Hole JAG-DD-21-224

  • 5.0m at 1.14% Ni , 0.15% Zn, 0.12% Cu and 0.02% Co from 30.0m

  • 11.5m at 0.74% Ni , 0.35% Zn, 0.02% Cu and 0.02% Co from 61.0m

Onça Preta

The December 2021 Mineral Resource Estimate (MRE) has expanded the Onça Preta Deposit to 5.2Mt at 1.52% Ni for more than 78kt of contained nickel, part of the overall Jaguar Project MRE which stands at 80.6Mt at 0.91% Ni for 730,700 tonnes of contained nickel .

The nickel grade at Onça Preta is the highest of all the deposits at the Jaguar Project at 1.52% Ni, with the deposit consistently returning thick intersections at over 2.0% Ni and remaining open at depth and along strike to the east.

The base of the planned underground operations at Onça Preta is currently restricted by the base of the March 2021 MRE. It is expected that, with the new MRE and further step-out drilling success, the underground operations will expand significantly as part of the Definitive Feasibility Study (DFS) and maiden Ore Reserve estimate.

Recently, more semi-massive and massive zones of nickel sulphides, including 23.0m at 1.17% Ni from 283m in JAG-DD-21-208 on section 476940mE (Figures 5 and 6), have been intersected. Furthermore, more than 100m down-dip from JAG-DD-21-208, drill hole JAG-DD-21-226[2] has intersected a zone of stringer and semi-massive nickel sulphide mineralisation over a down-hole width of 30m, extending the mineralisation both down-dip and further along strike to the east of the previous resource limits (Figure 6).

Figure 5 – Core photo from drill hole JAG-DD-21-208 (Onça Preta), 298.0m to 306.0m down-hole: Disseminated, stringer to semi-massive sulphides (metallic bronze/yellow colour) with intense magnetite (black colour) mineralisation hosted in basement gneiss.

==> picture [297 x 231] intentionally omitted <==

2 Visual estimates are uncertain in nature and hence in no way are intended to be a substitute for analytical results. All intervals have been sampled and the analytical results will be reported to the market when the Company receives them. For photos of the core and visual estimates see Figure 12 and Table 4.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

& MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 6 – The Onca Preta Deposit: Cross-Sections 476790mE (left) and 476940mE (right) showing existing drilling, DHEM conductor plates in dark blue and FLEM conductor plates in light blue.

==> picture [236 x 341] intentionally omitted <==

==> picture [236 x 341] intentionally omitted <==

New assay results from drilling at the Onça Preta Deposit include the following down-hole intervals (see Table 1 for complete results and plan map in Figure 10):

Hole JAG-DD-21-208

  • 23.0m at 1.17% Ni, 0.14% Zn, 0.07% Cu and 0.05% Co from 283.0m; including o 8.0m at 2.01% Ni, 0.21% Zn, 0.11% Cu and 0.09% Co from 298.0m

Hole JAG-DD-21-219

  • 14.2m at 0.98% Ni, 0.05% Zn, 0.08% Cu and 0.03% Co from 388.0m; including

  • 2.8m at 1.60% Ni, 0.02% Zn, 0.08% Cu and 0.05% Co from 389.3m; and

  • o 2.7m at 1.93% Ni, 0.17% Zn, 0.22% Cu and 0.07% Co from 399.5m

Importantly, down-hole electromagnetic (DHEM) survey work at the Onca Preta Deposit continues to identify multiple strong late-time (Ch20+) conductor plates. These sub-vertical plates extend down to 200m below the deepest drilling and have a combined strike extent of over 300m with very high conductivities of 2500-12000S (see Figure 6). At the Jaguar Project, conductor plates with these conductivity levels consistently host semi-massive and massive sulphides.

The new plates indicate that the high-grade nickel mineralisation is plunging north-northeast below historical drilling. A new drill section, 476985mE, located 50m east of the previous easternmost section, has now successfully intersected new mineralisation both along strike and down-dip (Figure 7) in drill hole JAG-DD-21-230 and JAG-DD21-241.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Visual results for drill hole JAG-DD-21-241[3] , which intersected over 30m of stringer to semi-massive and massive sulphides within a broader mineralised intersection, are very impressive. For photos of the core and visual estimates of hole JAG-DD-21-241, see Figure 13 and Table 5. Holes have been cased and DHEM surveys are planned to determine if mineralisation continues to plunge to the north-east, towards the Puma Layered Mafic-Ultramafic Complex.

Interestingly, the Onça deposits are less than 250m from the Puma Layered Mafic-Ultramafic Complex, which is interpreted to be the potential source of the hydrothermal nickel sulphide plumbing and an outstanding target for more high-grade mineralisation.

Figure 7 – The Onca Preta Deposit: Cross-Sections 476985mE showing significant drill intersections in yellow, DHEM conductor plates in dark blue and FLEM conductor plates in light blue.

==> picture [220 x 318] intentionally omitted <==

The 2022 drilling of the Onca Preta and Onça Rosa Deposits is part of a push to extend the high-grade underground resources at depth with the support of the new Down-Hole Electromagnetic (DHEM) probe, which has the capacity to survey down to a depth of 750m down-hole.

-ENDS-

For further enquiries please contact:

Authorised for Release by

Nicholas Read Darren Gordon Read Corporate Managing Director M: +61 419 929 046 Centaurus Metals Ltd T: +61 8 9388 1474 T: +61 8 6424 8420

3 Visual estimates are uncertain in nature and hence in no way are intended to be a substitute for analytical results. All intervals have been sampled and the analytical results will be reported to the market when the Company receives them. For photos of the core and visual estimates see Figure 13 and Table 5.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Competent Persons’ Statement

The information in this report that relates to Exploration Results is based on information compiled by Mr Roger Fitzhardinge who is a Member of the Australasia Institute of Mining and Metallurgy. Mr Fitzhardinge is a permanent employee and shareholder of Centaurus Metals Limited. Mr Fitzhardinge has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Fitzhardinge consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the Jaguar Mineral Resource is based on information compiled by Mr Lauritz Barnes (consultant with Trepanier Pty Ltd) and Mr Roger Fitzhardinge (a permanent employee and shareholder of Centaurus Metals Limited). Mr Barnes and Mr Fitzhardinge are both members of the Australasian Institute of Mining and Metallurgy. Mr Barnes and Mr Fitzhardinge have sufficient experience of relevance to the styles of mineralisation and types of deposits under consideration, and to the activities undertaken to qualify as Competent Persons as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Specifically, Mr Fitzhardinge is the Competent Person for the database (including all drilling information), the geological and mineralisation models plus completed the site visits. Mr Barnes is the Competent Person for the construction of the 3-D geology / mineralisation model plus the estimation. Mr Barnes and Mr Fitzhardinge consent to the inclusion in this report of the matters based on their information in the form and context in which they appear.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Table 1 – Jaguar Nickel Sulphide Project – Recent Results and Collar Locations. * Oxide intersection

Hole ID Deposit / Prospect Easting Northing mRL Azi Dip EOH Depth From (m) To (m) Interval (m) Ni % Cu % Co % Zn %
JAG-DD-21-196 Jaguar South 478390 9282390 421 180 -55 169.00
including
19.25
39.00
49.00
101.00
105.00
30.00
45.00
52.00
115.00
110.50
10.75
6.00
3.00
14.00
5.50
0.59
0.92
0.47
2.07
3.88
0.02
0.04
0.02
0.21
0.29
0.01
0.02
0.01
0.05
0.09
0.03
0.08
0.03
0.01
0.01
JAG-DD-21-197 Jaguar Central North 477330 9283221 313 180 -55 207.10 53.20
121.25
148.70
57.45
132.00
152.60
4.25
10.75
3.90
0.64
0.59
0.38
0.05
0.04
0.02
0.03
0.02
0.02
0.42
0.50
0.07
JAG-DD-21-199 Jaguar Central 477330 9283111 294 180 -55 395.65 229.85
352.00
369.00
232.50
355.00
378.00
2.65
3.00
9.00
0.75
0.43
0.43
0.01
0.01
0.01
0.03
0.01
0.01
0.05
0.04
0.03
JAG-DD-21-204 Jaguar South 478090 9282538 317 180 -58 534.60
including
95.00
154.50
161.55
279.10
379.90
382.00
461.40
108.00
158.00
166.00
283.00
387.00
386.00
466.40
13.00
3.50
4.45
3.90
7.10
4.00
5.00
1.02
0.56
1.11
0.41
1.46
2.13
0.74
0.04
0.04
0.09
0.02
0.04
0.05
0.03
0.01
0.02
0.03
0.01
0.03
0.05
0.01
0.01
0.03
0.02
0.02
0.01
0.01
0.01
JAG-DD-21-208 Onça Preta 476940 9284891 257 180 -64 120.70
Including
283.00
298.00
318.00
306.00
306.00
322.00
23.00
8.00
4.00
1.17
2.01
0.78
0.07
0.11
0.08
0.05
0.09
0.12
0.14
0.21
0.06
JAG-DD-21-209 Onça Preta 476842 9284709 269 160 -59 76.00 PQ Hole - Metalurgical Bulk Sample
JAG-DD-21-210 Jaguar West 476575 9283317 258 180 -55 311.00 84.40
145.90
187.00
225.65
252.50
88.00
151.10
191.00
232.50
257.45
3.60
5.20
4.00
6.85
4.95
0.52
0.39
0.39
0.67
0.62
0.03
0.01
0.01
0.02
0.04
0.01
0.01
0.01
0.02
0.01
0.02
0.09
0.06
0.07
0.08
JAG-DD-21-212 Jaguar Northeast 478590 9282804 322 180 -55 140.90 61.25
73.00
78.30
67.00
76.00
86.60
5.75
3.00
8.30
0.66
0.56
0.59
0.12
0.04
0.06
0.02
0.01
0.02
1.06
1.06
0.47
JAG-DD-21-213 Tigre 472146 9282495 241 180 -60 250.80 No Significant Intersection
JAG-DD-21-214 Jaguar Central 476985 9282997 310 2 -55 102.20 PQ Hole - Metalurgical Bulk Sample
JAG-DD-21-215 Jaguar Northeast 478590 9282844 308 180 -55 153.45 127.00 135.00 8.00 0.57 0.17 0.02 0.55
JAG-DD-21-216 Jaguar West 476575 9283258 260 180 -55 205.35
Including
And
66.75
73.00
134.45
143.50
160.50
70.00
97.00
171.75
154.50
166.50
3.25
24.00
37.30
11.00
6.00
1.23
0.80
1.11
1.43
2.44
0.05
0.03
0.04
0.06
0.10
0.03
0.02
0.02
0.03
0.05
0.66
0.27
0.26
0.39
0.42
JAG-DD-21-217 Tigre 472145 9282405 248 180 -55 60.80 31.00 41.00 10.00 0.60 0.04 0.02 0.01
JAG-DD-21-218 Tigre 472810 9282703 232 180 -55 84.65 64.00 67.00 3.00 1.15 0.07 0.04 0.01
JAG-DD-21-219 Onça Preta 476835 9285016 280 180 -62 505.55
Including
And
387.95
389.25
399.50
402.15
392.00
402.15
14.20
2.75
2.65
0.98
1.60
1.93
0.08
0.08
0.22
0.03
0.05
0.07
0.05
0.02
0.17
439.00 442.50 3.50 0.61 0.05 0.02 0.01
JAG-DD-21-220 Jaguar Northeast 478638 9282784 302 180 -55 123.60
Including
74.00
91.00
94.30
82.00
98.30
96.60
8.00
7.30
2.30
0.53
1.08
2.14
0.13
0.42
0.70
0.02
0.03
0.06
0.35
1.49
3.31
JAG-DD-21-221 Jaguar West 476575 9283218 260 180 -55 157.55
Including
And
And
37.00
53.00
74.00
80.00
90.00
100.00
41.00
69.00
114.00
84.60
96.50
105.00
4.00
16.00
40.00
4.60
6.50
5.00
0.68
0.65
1.04
1.51
2.04
2.13
0.02
0.02
0.04
0.08
0.09
0.05
0.02
0.02
0.02
0.03
0.04
0.06
0.53
0.31
0.23
0.58
0.58
0.04
JAG-DD-21-222 Jaguar West 477943 9282561 289 180 -55 121.45 PQ Hole - Metalurgical Bulk Sample
JAG-DD-21-223 Jaguar South 478300 9282544 413 180 -66 568.80 200.00
214.50
202.60
229.00
2.60
14.50
1.55
0.32
0.08
0.02
0.05
0.01
0.03
0.02
Including
Including
294.00
303.50
502.60
507.00
549.80
321.00
306.50
517.00
511.40
557.70
27.00
3.00
14.40
4.40
7.90
0.43
1.01
1.50
3.41
0.40
0.02
0.03
0.06
0.13
0.03
0.01
0.02
0.04
0.08
0.01
0.01
0.01
0.15
0.06
0.05
JAG-DD-21-224 Jaguar West 476490 9283181 268 180 -55 204.85 4.00
11.00
30.00
61.00
11.00
17.00
35.00
72.50
7.00*
6.00
5.00
11.50
0.59
0.42
1.14
0.74
0.02
0.02
0.12
0.02
0.01
0.01
0.02
0.02
0.49
0.71
0.15
0.35
JAG-DD-21-225 Jaguar Northeast 478640 9282873 281 180 -55 250.25 210.00
221.30
218.50
224.00
8.50
2.70
0.56
0.70
0.11
0.18
0.03
0.04
0.21
0.17

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Table 1 (continued) – Jaguar Nickel Sulphide Project – Recent Results and Collar Locations.

Hole ID Deposit / Prospect Easting Northing mRL Azi Dip EOH Depth From (m) To (m) Interval (m) Ni % Cu % Co % Zn %
JAG-DD-21-226 Onça Preta 476940 9284965 261 180 -66 510.00 Assays Pending
JAG-DD-21-227 Jaguar Central 477180 9282787 281 0 -58 244.85 Assays Pending
JAG-DD-21-228 Jaguar West 476435 9283199 272 180 -55 100.25 Assays Pending
JAG-DD-21-229 Jaguar South 478347 9282372 425 180 -58 138.50 PQ Hole - Metalurgical Bulk Sample
JAG-DD-21-230 Onça Preta 476985 9284873 250 180 -65 371.05 Assays Pending
JAG-DD-21-231 Jaguar West 476525 9283184 265 180 -55 117.10 Assays Pending
JAG-DD-21-232 Jaguar Northeast 478710 9282783 296 180 -55 211.15 Assays Pending
JAG-DD-21-233 Jaguar South 478390 9282548 421 180 -65 TBD Drilling
JAG-DD-21-234 Jaguar South 478350 9282324 452 180 -55 159.00 Assays Pending
JAG-DD-21-235 Jaguar Central 477180 9283134 316 180 -61 12.00 Drill hole abandoned
JAG-DD-21-236 Jaguar Central 477180 9283124 316 180 -64 497.55 Assays Pending
JAG-DD-21-237 Jaguar South 478206 9282136 454 45 -55 250.55 Geotech Hole -Assays Pending
JAG-DD-21-238 Jaguar South 478018 9282645 325 225 -55 300.85 Geotech Hole -Assays Pending
JAG-DD-21-239 Jaguar Northeast 478710 9282726 313 180 -55 94.35 Assays Pending
JAG-DD-21-240 Jaguar South 478300 9282370 423 180 -61 258.90 Assays Pending
JAG-DD-21-241 Onça Preta 476985 9284917 251 180 -71 492.65 Assays Pending
JAG-DD-21-242 Jaguar Northeast 478485 9282672 382 0 -55 301.25 Assays Pending
JAG-DD-21-243 Jaguar Northeast 478390 9282647 400 0 -55 332.40 Assays Pending
JAG-DD-21-244 Jaguar Central 477139 9283125 320 225 -55 308.30 Geotech Hole - Drilling
JAG-DD-21-245 Jaguar South 478390 9282317 449 180 -55 137.10 Assays Pending
JAG-DD-21-246 Jaguar South 478028 9282387 342 135 -55 250.00 Geotech Hole -Assays Pending
JAG-DD-21-247 Onça Preta 476820 9284843 260 135 -55 150.00 Geotech Hole -Assays Pending
JAG-DD-21-248 Jaguar Northeast 478350 9282613 405 0 -55 362.80 Assays Pending
JAG-DD-21-249 Jaguar Northeast 478485 9282792 356 0 -55 TBD Drilling
JAG-DD-21-250 Jaguar Central 476923 9283149 294 135 -55 250.90 Geotech Hole -Assays Pending
JAG-DD-21-251 Jaguar South 478350 9282354 436 180 -61 TBD Drilling
JAG-DD-21-252 Onça Preta 476846 9284832 256 225 -55 TBD Geotech Hole - Drilling
JAG-DD-22-253 Jaguar Central 476908 9283070 322 180 -55 TBD Drilling
JAG-DD-22-254 Onça Preta 477035 9284961 260 180 -60 TBD Drilling

Table 2 – The Jaguar JORC Mineral Resource Estimate by Deposit – December 2021

Deposit
Classification
Mt
Ni %
Cu %
Coppm
Zn %
Ni
Cu
Co
Zn
Grade
Contained Metal
Indicated
Inferred
Total
Jaguar South
13.9
1.01
0.05
220
0.18
139,800
6,900
3,100
25,200

13.7
0.86
0.04
195
0.13
118,000
6,200
2,700
17,600
27.6
0.93
0.05
208
0.15
257,800
13,100
5,700
42,700
Indicated
Inferred
Total
Jaguar Central
10.2
0.92
0.06
262
0.51
94,000
6,100
2,700
52,300
1.9
0.79
0.05
244
0.27
15,100
1,000
500
5,200
12.1
0.90
0.06
259
0.48
109,100
7,100
3,100
57,500
Indicated
Inferred
Total
Jaguar North
2.2
1.09
0.14
352
1.32
24,000
3,100
800
29,000
1.0
1.16
0.29
360
1.09
11,400
2,900
400
10,700
3.2
1.12
0.19
354
1.25
35,400
6,000
1,100
39,700
Indicated
Inferred
Total
Jaguar Central North
7.7
0.63
0.03
188
0.65
48,500
2,600
1,400
50,200
4.3
0.64
0.04
184
0.53
27,500
1,600
800
22,800
12.0
0.63
0.04
186
0.61
76,000
4,200
2,200
73,000
Indicated
Inferred
Total
Jaguar Northeast
-
-
-
-
-
-
-
-
-
9.1
0.84
0.10
278
0.51
76,700
9,200
2,500
46,900
9.1
0.84
0.10
278
0.51
76,700
9,200
2,500
46,900
Indicated
Inferred
Total
Jaguar West
5.6
0.73
0.03
165
0.11
40,800
1,700
900
6,100
1.7
0.77
0.04
158
0.10
13,200
700
300
1,700
7.3
0.74
0.03
163
0.11
54,000
2,400
1,200
7,800
Indicated
Inferred
Total
Jaguar Deposits
39.5
0.88
0.05
224
0.41
347,100
20,400
8,900
162,800
31.8
0.82
0.07
223
0.33
262,000
21,600
7,100
104,900
71.4
0.85
0.06
224
0.38
609,100
42,000
16,000
267,700
Onça Preta
Indicated
Inferred
Total
3.0
1.43
0.10
711
0.50
42,900
2,900
2,100
15,100
2.2
1.64
0.08
548
0.44
35,900
1,800
1,200
9,600
5.2
1.52
0.09
642
0.48
78,800
4,700
3,300
24,700
Indicated
Onça Rosa
Inferred
Total
-
-
-
-
-
-
-
-
-
2.1
1.28
0.09
353
0.05
26,600
1,900
700
1,000
2.1
1.28
0.09
353
0.05
26,600
1,900
700
1,000
Indicated
Tigre
Inferred
Total
0.8
0.86
0.09
307
0.04
7,000
700
300
300
1.2
0.79
0.07
289
0.02
9,200
800
300
200
2.0
0.82
0.08
296
0.03
16,200
1,500
600
500
Indicated
Inferred
Total
Jaguar MRE
43.4
0.92
0.06
259
0.41
397,000
24,000
11,300
178,200
37.2
0.90
0.07
251
0.31
333,700
26,100
9,400
115,700
80.6
0.91
0.06
256
0.36
730,700
50,100
20,600
293,900
* Within pit limits cut-off grade 0.3% Ni; below pit limits cut-
waste and therefore not reported as Resources.
off grade 0.7% Ni; Totals are rounded to reflect acceptable precision, subtotals may not reflect global totals. All oxide material is considered as

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

& MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 8 – The Jaguar South Deposit with DHEM (darker blue) and FLEM (lighter blue) conductor plates overlaid on the Ground Magnetics Survey results (Analytic Signal).

==> picture [440 x 323] intentionally omitted <==

Figure 9 – The Jaguar West Deposit with DHEM (darker blue) and FLEM (lighter blue) conductor plates overlaid on the Ground Magnetics Survey results (Analytic Signal).

==> picture [433 x 312] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 10 – The Onça Preta Deposit with DHEM (darker blue) and FLEM (lighter blue) conductor plates overlaid on the Ground Magnetics Survey results (Analytic Signal) with the location of the cross-sections in Figures 2 and 3 shown.

==> picture [435 x 331] intentionally omitted <==

Figure 11 – Core photo from drill hole JAG-DD-21-233 (right); 443.0m to 449.8m down-hole: Disseminated, stringer to semi-massive sulphides (metallic bronze/yellow colour) with intense magnetite (black colour) mineralisation

==> picture [426 x 270] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Table 3 – Visual estimates of intersected mineralisation in drill hole JAG-DD-21-233.

Deposit Drill hole From(m) To(m) Interval Description of Sulphide Mineralisation*
Jagaur South
Jagaur South
Jagaur South
Jagaur South
Jagaur South
Jagaur South
Jagaur South
Jagaur South
JAG-DD-21-233
JAG-DD-21-233
JAG-DD-21-233
JAG-DD-21-233
JAG-DD-21-233
JAG-DD-21-233
JAG-DD-21-233
JAG-DD-21-233
245.9
342.8
395.4
406.2
422.0
427.4
443.0
455.3
274.7
345.5
399.1
408.2
425.7
428.4
449.8
456.7
28.8
2.70
3.70
2.00
3.75
1.05
6.80
1.45
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-10% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-10% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-10% sulphides comprising py, mlr, pn, sp,po
Stringer and semi-massive
5-20% sulphides comprising py, mlr, pn, sp, cp, po
Stringer and semi-massive
5-20% sulphides comprising py, mlr, pn, sp, cp, po
Stringer and semi-massive
20-30% sulphides comprising py, mlr, pn, sp, cp, po
Disseminated to Stringer
2-10% sulphides comprising py,mlr, pn,sp,po
Total down hole width of mineralisation:
50.2
m(including 11.6m of stringer to semi-massive)

*pyrite (py), milerite (mlr), pentalndite (pn), chalcopyrite (cp), pyrhotite (po), sphalerite (sp)

Figure 12 – Core photo from drill hole JAG-DD-21-226 (right); 447.0m to 463.0m down-hole: Disseminated, stringer to semi-massive sulphides (metallic bronze/yellow colour) with intense magnetite (black colour) mineralisation.

==> picture [355 x 503] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Table 4 – Visual estimates of intersected mineralisation in drill hole JAG-DD-21-226.

Deposit Drill hole From(m) To(m) Interval Description of Sulphide Mineralisation*
Onça Preta
Onça Preta
Onça Preta
Onça Preta
Onça Preta
Onça Preta
Onça Preta
Onça Preta
JAG-DD-21-226
JAG-DD-21-226
JAG-DD-21-226
JAG-DD-21-226
JAG-DD-21-226
JAG-DD-21-226
JAG-DD-21-226
JAG-DD-21-226
416.5
425.3
433.7
436.3
443.7
450.5
459.4
476.8
424.2
432.1
436.3
440.1
450.5
459.4
463.9
481.1
7.7
6.9
2.7
3.8
6.8
8.9
4.5
4.3
Disseminated to stringer
2-5% sulphides comprising py, pn, mlr
Stringer and semi-massive
20-30% sulphides comprising py, pn, mlr, cp, sp
Stringer and semi-massive
10-20% sulphides comprising py, pn, mlr, cp, sp
Stringer and semi-massive
20-30% sulphides comprising py, pn, mlr, cp, sp
Stringer and semi-massive
10-20% sulphides comprising py, pn, mlr, cp, sp
Disseminated to stringer
2-5% sulphides comprising py, pn, mlr
Stringer and semi-massive
20-30% sulphides comprising py, pn, mlr, cp, sp
Disseminated to stringer
2-5% sulphides comprising py, pn,mlr
Total down hole width of mineralisation:
45.5
m(including 24.6m of stringer to semi-massive)

*pyrite (py), milerite (mlr), pentalndite (pn), chalcopyrite (cp), pyrhotite (po), sphalerite (sp)

Figure 13 – Core photo from drill hole JAG-DD-21-241 (right); 435.4m to 463.0m down-hole: Disseminated, stringer to semi-massive sulphides (metallic bronze/yellow colour) with intense magnetite (black colour) mineralisation.

==> picture [392 x 451] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 13 (continued) – Core photo from drill hole JAG-DD-21-241 (right); 447.5m to 468.5m down-hole: Disseminated, stringer to semimassive sulphides (metallic bronze/yellow colour) with intense magnetite (black colour) mineralisation.

==> picture [394 x 550] intentionally omitted <==

Table 5 – Visual estimates of intersected mineralisation in drill hole JAG-DD-21-241.

Deposit Drill hole From(m) To(m) Interval Description of Sulphide Mineralisation*
Onça Preta
Onça Preta
Onça Preta
Onça Preta
Onça Preta
Onça Preta
JAG-DD-21-241
JAG-DD-21-241
JAG-DD-21-241
JAG-DD-21-241
JAG-DD-21-241
JAG-DD-21-241
395.4
397.4
425.0
435.0
441.2
441.8
397.4
425.0
432.3
441.2
441.8
465.9
2.0
27.7
7.3
6.3
0.6
24.1
Stringer and semi-massive
10-20% sulphides comprising py, pn, mlr, cp, sp
Disseminated to stringer
2-5% sulphides comprising py, pn, mlr
Stringer and semi-massive
10-20% sulphides comprising py, pn, mlr, cp, sp
Stringer and semi-massive
10-20% sulphides comprising py, pn, mlr, cp, sp
Stringer and semi-massive
20-30% sulphides comprising py, pn, mlr, cp, sp
Stringer and semi-massive
10-20% sulphides comprising py, pn, mlr, cp, sp
Total down hole width of mineralisation:
67.8
m(including 40.2m of stringer to semi-massive)

*pyrite (py), milerite (mlr), pentalndite (pn), chalcopyrite (cp), pyrhotite (po), sphalerite (sp)

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

APPENDIX A – Compliance Statements for the Jaguar Project

The following Tables are provided for compliance with the JORC Code (2012 Edition) requirements for the reporting of Exploration Results and Mineral Resources at the Jaguar Project.

SECTION 1 - SAMPLING TECHNIQUES AND DATA

(Criteria in this section apply to all succeeding sections).

Criteria Commentary
Sampling techniques
Historical soil sampling was completed by Vale. Samples were taken at 50m intervals along 200m
spaced north-south grid lines.

Surface material was first removed, and sample holes were dug to roughly 20cm depth. A 5kg
sample was taken from the subsoil. The sample was placed in a plastic sample bag with a sample
tag before being sent to the lab.

Surface rock chip/soil samples were collected from in situ outcrops and rolled boulders and
submitted for chemical analysis.

The historical drilling is all diamond drilling. Drill sections are spaced 100m apart and generally there
is 50 to 100m spacing between drill holes on sections.

Core was cut and ¼ core sampled and sent to commercial laboratories for physical preparation and
chemical assay.

At the laboratories, samples were dried (up to 105°C), crushed to 95% less than 4mm,
homogenized, split and pulverized to 0.105mm. A pulverized aliquot was separated for analytical
procedure.

Sample length along core varies between 0.3 to 4.0m, with an average of 1.48m; sampling was done
according to lithological contacts and generally by 1m intervals within the alteration zones and 2m
intervals along waste rock.

Current drilling is being completed on spacing of 100m x 50m or 50m x 50m. Sample length along
core varies between 0.5 to 1.5m

Core is cut and ¼ core sampled and sent to accredited independent laboratory (ALS).

For metallurgical test work continuous downhole composites are selected to represent the
metallurgical domain and ¼ core is sampled and sent to ALS Metallurgy, Balcatta, Perth.

Samples from RC drilling are split to make 3-5kg samples. The sample is placed in a plastic sample
bagwith a sample tagbefore beingsent to the laboratory.
Drilling techniques
Historical drilling was carried out between 2006 to 2010 by multiple drilling companies (Rede and
Geosol), using wire-line hydraulic diamond rigs, drilling NQ and HQ core.

Vale drilled 169 drill holes for a total of 56,592m of drilling in the resource area. All drill holes were
drilled at 55⁰-60⁰ towards either 180⁰ or 360⁰. The resource considers 49 drill holes completed by
Centaurus for a total of 17,941m of drilling. All drill holes were drilled at 55⁰-75⁰ towards either
180⁰ or 360⁰.

Current drilling is a combination of HQ and NQ core (Servdrill).

The current RC drilling is completed by Geosenda Sondagem using a face sampling hammer (4.5”).
Sample is collected from the sample cyclone in large plastic sample bags. Samples are then split
either by riffle splitters or manually (fish bone method) where there is high moisture content.

All RC holes were sampled on 1m intervals. Sample size, sample recovery estimate and conditions
were recorded.
Drill sample recovery
Diamond Drilling recovery rates are being calculated at each drilling run.

For all diamond drilling, core recoveries were logged and recorded in the database for all historical
and current diamond holes. To date overall recoveries are >98% and there are no core loss issues
or significant sample recovery problems.

To ensure adequate sample recovery and representativity a Centaurus geologist or field technician
is present during drilling and monitors the sampling process.

No relationship between sample recovery and grade has been demonstrated. No bias to material
size has been demonstrated.

RC sample weights are taken for all samples and a recovery estimate are made where the sample
is not wet. Where the sample is wet a visual estimate of the sample recovery is made. The estimated
recovery is approximately 90%, which is considered acceptable for the deposit type.

To ensure the representative nature of the sample, the cyclone and sample hoses are cleaned after
each metre of drilling, the rig has two cyclones to facilitate the process. Additionally, extra care is
taken when drilling through the water table or other zones of difficult ground conditions.

Noquantitative twinned drillinganalysis has been undertaken at theproject to date.
Logging
Historical outcrop and soil sample points were registered and logged in the Vale geological mapping
point database.

All drill holes have been logged geologically and geotechnically by Vale or Centaurus geologists.

Drill samples are logged for lithology, weathering, structure, mineralisation and alteration among
other features. Loggingis carried out to industrystandard and is audited byCentaurus CP.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary

Logging for drilling is qualitative and quantitative in nature.

All historical and new diamond core has been photographed.

Geologists complete a visual log of the RC samples on 1m intervals at the time of drilling. Logging
captures colour, rock-type, mineralogy, alteration and mineralisation style. Logging is both
qualitative and quantitative.

Chiptrays have been collected, photographed and stored for all drill holes to-date.
Sub-sampling techniques and
sample preparation

Diamond Core (HQ/NQ) was cut using a core saw, ¼ core was sampled. Sample length along core
varies between 0.3 to 4.0m, with an average of 1.48m; sampling was done according to lithological
contacts and generally by 1m intervals within the alteration zones and 2m intervals along the waste
rock.

There is no non-core sample within the historical drill database.

For RC sampling 1m samples are taken from the cyclone and then split by rifle splitter (if dry) or
manually (if wet) using the fish-bone technique. Sample weight is between 3-5kg.

QAQC: Standards (multiple standards are used on a rotating basis) are inserted every 20 samples.
Blanks have been inserted every 20 samples. Field duplicates are completed every 30 samples.
Additionally, there are laboratory standards and duplicates that have been inserted.

Centaurus has adopted the same sampling QAQC procedures which are in line with industry
standards and Centaurus’s current operating procedures.

Sample sizes are appropriate for the nature of the mineralisation.

All historical geological samples were received and prepared by SGS Geosol or ALS Laboratories as
0.5-5.0kg samples. They were dried at 105°C until the sample was completely dry (6-12hrs), crushed
to 90% passing 4mm and reduced to 400g. The samples were pulverised to 95% passing 150µm and
split further to 50g aliquots for chemical analysis.

New samples are being sent to ALS Laboratories. The samples are dried, crushed and pulverised to
85% passing 75µm and split further to 250g aliquots for chemical analysis.

During the preparation process grain size control was completed by the laboratories (1 per 20
samples).

Metallurgical samples are crushed to 3.35mm and homogenised. Samples are then split to 1kg sub-
samples. Sub-samples areground to specific sizes fractions(53-106µm)for flotation testwork.
Quality of assay data and
laboratory tests

Chemical analysis for drill core and soil samples was completed by multi element using Inductively
Coupled Plasma ICPAES (multi-acid digestion); ore grade analysis was completed with Atomic
Absorption (multi-acid digestion); sulphur analysis was completed with Leco, and Au and PGEs
completed via Fire Assay.

New samples are being analysed for 48 elements by multi element using ME-MS61 (multi-acid
digestion) at ALS Laboratories; ore grade analysis was completed with ICP-AES (multi-acid
digestion); sulphur analysis was completed with Leco, and Au and PGEs completed via Fire Assay.

ALS Laboratories insert their own standards at set frequencies and monitor the precision of the
analysis. The results reported are well within the specified standard deviations of the mean grades
for the main elements. Additionally, ALS perform repeat analyses of sample pulps at a rate of 1:20
(5% of all samples). These compare very closely with the original analysis for all elements.

Vale inserted standard samples every 20 samples (representing 5%). Mean grades of the standard
samples are well within the specified 2 standard deviations.

All laboratory procedures are in line with industry standards. Analysis of field duplicates and lab
pulp duplicates have returned an average correlation coefficient of over 0.98 confirming that the
precision of the samples is within acceptable limits.

Vale QAQC procedures and results are to industry standard and are of acceptable quality.

All metallurgical chemical analysis is completed byALS laboratories
Verification of sampling and
assaying

All historical samples were collected by Vale field geologists. All assay results were verified by
alternative Vale personnel. The Centaurus CP has verified the historical significant intersections.

Centaurus Exploration Manager and Senior Geologist verify all new results and visually confirm
significant intersections.

No twin holes have been completed.

All primary data is now stored in the Centaurus Exploration office in Brazil. All new data is collected
on Excel Spreadsheet, validated and then sent to independent database administrator (MRG) for
storage (DataShed).

No adjustments have been made to the assaydata.
Location of data points
All historical collars were picked up using DGPS or Total Station units. Centaurus has checked
multiple collars in the field and has confirmed their location. All field sample and mapping points
were collected using a Garmin handheld GPS.

An aerial survey was completed by Esteio Topografia and has produced a detailed surface DTM at
(1:1000 scale).

The survey grid system used is SAD-69 22S. This is in line with Brazilian Mines Department
requirements.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary

New drill holes are sighted with handheld GPS and after completion picked-up by an independent
survey consultant periodically. Downhole survey for all the historical drill holes and Centaurus hole
up to JAG-DD-19-012 used Maxibor equipment. All new drill holes are being downhole surveyed
usingReflex digital down-hole tool,with readings everymetre.
Data spacing and
distribution

Soil samples were collected on 40m spacing on section with distance between sections of 200m
and 400m depending on location.

Sample spacing was deemed appropriate for geochemical studies.

The historical drilling is all diamond drilling. Drill sections are spaced 100m apart and generally there
is 50 to 100m spacing between drill holes on sections. Centaurus is in the process of closing the drill
spacing to 100m x 50m or 50m x 50m.

No sample compositing was applied to the drilling.

Metallurgical samples to date have been taken from Jaguar South, Jaguar Central, Jaguar North and
Onça Preta.
Orientation of data in
relation to geological
structure

Historical drilling was oriented at 55⁰-60⁰ to either 180⁰ or 360⁰. This orientation is generally
perpendicular to the main geological sequence along which broad scale mineralisation exists.

Mineralisation is sub-vertical; the majority of the drilling is at low angle (55-60⁰) in order to achieve
intersections at the most optimal angle.
Sample security
All historical and current samples are placed in pre-numbered plastic sample bags and then a
sample ticket was placed within the bag as a check. Bags are sealed and then transported by courier
to the ALS laboratories in Vespasiano, MG.

All remnant Vale diamond core has now been relocated to the Company’s own core storage facility
in Tucumã,PA.
Audits or reviews
The Company is not aware of any audit or review that has been conducted on the project to date.

SECTION 2 - REPORTING OF EXPLORATION RESULTS

(Criteria listed in the preceding Section also apply to this section).

Criteria Commentary
Mineral tenement and land
tenure status

The Jaguar project includes one exploration licence (856392/1996) for a total of circa 30km2. A
Mining Lease Application has been lodged that allows for ongoing exploration and project
development ahead of project implementation.

The tenement is part of a Sale & Purchase Agreement (SPA) with Vale SA. Two deferred consideration
payments totalling US$6.75M (US$1.75 million on commencement of BFS or 3 years and US$5
million on commencement of commercial production) and a production royalty of 0.75% are to
follow. Centaurus has taken on the original obligation of Vale to BNDES for 1.8% Net Operating
Revenue royalty.

Mining projects in Brazil are subject to a CFEM royalty, a government royalty of 2% on base metal
revenue.

Landowner royalty is 50% of the CFEM royalty.

Centaurus has secured possession rights to three properties over the Jaguar Project. The
agreements remove exposure to the landowner royalty over the properties secured.

The project is covered by a mix of cleared farmland and natural vegetation.

The project is not located within any environmental protection zones and exploration and mining is
permitted with appropriate environmental licences.
Exploration done by other
parties

Historically the Jaguar Project was explored for nickel sulphides by Vale from 2005 to 2010.
Geology
Jaguar Nickel Sulphide is a hydrothermal nickel sulphide deposit located near Tucumã in the Carajás
Mineral Province of Brazil.

Jaguar is located at the intersection of the WSW-trending Canaã Fault and the ENE-trending
McCandless Fault, immediately south of the NeoArchean Puma Layered Mafic-Ultramafic Complex.

Iron rich fluids were drawn up the mylonite zone causing alteration of the host felsic volcanic and
granite units and generating hydrothermal mineral assemblage. Late-stage brittle-ductile conditions
triggered renewed hydrothermal fluid ingress and resulted in local formation of high-grade nickel
sulphide zones within the mylonite and as tabular bodies within thegranite.
Drill hole Information
Refer Table 1-5 as well as Figures 1-13

Refer to previous ASX Announcements for significant intersections from Centaurus drilling.

Refer to ASX Announcement of 6 August 2019 for all significant intersections from historical drilling.
Data aggregation methods
Continuous sample intervals are calculated via weighted average using a 0.3 % Ni cut-off grade with
2m minimum intercept width.

There are no metal equivalents reported.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary
Relationship between
mineralisation widths and
intercept lengths

Mineralisation is sub-vertical; the majority of the drilling is at low angle (55-60⁰) in order to achieve
intersections at the most optimal angle.

The historical drilling results in ASX Announcement 6 August 2019 reflect individual down hole
sample intervals and no mineralised widths were assumed or stated.
Diagrams
Refer to Figures 1 to 13 of this announcement.

Refer to previous ASX Announcements for maps and sections from Centaurus drilling included in the
resource estimate.
Balanced reporting
All exploration results received by the Company to date are included in this or previous releases to
the ASX.

For the current resource, a revised 0.3% Ni cut-off grade has been applied to material less than 200m
vertical depth from surface in the estimation of the Global MRE with this being consistent with
mineralisation domain modellingand reported significant intersection cut-offgrades.
Other substantive
exploration data

The Company has received geophysical data from Vale that is being processed by an independent
consultant Southern Geoscience. Refer to ASX Announcements for geophysical information.
Further work
Electro-magnetic (EM) geophysical surveys (DHEM and FLEM) are ongoing.

In-fill and extensional drilling within the known deposits to test the continuity of high-grade zones is
ongoing. Resource samples are continuously being sent in batches of 150-300 samples and will be
reported once the batches are completed.

Metallurgical testwork is ongoing.

Geotechnical and hydrological studies for the proposed tailings facility and waste deposits have
started.

SECTION 3 - ESTIMATION AND REPORTING OF MINERAL RESOURCES

(Criteria listed in Section 1, and where relevant in Section 2, also apply to this Section.)

Criteria Commentary
Database integrity
The drilling database was originally held by Vale and received from them as csv exports.

The drilling data have been imported into a relational SQL server database using DatashedTM
(Industry standard drill hole database management software) by Mitchell River Group.

All of the available drilling data has been imported into 3D mining and modelling software packages
(SurpacTMand LeapfrogTM), which allow visual interrogation of the data integrity and continuity.
All of the resource interpretations have been carried out using these software packages. During
the interpretation process it is possible to highlight drilling data that does not conform to the
geological interpretation for further validation.

Data validation checks were completed on import to the SQL database.

Data validation has been carried out by visually checking the positions and orientations of drill
holes.
Site visits
The Competent Person responsible for Sampling Techniques and Data and Exploration Results, Mr
Roger Fitzhardinge, has visited the site multiple times and overseen exploration activity and
assumes responsibility for the sampling and data management procedures.

No visits to the Jaguar site have been undertaken by the Competent Person responsible for the
Mineral Resource Estimate(MRE),Mr Lauritz Barnes,due to travel restrictions(COVID-19).
Geological interpretation
Sufficient drilling has been conducted to reasonably interpret the geology and the mineralisation.
The mineralisation is traceable between multiple drill holes and drill sections.

Interpretation of the deposit was based on the current understanding of the deposit geology.
Centaurus field geologist supplied an interpretation that was validated and revised by the
independent resource geologist.

Drill hole data, including assays, geological logging, structural logging, lithochemistry, core photos
and geophysics have been used to guide the geological interpretation.

Extrapolation of mineralisation beyond the deepest drilling has been assumed up to a maximum of
100m where the mineralisation is open.

Alternative interpretations could materially impact on the Mineral Resource estimate on a local,
but not global basis. No alternative interpretations were adopted at this stage of the project.

Geological logging in conjunction with assays has been used to interpret the mineralisation. The
interpretation honoured modelled fault planes and interpretation of the main geological
structures.

Mineralisation at Jaguar occurs as veins and breccia bodies set in extensively altered and sheared
host rocks. Continuity of the alteration and sulphide mineralisation zones is good, continuity of
local zones of semi-massive to massive sulphide is not always apparent.

Mineralisation at the Onça Preta and Onça Rosa deposits plus the Tigre deposit predominantly
forms tabular semi-continuous to continuous bodies both alongstrike and down dip.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary

Post-mineralisation faulting may offset mineralisation at a smaller scale than that which can be
reliably modelled using the current drill hole data.
Dimensions
Jaguar South (primary mineralisation) covers an area of 1,250m strike length by 400m wide by
530m deep in strike length trending ESE-WNW. Individual domains dip sub-vertically with widths
ranging from a few metres up to 20-30m thick.

Jaguar Central (primary mineralisation) covers an area of 800m strike length by 250m wide by 420m
deep trending ESE-WNW. Individual domains dip sub-vertically with widths up to 20-30m.

Jaguar North (primary mineralisation) has a strike length of 600m by up to 25m wide by 300m deep,
trending SE-NW.

Jaguar Central North (primary mineralisation) covers an area of 720m strike length by 100m wide
by 500m deep, trending E-W. Individual domains dip sub-vertically with widths up to 20-30m.

Jaguar Northeast (primary mineralisation) covers an area of 1,200m strike length by 300m wide by
500m deep, trending ESE-WNW. Individual domains dip sub-vertically with widths up to 10-15m.

Jaguar West (primary mineralisation) has a strike length of 1,000m by up to 80m wide by 350m
deep, trending E-W. Individual domains dip sub-vertically with widths up to 10m.

Leao East (primary mineralisation) has a strike length of 275m by up to 10m wide by 130m deep,
trending ESE-WNW.

Onça Preta (primary mineralisation) has a strike length of 400m by up to 15m wide by 375m deep,
trending E-W.

Onça Rosa (primary mineralisation) has a strike length of 500m by up to 10m wide by 250m deep,
trending ESE-WNW

Tigre (primary mineralisation) has a strike length of 500m by up to 10m wide by 250m deep,
trendingESE-WNW.
Estimation and modelling
techniques

Grade estimation using Ordinary Kriging (OK) was completed using Geovia Surpac™ software for
Ni, Cu, Co, Fe, Mg, Zn and As.

Drill hole samples were flagged with wire framed domain codes. Sample data were composited to
1m using a using fixed length option and a low percentage inclusion threshold to include all
samples. Most samples (80%) are around 1m intervals in the raw assay data.

Top-cuts were decided by completing an outlier analysis using a combination of methods including
grade histograms, log probability plots and other statistical tools. Based on this statistical analysis
of the data population, no top-cuts were applied.

Directional variograms were modelled by domain using traditional variograms. Nugget values are
low to moderate (around 15-25%) and structure ranges up to 200 in the primary zones. Variograms
for domains with lesser numbers of samples were poorly formed and hence variography was
applied from the higher sampled domains.

Block model was constructed with parent blocks for 10m (E) by 2m (N) by 10m (RL). All estimation
was completed to the parent cell size.

Three estimation passes were used. The first pass had a limit of 75m, the second pass 150m and
the third pass searching a large distance to fill the blocks within the wire framed zones. Each pass
used a maximum of 12 samples, a minimum of 6 samples and maximum per hole of 4 samples.

Search ellipse sizes were based primarily on a combination of the variography and the trends of
the wire framed mineralized zones. Hard boundaries were applied between all estimation domains.

Validation of the block model included a volumetric comparison of the resource wireframes to the
block model volumes. Validation of the grade estimate included comparison of block model grades
to the declustered input composite grades plus swath plot comparison by easting and elevation.
Visual comparisons of input compositegrades vs. block modelgrades were also completed.
Moisture
The tonnages were estimated on an in-situ dry bulk density basis which includes natural moisture.
Moisture content was not estimated but is assumed to be low as the core is not visibly porous.
Cut-off parameters
Potential mining methods include a combination of open pit and underground. The new Jaguar
MRE has been reported within a pit shell using modifying factors determined in the Jaguar Value-
Add Scoping Study and metal prices of US$20,000/t Ni, US$44,000/t Co and US$2,900/t Zn. Within
the pit, a 0.3% Ni cut-off grade has been maintained. A higher grade 0.7% Ni cut-off grade has been
used for resources below the pit shell reflective of the cut-off grade that was determined for the
underground operations developed in the Scoping Study.
Mining factors or
assumptions

It is assumed that the Jaguar deposits will be mined by a combination of open pit and underground
mining methods.

Conceptual pit optimisation studies have been completed by Entech to ensure that there are
reasonable prospects for the eventual economic extraction of the mineralisation by these
methods.

Input parameters were benchmarked from similar base-metal operations in Brazil and Australia.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary
Metallurgical factors or
assumptions

Metallurgical test work has been undertaken on multiple composite samples sourced from the
Jaguar South, Jaguar Central, Jaguar West, Jaguar North, Jaguar Central North, Onça Rosa and Onça
Preta deposits. Material selection for test work was focused on providing a good spatial
representation of mineralisation for the deposits to date. Bench scale test work to date has
demonstrated that a conventional crushing, grinding and flotation circuit will produce concentrate
grades (10-15% Ni) and nickel sulphide recoveries (+95%)).

Pressure leach testing has identified that 97-98% nickel extraction from concentrate into solution
is reproducible. Metallurgical test work remains ongoing.

See ASX Announcements of 18 February 2020, 17 March 2020, 31 March 2020 and 8 December
2021 for metallurgical test results
Environmental factors or
assumptions

Tailings analysis and acid drainages tests have been completed which underpin the preliminary
tailing storage facility design (TSF), which is in progress.

Waste rock will be stockpiled into waste dumps adjacent to the mining operation.

The TSF and waste dumps will include containment requirements for the management of
contaminated waters and sediment generation in line with Brazilian environmental regulations.
Bulk density
On the new drilling, bulk densities were determined on 15 to 30 cm drill core pieces every 1m in
ore and every 10m in waste. On the historical drilling the bulk densities were determined on drill
core at each sample submitted for chemical analysis.

Bulk density determinations adopted the weight in air /weight in water method using a suspended
or hanging scale.

The mineralized material is not significantly porous, nor is the waste rock.

A total of 43,571 bulk density measurements have been completed.

Of these, 4,040 were included in the analysis and are within the defined mineralised domains – and
4,031 are from fresh or transitional material leaving only 9 measurements from saprolite or oxide
material.

Oxide and saprolite material are excluded from the reported resource.

Fresh and transitional measurements from within the mineralised domains we analysed
statistically by domain and depth from surface and compared to Ni, Fe and S. A reasonable
correlation was defined against Fe due to the magnetite in the system.

The bulk density values assigned the mineralised domains by oxidation were as follows:

Oxide: 2.0

Saprolite: 2.3

Transition: 2.6

Fresh: by regression against estimated Fe using: BD = (fe_ok*(0.0323)) + 2.6276

Work is in progress to further refine the relationships between bulk density and mineralised
domains, and updates will be applied to the next iteration of the resource model.
Classification
The Mineral Resource has been classified on the basis of confidence in the geological model,
continuity of mineralised zones, drilling density, confidence in the underlying database, a
combination of search volume and number of data used for the estimation plus availability of bulk
density information.

Indicated Mineral Resources are defined nominally on 50mE x 40mN spaced drilling and Inferred
Mineral Resources nominally 100mE x 100mN with consideration given for the confidence of the
continuity of geology and mineralisation.

Oxide and saprolite material are excluded from the Mineral Resource.

The Jaguar Mineral Resource in part has been classified as Indicated with the remainder as Inferred
according to JORC 2012.
Audits or reviews
This is the third Mineral Resource estimate completed by the Company. The current model was
reviewed by Entech as part of the MREEE assessment.
Discussion of relative
accuracy/ confidence

The relative accuracy of the Mineral Resource estimate is reflected in the reporting of the Mineral
Resource as per the guidelines of the 2012 JORC Code.

The statement relates to global estimates of tonnes and grade.